application reference number: wwo10001 design principles ...... · design principles: routemap of...

74
Design Principles Route Map Doc Ref: APP106.02 Folder 183 3 February 2014 DCO-DT-APP-ZZ100-060200 Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001

Upload: others

Post on 20-May-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Design Principles Route MapDoc Ref: APP106.02

Folder 183 3 February 2014DCO-DT-APP-ZZ100-060200

Des

ign

Prin

cipl

es R

oute

Map

Thames Tideway Tunnel Thames Water Utilities Limited

Application for Development ConsentApplication Reference Number: WWO10001

Page 2: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

3 February 2014

Design Principles: Routemap of securing mechanisms

APP106.2

Page 3: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Design Principles i

This page intentionally left blank

Page 4: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Design Principles ii

Thames Tideway Tunnel

Design Principles: Routemap of securing mechanisms

List of tables

Page number

Table 1.1 Generic design principles ........................................................................... 2

Table 1.2 Heritage design principles .......................................................................... 4

Table 1.3 Riparian and in-river structure principles .................................................... 6

Table 1.4 Landscape design principles ...................................................................... 9

Table 1.5 Lighting design principles ......................................................................... 12

Table 1.6 Site drainage principles ............................................................................ 14

Table 1.7 Acton Storm Tanks site-specific design principles .................................... 16

Table 1.8 Hammersmith Pumping Station site-specific design principles ................. 18

Table 1.9 Barn Elms site-specific design principles .................................................. 19

Table 1.10 Putney Embankment Foreshore site-specific design principles .............. 22

Table 1.11 Dormay Street site-specific design principles ......................................... 26

Table 1.12 King George's Park site-specific design principles ................................. 28

Table 1.13 Carnwath Road Riverside site-specific design principles ........................ 31

Table 1.14 Falconbrook Pumping Station site-specific design principles ................. 35

Table 1.15 Cremorne Wharf Depot site-specific design principles ........................... 37

Table 1.16 Chelsea Embankment Foreshore draft site-specific design principles .... 39

Table 1.17 Kirtling Street site-specific design principles ........................................... 43

Table 1.18 Heathwall Pumping Station site-specific design principles ..................... 44

Table 1.19 Albert Embankment Foreshore site-specific design principles ................ 46

Table 1.20 Victoria Embankment Foreshore site-specific design principles ............. 50

Table 1.21 Blackfriars Bridge Foreshore site-specific design principles ................... 52

Table 1.22 Chambers Wharf site-specific design principles ..................................... 58

Table 1.23 King Edward Memorial Park Foreshore site-specific design principles ... 60

Table 1.24 Earl Pumping Station site-specific design principles .............................. 62

Table 1.25 Deptford Church Street site-specific design principles ............................ 63

Table 1.26 Greenwich Pumping Station site-specific design principles .................... 64

Table 1.27 Abbey Mills Pumping Station site-specific design principles ................... 66

Table 1.28 Beckton Sewage Treatment Works site-specific design principles ......... 67

Page 5: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Design Principles iii

Table 1.29 Shad Thames Pumping Station site-specific design principles ............... 67

Table 1.30 Bekesbourne Street site-specific design principles ................................. 68

Page 6: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Design Principles: Routemap of securing mechanisms

Design Principles 1

1 Introduction

1.1.1 Thames Water has undertaken an exercise to check where each of the design principles is secured, in order to determine whether project-wide requirement PW7 is really necessary. This is an action which arose from the second Issue-Specific Hearing on the Development Consent Order (DCO). The tables below show the outcome of this exercise, which is that:

a. The Design Principles are in the main secured by reference in the site specific requirements

b. A smaller number are secured by other mechanisms, e.g. some of the Riparian and in-river structure design principles are secured through the Protective Provisions with the EA DCO Schedule 16, Part 3, some of the landscape design principles are secured by the Section 106 Agreements and other principles are secured by the provisions of the DCO itself - e.g. Article 12 dealing with Construction and maintenance of altered streets

c. In some cases alterations are proposed to site specific requirements to make explicit reference to the design principles - such as the site specific requirements relating to specification of accesses (e.g. CREWD13) and design principles relating to Location of permanent works (e.g. CHEEF2).

1.1.2 All the design principles are secured in some manner and therefore Thames Water is content that project-wide requirement PW7 is not necessary and can be deleted. This is proposed in the version of the DCO to be submitted to the Examining Authority on 3 February 2014.

Page 7: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

2

Tab

le 1

.1 G

en

eri

c d

es

ign

pri

nc

iple

s

Refe

ren

ce

G

en

eri

c d

esig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

FN

CC

.01

T

he

de

sig

ns s

ha

ll m

ake

eff

icie

nt u

se

of

the

lan

d r

equ

ire

d

for

the p

roje

ct

an

d lan

d t

ake

sh

all

be

min

imis

ed

. B

uild

ings

an

d m

ate

ria

ls s

ha

ll b

e r

e-u

se

d,

wh

ere

ve

r pra

ctica

ble

an

d

eco

no

mic

.

Th

is is s

ecu

red t

hro

ugh

the

Site w

ork

s p

ara

mete

r pla

ns

wh

ich p

rovid

e a

ma

xim

um

are

a fo

r un

de

rta

kin

g t

he

p

erm

an

en

t w

ork

s. T

hese

pa

ram

ete

rs a

re f

urt

he

r cla

rified t

hro

ugh

the

site

sp

ecific

requ

irem

ents

on

p

erm

an

en

t de

sig

n in

clu

din

g a

pp

rova

l of

de

taile

d d

esig

n

of

bu

ildin

gs a

nd s

tructu

res.

E.g

. A

CT

ST

2 a

nd

BLA

BF

2

(Lo

ca

tion

of

wo

rks)

BL

AB

F5 (

De

taile

d D

esig

n A

pp

rova

l fo

r P

erm

ane

nt A

bo

ve

Gro

un

d S

tructu

res)

and

BLA

BF

1

4 (

land

sca

pin

g).

FN

CC

.02

T

he

gro

un

d-leve

l su

rface

s o

f th

e w

ork

s s

ha

ll b

e in

tegra

ted

in

to th

e p

ub

lic r

ea

lm w

ith

out

the

ne

ed f

or

fen

ce

d a

nd

ga

ted

co

mpo

un

ds. T

his

is e

xce

pt a

t site

s w

hic

h a

re w

ith

in

exis

ting o

pe

ratio

na

l com

pou

nd

s (

Tham

es W

ate

r or

oth

ers

) o

r su

bje

ct to

a p

lan

nin

g p

rop

osa

l b

y o

the

r deve

lop

ers

. W

here

de

ve

lopm

en

t is

pro

po

se

d in a

pa

rk, th

e la

nd

sca

pe

d

esig

n f

or

the

lo

ca

tion

an

d la

yo

ut

of

an

y a

reas o

f h

ard

sta

nd

ing

sha

ll b

e s

ym

pa

thetic t

o th

e c

hara

cte

r and

n

atu

re o

f th

e p

ark

.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils a

nd

site

resto

ratio

n. E

.g.

AC

TS

T5

, B

LA

BF

14

(La

nd

sca

pe

Sch

em

e)

an

d C

RE

WD

9 (

site

re

sto

ration

sch

em

e)

FN

CC

.03

T

he

‘sig

na

ture

’ d

esig

n s

ha

ll b

e u

sed

fo

r a

ll ve

ntila

tion

co

lum

ns s

erv

ing t

he

shaft

, e

xce

pt

wh

ere

sta

ted

oth

erw

ise

in s

ite

-sp

ecific

prin

cip

les.

The

ve

ntila

tion

co

lum

ns s

ha

ll sta

nd a

ma

xim

um

6.5

m h

igh

an

d h

ave

a m

inim

um

p

rop

ort

ion

of

1:5

(girth

to

he

igh

t).

Mu

ltip

les o

f th

e s

ign

atu

re

de

sig

n s

ha

ll be

use

d to a

ch

ieve

the

cro

ss-s

ection

al a

rea

s

requ

ire

d f

or

ve

ntila

tion.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f ve

ntila

tion

str

uctu

res. E

.g.

BL

AB

F6 (

De

taile

d D

esig

n

Ap

pro

va

l fo

r S

ign

atu

re V

en

tila

tio

n C

olu

mn

s).

Page 8: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

3

Refe

ren

ce

G

en

eri

c d

esig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

FN

CC

.04

In

pa

rks a

nd

op

en s

pace

s a

ny a

bo

ve

-gro

un

d s

tructu

res

sh

all

be p

ositio

ned

on

th

e p

ark

/site

bo

un

da

rie

s a

nd

ad

jacen

t to

pla

ntin

g,

as f

ar

as p

ossib

le,

so

as n

ot to

o

bstr

uct

vie

ws in

to a

nd o

ut of

the

sp

ace

. In

exce

ptio

na

l circu

msta

nce

s, a

bo

ve

-gro

un

d s

tructu

res m

ay b

e d

esig

ne

d

as s

pe

cific

sta

tem

en

t fe

atu

res t

ha

t con

trib

ute

to

the

ch

ara

cte

r of

the

pa

rk.

Site

wo

rks p

ara

mete

r p

lan

pro

vid

es a

lo

cation

fo

r th

e

ab

ove

gro

un

d s

tructu

res.

Site

Sp

ecific

Require

me

nts

re

lating t

o th

e a

pp

rova

l of

de

taile

d d

esig

n o

f bu

ildin

gs

an

d s

tructu

res.

E.g

. A

CT

ST

2 B

LA

BF

2 (

De

taile

d D

esig

n

Ap

pro

va

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res).

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

).

FN

CC

.05

A

ll a

bo

ve

-gro

un

d s

tructu

res s

ha

ll b

e o

f h

igh

qu

alit

y d

esig

n

an

d m

ate

ria

ls, ap

pro

pria

te to

th

e c

on

text.

S

ite

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f d

eta

iled

de

sig

n o

f b

uild

ings a

nd

str

uctu

res inclu

din

g

de

tails

of

ma

teria

ls a

nd

fin

ishe

s.

E.g

. A

CT

ST

2 a

nd

B

LA

BF

5 (

Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res).

FN

CC

.06

A

rea

s o

f ha

rdsta

nd

ing r

equ

ire

d f

or

ma

inte

nance

acce

ss

sh

all

be m

inim

ised w

he

reve

r po

ssib

le in

ord

er

to r

edu

ce

su

rface

wa

ter

run

-off

ra

tes w

ith

ou

t com

pro

mis

ing t

he

fu

nction

al re

qu

ire

me

nts

.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

), s

ite

resto

ratio

n e

.g.

CR

EW

D 9

(s

ite

resto

ration

sche

me

) an

d s

urf

ace

wa

ter

dra

ina

ge

FN

CC

.07

In

pu

blic

ly a

cce

ssib

le a

rea

s,

larg

e a

cce

ss c

ove

rs

(exce

ed

ing 6

75m

m x

67

5m

m)

sha

ll h

ave

du

rab

le r

ece

sse

d

co

ve

rs in

tegra

ted

in

to th

e s

urr

ou

nd

ing p

avin

g t

rea

tme

nt fo

r vis

ua

l co

ntin

uity.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

) a

nd

site

resto

ratio

n e

.g.

CR

EW

D

9 (

site

resto

ratio

n s

ch

em

e).

FN

CC

.08

In

pu

blic

ly a

cce

ssib

le a

rea

s,

sm

all

acce

ss c

ove

rs (

67

5m

m

x 6

75

mm

or

less)

sh

all

be

of

a b

esp

oke p

roje

ct

de

sig

n o

r b

e r

ece

sse

d c

ove

rs in

se

t w

ith

th

e s

urr

ou

nd

ing p

avin

g

trea

tme

nt fo

r vis

ua

l con

tin

uity.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

) a

nd

site

resto

ratio

n e

.g.

CR

EW

D

9 (

site

resto

ratio

n s

ch

em

e).

.

FN

CC

.09

B

uild

ings a

nd

kio

sks s

ha

ll h

ave

a lo

w-m

ain

ten

an

ce

bro

wn

S

ite

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f

Page 9: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

4

Refe

ren

ce

G

en

eri

c d

esig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

roof

un

less o

the

rwis

e s

pe

cifie

d in

site

-spe

cific

prin

cip

les in

o

rde

r to

red

uce

su

rfa

ce

wa

ter

run

-off

ra

tes a

nd

to

pro

mote

b

iod

ive

rsity.

de

taile

d d

esig

n o

f b

uild

ings a

nd

str

uctu

res. E

.g.

AC

TS

T2

an

d B

LA

BF

5 (

De

taile

d D

esig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res).

FN

CC

.10

T

he

la

yo

ut of

the

pe

rma

nen

t w

ork

s s

ha

ll n

ot

co

mp

rom

ise

the

via

bili

ty o

f safe

gu

ard

ed

wh

arf

s b

ein

g u

sed a

s s

uch

, in

a

cco

rdan

ce

with

Lon

do

n P

lan

Po

licy 7

.26

and

su

pp

ort

ing

pa

ragra

ph

s a

nd in

pa

rtic

ula

r t

he la

yo

ut

of

the p

erm

ane

nt

wo

rks o

n a

safe

gu

ard

ed

wh

arf

site

sha

ll le

ave

, u

nle

ss

oth

erw

ise a

gre

ed

:

a.

a g

en

era

lly f

lat

site

b.

un

ob

str

ucte

d a

cce

ss to

the

riv

er

wa

ll a

nd

be

rthin

g w

all

c.

HG

V a

cce

ss o

nto

th

e s

urr

ou

nd

ing h

igh

wa

y n

etw

ork

d.

an

y a

bo

ve

-gro

un

d s

tructu

res t

o b

e g

rou

ped

to

ge

the

r a

nd

be

lo

ca

ted

clo

se

to

the

site

bou

nda

ry t

o m

inim

ise

the

aff

ecte

d f

oo

tprin

t.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f d

eta

iled

de

sig

n o

f b

uild

ings a

nd

str

uctu

res. E

.g.

AC

TS

T2

an

d B

LA

BF

5 (

De

taile

d D

esig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

and

lan

dscap

e

de

tails

. E

.g.

AC

TS

T5

an

d B

LA

BF

14

(La

nd

scap

e

Sch

em

e)

an

d s

ite

resto

ratio

n e

.g.

CR

EW

D 9

(site

re

sto

ration

sch

em

e).

Tab

le 1

.2 H

eri

tag

e d

es

ign

pri

nc

iple

s

Refe

ren

ce

H

eri

tag

e

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

HR

TG

.01

Where

in

terv

en

tion

s t

o t

he

fa

bric o

f lis

ted b

uild

ings o

r lis

ted

str

uctu

res a

re p

rop

ose

d, th

ey s

ha

ll be

de

sig

ne

d to

re

mo

ve

as little h

isto

ric f

ab

ric a

s p

ossib

le in

ord

er

to

en

su

re m

axim

um

rete

ntio

n o

f h

isto

ric fo

rm a

nd

fab

ric.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f w

ork

s to

lis

ted

bu

ildin

gs.

E.g

. B

LA

BF

11

(D

eta

ils o

f W

ork

s t

o L

iste

d B

uild

ings),

BL

AB

F12 (

Pro

tective

Wo

rks

to L

iste

d B

uild

ings)

BLA

BF

13 R

esto

ratio

n w

ork

s to

lis

ted

bu

ildin

gs.

HR

TG

.02

Mo

de

rn s

tructu

ral an

d e

nviro

nm

enta

l de

sig

ns t

ha

t in

terf

ace w

ith

lis

ted

bu

ildin

gs o

r str

uctu

res s

ha

ll re

sp

ect

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f d

eta

iled

de

sig

n o

f b

uild

ings a

nd

str

uctu

res. E

.g.

Page 10: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

5

Refe

ren

ce

H

eri

tag

e

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

the

his

toric s

tructu

ral an

d e

nviro

nm

enta

l be

havio

ur

of

the

a

dja

cen

t lis

ted

bu

ildin

g o

r str

uctu

re.

AC

TS

T2 a

nd

BL

AB

F5

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res),

BLA

BF

11

(D

eta

ils o

f W

ork

s to

Lis

ted

Bu

ildin

gs)

an

d B

LA

BF

14

La

nd

sca

pin

g.

In

ad

ditio

n C

HE

EF

5 a

nd

6 (

Herita

ge

a

sse

ts).

HR

TG

.03

Mo

nito

rin

g e

qu

ipm

en

t fo

r asse

ssin

g t

he

eff

ect of

the

wo

rks

on

lis

ted

bu

ildin

gs a

nd s

tructu

res s

ha

ll b

e d

esig

ne

d t

o b

e

un

ob

trusiv

e a

nd t

o e

nsu

re t

he

sig

nific

an

ce o

f th

e lis

ted

b

uild

ing is u

nd

am

age

d.

PW

9: M

on

ito

rin

g o

f and

pro

tective

wo

rks to

lis

ted

b

uild

ings a

nd

str

uctu

res

HR

TG

.04

Facin

g m

ate

ria

ls a

nd

de

taili

ng s

ha

ll be

com

patib

le w

ith

th

e

vis

ua

l ch

ara

cte

r of

exis

ting a

dja

cen

t lis

ted

bu

ildin

gs a

nd

h

erita

ge

asse

ts.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f d

eta

iled

de

sig

n o

f b

uild

ings a

nd

str

uctu

res. E

.g.

BL

AB

F

4 (

de

tails

of

rive

rwa

ll a

nd

fo

resh

ore

str

uctu

re),

BL

AB

F5

(De

taile

d D

esig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

G

rou

nd S

tructu

res),

BL

AB

F6 (

Deta

iled

De

sig

n A

pp

rova

l fo

r S

ign

atu

re V

en

tila

tion

Co

lum

ns)

an

d B

LA

BF

11

(D

eta

ils o

f W

ork

s to

Lis

ted

Bu

ildin

gs).

HR

TG

.05

Desig

ns s

ha

ll a

im t

o s

up

po

rt the

le

gib

ility

of

the

ke

y

his

toric f

un

ctio

ns o

f h

erita

ge

asse

ts.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f d

eta

iled

de

sig

n o

f b

uild

ings a

nd

str

uctu

res. .

E.g

. B

LA

BF

5 (

Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

an

d B

LA

BF

11

(D

eta

ils o

f W

ork

s t

o L

iste

d B

uild

ings),

BL

AB

F6 (

De

taile

d D

esig

n

Ap

pro

va

l fo

r S

ign

atu

re V

en

tila

tio

n C

olu

mn

s),

an

d

BL

AB

F 1

4 L

an

dscap

ing.

HR

TG

.06

Alte

ration

s t

o h

isto

ric fa

bric s

ha

ll be

reve

rsib

le,

wh

ere

ve

r re

aso

na

bly

pra

cticab

le.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f w

ork

s to

lis

ted

bu

ildin

gs.

E.g

. B

LA

BF

11

(w

ork

s to

lis

ted

bu

ildin

gs)

BL

AB

F12

(P

rote

ctive

Work

s to

Lis

ted

B

uild

ings).

HR

TG

.07

A p

roje

ct-

wid

e in

terp

reta

tio

n s

trate

gy s

ha

ll b

e d

eve

lop

ed

to

PW

12:

Inte

rpre

tation

Str

ate

gy a

nd

BL

AB

F 1

4

Page 11: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

6

Refe

ren

ce

H

eri

tag

e

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

ce

leb

rate

the

pio

nee

ring n

atu

re a

nd s

ign

ific

ance

of

Ba

za

lge

tte

’s s

ew

era

ge

syste

m,

an

d th

e e

ngin

ee

rin

g

ach

ieve

men

ts o

f th

e T

ha

me

s T

ide

wa

y T

un

nel a

s a

se

nsitiv

e d

eve

lop

me

nt of

Lo

ndo

n’s

his

toric s

ew

er

syste

m.

Th

is s

ha

ll ta

ke

acco

un

t of

an

y e

xis

ting lo

ca

l in

terp

reta

tion

str

ate

gie

s. T

he

de

sig

n o

f in

terp

reta

tive

ma

teria

ls a

t th

e s

ite

le

ve

l sh

all

be

sen

sitiv

ely

in

tegra

ted

in

to t

he

desig

n o

f th

e

ne

w f

acili

ties a

nd s

urr

ou

nd

ing a

rea

an

d a

vo

id c

rea

tin

g

un

acce

pta

ble

vis

ua

l clu

tte

r.

La

nd

sca

pin

g

HR

TG

.08

Tre

es t

ha

t ne

ed

to b

e r

em

ove

d in

a c

on

se

rva

tio

n a

rea

sh

all

be r

ep

lace

d a

s c

lose

as p

ossib

le t

o t

he

origin

al

po

sitio

n w

ith

a s

pe

cie

s t

ha

t re

late

s t

o th

e c

ha

racte

r of

the

a

rea

. F

or

ne

w t

ree

s, re

fere

nce

sha

ll b

e m

ade

to

th

e

prin

cip

les o

utlin

ed in

the

Ma

yo

r of

Lo

ndo

n’s

Lo

ndo

n T

ree

s

an

d W

oo

dla

nd

Fra

me

wo

rk. R

igh

t P

lace

, R

igh

t T

ree

in

itia

tive

.

New

tre

es c

ove

red

by S

ite

Sp

ecific

Requ

ire

me

nts

re

lating t

o lan

dscap

e d

eta

ils e

.g.

BL

AB

F 1

4

La

nd

sca

pin

g.

DC

O A

rtic

le 2

6 to

be

exte

nd

ed

to

in

clu

de

tr

ee

s in

Con

se

rva

tio

n A

rea

s

Tab

le 1

.3 R

ipari

an

an

d in

-riv

er

str

uctu

re p

rin

cip

les

Refe

ren

ce

R

ipa

ria

n a

nd

in

-riv

er

str

uctu

re p

rin

cip

les

S

ec

uri

ng

me

ch

an

ism

IRV

R.0

1

Str

uctu

res in

or

ove

r th

e r

ive

r sh

all

be

redu

ced

in

sca

le a

s

far

as p

ossib

le. T

he

y s

ha

ll b

e d

esig

ned

to t

ake

accou

nt of

eff

ects

on r

ive

r flow

, th

e n

ee

ds o

f rive

r use

rs,

vis

ua

l e

ffe

cts

a

nd

aqu

atic e

co

logy.

Fea

ture

s in

tegra

l to

or

ad

jace

nt

to t

he

fo

resh

ore

str

uctu

res t

ha

t can

pro

vid

e r

efu

ge

to

mig

ratin

g

juve

nile

fis

h s

ha

ll b

e inclu

de

d w

he

re p

racticab

le.

Th

is is s

ecu

red t

hro

ugh

the

Site w

ork

s p

ara

mete

r pla

ns

wh

ich p

rovid

e a

ma

xim

um

are

a fo

r un

de

rta

kin

g t

he

p

erm

an

en

t w

ork

s in t

he

riv

er.

An

y v

aria

tio

ns in

the

se

n

eed

to b

e a

pp

rove

d b

y t

he

lo

ca

l au

tho

rity

, in

co

nsu

lta

tion

with

sta

keh

old

ers

, a

nd

with

refe

ren

ce

to

th

e D

esig

n P

rin

cip

les –

e.g

. P

UT

EF

3. T

he

se

p

ara

me

ters

are

fu

rthe

r cla

rified t

hro

ugh

the

site

sp

ecific

re

qu

ire

me

nts

on p

erm

an

en

t de

sig

n in

clu

din

g loca

tio

n o

f

Page 12: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

7

Refe

ren

ce

R

ipa

ria

n a

nd

in

-riv

er

str

uctu

re p

rin

cip

les

S

ec

uri

ng

me

ch

an

ism

pe

rma

nen

t w

ork

s a

nd d

eta

ils o

f rive

r str

uctu

res e

.g.

an

d

BL

AB

F2

(Lo

ca

tio

n o

f w

ork

s)

an

d B

LA

BF

4 (

Deta

iled

D

esig

n A

pp

rova

l R

ive

r W

all

an

d fo

resho

re s

tru

ctu

re)

IRV

R.0

2

As a

min

imum

, a

ll ne

w f

loo

d d

efe

nce

s s

ha

ll pro

vid

e t

he

sa

me le

ve

l of

pro

tection

aga

inst flo

od

ing a

s th

e e

xis

ting

defe

nce

s a

nd s

ha

ll b

e d

esig

ne

d to

accom

mod

ate

the

rais

ed

leve

ls s

pe

cifie

d in

th

e E

nviro

nm

ent

Age

ncy’s

TE

21

00

G

uid

an

ce

at

an

ap

pro

pria

te t

ime

in

th

e f

utu

re.

Se

cu

red

by P

rote

ctive

Pro

vis

ion

s w

ith

th

e E

A (

DC

O

Sch

edu

le 1

6, P

art

3 (

5)

requ

ire

s d

eta

ils o

f any f

loo

d

defe

nce

s to

be

subm

itte

d a

nd

ap

pro

ve

d b

y E

A.

IRV

R.0

3

New

fo

resho

re s

tructu

res s

ha

ll b

e p

ub

licly

acce

ssib

le

exce

pt

du

rin

g e

sse

ntia

l m

ain

tena

nce

wo

rks w

he

n th

ey

wo

uld

be

clo

sed

to

the

pu

blic

.

S1

06 a

gre

em

ents

with

rele

va

nt

loca

l au

tho

ritie

s.

AC

TS

T5 a

nd

BL

AB

F14

(La

nd

scap

e S

ch

em

e)

de

al w

ith

th

rou

gh

refe

ren

ce

to ‘re

leva

nt

Desig

n P

rin

cip

les’.

IRV

R.0

4

Life

sa

vin

g e

qu

ipm

en

t o

n th

e r

ive

r w

all

sh

all

tie

in

with

an

y

exis

ting s

afe

ty f

eatu

res a

nd c

om

ply

with

th

e P

ort

of

Lo

nd

on

A

uth

ority

(P

LA

) re

co

mm

end

atio

ns in t

he

Revie

w o

f lif

esa

vin

g p

rovis

ion

alo

ng

th

e t

ida

l T

ha

me

s 1

99

4.

Cove

red

un

de

r la

nd

sca

pin

g r

equ

ire

men

t fo

r a

pp

rova

l of

min

or

str

uctu

res –

e.g

. C

HE

EF

8 (

f) a

nd

AL

BE

F9(f

)

IRV

R.0

5

Facin

g m

ate

ria

ls a

nd

de

taili

ng f

or

ne

w r

ive

r w

alls

sh

all

be

co

mpa

tib

le w

ith

th

e v

isua

l cha

racte

r of

exis

ting a

dja

ce

nt

rive

r w

alls

.

Site

spe

cific

requ

ire

men

ts r

ela

ting to

the

ap

pro

va

l o

f d

eta

ils o

f rive

r str

uctu

res.

E.g

. B

LA

BF

4 (

Deta

iled

D

esig

n A

pp

rova

l R

ive

r W

all

an

d T

err

ace

)

IRV

R.0

6

Ho

rizo

nta

l o

r ve

rtic

al tim

be

r fe

nd

ers

sha

ll b

e in

clu

ded

in th

e

de

sig

n o

f rive

r w

alls

in o

rde

r to

pro

mo

te a

qu

atic e

co

logy.

Site

spe

cific

requ

ire

men

ts r

ela

ting to

the

ap

pro

va

l o

f d

eta

ils o

f rive

r str

uctu

res.

.g.

BL

AB

F4 (

Deta

iled

De

sig

n

Ap

pro

va

l R

ive

r W

all

and

Te

rra

ce

)

IRV

R.0

7

Horizo

nta

l d

em

arc

ation

s s

ha

ll b

e d

esig

ne

d o

n t

he

ne

w r

ive

r w

alls

to

ma

rk p

ert

ine

nt rive

r le

ve

ls (

such

as t

he

hig

he

st

astr

on

om

ical tid

e, m

ean

hig

h w

ate

r springs e

tc)

acro

ss t

he

p

roje

ct.

Site

spe

cific

requ

ire

men

ts r

ela

ting to

the

ap

pro

va

l o

f d

eta

ils o

f rive

r str

uctu

res.

e.g

. B

LA

BF

4 (

Deta

iled

D

esig

n A

pp

rova

l R

ive

r W

all

an

d T

err

ace

)

Page 13: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

8

Refe

ren

ce

R

ipa

ria

n a

nd

in

-riv

er

str

uctu

re p

rin

cip

les

S

ec

uri

ng

me

ch

an

ism

IRV

R.0

8

Navig

atio

na

l a

ids in

clu

din

g s

ign

age

an

d lig

htin

g s

ha

ll b

e

pro

vid

ed

wh

ere

re

qu

ire

d b

y t

he

PL

A.

Pro

tective

Pro

vis

ion

s w

ith

th

e P

LA

DC

O S

che

du

le 1

6,

Pa

rt 2

requ

ire

s d

eta

ils t

o b

e a

pp

rove

d, b

ut n

o r

efe

ren

ce

to

DP

s.

Cove

red

un

de

r la

nd

sca

pin

g r

equ

ire

me

nt fo

r a

pp

rova

l of

min

or

str

uctu

res –

e.g

. C

HE

EF

8 (

f) a

nd

A

LB

EF

9(f

)

IRV

R.0

9

The

ap

ron

s o

f a

ny e

xis

tin

g o

utfa

lls m

ad

e r

ed

un

dan

t b

y t

he

p

roje

ct

sha

ll b

e b

roken o

ut a

nd

rem

ove

d a

nd

, w

he

re

pra

cticab

le,

ha

bitat

rein

sta

ted

.

