application of fvcom to the gulf of maine/georges bank:

30
Application of FVCOM to the Gulf of Maine/Georges Bank: Simulated and Assimilated Modeling Studies of Stratification and Sub-tidal Circulation Chen, C, H. Liu, R. C. Beardsley, G. Cowles, J. Pringle, R. Schlitz and B. Rothschild

Upload: melva

Post on 14-Jan-2016

30 views

Category:

Documents


5 download

DESCRIPTION

Application of FVCOM to the Gulf of Maine/Georges Bank:. Simulated and Assimilated Modeling Studies of Stratification and Sub-tidal Circulation. Chen, C, H. Liu, R. C. Beardsley, G. Cowles, J. Pringle, R. Schlitz and B. Rothschild. Meteorological forcing. GOM/GB MM5. Boundary forcings. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Application of FVCOM to the Gulf of Maine/Georges Bank:

Application of FVCOM to the Gulf of Maine/Georges Bank:

Simulated and Assimilated Modeling Studies of Stratification and Sub-tidal Circulation

Chen, C, H. Liu, R. C. Beardsley, G. Cowles, J. Pringle, R. Schlitz and B. Rothschild

Page 2: Application of FVCOM to the Gulf of Maine/Georges Bank:

The FVCOM GOM/GB

Physical Model

Wind stress, heat flux

GOM/GB MM5

• Real-time tidal forcing

• River discharges

• Scotian shelf water input

• North Atlantic open boundary condition ??

• SST

• Hydrographic survey CTD

• ADCP

• Moored current meter data

• CODAR??

Assimilation Boundary forcings

Meteorological forcing

Page 3: Application of FVCOM to the Gulf of Maine/Georges Bank:

: H, , , D, s, , q2, q2l, Am, Kh I : u, v,

The Finite-Volume Coastal Ocean Model (FVCOM)

6 ADCPs 3-6, 1999

NECE

Page 4: Application of FVCOM to the Gulf of Maine/Georges Bank:

The 1995 and 1999 Experiments

1. Run the model with tidal forcing only from December 1-15;

2. Re-start the model on December 15 with the initial condition of T and S given by December climatologic hydrographic field;

3. Add real-time wind stress, heat flux, river discharge, etc on January 1

Simulating

Assimilating: SST, Current

Re-start with the assimilated field

January February

Page 5: Application of FVCOM to the Gulf of Maine/Georges Bank:

Observed Calculated CalculatedObserved

M2

N2

S2

Page 6: Application of FVCOM to the Gulf of Maine/Georges Bank:

Observed ObservedCalculated Calculated

K1

O1

Page 7: Application of FVCOM to the Gulf of Maine/Georges Bank:
Page 8: Application of FVCOM to the Gulf of Maine/Georges Bank:

The 1995 Simulation and Assimilation

Page 9: Application of FVCOM to the Gulf of Maine/Georges Bank:

Jan

Feb

March

Observed Simulated Assimilated

Page 10: Application of FVCOM to the Gulf of Maine/Georges Bank:

SimulatedObserved Assimilated

April

May

June

Page 11: Application of FVCOM to the Gulf of Maine/Georges Bank:

Observed Simulated Assimilated

July

Aug

Sept

Page 12: Application of FVCOM to the Gulf of Maine/Georges Bank:

Observed Simulated Assimilated

Oct

Nov

Dec

Page 13: Application of FVCOM to the Gulf of Maine/Georges Bank:
Page 14: Application of FVCOM to the Gulf of Maine/Georges Bank:
Page 15: Application of FVCOM to the Gulf of Maine/Georges Bank:
Page 16: Application of FVCOM to the Gulf of Maine/Georges Bank:
Page 17: Application of FVCOM to the Gulf of Maine/Georges Bank:
Page 18: Application of FVCOM to the Gulf of Maine/Georges Bank:
Page 19: Application of FVCOM to the Gulf of Maine/Georges Bank:
Page 20: Application of FVCOM to the Gulf of Maine/Georges Bank:

23 m

99 m

191 m

Site: NECE

Page 21: Application of FVCOM to the Gulf of Maine/Georges Bank:

Site: NECE

23 m

99 m

191 m

Page 22: Application of FVCOM to the Gulf of Maine/Georges Bank:

February 1995

Page 23: Application of FVCOM to the Gulf of Maine/Georges Bank:

July 1995

Page 24: Application of FVCOM to the Gulf of Maine/Georges Bank:

The 1999 Summer Simulation and Assimilation

Page 25: Application of FVCOM to the Gulf of Maine/Georges Bank:

Observed Simulated Assimilated

Page 26: Application of FVCOM to the Gulf of Maine/Georges Bank:

Times (day) May 1999

Observed Simulated Assimilated

Page 27: Application of FVCOM to the Gulf of Maine/Georges Bank:

Ob

serv

edS

imu

late

dA

ssim

ilat

ion

Site2 Site4 Site6

Page 28: Application of FVCOM to the Gulf of Maine/Georges Bank:

Comparison between observed and simulated currents at an ADCP site

May 1999

Page 29: Application of FVCOM to the Gulf of Maine/Georges Bank:

May 1999Simulated subtidal surface water temperature and currents

Page 30: Application of FVCOM to the Gulf of Maine/Georges Bank:

Summary

1. Both simulation and assimilation clearly show that the seasonal variation of clockwise subtidal gyre on GB and also cyclonic circulation around the Jordon basin. The cyclonic circulation forming around the Jordon basin could cause a significant on-bank water transport to GB during summer.

2. Good agreement between model-predicted and observed currents was found on the southern flank of GB, but not in the Northeast Channel (NEC). This suggests that the subtidal circulation on GB is mainly controlled by local forcing, while the currents in the eastern GOM/GB are strongly influenced by water input from the Scotian Shelf.

3. Nudging assimilation is used to merge the model-computed and observed currents in the NEC. This approach produces a more realistic pattern of subtidal currents and on-bank transport on the northeastern flank of GB.