applications lodged listing - combined development applic
TRANSCRIPT
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
9/04/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved DAP
7/2015/1 5/01/2015 129 Dawkins Road LEWISTON
LOT: 110 ALT: A HD: 3 PL: D013489 CT: 5698/760
Outbuilding (Shed) $21,000 Planning Assessment 16/04/2015
Category 2Category:
Approval:
BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
17/02/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/2 5/01/2015 Pederick Road LEWISTON
LOT: 206 ALT: A HD: 3 PL: D83809 CT: 6065/503
Verandah
$9,000 Decision Issued 25/03/2015
Category 1Category:
Approval:
BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
2/12/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/3 5/01/2015 Shellgrit Road TWO WELLS
LOT: 44 ALT: A HD: 3 PL: D93015 CT: 6134/846
Construction of commercial packing
shed
$15,000 Decision Issued 2/12/2015
Category 2Category:
Approval:
BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
finished floor level not less 700mmP18
planting bushes to and replace when dieP44
propagted from locall indigenous speciesP45
planting approp bushes within first seasP48
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 1 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
30/01/2015C J LEMM
TWO WELLS SA 5501
2 Trim RoadApproved by Delegation
7/2015/4 6/01/2015 2A Trim Road TWO WELLS
LOT: 120 ALT: A HD: 3 PL: D84395 CT: 6063/679
Verandah
$4,900 Final Inspection 27/03/2015
Category 1Category:
Approval:
C J LEMM $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
LitterB76
Footings in natural groundB88
Builder: Conditions: Payments:
29/01/2015M PJEVAC
LEWISTON SA 5501
Pte Road Off Tower Road RoadApproved by Delegation
7/2015/5 14/01/2015 32 Robins Road LEWISTON
LOT: 6 ALT: A HD: 3 PL: D007364 CT: 6060/187
Outbuilding (Shed) $3,600 Decision Issued 29/01/2015
Category 1Category:
Approval:
M PJEVAC $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS1
Builder: Conditions: Payments:
1/07/2015M PANELLA
TWO WELLS SA 5501
Lot 11 Old Port Wakefield Roadwithdrawn Application
7/2015/6 14/01/2015 Old Port Wakefield Road TWO WELLS
LOT: 11 ALT: A HD: 3 PL: F219571 CT: 6106/720
Sheep Keeping (20 sheep) $0 Decision Issued 1/07/2015
Category 3Category:
Approval:
M PANELLA $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
Builder: Conditions: Payments:
28/01/2015A H ROUTLEY
TWO WELLS SA 5501
76 Old Port Wakefield RoadApproved by Delegation
7/2015/7 14/01/2015 76 Old Port Wakefield Road TWO WELLS
LOT: 367 ALT: A HD: 3 PL: F174834 CT: 5410/612
Outbuilding (Refrigerated Container) $9,000 Decision Issued 28/01/2015
Category 1Category:
Approval:
A H ROUTLEY $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$59.95 Class 7 & 8
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
planning non standard conditionPNS1
planning non standard conditionPNS2
Fire ExtinguishersB77
Statement of ComplianceB8
Builder: Conditions: Payments:
Page 2 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
1/07/2015C A FLAMANK
LEWISTON SA 5501
19 Aunger RoadApproved by Delegation
7/2015/8 14/01/2015 19 Aunger Road LEWISTON
LOT: 12 ALT: A HD: 3 PL: D013157 CT: 5885/966
Construction of Fence (in flood
hazard zones 1 and 2)
$4,000 Decision Issued 1/07/2015
Category 1Category:
Approval:
C A FLAMANK $58.50 Planning Lodgement Fee (up to $5,000)
$2.55 Planning Fee DAC
$107.10 Planning Fee DAC
$47.95 Planning Fee Non-Complying
$94.00 Planning Fee Non-Complying
$11.90 Planning Fee Non-Complying
$175.00 HYDROLOGICAL REPORT (FLOOD)
planning non standard conditionPNS1Builder: Conditions: Payments:
22/04/2015J BEAUCHAMP
UNKNOWN 0000Approved by Delegation
7/2015/9 15/01/2015 11 Cameron Terrace MALLALA
LOT: 3 ALT: A HD: 1 PL: D021978 CT: 6079/133
Outbuilding (Garage) $7,000 Decision Issued 22/04/2015
Category 1Category:
Approval:
J BEAUCHAMP $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
provisional building rules consentP101
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
21/01/2015S CHAN
BROOKLYN PARK SA 5032
PO Box 670Approved by Delegation
7/2015/10 16/01/2015 Bailey Road West TWO WELLS
LOT: 7 ALT: S HD: 3 PL: D93213 CT: 6135/131
Outbuilding (Toilet Facilities) $1,000 Decision Issued 21/01/2015
Category 1Category:
Approval:
S CHAN $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$318.00 Septic Tank application Fee
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
dwelling connected to effluent systemP13
Builder: Conditions: Payments:
17/02/2015G N BUDGEN
THOMPSON BEACH SA 5501
32 Sandpiper DriveApproved by Delegation
7/2015/11 19/01/2015 32 Sandpiper Drive THOMPSON BEACH
LOT: 94 ALT: A HD: 2 PL: D029513 CT: 5295/785
Verandah
$1,500 Decision Issued 17/02/2015
Category 1Category:
Approval:
G N BUDGEN $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
LitterB76
Footings in natural groundB88
Inspection of building workB5
Builder: Conditions: Payments:
Page 3 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
2/02/2015STATEWIDE POOLS PTY LTD
SALISBURY PLAIN SA 5109
59-63 Saints RoadApproval Bulding Consent
7/2015/12 19/01/2015 2 Karapas Court LEWISTON
LOT: 110 ALT: A HD: 3 PL: D75923 CT: 6002/20
Swimming Pool & Safety Fence
$9,600 Final Inspection 27/02/2015
Category 1Category:
Approval:
STATEWIDE POOLS PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$175.00 Swimming Pool Lodgement Fee
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
C SRAYNEANG.
SALISBURY DOWNS SA 5108
56 Natalie Avenue
7/2015/13 22/01/2015 Tower Road LEWISTON
LOT: 150 ALT: A HD: 3 PL: D059456 CT: 5899/231
Construction of 2 plastic covered
greenhouses...... Construction of 2
plastic covered greenhouses, 1
shade house and 1 water storage
dam
$41,552 2nd Additional Information 12/04/2016
Category 2Category:
Approval:
L MARAFIOTI $58.50 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$5.05 Planning Fee DAC
$207.76 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
$2,760.24 Class 7 & 8
in accordance with plans submittedP1Builder: Conditions: Payments:
29/01/2015B J BIRKS
TWO WELLS SA 5501
5 Gameau RoadApproved by Delegation
7/2015/14 22/01/2015 5 Gameau Road TWO WELLS
LOT: 50 ALT: A HD: 3 PL: D064975 CT: 5919/364
Outbuilding (Shed) $6,500 Decision Issued 29/01/2015
Category 1Category:
Approval:
B J BIRKS $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS1
Builder: Conditions: Payments:
17/02/2015J & S PERGOLA INSTALLATIONS
SALISBURY NORTH SA 5108
19A Playford CrescentApproved Private Certifier
7/2015/15 23/01/2015 55 Aunger Road LEWISTON
LOT: 23 ALT: A HD: 3 PL: D014929 CT: 5885/919
Demolition of sunroom, erect
verandah
$4,990 Decision Issued 17/02/2015
Category 1Category:
Approval:
J & S PERGOLA INSTALLATIONS $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
provisional building rules consentP101
Builder: Conditions: Payments:
Page 4 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
21/04/2015 A BRISCOE.