Se

cu

red

th

rou

gh

the

Sco

ur

and

Accre

tio

n M

on

ito

rin

g

an

d M

itig

atio

n S

trate

gy

IRV

R.1

0

Where

ne

ce

ssa

ry,

an

d w

he

re ju

stifie

d a

s a

ppro

pria

te,

sco

ur

pro

tection

sha

ll b

e p

rovid

ed

be

ne

ath

an

y n

ew

ou

tfa

ll a

nd a

t th

e to

e o

f in

-riv

er

str

uctu

res t

o p

reve

nt e

xce

ssiv

e s

co

urin

g

of

the

fo

resh

ore

and

to p

rote

ct th

e f

ou

nd

ation

of

the

riv

er

wa

ll.

Th

e d

eta

iled

de

sig

n,

wh

ich s

ha

ll co

nsid

er

the

exte

nt

of

the

pro

tection

requ

ire

d,

sh

all

se

ek t

o a

vo

id o

r, w

he

re t

his

is

no

t p

racticab

le,

min

imis

e a

dve

rse e

ffe

cts

on

aqu

atic

eco

logy.

DM

L C

on

ditio

n 8

)S

cou

r M

on

ito

rin

g a

nd

Mitig

atio

n)

an

d

Pro

tective

Pro

vis

ion

s w

ith

th

e E

A D

CO

Sch

ed

ule

16

, P

art

3.

Se

cu

red

th

rou

gh

the

Sco

ur

and

Accre

tio

n M

on

ito

rin

g

an

d M

itig

atio

n S

trate

gy

IRV

R.1

1

An

y m

oo

rin

gs a

ffe

cte

d b

y t

he

wo

rks s

ha

ll b

e r

ep

laced

, w

he

re p

racticab

le, u

nle

ss o

the

rwis

e a

gre

ed

with

th

e P

LA

.

Se

cu

red

by P

LA

DC

O S

ch

edu

le 1

6, P

art

2 w

hic

h

requ

ire

s d

eta

ils to

be

ap

pro

ve

d

IRV

R.1

2

An

y f

loo

d d

efe

nce

s t

hat

are

dire

ctly im

pa

cte

d s

ha

ll b

e

rein

sta

ted

to

an

ap

pro

pria

te s

tan

da

rd.

Se

cu

red

by P

rote

ctive

Pro

vis

ion

s w

ith

th

e E

A D

CO

S

ch

edu

le 1

6, P

art

3 r

equ

ire

s d

eta

ils to

be

app

rove

d

IRV

R.1

3

Ap

pro

pria

te lan

d-b

ased

acce

ss t

o th

e f

lood

defe

nce

s fo

r p

lan

t a

nd m

ach

ine

ry t

o c

arr

y o

ut

em

erg

en

cy a

nd

no

n-

em

erg

en

cy m

ain

ten

ance

and

repa

ir w

ork

s s

ha

ll b

e

pro

vid

ed

. A

pla

n s

ho

win

g t

his

acce

ss s

ha

ll be p

rovid

ed

to

the

En

viro

nm

en

t A

ge

ncy.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f d

eta

iled

de

sig

n o

f b

uild

ings,

str

uctu

res,

lan

dsca

pin

g

an

d s

ite

resto

ratio

n.

E.g

. B

LA

BF

4 (

de

tails

of

rive

rwa

ll a

nd

fo

resho

re s

tructu

re),

BL

AB

F5 (

De

taile

d D

esig

n

Ap

pro

va

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res),

B

LA

BF

6 (

Deta

iled

De

sig

n A

pp

rova

l fo

r S

ign

atu

re

Ve

ntila

tio

n C

olu

mn

s)

an

d B

LA

BF

14

Page 14: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

9

Refe

ren

ce

R

ipa

ria

n a

nd

in

-riv

er

str

uctu

re p

rin

cip

les

S

ec

uri

ng

me

ch

an

ism

(La

nd

sca

pin

g)P

rote

ctive

Pro

vis

ion

s w

ith

th

e E

A D

CO

S

ch

edu

le 1

6, P

art

3 r

equ

ire

s d

eta

ils to

be

app

rove

d,

but

no

refe

ren

ce t

o D

Ps.

IRV

R.1

4

All

floo

d d

efe

nce

s/w

alls

th

at re

qu

ire

mod

ific

ation

or

rep

lacem

ent

sha

ll ta

ke a

cco

un

t of

the

En

viro

nm

ent

Age

ncy’s

Estu

ary

Ed

ge

s G

uid

an

ce.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f d

eta

iled

de

sig

n o

f rive

r w

alls

. E

.g.

BL

AB

F 4

(de

tails

of

rive

rwa

ll a

nd

fo

resh

ore

str

uctu

re),

. P

rote

ctive

P

rovis

ion

s w

ith

th

e E

A D

CO

Sch

edu

le 1

6, P

art

3

requ

ire

s d

eta

ils to

be

ap

pro

ve

d,

bu

t n

o r

efe

ren

ce

to

D

Ps.

Tab

le 1

.4 L

an

ds

ca

pe

des

ign

pri

ncip

les

Refe

ren

ce

Lan

ds

ca

pe

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

LS

CP

.01

Desig

ns s

ha

ll se

ek to

pro

vid

e a

ne

t in

cre

ase

in t

ree

s o

ve

r th

e p

roje

ct a

s a

wh

ole

. W

he

re p

ractica

ble

, a

ny t

ree

s w

hic

h

are

rem

ove

d s

ha

ll b

e r

ep

laced

as c

lose

as p

ossib

le t

o th

e

cu

rre

nt

po

sitio

n o

r w

ith

in c

lose

pro

xim

ity t

o t

he

site

, in

lin

e

with

a c

oh

ere

nt

lan

dsca

pe

de

sig

n.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd B

LA

BF

14

(L

an

dsca

pe S

che

me

).

LS

CP

.02

For

ne

w t

ree

s,

refe

rence

sh

all

be

mad

e to

the

prin

cip

les

ou

tlin

ed

in

th

e M

ayo

r of

Lon

don

’s L

on

do

n T

ree

s a

nd

W

ood

land

Fra

me

wo

rk. R

igh

t P

lace

, R

igh

t T

ree

in

itia

tive

. T

he

y s

ha

ll b

e n

ative

spe

cie

s e

xce

pt

wh

ere

non

-na

tive

sp

ecie

s (

eg,

Lo

nd

on P

lan

e)

are

ch

ose

n fo

r th

eir t

ow

nsca

pe

va

lue

. S

pe

cie

s m

ay b

e s

ele

cte

d fo

r th

eir r

esili

en

ce

to

a

de

ma

nd

ing u

rba

n e

nvir

on

me

nt o

r clim

ate

ch

an

ge

wh

ere

a

bio

div

ers

ity b

en

efit can a

lso b

e d

em

on

str

ate

d.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd B

LA

BF

14

(L

an

dsca

pe S

che

me

).

LS

CP

.03

Where

possib

le, la

rge tre

e p

its s

ha

ll be p

rovid

ed t

o m

axim

ise tre

e s

ize

and g

row

th p

ote

ntia

l in

ord

er

to incre

ase t

he tre

e’s

access to s

pace

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd B

LA

BF

14

Page 15: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

10

Refe

ren

ce

Lan

ds

ca

pe

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

and lig

ht

and r

educe t

he p

ote

ntial fo

r van

da

lism

. (L

an

dsca

pe S

che

me

).

LS

CP

.04

An

y p

ub

lic f

urn

itu

re, fe

ncin

g o

r ra

ilings s

ha

ll be

rob

ust,

d

ura

ble

and

in

ke

ep

ing w

ith

th

e c

ha

racte

r of

the

su

rro

un

din

g to

wn

sca

pe

. R

efe

ren

ce s

ha

ll b

e m

ade

to

an

y

rele

va

nt

loca

l str

ee

t desig

n g

uid

es f

or

spe

cific

ation

of

lan

dscap

e e

lem

en

ts.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd B

LA

BF

14

(L

an

dsca

pe S

che

me

).

LS

CP

.05

The

de

sig

n s

ha

ll be

deve

lop

ed

with

refe

ren

ce t

o r

ele

va

nt

gu

ida

nce

on

safe

ty a

nd

se

cu

rity

, in

clu

din

g S

ecu

red

by

Desig

n,

Desig

n C

ou

ncil

CA

BE

gu

idan

ce

an

d th

e C

en

tre fo

r th

e P

rote

ctio

n o

f N

ation

al In

fra

str

uctu

re a

nd

Nation

al

Cou

nte

r-T

err

orism

Se

cu

rity

Off

ice's

Pro

tecting

Cro

wd

ed

Pla

ce

s d

esig

n g

uid

an

ce

.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd B

LA

BF

14

(L

an

dsca

pe S

che

me

).

LS

CP

.06

Pu

blic

ally

acce

ssib

le s

pa

ce

s s

ha

ll be

de

sig

ned

to

be

safe

a

nd

in

clu

siv

e a

nd

co

nsid

er

the n

ee

ds o

f th

e d

ive

rse

co

mm

un

itie

s w

ith

in t

he c

ity.

In lin

e w

ith

cu

rre

nt

be

st

pra

ctice th

e fo

llow

ing s

ha

ll a

pp

ly a

s a

min

imum

:

a.

Gra

die

nts

sh

all

be

ke

pt a

s s

ha

llow

as p

ossib

le,

pre

fera

bly

no

ste

ep

er

tha

n 1

:21

.

b.

On

gra

de

d r

ou

tes (

1:2

1 t

o 1

:60

) le

ve

l re

st

are

as s

ha

ll b

e p

rovid

ed a

t a

min

imum

of

10m

in

terv

als

.

c.

Su

rfa

ce c

olo

ur

co

ntr

ast

and

‘co

rdu

roy’ str

ips s

ha

ll b

e

use

d a

t la

nd

ings t

o s

tep

s a

nd

ram

ps w

he

re

ap

pro

pria

te t

o e

nab

le v

isua

lly im

pa

ire

d p

ers

ons t

o u

se

a

nd

an

ticip

ate

th

em

. d

. W

here

exte

rna

l sta

irs a

re p

rovid

ed

, a

ste

p-f

ree

a

lte

rna

tive

sha

ll a

lso b

e p

rovid

ed

.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd B

LA

BF

14

(L

an

dsca

pe S

che

me

).

Page 16: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

11

Refe

ren

ce

Lan

ds

ca

pe

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

e.

Where

sta

irs a

re p

rovid

ed

, th

ey s

ha

ll b

e d

esig

ne

d in

a

cco

rdan

ce

with

Pa

rt M

(A

pp

rove

d D

ocum

en

t M

) of

Sch

edu

le 1

of

the

Bu

ildin

g R

egu

lation

s.

f.

A m

inim

um

of

2.3

m c

lea

r he

igh

t sha

ll b

e a

llow

ed

un

de

r o

ve

rha

ngs,

str

uctu

res, sig

na

ge

an

d t

ree

ca

nop

ies.

LS

CP

.07

Where

ver

pra

ctica

ble

, w

alk

wa

ys s

ha

ll be a

n a

de

qua

te w

idth

to a

llow

w

hee

lcha

ir u

sers

to p

ass o

ne a

noth

er

com

fort

ably

(a m

inim

um

of

2m

).

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd B

LA

BF

14

(L

an

dsca

pe S

che

me

).

LS

CP

.08

Desig

ns s

ha

ll se

ek to

im

pro

ve

acce

ss f

or

pe

de

str

ian

s a

nd

cyclis

ts,

wh

ere

ve

r pra

ctica

ble

an

d e

con

om

ic, w

hile

m

eetin

g f

un

ctio

na

l re

qu

ire

men

ts.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd B

LA

BF

14

(L

an

dsca

pe S

che

me

).

LS

CP

.09

Cle

ar

lines o

f sig

ht sha

ll be m

ain

tain

ed thro

ug

hout

pe

destr

ian

environm

ents

in o

rder

to m

axim

ise a

ccessib

ility

, re

duce v

isua

l confu

sio

n, a

nd r

educe d

ep

ende

nce o

n s

ignag

e a

nd a

uditory

in

form

ation.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

).

LS

CP

.10

Pa

vin

g m

ate

rials

sh

all

be

sele

cte

d f

or

safe

ty a

nd a

cce

ssib

ility

. F

oo

twa

y

surf

aces s

hall

be

firm

, le

vel and s

lip-r

esis

tant.

Where

pavin

g is

pro

vid

ed,

larg

er

sett

s/s

labs s

hall

be u

sed w

here

pra

ctica

ble

to

min

imis

e the r

isk o

f tr

appin

g w

he

els

or

oth

er

walk

ing

aid

s.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

).

LS

CP

.11

Ma

teria

ls s

ha

ll be

robust,

du

rab

le a

nd m

ee

t th

e t

ech

nic

al

requ

ire

me

nts

of

the p

roje

ct.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

).

LS

CP

.12

In a

reas o

f pub

lic r

ea

lm, pavin

g m

ate

rials

sh

all

rela

te t

o a

nd r

eflect

the

chara

cte

r of

the s

urr

ou

nd

ing t

ow

nscape.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

).

LS

CP

.13

Surf

aces a

nd s

ub

-surf

aces in o

pera

tio

nal are

as s

hall

be c

onstr

ucte

d t

o

support

hea

vy m

achin

ery

and v

eh

icle

s.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

).

Page 17: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

12

Refe

ren

ce

Lan

ds

ca

pe

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

LS

CP

.14

An

y c

ycle

pa

rkin

g s

pa

ce

s a

ffe

cte

d b

y t

he

wo

rks s

ha

ll,

wh

ere

pra

cticab

le, b

e r

e-p

rovid

ed

to

an

equ

ivale

nt

sta

nda

rd.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f la

nd

scap

e d

eta

ils.

E.g

. A

CT

ST

5 a

nd

BL

AB

F14

(L

an

dsca

pe S

che

me

).

Tab

le 1

.5 L

igh

tin

g d

es

ign

pri

ncip

les

Refe

ren

ce

Lig

hti

ng

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

LT

NG

.01

Lig

ht

po

llution

at

site

s s

ha

ll b

e m

inim

ised b

y m

ean

s o

f ca

ppe

d, d

ire

ctio

na

l a

nd

co

wle

d lig

htin

g u

nits.

Lig

htin

g

de

sig

n s

ha

ll ad

he

re t

o th

e p

rin

cip

les o

utlin

ed

in

Ba

ts a

nd

L

igh

ting

in

th

e U

K1 p

rodu

ce

d b

y t

he

Ba

t C

on

serv

atio

n T

rust

in p

art

ne

rship

with

the

In

stitu

te o

f L

igh

tin

g E

ngin

ee

rs.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.02

In h

erita

ge

lo

ca

tio

ns,

ligh

tin

g p

rop

osa

ls s

ha

ll re

sp

ect

ad

jacen

t h

isto

ric e

lem

en

ts a

nd

be

co

-ord

ina

ted

with

wid

er

ligh

tin

g o

bje

ctive

s.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.03

In h

erita

ge

lo

ca

tio

ns, th

e c

olo

ur

tem

pe

ratu

re o

f lig

ht

so

urc

es s

ha

ll com

ple

me

nt a

nd e

nh

an

ce

th

e c

olo

urs

of

ad

jacen

t bu

ildin

gs a

nd

th

e w

ide

r la

nd

sca

pe s

ett

ing.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.04

Lig

htin

g d

esig

ns s

ha

ll se

ek to

redu

ce

th

e r

isk o

f a

ccid

ents

a

nd

he

lp to

pre

ve

nt

crim

e a

nd t

he

fea

r of

crim

e. T

his

sha

ll b

e b

ala

nce

d w

ith

the

ne

ed

to

pro

du

ce

hig

h q

ua

lity

att

ractive

de

sig

n,

red

uce

lig

ht

po

llution

an

d p

rom

ote

te

rre

str

ial a

nd

aqu

atic b

iod

ive

rsity.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.05

Dark

pa

tche

s a

nd

hig

h lig

ht/

da

rk c

ontr

asts

sha

ll b

e a

vo

ide

d

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f

1 h

ttp

://w

ww

.ba

ts.o

rg.u

k/p

ub

licatio

ns_

do

wn

load

.php

/243

/BA

TS

AN

DL

IGH

TIN

GIN

TH

EU

KJa

n0

8.p

df

Page 18: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

13

Refe

ren

ce

Lig

hti

ng

de

sig

n p

rin

cip

les

Se

cu

rin

g m

ec

han

ism

as t

he

y c

an

im

pa

ir v

isib

ility

. o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.06

Lo

ca

lise

d lig

htin

g o

f shru

bs,

tree

s a

nd

flo

we

rbe

ds m

ay b

e

use

d to

cre

ate

a c

on

trastin

g e

ffe

ct a

t n

igh

t. T

his

sh

all

be

d

ete

rmin

ed

on

a s

ite

-by-s

ite

ba

sis

.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.07

Where

app

rop

ria

te,

ligh

tin

g s

ha

ll be

in

tegra

ted

in

to s

eatin

g,

ste

ps,

wa

lls a

nd o

the

r fu

rnitu

re a

nd

fe

atu

res in

ord

er

to

red

uce

vis

ua

l clu

tte

r.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.08

Lig

htin

g u

nits s

ha

ll b

e h

igh

qu

alit

y a

nd

rob

ust.

The

ea

se o

f fu

ture

ma

inte

na

nce

sha

ll b

e a

rele

va

nt

co

nsid

era

tio

n to

th

e

ch

oic

e o

f de

taile

d lig

ht

fittin

gs.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.09

Lig

htin

g s

ha

ll n

ot b

e p

rop

ose

d f

or

the

Riv

er

Tha

me

s o

r d

ire

cte

d to

wa

rds it,

exce

pt

wh

ere

re

qu

ire

d fo

r n

avig

atio

na

l safe

ty.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

LT

NG

.10

Lig

htin

g u

nits s

ha

ll b

e s

ele

cte

d t

o b

e a

esth

etica

lly

ap

pro

pria

te a

nd t

o lim

it lig

ht

po

llutio

n,

imp

rove

en

erg

y

eff

icie

ncy a

nd in

cre

ase e

qu

ipm

en

t lo

nge

vity.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f o

pe

ratio

na

l lig

htin

g d

eta

ils.

E.g

. A

CT

ST

11

and

B

LA

BF

24

(Lig

htin

g –

Op

era

tion

al P

ha

se

).

Page 19: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

14

Tab

le 1

.6 S

ite d

rain

ag

e p

rin

cip

les

Refe

ren

ce

S

ite d

rain

ag

e p

rin

cip

les

S

ec

uri

ng

me

ch

an

ism

SD

RN

.01

Site

dra

ina

ge

sha

ll com

ply

with

th

e N

ation

al S

tand

ard

s fo

r S

usta

ina

ble

Dra

ina

ge

Syste

ms u

nd

er

the

Flo

od

s a

nd

Wate

r M

an

age

me

nt A

ct 2

010

2.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f su

rface

wa

ter

dra

ina

ge

de

tails

. E

.g. A

CT

ST

10

and

B

LA

BF

23

(S

urf

ace

Wate

r D

rain

age

) N

ote

, no

t a

ll; s

ite

s

ha

ve

dra

ina

ge

requ

irem

ents

– e

.g.

Sh

ad T

ham

es P

S –

a

nd

in

the

se

in

sta

nce

s d

rain

age

prin

cip

les a

re

dis

ap

plie

d

SD

RN

.02

Site

dra

ina

ge

at fo

resho

re s

ite

s a

nd s

ite

s im

me

dia

tely

a

dja

cen

t to

th

e t

ida

l river

sh

all

be

de

sig

ne

d to d

ischa

rge

su

rface

wa

ter

run

-off

directly in

to t

he

riv

er.

In

th

e e

ve

nt

of

a

sto

rm c

oin

cid

ing w

ith

a h

igh

tid

e e

ve

nt,

su

rfa

ce

wa

ter

dra

ina

ge

fro

m th

e s

ite

ma

y b

e r

estr

icte

d a

nd w

ou

ld n

ee

d t

o

be

sto

red

on

-site

. W

he

re d

em

on

str

ate

d th

at it w

ou

ld b

e

ne

ce

ssa

ry,

on

-site

sto

rage

sh

all

be

pro

vid

ed

to

man

age

th

e

risk o

f site

flo

od

ing in

th

e e

ve

nt of

tid

e-lockin

g o

f th

e s

urf

ace

w

ate

r ou

tfa

ll.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f su

rface

wa

ter

dra

ina

ge

de

tails

. E

.g.

AC

TS

T10

and

B

LA

BF

23

(S

urf

ace

Wate

r D

rain

age

)

SD

RN

.03

At

gre

enfield

and

pa

rk s

ite

s,

site

dra

ina

ge

sh

all

be

de

sig

ne

d

to e

nsu

re th

at p

ost-

de

ve

lopm

ent

su

rfa

ce

wa

ter

run

-off

ra

tes

do

no

t e

xce

ed

exis

ting r

ate

s.

Su

sta

inab

le D

rain

age

S

yste

ms m

ea

su

res f

ollo

win

g t

he

Su

DS

hie

rarc

hy s

ha

ll b

e

use

d, w

he

reve

r pra

ctica

l.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f su

rface

wa

ter

dra

ina

ge

de

tails

. E

.g.

AC

TS

T10

and

B

LA

BF

23

(S

urf

ace

Wate

r D

rain

age

)

2 ’I

t shou

ld b

e n

ote

d t

hat th

e N

ationa

l S

tandard

s is c

urr

ently a

dra

ft d

ocum

ent th

at

was issued f

or

consu

ltatio

n b

y D

efr

a in D

ecem

ber

201

1. It is a

nticip

ate

d

that th

e r

em

ain

ing p

rovis

ions o

f th

e F

lood a

nd W

ate

r M

ana

gem

ent A

ct, inclu

din

g those r

ela

tin

g to t

he r

equ

irem

ents

for

Susta

ina

ble

Dra

ina

ge S

yste

ms,

pro

vid

ed f

or

in S

che

dule

3,

would

be im

ple

mente

d b

y D

ecem

ber

2014. If

th

is is n

ot th

e c

ase, th

e s

ite d

rain

age s

ha

ll com

ply

with d

esig

n p

rincip

les S

DR

N.0

2,

SD

RN

.03 o

r S

DR

NR

.04 a

s r

ele

vant.

O

nce t

he N

ation

al S

tand

ard

s c

om

e into

forc

e, th

e s

ite d

rain

ag

e s

ha

ll co

mply

with t

hese a

s w

ell

as w

ith t

he d

esig

n

princip

les S

DR

N.0

2,

SD

RN

.03 o

r S

DR

N.0

4 a

s r

ele

vant.

Page 20: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

15

Refe

ren

ce

S

ite d

rain

ag

e p

rin

cip

les

S

ec

uri

ng

me

ch

an

ism

SD

RN

.04

At

bro

wnfield

site

s,

site d

rain

age

sh

all

com

ply

with

th

e

follo

win

g s

tan

da

rds:

a.

use

Su

sta

ina

ble

Dra

ina

ge

Syste

ms m

ea

su

res

follo

win

g t

he

Su

DS

hie

rarc

hy,

wh

ere

ve

r pra

ctica

l

b.

ach

ieve

100

pe

r cent

att

enu

ation

of

the

un

de

ve

lop

ed

site

’s s

urf

ace w

ate

r ru

n-o

ff a

t pe

ak t

ime

s (

ie, M

ayo

r’s

Pre

ferr

ed

Sta

nd

ard

). W

here

100

pe

r cent

atte

nua

tio

n

is u

na

ch

ieva

ble

, ju

stifica

tio

n s

ha

ll be

pro

vid

ed

c.

wh

ere

10

0 p

er

cen

t atte

nua

tio

n is u

na

ch

ieva

ble

, a

tten

uatio

n s

ha

ll be

ma

xim

ised

with

an

y s

ho

rtfa

ll b

ein

g ju

stified.

As a

min

imum

50

pe

r cen

t att

en

ua

tio

n

of

the

un

de

ve

lop

ed

site

’s p

ea

k s

urf

ace

wa

ter

run

-off

a

t pe

ak t

ime

s (

ie, th

e M

ayo

rs E

sse

ntia

l S

tand

ard

) sh

all

be a

ch

ieve

d.

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f su

rface

wa

ter

dra

ina

ge

de

tails

. E

.g.

AC

TS

T10

and

B

LA

BF

23

(S

urf

ace

Wate

r D

rain

age

)

SD

RN

.05

For

ou

tfa

lls w

ith

a d

iam

ete

r of

300

mm

or

gre

ate

r tw

o m

ea

ns

of

pre

ve

ntin

g th

e b

ack u

p o

f rive

r w

ate

r sha

ll b

e p

rovid

ed

(eg,

two

ro

ws o

f fla

p v

alv

es).

Site

Sp

ecific

Requ

ire

me

nts

rela

tin

g t

o th

e a

ppro

va

l o

f su

rface

wa

ter

dra

ina

ge

de

tails

. E

.g.

AC

TS

T10

and

B

LA

BF

23

(S

urf

ace

Wate

r D

rain

age

)

Page 21: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

16

Tab

le 1

.7 A

cto

n S

torm

Tan

ks

sit

e-s

pe

cif

ic d

es

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

AC

TS

T.0

1

A s

ingle

ve

hic

ula

r m

ain

tena

nce a

cce

ss t

o the

pro

ject w

ork

s

sh

all

be p

rovid

ed

fro

m C

an

ham

Roa

d. T

his

acce

ss s

ha

ll be

u

se

d b

y la

rge

r ve

hic

les t

o e

nab

le th

em

to t

urn

with

in t

he

site

. A

cce

ss f

or

frequen

t vis

its b

y s

ma

ller

ve

hic

les s

ha

ll b

e

via

th

e A

cto

n S

torm

Tan

ks e

xis

ting s

ite

acce

ss f

rom

Warp

le

Way/C

an

ham

Ro

ad.

AC

TS

T8:

Ju

nction

Layo

ut

an

d o

the

r hig

hw

ay w

ork

s

AC

TS

T.0

2

The

wid

th o

f th

e f

oo

tpath

on

Canh

am

Roa

d s

ha

ll b

e

exte

nd

ed t

o a

min

imum

of

2m

, u

sin

g la

nd

with

in t

he

T

ha

me

s W

ate

r site

. T

he

foo

tpa

th s

ha

ll be

constr

ucte

d to

a

dop

tab

le s

tan

da

rds.

AC

TS

T8:

Jun

ction

La

yo

ut a

nd o

the

r hig

hw

ay w

ork

s

AC

TS

T.0

3

Su

sta

ina

ble

dra

ina

ge

sh

all

be p

rovid

ed

(as s

ho

wn

on

the

in

dic

ative

La

nd

scap

e p

lan

), in o

rde

r to

com

ply

with

th

e

ge

ne

ric s

ite

dra

ina

ge

prin

cip

les.

Th

is s

ha

ll b

e m

ain

tain

ed

b

y T

ham

es W

ate

r as p

art

of

the o

pe

ratio

na

l site

.

AC

TS

T10

: S

urf

ace

Wate

r D

rain

age

AC

TS

T.0

4

The

de

sig

n o

f th

e v

en

tila

tion

co

lum

n s

ha

ll b

e b

espo

ke

an

d

he

lp to

ma

rk it a

s a

lo

ca

l la

ndm

ark

, e

nh

an

ce

th

e lo

ca

l to

wn

sca

pe

an

d c

ele

bra

te th

e p

roje

ct. T

he

form

of

the

co

lum

n s

ha

ll m

ake

vis

ua

l re

fere

nce

to

th

e s

ign

atu

re d

esig

n

in o

rde

r to

ach

ieve

co

nsis

ten

cy w

ith

oth

er

sites a

nd it

sha

ll b

e c

lad

in

a h

igh

qu

alit

y,

rob

ust

ma

teria

l.

AC

TS

T2:

De

taile

d D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res

AC

TS

T.0

5

The

ve

ntila

tion

co

lum

n a

nd v

en

tila

tion

str

uctu

re s

ha

ll be

lo

ca

ted

as c

lose

to

the

Can

ham

Roa

d f

ron

tage

as p

ossib

le,

bu

t n

o c

lose

r th

an

8 m

etr

es a

wa

y.

Th

is is s

o th

at

the

vis

ua

l eff

ects

on p

rope

rtie

s to t

he

we

st

are

red

uce

d a

nd

to

loca

te

the

ve

ntila

tion

co

lum

n n

ea

rer

to s

imila

r h

eig

ht b

uild

ings a

nd

in

a p

rom

ine

nt

loca

tion n

ea

r th

e p

ub

lic f

ootp

ath

.

AC

TS

T2:

De

taile

d D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res

Page 22: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

17

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

AC

TS

T.0

6

Ad

va

nce

d tre

e p

lan

tin

g a

lon

g W

arp

le W

ay s

ha

ll b

e

co

mp

lete

d p

rio

r to

site

cle

ara

nce a

nd

con

str

uctio

n

co

mm

en

cin

g in o

rde

r to

pa

rtia

lly s

cre

en

vie

ws o

f th

e s

ite

.

Ma

teria

l p

iles p

ote

ntia

lly u

se

d b

y h

ed

ge

ho

gs a

nd

no

tab

le

inve

rteb

rate

s s

ha

ll b

e r

elo

ca

ted

with

in t

he

ad

va

nced

p

lan

tin

g.

Th

is w

ork

ha

s b

een

und

ert

aken

alrea

dy

AC

TS

T.0

7

Fen

ce

s to

th

e n

ort

h a

nd

we

st

of

the

site

sha

ll b

e r

ep

lace

d

with

a n

ew

hig

h q

ua

lity b

oun

da

ry t

rea

tmen

t. T

he

exte

nt of

the

rep

lacem

en

t bo

un

da

ry t

rea

tmen

t sha

ll b

e a

s s

ho

wn

on

the

pro

po

se

d la

nd

sca

pe

pla

n.

