APPLICATION TO CONNECTA Guide to preparing your Application to ConnectJuly 2018
Page 1 l Application to Connect Form
Contents
1. Instructions 2
2. Application to Connect Form 3
2.1 Part One: Connection Applicant Details 3 2.2 Part Two: Entry Point (Generation Asset) Connection Overview 4
2.2.1 Source of Supply 4 2.2.2 Circuit Breaker and Extra High Voltage (EHV) Plant Control 5 2.2.3 Protection Systems 5 2.2.4 Local Instrumentation and Metering 6 2.2.5 Telemetered SCADA Points 7 2.2.6 Other Requirements 7
2.3 Part Two: Exit Point (Direct Connect Asset) Connection Overview 8
2.3.1 Source of Supply 8 2.3.2 Circuit Breaker and Extra High Voltage (EHV) Plant Control 8 2.3.3 Protection Systems 9 2.3.4 Local Instrumentation and Metering 10 2.3.5 Telemetered SCADA Points 11 2.3.6 Other Requirements 11
3. Required Information Guide 12
3.1 Entry Points 12 3.2 Exit Points 14
Page 2 l Application to Connect Form
1. InstructionsIn accordance with clause 5.3.4 of the National Electricity Rules (NER), this application form gathers the information ElectraNet requires to progress an application to connect to the South Australian transmission network and the National Electricity Market (NEM).
Before you complete this form, we recommend you take the time to understand the connection process and have early conversations with our Business Development team, to receive appropriate advice for your situation. The team is here to help and would welcome a chance to discuss how we can help deliver your project.
ProcessThere are three key stages to the transmission network connection negotiation process: the initial connection enquiry; this application to connect stage and the final offer to connect stage, which will involve the negotiation and execution of a transmission connection agreement between you and ElectraNet.
Before completing this form, you must have submitted a connection enquiry, in accordance with clause 5.3.2 of the NER, and have received our response in accordance with clause 5.3.3 of the NER.
Before ElectraNet will process the application to connect, you must have executed a Preliminary Works Agreement for ElectraNet to support your application. ElectraNet would be pleased to provide you with a proposal for these services when required.
ElectraNet requires that the information outlined in its Generator Connection Checklist, including your proposed technical access standards, be submitted as part of this application to connect form.
In addition to the information to be provided with your application to connect, if any services related to contestable IUSA components are not to be provided
by ElectraNet, the Connection Applicant must also provide the information outlined in section 4 of this form, in accordance with clause 5.3.4 of the NER. Please note if ElectraNet is to provide services related to contestable IUSA components, the information outlined in section 4 need not be submitted with your application to connect.
After reviewing your completed application to connect form, we may ask you for additional information better understand your requirements and process your request.
NotesThe application to connect form has two parts: connection requirements relating to entry points (generation facilities) and connection requirements relating to exit points (direct connect (load) facilities). Please only complete the section that relates to your type of connection application.
Definitions and terms used in this form are explained in section three and can also be found in chapter 10 of the NER. Italicised terms used in this form defined by the NER.
Contact informationTo have a confidential discussion about your project, the transmission connection process or how to complete or submit any of the associated forms, please contact our Business Development team:
P +61 8 8404 7966 E [email protected]
Page 3 l Application to Connect Form
2. Application to Connect Form2.1 Part One: Connection applicant details
Connection Applicant Details
Date of Connection Enquiry
Conenction Enquiry Reference Number1
Has and ElectraNet confidentiality agreement been executed by the connection applicant?
Yes No
Company Details
Company Name
ACN
ABN
Primary Contact
Name
Position
Phone Number
Email Address
Postal Address
Project Details
Project Name
1 The connection enquiry reference number is the unique identification number for each connection enquiry and can be found at the top of all correspondence sent to the connection applicant.