PASADENA SA 5042
9 Kalka Cresent
C/- BDCApproval Bulding Consent
7/2015/16 23/01/2015 16 Canala Court TWO WELLS
LOT: 22 ALT: A HD: 3 PL: D033249 CT: 5060/219
Extension and Alteration to Dwelling $45,000 Decision Issued 21/04/2015
Category 1Category:
Approval:
MCARDLE PROJECTS $58.50 Planning Lodgement Fee (up to $5,000)
$66.50 Planning Lodgement Fee (over $5,000)
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
3/02/2015BGI Building Group
Nuriootpa 5355
21-23 Tanunda RoadApproved by Delegation
7/2015/17 23/01/2015 27 Bailey Road TWO WELLS
LOT: 10 ALT: A HD: 3 PL: D90686 CT: 6106/352
Attached Flat Outback Verandah $11,500 Decision Issued 3/02/2015
Category 1Category:
Approval:
BGI Building Group $58.50 Planning Lodgement Fee (up to $5,000)
$88.28 Class 10
$5.05 Planning Fee DAC
$6.64 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
Distinctive Homes
MARLESTON SA 5033
PO Box 208
7/2015/18 23/01/2015 26 Butler Street MALLALA
LOT: 21 ALT: A HD: 1 PL: D93594 CT: 6137/313
Variation to 312/192/2014 to amend
final truss calculations
$212,647 Building Assessment 29/01/2015
Category 1Category:
Approval:
Distinctive Homes $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
Builder: Conditions: Payments:
Page 5 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
10/02/2015K MALTHOUSE
THOMPSON BEACH SA 5501
22 Heron CrescentApproved by Delegation
7/2015/19 27/01/2015 22 Heron Crescent THOMPSON BEACH
LOT: 227 ALT: A HD: 2 PL: D029513 CT: 5370/727
Outbuilding (Shed) and Verandah $10,400 Decision Issued 10/02/2015
Category 1Category:
Approval:
M J MALTHOUSE $58.50 Planning Lodgement Fee (up to $5,000)
$69.34 Class 10
$5.05 Planning Fee DAC
$5.22 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$28.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
external walls maintained in good condP7
approved for domestic purposes onlyP9
planting bushes to and replace when dieP44
planning non standard conditionPNS1
DisclaimerPNS6
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
V H LY.
VIRGINIA SA 5120
PO Box 1071
7/2015/20 27/01/2015 Shellgrit Road TWO WELLS
LOT: 43 ALT: A HD: 3 PL: D93015 CT: 6134/845
4 plastic covered greenhouses and 1
water storage dam... 4 plastic
covered greenhouses and 1 water
storage dam, in 2 stages
$85,000 Additional Information Buildin 17/04/2015
Category 2Category:
Approval:
V H LY. $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$249.90 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
$3,320.10 Class 7 & 8
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
planting bushes to and replace when dieP44
propagted from locall indigenous speciesP45
planting approp bushes within first seasP48
planning non standard conditionPNS1
no other egress shall be createdP40
epa - practical measuresP140
Builder: Conditions: Payments:
10/02/2015B J FRIDD
TWO WELLS SA 5501
48a Dawkins RoadApproved by Delegation
7/2015/21 27/01/2015 48A Dawkins Road TWO WELLS
LOT: 32 ALT: A HD: 3 PL: D065294 CT: 5921/940
Storage Shed for Domestic Use $3,000 Decision Issued 10/02/2015
Category 1Category:
Approval:
B J FRIDD $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
LitterB76
Footings in natural groundB88
Inspection of building workB5
Builder: Conditions: Payments:
Page 6 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
24/08/2015S J CASKEY
LEWISTON SA 5501
7 Humzy CourtRefused by Delegation
7/2015/22 29/01/2015 7 Humzy Court LEWISTON
LOT: 71 ALT: A HD: 3 PL: 24982 CT: 5377/730
Parking of 2 Trucks $0 Decision Issued 24/08/2015
Category 1Category:
Approval:
S J CASKEYBuilder: Conditions: Payments:
7/04/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEApproved Private Certifier
7/2015/23 3/02/2015 44 Walter Avenue TWO WELLS
LOT: 18 ALT: A HD: 3 PL: D92086 CT: 6117/277
Dwelling
$216,975 Decision Issued 9/04/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$13.56 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$257.66 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
dwelling connected to effluent systemP13
water storage tank 22400 litresP174
provisional building rules consentP101
no other egress shall be createdP40
epa - practical measuresP140
Waste containmentB19
On site toilet facilityB20
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
10/02/2015STATEWIDE POOLS PTY LTD
SALISBURY PLAIN SA 5109
59-63 Saints RoadApproval Bulding Consent
7/2015/24 3/02/2015 11 Kathleen Road TWO WELLS
LOT: 61 ALT: A HD: 3 PL: D045869 CT: 5365/351
Swimming Pool and Safety Fence $9,600 Decision Issued 10/02/2015
Building Rules Consent OnlyCategory:
Approval:
STATEWIDE POOLS PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$175.00 Swimming Pool Lodgement Fee
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
23/02/2015K L SINFIELD
WILD HORSE PLAINS SA 5501
Sec 360 Second StreetApproved by Delegation
7/2015/25 3/02/2015 Second Street WILD HORSE PLAINS
ALT: S HD: 2 SEC: 360 PL: H140400 CT: 6102/304
Verandah
$0 Decision Issued 23/02/2015
Category 1Category:
Approval:
K L SINFIELD $58.50 Planning Lodgement Fee (up to $5,000)
$62.50 Class 10
$3.99 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.70 Building - DAC
$0.21 Building - DAC
$28.00 Certificate of Title Request
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
provisional building rules consentP101
stormwater be directed away from roofP125
stormwater dischargeB31
LitterB76
Footings in natural groundB88
Inspection of building workB5
Builder: Conditions: Payments:
Page 7 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
24/08/2015SIMONDS HOMES
ADELAIDE 5000
280 Pultney StreetRefused by Delegation
7/2015/26 4/02/2015 Bailey Road West TWO WELLS
LOT: 24 ALT: A HD: 3 PL: D89146 CT: 6094/793
Single storey dwelling (incorporating
porch and garage)
$249,767 Decision Issued 24/08/2015
Category 1Category:
Approval:
SIMONDS HOMES $58.50 Planning Lodgement Fee (up to $5,000)
$15.62 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$296.88 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
Builder: Conditions: Payments:
29/05/2015 RIVERGUM HOMES PTY LTD.