AC

TS

T5:

La

nd

sca

pe

Sch

em

e

AC

TS

T.0

8

Fiv

e b

at

bo

xe

s s

ha

ll b

e a

tta

ch

ed

to t

he

matu

re t

ree

s

reta

ined

on

-site

. A

dd

itio

na

l b

at b

oxe

s s

ha

ll o

nly

be

p

rovid

ed

, sho

uld

th

e n

ee

d fo

r th

em

be

dem

on

str

ate

d.

AC

TS

T5:

La

nd

sca

pe

Sch

em

e (

min

or

str

uctu

re)

AC

TS

T.0

9

The

exis

ting lig

htin

g s

ch

em

e fo

r th

e c

om

po

und

sh

all

be

re

insta

ted

.

AC

TS

T1:

Lig

htin

g O

pera

tio

na

l P

ha

se

AC

TS

T.1

0

Sp

ecie

s-r

ich

wild

flow

er

gra

ssla

nd

, na

tive

tre

es a

nd s

cru

b

sh

all

be p

rovid

ed

in

app

rop

ria

te a

rea

s a

s p

art

of

the

re

insta

tem

en

t of

the

con

str

uctio

n s

ite

.

AC

TS

T5:

La

nd

sca

pe

Sch

em

e

Page 23: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

18

Tab

le 1

.8 H

am

me

rsm

ith

Pu

mp

ing

Sta

tio

n s

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

HA

MP

S.0

1

The

ele

ctr

ical a

nd

con

trol e

qu

ipm

en

t sh

all

be

loca

ted

with

in

the

exis

ting p

um

pin

g s

tatio

n b

uild

ing.

The

lo

ca

l p

en

sto

ck

isola

tio

n k

iosk s

ha

ll b

e loca

ted

on t

he

no

rth

-ea

st

exte

rna

l w

all

of

the

pu

mp

ing s

tatio

n.

Sch

em

e D

esig

n

HA

MP

S.0

2

All

ab

ove

-gro

un

d s

tructu

res s

ha

ll b

e lo

ca

ted

with

in t

he

T

ha

me

s W

ate

r ope

ratio

na

l site

.

Sch

em

e D

esig

n

HA

MP

S.0

3

The

exte

nd

ed a

nd

rebu

ilt c

om

pou

nd w

all

facin

g

Cha

nce

llor’s a

nd

Dis

tille

ry R

oa

ds s

ha

ll vis

ua

lly m

atc

h th

e

exis

ting p

reca

st

co

ncre

te w

all.

The

de

sig

n o

f a

ny w

alls

an

d

fen

cin

g t

o t

he

so

uth

and

we

st

of

the

pum

pin

g s

tatio

n s

ha

ll b

e s

ym

path

etic t

o th

e n

ew

resid

en

tia

l d

eve

lop

men

t.

HA

MP

S9

(D

eta

iled

Desig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

HA

MP

S.0

4

An

y s

tructu

res o

uts

ide

th

e T

ham

es W

ate

r com

pou

nd

sha

ll b

e d

esig

ne

d to

be

in

corp

ora

ted

in

to t

he

pu

blic

rea

lm o

f th

e

resid

en

tia

l d

eve

lopm

en

t th

at

will

be

com

ple

ted

by o

the

rs.

Se

cu

red

th

rou

gh

the

Pro

pe

rty A

gre

em

en

t

HA

MP

S.0

5

No lig

htin

g s

ha

ll b

e p

rovid

ed

, u

nle

ss in

co

rpo

rate

d a

s p

art

of

the

ad

jacen

t re

sid

ential d

eve

lop

me

nt.

Se

cu

red

th

rou

gh

HA

MP

S9

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

HA

MP

S.0

6

The

sig

na

ture

de

sig

n v

en

tila

tion

co

lum

n s

ha

ll n

ot b

e u

se

d.

The

ve

ntila

tion

co

lum

n s

ha

ll be

com

bin

ed

with

the

exis

ting

Ve

ntu

ri v

en

tila

tion

su

pe

rstr

uctu

re loca

ted

with

in t

he

exis

ting

pu

mp

ing s

tatio

n s

ite

. T

he

fa

cin

g m

ate

ria

ls f

or

the

com

bin

ed

str

uctu

re s

ha

ll e

ithe

r m

atc

h th

e e

xis

ting o

r be

re

-cla

d w

ith

m

ate

ria

ls a

pp

rop

ria

te to

the

ir c

on

text.

HA

MP

S9

(D

eta

iled

Desig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

HA

MP

S.0

7

If t

he

Scre

en

Hou

se

is r

em

ove

d, th

en

it

sha

ll b

e r

ep

lace

d

with

a s

tructu

re(s

) th

at sh

all

not

exce

ed

th

e h

eig

ht

an

d

foo

tprin

t of

the

exis

ting S

cre

en H

ou

se b

uild

ing.

Se

cu

red

th

rou

gh

HA

MP

S9

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

wo

uld

allo

w

de

tails

to

be

scru

tin

ised

Page 24: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

19

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

HA

MP

S.0

8

Ba

t ro

ost fe

atu

res f

or

co

mm

on

pip

istr

elle

and

so

pra

no

p

ipis

trelle

ba

ts s

ha

ll b

e m

ou

nte

d in m

atu

re t

ree

s a

lon

g

Cha

nce

llor’s R

oad

on

la

nd

ow

ne

d b

y T

ham

es W

ate

r.

Th

is is a

min

or

wo

rk, w

hic

h is n

ot

de

ve

lop

me

nt,

and

w

hic

h w

ill b

e im

ple

me

nte

d o

n lan

d u

nde

r T

WU

L c

on

trol

HA

MP

S.0

9

The

th

ree

tre

es to

be

re

mo

ve

d a

s p

art

of

the

co

nstr

uction

w

ork

s s

ha

ll n

ot

be

rep

lace

d. T

his

is b

eca

use

th

e a

rea

fo

rma

lly o

ccu

pie

d b

y t

he

tre

es w

ill b

e in

co

rpo

rate

d in

to t

he

a

dja

cen

t de

ve

lop

me

nt site

and

la

nd

scap

ing p

rop

osa

ls.

Th

is is s

ecu

red t

hro

ugh

the

na

ture

of

ad

jace

nt

pla

nn

ing

pe

rmis

sio

n

HA

MP

S.1

0

Su

rfa

ce w

ate

r dra

ina

ge

fo

r th

e a

rea

with

in t

he

Fu

lham

R

ea

ch

de

ve

lopm

en

t sha

ll co

mp

ly w

ith

th

e d

rain

age

de

sig

n

for

the a

pp

rove

d r

esid

en

tia

l sch

em

e.

HA

MP

S7

(S

urf

ace

Wate

r D

rain

age

)

Tab

le 1

.9 B

arn

Elm

s s

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BA

RE

L.0

1

Rep

lacem

en

t cha

ngin

g r

oo

m f

acili

ties s

ha

ll b

e lo

ca

ted

in

clo

se

pro

xim

ity t

o t

he

exis

ting f

acili

ties s

ch

edule

d f

or

de

mo

litio

n a

t a

lo

catio

n a

gre

ed

with

th

e la

nd

ow

ne

r an

d t

he

lo

ca

l p

lann

ing a

uth

ority

.

The

relo

ca

ted t

rack a

nd

fie

ld fa

cili

ties s

ha

ll b

e r

e-p

rovid

ed

a

t lo

catio

ns a

gre

ed

by t

he

lo

ca

l p

lan

nin

g a

uth

ority

in

co

nsu

lta

tio

n w

ith

the

lan

do

wn

er.

Se

cu

red

by B

AR

EL1

0 (

Re

-pro

vis

ion

of

ch

an

gin

g r

oo

ms)

BA

RE

L.0

2

The

pe

rman

en

t w

ork

s s

ha

ll b

e lo

ca

ted

as c

lose

as p

ossib

le

to t

he

sou

th-e

aste

rn p

erim

ete

r of

the

site

, sub

ject

to

inco

rpo

ratin

g a

n 8

m b

uff

er

from

th

e e

mb

an

km

en

t to

th

e

Be

ve

rle

y B

roo

k.

Th

is w

ou

ld a

llow

fo

r flexib

ility

in

th

e

reco

nfigu

ratio

n a

nd

re

loca

tion

of

the

pla

yin

g f

ield

s w

ith

ou

t co

mp

rom

isin

g T

ham

es W

ate

r’s a

cce

ss a

nd

main

ten

an

ce

a

rra

nge

men

ts.

Sch

em

e D

esig

n a

nd B

AR

EL

2 (

Deta

iled

De

sig

n

Ap

pro

va

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res).

Page 25: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

20

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BA

RE

L.0

3

Ve

hic

ula

r m

ain

tena

nce a

cce

ss s

ha

ll b

e f

rom

th

e n

ort

h

alo

ng t

he e

aste

rn e

dge o

f th

e p

layin

g f

ield

s. T

he

su

rfa

ce

of

this

rou

te s

ha

ll b

e r

ein

forc

ed

gra

ss a

nd

th

e c

on

str

uctio

n

sh

all

be c

apa

ble

of

su

pp

ort

ing o

pe

ratio

na

l m

ain

tena

nce

ve

hic

les,

pla

nt o

r equ

ipm

ent.

The

ve

hic

ula

r m

ain

ten

an

ce

a

cce

ss s

ha

ll b

e lo

ca

ted

to

avo

id im

pa

ct o

n m

atu

re t

ree

s.

BA

RE

L5 (

La

nd

scap

e S

ch

em

e)

BA

RE

L.0

4

The

ab

ove

-gro

un

d s

tructu

res s

ha

ll b

e p

ositio

ne

d in

a

pla

ntin

g a

nd

lan

dfo

rm s

ch

em

e s

ym

path

etic t

o t

he

ch

ara

cte

r of

a tre

e-d

om

ina

ted

backd

rop

an

d a

me

nity g

rass (

pla

yin

g

field

) fo

regro

und

, w

he

n v

iew

ed

fro

m w

ith

in t

he p

layin

g

field

s,

as illu

str

ate

d o

n th

e ind

icative

la

nd

sca

pe

pla

n.

BA

RE

L5 (

La

nd

scap

e S

ch

em

e)

BA

RE

L.0

5

The

exte

nt of

ha

rdsta

nd

ing

sh

all

be r

ed

uce

d a

s f

ar

as

pra

cticab

le t

o m

ain

tain

th

e c

ha

racte

r of

the

pla

yin

g f

ield

s

an

d r

ed

uce

su

rfa

ce

wa

ter

run

-off

.

BA

RE

L5 (

La

nd

scap

e S

ch

em

e)

BA

RE

L.0

6

In a

cco

rda

nce

with

FN

CC

.02

, th

ere

sh

all

be

no

se

cu

rity

fe

nce. T

he

refo

re, th

e a

bo

ve

-gro

un

d s

tructu

res s

ha

ll be

d

esig

ne

d to

be

pu

blic

ly a

cce

ssib

le. T

he d

esig

ns s

ha

ll m

ake

p

rovis

ion

fo

r hig

h s

ecurity

do

ors

an

d m

an

ho

le c

ove

rs,

as

we

ll a

s a

n a

pp

rop

ria

te v

oid

ratio

fo

r th

e c

lad

din

g o

f th

e

str

uctu

re.

BA

RE

L5 (

La

nd

scap

e S

ch

em

e)

an

d B

AR

EL2 (

Deta

iled

D

esig

n A

pp

rova

l fo

r P

erm

an

ent

Abo

ve

Gro

un

d

Str

uctu

res)

BA

RE

L.0

7

The

de

sig

n s

ha

ll a

ccom

mo

da

te th

e r

ais

ed

leve

l re

qu

ire

d f

or

the

sh

aft

and

oth

er

hyd

rau

lic s

tructu

res. T

he

y s

ha

ll be

a

cco

mm

od

ate

d in

a r

ein

forc

ed g

rass c

ove

red

ha

rdsta

nd

ing

are

a,

wh

ich is d

esig

ne

d t

o s

upp

ort

he

avy p

lan

t re

qu

ire

d fo

r o

pe

ratio

na

l m

ain

ten

ance

.

BA

RE

L5 (

La

nd

scap

e S

ch

em

e)

BA

RE

L.0

8

The

sig

na

ture

de

sig

n v

en

tila

tion

co

lum

n s

ha

ll n

ot b

e u

se

d.

The

ele

ctr

ical a

nd

con

trol kio

sk a

nd

ve

ntila

tion

co

lum

n s

ha

ll b

e c

om

bin

ed in

to a

sin

gle

str

uctu

re.

The

co

mb

ine

d

BA

RE

L2 (

Deta

iled D

esig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

Page 26: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

21

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

str

uctu

re s

ha

ll h

ave

a b

row

n r

oof

and

th

e w

alls

sh

all

be

finis

he

d t

o p

rom

ote

bio

div

ers

ity.

BA

RE

L.0

9

No lig

htin

g s

ha

ll b

e p

rovid

ed

, e

xce

pt

a lo

w le

ve

l lig

ht

to th

e

kio

sk d

oo

rs to

allo

w a

cce

ss f

or

ma

inte

na

nce p

urp

ose

s in

th

e h

ou

rs o

f da

rkne

ss. T

his

lig

ht

sh

all

on

ly b

e a

ctiva

ted

by

a d

ire

ction

al m

otion

con

trol sw

itch

, lin

ke

d to

th

e d

oo

r o

pen

ing.

Se

cu

red

th

rou

gh

BA

RE

L2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

ane

nt A

bo

ve

Gro

un

d S

tructu

res)

wo

uld

allo

w

de

tails

to

be

scru

tin

ised

BA

RE

L.1

0

La

nd

sca

pin

g s

ha

ll in

clu

de

se

mi-im

pro

ve

d a

cid

to

neu

tral

gra

ssla

nd

to

pro

mo

te b

iod

ive

rsity a

rou

nd

ope

ratio

na

l str

uctu

res a

nd a

lon

g the

ope

ration

al a

cce

ss r

oa

d. A

ny

lan

dscap

ing s

ha

ll no

t im

pin

ge

on

th

e u

se

of

the

pla

yin

g

field

s.

BA

RE

L5 (

La

nd

scap

e S

ch

em

e)

BA

RE

L.1

1

15

ba

t b

oxe

s s

ha

ll be

in

sta

lled in

re

-pro

vid

ed

tre

es a

nd

on

e

xis

ting t

ree

s in

ord

er

to p

rom

ote

bio

div

ers

ity.

Ad

ditio

na

l b

at b

oxe

s s

ha

ll on

ly b

e p

rovid

ed

if

a d

em

on

str

ab

le n

eed

ca

n b

e e

sta

blis

he

d.

New

tre

es s

ha

ll b

e o

f a

n a

pp

rop

ria

te

he

igh

t a

nd

gro

wth

pa

tte

rn in

ord

er

to p

hysic

ally

a

cco

mm

od

ate

ba

t b

oxe

s a

nd

to

in

cre

ase

th

e c

ha

nce

of

su

cce

ssfu

l u

se

by b

ats

.

BA

RE

L5 (

La

nd

scap

e S

ch

em

e)

BA

RE

L.1

2

Ten

bird

bo

xe

s f

or

sm

all

bird

sp

ecie

s s

ha

ll be

att

ach

ed t

o

ma

ture

tre

es o

r d

en

se

sh

rub

/un

de

r sto

rey s

pecie

s m

ay b

e

pla

nte

d in

ord

er

to p

rom

ote

bio

div

ers

ity.

Ad

ditio

na

l b

ird

b

oxe

s s

ha

ll on

ly b

e p

rovid

ed

if

a d

em

on

str

ab

le n

ee

d c

an

b

e e

sta

blis

he

d.

BA

RE

L5 (

La

nd

scap

e S

ch

em

e)

Page 27: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

22

Tab

le 1

.10 P

utn

ey E

mb

an

km

en

t F

ore

sh

ore

sit

e-s

pe

cif

ic d

esig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

PU

TEF.

01

In o

rde

r to

min

imis

e the

vis

ua

l a

nd

ph

ysic

al im

pa

ct

on

the

lis

ted

brid

ge

, th

e to

p o

f th

e in

terc

ep

tio

n c

ham

be

r sha

ll sit

be

low

th

e s

prin

gin

g p

oin

t of

the

brid

ge

arc

h a

nd

be

as s

ma

ll a

s p

ossib

le.

The

in

terc

ep

tion

ch

am

be

r sha

ll be

se

t b

ack

from

th

e m

ain

brid

ge

ele

va

tio

ns a

s fa

r as p

ossib

le t

o

ma

inta

in th

e a

rchite

ctu

ral in

tegrity

of

the

exis

ting b

rid

ge

.

PU

TE

F2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

PU

TEF.

02

The

in

terc

ep

tion

cham

be

r sha

ll b

e f

inis

he

d in

hig

h q

ua

lity,

fair-f

ace

d c

on

cre

te t

ha

t co

mp

lem

en

ts t

he

exis

ting f

inis

h o

f th

e b

rid

ge

.

PU

TE

F2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

PU

TEF.

03

In o

rde

r to

min

imis

e t

he

siz

e o

f th

e in

terc

ep

tio

n c

ha

mb

er

(see

PU

TE

F.0

1 a

bo

ve

) an

d m

ain

tain

hyd

rau

lic in

tegrity

, th

ere

sh

all

be

no

op

en

ings s

uch

as a

cce

ss c

ove

rs a

nd

fla

p

va

lve

op

en

ings in th

e s

tructu

re.

PU

TE

F2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

PU

TEF.

04

Le

ve

l a

cce

ss to

the

fo

resh

ore

str

uctu

re s

ha

ll b

e p

rovid

ed f

or

ma

inte

na

nce v

eh

icle

s v

ia t

he

Em

ban

km

en

t/Lo

we

r R

ich

mo

nd

R

oa

d.

PU

TE

F4

(D

eta

iled

De

sig

n A

pp

rova

l of

Riv

er

Wall

an

d

Fore

sh

ore

Str

uctu

res)

PU

TEF.

05

The

su

rfa

ce

of

the

fo

resh

ore

str

uctu

re s

ha

ll sit a

t o

r abo

ve

cu

rre

nt floo

d d

efe

nce le

ve

l.

PU

TE

F4

(D

eta

iled

De

sig

n A

pp

rova

l of

Riv

er

Wall

an

d

Fore

sh

ore

Str

uctu

res)

PU

TEF.

06

The

ele

ctr

ical a

nd

con

trol e

qu

ipm

en

t sh

all

be

ho

use

d in

tw

o

str

uctu

res. T

he

ma

in k

iosk s

ha

ll b

e loca

ted

on W

ate

rma

n’s

G

ree

n a

nd a

sm

alle

r kio

sk s

ha

ll b

e lo

ca

ted

on t

he

fo

resho

re

str

uctu

re.

PU

TE

F2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

Page 28: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

23

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

PU

TEF.

07

The

de

sig

n a

nd

mate

ria

ls o

f th

e fa

cad

es o

f th

e m

ain

kio

sk

sh

all

matc

h th

e e

xis

tin

g b

rid

ge

ab

utm

en

t w

all.

The

de

sig

n

an

d la

yo

ut

of

this

kio

sk s

ha

ll a

cco

mm

od

ate

the

co

ntin

ued

u

se

of

an

exis

ting v

en

tila

tion

lou

vre

loca

ted w

ith

in th

e

ab

utm

en

t w

all.

PU

TE

F2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

PU

TEF.

08

The

ma

in k

iosk s

ha

ll be

as n

arr

ow

in

de

pth

as p

ossib

le (

ie,

to m

inim

ise t

he e

xte

nt to

wh

ich it p

rotr

ud

es o

ff th

e e

xis

ting

wa

ll) to

maxim

ise s

pa

ce

on W

ate

rma

n’s

Gre

en

.

PU

TE

F2

(D

eta

iled

Desig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

PU

TEF.

09

The

cab

le a

nd

du

ctin

g r

ou

te to

th

e m

ain

kio

sk s

ha

ll ru

n

be

ne

ath

the

pa

ve

me

nt a

nd

roa

d s

urf

ace

. O

nly

wh

ere

th

is is

no

t p

racticab

le,

sha

ll th

e r

ou

te b

e lo

cate

d b

ene

ath

W

ate

rman

’s G

reen

. T

his

is in o

rde

r to

pro

tect tr

ee

roots

an

d

avo

id d

istu

rban

ce

to

Wa

term

an

’s G

ree

n.

PU

TE

F1

3 (

La

nd

sca

pe

Sch

em

e)

PU

TEF.

10

No

ve

hic

ula

r acce

ss s

ha

ll b

e p

rovid

ed

to

th

e m

ain

kio

sk.

Ma

inte

na

nce a

cce

ss s

ha

ll b

e o

n fo

ot

via

Wate

rman

’s G

reen

. In

em

erg

en

cie

s v

eh

icle

s s

ha

ll pa

rk o

n th

e a

dja

ce

nt p

ub

lic

dra

wd

ock/s

lipw

ay o

r carr

iage

wa

y.

Se

cu

red

th

rou

gh

PU

TE

F1

7 (

Sp

ecific

ation

of A

cce

sse

s)

PU

TEF.

11

No n

ew

lig

htin

g s

ha

ll b

e p

rovid

ed

to

Wate

rman

’s G

ree

n

exce

pt

a lo

w le

ve

l lig

ht

to th

e m

ain

kio

sk d

oo

rs t

o a

llow

a

cce

ss fo

r m

ain

ten

an

ce

pu

rpo

se

s in

the

ho

urs

of

da

rkne

ss.

Th

is lig

ht

sha

ll o

nly

be

activa

ted

by a

dire

ctio

na

l m

otio

n

co

ntr

ol sw

itch

, lin

ke

d to

the

do

or

op

en

ing

.

PU

TE

F1

9 (

Lig

htin

g –

Op

era

tion

Ph

ase

)

PU

TEF.

12

The

kio

sk o

n th

e fo

resh

ore

str

uctu

re s

ha

ll be

po

sitio

ne

d to

m

ark

th

e w

este

rn jun

ction

with

th

e e

xis

ting e

mb

an

km

en

t a

nd

m

ed

iate

th

e le

ve

l ch

ange

be

twe

en

th

e p

ave

me

nt a

nd t

he

fo

resh

ore

str

uctu

re.

The

fin

ish o

f th

e k

iosk s

ha

ll b

e d

esig

ned

to e

nh

an

ce

th

e

pu

blic

rea

lm a

nd

sh

all

inclu

de p

ub

lic a

rt, p

ossib

ly

PU

TE

F2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

Page 29: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

24

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

inco

rpo

ratin

g h

isto

ric in

terp

retive

info

rma

tio

n o

n th

e a

rea

a

nd

ma

ritim

e e

ve

nts

, in

acco

rda

nce

with

th

e In

terp

reta

tion

S

trate

gy.

An

y p

ub

lic a

rt a

t th

is s

ite

sha

ll b

e p

rocu

red

in

clo

se

co

llabo

ration

with

the

lo

ca

l a

uth

ority

’s A

rts T

eam

.

PU

TEF.

13

The

de

sig

n o

f th

e v

en

tila

tion

co

lum

n (

po

sitio

ne

d o

n th

e

liste

d b

rid

ge

) sha

ll b

e a

pp

rop

ria

te to

th

e lis

ted

str

uctu

re a

nd

in

ke

ep

ing w

ith

th

e c

hara

cte

r of

su

rro

und

ing s

tree

t fu

rnitu

re.

The

ve

ntila

tion

co

lum

n o

n th

e fo

resho

re s

tructu

re s

ha

ll b

e

the

sig

na

ture

de

sig

n (

in a

cco

rda

nce

with

FN

CC

.03

)

PU

TE

F2

0 (

Deta

iled

Desig

n A

pp

rova

l fo

r S

igna

ture

V

en

tila

tio

n C

olu

ms)

PU

TEF.

14

The

la

yo

ut of

the

pe

rma

nen

t w

ork

s s

ha

ll m

inim

ise a

ny v

isua

l a

nd

ph

ysic

al eff

ects

on t

he

exis

ting s

lipw

ay a

nd

sha

ll a

vo

id

the

ne

ed

fo

r alte

ratio

ns.

An

y s

lipw

ay m

ate

ria

ls t

ha

t a

re

dis

turb

ed

by t

he c

on

str

uction

wo

rks s

ha

ll be

re

mo

ve

d w

ith

ca

re,

sto

red

an

d r

ein

sta

ted t

o th

e e

xis

ting s

tan

da

rd o

nce

co

nstr

uction

wo

rks a

re c

om

ple

te.

The

layo

ut of

the

p

erm

an

en

t w

ork

s s

ha

ll n

ot p

reju

dic

e t

he

fu

ture

wid

en

ing o

f th

e s

lipw

ay b

y o

the

rs.

PU

TE

F2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

PU

TEF.

15

Pro

vis

ion

sh

all

be

made

fo

r th

e p

ote

ntia

l e

xte

nsio

n o

f th

e

pla

tfo

rm to

redu

ce

th

e a

ccu

mu

lation

of

sed

ime

nt/d

eb

ris in

th

e fo

resho

re a

rea

be

twe

en

th

e e

xis

ting r

ive

r w

alls

an

d t

he

fo

resh

ore

str

uctu

re.

PU

TE

F4

(D

eta

iled

De

sig

n A

pp

rova

l of

Riv

er

Wall

an

d

Fore

sh

ore

Str

uctu

res)

PU

TEF.

16

The

ed

ge

tre

atm

en

t of

the

fo

resho

re s

tructu

re s

ha

ll be

d

esig

ne

d to

fa

cili

tate

the

moo

rin

g o

f ve

sse

ls, e

xce

pt

imm

ed

iate

ly in f

ron

t of

the

ne

w C

SO

ou

tfa

ll w

he

re m

oo

rin

g

sh

all

be p

roh

ibite

d. T

he

han

dra

il sha

ll b

e s

et b

ack f

rom

th

e

ed

ge

of

the

fo

resh

ore

str

uctu

re. It

sha

ll n

ot

inco

rpo

rate

an

y

rem

ova

ble

se

ctio

ns,

exce

pt

if r

equ

ire

d f

or

ve

sse

l lo

ad

ing.

PU

TE

F4

(D

eta

iled

De

sig

n A

pp

rova

l of

Riv

er

Wall

an

d

Fore

sh

ore

Str

uctu

res)

Page 30: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

25

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

PU

TEF.

17

The

fo

resh

ore

str

uctu

re s

its o

n t

he

sta

rtin

g lin

e o

f th

e

Univ

ers

ity B

oa

t R

ace

. T

he

Un

ive

rsity B

oa

t R

ace

sto

ne s

ha

ll b

e r

eta

ined

in

its

cu

rren

t po

sitio

n. A

ph

ysic

al m

ark

er

sha

ll ru

n f

rom

the

sto

ne t

o th

e n

ew

riv

er

wa

ll.

The m

ark

er

sh

all

ha

ve

a d

eta

iled

tre

atm

en

t a

nd u

nle

ss o

the

rwis

e a

gre

ed

with

th

e lo

ca

l a

uth

ority

sh

all

fea

ture

as a

wo

rk o

f pu

blic

art

.

PU

TE

F4

(D

eta

iled

De

sig

n A

pp

rova

l of

Riv

er

Wall

an

d

Fore

sh

ore

Str

uctu

res)

PU

TEF.

18

The

de

sig

n o

f th

e k

iosk o

n th

e f

ore

sho

re s

tructu

re s

ha

ll in

co

rpo

rate

a s

egre

ga

ted

ele

ctr

ica

l co

nn

ection

tha

t is

p

rote

cte

d a

ga

inst

wa

ter

for

use

by t

he

lo

ca

l au

tho

rity

.

PU

TE

F2

(D

eta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

PU

TEF.

19

The

riv

er

wa

ll o

f th

e f

ore

sh

ore

str

uctu

re s

ha

ll b

e f

inis

he

d in

n

atu

ral sto

ne

with

ve

rtic

al tim

be

r fe

nd

ers

on

th

e o

ute

r fa

ce

a

nd

ho

rizo

nta

l tim

be

r fe

nde

rs o

n th

e u

pstr

eam

an

d

do

wn

str

ea

m fa

ce

s.

PU

TE

F4

(D

eta

iled

De

sig

n A

pp

rova

l of

Riv

er

Wall

an

d

Fore

sh

ore

Str

uctu

res)

PU

TEF.

20

The

lis

ted b

olla

rds s

ha

ll b

e c

are

fully

rem

ove

d, sto

red

and

re

insta

ted

fo

llow

ing c

om

ple

tio

n o

f ou

r con

str

uctio

n w

ork

s.

The

y s

ha

ll b

e r

elo

ca

ted

in th

e v

icin

ity o

f th

eir

cu

rre

nt

po

sitio

ns in

kee

pin

g w

ith

the

revis

ed

la

yo

ut an

d a

cce

ss

requ

ire

me

nts

.

PU

TE

F6

(D

eta

iled

of W

ork

s t

o L

iste

d B

uild

ings a

nd

S

tructu

res)

PU

TEF.

21

The

la

yo

ut of

the

fo

resh

ore

str

uctu

re s

ha

ll a

llow

fo

r a p

ier

to

be

con

str

ucte

d f

rom

it in

the

futu

re b

y o

the

rs. T

he

de

sig

n o

f th

e fo

resho

re s

tructu

re s

ha

ll a

lso

ma

ke

pro

vis

ion

fo

r a

n

acce

ss z

on

e a

cro

ss it fr

om

Pu

tne

y E

mba

nkm

en

t to

en

ab

le

ma

inte

na

nce w

ork

s to

be

un

de

rta

ken

.