Page 4 l Application to Connect Form
2.2 Part Two: Entry point (generation asset) connection
2.2.1 Source of Supply
Connection requirement Connection applicant comment
Voltage level – nominal (kV)
Voltage level – dynamic range (kV range)Insulation coordination – lightning impulse withstand (kVp)Insulation coordination – power frequency withstand (kV)Rated MVA (power transfer capability)
Rated MW (power transfer capability)
Emergency ratings (if required)
Maximum continuous current rating (Amps)Maximum short term withstand current (kA seconds)Ambient condition range (degrees C) under which the above currentappliesShort circuit – maximum generator 3 Phase S/C infeed (symmetrical) (kA)Minimum zero sequence impedance (% on 100 MVA Base)Minimum negative sequence impedance (% on 100 MVA Base)
X/R ratio for switchgear consideration
Earthing method
Earth grid rated current (kA seconds)
Single line diagram
Page 5 l Application to Connect Form
2.2.2 Circuit breaker and extra high voltage (EHV) plant control
Connection requirement Connection applicant comment
Auto control schemes
Synchronising and synchronism check Manual Auto Both
Point of wave switching required Yes No
Interlocking requirements required Yes No
Local control (from power station)
Control schematics for interfacing with the EHV assets
AC drawings provided:
Yes No
DC drawings provided:
Yes No
2.2.3 Protection Systems
Connection requirement Connection applicant comment
X protection
Y protection
Circuit breaker failure
Earth leakage protection required: Yes
No
Protection signalling requirements – X protection Protection signalling requirements – Y protection
Tele-protection requirements
Fault clearance times
Page 6 l Application to Connect Form
2.2.4 Local instrumentation and metering
Connection requirement Connection applicant comment
Revenue metering
Expected maximum demand (MW)Expected annual energy transfers (GWh)
NEM metering required?
Yes
No
AmmeterRequired
Yes
NoType of ammeter
VoltmeterRequiredType of voltmeter
MW
Required Yes
NoSpecify range (state measurement unit)
MVAR
Required Yes
No
Specify range (state measurement unit)
Disturbance recording or supply quality monitoring
Dedicated recording equipment required:
Yes No
Dedicated quality of supply monitoring system required:
Yes No
Page 7 l Application to Connect Form
2.2.5 Telemetered SCADA points
Connection requirement Connection applicant comment
Control
Status
Alarms
AC measurements
SCADA interface
Redundancy requirements
2.2.6 Other requirements
Are there any other requirements not yet covered?
Page 8 l Application to Connect Form
2.3 Part Two: Exit point (generation asset) connection
2.3.1 Source of Supply
Connection requirement Connection applicant comment
Voltage level – nominal (kV)
Exit separation relative to other circuits
Continuous rating (Amps)
Type of load
Single line diagram
2.3.2 Circuit breaker and extra high voltage (EHV) plant control
Connection requirement Connection applicant comment
Auto-reclose
Auto control schemes
Synchronising check Manual Auto Both
Point of wave switching required Yes No
Interlocking requirements required Yes No
Page 9 l Application to Connect Form
2.3.3 Circuit breaker and extra high voltage (EHV) plant control
Connection requirement Connection applicant comment
X protection
Y protection
Circuit breaker failure
Earth leakage protection required: Yes No
Protection signalling requirements – X protection Protection signalling requirements – Y protection
Tele-protection requirements
Fault clearance times
Page 10 l Application to Connect Form
2.3.4 Local instrumentation and metering
Connection requirement Connection applicant comment
Revenue metering
Expected maximum demand (MW)Expected annual energy transfers (GWh)
NEM metering required?
Yes
No
AmmeterRequired
Yes
NoType of ammeter
VoltmeterRequiredType of voltmeter
MW
Required Yes
NoSpecify range (state measurement unit)
MVAR
Required Yes
NoSpecify range (state measurement unit)
Disturbance recording or supply quality monitoring
Dedicated recording equipment required:
Yes NoDedicated quality of supply monitoring system required:
Yes No
Page 11 l Application to Connect Form
2.3.5 Telemetered SCADA points
Connection requirement Connection applicant comment
Control
Status
Alarms
AC measurements
SCADA interface
Redundancy requirements
2.3.6 Other requirements
Are there any other requirements not yet covered?
Page 12 l Application to Connect Form
3. Required Information Guide3.1 Entry points
Source of supplySingle line diagram Note: This should be submitted with this application to connect form
Applicant to provide a single line diagram that outlines the nature of the required connection – single switched, double switched, one and a half CBs, ROIs etc.
Maximum continuous current rating (Amps)
This will be used to determine the rating of the primary and secondary plant. If any form of short term overloads is anticipated, theses should be mentioned in this section.
Type of loadSpecify the general nature of the connected load (e.g. large motor drives, controlled rectifiers, battery etc) and identify any particular impacts on the Connection Assets and whether demand is to be firm.
