IEA HPT Annex48 Expert Meeting of Japan

Application of Heat Pumps to

Cutting and Washing Processes

Choyu WATANABE

Chubu Electric Power Co., Inc.

Yohji UCHIYAMA

University of Tsukuba

2

Page 3: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Industry Automobile parts production

Site Gamagoori Plant, AISIN AW Co., Ltd.

Aichi Prefecture, Japan

Processes Cutting, washing

Purpose Reduction of boiler steam (fuel: crude oil)

System Waste heat recovery heat pumps

with heating capacity 22 kW (6 units)

Air-source heat pumps

with heating capacity 44 kW(8 units)

Overview

3

The amount of industrial shipment of Aichi occupy approximately 15% of Japan.

Page 4: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Conventional system

Washing liquid

60 oC

Input energy (Gas) 1

Boiler

Heating energy

0.2

Total thermal

Efficiency =

0.2

Chiller

Cutting liquid

20 oC

Input energy

(Electric power)

1Cooling energy

2

Cooling

COP

= 2

4

Page 5: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Boiler roomGround plan of the factory

East wing

West wingCutting machines

Washing machines

Steam is supplied from the boiler

to the 300 m away washing machines. Large heat loss was caused.

5

Page 6: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Cutting liquid

20 oC

Washing liquid

60 oC

Heating

energy

3Coolingenergy

2

Input energy

(Electric power) 1 Compressor

Expansion

valve

Evaporator Condenser

Application of heat pumps to cutting and washing processes

6

Page 7: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Cutting liquid

20 oC

Washing liquid

60 oC

Heating

energy

3Coolingenergy

2

Input energy

(Electric power) 1 Compressor

Expansion

valve

Evaporator Condenser

Application of heat pumps to cutting and washing processes

7

Total COP = 5

Simultaneous

cooling and heating

Page 8: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

There were no heat pumps which were able to applied

to both cutting and washing processes in 2007.

Events until completion of the development

of the heat pumps

Cooperative development of heat pumps

by Zeneral Heat Pump Industry Co., Ltd.

and Chubu Electric Power Co., Inc. in 2008 to 2009.

Field tests of heat pumps

by AISIN AW Co., Ltd.,

Zeneral Heat Pump Industry Co., Ltd.

and Chubu Electric Power Co., Inc. in 2008 to 2009.8

Page 9: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

1. Highly efficient hot water circulation heating (60-65oC)

2. Countermeasure against contamination of air-refrigerant heat exchangers with oil mist and dust

3. Countermeasure against unbalance between heating and cooling demands

Standard equipment of oil mist filters

Selection of the best refrigerant

Development of heat pumps was carried out.

Technical issues

9

Page 10: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Simultaneous heating & cooling operation

mode

Heating

operation

mode

Cooling

operation

mode

Switching three

operation modes

Countermeasure against unbalance between heating and cooling demands

10

Page 11: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Simultaneous heating & cooling operation mode

Heat exchanger between water and

refrigerant

CompressorCoolingenergy

2

Heating

energy

3

Heat exchanger between water and refrigerant

Input energy

(Electric power) 1

11

Page 12: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Heat exchanger between air and

refrigerant

Heating operation

mode

Heating

energy

3

Input energy

(Electric power) 1

Heat exchanger between water and refrigerant

Compressor

12

Page 13: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Cooling

operation

mode

Heat exchanger between water and

refrigerant

Coolingenergy

5

Input energy

(Electric power) 1

Compressor

13

Page 14: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Boiler room

East wing

West wingCutting

machines

Washing machines

The heat pump has been installed here for field tests

Ground plan of the factory

14

Page 15: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

65 oC

62 oC

63 oC

温水

Washing liquid

Installation of the heat pump

Cutting liquid bath Washing liquid bathHeat Pump

Heat exchangers

One washing liquid bathSix cutting liquid baths Heat pump

Plate type heatexchanger

10 oC

15 oC

Hot water

Cold water

15

63 oC

68 oC

Page 16: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Field test results (temperatures)

洗浄液温度切削液温度施盤本体温度

Tem

per

atu

re(o

C)

0

10

20

30

40

50

60

70

8:00 10:00 12:00 14:00 16:00 18:00

Temperature of washing liquid ≒ 62 oC

Temperature of cutting liquid≒ Temperature of cutting machine

16

Page 17: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

The developed heat pump can cope with a variation in unbalance of heating and cooling demands.