PU

TE

F4

(D

eta

iled

De

sig

n A

pp

rova

l of

Riv

er

Wall

an

d

Fore

sh

ore

Str

uctu

res)

PU

TEF.

22

The

fo

resh

ore

str

uctu

re s

ha

ll fa

cili

tate

th

e lo

ad

ing a

nd

u

nlo

ad

ing o

f ve

sse

ls a

t its e

aste

rn e

nd

. A

bo

ve

-gro

un

d

str

uctu

res s

ha

ll n

ot

be

loca

ted

in th

is a

rea

to e

nsu

re th

is

activity is u

no

bstr

ucte

d.

PU

TE

F4

(D

eta

iled

De

sig

n A

pp

rova

l of

Riv

er

Wall

an

d

Fore

sh

ore

Str

uctu

res)

Page 31: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

26

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

PU

TEF.

23

The

Ho

lly t

ree

tha

t w

ou

ld b

e r

em

ove

d f

rom

Wate

rman

’s

Gre

en

du

rin

g c

on

str

uction

sha

ll b

e r

ep

laced

with

ano

the

r tr

ee

at a

lo

ca

tion

to b

e a

gre

ed

with

th

e lo

ca

l au

tho

rity

.

PU

TE

F1

3 (

La

nd

sca

pe

Sch

em

e)

PU

TEF.

24

Ba

t bo

xe

s f

or

com

mo

n p

ipis

trelle

an

d s

op

rano

pip

istr

elle

b

ats

sh

all

be a

tta

che

d to

tre

es o

n a

nd

ad

jacen

t to

the

site

.

The

ba

t bo

xe

s s

ha

ll be p

laced

at lo

ca

tion

s w

he

re t

he

y w

ou

ld

no

t b

e d

istu

rbed

by lig

htin

g.

PU

TE

F1

3 (

La

nd

sca

pe

Sch

em

e)

PU

TEF.

25

The

de

sig

n s

ha

ll see

k to

min

imis

e m

ain

ten

an

ce

re

qu

ire

me

nts

and

th

e r

isk o

f lit

ter

accum

ula

tion

.

PU

TE

F1

3 (

La

nd

sca

pe

Sch

em

e)

PU

TEF.

26

The

exis

ting s

urf

ace

wa

ter

dra

ina

ge

regim

e s

ha

ll b

e r

eta

ine

d

as f

ar

as p

ossib

le fo

r are

as o

uts

ide

th

e a

rea o

f la

nd

sca

pin

g

define

d in

th

e S

ite w

ork

s p

ara

me

ter

pla

n.

PU

TE

F1

8 (

Su

rface

Wate

r D

rain

age

)

Tab

le 1

.11 D

orm

ay S

tre

et

sit

e-s

pec

ific

des

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

DR

MS

T.0

1

The

ele

ctr

ical a

nd

con

trol kio

sk a

nd

ve

ntila

tion

co

lum

n s

ha

ll b

e c

om

bin

ed in

to a

sin

gle

str

uctu

re. T

he

sig

na

ture

de

sig

n

ve

ntila

tion

co

lum

n s

ha

ll n

ot b

e u

se

d.

DR

MS

T2

(D

eta

iled

Desig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

DR

MS

T.0

2

No o

pe

ratio

na

l lig

htin

g s

ha

ll b

e p

rovid

ed

excep

t fo

r a

lo

w

leve

l lig

ht

to th

e k

iosk d

oo

rs to

allo

w a

cce

ss fo

r m

ain

tena

nce p

urp

ose

s in

the

ho

urs

of

da

rkness.

Th

is lig

ht

sh

all

on

ly b

e a

ctiva

ted

by a

dire

ctio

na

l m

otion c

on

trol sw

itch

lin

ke

d to

the

do

or

op

enin

g.

DR

MS

T2

(D

eta

iled

Desig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

DR

MS

T.0

3

Exis

ting o

pe

ratio

na

l lig

htin

g t

o th

e d

epo

t a

reas s

ha

ll be

re

tain

ed

or

if r

em

ove

d d

urin

g c

on

str

uctio

n,

sha

ll b

e

rein

sta

ted

up

on

com

ple

tio

n o

f th

e c

on

str

uction

wo

rks.

DR

MS

T2

(D

eta

iled

Desig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

Page 32: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

27

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

DR

MS

T.0

4

Ve

hic

ula

r m

ain

tena

nce a

cce

ss t

o th

e s

ite

sha

ll b

e f

rom

D

orm

ay S

tree

t ra

the

r th

an

The

Ca

use

wa

y,

whic

h is

un

su

ita

ble

fo

r lo

rry t

raff

ic.

Se

cu

red

by n

ew

requ

ire

men

t D

RM

ST

12

DR

MS

T.0

5

The

pe

rman

en

t w

ork

s s

ha

ll b

e p

ositio

ned

to a

llow

fo

r th

e

futu

re p

rovis

ion

of

a r

iver

wa

lkw

ay b

y o

the

rs. T

he

layo

ut of

the

pe

rma

nen

t w

ork

s s

ha

ll p

rovid

e a

min

imum

wid

th o

f 4m

fr

om

th

e e

dge

of

the

kio

sk t

o th

e r

ive

r w

all.

Se

cu

red

by D

RM

ST

2 (

Ap

pro

va

l of

ab

ove

gro

un

d

str

uctu

res)

an

d D

RM

ST

6 (

La

nd

sca

pe

Sch

em

e)

DR

MS

T.0

6

A d

eta

iled

asse

ssm

en

t of

the

exis

ting r

ive

r w

all

sh

all

be

ca

rrie

d o

ut

prio

r to

co

nstr

uctio

n c

om

men

cin

g. S

hou

ld th

e

de

taile

d a

sse

ssm

en

t co

nclu

de

tha

t th

e w

all

requ

ire

s

str

en

gth

en

ing,

ren

ova

tio

n o

r re

bu

ildin

g,

it s

ha

ll b

e

reco

nstr

ucte

d. T

he

de

sig

n o

f th

e r

ep

lace

me

nt ri

ve

r w

all

sh

all:

a.

ma

ke p

rovis

ion

fo

r b

iod

ive

rsity,

takin

g a

cco

un

t of

the

E

nviro

nm

ent

Age

ncy’s

Estu

ary

Ed

ge

s G

uid

ance

(as

requ

ire

d b

y d

esig

n p

rincip

le I

RV

R.1

4)

b.

be

de

sig

ne

d to

sup

po

rt th

e f

ore

ca

st

rais

ed f

loo

d d

efe

nce

le

ve

ls s

tip

ula

ted in

th

e E

nviro

nm

ent

Age

ncy’s

TE

21

00

G

uid

an

ce

(as r

equ

ire

d b

y d

esig

n p

rin

cip

le I

RV

R.0

2)

The

fin

ish o

f th

e r

ive

r w

all

sh

all

vis

ua

lly r

ela

te t

o th

e

su

rro

un

din

gs a

nd

, su

bje

ct

to a

gre

em

ent

with

th

e

En

viro

nm

ent

Age

ncy s

ha

ll in

co

rpo

rate

ho

rizo

nta

l fe

nde

rs to

e

nab

le a

ccre

tio

n a

nd p

ote

ntia

l h

ab

ita

t fo

r ve

ge

tation

an

d

inve

rteb

rate

s.

Se

cu

red

th

rou

gh

the

Co

CP

Pa

rt B

fo

r th

is s

ite a

nd

Requ

ire

me

nt D

RM

ST

6 (

La

nd

sca

pin

g)

DR

MS

T.0

7

Unle

ss a

gre

ed

oth

erw

ise

with

th

e lo

ca

l a

uth

ority

, a

n

op

era

tio

na

l re

fuge

sha

ll b

e p

rovid

ed a

roun

d the

kio

sk a

nd

th

e v

alv

e c

ha

mb

er.

It

sh

all

be c

rea

ted

usin

g b

olla

rds a

nd

sh

all

be d

esig

ned

to m

ain

tain

24

-ho

ur

acce

ss a

nd t

o p

rote

ct

DR

MS

T6

(La

nd

sca

pe S

ch

em

e)

Page 33: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

28

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

aga

inst

ve

hic

le s

trik

e.

DR

MS

T.0

8

A s

ection

of

rive

r w

all

on

th

e s

ou

the

rn s

ide

of B

ell

Lan

e

Cre

ek e

ast of

the s

haft lo

ca

tion

sh

all

be

alte

red

at th

e e

nd

of

the

con

str

uction

pe

rio

d to

in

co

rpo

rate

an in

ter-

tid

al

terr

ace

.

Se

cu

red

th

rou

gh

Re

quire

me

nt

DR

MS

T6 (

Land

sca

pin

g)

DR

MS

T.0

9

Rep

lacem

en

t tr

ee

an

d s

cru

b p

lan

tin

g s

ha

ll be

re

-pro

vid

ed

fo

r ve

ge

tatio

n lo

st

du

rin

g c

on

str

uction

. It s

ha

ll b

e lo

ca

ted

a

dja

cen

t to

Be

ll L

an

e C

ree

k t

o r

esto

re th

e c

orr

ido

r fo

r th

e

mo

ve

me

nt of

an

d fo

ragin

g r

eso

urc

e f

or

ba

ts,

an

d a

ne

stin

g

an

d fo

ragin

g r

eso

urc

e fo

r birds.

DR

MS

T6

(La

nd

sca

pe S

ch

em

e)

Ta

ble

1.1

2 K

ing

Ge

org

e's

Pa

rk s

ite

-sp

ec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

KN

GG

P.0

1

The

pla

ntin

g a

nd

lan

dsca

pe

de

sig

n s

ha

ll re

info

rce e

dge

p

lan

tin

g a

t th

e p

ark

bou

nda

rie

s.

The

exis

ting c

ast

iro

n

raili

ngs a

nd

ga

tes s

ha

ll b

e r

e-u

se

d, if p

racticab

le,

as p

art

of

the

ne

w p

ark

bou

nd

ary

fro

ntin

g B

uckh

old

Ro

ad

.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.0

2

The

exis

ting a

ve

nu

e o

f tr

ee

s a

lon

g t

he

ea

ste

rn e

dge

of

the

p

ark

, w

hic

h t

erm

ina

tes a

t th

e n

ort

h e

nd

with

Bla

ck P

op

lar

an

d R

ed

Oa

k t

ree

s,

sha

ll b

e r

eta

ined

, w

ith

the

exce

ptio

n o

f th

e t

ree

s s

ho

wn

on

th

e D

em

olit

ion

pla

n fo

r re

mo

va

l.

While

th

e R

ed

Oa

k lo

ca

ted in th

e n

ort

he

rnm

ost

are

a o

f th

e

pa

rk, ad

jacen

t to

the

jun

ctio

n w

ith

Bu

ckh

old

Ro

ad

an

d

Nevill

e G

ill C

lose

sh

all

be

reta

ined

, it m

ay r

equ

ire

pru

nin

g.

An

y p

run

ing s

ha

ll be

su

bje

ct to

ap

pro

va

l b

y th

e lo

ca

l p

lan

nin

g a

uth

ority

.

KN

GG

P5

(La

nd

sca

pe

, P

rote

ctive

Me

asu

res)

Page 34: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

29

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

KN

GG

P.0

3

The

de

sig

n s

ha

ll a

ccom

mo

da

te p

lan

s fo

r an

alte

rna

tive

p

ede

str

ian

acce

ss to

th

e p

ark

at th

e c

orn

er

of

Ne

vill

e G

ill

Clo

se

and

Bu

ckh

old

Ro

ad

as s

ho

wn

on

th

e in

dic

ative

L

and

sca

pe

Pla

n. T

he

de

taile

d d

esig

n o

f th

e a

cce

ss s

ha

ll b

e

agre

ed

with

th

e lo

ca

l au

tho

rity

.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.0

4

The

de

sig

n s

ha

ll p

rovid

e p

ath

s w

hic

h c

on

ne

ct

the f

ollo

win

g

po

ints

with

in t

he

pa

rk:

c.

the

pa

th t

o t

he

we

st

of

the

la

ke

d.

the

pa

th t

o t

he

ea

st

of

the

la

ke

e.

the

alte

rnative

en

tran

ce

and

asso

cia

ted

fo

otp

ath

s

pro

vid

ed

at th

e c

orn

er

of

Ne

vill

e G

ill C

lose

and

Bu

ckh

old

R

oa

d (

thro

ugh

de

sig

n p

rin

cip

le K

NG

GP

.03

).

The

la

yo

ut

sh

all

en

su

re t

ha

t th

e lin

ks a

re e

asy f

or

pe

de

str

ian

s to

fo

llow

.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.0

5

The

are

a o

f ha

rdsta

nd

ing s

ha

ll b

e r

ed

uce

d a

s f

ar

as

pra

cticab

le (

in a

cco

rdan

ce

with

FN

CC

.06

).

All

ne

w p

ath

s

an

d a

rea

s o

f h

ard

sta

nd

ing s

ha

ll b

e s

urf

ace

d in

resin

b

ond

ed

gra

ve

l, w

he

reve

r po

ssib

le a

nd

pra

ctica

ble

, u

sin

g a

sp

ecific

ation

tha

t sh

all

be

agre

ed

with

th

e lo

ca

l p

lann

ing

au

tho

rity

.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.0

6

The

de

sig

n s

ha

ll m

axim

ise th

e a

mo

unt

of

soft

la

nd

sca

pin

g

with

in t

he

site

bo

un

da

ry t

o m

ain

tain

th

e c

ha

racte

r of

the

pa

rk a

nd

im

pro

ve

su

rface

wa

ter

dra

ina

ge

. A

t le

ast fo

ur

sp

ecim

en

tre

es s

ha

ll be

pla

nte

d a

lon

g t

he

no

rth

we

ste

rn

bo

un

da

ry in

lo

ca

tion

s th

at fo

rm p

art

of

a c

ohere

nt

lan

dscap

e d

esig

n f

or

the

pa

rk.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

Page 35: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

30

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

KN

GG

P.0

7

Ve

hic

ula

r m

ain

tena

nce a

cce

ss t

o th

e s

ite

sha

ll b

e f

rom

N

evill

e G

ill C

lose

.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.0

8

The

de

sig

n s

ha

ll a

ccom

mo

da

te th

e r

ais

ed

leve

l re

qu

ire

d f

or

the

sh

aft

and

in

terc

ep

tio

n s

tructu

res w

ith

in a

co

he

ren

t la

nd

scap

e d

esig

n f

or

the

pa

rk.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.0

9

The

Joh

n Y

oun

g t

ree

an

d m

em

oria

l be

nch s

ha

ll b

e

pro

tecte

d a

nd r

eta

ine

d in

the

ir c

urr

en

t p

ositio

n in

th

e f

ina

l d

esig

n.

KN

GG

P5

(La

nd

sca

pe

, P

rote

ctive

Mea

su

res)

KN

GG

P.1

0

The

de

sig

n s

ha

ll in

co

rpo

rate

the

pro

vis

ion

of

a s

epa

rate

se

cu

re p

ow

er

an

d w

ate

r su

pp

ly t

o th

e a

rea

of

ha

rdsta

nd

ing

. T

his

will

be

insta

lled

as p

art

of

the

pro

ject fo

r u

se

by t

he

lo

ca

l a

uth

ority

fo

r a

mob

ile c

afé

if

requ

ire

d.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.1

1

A lo

w le

ve

l lig

ht

sh

all

be

pro

vid

ed

to

th

e k

iosk d

oo

rs to

a

llow

acce

ss f

or

ma

inte

nan

ce

pu

rpo

se

s in

the

hou

rs o

f d

ark

ne

ss. T

his

lig

ht

sha

ll o

nly

be

activa

ted

by a

dire

ction

al

mo

tion

con

trol sw

itch

, lin

ke

d to

th

e d

oo

r o

pen

ing.

In

ad

ditio

n,

low

le

ve

l lig

htin

g s

ha

ll b

e p

rovid

ed

at th

e e

ntr

an

ce

to

the

pa

rk,

alo

ng t

he s

tep

s a

rou

nd

th

e p

erm

an

en

t p

latfo

rm

of

the

wo

rks.

KN

GG

P12

(Lig

htin

g –

Op

era

tion

al P

ha

se

)

KN

GG

P.1

2

The

de

sig

n s

ha

ll in

co

rpo

rate

re

-co

nto

urin

g o

f th

e s

ite

to

im

pro

ve

flo

od

pla

in f

low

ch

ara

cte

ristics.

Th

is r

equ

ire

s p

art

of

the

exis

ting s

ite

ad

jace

nt

to th

e s

haft

to

be

lo

we

red

by u

p

to 7

00m

m.

Re

-co

nto

urin

g s

ha

ll b

e in

kee

pin

g w

ith

th

e

ch

ara

cte

r of

the

pa

rk a

nd

th

e o

ve

rall

lan

dscap

e d

esig

n f

or

the

site

..

The

de

sig

n o

f th

e p

erm

ane

nt w

ork

s s

ha

ll h

ave

rega

rd t

o

an

y a

pp

rove

d E

nviro

nm

ent

Age

ncy F

loo

d A

llevia

tion

S

ch

em

es. W

he

re a

pp

rop

ria

te a

nd

pra

ctica

l, th

e d

esig

n s

ha

ll

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

Page 36: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

31

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

be

am

en

de

d t

o r

eflect

the

se

sch

em

es.

KN

GG

P.1

3

On

com

ple

tio

n o

f th

e p

erm

an

ent

wo

rks,

su

itab

le m

ea

su

res

sh

all

be in

co

rpo

rate

d (

su

ch

as g

ap

s in

fe

nce

bo

tto

ms a

nd

ra

ilings)

to a

llow

he

dge

ho

gs f

ree

tra

nsit th

rough

th

e s

ite

.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.1

4

The

la

nd

scap

e d

esig

n s

ha

ll in

clu

de

gro

un

d t

rea

tme

nt

an

d

pla

ntin

g s

tructu

res to

pro

mo

te n

atu

ral co

lon

isa

tio

n b

y

terr

estr

ial in

ve

rteb

rate

s.

Rep

lacem

en

t tr

ee

s s

ha

ll in

clu

de

sem

i-m

atu

re a

nd

sp

ecim

en

tre

es.

KN

GG

P6

(La

nd

sca

pe

Sch

em

e)

KN

GG

P.1

5

Ad

va

nce

d p

lantin

g s

hall

be

com

ple

ted p

rio

r to

site

cle

ara

nce a

nd

con

str

uctio

n w

ork

s c

om

men

cin

g in o

rde

r to

p

art

ially

scre

en

vie

ws o

f th

e s

ite d

urin

g c

on

str

uction

. T

he

a

dva

nce

d p

lantin

g s

ha

ll co

mp

rise t

ree

pla

nting a

lon

g t

he

p

ath

tha

t ru

ns a

dja

ce

nt to

th

e la

ke

un

til it fo

rks to

wa

rds

Bu

ckh

old

Ro

ad

an

d tow

ard

s t

he

site

. T

his

adva

nce

d

pla

ntin

g s

ha

ll b

e r

eta

ine

d in

th

e o

pe

ration

al ph

ase

.

Th

is p

lan

tin

g w

ill b

e u

nd

ert

aken

th

is m

on

th

Tab

le 1

.13 C

arn

wa

th R

oad

Riv

ers

ide

sit

e-s

pec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

CA

RR

R.0

1

The

exis

ting s

urf

ace

wa

ter

dra

ina

ge

regim

e s

ha

ll b

e

reta

ined

as fa

r as p

ossib

le f

or

are

as o

uts

ide

th

e a

rea

of

lan

dscap

ing d

efin

ed in

th

e S

ite

wo

rks p

ara

me

ter

pla

n.

CA

RR

12

(S

urf

ace

Wate

r D

rain

age

)

CA

RR

R.0

2

The

su

rfa

ce

of

the

sh

aft

sh

all

be

in

co

rpo

rate

d into

a n

ew

a

rea

of

land

scap

ed p

ub

lic s

pa

ce. T

he d

esig

n o

f th

e

lan

dscap

ed p

ub

lic s

pace

will

be

su

ch

tha

t it s

ha

ll a

llow

th

e

sp

ace

to

be

inte

gra

ted into

th

e w

ide

r de

ve

lopm

ent

of

the

a

rea

by o

the

rs. T

he

top

of

the s

haft

sla

b s

ha

ll b

e b

urie

d 1

m

CA

RR

1 (

Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

Page 37: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

32

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

be

low

th

e f

inis

he

d s

urf

ace

le

ve

l to

en

ab

le t

ree

pla

ntin

g a

nd

soft

lan

dscap

ing.

CA

RR

R.0

3

The

ne

w p

ub

lic s

pa

ce

sh

all

str

en

gth

en

th

e lin

ks b

etw

ee

n

Carn

wa

th R

oa

d a

nd t

he

riv

er

by im

pro

vin

g v

isu

al an

d

pe

de

str

ian

pe

rme

ab

ility

acro

ss t

he

site.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e)

CA

RR

R.0

4

The

la

nd

scap

e t

rea

tmen

t sha

ll scre

en

th

e s

pace

fro

m t

he

tr

aff

ic e

ffe

cts

of

Ca

rnw

ath

Roa

d a

llow

ing f

or

fram

ed

vie

ws o

f th

e t

ida

l T

ha

me

s.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e)

CA

RR

R.0

5

The

ve

ntila

tion

bu

ildin

g a

nd v

en

tila

tion

co

lum

n s

ha

ll be

p

ositio

ne

d o

n th

e e

aste

rn s

ide

of

the

Whiffin

Wharf

ele

me

nt

of

the

site t

o c

rea

te a

buff

er

be

twe

en

Whiffin

Wharf

and

the

a

dja

cen

t safe

gu

ard

ed

wh

arf

. S

ho

uld

de

ve

lopm

ent

by o

the

rs

co

me f

orw

ard

on

Whiffin

Wha

rf w

ith

in a

co

mpa

tib

le

tim

esca

le,

con

sid

era

tion

sh

all

be

giv

en

to

wh

eth

er

the

ve

ntila

tion

bu

ildin

g a

nd v

en

tila

tion

co

lum

n c

an b

e inte

gra

ted

into

th

is d

eve

lopm

en

t.

CA

RR

1 (

(Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

CA

RR

R.0

6

The

arc

hite

ctu

ral tr

ea

tme

nt

of

the

ve

ntila

tion

bu

ildin

g a

nd

b

oun

da

ry w

all/

fen

ce s

ha

ll co

ord

ina

te w

ith

and

co

mp

lem

en

t th

e lan

dscap

e d

esig

n fo

r th

e n

ew

pu

blic

sp

ace

.

CA

RR

1 (

(Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

Page 38: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

33

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

CA

RR

R.0

7

A d

eta

iled

asse

ssm

en

t of

the

exis

ting r

ive

r w

all

sh

all

be

ca

rrie

d o

ut

prio

r to

co

nstr

uctio

n c

om

men

cin

g. S

hou

ld th

e

de

taile

d a

sse

ssm

en

t co

nclu

de

tha

t th

e w

all

requ

ire

s

str

en

gth

en

ing,

ren

ova

tio

n o

r re

bu

ildin

g,

it s

ha

ll b

e

reco

nstr

ucte

d. T

he

de

sig

n o

f th

e r

ep

lace

me

nt ri

ve

r w

all

sh

all

no

t co

mp

rom

ise

the

via

bili

ty o

f H

urlin

gh

am

Wharf

(in

a

cco

rdan

ce

with

FN

CC

10

) and

sha

ll m

ake

pro

vis

ion

fo

r b

iod

ive

rsity,

takin

g a

cco

un

t of

the E

nviro

nm

en

t A

ge

ncy’s

E

stu

ary

Ed

ge

s G

uid

ance

(as r

equ

ire

d b

y d

esig

n p

rin

cip

le

IRV

R.1

4).

CA

RR

16

((D

eta

iled

Desig

n A

pp

rova

l R

ive

r W

all)

CA

RR

R.0

8

All

sh

aft

acce

ss o

pe

nin

gs a

nd

co

ve

rs s

ha

ll b

e loca

ted

with

in

the

bo

un

da

ry o

f W

hiffin

Wha

rf.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e)

CA

RR

R.0

9

The

ve

ntila

tion

co

lum

n s

ha

ll sta

nd

a m

axim

um

of

15m

hig

h

an

d h

ave

a m

inim

um

pro

po

rtio

n o

f 1

:4 (

girth

to

he

igh

t). T

he

ve

ntila

tion

co

lum

n s

ha

ll b

e m

ain

tain

ab

le f

rom

th

e o

uts

ide

, e

g,

for

the

rep

lacem

ent

of

an

y lig

htin

g c

ab

ling,

co

nd

uits a

nd

cla

dd

ing.

CA

RR

1 (

Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

CA

RR

R.1

0

The

he

igh

t a

nd

cro

ss-s

ectio

n o

f th

e v

en

tila

tio

n r

equ

ire

me

nts

a

t th

is s

ite

pre

clu

de t

he

use o

f th

e s

ign

atu

re d

esig

n

ve

ntila

tion

co

lum

n.

How

eve

r, th

e f

orm

an

d d

esig

n o

f th

e

co

lum

n s

ha

ll m

ake

a v

isu

al re

fere

nce

to

th

e s

ign

atu

re

de

sig

n f

or

con

sis

ten

cy w

ith

oth

er

site

s.

CA

RR

1 (

Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

CA

RR

R.1

1

The

de

sig

n o

f th

e v

en

tila

tion

co

lum

n s

ha

ll m

ark

it

as a

lo

ca

l la

ndm

ark

an

d e

nha

nce t

he

lo

ca

l to

wn

sca

pe

. I

f th

e f

ina

l d

esig

n f

or

the

ve

ntila

tio

n c

olu

mn

in

co

rpo

rate

s lig

htin

g,

an

y

pro

vis

ion

s d

eem

ed

nece

ssa

ry b

y t

he

Civ

il A

via

tion

Au

tho

rity

sh

all

be a

ccom

mo

da

ted

with

in t

he

de

sig

n a

s th

e s

ite is o

n

the

ap

pro

ach

to

Ba

tte

rsea

He

lipo

rt.

CA

RR

1 (

Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

Page 39: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

34

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

CA

RR

R.1

2

Lig

htin

g s

ha

ll b

e p

rovid

ed

to

the

Tha

me

s P

ath

an

d n

ew

p

ub

lic a

rea

in a

cco

rdan

ce

with

th

e lig

htin

g d

esig

n p

rin

cip

les.

CA

RR

13

(Lig

htin

g –

Op

era

tion

al P

ha

se

)

CA

RR

R.1

3

The

site

la

yo

ut

sha

ll le

ave

suff

icie

nt sp

ace

to a

cco

mm

od

ate

a

fea

sib

le fo

otp

rin

t fo

r re

sid

entia

l d

eve

lopm

en

t a

t th

e

we

ste

rn e

nd

of W

hiffin

Wharf

. N

o o

pe

ratio

na

l a

sse

ts, b

urie

d

or

oth

erw

ise,

sh

all

be

site

d w

est

of

the s

haft

’s e

xte

rna

l d

iam

ete

r.

Not

sp

ecific

ally

se

cu

red

CA

RR

R.1

4

New

ha

nd

raili

ng s

ha

ll b

e p

rovid

ed o

n t

he

riv

er

wa

ll in

a

cco

rdan

ce

with

Roya

l S

ocie

ty f

or

Pre

ve

ntion o

f A

ccid

en

ts

gu

ida

nce

.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e)

CA

RR

R.1

5

The

ve

ntila

tion

bu

ildin

g a

nd b

ou

nda

ry t

rea

tmen

t to

the

e

aste

rn e

dge

of W

hiffin

Wha

rf s

ha

ll b

e c

lad

in

the

sam

e h

igh

qu

alit

y m

ate

ria

ls. T

he

se

lection o

f m

ate

ria

ls s

ha

ll com

ply

w

ith

th

e S

an

ds E

nd

Con

se

rvation

Are

a A

pp

rais

al.

CA

RR

1 (

Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

CA

RR

R.1

6

Lo

nd

on

Pla

ne

tre

es s

ha

ll b

e u

se

d w

he

re a

pp

rop

ria

te, to

su

pp

lem

en

t n

ative

pla

ntin

g a

nd e

nh

an

ce

th

e lan

dscap

e

de

sig

n o

f th

e s

ite

.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e)

CA

RR

R.1

7

The

fou

r tr

ee

s p

ropo

sed

fo

r re

mo

va

l to

fa

cili

tate

the

C

arn

wa

th R

oa

d/W

andsw

ort

h B

rid

ge

Ro

ad

jun

ctio

n

imp

rove

men

t sh

all

be r

ep

laced

as c

lose

as p

ossib

le t

o th

eir

exis

ting lo

ca

tio

ns.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e)

CA

RR

R.1

8

Hig

h q

ua

lity s

ecu

re h

oa

rdin

gs s

ha

ll be

left

aro

und

the

b

oun

da

ry o

f H

urlin

gh

am

Wha

rf a

nd

the

Ca

rnw

ath

Ro

ad

in

du

str

ial a

rea

.

Se

cu

red

by n

ew

requ

ire

men

t C

AR

RR

17

CA

RR

R.1

9

The

roof

of

the

ve

ntila

tio

n b

uild

ing s

ha

ll be

mon

o-p

itche

d

an

d fe

atu

re w

ate

r colle

ctio

n a

lon

g t

he w

este

rn p

erim

ete

r to

m

ake m

ain

ten

an

ce

easie

r.

CA

RR

1 (

Deta

iled

De

sig

n A

pp

rova

l fo

r P

erm

an

en

t A

bo

ve

Gro

un

d S

tructu

res)

Page 40: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

35

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

CA

RR

R.2

0

The

Tha

me

s P

ath

sh

all

be

a m

inim

um

wid

th o

f 6m

alo

ng t

he

ri

ve

r fr

onta

ge

of W

hiffin

Wha

rf, e

xce

pt

wh

ere

th

e v

en

tila

tio

n

co

lum

n e

ncro

ache

s in

to t

his

wid

th.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e).