Circuit breaker and extra high voltage (EHV) plant control
Auto-control schemesSpecify any requirements for auto-control schemes such as auto-closing or opening of CBs (other than auto-reclosing), giving an overview of the required functionality.
Synchronising and synchronism check Specify whether it is needed for manual, auto or for both.
Point on wave switching Specify if required.
Interlocking requirements Is the CB control to be interlocked with any other switchgear or operational conditions?
Load control (from power station) Specify any plant control requirements from the power station and how they are envisaged.
Control schematics for interfacing with the EHV assets
Provide AC and DC schematic drawings for the interfacing with EHV assets.
Protection systems
X protection
Specify protection type (i.e. distance, current differential, pilot-wire, directional over current etc.) and preferred vendor device if applicable.
Typically the generator and the generator transformer protection are owned by the connection applicant and the X and Y protection operates directly into ElectraNet’s EHV Assets via an approved dedicated interface. Note that any deviation from the standard ElectraNet applied protection relays may attract additional costs.
Y protection
Specify protection type (i.e. distance, current differential, pilot-wire, directional over current etc.) and preferred vendor device if applicable.
Typically the generator and the generator transformer protection are owned by the connection applicant and the X and Y protection operates directly into ElectraNet’s EHV Assets via an approved dedicated interface. Note that any deviation from the standard ElectraNet applied protection relays may attract additional costs.
Page 13 l Application to Connect Form
Circuit breaker failure
Specify any special requirements. Please indicate if the exit protection “zone” includes any areas where earth fault current has been limited to the extent that traditional CB Failure protection cannot be set above load current.
Earth leakage protection Specify if required and note any special requirements.
Protection signalling requirements – X protection
Specify what protection signalling is required (e.g. F/C – direct connected or switched via mux, pilot wire, etc).
Protection signalling requirements – Y protection
Specify what protection signalling is required (e.g. F/C – direct connected or switched via mux, pilot wire, etc).
Tele-protection requirements
Specify any Tele-protection requirements (e.g. permissive trips, remote trips, back up remote trips etc). Specify the communications requirements associated with these. Tele-protection signals (bearer, termination equipment, etc).
Local instrumentation and metering
Revenue metering
Specify expected Maximum Demand and Annual Energy Transfers as well as NEM class of metering to be provided.
ElectraNet is the default Revenue Metering Service Provider, please indicate if this function is to be carried out by another party.
Ammeter Specify if this is required, whether three phase or single phase and nominate range.
Voltmeter Specify if this is required, whether three phase or single phase and nominate range.
MW Specify if this is required and nominate range.
MVAR Specify if this is required and nominate range.
Disturbance recording or supply quality monitoring
Specify if any dedicated disturbance recording equipment or quality of supply monitoring systems are required. If modern digital protection is installed, ElectraNet would normally order the devices with the fault recording capability included.
Telemetered SCADA points
Control Specify any remote control requirements (e.g. CB Open / Close Control).
Status Specify what status points are required.
Alarms Specify what alarms are required.
AC measurements Specify what AC signals are to be telemetered.
Page 14 l Application to Connect Form
SCADA interface Nominate SCADA interface and protocol to be used.
Redundancy requirements
Specify any redundancy requirements associated with the RTU telecontrol signalling (e.g. are any SCADA qualities required to be duplicated? are duel SCADA ports and communications interfaces required?)
3.2 Exit points
Source of supply
Exit separation relative to other circuits Specify if there needs to be any special treatment of the proposed exitpoint relative to other bays/circuits at the station.
Maximum continuous current rating (Amps)
This will be used to determine the rating of the primary and secondary plant. If any form of short-term overloads are anticipated, these need to be mentioned in this section.
Type of loadSpecify the general nature of the connected load (e.g. large motor drives, controlled rectifiers, battery etc) and identify any particular impacts on the Connection Assets and whether demand is to be firm.
Single line diagramApplicant to provide a single line diagram that outlines the nature of the required connection – single switched, double switched, one and a half CBs, ROIs etc.
Circuit breaker and extra high voltage (EHV) plant control
Auto-control schemesSpecify any requirements for auto-control schemes such as auto-closing or opening of CBs (other than auto-reclosing), giving an overview of the required functionality.
Synchronising check Specify whether it is needed for manual, auto or for both.
Point on wave switching Specify if required.
Interlocking requirements Is the CB control to be interlocked with any other switchgear or operational conditions?