TORRENSVILLE SA 5031
PO Box 191Approved Private Certifier
7/2015/27 5/02/2015 4 Milbourne Court LEWISTON
LOT: 302 ALT: A HD: 3 PL: D94528 CT: 6146/874
Dwelling
$262,079 Decision Issued 29/05/2015
Category 1Category:
Approval:
RIVERGUM HOMES PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$16.38 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$311.21 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
dwelling connected to effluent systemP13
Site ConditionsP242
planning non standard conditionPNS1
provisional building rules consentP101
Waste containmentB19
On site toilet facilityB20
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
5/03/2015 ALPHA INDUSTRIES.
CAVAN SA 5094
12 STOCK ROADApproved by Delegation
7/2015/28 5/02/2015 50 Bethesda Road LEWISTON
LOT: 704 ALT: A HD: 3 PL: D81532 CT: 6041/215
Shed
$6,650 Decision Issued 5/03/2015
Category 1Category:
Approval:
L K SCOTT. $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS1
Engineer's SpecificationsB90
Builder: Conditions: Payments:
16/04/2015BOUNDRINA LTD
REEVES PLAINS SA 5502
Boundary RoadApproved by Delegation
7/2015/29 6/02/2015 1,194-75 Boundary Road LEWISTON
LOT: 513 ALT: A HD: 3 PL: F174980 CT: 5732/312
Variation to 312/208/2014 to
increase floor area by 252sqm
Variation to 312/208/2014 to
increase floor area by 252sqm
$100,000 Decision Issued 16/04/2015
Category 1Category:
Approval:
MAGNUS AUSTRALIA $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$44.41 Building - DAC
$95.95 Planning Fee ($10,000-$100,000)
$585.59 Class 7 & 8
in accordance with plans submittedP1
stormwater dischargeB31
LitterB76
Footings in natural groundB88
Engineer's SpecificationsB90
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 8 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
24/08/2015A E PLACUCCI
WINDSOR SA 5501
8 Windsor StreetApproved by Delegation
7/2015/30 6/02/2015 8 Windsor Street WINDSOR
LOT: 13 ALT: A HD: 2 PL: D000493 CT: 5593/221
Change of land use to residential,
construction of a single... storey
dwelling and temporary
accommodation of a caravan
$130,000 Underfloor - Septic 1/09/2015
Category 1Category:
Approval:
A E PLACUCCI
L E PLACUCCI$58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$8.13 Planning Fee DAC
$40.37 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$154.38 Planning Fee (more than $100,001)
$536.38 Class 1, 2 & 4
building non standard conditionBNS1
building non standard conditionBNS2
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS3
building non standard conditionBNS4
Statement of ComplianceB8
in accordance with plans submittedP1
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
water storage tank 22400 litresP174
Fire fighting water tankP238
safe vehicle access to roadP163
Stormwater drained and retained onsiteP243
Site ConditionsP242
planning non standard conditionPNS1
epa - practical measuresP140
Builder: Conditions: Payments:
23/02/2015 K A SMITH.
TWO WELLS SA 5501
15 Artesian RoadApproved by Delegation
7/2015/31 10/02/2015 15 Artesian Road TWO WELLS
LOT: 50 ALT: A HD: 3 PL: D025644 CT: 5334/715
Shed
$3,500 Decision Issued 23/02/2015
Category 1Category:
Approval:
K A SMITH. $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS1
Builder: Conditions: Payments:
12/03/2015 N L BELLCHAMBERS
TWO WELLS SA 5501
Lot 11 Coats RoadApproved by Delegation
7/2015/32 10/02/2015 18A Coats Road TWO WELLS
LOT: 11 ALT: A HD: 3 PL: D93865 CT: 6139/773
Horse Keeping, 2 Horses, Fencing,
Day Yards and Stables
$2,500 Decision Issued 12/03/2015
Category 1Category:
Approval:
N L BELLCHAMBERS.
C W BELLCHAMBERS.$58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
11/11/2015 H E CURNOW.
WINDSOR SA 5501
Port Wakefield RoadApproved by Development Assess
Commision
7/2015/33 11/02/2015 Avon Road DUBLIN
LOT: 1001 ALT: A HD: 2 PL: D047003 CT: 5452/42
Port Wakefield Road DUBLIN
LOT: 1000 ALT: A HD: 2 PL: D047003 CT: 5452/41
Land Division (boundary realignment) $0 Decision Issued 11/11/2015
Category 1Category:
Approval:
H E CURNOW. in accordance with plans submittedP1Builder: Conditions: Payments:
Page 9 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
23/04/2015J D BEAUCHAMP
MALLALA SA 5502
11 Cameron TerracePlanning Consent Only
7/2015/34 12/02/2015 11 Cameron Terrace MALLALA
LOT: 3 ALT: A HD: 1 PL: D021978 CT: 6079/133
Variation to 312/009/2015 to
increase the floor area... Variation to
312/009/2015 to increase the floor
area of the outbuilding to 54 square
metres
$10,000 Decision Issued 23/04/2015
Category 1Category:
Approval:
J D BEAUCHAMP $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$28.00 Certificate of Title Request
in accordance with plans submittedP1
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
5/08/2015DISTRICT COUNCIL OF MALLALA
MALLALA SA 5502
2A Wasleys RoadApproved by Delegation
7/2015/35 12/02/2015 210 Hayman Road LEWISTON
LOT: 3 ALT: A HD: 3 PL: D050726 CT: 5627/789
Variation to development
authorisation 312/199/2010...