CA

RR

R.2

1

The

re s

ha

ll b

e n

o v

eh

icu

lar

acce

ss to

th

e n

ew

are

a o

f pu

blic

sp

ace

exce

pt fo

r m

ain

ten

an

ce

pu

rpo

se

s, u

nle

ss o

the

rwis

e

agre

ed

with

th

e lo

ca

l au

tho

rity

.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e).

CA

RR

R.2

2

Nesting f

ea

ture

s s

ha

ll b

e p

rovid

ed a

t a

pp

rop

riate

lo

ca

tio

ns

on

-site

fo

r ne

stin

g b

lack r

ed

sta

rts w

he

re th

ey w

ill n

ot

co

mp

rom

ise t

he

via

bili

ty o

f H

urlin

gh

am

Wha

rf (

in

acco

rdan

ce

with

FN

CC

10

). T

his

ha

s th

e p

ote

ntia

l to

in

cre

ase

th

e p

op

ula

tion

of

this

spe

cie

s o

f conse

rva

tio

n

co

nce

rn in

Lo

ndo

n a

nd t

he

UK

.

CA

RR

7 (

La

nd

sca

pe

Sch

em

e).

Tab

le 1

.14 F

alc

on

bro

ok P

um

pin

g S

tati

on

sit

e-s

pec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

FA

LP

S.0

1

The

are

a o

uts

ide t

he

pu

mp

ing s

tation

com

pou

nd

sh

all

be

p

ub

licly

acce

ssib

le a

t nig

ht.

Ne

w lig

htin

g s

ha

ll b

e p

rovid

ed

in a

cco

rda

nce w

ith

th

e lig

htin

g p

rin

cip

les.

Se

cure

d b

y R

eq

uire

me

nts

FA

LP

S4

(L

an

dsca

pin

g)

and

F

AL

PS

10(L

igh

ting

)

FA

LP

S.0

2

The

de

sig

n s

ha

ll a

ccom

mo

da

te th

e r

ais

ed

leve

l re

qu

ire

d f

or

the

sh

aft

and

com

bin

ed

va

lve

/inte

rcep

tio

n s

tructu

res.

FA

LP

S1

1 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

anen

t A

bove

G

roun

d S

tru

ctu

res).

FA

LP

S.0

3

Ve

hic

ula

r m

ain

tena

nce a

cce

ss s

ha

ll b

e t

hro

ugh

Yo

rk

Ga

rde

ns t

o th

e e

ast

of th

e p

um

pin

g s

tatio

n.

Th

is is t

he o

nly

access to

th

e s

ite,

and it

is e

xis

tin

g

FA

LP

S.0

4

Follo

win

g c

om

ple

tion

of

co

nstr

uctio

n w

ork

s, th

e e

xis

ting

pu

mp

ing s

tatio

n c

om

po

und

wa

ll sh

all

be

rein

sta

ted

in

its

cu

rre

nt

po

sitio

n. A

n o

pe

n s

ectio

n o

f w

all

with

raili

ngs s

ha

ll b

e in

co

rpo

rate

d to

pro

vid

e a

lin

e o

f sig

ht

betw

ee

n t

he

p

um

pin

g s

tatio

n c

om

po

und

and

th

e s

haft

. D

em

oun

tab

le

Se

cure

d b

y R

eq

uire

me

nt F

AL

PS

4 (

Lan

dsca

pe

– v

ehic

ula

r a

nd

pe

destr

ian a

ccess)

Page 41: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

36

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

raili

ngs/g

ate

d a

cce

ss s

ha

ll b

e in

co

rpo

rate

d in

to t

he

pu

mp

ing

sta

tio

n w

all

ad

jace

nt to

th

e r

ais

ed

inte

rce

ptio

n c

ham

be

r str

uctu

re to

allo

w m

ain

ten

an

ce

acce

ss.

FA

LP

S.0

5

Pe

de

str

ian

on

ly a

cce

ss s

ha

ll be

pro

vid

ed

to

th

e a

rea

o

uts

ide

of

the

pum

pin

g s

tation

com

po

und

, e

xce

pt

for

ve

hic

les r

equ

ire

d f

or

ma

inte

na

nce

pu

rpo

se

s.

Se

cure

d b

y F

AL

PS

4 (

Lan

dsca

pe

Sch

em

e)

wo

uld

se

t o

ut th

e

access r

oute

, b

ut

not o

blig

e t

he u

se o

f th

at

access r

oute

.

FA

LP

S.0

6

The

de

sig

n o

f th

e v

en

tila

tion

co

lum

n s

ha

ll b

e b

espo

ke

as

the

co

lum

n w

ou

ld b

e loca

ted in

th

e p

um

pin

g s

tatio

n

co

mpo

un

d.

FA

LP

S1

1 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

anen

t A

bove

G

roun

d S

tru

ctu

res).

FA

LP

S.0

7

The

land

scap

e d

esig

n s

ha

ll re

sp

on

d p

ositiv

ely

to

th

e lo

ca

l a

uth

ority

's e

me

rgin

g L

an

dsca

pe

Ma

na

gem

ent

Str

ate

gy f

or

the

Yo

rk G

ard

en

s a

rea.

FA

LP

S5

(L

an

dsca

pe S

ch

em

e)

FA

LP

S.0

8

Ad

va

nce

d p

lantin

g s

hall

be

com

ple

ted p

rio

r to

site

cle

ara

nce a

nd

con

str

uctio

n c

om

me

ncin

g.

The

pla

ntin

g s

ha

ll b

e p

rovid

ed a

t th

e p

erim

ete

r of

the p

um

pin

g s

tatio

n

co

mpo

un

d in o

rde

r to

scre

en

vie

ws o

f th

e p

um

pin

g s

tatio

n,

su

b-s

tation

bu

ildin

gs a

nd

th

e c

om

po

un

d. T

he

ad

va

nced

p

lan

tin

g s

ha

ll co

mp

rise t

ree

pla

ntin

g,

wh

ich w

ou

ld b

e

reta

ined

in

th

e o

pe

ration

al ph

ase

.

No

t se

cure

d. P

erh

ap

s S

.106

?

FA

LP

S.0

9

Pla

ntin

g s

ha

ll co

mp

rise

native

de

cid

uo

us t

ree

s a

nd

oth

er

rob

ust,

lo

w-m

ain

tena

nce

sh

rub

s t

ha

t p

rovid

e s

ea

son

al

va

rie

ty.

The

sche

me

sh

all

als

o fa

cili

tate

the

lo

ca

l au

tho

rity

’s

asp

ira

tio

n t

o im

pro

ve

th

e b

iod

ive

rsity v

alu

e o

f Y

ork

G

ard

en

s.

FA

LP

S5

(L

an

dsca

pe S

ch

em

e).

FA

LP

S.1

0

The

exis

ting a

dve

rtis

ing s

cre

en

sh

all

be

pe

rma

nen

tly

rem

ove

d.

Se

cure

d b

y C

oC

P P

art

B

FA

LP

S.1

1

Cob

ble

s f

rom

th

e e

xis

ting p

avin

g in

th

e a

rea

aro

un

d th

e

FA

LP

S5

(L

an

dsca

pe S

ch

em

e).

Page 42: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

37

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

pu

mp

ing s

tatio

n c

om

po

und

sh

all

be

reu

se

d in

the

fin

al

pro

po

sa

ls.

FA

LP

S.1

2

The

en

tran

ce

ga

tes to

th

e p

um

pin

g s

tatio

n c

om

pou

nd

ma

y

be

relo

ca

ted

alo

ng t

he

so

uth

ern

fa

ça

de

to

acco

mm

od

ate

th

e fu

nctio

na

l re

qu

irem

en

ts.

Se

cure

d b

y R

eq

uire

me

nt F

AL

PS

4 (

Lan

dsca

pe

– v

ehic

ula

r a

nd

pe

destr

ian a

ccess)

FA

LP

S.1

3

A p

ed

estr

ian a

cce

ss f

rom

Yo

rk W

ay to

Yo

rk G

ard

en

s s

ha

ll b

e r

ein

sta

ted

.

FA

LP

S5

(L

an

dsca

pe S

ch

em

e).

FA

LP

S.1

4

Ba

t bo

xe

s f

or

a r

an

ge

of

ba

t spe

cie

s s

ha

ll b

e p

rovid

ed

at

su

ita

ble

lo

ca

tion

s in

York

Ga

rde

ns. T

he n

um

be

r of

ba

t b

oxe

s,

loca

tion

s a

nd

me

thod

of

atta

chm

en

t to

tre

es s

ha

ll b

e

agre

ed

with

th

e lo

ca

l au

tho

rity

.

FA

LP

S5

(L

an

dsca

pe S

ch

em

e).

FA

LP

S.1

5

Gro

un

d t

reatm

en

ts s

hall

inco

rpo

rate

are

as o

f sh

ade

d,

exp

ose

d e

art

h to

pro

mote

na

tura

l co

lon

isation

by t

err

estr

ial

inve

rteb

rate

s.

FA

LP

S5

(L

an

dsca

pe S

ch

em

e).

Tab

le 1

.15 C

rem

orn

e W

harf

Dep

ot

sit

e-s

pec

ific

des

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

CR

EW

D.0

1

On

com

ple

tio

n o

f co

nstr

uction

wo

rks, th

e d

epo

t fa

cili

ties

sh

all

be r

ein

sta

ted u

nle

ss a

gre

ed

oth

erw

ise w

ith

th

e

lan

do

wn

er.

CR

EW

D 3

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

an

en

t A

bove

G

roun

d S

tru

ctu

res)

and C

RE

WD

9 (

Site

Resto

ratio

n S

ch

em

e)

doe

s n

ot se

cure

th

ese

de

tails

.

CR

EW

D.0

2

The

foo

tprint,

sca

le a

nd

de

sig

n o

f th

e r

ein

sta

ted

de

pot

facili

ties s

ha

ll re

sp

ect th

e h

isto

ric s

ett

ing o

f th

e lis

ted

p

um

pin

g s

tatio

n.

CR

EW

D 3

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

and C

RE

WD

9 (

Site

Resto

ratio

n S

ch

em

e)

doe

s n

ot se

cure

th

ese

de

tails

. .

CR

EW

D.0

3

The

sig

na

ture

de

sig

n v

en

tila

tion

co

lum

ns s

ha

ll b

e lo

ca

ted

clo

se

to t

he

riv

er

un

less u

np

ractica

ble

with

ou

t im

ped

ing t

he

fu

ture

pro

vis

ion

of

the

Tha

me

s P

ath

. T

he

ve

ntila

tio

n

CR

EW

D3

(D

eta

iled D

esig

n A

ppro

va

l fo

r S

ign

atu

re

Ve

ntila

tion

Colu

mn

s)

Page 43: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

38

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

co

lum

ns s

ha

ll n

ot b

e f

loo

d lit.

CR

EW

D.0

4

Ele

ctr

ica

l a

nd

con

trol equ

ipm

ent

locate

d in

the

Lots

Road

P

um

pin

g S

tatio

n s

ha

ll b

e f

ree

sta

nd

ing a

wa

y f

rom

th

e

exis

ting t

iled

wa

lls.

Th

e t

ile w

all

finis

h t

o th

e p

um

pin

g

sta

tio

n s

ha

ll no

t b

e r

em

ove

d u

nle

ss a

pp

roved

by t

he

lo

ca

l p

lan

nin

g a

uth

ority

.

CR

EW

D2

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

anen

t A

bove

G

roun

d S

tru

ctu

res)

CR

EW

D.0

5

A loca

l con

trol p

illar

sha

ll b

e lo

ca

ted

exte

rna

lly,

ad

jace

nt

(no

t a

tta

che

d)

to th

e r

ea

r w

all

of

the

Lo

ts R

oad

Pum

pin

g

Sta

tion

with

a lin

e o

f sig

ht

to th

e a

cce

ss c

ove

rs o

f th

e C

SO

in

terc

ep

tio

n s

tructu

re.

CR

EW

D4

(D

eta

ils o

f W

ork

s to

Lis

ted B

uild

ing

s a

nd

S

tru

ctu

res)

CR

EW

D.0

6

Lig

htin

g f

or

the r

ein

sta

ted

de

pot

bu

ildin

g s

ha

ll b

e p

rovid

ed

as e

xis

ting a

nd

sha

ll on

ly b

e f

or

op

era

tion

al an

d s

afe

ty

rea

so

ns.

Se

cure

d th

roug

h a

ne

w r

eq

uirem

ent (C

RE

WD

15)

CR

EW

D.0

7

Con

ne

ctio

ns b

etw

ee

n th

e p

erm

an

en

t w

ork

s f

or

the

Tha

me

s

Tid

ew

ay T

unn

el a

nd t

he

ele

ctr

ica

l a

nd c

ontr

ol e

qu

ipm

en

t in

th

e L

ots

Ro

ad P

um

pin

g S

tatio

n s

ha

ll be

ma

de

u

nde

rgro

un

d.

CR

EW

D9

(S

ite

Resto

ratio

n S

ch

em

e)

doe

s n

ot

secu

re th

ese

d

eta

ils.)

CR

EW

D.0

8

The

de

sig

n o

f th

e v

en

tila

tion

co

lum

n to

the

va

lve

an

d

inte

rcep

tio

n c

ham

be

rs s

ha

ll m

ake

use

of

the

ro

ute

of

the

exis

ting c

on

cre

te v

en

tila

tion

sta

ck o

n th

e s

ou

the

ast co

rne

r of

the

Lo

ts R

oa

d P

um

pin

g S

tatio

n.

The

con

ne

ctio

n in

to th

e

sta

ck s

ha

ll b

e m

ad

e u

nd

erg

rou

nd

an

d t

he

ve

ntila

tion

sta

ck

sh

all

be s

ym

pa

the

tica

lly r

ep

lace

d in c

ast

iro

n o

r re

insta

ted

in

brick t

o p

rese

rve

and

enh

an

ce

th

e lis

ted

pu

mp

ing

sta

tio

n.

CR

EW

D4

(d

eta

ils o

f w

ork

s t

o lis

ted b

uild

ings a

nd s

tru

ctu

res)

CR

EW

D.0

9

Su

bje

ct to

th

e a

gre

em

en

t of

the

lan

do

wn

er

an

d th

e d

epo

t’s

op

era

tio

na

l re

qu

irem

en

ts,

ba

t ro

ost fe

atu

res fo

r com

mon

p

ipis

trelle

an

d s

op

rano p

ipis

trelle

ba

ts s

ha

ll be

in

sta

lled

on

-

CR

EW

D 3

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

rou

nd S

tru

ctu

res)

Page 44: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

39

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

site

.

CR

EW

D.1

0

Su

bje

ct to

th

e a

gre

em

en

t of

the

lan

do

wn

er

an

d th

e d

epo

t’s

op

era

tio

na

l re

qu

irem

en

ts,

ne

st b

oxe

s/le

dge

s s

ha

ll b

e

insta

lled

in t

he

rein

sta

ted

de

pot

bu

ildin

g t

o a

ttra

ct

a r

an

ge

of

bird

sp

ecie

s, in

clu

din

g t

he

Bla

ck R

ed

sta

rts a

nd G

rey

Wagta

ils (

an

Am

be

r Lis

t sp

ecie

s).

CR

EW

D 3

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

CR

EW

D.1

1

No b

oxe

s o

r le

dge

s f

or

bird

s/b

ats

sha

ll b

e a

tta

ch

ed

or

ma

de

with

in L

ots

Ro

ad P

um

pin

g S

tatio

n.

CR

EW

D4

(d

eta

ils o

f w

ork

s t

o lis

ted b

uild

ings a

nd s

tru

ctu

res)

CR

EW

D.1

2

The

site

re

sto

ratio

n s

ha

ll m

inim

ise

vis

ua

l clu

tte

r an

d s

treet

furn

itu

re. T

he

de

sig

n s

ha

ll a

lso p

rovid

e a

4m

cle

ar

str

ip

alo

ng t

he r

ive

r fr

on

tage

fo

r th

e fu

ture

pro

vis

ion

of

a

Tha

me

s P

ath

by o

the

rs.

CR

EW

D9

(S

ite

Resto

ratio

n S

ch

em

e)

Tab

le 1

.16 C

hels

ea

Em

ba

nkm

en

t F

ore

sh

ore

dra

ft s

ite

-sp

ec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

CH

EE

F.0

1

The

ne

w r

ive

r w

all

an

d p

ara

pe

t m

ate

ria

ls s

ha

ll m

atc

h t

he

sto

ne a

nd

brick o

f th

e e

xis

ting w

all.

C

HE

EF

3 (

De

taile

d D

esig

n A

ppro

va

l R

ive

r W

all

and

T

err

aces)

CH

EE

F.0

2

The

fo

resh

ore

str

uctu

re s

ha

ll in

co

rpo

rate

te

rra

ce

s a

t a

se

rie

s o

f le

ve

ls o

n t

he

ou

tsid

e o

f th

e r

ive

r w

all

tha

t p

rovid

e

a t

ran

sitio

n f

rom

fu

nctio

nin

g inte

r-tid

al h

ab

ita

t o

n th

e lo

we

st

leve

l to

mo

re f

orm

al p

lan

tin

g.

Ma

inly

na

tive

sp

ecie

s s

ha

ll b

e

use

d. P

re-e

sta

blis

hed

pla

ntin

g s

ha

ll b

e u

sed

fo

r th

e

inte

rtid

al h

ab

ita

t.

CH

EE

F3 (

De

taile

d D

esig

n A

ppro

va

l R

ive

r W

all

and

T

err

aces)

CH

EE

F.0

3

The

pu

blic

rea

lm o

n the

fo

resh

ore

str

uctu

re a

nd

th

e B

ull

Rin

g s

ha

ll b

e v

isua

lly c

on

ce

ive

d a

s o

ne

spa

ce.

A s

en

se o

f e

nclo

su

re w

ill b

e c

rea

ted

on

th

e fo

resho

re s

tru

ctu

re b

y t

he

u

se

of fo

rma

lise

d la

ndsca

pe

pla

ntin

g.

Th

e s

pa

ce

cre

ate

d

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

Page 45: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

40

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

will

be

mirro

red

on

th

e B

ull

Rin

g,

eith

er

by la

nd

sca

pe

p

lan

tin

g o

r su

rface

ma

teria

ls.

CH

EE

F.0

4

The

la

nd

scap

e d

esig

n s

ha

ll re

pla

ce

the

tre

es r

em

ove

d

alo

ng t

he E

mb

an

km

ent.

Th

e s

am

e n

um

be

r of

se

mi-

ma

ture

L

ond

on

Pla

ne

s s

ha

ll be

pro

vid

ed

lo

ca

ted

on

th

e

Em

ba

nkm

en

t o

r th

e B

ull

Rin

g.

A g

ap

in

th

e lin

e o

f th

e e

xis

ting L

on

do

n P

lane

tre

es s

ha

ll b

e

reta

ined

as p

art

of

the

la

nd

sca

pe

sch

em

e t

o fa

cili

tate

vie

ws

be

twe

en

th

e r

ive

r an

d th

e R

oya

l H

osp

ita

l C

he

lse

a.

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.0

5

The

de

sig

n s

ha

ll d

iscou

rage

use

of

the

fo

resh

ore

str

uctu

re

as a

bu

s/c

oa

ch d

rop o

ff.

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.0

6

The

pro

po

sed

sig

na

ture

de

sig

n v

en

tila

tion

co

lum

ns,

ele

ctr

ica

l a

nd

con

trol kio

sks,

an

d t

ree

s s

ha

ll be

lo

ca

ted

b

eyo

nd

th

e w

idth

of

Mo

num

en

t W

alk

to

ma

inta

in c

lea

r vie

ws a

lon

g M

on

um

en

t W

alk

to

an

d f

rom

the

riv

er,

as w

ell

as t

o a

nd

fro

m th

e R

oya

l H

osp

ita

l C

he

lsea.

CH

EE

F2 (

Loca

tion

of

Perm

ane

nt W

ork

s),

CH

EE

F4 (

De

taile

d

De

sig

n A

ppro

va

l fo

r P

erm

ane

nt A

bove

Gro

un

d S

tru

ctu

res)

and

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.0

7

The

la

nd

scap

e d

esig

n o

f th

e c

arr

iage

wa

y a

nd

rou

nda

bo

ut

be

twe

en

th

e B

ull

Rin

g G

ate

and

Ch

els

ea

Em

ba

nkm

en

t (A

32

12

) sha

ll:

f.

be

repa

ve

d t

o m

atc

h the

ne

w f

ore

sho

re s

tructu

re in

n

atu

ral sto

ne

g.

no

t co

mp

rom

ise

the

safe

op

era

tion

of

the

Tra

nsp

ort

fo

r L

ond

on

Ro

ad N

etw

ork

an

d b

us tu

rnin

g

h.

en

su

re th

at

safe

HG

V a

cce

ss is m

ain

tain

ed

fro

m

Che

lsea

Em

ba

nkm

en

t (A

32

12

) fo

r th

e o

pe

ratio

n a

nd

fu

nction

of

the

Ro

ya

l H

osp

ita

l C

he

lsea

, in

clu

din

g t

he

C

he

lsea

Flo

we

r S

ho

w a

nd

Maste

rpie

ce

Lo

ndo

n e

ve

nts

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

& C

HE

EF

16

(H

ighw

ay

Work

s)

Page 46: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

41

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

i.

rein

sta

te t

he

foo

twa

y p

avin

g t

o t

he

no

rth o

f th

e B

ull

Rin

g t

o m

atc

h th

e e

xis

ting a

nd

to

be

ab

le to

with

sta

nd

ve

hic

le o

ve

rru

ns.

j.

pro

vid

e v

isua

lly d

iscre

et

pro

tection

of

the

ga

te p

iers

fr

om

ve

hic

le im

pa

ct

CH

EE

F.0

8

The

exis

ting p

ede

str

ian

cro

ssin

g (

refu

ge

) to

th

e e

ast of

the

B

ull

Rin

g g

ate

s s

ha

ll be

relo

ca

ted

fu

rthe

r ea

st

as p

art

of

the

o

ve

rall

lan

dsca

pin

g s

ch

em

e.

It s

ha

ll p

rovid

e th

e s

am

e

facili

ties a

s e

xis

ting.

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.0

9

The

la

nd

scap

e d

esig

n s

ha

ll m

inim

ise v

isua

l clu

tte

r an

d

str

ee

t fu

rnitu

re.

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.1

0

Tim

be

r fe

nde

rs s

ha

ll no

t be

pro

vid

ed

as th

ey a

re

ina

pp

rop

ria

te to

th

e c

ha

racte

r of

this

str

etc

h o

f th

e r

ive

r w

all.

CH

EE

F3 (

De

taile

d D

esig

n A

ppro

va

l R

ive

r W

all

and

T

err

aces)

CH

EE

F.1

1

The

exis

ting p

arish

bou

nda

ry m

ark

er

sh

all

be r

ein

sta

ted

on

th

e n

ew

riv

er

wa

ll.

CH

EE

F3 (

De

taile

d D

esig

n A

ppro

va

l R

ive

r W

all

and

T

err

aces)

CH

EE

F.1

2

Ra

ilings p

rovid

ed

on

top

of

the n

ew

riv

er

wa

ll p

ara

pe

t on

a

nd

aro

un

d th

e a

xis

fro

m th

e R

oya

l H

osp

ita

l C

he

lsea

, sh

all

be

de

sig

ne

d to

be

vis

ua

lly u

no

btr

usiv

e.

This

is t

o e

nsu

re

vie

ws b

etw

ee

n t

he

riv

er

an

d th

e h

osp

ita

l a

re a

s

un

inte

rru

pte

d a

nd

un

clu

tte

red

as p

ossib

le.

CH

EE

F3 (

De

taile

d D

esig

n A

ppro

va

l R

ive

r W

all

and

T

err

aces)

CH

EE

F.1

3

Inte

rpre

tive

his

torica

l m

ate

ria

l a

nd

info

rmation

tha

t re

fere

nce

s t

he

lo

st

rive

r (W

estb

ou

rne

) sh

all

be

ca

refu

lly

de

sig

ne

d a

nd in

tegra

ted

in

to t

he

site

. A

ny m

ate

ria

l a

nd

info

rma

tio

n s

ha

ll be

agre

ed

with

th

e lo

ca

l a

uth

ority

prio

r to

its im

ple

men

tatio

n.

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

Page 47: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

42

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

CH

EE

F.1

4

The

la

nd

scap

e w

ork

s a

rou

nd

an

d a

bo

ve

the

lo

w le

ve

l se

we

r con

ne

ction

sha

ll b

e g

rad

ed

to

ble

nd

in w

ith

exis

tin

g

leve

ls.

The

ne

w v

en

tila

tion

co

lum

n s

ha

ll b

e lo

ca

ted

on

the

so

uth

ern

ed

ge

of

the

fo

otp

ath

on t

he n

ort

he

rn s

ide

of

Che

lsea

Em

ba

nkm

en

t (A

32

12

) in

the

lin

e o

f th

e e

xis

ting

tree

s.

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.1

5

The

bo

und

ary

tre

atm

en

t of

Rane

lagh

Ga

rde

ns inclu

din

g t

he

ra

ilings a

nd

dw

arf

wa

ll, w

ill b

e r

ein

sta

ted t

o its

cu

rre

nt fo

rm

as p

art

of

the

la

nd

sca

pe

sch

em

e

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.1

6

The

de

sig

n a

nd

pro

vis

ion

of

an

y s

ea

tin

g s

ha

ll d

iscou

rage

ro

ugh

sle

epe

rs.

CH

EE

F8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.1

7

An

y w

ork

s to

th

e c

arr

iage

wa

y o

f th

e C

he

lsea

Em

ba

nkm

en

t (A

32

12

) sha

ll u

se

robust

and

du

rab

le m

ate

ria

ls a

nd b

e t

o

ad

op

tab

le s

tan

da

rds.

CH

EE

F16

(H

igh

wa

y W

ork

s)

CH

EE

F.1

8

The

sig

na

ture

de

sig

n v

en

tila

tion

co

lum

ns s

ha

ll n

ot b

e f

loo

d

lit.

CH

EE

F18

(L

ightin

g –

Ope

ratio

na

l P

hase

)

CH

EE

F.1

9

The

kio

sks s

ha

ll be

vis

ua

lly inte

gra

ted

in

to the

de

sig

n o

f th

e

ne

w r

ive

r w

all,

in o

rde

r to

min

imis

e v

isua

l clu

tte

r on

th

e s

ite

. T

he

y s

ha

ll b

e s

tructu

rally

se

pa

rate

fro

m th

e f

loo

d d

efe

nce

wa

ll.

CH

EE

F4 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

CH

EE

F.2

0

The

de

sig

n s

ha

ll see

k to

min

imis

e m

ain

ten

an

ce

re

qu

ire

me

nts

and

th

e r

isk o

f lit

ter

accum

ula

tion

. C

HE

EF

8 (

Lan

dsca

pe

Sch

em

e)

CH

EE

F.2

1

The

exis

ting s

urf

ace

wa

ter

dra

ina

ge

regim

e s

ha

ll b

e

reta

ined

as fa

r as p

ossib

le f

or

are

as o

uts

ide

th

e

lan

dscap

ed a

re o

n th

e fo

resh

ore

defin

ed

in

the

Site

wo

rks

pa

ram

ete

r pla

n.

CH

EE

F17

(S

urf

ace W

ate

r D

rain

ag

e S

ch

em

e)

Page 48: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

43

Tab

le 1

.17 K

irtl

ing

Str

ee

t sit

e-s

pec

ific

des

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

KR

TS

T.0

1

No o

pe

ratio

na

l lig

htin

g s

ha

ll b

e p

rovid

ed

, e

xce

pt fo

r th

e

co

ncre

te b

atc

hin

g p

lant.

A lo

w le

ve

l lig

ht

to t

he

ele

ctr

ica

l a

nd

co

ntr

ol kio

sk d

oo

rs s

ha

ll a

lso b

e p

rovid

ed

to

allo

w

acce

ss fo

r m

ain

ten

an

ce

pu

rpo

se

s in

the

ho

urs

of

da

rkne

ss.

Th

is lig

ht

sha

ll o

nly

be

activa

ted

by a

dire

ctio

na

l m

otio

n

co

ntr

ol sw

itch

, lin

ke

d to

the

do

or

op

en

ing.

Se

cure

d th

roug

h K

RS

T5 (

Lan

dsca

pin

g)

and K

RS

T7 (

Ba

tch

ing

pla

nt)

KR

TS

T.0

2

No lan

dsca

pe w

ork

s s

ha

ll b

e u

nd

ert

ake

n e

xce

pt fo

r ne

w

tree

pla

ntin

g o

n K

irtlin

g a

nd C

rin

gle

Str

ee

ts (

su

bje

ct to

th

e

agre

em

en

t of

the

hig

hw

ay a

uth

ority

) an

d in

terim

pro

vis

ion

of

sig

na

ge

fo

r th

e T

ham

es P

ath

.

KR

TS

T5

(L

an

dsca

pe

Sch

em

e)

KR

TS

T.0

3

The

ele

ctr

ical a

nd

con

trol kio

sk a

nd

ve

ntila

tion

co

lum

n s

ha

ll b

e c

om

bin

ed in

a s

ingle

str

uctu

re. T

he

sig

na

ture

de

sig

n

ve

ntila

tion

co

lum

n s

ha

ll n

ot b

e u

se

d.