Cooling demandHeating demand

Heating &Cooling

Heating

Cooling

Time (min.)

0 10 20 30 40 50 60 70 80 90 1000

5

10

15

20

25

30

35

40

Therm

al dem

and (

kW

)

Field test results (heat demands and operation modes)

17

Operationmodes

Page 18: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Before application of heat pumps

After application of heat pumps

Reduction achieved

Power consumption(MWh/ year)

193 (100%) <Boiler auxiliary equipment, Cooler>

570 (295%)<Heat pump>

+377 (+195%)

Fuel oil consumption(Kilo Litters/ year)

470 (100%)<Boiler fuel oil>

0 (0%)<Heat pump>

-470 (-100%)

Water consumption(KL/ year)

6,953 (100%)<Steam>

0 (0%)<Heat pump>

-6,953 (-100%)

Energy saving(Fuel oil equivalent, KL/year)

522 (100%) < Boiler, Cooler>

85 (16%)<Heat pump>

-437 (-84%)

CO2 emissions(Tons of CO2/ year)

1,364 (100%) <Boiler, Cooler>

270 (20%)<Heat pump>

-1,094 (-80%)

Effects of application of heat pumps (Energy)

18

Page 19: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Initial equipment investment cost: 91,000,000 JPY

Running cost reduction: 26,030,000 JPY/year, Pay back time: 3.5 years

Before application of heat pumps

After application of heat pumps

Reduction achieved

Investment cost

Boiler (Including piping):75,300,000 JPY

Steam heater: 10,500,000 JPY

Cooler: 50,400,000 JPYTotal: 136,200,000 JPY(100%)

Heat pump system(14 units)Total 91,000,000 JPY(66.8%)

45,200,000 JPY or 33.2%

Annualrunningcost

Electricity: 193MWh,2,340,000 JPY

Fuel oil: 470KL,28,130,000 JPY

Water: 6,953KL,2,450,000 JPY

Total: 32,920,000 JPY(100%)

Electricity:570MWh,6,890,000 JPY

Total: 6,890,00JPY(20.9%)

26,030,000 JPY or 79.1%

Effects of application of heat pumps (Cost)

19

Page 20: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Initial equipment investment cost: 91,000,000 JPY

Running cost reduction: 26,030,000 JPY/year, Pay back time: 3.5 years

Before application of heat pumps

After application of heat pumps

Reduction achieved

Investment cost

Boiler (Including piping):75,300,000 JPY

Steam heater: 10,500,000 JPY

Cooler: 50,400,000 JPYTotal: 136,200,000 JPY(100%)

Heat pump system(14 units)Total 91,000,000 JPY(66.8%)

45,200,000 JPY or 33.2%

Annualrunningcost

Electricity: 193MWh,2,340,000 JPY

Fuel oil: 470KL,28,130,000 JPY

Water: 6,953KL,2,450,000 JPY

Total: 32,920,000 JPY(100%)

Electricity:570MWh,6,890,000 JPY

Total: 6,890,00JPY(20.9%)

26,030,000 JPY or 79.1%

Effects of application of heat pumps (Cost)

When a factory is newly founded,

both initial investment and running

cost of the heat pump system are

lower than those of the conventional

steam supply system and chillers.

20

Page 21: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan

Heat pumps for cutting and washing processes

14 heat pumps are operatingin the plant.

Around 110 heat pumps are operating

in Japan and Japan's neighbors in 2017.

are superior in Energy saving, Economy, and Environmental conservation.

21

Page 22: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan 22

First List of the Best Available Technologies and

Best Practices to Improve Energy Efficiency

Internationally, the International Partnership for

Energy Efficiency Cooperation (IPEEC),

23 Mar 2016.

https://ipeec.org/publications.html

Reference documents

Page 23: Application of Heat Pumps to Cutting and Washing Processes

IEA HPT Annex48 Expert Meeting of Japan 23

Thank you for your attention!