Protection systems
X protection
Specify protection type (i.e. distance, current differential, pilot-wire, directional over current etc.) and preferred vendor device if applicable.
Note that any deviation from the standard ElectraNet applied protection relays may attract additional costs.
Y protection
Specify protection type (i.e. distance, current differential, pilot-wire, directional over current etc.) and preferred vendor device if applicable.
Note that any deviation from the standard ElectraNet applied protection relays may attract additional costs.
Page 15 l Application to Connect Form
Circuit breaker failure
Specify any special requirements. Please indicate if the exit protection “zone” includes any areas where earth fault current has been limited to the extent that traditional CB Failure protection cannot be set above load current.
Earth leakage protection Specify if required and note any special requirements.
Protection signalling requirements – X protection
Specify what protection signalling is required (e.g. F/C – direct connected or switched via mux, pilot wire, etc).
Protection signalling requirements – Y protection
Specify what protection signalling is required (e.g. F/C – direct connected or switched via mux, pilot wire, etc).
Tele-protection requirements
Specify any Tele-protection requirements (e.g. permissive trips, remote trips, back up remote trips etc). Specify the communications requirements associated with these. Tele-protection signals (bearer, termination equipment, etc).
Fault clearance times
The National Electricity Code specifies fault clearance requirements for auto access (Schedule 5.1a). If a slower fault clearance time is required this needs to be negotiated with ElectraNet.
These requirements need to be categorised according to National Electricity Code section (Schedule 5.1a.8).
Local instrumentation and metering
Revenue metering
Specify expected Maximum Demand and Annual Energy Transfers as well as NEM class of metering to be provided.
ElectraNet is the default Revenue Metering Service Provider, please indicate if this function is to be carried out by another party.
Ammeter Specify if this is required, whether three phase or single phase and nominate range.
Voltmeter Specify if this is required, whether three phase or single phase and nominate range.
MW Specify if this is required and nominate range.
MVAR Specify if this is required and nominate range.
Disturbance recording or supply quality monitoring
Specify if any dedicated disturbance recording equipment or quality of supply monitoring systems are required. If modern digital protection is installed, ElectraNet would normally order the devices with the fault recording capability included.
Page 16 l Application to Connect Form
Telemetered SCADA points
Control Specify any remote control requirements (e.g. CB Open / Close Control).
Status Specify what status points are required.
Alarms Specify what alarms are required.
AC measurements Specify what AC signals are to be telemetered.
SCADA interface Nominate SCADA interface and protocol to be used.
Redundancy requirements
Specify any redundancy requirements associated with the RTU telecontrol signalling (e.g. are any SCADA qualities required to be duplicated? are duel SCADA ports and communications interfaces required?)
Page 17 l Application to Connect Form
4. Additional InformationAdditional information to be submitted with this application to connect form if services related to contestable IUSA components are not obtained from ElectraNet
Details of party responsible for IUSA construction
Business/Company Name
ACN
ABN
Primary Contact
Name
Position
Phone number
Email address
Postal address
Details of IUSA owner
Business/Company Name
ACN
ABN
Primary Contact
Name
Position
Phone number
Email address
Postal address
Page 18 l Application to Connect Form
Please submit with this application the detailed design of the contestable IUSA components, in accordance with clause 5.3.4(b1) of the NER. The detailed design must be in accordance with ElectraNet’s functional design requirements as published on it’s website here: https://www.electranet.com.au/what-we-do/solutions/connection-services/connection-services-resources/
Please also include all information for ElectraNet relevant to the contestable IUSA components. This should include:
• the Connection Applicant’s process for howElectraNet will undertake a review of the detaileddesign, inspect the construction of thosecomponents and how risks of defects will beaddressed. This process must be based on, andin accordance with, ElectraNet’s detailed designreview process;
• the Connection Applicant’s proposed changesto the form of the network operating agreementhttps://www.electranet.com.au/wp-content/uploads/2018/06/Network-Operating-Agreement-1-July-2018.pdf; and
• all information reasonably required for ElectraNetto properly provide operation and maintenanceservices for the life of the contestable IUSAcomponents, including details of their construction,instructions for operation and maintenance andhealth safety and asset management manuals.
Contact UsTo have a confidential discussion about your project, the transmission connection process or how to complete or submit any of the associated forms, please contact our Business Development team.