KR

TS

T1

3 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

anen

t A

bove

G

roun

d S

tru

ctu

res)

KR

TS

T.0

4

The

fin

al a

cce

ss a

rra

nge

me

nt a

nd

fe

nce d

esig

n f

or

Kirtlin

g

Wharf

sh

all

be

de

term

ine

d b

y t

he

site

ow

ne

r a

nd

op

era

tor

an

d a

gre

ed

with

Tham

es W

ate

r an

d th

e L

on

do

n B

oro

ugh

of

Wandsw

ort

h.

Se

cure

d b

y R

eq

uire

me

nts

KR

TS

T5(L

an

dsca

pin

g)

and

K

RT

ST

21 (

Sp

ecific

ation

of

Acce

sse

s)

KR

TS

T.0

5

Ve

hic

ula

r m

ain

tena

nce a

cce

ss s

ha

ll b

e p

rovid

ed

fro

m

Kirtlin

g S

tree

t.

KR

TS

T2

1 (

Sp

ecific

ation

of

Acce

sse

s)

KR

TS

T.0

6

The

ma

teria

ls a

nd

de

sig

n o

f an

y r

ein

sta

tem

ent

wo

rks

ou

tsid

e o

f K

irtlin

g W

harf

sh

all

be c

on

sis

ten

t w

ith

the

R

ive

rlig

ht

de

ve

lop

men

t in

ord

er

to s

up

po

rt a

co

he

ren

t pu

blic

re

alm

in t

he a

rea

.

Se

cure

d b

y R

eq

uire

me

nt K

RT

ST

5 (

Lan

dsca

pin

g)

KR

TS

T.0

7

At

the

en

d o

f con

str

uctio

n w

ork

s, th

ose

pa

rts o

f th

e s

ite t

ha

t a

re n

ot

pu

blic

hig

hw

ay o

r con

cre

te b

atc

hin

g p

lan

t sh

all

be

bo

un

d w

ith

hig

h q

ua

lity s

ecu

re h

oa

rdin

gs.

Se

cure

d b

y R

eq

uire

me

nt K

RT

ST

5 (

Lan

dsca

pin

g)

Page 49: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

44

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

KR

TS

T.0

8

The

lo

catio

n o

f th

e p

erm

ane

nt str

uctu

res s

ha

ll n

ot

co

mp

rom

ise t

he

futu

re p

rovis

ion

of

a r

ive

rsid

e T

ham

es P

ath

(b

y o

the

rs).

KR

TS

T1

3 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

anen

t A

bove

G

roun

d S

tru

ctu

res)

KR

TS

T.0

9

The

com

bin

ed

ve

ntila

tio

n a

nd

ele

ctr

ica

l an

d c

on

trol kio

sk

str

uctu

re s

ha

ll u

nle

ss o

the

rwis

e a

gre

ed

be lo

ca

ted w

ith

in

the

ea

ste

rn z

on

e ide

ntified

on

th

e S

ite

wo

rks p

ara

me

ter

pla

n. T

his

is in o

rde

r to

allo

w s

afe

and

un

restr

icte

d a

cce

ss

for

ma

inte

na

nce

pu

rpose

s a

nd

pro

vid

e m

axim

um

fle

xib

ility

fo

r th

e s

ite

s fu

ture

use

.

KR

TS

T1

3 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

anen

t A

bove

G

roun

d S

tru

ctu

res)

KR

TS

T.1

0

Su

rfa

ce w

ate

r dra

ina

ge

fo

r th

e s

haft

are

a a

nd

the

are

a

ab

ove

oth

er

pe

rma

nent

str

uctu

res s

ha

ll b

e d

esig

ne

d t

o tie

in

with

th

e e

xis

ting C

em

ex b

atc

hin

g w

ork

s s

urf

ace

wa

ter

dra

ina

ge

syste

m.

KR

TS

T1

4 (

Su

rface

Wate

r D

rain

ag

e S

ch

em

e)

Tab

le 1

.18 H

ea

thw

all

Pu

mp

ing

Sta

tio

n s

ite

-sp

ec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

HE

AP

S.0

1

A n

ew

, p

ub

licly

acce

ssib

le r

ive

rsid

e w

alk

wa

y s

ha

ll b

e

co

nstr

ucte

d b

etw

ee

n M

idd

le W

ha

rf a

nd

th

e R

ive

rlig

ht

de

ve

lop

me

nt p

rovid

ing a

cce

ss to

th

e fo

resho

re s

tructu

re.

P

rovis

ion

sh

all

be

made

fo

r its c

losu

re d

urin

g e

sse

ntia

l m

ain

tena

nce a

ctivitie

s,

an

d t

he

op

era

tion

of

the

safe

gu

ard

ed

wh

arf

if

requ

ire

d.

A d

ive

rsio

n v

ia N

ine

Elm

s

La

ne

(alo

ng th

e r

ou

te o

f th

e e

xis

tin

g T

ha

me

s P

ath

) sh

all

be

cle

arly s

ign

po

ste

d w

he

n t

he

riv

ers

ide

wa

lkw

ay is c

lose

d.

Se

cure

d b

y R

eq

uire

me

nt H

EA

PS

8 (

Lan

dsca

pin

g –

ve

hic

ula

r a

nd

pe

destr

ian c

ircu

latio

n)

HE

AP

S.0

2

Safe

and

se

cu

re a

cce

ss s

ha

ll be

pro

vid

ed

fo

r fu

ture

use

rs o

f M

idd

le W

ha

rf a

cro

ss t

he

riv

ers

ide

wa

lkw

ay a

nd

ove

r th

e

rive

r w

all

to t

he

ir jett

y.

Se

cure

d b

y R

eq

uire

me

nt H

EA

PS

8 (

Lan

dsca

pin

g)

and

H

EA

PS

12 (

Sp

ecific

atio

n o

f A

cce

sse

s)

Page 50: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

45

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

HE

AP

S.0

3

The

riv

ers

ide

wa

lkw

ay s

ha

ll b

e a

s w

ide

as p

ractica

lly

po

ssib

le (

min

imum

of

4m

, w

he

re p

racticab

le)

with

ou

t co

mp

rom

isin

g t

he

op

era

tio

n o

f th

e s

afe

gu

ard

ed

wh

arf

an

d

Tha

me

s W

ate

r a

ctivitie

s,

or

with

ou

t en

cro

ach

ing in

to th

e

Riv

er

Th

am

es.

Se

cure

d b

y R

eq

uire

me

nt

HE

AP

S8

(L

an

dsca

pin

g –

ve

hic

ula

r a

nd

pe

destr

ian c

ircu

latio

n)

HE

AP

S.0

4

Ma

teria

ls a

nd

fu

rnitu

re in t

he p

ub

lic r

ea

lm s

ha

ll b

e in

a

cco

rdan

ce

with

the

pu

blic

rea

lm s

trate

gy in

th

e V

au

xh

all

Nin

e E

lms B

att

ers

ea

Op

po

rtun

ity A

rea

Pla

nn

ing

Fra

me

wo

rk

an

d s

ha

ll coo

rdin

ate

with

ma

teria

ls u

se

d in

the

ad

jace

nt

Riv

erl

igh

t d

eve

lop

men

t.

HE

AP

8 (

Lan

dsca

pe

Sche

me

)

HE

AP

S.0

5

Ba

rbed

wire

sh

all

be

rem

ove

d f

rom

th

e b

ou

nda

ry a

nd

p

um

pin

g s

tatio

n w

alls

. It

sh

all

be

rep

laced

with

a s

uita

ble

a

nd

ap

pro

pria

te s

ecu

rity

me

asu

re th

at

com

plie

s w

ith

T

ha

me

s W

ate

r secu

rity

requ

ire

me

nts

. T

he

pu

mp

ing s

tation

a

nd

bo

un

da

ry w

alls

sh

all

be

cle

an

ed

an

d p

ain

ted a

s

ne

ce

ssa

ry.

HE

AP

8 (

Lan

dsca

pe

Sche

me

)

HE

AP

S.0

6

The

tre

atm

en

t of

the w

all

at

the

we

ste

rn e

nd o

f th

e M

idd

le

Wharf

site

sha

ll b

e c

oord

ina

ted

with

th

at p

rovid

ed

as p

art

of

the

Riv

erlig

ht

de

ve

lop

me

nt.

HE

AP

8 (

Lan

dsca

pe

Sche

me

)

HE

AP

S.0

7

The

sub

sta

tio

n/o

ffic

e s

tructu

re o

n M

idd

le W

ha

rf s

ha

ll be

re

tain

ed

.

De

mo

litio

n p

lans a

re f

or

app

rova

l a

nd

th

is b

uild

ing is n

ot

pro

po

sed

fo

r d

em

olit

ion

HE

AP

S.0

8

New

tre

es s

ha

ll b

e p

lan

ted o

n N

ine

Elm

s L

ane

in

a

cco

rdan

ce

with

the

pu

blic

rea

lm s

trate

gy in

th

e V

au

xh

all

Nin

e E

lms B

att

ers

ea

Op

po

rtun

ity A

rea

Pla

nn

ing

Fra

me

wo

rk

an

d p

ositio

ne

d t

o m

inim

ise d

isru

ptio

n t

o e

xis

ting u

tilit

ies in

th

e fo

otw

ay.

HE

AP

8 (

Lan

dsca

pe

Sche

me

)

HE

AP

S.0

9

New

lig

htin

g t

o t

he

riv

ers

ide

wa

lkw

ay a

nd

fo

resh

ore

str

uctu

res s

ha

ll b

e p

rovid

ed

in

acco

rda

nce w

ith

the

ge

ne

ric

HE

AP

14 (

Lig

htin

g –

Op

era

tion

al P

hase

)

Page 51: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

46

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

ligh

tin

g p

rin

cip

les a

nd

sh

ou

ld n

ot h

ave

an

y d

ele

terio

us

eff

ect o

n n

avig

atio

n o

n t

he

Riv

er

Tham

es. L

um

ina

res s

ha

ll b

e c

ho

se

n t

o t

ie in w

ith t

he

Riv

erlig

ht

de

ve

lop

me

nt.

HE

AP

S.1

0

Hig

h q

ua

lity f

en

cin

g s

ha

ll b

e p

rovid

ed

to t

he

so

uth

ern

(b

ack)

ed

ge

of

the

riv

ers

ide

wa

lkw

ay.

The

fen

cin

g s

ha

ll in

co

rpo

rate

se

cu

re a

cce

ss g

ate

s to

th

e p

um

pin

g s

tatio

n a

nd

M

idd

le W

ha

rf. T

he

fe

ncin

g f

inis

he

s s

ha

ll tie in w

ith

th

e

ad

jacen

t R

ive

rlig

ht

de

ve

lopm

ent.

HE

AP

8 (

Lan

dsca

pe

Sche

me

)

Tab

le 1

.19 A

lbert

Em

ban

km

en

t F

ore

sh

ore

sit

e-s

pecif

ic d

es

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

AL

BE

F.0

1

Acce

ss t

o L

ack's

Do

ck s

ha

ll be

reta

ine

d f

or

Lo

ndo

n D

uck

Tou

rs L

td. T

he

ir s

ecu

rity

kio

sk a

nd

ve

hic

le b

arr

ier

sh

all

be

re

insta

ted

in

th

eir e

xis

ting lo

ca

tio

n.

AL

BE

F4 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res).

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F 1

6 S

pecific

ation

of

hig

hw

ay a

cce

sse

s

Pro

pe

rty a

gre

em

ent

with

Lo

ndo

n D

uck T

ours

Ltd

AL

BE

F.0

2

An

y p

lan

tin

g lo

st a

lon

g L

ack's

Do

ck d

urin

g c

on

str

uctio

n

sh

all

be r

ep

lace

d.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F.0

3

The

de

sig

n o

f th

e p

erm

ane

nt w

ork

s s

ha

ll re

sp

ect

the

ch

ara

cte

r a

nd s

ett

ing o

f th

e G

rade

II*

lis

ted

Va

uxh

all

Brid

ge

. In

ord

er

to m

inim

ise e

ffe

cts

on t

he

se

ttin

g o

f th

e

brid

ge

, th

e t

op

of

the

inte

rcep

tion

str

uctu

re (

exclu

din

g

ve

ntila

tio

n c

olu

mn

s)

sha

ll b

e b

elo

w t

he

sp

rin

gin

g p

oin

t of

the

brid

ge

arc

h.

AL

BE

F4 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

AL

BE

F3 (

deta

iled d

esig

n o

f rive

rwa

ll a

nd

terr

aces)

AL

BE

F.0

4

Inte

r-tid

al h

ab

ita

t sh

all

be

pro

vid

ed o

n t

he

te

rra

ce

s a

rou

nd

th

e inte

rceptio

n s

tructu

re.

The

de

sig

n o

f th

e inte

r-tid

al

ha

bita

t an

d te

rra

ce

s s

ha

ll:

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F3 (

deta

iled d

esig

n o

f rive

rwa

ll a

nd

terr

aces)

Page 52: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

47

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

k.

min

imis

e t

he

accu

mu

latio

n o

f lit

ter

l.

use

pre

-esta

blis

he

d p

lan

tin

g

m. h

ave

min

imum

fix

ings in

to th

e lis

ted

brid

ge

abu

tmen

t n

. h

ave

an

att

ractive

ap

pe

ara

nce

in

an

un

-ve

ge

tate

d s

tate

o

. d

iscou

rage

acce

ss a

nd c

limb

ing f

rom

the

fo

resh

ore

on

to

the

to

p o

f th

e s

tructu

re

p.

requ

ire

min

imal m

ain

ten

an

ce

.

AL

BE

F.0

5

The

in

terc

ep

tion

str

uctu

re a

nd

te

rra

ce

s s

ha

ll b

e ‘be

dde

d’

into

th

e fo

resho

re b

y r

ocks a

nd

bo

uld

ers

to

soft

en

the

tr

an

sitio

n b

etw

ee

n t

he

te

rra

ce

s a

nd

th

e f

ore

sh

ore

.

AL

BE

F3 (

deta

iled d

esig

n o

f rive

rwa

ll a

nd

terr

aces)

AL

BE

F.0

6

Unle

ss o

the

rwis

e a

gre

ed

with

th

e o

ccup

iers

of

Va

uxh

all

Cro

ss,

the

re s

ha

ll be

no

pub

lic a

cce

ss to

th

e to

p o

f th

e

inte

rcep

tio

n s

tructu

re. L

eve

l m

ain

tena

nce a

cce

ss s

ha

ll b

e

pro

vid

ed

th

rou

gh

the

exis

ting r

ive

r w

all

via

a s

ecu

re g

ate

fr

om

th

e T

ham

es P

ath

. T

he

ga

te s

ha

ll b

e th

e s

am

e h

eig

ht

as t

he

ha

nd

rail

on

th

e e

xis

ting r

ive

r w

all.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

S1

06

pe

rmis

siv

e p

ub

lic r

ealm

if

Va

uxh

all

Cro

ss w

ith

dra

w t

he

obje

ction.

AL

BE

F.0

7

The

shaft

str

uctu

re s

hall

be

pu

blic

ly a

cce

ssib

le e

xce

pt

du

rin

g e

sse

ntia

l m

ain

ten

an

ce

wh

en

it

wo

uld

be

clo

se

d to

th

e p

ub

lic.

S.1

06

pro

vid

ing

fo

r p

erm

issiv

e p

ub

lic r

ealm

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F.0

8

The

ma

in e

lectr

ica

l and

co

ntr

ol kio

sk loca

ted

on

th

e

inte

rcep

tio

n s

tructu

re s

ha

ll b

e lo

ca

ted

in t

he

se

cu

re a

rea

b

elo

w V

au

xh

all

Brid

ge

. T

he

kio

sk s

ha

ll no

t b

e a

tta

ch

ed t

o

the

lis

ted

brid

ge

.

A lo

w le

ve

l lig

ht

sh

all

be

pro

vid

ed

to

th

e k

iosk d

oo

rs to

allo

w

acce

ss fo

r m

ain

ten

an

ce

pu

rpo

se

s in

the

ho

urs

of

da

rkne

ss.

Site

wo

rks p

ara

me

ter

pla

n p

rovid

es lo

catio

n o

f a

bo

ve

gro

un

d

str

uctu

res

AL

BE

F4 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

and A

LB

EF

6 (

De

tails

of W

ork

s t

o L

iste

d

Bu

ildin

gs)

Page 53: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

48

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

Th

is lig

ht

sha

ll o

nly

be

illu

min

ate

d d

urin

g m

ain

tena

nce

activity.

AL

BE

F.0

9

Se

cu

re fe

ncin

g b

oun

din

g t

he

are

a b

elo

w t

he

brid

ge

sh

all

be

re

insta

ted

to

ma

tch t

he e

xis

ting lik

e-f

or-

like

.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

Po

ten

tia

lly A

LB

EF

6 (

De

tails

of W

ork

s t

o L

iste

d B

uild

ing

s)

AL

BE

F.1

0

The

pu

blic

rea

lm locate

d a

bo

ve

the

shaft

str

uctu

re s

ha

ll b

e

ele

va

ted

to

th

e e

xis

ting f

loo

d d

efe

nce

le

ve

l to

en

cou

rage

vie

ws a

cro

ss t

he

riv

er

to t

he

Pa

lace

of W

estm

inste

r W

orld

H

erita

ge

Site

an

d T

ate

Brita

in.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F3 (

deta

iled d

esig

n o

f rive

rwa

ll a

nd

terr

aces)

AL

BE

F.1

1

In o

rde

r to

wid

en

an

d im

pro

ve

the

Tha

me

s P

ath

, th

e len

gth

of

exis

ting T

ha

me

s P

ath

tha

t pa

sse

s b

elo

w C

am

elfo

rd

Hou

se

sh

all

be d

ive

rte

d o

ve

r th

e s

haft

str

uctu

re.

The

T

ha

me

s P

ath

sh

all

be

a m

inim

um

wid

th o

f 4m

acro

ss t

he

sh

aft

str

uctu

re.

The

un

de

rcro

ft a

rea

of C

am

elfo

rd H

ou

se

sha

ll b

e e

nclo

sed

a

nd

sh

all

no

t be

pu

blic

ally

acce

ssib

le,

su

bje

ct to

agre

em

en

t w

ith

th

e la

ndo

wn

er.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

Pro

pe

rty a

gre

em

ent

with

ow

ners

of

Ca

me

lford

Hou

se

AL

BE

F.1

2

The

ele

ctr

ical a

nd

con

trol kio

sk o

n th

e s

haft

str

uctu

re s

ha

ll b

e lo

ca

ted in

th

e p

rop

ose

d t

ree

lin

e.

AL

BE

F4 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F.1

3

Se

atin

g o

n th

e s

haft

str

uctu

re s

ha

ll b

e p

ositio

ne

d to

m

axim

ise v

iew

s o

f th

e P

ala

ce

of W

estm

inste

r W

orld

H

erita

ge

Site

.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F.1

4

Th

ree

ne

w s

em

i-m

atu

re L

on

don

Pla

ne t

ree

s s

ha

ll b

e

pla

nte

d o

n th

e s

haft

str

uctu

re to

sep

ara

te th

e T

ha

me

s P

ath

fr

om

th

e s

ea

tin

g a

rea

.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

Page 54: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

49

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

AL

BE

F.1

5

Rem

ova

ble

bo

llard

s s

ha

ll b

e p

rovid

ed

alo

ng t

he

no

rthe

rn

ed

ge

of

the

entr

y t

o L

ack’s

Dock t

o a

llow

ve

hic

ula

r acce

ss

to t

he

shaft

str

uctu

re f

or

ma

inte

na

nce

pu

rpo

ses.

Th

e

lan

dscap

e d

esig

n s

ha

ll in

clu

de p

rovis

ion

fo

r a v

eh

icle

to

tu

rn a

rou

nd o

n t

he

shaft

str

uctu

re.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F.1

6

Inte

rpre

tive

ma

teria

ls a

nd

info

rma

tio

n o

n th

e v

iew

s a

nd

h

isto

ric in

tere

st of

the s

ite

sh

all

be

in

co

rpo

rate

d in

to th

e

pe

rma

nen

t w

ork

s.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F.1

7

Exis

ting lig

htin

g o

n t

he T

ham

es P

ath

sh

all

be

rein

sta

ted

as

ap

pro

pria

te in a

cco

rdan

ce

with

th

e o

ve

rall

ligh

tin

g d

esig

n.

AL

BE

F19

(L

ightin

g –

Ope

ratio

na

l P

hase

)

AL

BE

F.1

8

Exis

ting p

avin

g in

fro

nt of

the

Va

uxh

all

Cro

ss b

uild

ing s

ha

ll b

e r

ein

sta

ted

in

acco

rda

nce

with

the

la

nd

scape

sch

em

e f

or

the

site

.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F.1

9

The

ne

w r

ive

r w

alls

to

th

e in

terc

ep

tio

n c

ham

be

r an

d s

haft

str

uctu

res s

ha

ll b

e f

inis

he

d in

hig

h q

ua

lity f

air f

ace

d

co

ncre

te.

AL

BE

F (

De

taile

d D

esig

n A

ppro

va

l R

ive

r W

all

and

Te

rra

ce)

AL

BE

F.2

0

Pa

vin

g t

o t

he

to

p o

f th

e in

terc

ep

tion

str

uctu

re s

ha

ll be

im

agin

ative

ly d

esig

ne

d t

o r

efe

ren

ce

the

lo

st rive

r E

ffra

an

d

to b

e a

ttra

ctive

wh

en

vie

we

d f

rom

th

e b

rid

ge

ab

ove

.

AL

BE

F9 (

Lan

dsca

pe S

ch

em

e)

AL

BE

F.2

1

The

exis

ting s

urf

ace

wa

ter

dra

ina

ge

regim

e s

ha

ll b

e

reta

ined

as fa

r as p

ossib

le f

or

are

as o

uts

ide

th

e a

rea

s o

f la

nd

scap

ing d

efin

ed in

th

e S

ite

wo

rks p

ara

me

ter

pla

n.

AL

BE

F18

(S

urf

ace

Wate

r D

rain

ag

e)

Page 55: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

50

Tab

le 1

.20 V

icto

ria

Em

ba

nkm

en

t F

ore

sh

ore

sit

e-s

pe

cif

ic d

esig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

VC

TE

F.0

1

The

ne

w r

ive

r w

all

sh

all

be

fin

ish

ed

in

gra

nite

blo

cks t

o t

ie

in w

ith

th

e e

xis

ting w

all.

VC

TE

F5 (

De

taile

d D

esig

n A

ppro

va

l fo

r S

ign

atu

re V

entila

tion

C

olu

mn

s)

VC

TE

F.0

2

Rep

lacem

en

t tr

ee

s p

lan

ted o

n t

he

Em

ban

km

en

t sh

all

be

se

mi-m

atu

re L

on

don

Pla

ne

s. A

dd

itio

na

l tr

ee

s s

ha

ll be

p

lan

ted

on

th

e fo

reshore

str

uctu

re to

pro

vid

e s

ha

de

and

im

pro

ve

th

e m

icro

clim

ate

.

VC

TE

F16

(L

an

dsca

pe S

ch

em

e)

VC

TE

F.0

3

The

stu

rge

on

lam

p s

tan

da

rds s

ha

ll be

rein

sta

ted

in t

he

ir

cu

rre

nt

po

sitio

n. W

he

re t

he

fo

resh

ore

str

uctu

re p

roh

ibits

this

, th

eir r

e-u

se

sh

all

be

agre

ed

with

th

e lo

ca

l a

uth

ority

.

VC

TE

F8 (

Pro

tective

Work

s t

o L

iste

d B

uild

ing

s)

VC

TE

F.0

4

The

lis

ted (

sph

inx)

be

nch

es o

n th

e V

icto

ria

Em

ban

km

en

t sh

all

be r

ein

sta

ted a

nd r

ep

ositio

ne

d t

o e

ithe

r sid

e o

f th

e

fore

sh

ore

str

uctu

re.

If

this

is n

ot

po

ssib

le,

their r

e-u

se

w

ou

ld b

e a

gre

ed w

ith

th

e lo

ca

l a

uth

ority

.

VC

TE

F8 (

Pro

tective

Work

s t

o L

iste

d B

uild

ing

s)

VC

TE

F.0

5

The

pro

po

sed

sea

tin

g s

ha

ll b

e p

ositio

ned

to m

axim

ise

vie

ws o

ve

r th

e r

ive

r to

wa

rds t

he

Pa

lace

of W

estm

inste

r W

orld

He

rita

ge

Site

.

VC

TE

F16

(L

an

dsca

pe S

ch

em

e)

VC

TE

F.0

6

The

coa

ch

pa

rkin

g o

n V

icto

ria

Em

ban

km

ent sh

all

be

rein

sta

ted

wh

ere

pra

ctica

ble

.

VC

TE

F16

(L

an

dsca

pe S

ch

em

e)

VC

TE

F20

sp

ecific

atio

n o

f a

ccesse

s

VC

TE

F.0

7

The

fe

sto

on

lig

htin

g o

n V

icto

ria

Em

ba

nkm

en

t sh

all

be

rein

sta

ted

as f

ar

as p

ossib

le a

nd

te

rmin

ate

eith

er

sid

e o

f th

e s

tructu

re. N

ew

lig

htin

g s

ha

ll b

e d

esig

ned

in

co

nsu

lta

tio

n w

ith

the

loca

l a

uth

ority

an

d th

e H

isto

ric

Bu

ildin

gs a

nd

Monu

men

ts C

om

mis

sio

n f

or

Engla

nd

.

VC

TE

F22

(L

ightin

g –

Ope

ratio

na

l P

hase

)

VC

TE

F.0

8

The

ele

ctr

ical a

nd

con

trol kio

sk(s

) a

nd

sm

all

am

en

ity

bu

ildin

gs (

to b

e o

pe

rate

d b

y o

the

rs)

sh

all

be

lo

ca

ted

on

th

e

VC

TE

F4 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

round S

tru

ctu

res)

Page 56: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

51

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

line

of

the e

xis

ting r

ive

r w

all.

VC

TE

F.0

9

The

ele

ctr

ical a

nd

con

trol kio

sks s

ha

ll be

cla

d in

natu

ral

sto

ne t

ha

t is

ap

pro

pria

te t

o th

e s

ett

ing a

nd s

ha

ll in

co

rpo

rate

a

pla

nte

d r

oof.

VC

TE

F4 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

VC

TE

F.1

0

Bo

th ju

nction

s w

ith

th

e e

xis

ting r

ive

r w

all

sh

all

be

ma

rked

w

ith

a ‘sh

ad

ow

ga

p’, w

hic

h s

ha

ll b

e d

esig

ne

d to

lim

it

accu

mu

lation

of

litte

r.

VC

TE

F6 (

De

taile

d D

esig

n A

ppro

va

l R

ive

r W

all

and

Te

rra

ces)

VC

TE

F.1

1

Pa

vin

g m

ate

ria

ls s

ha

ll b

e o

f na

tura

l sto

ne

ap

pro

pria

te to

th

e

se

ttin

g.

VC

TE

F16

(L

an

dsca

pe S

ch

em

e)

VC

TE

F.1

2

The

cen

tral pa

rt o

f th

e p

ub

lic r

ea

lm s

ha

ll b

e r

ais

ed

to

flo

od

d

efe

nce

le

ve

l to

cre

ate

vie

win

g p

latf

orm

s t

ow

ard

s t

he

P

ala

ce

of W

estm

inste

r W

orld

He

rita

ge

Site

.

VC

TE

F16

(L

an

dsca

pe S

ch

em

e)

VC

TE

F.1

3

The

raili

ng p

ropo

se

d for

the

fro

nt p

roje

ctin

g a

rea

of

the

fo

resh

ore

str

uctu

re s

ha

ll b

e d

esig

ne

d to

be

vis

ua

lly

un

ob

trusiv

e a

nd w

ou

ld b

e u

ngla

ze

d.

VC

TE

F16

(L

an

dsca

pe S

ch

em

e)

VC

TE

F.1

4

An

y p

ub

lic f

urn

itu

re, fe

ncin

g o

r ra

ilings s

ha

ll be

rob

ust,

d

ura

ble

and

in

ke

ep

ing w

ith

th

e c

ha

racte

r of

the

su

rro

un

din

g to

wn

sca

pe

.

VC

TE

F16

(L

an

dsca

pe S

ch

em

e)

VC

TE

F.1

5

The

de

sig

n o

f th

e p

ub

lic r

ea

lm s

ha

ll be

in

acco

rda

nce

with

gu

ida

nce

in W

estm

inste

r C

ity C

ou

ncil’

s W

estm

inste

r W

ay -

P

ub

lic R

ea

lm S

trate

gy, D

esig

n P

ractice

an

d P

rin

cip

les a

nd

T

ree

s a

nd

th

e P

ub

lic R

ea

lm -

A T

ree

Str

ate

gy f

or

We

stm

inste

r, w

he

re p

ractica

ble

and

un

less o

the

rwis

e

agre

ed

with

th

e C

ity C

ou

ncil.

VC

TE

F16 (

Lan

dsca

pe S

ch

em

e)

VC

TE

F.1

6

The

ea

ste

rn (

fro

nt p

roje

ctin

g)

pa

rt o

f th

e fo

resh

ore

str

uctu

re

sh

all

be d

esig

ned

to s

tep

do

wn

to

be

low

th

e f

loo

d d

efe

nce

leve

l to

cre

ate

an a

rea o

f pu

blic

rea

lm t

ha

t o

cca

sio

na

lly

VC

TE

F16

(L

an

dsca

pe S

ch

em

e),

pote

ntia

l o

ve

rlap

with

P

rote

ctive

Pro

vis

ions a

nd

DM

L C

on

ditio

ns r

ela

ting

to t

he

app

rova

l o

f fo

reshore

deta

ils.