Variation to development
authorisation 312/199/2010 involving
removal of Development Plan
condition 3 to allow relocation of
playground vehicular access/egress
point from Hayman Road to Pederick
Road, and relocation of car park
$0 Decision Issued 5/08/2015
Category 3Category:
Approval:
DISTRICT COUNCIL OF MALLALA in accordance with plans submittedP1Builder: Conditions: Payments:
4/06/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEApproved Private Certifier
7/2015/36 12/02/2015 5 Morias Court LEWISTON
LOT: 124 ALT: A HD: 3 PL: D88783 CT: 6091/52
Dwelling
$240,166 Decision Issued 4/06/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$15.01 Planning Fee DAC
$169.00 Consultative Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$39.00 Consultative Fee - Other
$285.20 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Waste containmentB19
On site toilet facilityB20
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
16/04/2015B R BEER
PARHAM SA 5501
24 The EsplanadeApproved by Delegation
7/2015/37 13/02/2015 24 The Esplanade PARHAM
LOT: 93 ALT: A HD: 2 PL: T140402 CT: 5714/337
Installation of Solar Photovoltaic
Panels
$3,921 Decision Issued 16/04/2015
Category 1Category:
Approval:
EUROSOLAR. $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
25/03/2015K L EARL
WINDSOR SA 5501
Sec 122 Windsor StreetApproved by Delegation
7/2015/38 13/02/2015 20 Balaklava Road MALLALA
LOT: 42 ALT: A HD: 1 PL: D019203 CT: 5453/478
Carport
$4,800 Decision Issued 25/03/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$4.05 Building - DAC
stormwater dischargeB31
LitterB76
Footings in natural groundB88
Builder: Conditions: Payments:
Page 10 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
29/05/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEApproved Private Certifier
7/2015/39 17/02/2015 129 Dawkins Road LEWISTON
LOT: 110 ALT: A HD: 3 PL: D013489 CT: 5698/760
Single Storey Detached Dwelling and
Demolition of Existing Dwelling
Construction of a single storey
detached dwelling and demolition of
existing dwelling and ancillary carport
and outbuilding
$239,876 Decision Issued 29/05/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$100.00 Septic Tank application Fee
$14.99 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$284.86 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
dwelling connected to effluent systemP13
Stormwater drained and retained onsiteP243
water storage tank 22400 litresP174
Fire fighting water tankP238
planning non standard conditionPNS1
provisional building rules consentP101
Builder: Conditions: Payments:
13/08/2015 T J PALMER
DUBLIN SA 5501
3 Third StreetApproved by Delegation
7/2015/40 17/02/2015 3 Third Street DUBLIN
LOT: 39 ALT: A HD: 2 PL: T140401 CT: 5514/90
Construction of a single storey
dwelling Construction of a single
storey dwelling - dependent
accommodation in association with
existing main dwelling and demolition
of domestic outbuilding
$20,000 Decision Issued 13/08/2015
Category 1Category:
Approval:
WOODLAND CONSTRUCTIONS. $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$209.00 Septic Tank application Fee
$5.05 Planning Fee DAC
$4.05 Building - DAC
$6.21 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$82.61 Class 1, 2 & 4
in accordance with plans submittedP1
dwelling connected to effluent systemP13
planning non standard conditionPNS1
LitterB76
Rainwater tankB81
Statement of ComplianceB8
Builder: Conditions: Payments:
14/10/2015A R LODGE
LEWISTON SA 5501
229 Hayman RoadApproved by Delegation
7/2015/41 17/02/2015 229 Hayman Road LEWISTON
LOT: 49 ALT: A HD: 3 PL: D014929 CT: 5691/849
Extension to carport forward of
dwelling
$21,646 Decision Issued 14/10/2015
Category 2Category:
Approval:
OLYMPIC INDUSTRIES $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$64.50 Category 2 Fee
$36.50 Category 2 Fee
$375.00 HYDROLOGICAL REPORT (FLOOD)
in accordance with plans submittedP1
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
23/02/2015 S R WILLIAMS.
TWO WELLS SA 5501
28 Chapman StreetApproval Bulding Consent
7/2015/42 20/02/2015 Chapman Street TWO WELLS
LOT: 21 ALT: A HD: 3 PL: D80696 CT: 6048/12
Swimming Pool and Safety Fence
$33,000 Decision Issued 23/02/2015
Building Rules Consent OnlyCategory:
Approval:
FREEDOM POOLS $58.50 Planning Lodgement Fee (up to $5,000)
$175.00 Swimming Pool Lodgement Fee
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
Page 11 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
16/03/2015CROWN CASTLE AUSTRALIA PTY
LTD
CHATSWOOD NSW 2067
PO Box 202Approval Land Division
7/2015/43 23/02/2015 6,167 Port Wakefield Road WILD HORSE PLAINS
LOT: 213 ALT: Q HD: 2 PL: D028530 CT: 5506/611
Slant Road WILD HORSE PLAINS
LOT: 212 ALT: Q HD: 2 PL: D028530 CT: 5506/611
Land Division (Lease) $0 Planning Assessment 17/04/2015
Category 1Category:
Approval:
CROWN CASTLE AUSTRALIA PTY LTD in accordance with plans submittedP1Builder: Conditions: Payments:
5/03/2015D B NUSKE
MIDDLE BEACH SA 5501
Sec 748 Middle Beach RoadApproved by Delegation
7/2015/44 24/02/2015 The Esplanade MIDDLE BEACH
ALT: S HD: 3 SEC: 748 PL: H140800 CT: 5484/544
Carport $1,200 Decision Issued 5/03/2015
Category 1Category:
Approval:
D B NUSKE $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$5.05 Planning Fee DAC
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$28.00 Certificate of Title Request
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
LitterB76
Footings in natural groundB88
Builder: Conditions: Payments:
12/06/2015R J PAGET
TWO WELLS SA 5501
Lot 1 Germantown RoadApproved by Delegation
7/2015/45 25/02/2015 576 Germantown Road TWO WELLS
LOT: 1 ALT: A HD: 3 PL: F107857 CT: 5187/748
Parking of 2 x Trucks and 6 x Trailers
associated with... ... off-site grain
transport and 3 Storage Containers
$6,600 Decision Issued 12/06/2015
Category 1Category:
Approval:
R J PAGET $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$335.00 Advertising Fee
$15.75 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$209.25 Class 7 & 8
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
Site ConditionsP242
1 prime mover or truck, up to 10 tonnesP189
minor repairs & maintenance to vehicleP190
restriction times of truck movementsP197
planning non standard conditionPNS1
planning non standard conditionPNS2
external materials to match existing bldP12
external appearance maintainedP10
planning non standard conditionPNS3
approved for domestic purposes onlyP9
building non standard conditionBNS1
Builder: Conditions: Payments:
16/04/2015 K HAYWOOD.
MUNNO PARA WEST SA 5115
69 Peerless Roadwithdrawn Application
7/2015/46 25/02/2015 3 Tatura Avenue TWO WELLS
LOT: 61 ALT: A HD: 3 PL: D031300 CT: 5784/285
Parking of 1 Truck and Trailer $0 Decision Issued 16/04/2015
Category 1Category:
Approval:
K HAYWOOD. $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
Builder: Conditions: Payments:
Page 12 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
8/04/2015 R & M TIMBER.
WILLASTON SA 5118
PO Box 71Approved by Delegation
7/2015/47 25/02/2015 4 Goss Road LEWISTON
LOT: 113 ALT: A HD: 3 PL: D018653 CT: 5136/691
Verandah
$4,069 Decision Issued 8/04/2015
Category 1Category:
Approval:
A J GAMEAU $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
C L MOSTYN.