Page 57: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

52

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

floo

ds a

t th

e h

igh

est

tid

es.

The

ste

ps s

ha

ll be

bro

ad

to

p

rovid

e info

rma

l se

ating.

Th

e d

esig

n s

ha

ll p

rovid

e a

safe

m

ean

s o

f e

sca

pe w

he

n t

he

lo

we

r ste

ps a

re f

loo

de

d b

y t

he

tid

e.

Due

to

spa

ce

constr

ain

ts a

nd

th

e d

esig

n in

tent

to

reflect

exis

ting p

roje

ctio

ns in

th

e lis

ted

riv

er

wall,

ste

p f

ree

a

cce

ss to

th

is a

rea

is n

ot

po

ssib

le.

VC

TE

F.1

7

The

pe

rgo

la c

onn

ecting t

he

kio

sks s

ha

ll h

ave a

so

lid f

ram

e

with

lig

htw

eig

ht

inte

rio

r tr

usse

s to

en

su

re th

e v

iew

s o

f th

e

Riv

er

Th

am

es f

rom

Wh

ite

ha

ll a

nd V

icto

ria

Em

ban

km

en

t G

ard

en

s a

re f

ram

ed

bu

t no

t o

ve

rpo

we

red

by th

e s

tructu

re.

The

pla

ntin

g s

pe

cie

s s

ha

ll b

e s

pe

cifie

d to

en

su

re t

he

e

ntr

an

ce

to

the

pu

blic

sp

ace

is s

ha

de

d a

nd

we

lcom

ing a

nd

n

ot d

ark

an

d o

ve

rbe

arin

g.

VC

TE

F4 (

De

taile

d D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

VC

TE

F.1

8

The

ne

w f

ore

sh

ore

str

uctu

re s

ha

ll be

ort

ho

gon

al in

pla

n

with

exte

rna

l co

rne

rs a

t righ

t a

ngle

s.

VC

TE

F6 (

De

taile

d D

esig

n A

ppro

va

l R

ive

r W

all

and

Te

rra

ces)

VC

TE

F.1

9

The

de

sig

n s

ha

ll see

k to

min

imis

e m

ain

ten

an

ce

re

qu

ire

me

nts

and

th

e r

isk o

f lit

ter

accum

ula

tion

.

VC

TE

F16

(L

an

dsca

pe S

ch

em

e)

VC

TE

F.2

0

The

exis

ting s

urf

ace

wa

ter

dra

ina

ge

regim

e s

ha

ll b

e

reta

ined

as fa

r as p

ossib

le f

or

are

as o

uts

ide

th

e a

rea

of

lan

dscap

ing d

efin

ed in

th

e S

ite

wo

rks p

ara

me

ter

pla

n.

VC

TE

F21

(S

urf

ace

Wate

r D

rain

ag

e)

Tab

le 1

.21 B

lack

fria

rs B

rid

ge F

ore

sh

ore

sit

e-s

pec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BL

AB

F.0

1

A

lift

sh

all

be

pro

vid

ed

be

twe

en

th

e T

ham

es P

ath

and

B

lackfr

iars

Brid

ge

to

facili

tate

ste

p f

ree

acce

ss b

etw

ee

n

Bla

ckfr

iars

Mill

en

niu

m P

ier

and

Bla

ckfr

iars

Sta

tio

n.

BL

AB

F9

: T

ha

me

s P

ath

(P

erm

an

ent

lift a

nd

sta

irs)

Page 58: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

53

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BL

AB

F.0

2

T

he

Tha

me

s P

ath

sh

all

be

div

ert

ed

ove

r th

e fo

resh

ore

str

uctu

re. I

t sh

all

be

leve

l a

nd

a m

inim

um

wid

th o

f 4m

. T

he

T

ha

me

s P

ath

ea

st of

the

Fle

et

Ma

in C

SO

sha

ll b

e a

m

inim

um

wid

th o

f 3

m.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.0

3

A

cce

ss r

am

ps fo

r th

e P

resid

ent

mo

orin

gs s

ha

ll b

e

de

sig

ne

d to

cu

rren

t sta

nd

ard

s. T

he

y s

ha

ll b

ridge

ove

r th

e

rive

r w

all

with

min

imum

ph

ysic

al o

r vis

ua

l im

pa

ct o

n th

e

liste

d s

tructu

re o

r sp

an f

rom

th

e e

leva

ted p

latfo

rm a

t th

e

we

ste

rn e

nd

of

the

fo

resh

ore

str

uctu

re.

BL

AB

F1

0:

De

taile

d d

esig

n a

pp

rova

l of

pe

rman

en

t rive

r str

uctu

re (

mo

orin

gs a

nd

pie

rs)

BL

AB

F.0

4

T

he

coa

ch

pa

rkin

g o

n V

icto

ria

Em

ban

km

ent sh

all

be

rein

sta

ted

wh

ere

pra

ctica

ble

.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

Resto

ration

of

the

exis

ting h

igh

wa

y

BL

AB

F.0

5

T

he

fe

sto

on

lig

htin

g t

o V

icto

ria

Em

ban

km

ent sh

all

be

rein

sta

ted

as f

ar

as p

ossib

le.

BL

AB

F2

4: L

igh

tin

g d

eta

ils

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.0

6

T

he

WC

s b

elo

w t

he r

am

p s

ha

ll be

retu

rne

d t

o u

se

with

n

ew

se

pa

rate

en

tran

ces.

BL

AB

F5

: D

eta

iled

De

sig

n o

f pe

rman

ent

ab

ove

gro

un

d

str

uctu

res

BL

AB

F.0

7

T

he

ma

in e

lectr

ica

l and

co

ntr

ol e

qu

ipm

ent

sha

ll b

e lo

ca

ted

in

th

e u

nd

erc

roft

are

a B

lackfr

iars

Brid

ge

off

-ra

mp.

A

sm

alle

r kio

sk s

ha

ll be

lo

ca

ted

alo

ng t

he lin

e o

f th

e e

xis

ting

rive

r w

all.

The

sm

alle

r kio

sk s

ha

ll on

ly c

on

tain

equ

ipm

en

t th

at m

ust

be

lo

cate

d c

lose

to

the

shaft

.

BL

AB

F5

: D

eta

iled

De

sig

n o

f pe

rman

ent

ab

ove

gro

un

d

str

uctu

res

BL

AB

F.0

8

V

oid

s b

elo

w t

he

Bla

ckfr

iars

Brid

ge

off

-ram

p (

bo

th e

xis

ting

an

d p

ropo

se

d)

sh

all

be e

nclo

se

d w

ith

hig

h q

ua

lity s

cre

en

s

de

sig

ne

d to

be

in

ke

epin

g w

ith

th

e o

ve

rall

arc

hite

ctu

ral a

nd

la

nd

scap

e d

esig

n.

En

tran

ce

s to

the

ma

in e

lectr

ica

l a

nd

co

ntr

ol e

qu

ipm

en

t kio

sk, W

Cs a

nd

sp

ecia

list sp

ort

s f

acili

ty

sh

all

be in

tegra

ted

in

to t

his

scre

en

.

BL

AB

F5

: D

eta

iled

De

sig

n o

f pe

rman

ent

ab

ove

gro

un

d

str

uctu

res

Page 59: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

54

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BL

AB

F.0

9

S

erv

ices s

ha

ll b

e p

rovid

ed

to

th

e u

nde

rcro

ft a

rea

s o

f th

e

Bla

ckfr

iars

Brid

ge

off

-ra

mp t

o fa

cili

tate

po

ssib

le f

utu

re

co

mm

erc

ial de

ve

lop

me

nt

(by o

the

rs).

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.1

0

T

he

ha

nd

rail

tha

t ru

ns f

rom

th

e w

este

rn B

lackfr

iars

Brid

ge

p

ara

pe

t to

the

off

-ram

p f

rom

Bla

ckfr

iars

Brid

ge

to

Vic

toria

E

mba

nkm

en

t sha

ll b

e r

ep

laced

to t

ie in w

ith

the

ne

w

de

ve

lop

me

nt. T

he f

ascia

of

the

co

ncre

te e

dge b

eam

sh

all

als

o b

e r

e-c

lad

.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.1

1

T

he

we

ste

rn e

nd

of

the f

ore

sho

re s

tructu

re s

ha

ll b

e r

ais

ed

a

bo

ve

the

cu

rre

nt floo

d d

efe

nce le

ve

l to

cre

ate

a v

iew

ing

pla

tfo

rm.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.1

2

T

he

pro

po

sed

raili

ngs to

the

we

ste

rn e

nd

of

the

fo

resh

ore

str

uctu

re s

ha

ll b

e d

esig

ne

d t

o b

e a

s v

isua

lly u

nob

trusiv

e a

s

po

ssib

le w

ith

ou

t com

pro

mis

ing s

afe

ty.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.1

3

A

n a

men

ity b

uild

ing (

to b

e o

pe

rate

d b

y o

the

rs)

sh

all

be

p

rovid

ed

at th

e w

este

rn e

nd

of

the

fo

resh

ore

str

uctu

re to

h

elp

an

ima

te t

he

spa

ce

.

BL

AB

F5

: D

eta

iled

De

sig

n o

f pe

rman

ent

ab

ove

gro

un

d

str

uctu

res

BL

AB

F.1

4

T

he

exis

ting lis

ted

stu

rge

on

lam

p s

tand

ard

s s

ha

ll b

e

ca

refu

lly r

em

ove

d,

sto

red

an

d r

ein

sta

ted

in

the

ir c

urr

en

t p

ositio

ns a

s fa

r as p

ossib

le f

ollo

win

g c

om

ple

tio

n o

f co

nstr

uction

wo

rks.

BL

AB

F2

4: L

igh

tin

g d

eta

ils

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F 1

2 p

rote

ctive

wo

rks to

lis

ted

bu

ildin

gs

BL

AB

F.1

5

T

ree

s p

lan

ted o

n t

he

Vic

toria

Em

ban

km

en

t sha

ll b

e s

em

i-m

atu

re L

on

do

n P

lane

s.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

Page 60: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

55

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BL

AB

F.1

6

T

he

la

nd

scap

e d

esig

n s

ha

ll se

ek t

o e

du

ca

te a

nd

e

ncou

rage

info

rma

l p

lay a

nd

bio

div

ers

ity.

Inclu

sio

n o

f th

e

follo

win

g e

lem

en

ts in

th

e lan

dscap

e d

esig

n s

ha

ll b

e

co

nsid

ere

d:

q.

a w

ate

r fe

atu

re to

vis

ua

lly in

terp

ret

the c

ha

llen

ge

s o

f su

rface

wa

ter

ma

na

gem

ent,

en

cou

rage

pla

y a

nd

im

pro

ve

th

e m

icro

clim

ate

, su

bje

ct

to s

uitab

le

ma

inte

na

nce a

rra

ngem

ents

r.

pla

ntin

g t

o p

rovid

e s

had

e a

nd

im

pro

ve

the

mic

roclim

ate

s.

cre

ative

pa

vin

g (

inclu

din

g e

ngra

vin

g)

in t

he

cen

tral

sp

ace

to

bre

ak d

ow

n its

sca

le

t.

ca

refu

l m

odu

lation

of

the

fo

rm o

f th

e te

rra

ce

s.

The

fin

al la

nd

sca

pe

desig

n s

ha

ll b

ala

nce

th

e e

lem

en

ts

liste

d a

bo

ve

with

th

e form

alit

y a

nd

alig

nm

en

t of

the

p

rop

ose

d r

ive

r w

all.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.1

7

T

he

de

sig

n s

ha

ll re

spect

the v

iew

s f

rom

th

e r

ive

r to

th

e

liste

d b

uild

ings a

lon

g V

icto

ria

Em

ban

km

en

t a

nd

St P

au

l’s

Cath

ed

ral b

eyo

nd.

BL

AB

F5

: D

eta

iled

De

sig

n o

f pe

rman

ent

ab

ove

gro

un

d

str

uctu

res

BL

AB

F.1

8

T

he

fo

resh

ore

str

uctu

re w

alls

sh

all

be

fin

ish

ed

in

na

tura

l sto

ne.

BL

AB

F5

: D

eta

iled

De

sig

n o

f pe

rman

ent

ab

ove

gro

un

d

str

uctu

res

BL

AB

F.1

9

T

he

Lio

ns’ H

ead

s a

long t

he

riv

er

wa

ll sh

all

be in

co

rpo

rate

d

into

th

e d

esig

n w

he

re p

ossib

le.

BL

AB

F5

: D

eta

iled

De

sig

n o

f pe

rman

ent

ab

ove

gro

un

d

str

uctu

res

BL

AB

F.2

0

T

he

pu

mp

ho

use s

ha

ll b

e r

em

ove

d a

nd

no

t re

pla

ce

d.

BL

AB

F5

: D

eta

iled

De

sig

n o

f pe

rman

ent

ab

ove

gro

un

d

str

uctu

res

BL

AB

F.2

1

T

he

in

ter-

tid

al p

latf

orm

pro

vid

ed

be

low

Bla

ckfr

iars

Brid

ge

sh

all

be in

acce

ssib

le to

the

pu

blic

.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

Page 61: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

56

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BL

AB

F.2

2

T

he

exis

ting b

rea

k in

th

e p

ara

pe

t w

all

of

Bla

ckfr

iars

Brid

ge

sh

all

be u

sed

to a

ccom

mo

da

te r

ep

lace

me

nt sta

irs a

nd

a

ne

w lift

to t

he

ea

ste

rn s

ide

of

the

brid

ge

. T

he

we

ste

rn

rep

lacem

ent

sta

irs s

hall

be

po

sitio

ned

to

en

d in

the

zo

ne

of

mo

de

rn a

dd

itio

ns to

the

brid

ge

. B

oth

se

ts o

f re

pla

cem

ent

sta

irs s

ha

ll be

de

sig

ne

d t

o r

esp

ect th

e h

isto

ric c

ha

racte

r a

nd

fa

bric o

f th

e b

rid

ge.

BL

AB

F9

: T

ha

me

s P

ath

(P

erm

an

ent

lift a

nd

sta

irs)

BL

AB

F.2

3

T

he

ju

nctio

n a

t th

e w

este

rn e

nd

of

the

fo

resho

re s

tructu

re

with

th

e lis

ted

wa

ll sh

all

be

ma

rked w

ith

a ‘sh

ad

ow

ga

p’,

wh

ich s

ha

ll b

e d

esig

ned

to

lim

it a

ccu

mu

lation

of

litte

r.

BL

AB

F1

0:

De

taile

d d

esig

n a

pp

rova

l of

pe

rman

en

t rive

r str

uctu

re (

mo

orin

gs a

nd

pie

rs)

BL

AB

F.2

4

P

avin

g m

ate

ria

ls fo

r are

as o

f pu

blic

rea

lm s

ha

ll b

e o

f n

atu

ral sto

ne

.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.2

5

V

ert

ical tim

be

r fe

nde

rs s

ha

ll be

in

clu

de

d in

the

de

sig

n o

f ri

ve

r w

alls

in o

rde

r to

deflect

ve

sse

ls a

wa

y f

rom

th

e

str

uctu

re,

if r

equ

ire

d b

y t

he

na

vig

atio

na

l risk a

sse

ssm

en

t.

BL

AB

F1

0:

De

taile

d d

esig

n a

pp

rova

l of

pe

rman

en

t ri

ve

r str

uctu

re (

mo

orin

gs a

nd

pie

rs)

BL

AB

F.2

6

A

cce

ssib

le s

ea

tin

g s

hall

be

pro

vid

ed

on

th

e f

ore

sh

ore

str

uctu

re th

at is

att

ractive

an

d in

ke

ep

ing w

ith

th

e w

ide

r la

nd

scap

e d

esig

n.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.2

7

T

he

de

sig

n o

f th

e p

ub

lic r

ea

lm s

ha

ll be

in

acco

rda

nce

with

C

ity o

f Lo

ndo

n R

ive

rsid

e W

alk

En

han

cem

en

t S

trate

gy

wh

ere

pra

cticab

le a

nd

un

less o

the

rwis

e a

gre

ed

with

th

e

co

un

cil.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

BL

AB

F.2

8

T

he

de

sig

n s

ha

ll see

k to

min

imis

e m

ain

ten

an

ce

re

qu

ire

me

nts

and

th

e r

isk o

f lit

ter

accum

ula

tion

.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

Page 62: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

57

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BL

AB

F.2

9

In

ord

er

to c

rea

te a

ne

w a

rea

of

pub

lic r

ea

lm t

hat

is s

afe

, se

cu

re

and

a

cce

ssib

le

to

all,

th

e

ob

jective

s

define

d

in

de

sig

n p

rin

cip

les B

LA

BF

.01

to

BLA

BF

.27

sh

all

be

dra

wn

to

ge

the

r to

pro

du

ce

an o

ve

rall

de

sig

n t

hat:

a

) re

late

s s

ucce

ssfu

lly t

o its

wid

er

se

ttin

g w

ith

in t

he

City o

f L

ond

on

and

reco

gn

ises t

he

his

toric c

on

text

of

the

are

a

b)

inte

gra

tes su

cce

ssfu

lly w

ith

th

e im

med

iate

ly a

djo

inin

g

fab

ric a

nd

riv

ers

ide

str

uctu

res

c)

ha

s

its

ow

n

cle

ar,

h

igh

-qu

alit

y

ide

ntity

, e

mp

loyin

g

ap

pro

pria

te m

ate

ria

ls a

nd

fo

rms)

pa

ys p

art

icula

r a

tte

ntio

n

to

the

d

eta

iled

a

pp

ea

ran

ce

of

all

ve

nts

, ste

ps,

wa

ter

fea

ture

s,

pa

vin

g

layo

uts

, ra

ilings,

pla

ntin

g,

terr

ace

s,

ligh

tin

g s

tructu

res a

nd

th

e lig

htin

g e

ffe

cts

pro

du

ced

, etc

.

BL

AB

F1

4: L

an

dscap

e S

ch

em

e

Page 63: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

58

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BL

AB

F.3

0

T

he

de

sig

n o

f th

e r

ep

lace

men

t B

lackfr

iars

Mill

en

niu

m p

ier

sh

all

be f

un

ctio

na

l, s

afe

, se

cu

re a

nd

ele

ga

nt, s

ee

kin

g t

o

min

imis

e t

he

im

pa

ct o

n v

iew

s f

rom

the

city w

alk

wa

y a

lon

g

the

len

gth

of

the

pie

r acro

ss t

he

riv

er

to th

e n

ort

h. T

he

re

qu

ire

d o

pe

ratio

na

l str

uctu

res ,

in

clu

din

g a

cce

ss r

am

ps

an

d e

nclo

se

d w

aitin

g a

rea

s,

sha

ll b

e c

on

ce

ntr

ate

d o

n t

he

p

on

too

n in

a c

oo

rdin

ate

d w

ay t

ha

t d

iffe

ren

tia

tes t

he

m f

rom

th

e p

onto

on

str

uctu

re a

nd

min

imis

es th

e p

ossib

ility

of

reflecte

d g

lare

fro

m t

he

pie

r str

uctu

res to

pro

du

ce

an

o

ve

rall

de

sig

n t

ha

t:

a.

rela

tes s

ucce

ssfu

lly t

o its

wid

er

sett

ing w

ith

in t

he

City

of

Lo

ndo

n a

nd r

eco

gn

ise

s t

he

his

toric c

on

text

of

the

a

rea

b.

inte

gra

tes s

ucce

ssfu

lly w

ith

th

e im

med

iate

ly a

djo

inin

g

fab

ric a

nd

riv

ers

ide

str

uctu

res

c.

ha

s its

ow

n c

lea

r, h

igh

-qu

alit

y id

en

tity

, e

mp

loyin

g

ap

pro

pria

te m

ate

ria

ls a

nd

fo

rms

d.

is a

cce

ssib

le to

all

su

bje

ct

to t

he

fun

ction

al con

str

ain

ts

of

its loca

tio

n a

nd

op

era

tio

n.

BL

AB

F1

0:

De

taile

d d

esig

n a

pp

rova

l of

pe

rman

en

t rive

r str

uctu

re (

mo

orin

gs a

nd

pie

rs)

Tab

le 1

.22 C

ham

be

rs W

harf

sit

e-s

pec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

CH

AW

F.0

1

The

ele

ctr

ical a

nd

con

trol kio

sk s

ha

ll be

cla

d in

mate

ria

ls

tha

t re

fle

ct

the

fu

ture

use

of

this

pa

rt o

f th

e s

ite

as p

ub

lic

rea

lm.

CH

AW

F2

(D

eta

iled

Desig

n o

f p

erm

ane

nt a

bove

gro

un

d

str

uctu

res)

CH

AW

F.0

2

The

la

rge

acce

ss c

ove

rs s

ha

ll b

e p

ave

d w

ith

ma

teria

ls

pro

vid

ed

by t

he

de

ve

lop

er

to m

atc

h p

ropo

sa

ls f

or

the

CH

AW

F1

2 (

Site

Re

sto

ratio

n)

Page 64: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

59

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

resid

en

tia

l d

eve

lopm

en

t. In

the

eve

nt th

at

the

co

mm

en

cem

ent

of

the

ap

pro

ve

d r

esid

en

tia

l de

ve

lop

men

t fo

r th

e s

ite

is d

ela

ye

d a

nd

do

es n

ot p

rocee

d im

me

dia

tely

aft

er

co

nstr

uction

of

the

op

era

tio

na

l str

uctu

res, th

e larg

e a

cce

ss

co

ve

rs s

ha

ll h

ave

a tem

po

rary

in

fill.

CH

AW

F.0

3

The

site

sh

all

no

t b

e p

ub

licly

acce

ssib

le u

ntil th

e r

esid

en

tia

l d

eve

lop

me

nt a

nd

associa

ted

la

nd

sca

pin

g b

y o

the

rs is

co

mp

lete

. I

n t

he

inte

rim

, th

e s

ite

sha

ll b

e left

se

cu

red

a

ga

inst

pub

lic a

cce

ss b

ut

sh

all

allo

w s

afe

acce

ss f

or

ma

inte

na

nce o

f th

e p

erm

ane

nt w

ork

s.

Not

se

cu

red

CH

AW

F.0

4

No lig

htin

g s

ha

ll b

e p

rovid

ed

, e

xce

pt

a lo

w le

ve

l lig

ht

to th

e

ele

ctr

ica

l a

nd

con

trol kio

sk d

oo

rs to

allo

w a

cce

ss f

or

ma

inte

na

nce p

urp

ose

s in

the

ho

urs

of

da

rkness.

Th

is lig

ht

sh

all

on

ly b

e o

nly

be

illu

min

ate

d d

urin

g m

ain

ten

an

ce

a

ctivity.

Se

cu

red

by r

equ

ire

men

t C

HA

WF

2 a

s w

ill o

nly

be

re

leva

nt

to th

e k

iosk.

An

y o

the

r site

lig

htin

g w

ill b

e p

art

of

the

ap

pro

ve

d r

esid

en

tia

l p

lan

nin

g p

erm

issio

n o

n th

e

site

CH

AW

F.0

5

Pe

rman

en

t ha

nd

rail/

gu

ard

ings t

o th

e r

ive

r w

all

sh

all

be

pro

vid

ed

by t

he

resid

en

tia

l de

ve

lop

er.

In

th

e inte

rim

, a

te

mp

ora

ry g

ua

rdin

g s

ha

ll b

e p

rovid

ed

to t

he

ne

w r

ive

r w

all

aro

und

the

ma

inte

na

nce

are

a o

nly

to

en

su

re th

e s

afe

ty o

f m

ain

tena

nce p

ers

on

nel.

CH

AW

F1

2 (

Site

Re

sto

ratio

n)

CH

AW

F.0

6

The

ve

ntila

tion

co

lum

ns a

nd e

lectr

ica

l a

nd c

on

trol kio

sk

sh

all

be p

ositio

ned

to m

inim

ise t

he

im

pa

ct o

n t

he

resid

entia

l d

eve

lop

me

nt a

nd

circula

tion

with

in t

he

ne

w p

ub

lic r

ea

lm a

nd

T

ha

me

s P

ath

(to

be

pro

vid

ed

by t

he

resid

entia

l d

eve

lop

er)

. T

he

ele

ctr

ical a

nd

con

trol kio

sk s

ha

ll be

lo

cate

d n

o c

lose

r th

an 0

.8m

fro

m t

he

bou

nda

ry w

all

of

pro

pe

rtie

s in

Fou

nta

in

Gre

en

Squ

are

.

CH

AW

F3

(D

eta

iled

Desig

n A

pp

rova

l fo

r S

igna

ture

V

en

tila

tio

n C

olu

mn

s)

CH

AW

F.0

7

If

Tha

me

s W

ate

r in

str

ucts

the

con

tracto

r th

at

CH

AW

F1

2 (

Site

Re

sto

ratio

n)

Page 65: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

60

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

co

mm

en

cem

ent

of

the

ap

pro

ve

d r

esid

en

tia

l de

ve

lop

men

t fo

r th

e s

ite

will

pro

ce

ed

im

me

dia

tely

aft

er

co

nstr

uctio

n o

f th

e

op

era

tio

na

l str

uctu

res, su

rface

wa

ter

dra

ina

ge s

ha

ll com

ply

w

ith

th

e d

rain

age

de

sig

n f

or

the a

pp

rove

d r

esid

en

tia

l sch

em

e. T

ab

le 1

.23 K

ing

Ed

ward

Mem

ori

al P

ark

Fo

res

ho

re s

ite

-sp

ec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

KE

MP

F.0

1

The

ele

ctr

ical a

nd

con

trol kio

sk s

ha

ll be

lo

cate

d n

o c

lose

r th

an 0

.8m

fro

m t

he

easte

rn b

ou

nd

ary

wa

ll o

f th

e p

ark

, to

a

vo

id inte

rru

ptin

g v

iew

s f

rom

th

e p

ark

to

th

e r

ive

r. I

t sh

all

be

d

esig

ne

d s

o t

ha

t it d

oes n

ot p

rovid

e a

mea

ns o

f sca

ling t

he

b

oun

da

ry w

all

into

th

e a

dja

cen

t re

sid

en

tia

l d

eve

lop

me

nt.

KE

MP

F3 (

De

taile

d D

esig

n o

f p

erm

ane

nt a

bove

gro

un

d

str

uctu

res)

KE

MP

F.0

2

The

pe

rman

en

t a

cce

ss r

ou

te to

th

e s

ite

sha

ll b

e fu

lly

inte

gra

ted

with

the

land

sca

pin

g p

rop

osa

ls fo

r th

e p

ark

, a

s

pa

rt o

f a

ne

w a

rea

of

pu

blic

rea

lm.

Su

bje

ct to

agre

em

en

t w

ith

th

e lo

ca

l au

tho

rity

it

ma

y p

rovid

e a

ne

w a

lign

me

nt

for

a

wid

en

ed

Th

am

es P

ath

. T

he

pe

rma

nen

t a

cce

ss r

ou

te s

ha

ll o

nly

be

pub

licly

acce

ssib

le t

o p

ede

str

ian

s a

nd c

yclis

ts

du

rin

g p

ark

op

en

ing h

ou

rs. T

he e

ntr

an

ce a

t G

lam

is R

oa

d

sh

all

be g

ate

d w

he

n t

he

pa

rk is c

lose

d.

KE

MP

F6 (

La

nd

sca

pe D

eta

ils)

KE

MP

F.0

3

The

mem

oria

l be

nche

s a

nd b

an

dsta

nd s

ha

ll be

rein

sta

ted

with

in t

he

pa

rk a

s s

how

n o

n t

he L

an

dscap

e P

lan

, u

nle

ss

oth

erw

ise a

gre

ed

with

th

e lo

ca

l a

uth

ority

.

KE

MP

F6 (

La

nd

sca

pe D

eta

ils)

KE

MP

F.0

4

Prio

r to

con

str

uction

com

me

ncin

g,

the

sp

ort

s p

itch

es s

ha

ll b

e r

econfigu

red

an

d t

he

ch

ildre

n’s

pla

ygro

un

d s

ha

ll b

e

relo

ca

ted

in o

rde

r to

acco

mm

od

ate

the

pro

po

se

d a

cce

ss

arr

an

ge

men

ts.

KE

MP

F7 s

ecu

res th

is

Page 66: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

61

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

KE

MP

F.0

5

Circula

tio

n o

nto

an

d a

rou

nd

the

fo

resh

ore

str

uctu

re s

ha

ll be

cle

ar,

legib

le a

nd

in

tegra

ted

as f

ar

as p

ossib

le w

ith

circu

lation

aro

und

the

pa

rk a

nd

alo

ng t

he

Tha

me

s P

ath

.

KE

MP

F6 (

La

nd

sca

pe D

eta

ils)

KE

MP

F.0

6

The

de

sig

n o

f th

e p

erm

ane

nt w

ork

s s

ha

ll re

info

rce th

e

ch

ara

cte

r of

the

pa

rk. T

his

sh

all

be

ach

ieve

d b

y p

lan

tin

g

larg

e t

ree

sp

ecie

s c

lose

to

th

e r

ive

r fr

on

tage

wh

ere

ve

r p

ossib

le. E

xis

ting p

ath

s a

nd la

nd

sca

pe

d a

reas s

ha

ll e

xte

nd

on

to t

he

fo

resh

ore

str

uctu

re w

he

re p

ractica

ble

, in

ord

er

to

inte

gra

te it

into

th

e s

urr

ou

nd

ings.

KE

MP

F3 (

De

taile

d D

esig

n o

f p

erm

ane

nt a

bove

gro

un

d

str

uctu

res)

an

d K

EM

PF

4 (

De

taile

d D

esig

n A

pp

rova

l fo

r S

ign

atu

re V

en

tila

tio

n C

olu

mn

s)

KE

MP

F.0

7

The

pa

rk is c

lose

d a

t nig

ht,

th

ere

fore

no

pe

rma

nen

t lig

htin

g

sh

all

be p

rovid

ed

excep

t fo

r a

lo

w le

ve

l lig

ht

to t

he

kio

sk

do

ors

to

allo

w a

cce

ss fo

r em

erg

en

cy m

ain

tena

nce

p

urp

ose

s in

th

e h

ou

rs o

f da

rkne

ss. T

his

lig

ht

sh

all

on

ly b

e

illum

ina

ted

du

rin

g m

ain

tena

nce a

ctivity.

Th

is is p

art

of th

e d

eta

ils to

be s

ubm

itte

d u

nd

er

KE

MP

F3.

KE

MP

F.0

8

The

de

sig

n o

f th

e r

ive

r w

alls

sh

all

no

t com

pro

mis

e th

e

safe

ty o

f re

cre

atio

na

l bo

at u

se

rs a

nd

sh

all

no

t in

co

rpo

rate

o

ve

rha

ngs u

nle

ss th

ese

are

ad

equa

tely

fe

ndere

d.

KE

MP

F5 (

De

taile

d D

esig

n A

pp

rova

l of

Riv

er

Wall)

KE

MP

F.0

9

Bird

bo

xe

s s

ha

ll b

e in

sta

lled

on

tre

es to

attra

ct

a r

an

ge

of

bird

sp

ecie

s.

KE

MP

F6 (

La

nd

sca

pe D

eta

ils)

KE

MP

F.1

0

Ba

t bo

xe

s s

ha

ll be

in

sta

lled

on

tre

es t

o a

ttra

ct sp

ecie

s s

uch

a

s c

om

mo

n p

ipis

trelle

an

d n

octu

le b

ats

.

KE

MP

F6 (

La

nd

sca

pe D

eta

ils)

KE

MP

F.1

1

The

pe

rman

en

t a

cce

ss r

ou

te s

ha

ll be

de

sig

ned

to

fa

cili

tate

im

pro

ve

d v

iew

s o

f th

e R

oth

erh

ith

e tu

nn

el ve

ntila

tion

sh

aft

w

hic

h a

t th

e p

resen

t is

no

t vis

ible

fro

m the

we

ste

rn e

nd

of

the

Tham

es P

ath

.

KE

MP

F6 (

La

nd

sca

pe D

eta

ils)

KE

MP

F.1

2

The

de

sig

n s

ha

ll see

k to

min

imis

e m

ain

ten

an

ce

re

qu

ire

me

nts

and

th

e r

isk o

f lit

ter

accum

ula

tion

.

KE

MP

F6 (

La

nd

sca

pe D

eta

ils)

Page 67: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

62

Tab

le 1

.24

Earl

Pu

mp

ing

Sta

tio

n s

ite

-sp

ec

ific

des

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

EA

RP

S.0

1

On

com

ple

tio

n o

f co

nstr

uction

wo

rks,

hig

h q

ua

lity s

ecu

re

ho

ard

ings s

ha

ll b

e in

sta

lled

on

the

pa

rt o

f th

e s

ite

tha

t is

no

t re

qu

ire

d p

erm

ane

ntly (

sho

wn

on

th

e lan

dsca

pe

pla

n).

EA

RP

S5

sp

ecific

ally

in

clu

de

s t

his

at (g

)

EA

RP

S.0

2

For

hyd

rau

lic r

ea

so

ns, th

e d

esig

n s

ha

ll in

co

rpo

rate

th

e

rais

ed

le

ve

l re

qu

ire

d f

or

the

shaft

str

uctu

re.

EA

RP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

EA

RP

S.0

3

The

exis

ting p

um

pin

g s

tatio

n c

om

pou

nd

wa

ll sh

all

be

rein

sta

ted

in

its

cu

rre

nt p

ositio

n.

The

de

sig

n o

f th

e

rein

sta

ted

com

po

un

d w

all

sh

all

inco

rpo

rate

ga

tes,

wh

ich

sh

all

pro

vid

e a

cce

ss t

o t

he

sh

aft

.

Lan

dsca

pe

Req

uirem

ent E

AR

PS

5 inclu

de

s d

eta

ils o

f a

ll e

nclo

sure

s to

be s

ubm

itte

d

EA

RP

S.0

4

A h

igh

qu

alit

y,

low

-ma

inte

na

nce p

lan

ted

bro

wn

roof

sh

all

be

p

rovid

ed

on t

op

of

the

sh

aft

. T

he r

oof

sh

all

be v

isua

lly

att

ractive

wh

en

vie

we

d f

rom

abo

ve

.

EA

RP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

EA

RP

S.0

5

The

shaft

en

clo

su

re s

ha

ll p

rovid

e v

isua

l in

tere

st

wh

en

vie

we

d f

rom

th

e s

urr

oun

din

g s

tree

tsca

pe

an

d f

rom

ab

ove

.

EA

RP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

EA

RP

S.0

6

The

va

lve

ch

am

be

r sha

ll in

co

rpo

rate

a lo

w-m

ain

ten

an

ce

b

row

n r

oof.

EA

RP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

EA

RP

S.0

7

Acce

ss t

o t

he

roof

of

the

sh

aft

str

uctu

re s

ha

ll b

e p

rovid

ed

from

with

in t

he

exis

ting p

um

pin

g s

tatio

n c

om

po

und

. T

he

ro

of

of

the

shaft

str

uctu

re s

ha

ll no

t be

pu

blic

ly a

cce

ssib

le.

EA

RP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

EA

RP

S.0

8

The

de

sig

n s

ha

ll no

t co

mp

rom

ise t

he

exis

ting o

pe

ration

of

the

Tham

es W

ate

r pum

pin

g s

tatio

n.

EA

RP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

EA

RP

S.0

9

Lig

htin

g s

ha

ll o

nly

be

pro

vid

ed

to

th

e s

tairca

se

and

shaft

su

rface

fo

r m

ain

ten

an

ce

activitie

s.

Re

qu

irem

ent E

AR

PS

2 (

de

tails

for

all

abo

ve

gro

und

str

uctu

res)

Page 68: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

63

Tab

le 1

.25 D

ep

tfo

rd C

hu

rch

Str

ee

t sit

e-s

pe

cif

ic d

es

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

DE

PC

S.0

1

The

de

sig

n s

ha

ll fa

cili

tate

pe

de

str

ian

mo

vem

en

ts a

rou

nd

th

e s

ite

an

d th

rou

gh

the

are

a a

s ide

ntifie

d in th

e lo

ca

l a

uth

ority

's N

ort

h L

ew

ish

am

Lin

ks S

trate

gy 2

00

7.

DE

PC

S4

(L

an

dsca

pe

Sch

em

e)

DE

PC

S.0

2

The

ca

r p

ark

ing s

pa

ces o

n C

off

ey S

treet

sha

ll b

e r

ein

sta

ted

u

nle

ss o

the

rwis

e a

gre

ed

with

th

e lo

ca

l au

thority

.

S1

06

se

cu

res im

ple

me

nta

tion

of

these

wo

rks a

nd A

rtic

le 1

2 o

f D

CO

req

uires r

ein

sta

tem

ent

of

ado

pte

d h

igh

wa

y.

DE

PC

S.0

3

Ad

equ

ate

spa

ce

fo

r S

t Jo

se

ph

’s P

rim

ary

Sch

oo

l fire

and

e

me

rge

ncy m

uste

rin

g p

oin

t sh

all

be

re

-pro

vid

ed

.

DE

PC

S4

(L

an

dsca

pe

Sch

em

e)

DE

PC

S.0

4

Acce

ss p

oin

ts fo

r m

ain

ten

an

ce

ve

hic

les s

ha

ll b

e p

rovid

ed

on

Coff

ey S

tree

t a

nd

Cro

ssfield

Str

ee

t to

cre

ate

a th

rou

gh

ro

ute

acro

ss th

e s

ite.

When n

ot

in u

se f

or

ma

inte

na

nce

p

urp

ose

s,

the

rou

te s

ha

ll o

nly

be

acce

ssib

le to

ped

estr

ian

s

an

d c

yclis

ts.

DE

PC

S9

(S

pecific

atio

n o

f A

cce

sse

s)

DE

PC

S.0

5

The

am

ou

nt of

ha

rdsta

nd

ing w

ith

in t

he

site

bou

nda

ry s

ha

ll b

e m

inim

ised

as f

ar

as p

ossib

le. W

he

re h

ard

sta

nd

ing is

requ

ire

d,

it s

ha

ll b

e h

ard

we

arin

g a

nd

of

go

od

qu

alit

y.

DE

PC

S4

(L

an

dsca

pe

Sch

em

e)

DE

PC

S.0

6

The

de

sig

n s

ha

ll cre

ate

a m

ore

in

tegra

ted

and

acce

ssib

le

pu

blic

spa

ce

to

en

ha

nce

the

se

ttin

g o

f th

e lis

ted

chu

rch.

DE

PC

S4

(L

an

dsca

pe

Sch

em

e)

DE

PC

S.0

7

No n

ew

lig

htin

g t

o t

he

pa

rk s

ha

ll b

e p

rovid

ed

exce

pt fo

r a

low

le

ve

l lig

ht

to t

he

kio

sk d

oo

rs to

allo

w a

cce

ss f

or

ma

inte

na

nce p

urp

ose

s in

the

ho

urs

of

da

rkness.

Th

is lig

ht

sh

all

on

ly b

e illu

min

ate

d d

urin

g m

ain

ten

an

ce

activity.

DE

PC

S2

de

tails

of

abo

ve

gro

un

d s

tru

ctu

res t

hat sp

ecific

ally

in

clu

de

s k

iosk p

lus D

EP

CS

4 f

or

deta

ils o

f la

nd

sca

pin

g.

DE

PC

S.0

8

Bird

bo

xe

s s

ha

ll b

e insta

lled

on

tre

es to

attra

ct

a r

an

ge

of

bird

sp

ecie

s f

ollo

win

g c

om

ple

tio

n o

f th

e c

on

str

uction

wo

rks.

DE

PC

S4

(L

an

dsca

pe

Sch

em

e)

DE

PC

S.0

9

The

op

en s

pa

ce

sha

ll b

e r

e-land

sca

pe

d fo

llow

ing

co

mp

letio

n o

f th

e c

on

str

uction

s w

ork

s. A

specie

s-r

ich

DE

PC

S4

(L

an

dsca

pe

Sch

em

e)

Page 69: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

64

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

am

en

ity g

rassla

nd

mix

sh

all

be u

sed

wh

ich s

ha

ll in

clu

de

th

e

fidd

le d

ock s

pe

cie

s.

DE

PC

S.1

0

The

am

ou

nt of

soft

la

nd

sca

pin

g w

ith

in t

he s

ite

bou

nda

ry

sh

all

be m

axim

ised

.

DE

PC

S4

(L

an

dsca

pe

Sch

em

e)

DE

PC

S.1

1

The

exis

ting s

urf

ace

wa

ter

dra

ina

ge

regim

e s

ha

ll b

e

reta

ined

as fa

r as p

ossib

le f

or

are

as o

uts

ide

th

e a

rea

of

lan

dscap

ing d

efin

ed in

th

e S

ite

wo

rks p

ara

me

ter

pla

n.

DE

PC

S1

0 (

Su

rfa

ce W

ate

r D

rain

ag

e S

ch

em

e)

Tab

le 1

.26 G

ree

nw

ich

Pu

mp

ing

Sta

tio

n s

ite-s

pec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

GR

EP

S.0

1

On

com

ple

tio

n o

f th

e w

ork

s, h

igh

qu

alit

y s

ecu

re h

oa

rdin

gs

sh

all

be insta

lled

on

the

Pho

en

ix W

ha

rf p

art

of

the s

ite

. T

he

h

oa

rdin

gs s

ha

ll b

e r

eta

ine

d u

ntil th

e s

ite is h

an

ded

ove

r to

o

the

rs fo

r re

de

ve

lop

me

nt.

Re

qu

irem

ent G

RE

PS

6 inclu

de

s n

ee

d fo

r d

eta

ils o

f a

ll fe

ncin

g

or

enclo

sure

s

GR

EP

S.0

2

The

foo

tpa

th (

ide

ntifie

d o

n th

e la

nd

sca

pe p

lan)

an

d

asso

cia

ted

lig

htin

g s

hall

be

rein

sta

ted

as e

xis

ting,

un

less

oth

erw

ise a

gre

ed

by t

he

lo

ca

l a

uth

ority

. L

and

be

twe

en

th

e

DLR

an

d N

etw

ork

Ra

il via

du

cts

sh

all

be

left

in a

con

ditio

n

tha

t sh

all

no

t p

reclu

de

an

y p

ote

ntia

l fu

ture

enh

an

ce

me

nt of

the

pu

blic

rea

lm in t

his

are

a.

GR

EP

S6

(la

nd

scap

ing d

eta

ils).

Th

is is a

do

pte

d h

igh

wa

y

accord

ing

to

th

e c

ouncil

so

als

o s

ecure

d th

roug

h A

rt 1

2

GR

EP

S.0

3

For

hyd

rau

lic r

ea

so

ns, th

e d

esig

n s

ha

ll a

ccom

mo

da

te t

he

ra

ise

d le

ve

l re

qu

ire

d f

or

the

shaft

str

uctu

re.

The

rais

ed

le

ve

l sh

all

be

in

co

rpo

rate

d into

th

e o

ve

rall

arc

hite

ctu

ral a

nd

la

nd

scap

e d

esig

n f

or

the

site.

Th

e s

haft

sha

ll fe

atu

re a

lo

w-

ma

inte

na

nce b

row

n r

oof

with

in

tegra

ted c

ove

rs.

GR

EP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

GR

EP

S.0

4

An

y Y

ork

sto

ne

sla

bs r

em

ove

d b

y c

on

str

uction

wo

rks s

ha

ll b

e r

e-u

se

d fo

r th

e r

oof of

the

in

terc

ep

tio

n c

ham

be

r.

If th

is is

GR

EP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

Page 70: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

65

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

no

t p

ossib

le, th

e c

ha

mb

er

sha

ll b

e f

inis

he

d in

fa

ir-f

ace

d

co

ncre

te c

on

sis

ten

t w

ith

its

fun

ction

al na

ture

an

d c

on

text.

GR

EP

S.0

5

Acce

ss f

or

ma

inte

na

nce

ve

hic

les s

ha

ll be

via

Norm

an

Roa

d. M

od

ific

atio

ns to t

he

exis

ting g

ate

s a

nd w

all

sh

all

be

in

ch

ara

cte

r w

ith

th

e e

xis

ting.

GR

EP

S1

1 (

Sp

ecific

atio

n o

f A

cce

sses)

GR

EP

S.0

6

Fen

cin

g o

r ra

ilings s

hall

be

robu

st,

du

rab

le a

nd

in

kee

pin

g

with

th

e c

onte

xt.

GR

EP

S6

(L

an

dsca

pe

Sch

em

e)

GR

EP

S.0

7

The

are

a w

ith

in t

he s

ite

tha

t is

no

t re

qu

ire

d for

acce

ss s

ha

ll b

e p

lan

ted

with

lo

w-m

ain

tena

nce

wild

flo

we

rs a

nd

gra

ssla

nd

.

GR

EP

S6

(L

an

dsca

pe

Sch

em

e)

GR

EP

S.0

8

Se

cu

rity

arr

an

ge

men

ts w

ith

in t

he

site,

su

ch a

s n

ew

or

alte

red

fe

nce

lin

es,

sha

ll b

e in a

cco

rda

nce w

ith

Th

am

es

Wate

r p

olic

y.

GR

EP

S6

(L

an

dsca

pe

Sch

em

e)

GR

EP

S.0

9

The

exis

ting g

lazin

g o

f th

e E

ast B

eam

En

gin

e H

ou

se

sh

all

be

reno

va

ted

or

rep

lace

d a

s r

equ

ire

d.

An

y a

lte

ratio

ns t

o

the

gla

zin

g t

o f

acili

tate

th

e r

eu

se

of

the

bu

ildin

g s

ha

ll b

e

se

nsitiv

e t

o th

e b

uild

ing’s

sig

nific

an

ce

.

GR

EP

S3

(d

eta

ils o

f w

ork

s t

o L

iste

d B

uild

ing

s)

GR

EP

S.1

0

No n

ew

lig

htin

g s

ha

ll b

e p

rovid

ed

exce

pt fo

r lo

w le

ve

l lig

htin

g t

o t

he

ste

ps to

th

e s

haft

, w

hic

h s

ha

ll on

ly b

e u

se

d

du

rin

g m

ain

tena

nce

activitie

s.

GR

EP

S2

(a

ppro

va

l o

f a

bo

ve

gro

un

d s

tru

ctu

res)

an

d G

RE

PS

6

(Lan

dsca

pin

g)

GR

EP

S.1

1

Tre

es r

em

ove

d t

o im

pro

ve

acce

ss to

the

con

str

uction

site

sh

all

be r

ep

lace

d e

lsew

he

re o

n t

he

site.

GR

EP

S6

(L

an

dsca

pe

Sch

em

e)

GR

EP

S.1

2

The

la

nte

rn o

f th

e E

ast B

eam

En

gin

e H

ou

se

sh

all

be

refu

rbis

hed

to e

na

ble

it

to fo

rm p

art

of

the

na

tura

l ve

ntila

tion

syste

m f

or

the

bu

ildin

g.

It m

ay b

e r

ep

lace

d w

ith

a r

ep

lica

o

nly

if

it c

an

be

dem

onstr

ate

d th

at

repa

ir t

o the

exis

ting

fab

ric is n

ot

po

ssib

le.

GR

EP

S3

(d

eta

ils o

f w

ork

s t

o L

iste

d B

uild

ing

s)

Page 71: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

66

Tab

le 1

.27 A

bb

ey M

ills

Pu

mp

ing

Sta

tio

n s

ite

-sp

ec

ific

des

ign

pri

ncip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

AB

MP

S.0

1

The

la

yo

ut of

the

pe

rma

nen

t w

ork

s s

ha

ll b

e c

om

pa

tib

le w

ith

th

e p

erm

an

en

t w

ork

s a

sso

cia

ted

with

th

e L

ee T

un

ne

l p

roje

ct.

Sch

em

e d

esig

n

AB

MP

S.0

2

The

de

sig

n o

f th

e v

en

tila

tion

ou

tle

ts s

ha

ll b

e in

ke

ep

ing w

ith

th

e c

on

text.

The

sig

na

ture

de

sig

n v

en

tila

tion

co

lum

n s

ha

ll n

ot b

e u

se

d.

AB

MP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

AB

MP

S.0

3

Pla

ntin

g a

nd

fe

nce

tre

atm

en

ts to

th

e b

ou

ndary

, o

uts

ide

of

the

lim

it o

f la

nd t

o b

e a

cqu

ire

d a

nd u

sed

, sh

all

be

co

mp

lete

d a

s p

art

of

the

Lee

Tun

ne

l p

roje

ct. A

ny

lan

dscap

ing d

isru

pte

d d

urin

g c

on

str

uctio

n o

f th

e T

ha

me

s

Tid

ew

ay T

unn

el sh

all

be

rein

sta

ted

. N

o a

dd

itio

na

l la

nd

scap

ing is p

ropo

sed

fo

r th

e T

ham

es T

idew

ay T

un

ne

l w

ork

s.

Th

is is n

ot p

art

of th

e c

urr

ent a

pp

lica

tion

as o

uts

ide

th

e L

LA

U

but

is in

clu

de

d fo

r w

ider

co

nte

xt

AB

MP

S.0

4

The

fen

ced

en

clo

su

re a

rou

nd

the

Le

e T

un

ne

l sh

aft

sh

all

be

e

xte

nd

ed t

o e

nco

mp

ass t

he

Tham

es T

ide

wa

y T

un

ne

l w

ork

s

an

d its

de

sig

n s

ha

ll b

e c

om

pa

tib

le w

ith

th

e lo

ca

l co

nte

xt.

Th

is is a

sta

nd

ard

se

curity

re

qu

irem

ent

AB

MP

S.0

5

Ma

teria

ls s

ha

ll be

robust,

com

patib

le w

ith

the

loca

l co

nte

xt,

a

nd

co

mp

ly w

ith

Tham

es W

ate

r re

qu

ire

me

nts

.

AB

MP

S2

(D

eta

iled D

esig

n o

f p

erm

ane

nt a

bo

ve

gro

un

d

str

uctu

res)

AB

MP

S.0

6

Ten

ba

t bo

xe

s s

ha

ll be in

sta

lled o

n tre

es a

dja

ce

nt

to th

e

site

fo

llow

ing c

om

ple

tio

n o

f th

e c

on

str

uction

wo

rks.

Ad

ditio

na

l ba

t b

oxe

s s

ha

ll o

nly

be

pro

vid

ed

, sh

ou

ld t

he

ne

ed

fo

r th

em

be

dem

on

str

ate

d.

Th

is is a

min

or

wo

rk, w

hic

h is n

ot

de

ve

lopm

ent, a

nd w

hic

h w

ill

be im

ple

me

nte

d o

n la

nd

und

er

TW

UL c

ontr

ol

AB

MP

S.0

7

Bird

bo

xe

s s

ha

ll b

e in

sta

lled

on

tre

es a

dja

cent

to th

e s

ite

to

a

ttra

ct a

ran

ge

of

bird

sp

ecie

s inclu

din

g k

estr

el a

nd

pie

d

wa

gta

il, f

ollo

win

g c

om

ple

tion o

f th

e c

on

str

uction

wo

rks.

Th

is is a

min

or

wo

rk, w

hic

h is n

ot

deve

lopm

ent, a

nd w

hic

h w

ill

be im

ple

me

nte

d o

n la

nd

und

er

TW

UL c

ontr

ol

Page 72: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

67

Tab

le 1

.28 B

eck

ton

Sew

ag

e T

rea

tmen

t W

ork

s s

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BE

ST

W.0

1

The

site

la

yo

ut

sha

ll coo

rdin

ate

with

th

e L

ee

Tun

ne

l p

roje

ct

an

d th

e p

erm

ane

nt w

ork

s o

f th

e s

ew

age

tre

atm

ent

wo

rks

up

gra

de

.

Sch

em

e d

esig

n

BE

ST

W.0

2

The

de

sig

n o

f th

e v

en

tila

tion

ou

tle

ts s

ha

ll b

e in

ke

ep

ing w

ith

th

e c

on

text.

T

he

sig

natu

re d

esig

n v

en

tila

tion

co

lum

n s

ha

ll n

ot b

e u

se

d.

Se

cure

d b

y n

ew

req

uirem

ent B

ES

TW

6 (

De

sig

n P

rin

cip

les)

BE

ST

W.0

3

Ma

teria

ls s

ha

ll be

robust

and

com

ply

with

Th

am

es W

ate

r re

qu

ire

me

nts

.

Se

cure

d b

y n

ew

req

uirem

ent B

ES

TW

6 (

De

sig

n P

rin

cip

les)

BE

ST

W.0

4

Ba

rn o

wl n

est

site

s c

rea

ted d

urin

g c

on

str

uction

sh

all

be

re

tain

ed

an

d m

ain

tain

ed

du

rin

g o

pe

ration

.

Se

cure

d b

y n

ew

req

uirem

ent B

ES

TW

6 (

De

sig

n P

rin

cip

les)

BE

ST

W.0

5

Work

s t

o t

he

No

rthe

rn O

utf

all

Se

we

r sh

all

be

de

sig

ne

d a

nd

un

de

rtaken

so

as to

min

imis

e e

ffe

cts

on

the

his

toric f

ab

ric

of

the

str

uctu

re.

Se

cure

d b

y n

ew

req

uirem

ent B

ES

TW

6 (

De

sig

n P

rin

cip

les)

Tab

le 1

.29 S

had

Th

am

es

Pu

mp

ing

Sta

tio

n s

ite

-sp

ec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

SH

TP

S.0

1

The

ne

w a

nn

ex b

uild

ing s

ha

ll b

e n

o h

igh

er

tha

n th

e fo

rme

r b

uild

ing.

SH

TP

S2

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

SH

TP

S.0

2

The

ma

teria

ls f

or

the

ne

w a

nn

ex b

uild

ing s

ha

ll b

e lo

w-

ma

inte

na

nce a

nd

du

rab

le.

The

y s

ha

ll p

rese

rve

or

en

han

ce

th

e c

ha

racte

r of

the c

on

se

rva

tio

n a

rea

an

d t

he

se

ttin

g o

f th

e lis

ted

Whea

t W

ha

rf.

SH

TP

S2

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

SH

TP

S.0

3

Gla

ss o

n t

he

no

rthea

st e

leva

tio

n o

f th

e n

ew

an

ne

x s

ha

ll be

m

inim

ised

. W

he

re w

ind

ow

s a

re r

equ

ire

d t

he

gla

ss s

ha

ll b

e

pe

rma

nen

tly o

bscu

red a

nd

win

do

ws s

ha

ll b

e fix

ed

sh

ut

so

SH

TP

S2

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

Page 73: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Desig

n P

rin

cip

les:

Rou

tem

ap o

f se

cu

rin

g m

ech

an

ism

s

Desig

n P

rincip

les

68

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

tha

t it is n

ot

po

ssib

le to lo

ok d

ire

ctly in

to r

oom

s a

nd

ba

lcon

ies o

n W

he

at W

ha

rf.

SH

TP

S.0

4

The

ve

ntila

tion

co

lum

n f

or

the

pu

mp

ing s

tation

sh

all

be

re

loca

ted

as fa

r as p

ossib

le f

rom

exis

ting r

esid

en

tia

l w

ind

ow

s in o

rde

r to

min

imis

e im

pa

cts

on

resid

en

tia

l a

men

ity.

SH

TP

S2

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

SH

TP

S.0

5

A b

row

n r

oof

sh

all

no

t b

e p

rovid

ed o

n t

he

new

an

ne

x

bu

ildin

g.

SH

TP

S2

(D

eta

iled D

esig

n A

ppro

va

l fo

r P

erm

ane

nt

Ab

ove

G

roun

d S

tru

ctu

res)

SH

TP

S.0

6

The

ma

in p

ede

str

ian a

cce

ss t

o th

e a

nn

ex s

hall

be

via

th

e

alle

y w

ay a

t th

e n

ort

hea

ste

rn e

nd o

f th

e b

uild

ing.

SH

TP

S7

(S

pecific

atio

n o

f A

cce

sse

s)

SH

TP

S.0

7

Ve

hic

ula

r a

cce

ss s

ha

ll b

e v

ia M

agu

ire

Str

ee

t o

nly

. S

HT

PS

7 (

Sp

ecific

atio

n o

f A

cce

sse

s)

SH

TP

S.0

8

Site

dra

ina

ge

sha

ll b

e r

ein

sta

ted

as e

xis

ting.

SH

TP

S2

(a

ppro

va

l of

abo

ve

gro

un

d s

tru

ctu

res)

will

dea

l w

ith

d

rain

ag

e o

f th

e b

uild

ing

and

ro

ad w

ork

s w

hic

h w

ill n

ee

d t

o

co

mp

ly w

ith

Art

12 o

f th

e D

CO

Ta

ble

1.3

0 B

eke

sb

ou

rne

Str

ee

t s

ite

-sp

ec

ific

de

sig

n p

rin

cip

les

Refe

ren

ce

S

ite

-sp

ecif

ic d

es

ign

pri

nc

iple

s

Se

cu

rin

g m

ec

han

ism

BE

KS

T.0

1

The

pa

vin

g t

rea

tmen

t a

rou

nd

the

lan

dscap

ing w

ork

s o

n

Be

ke

sbo

urn

e S

tree

t sha

ll b

e r

ein

sta

ted

as e

xis

ting.

Se

cu

red

by n

ew

requ

ire

men

t B

EK

ST

7 (

Str

ee

t T

ree

s)

BE

KS

T.0

2

Site

dra

ina

ge

sha

ll b

e r

ein

sta

ted

as e

xis

ting.

Se

cure

d b

y n

ew

req

uirem

ent B

EK

ST

7 (

Str

eet T

rees)

BE

KS

T.0

3

An

ad

ditio

na

l tr

ee

sha

ll b

e p

lan

ted

in t

he

em

pty

tre

e p

it o

n

Be

ke

sbo

urn

e S

tree

t.

Se

cure

d b

y n

ew

req

uirem

ent B

EK

ST

7 (

Str

eet T

rees)

Page 74: Application Reference Number: WWO10001 Design Principles ...... · Design Principles: Routemap of securing mechanisms Design Principles 1 1 Introduction 1.1.1 Thames Water has undertaken

Copyright notice

All rights reserved. Any plans, drawings, designs and materials (materials) submitted by Thames Water Utilities Limited (Thames Water) as part of this application for Development Consent to the Planning Inspectorate are protected by copyright. You may only use this material (including making copies of it) in order to (a) inspect those plans, drawings, designs and materials at a more convenient time or place; or (b) to facilitate the exercise of a right to participate in the pre-examination or examination stages of the application which is available under the Planning Act 2008 and related regulations. Use for any other purpose is prohibited and further copies must not be made without the prior written consent of Thames Water. Thames Water Utilities LimitedClearwater Court, Vastern Road, Reading RG1 8DB The Thames Water logo and Thames Tideway Tunnel logo are © Thames Water Utilities Limited. All rights reserved.

Copyright © Thames Water Utilities Limited February 2014.