LEWISTON SA 5501
186 Dawkins Road
7/2015/48 25/02/2015 186 Dawkins Road LEWISTON
LOT: 2 ALT: A HD: 3 PL: D89655 CT: 6096/640
Dog keeping (9 dogs) $0 Additional Information Plannin 18/03/2015
Category 1Category:
Approval:
C L MOSTYN. $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
Builder: Conditions: Payments:
8/04/2015M S EUSTACE
LEWISTON SA 5501
3 James RoadApproved by Delegation
7/2015/49 26/02/2015 3 James Road LEWISTON
LOT: 126 ALT: A HD: 3 PL: D033551 CT: 5071/336
Outbuilding - Domestic Storage Shed $7,000 Decision Issued 8/04/2015
Category 1Category:
Approval:
M S EUSTACE $58.50 Planning Lodgement Fee (up to $5,000)
$74.60 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$5.62 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
LitterB76
Footings in natural groundB88
building non standard conditionBNS1
Engineer's SpecificationsB90
Builder: Conditions: Payments:
18/05/2015N D TILLER
MALLALA SA 5502
Franks RoadApproval Land Division
7/2015/50 26/02/2015 701 Traeger Road GRACE PLAINS
LOT: 2 ALT: S HD: 1 PL: D110762 CT: 6164/509
Broster Road GRACE PLAINS
LOT: 666 ALT: A HD: 1 PL: F175133 CT: 6006/473
Traeger Road GRACE PLAINS
LOT: 1 ALT: S HD: 1 PL: D110762 CT: 6164/508
Land Division - boundary realignment $0 Decision Issued 18/05/2015
Category 1Category:
Approval:
N D TILLER in accordance with plans submittedP1Builder: Conditions: Payments:
Page 13 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
Premium Home Improvements
KENT TOWN SA 5067
78 North Terrace
7/2015/51 25/02/2015 27 Walter Avenue TWO WELLS
LOT: 6 ALT: A HD: 3 PL: D84941 CT: 6064/403
Verandah
$11,750 Health Assessment 28/04/2015
Category 1Category:
Approval:
Premium Home Improvements $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$5.05 Planning Fee DAC
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
stormwater dischargeB31Builder: Conditions: Payments:
7/05/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEApproved Private Certifier
7/2015/52 25/02/2015 576 Germantown Road TWO WELLS
LOT: 1 ALT: A HD: 3 PL: F107857 CT: 5187/748
Construction of New Dwelling $337,920 Decision Issued 7/05/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$21.12 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$401.28 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
Site ConditionsP242
dwelling connected to effluent systemP13
provisional building rules consentP101
Builder: Conditions: Payments:
22/05/2015 M E ROACH.
LEWISTON SA 5501
Lot 58 Hayman RoadApproved by Delegation
7/2015/53 26/02/2015 Hayman Road LEWISTON
LOT: 58 HD: 3 PL: D89849 CT: 6098/306
Construction of Outbuildings
(Storage Shed/Carport and Stables)
$10,300 Decision Issued 22/05/2015
Category 1Category:
Approval:
ALPHA INDUSTRIES. $58.50 Planning Lodgement Fee (up to $5,000)
$103.12 Class 10
$1.85 Planning Fee DAC
$7.76 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
external appearance maintainedP10
Stormwater drained and retained onsiteP243
finished floor level not less 700mmP18
planning non standard conditionPNS1
building non standard conditionBNS1
stormwater dischargeB31
Builder: Conditions: Payments:
4/03/2015 BEYOND INK.
HAHNDORF SA 5245
PO Box 531Planning Consent Only
7/2015/54 27/02/2015 495 Frost Road DUBLIN
LOT: 100 ALT: A HD: 2 PL: F017282 CT: 6162/359
Hay Shed $80,000 Decision Pending 30/03/2015
Category 1Category:
Approval:
GREENWHEAT FREEKEH. $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
Page 14 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
26/06/2015DECHELLIS HOMES PTY LTD
Evandale SA 5069
170 Payneham RoadApproved Private Certifier
7/2015/55 2/03/2015 8 Milbourne Court LEWISTON
LOT: 304 ALT: A HD: 3 PL: D94528 CT: 6146/876
Single storey dwelling with garage
under main roof
$277,303 Waste Control Approval 28/01/2016
Category 1Category:
Approval:
DECHELLIS HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$24.26 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$322.36 Planning Fee (more than $100,001)
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
dwelling connected to effluent systemP13
planning non standard conditionPNS1
provisional building rules consentP101
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
1/09/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEwithdrawn Application
7/2015/56 2/03/2015 4 Mallee Court TWO WELLS
LOT: 17 ALT: A HD: 3 PL: D95828 CT: 6153/552
Coats Road TWO WELLS
LOT: 14 ALT: A HD: 3 PL: D93865 CT: 6139/776
Single storey detached dwelling with
garage under main roof
$294,205 Decision Issued 1/09/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$427.00 Septic Tank application Fee
$18.39 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$349.37 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
12/03/2015D F BRAY
TWO WELLS SA 5501
16 Elizabeth StreetApproved by Delegation
7/2015/57 3/03/2015 12-14 Elizabeth Street TWO WELLS
LOT: 17 ALT: A HD: 3 PL: D000244 CT: 6037/792
Solid Fence in Flood Zone $860 Decision Issued 12/03/2015
Category 1Category:
Approval:
D F BRAY $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
planning non standard conditionPNS1
planning non standard conditionPNS2
Builder: Conditions: Payments:
25/03/2015PBS AUSTRALIA
SOUTH PLYMPTON SA 5038
607 Marion RoadPlanning Consent Only
7/2015/58 3/03/2015 255 Hart Road LOWER LIGHT
LOT: 100 ALT: A HD: 3 PL: D070158 CT: 6156/227
Swimming Pool and Safety Fence
$40,000 Planning Assessment 25/03/2015
Category 1Category:
Approval:
PBS AUSTRALIA $58.50 Planning Lodgement Fee (up to $5,000)
$2.45 Planning Fee DAC
$2.60 Planning Fee DAC
$175.00 Swimming Pool Lodgement Fee
$46.55 Planning Fee ($10,000-$100,000)
$49.40 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1Builder: Conditions: Payments:
Page 15 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
21/07/2015BAYLIES ROAD PROPERTY
INVESTMENTS PTY LTD.
TWO WELLS SA 5501
Section 194 Bailey Road WestApproved by Delegation
7/2015/59 4/03/2015 Shellgrit Road MIDDLE BEACH
ALT: S HD: 3 SEC: 218 PL: H140800 CT: 6155/358
Change of Land Use from Primary
Production to Horticulture
$2,000 Decision Issued 21/07/2015
Category 1Category:
Approval:
BAYLIES ROAD PROPERTY INVESTMENTS PTY LTD. in accordance with plans submittedP1Builder: Conditions: Payments:
2/09/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadPlanning Consent Only
7/2015/60 5/03/2015 143 Brownes Road PORT GAWLER
ALT: S HD: 3 SEC: 23 PL: H140800 CT: 5463/582
Construction of 44 plastic covered
greenhouses, 6 water.....
Construction of 44 plastic covered
greenhouses, 6 water storage dams,
5 machinery sheds and 1 water tank
(32,000 litres)
$80,000 Approved by Private Certifier 14/01/2016
Category 2Category:
Approval:
BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)
$4.95 Planning Fee DAC
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$94.05 Planning Fee (more than $100,001)
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
planning non standard conditionPNS1
no other egress shall be createdP40
epa - practical measuresP140
provisional building rules consentP101
Builder: Conditions: Payments:
23/11/2015S LEONELLO
MALLALA SA 5502
Lot 64 Redbanks RoadApproved Private Certifier
7/2015/61 5/03/2015 2,401 Redbanks Road REDBANKS
LOT: 64 ALT: A HD: 1 PL: D045143 CT: 6057/278
Construction of Store (incorporating
cold storage area)
$100,000 Decision Issued 23/11/2015
Category 1Category:
Approval:
S LEONELLO $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$169.00 Consultative Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$39.00 Consultative Fee - Other
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
planning non standard conditionPNS1
provisional building rules consentP101
Builder: Conditions: Payments:
12/03/2015STATEWIDE POOLS PTY LTD
SALISBURY PLAIN SA 5109
59-63 Saints RoadApproved Private Certifier
7/2015/62 5/03/2015 21B Williams Road TWO WELLS
LOT: 702 ALT: A HD: 3 PL: D078947 CT: 6021/868
Swimming Pool and Safety Fence
$9,600 Decision Issued 25/03/2015
Category 1Category:
Approval:
STATEWIDE POOLS PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$175.00 Swimming Pool Lodgement Fee
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 16 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
14/09/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/63 5/03/2015 170 Dawkins Road LEWISTON
LOT: 5 ALT: A HD: 3 PL: D011388 CT: 5440/611
Construction of fence (in Hazard
Zone 2) and construction...
Construction of fence (in Hazard
Zone 2) and construction of
outbuilding (shed)
$4,000 Decision Issued 14/09/2015
Category 1Category:
Approval:
BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
planning non standard conditionPNS1
approved for domestic purposes onlyP9
provisional building rules consentP101
Private Certifer Consent ConditionsB11
Builder: Conditions: Payments:
M D LLOYD
TWO WELLS SA 5501
48 Dawkins Road
7/2015/64 6/03/2015 48 Dawkins Road TWO WELLS
LOT: 31 ALT: A HD: 3 PL: D065294 CT: 5921/939
Swimming Pool and Safety Fence
$15,000 Swim Pool Fence Inspection 19/03/2015
Category 1Category:
Approval:
M D LLOYD $175.00 Swimming Pool Lodgement Fee
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
$28.00 Certificate of Title Request
Inspection of building workB5
Swimming Pool Backwash DisposalB74
Swimming Pool WarningsB70
building non standard conditionBNS1
Builder: Conditions: Payments:
9/07/2015S F FATTORI
TWO WELLS SA 5501
44 Bailey Road WestApproval Land Division
7/2015/65 5/03/2015 44 Bailey Road West TWO WELLS
LOT: 30 ALT: A HD: 3 PL: D006229 CT: 5456/201
46 Bailey Road West TWO WELLS
LOT: 12 ALT: A HD: 3 PL: D110951 CT: 6165/394
48 Bailey Road West TWO WELLS
LOT: 13 ALT: A HD: 3 PL: D110951 CT: 6165/395
50 Bailey Road West TWO WELLS
LOT: 14 ALT: A HD: 3 PL: D110951 CT: 6165/396
Land Division - One Allotment into
Four
$0 Decision Issued 26/06/2015
Category 1Category:
Approval:
S F FATTORI planning non standard conditionPNS1Builder: Conditions: Payments:
VIRGINIA PACKING SHEDS SA.
PO Box 1000 KENT TOWN SA 5071
C/- Alexander Symonds Pty Ltd
7/2015/66 6/03/2015 176 McEvoy Road LOWER LIGHT
LOT: 8 ALT: A HD: 3 PL: F000086 CT: 5530/177
Light Beach Road LOWER LIGHT
LOT: 1 ALT: A HD: 3 PL: F000086 CT: 5530/170
Paterson Road LOWER LIGHT
LOT: 9 ALT: A HD: 3 PL: F000086 CT: 5530/178
Division of Land - 9 allotments into
30 allotments - Non-complying
$0 Planning Assessment 6/03/2015
Category 3Category:
Approval:
VIRGINIA PACKING SHEDS SA. planning non standard conditionPNS1Builder: Conditions: Payments:
10/04/2015C R BILLING
WEBB BEACH SA 5501
10 Jury StreetApproved by Delegation
7/2015/67 10/03/2015 10 Jury Street WEBB BEACH
ALT: S HD: 2 SEC: 581 PL: H140400 CT: 5500/771
Construction of Front Verandah $2,506 Decision Issued 10/04/2015
Category 1Category:
Approval:
C R BILLING $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
Page 17 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
5/08/2015S G MERTINEIT
LEWISTON SA 5501
225 Hayman Roadwithdrawn Application
7/2015/68 11/03/2015 225 Hayman Road LEWISTON
LOT: 51 ALT: A HD: 3 PL: D014929 CT: 5691/848
Dog Keeping (25 dogs), construction
of dog kennels and... Dog Keeping
(25 dogs), construction of dog
kennels and associated exercise
yards, use of land for dog obedience
training, construction of ablution
block and construction of chicken
shed
$9,500 Decision Issued 5/08/2015
Category 2Category:
Approval:
S G MERTINEIT $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$175.00 HYDROLOGICAL REPORT (FLOOD)
Builder: Conditions: Payments:
12/06/2015S G MERTINEIT
LEWISTON SA 5501
225 Hayman Roadwithdrawn Application
7/2015/69 11/03/2015 225 Hayman Road LEWISTON
LOT: 51 ALT: A HD: 3 PL: D014929 CT: 5691/848
Construction of two habitable rooms
and two storage containers
$3,000 Decision Issued 12/06/2015
Category 1Category:
Approval:
S G MERTINEIT $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$125.00 HYDROLOGICAL REPORT (FLOOD)
Builder: Conditions: Payments:
4/06/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/70 11/03/2015 33 Dawkins Road TWO WELLS
LOT: 1 ALT: A HD: 3 PL: F001030 CT: 5298/386
Demolition of existing outbuildings
and construction of.... Demolition of
existing outbuildings and
construction of new outbuilding
(shed)
$28,000 Decision Issued 4/06/2015
Category 2Category:
Approval:
S R LOCKWOOD $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
planning non standard conditionPNS1
approved for domestic purposes onlyP9
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
D J THOMAS
LEWISTON SA 5501
129 Dawkins Road
7/2015/71 12/03/2015 129 Dawkins Road LEWISTON
LOT: 110 ALT: A HD: 3 PL: D013489 CT: 5698/760
Demolition of dwelling and shed and
carport
$20,000 Decision Issued 2/04/2015
Building Rules Consent OnlyCategory:
Approval:
D J THOMAS $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
Demolition of structureB83
Asbestos demolition, transport and dispoB84
Builder: Conditions: Payments:
Page 18 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
7/05/2015H J HAYDON
LEWISTON SA 5501
84 Bethesda RoadApproved by Delegation
7/2015/72 13/03/2015 84 Bethesda Road LEWISTON
LOT: 32 ALT: A HD: 3 PL: D019441 CT: 5390/395
Outbuilding (Garage) $6,860 Decision Issued 7/05/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$175.00 HYDROLOGICAL REPORT (FLOOD)
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
planning non standard conditionPNS1
no other egress shall be createdP40
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
24/04/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEApproved Private Certifier
7/2015/73 13/03/2015 19 Milbourne Court LEWISTON
LOT: 316 ALT: A HD: 3 PL: D94528 CT: 6146/888
Construction of New Dwelling $203,525 Decision Issued 24/04/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$12.73 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$241.68 Planning Fee (more than $100,001)
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
dwelling connected to effluent systemP13
planning non standard conditionPNS1
provisional building rules consentP101
Waste containmentB19
On site toilet facilityB20
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
26/08/2015S M SMITH
TWO WELLS SA 5501
28 Walter AvenueApproved by Delegation
7/2015/74 19/03/2015 28 Walter Avenue TWO WELLS
LOT: 37 ALT: A HD: 3 PL: D84941 CT: 6064/416
Construction of Shed for Domestic
Storage and Attached Carport
$13,500 Decision Issued 26/08/2015
Category 1Category:
Approval:
S M SMITH $58.50 Planning Lodgement Fee (up to $5,000)
$92.18 Class 10
$5.05 Planning Fee DAC
$6.94 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
planning non standard conditionPNS1
Building work contractor insuranceB6
Stormwater disposalB33
Engineers ReportB64
Builder: Conditions: Payments:
Page 19 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
9/10/2015HOMESTEAD AWARD WINNING
HOMES PTY LTD
MODBURY SA 5092
928 North East RoadApproved Private Certifier
7/2015/75 20/03/2015 3 Leilete Road TWO WELLS
LOT: 2 ALT: A HD: 3 PL: D93938 CT: 6140/804
Construction of New Dwelling $176,331 Decision Issued 9/10/2015
Category 1Category:
Approval:
HOMESTEAD AWARD WINNING HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$15.42 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$204.99 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Vehicle AccessP236
external surfaces painted durable paintP17
provisional building rules consentP101
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
28/08/2015 COMO GLASSHOUSE PTY LTD.
SOUTH YARRA VIC 3141
644 Chapel Street
Level 18, Como Office TowerApproved Private Certifier
7/2015/76 20/03/2015 687 Germantown Road KORUNYE
LOT: 10 ALT: S HD: 3 PL: D93356 CT: 6133/537
Kenner Road KORUNYE
ALT: S HD: 3 SEC: 505 PL: H140800 CT: 5869/886
Construction of Wood Fired Boiler
including.... Construction of Wood
Fired Boiler including conversion of
existing store (storage shed)
$750,000 Decision Issued 28/08/2015
Category 3Category:
Approval:
COMO GLASSHOUSE PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$46.87 Planning Fee DAC
$310.00 Consultative Fee DAC
$335.00 Advertising Fee
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$39.00 Consultative Fee - Other
$890.63 Planning Fee (more than $100,001)
in accordance with plans submittedP1
Site ConditionsP242
Stormwater drained and retained onsiteP243
provisional building rules consentP101
planning non standard conditionPNS1
Private Certifer Consent ConditionsB11
Builder: Conditions: Payments:
8/04/2015STATEWIDE POOLS PTY LTD
SALISBURY PLAIN SA 5109
59-63 Saints RoadApproval Bulding Consent
7/2015/77 20/03/2015 Old Port Wakefield Road TWO WELLS
LOT: 502 ALT: A HD: 3 PL: D072248 CT: 6120/654
Swimming Pool and Safety Fence
$9,600 Decision Issued 8/04/2015
Building Rules Consent OnlyCategory:
Approval:
STATEWIDE POOLS PTY LTD $175.00 Swimming Pool Lodgement Fee
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
M R TULL
LEWISTON SA 5501
108 Dawkins Road
7/2015/78 23/03/2015 108 Dawkins Road LEWISTON
LOT: 13 ALT: A HD: 3 PL: D032588 CT: 5077/333
Extension to Carport $6,000 Additional Information Buildin 9/06/2015
Category 2Category:
Approval:
M R TULL $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$28.00 Certificate of Title Request
in accordance with plans submittedP1
external appearance maintainedP10
external materials to match existing bldP12
Stormwater drained and retained onsiteP243
stormwater dischargeB31
Builder: Conditions: Payments:
Page 20 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
9/04/2015N KYRIACOU
TWO WELLS SA 5501
27 Bailey RoadApproval Bulding Consent
7/2015/79 25/03/2015 27 Bailey Road TWO WELLS
LOT: 9 ALT: A HD: 3 PL: D90686 CT: 6106/351
Demolition of Dwelling and Ancillary
Outbuilding and Storage Shed
$7,000 Decision Issued 9/04/2015
Building Rules Consent OnlyCategory:
Approval:
N KYRIACOU $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$4.05 Building - DAC
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
in accordance with plans submittedP1
Demolition of structureB83
Builder: Conditions: Payments:
1/05/2015E ANDREW
MALLALA SA 5502
8 Cameron TerraceApproved by Delegation
7/2015/80 26/03/2015 8 Cameron Terrace MALLALA
LOT: 754 ALT: A HD: 1 PL: F175221 CT: 5779/970
Demolition
$10,000 Decision Issued 30/04/2015
Category 1Category:
Approval:
E ANDREW $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$4.05 Building - DAC
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
in accordance with plans submittedP1
Demolition of structureB83
Asbestos demolition, transport and dispoB84
Builder: Conditions: Payments:
13/07/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/81 30/03/2015 9 Buckland Park Road TWO WELLS
LOT: 5 ALT: A HD: 3 PL: D043578 CT: 5298/928
Construction of Outbuilding (Garage) $11,000 Decision Issued 13/07/2015
Category 1Category:
Approval:
ADELAIDE FENCING & STEEL SUPPLIES $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
planning non standard conditionPNS1
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
23/04/2015 BEYOND INK.
HAHNDORF SA 5245
PO Box 531Approved Private Certifier
7/2015/82 31/03/2015 495 Frost Road DUBLIN
LOT: 100 ALT: A HD: 2 PL: F017282 CT: 6162/359
Hay Shed $80,000 Decision Issued 23/04/2015
Category 1Category:
Approval:
BEYOND INK. $58.50 Planning Lodgement Fee (up to $5,000)
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
9/09/2015METRICON HOMES PTY LTD
NORWOOD SA 5067
88 Fullarton Roadwithdrawn Application
7/2015/83 31/03/2015 21 Walter Avenue TWO WELLS
LOT: 3 ALT: A HD: 3 PL: D84941 CT: 6064/400
Dwelling (Single Storey) $277,464 Decision Issued 9/09/2015
Category 1Category:
Approval:
METRICON HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$17.34 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$329.48 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
Builder: Conditions: Payments:
Page 21 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
11/06/2015L J SUTHERLAND
LEWISTON SA 5501
255 Hayman RoadApproved by Delegation
7/2015/84 7/04/2015 255 Hayman Road LEWISTON
LOT: 36 ALT: A HD: 3 PL: D014929 CT: 5273/306
Demolition of verandah and
construction.... Demolition of
verandah and construction of
dwelling addition (incorporating
family room and deck)
$35,000 Decision Issued 11/06/2015
Category 1Category:
Approval:
L J SUTHERLAND $58.50 Planning Lodgement Fee (up to $5,000)
$83.97 Planning Lodgement Fee (up to $5,000)
$26.51 Class 10
$5.05 Planning Fee DAC
$1.99 Building - DAC
$6.31 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$175.00 HYDROLOGICAL REPORT (FLOOD)
in accordance with plans submittedP1
Site ConditionsP242
Stormwater drained and retained onsiteP243
external surfaces painted durable paintP17
planning non standard conditionPNS1
planning non standard conditionPNS2
certificate building indemnity insuranceB7
Termite managementB60
roko - written statement of completionB53
building non standard conditionBNS1
Builder: Conditions: Payments:
12/06/2015G P CURNOW
LOWER LIGHT SA 5501
Ryan RoadApproved Private Certifier
7/2015/85 2/04/2015 Ryan Road LOWER LIGHT
LOT: 1 ALT: A HD: 1 PL: D012092 CT: 5331/970
Construction of Farm Building (hay
shed) and...... Construction of Farm
Building (hay shed) and relocation of
existing water tank
$85,000 Decision Issued 12/06/2015
Category 1Category:
Approval:
G P CURNOW $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$28.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
planning non standard conditionPNS1
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
12/06/2015 R VERBIS.
THOMPSON BEACH SA 5501
53 Sandpiper DriveApproved by Delegation
7/2015/86 8/04/2015 53 Sandpiper Drive THOMPSON BEACH
LOT: 70 ALT: A HD: 2 PL: D029513 CT: 5369/639
Construction of domestic outbuilding
- storage shed
$9,900 Decision Issued 12/06/2015
Category 1Category:
Approval:
R VERBIS. $58.50 Planning Lodgement Fee (up to $5,000)
$63.28 Class 10
$1.85 Planning Fee DAC
$169.00 Consultative Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.76 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$39.00 Consultative Fee - Other
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
planning non standard conditionPNS1
planning non standard conditionPNS2
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 22 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
14/09/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/87 8/04/2015 27 Bailey Road TWO WELLS
LOT: 9 ALT: A HD: 3 PL: D90686 CT: 6106/351
Construction of Storage and Utility
Shed associated with... ...the existing
approved use of the land
$18,000 Decision Issued 14/09/2015
Category 1Category:
Approval:
N KYRIACOU $58.50 Planning Lodgement Fee (up to $5,000)
$209.00 Septic Tank application Fee
$5.05 Planning Fee DAC
$335.00 Advertising Fee
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
planning non standard conditionPNS1
provisional building rules consentP101
Waste containmentB19
On site toilet facilityB20
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
10/04/2015 VERGOLA (SA) PTY LTD.
THEBARTON SA 5031
101 Port RoadApproval Bulding Consent
7/2015/88 8/04/2015 14 Redbanks Road MALLALA
LOT: 1 ALT: A HD: 1 PL: D018916 CT: 5342/263
Vergola Louvred Sun Control System $18,599 Decision Issued 10/04/2015
Category 1Category:
Approval:
VERGOLA (SA) PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$66.50 Planning Lodgement Fee (over $5,000)
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
12/08/2015G M INGERSON
TWO WELLS SA 5501
Lot 1 Halstead RoadApproved by Delegation
7/2015/89 10/04/2015 Halstead Road West Road TWO WELLS
LOT: 1 ALT: A HD: 3 PL: D064908 CT: 5930/773
Relocate Transportable Outbuilding
and Install Rainwater Tank
$14,000 Decision Issued 12/08/2015
Category 1Category:
Approval:
G M INGERSON $58.50 Planning Lodgement Fee (up to $5,000)
$96.53 Class 10
$5.05 Planning Fee DAC
$7.26 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
finished floor level not less 700mmP18
floor level no less than 2.1 metresP173
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
Footings in natural groundB88
Builder: Conditions: Payments:
12/08/2015T J GAMEAU
TWO WELLS SA 5501
43 Gawler RoadApproved by Delegation
7/2015/90 14/04/2015 942 Boundary Road REEVES PLAINS
LOT: 1 ALT: A HD: 3 PL: D032983 CT: 5059/267
Dwelling addition Construction of
single storey detached dwelling
addition
$72,462 Decision Issued 12/08/2015
Category 1Category:
Approval:
GAMEAU BUILDERS $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$12.99 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$172.62 Class 1, 2 & 4
in accordance with plans submittedP1
external materials to match existing bldP12
faulty or unsuitable materials not usedB3
Stormwater disposalB33
roko - footing sizes - footing failuresB56
Builder: Conditions: Payments:
Page 23 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
18/06/2015 GLENCORE GRAIN PTY LTD.
ADELAIDE SA 5001
124-130 South TerraceApproved Private Certifier
7/2015/91 14/04/2015 17 Port Wakefield Road TWO WELLS
LOT: 500 ALT: A HD: 3 PL: D057142 CT: 5851/382
Port Wakefield Road TWO WELLS
LOT: 500 ALT: A HD: 3 PL: D057142 CT: 5851/382
Erection of an advertising hoarding
and advertising display (sign)
$5,000 Decision Issued 22/07/2015
Category 3Category:
Approval:
GLENCORE GRAIN PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$5.05 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$335.00 Advertising Fee
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
planning non standard conditionPNS1
planning non standard conditionPNS2
Builder: Conditions: Payments:
14/09/2015FAIRMONT HOMES GROUP PTY LTD
ADELAIDE SA 5000
21 - 24 North TerraceApproved Private Certifier
7/2015/92 14/04/2015 2 Mallee Court TWO WELLS
LOT: 15 ALT: A HD: 3 PL: D95828 CT: 6153/550
Single Storey Detached Dwelling $232,360 Decision Issued 14/09/2015
Category 1Category:
Approval:
FAIRMONT HOMES GROUP PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$14.52 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$275.93 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
$175.00 HYDROLOGICAL REPORT (FLOOD)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
Vehicle AccessP236
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
provisional building rules consentP101
Builder: Conditions: Payments:
26/08/2015FAIRMONT HOMES GROUP PTY LTD
ADELAIDE SA 5000
21 - 24 North TerraceApproved Private Certifier
7/2015/93 14/04/2015 1 Mallee Court TWO WELLS
LOT: 14 ALT: A HD: 3 PL: D95828 CT: 6153/549
Single Storey Detached Dwelling $240,259 Decision Issued 26/08/2015
Category 1Category:
Approval:
FAIRMONT HOMES GROUP PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$15.01 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$285.31 Planning Fee (more than $100,001)
$175.00 HYDROLOGICAL REPORT (FLOOD)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
Vehicle AccessP236
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
provisional building rules consentP101
Private Certifer Consent ConditionsB11
Builder: Conditions: Payments:
8/09/2015S M MCARDLE
MALLALA SA 5502
5 Aerodrome Roadwithdrawn Application
7/2015/94 15/04/2015 44 The Esplanade PARHAM
LOT: 103 ALT: A HD: 2 PL: T140402 CT: 5992/591
Demolition of part of existing dwelling
and construction of two... Demolition
of part of existing dwelling and
construction of two storey dwelling
addition
$120,000 Health Assessment 11/09/2015
Category 1Category:
Approval:
MCARDLE PROJECTS $58.50 Planning Lodgement Fee (up to $5,000)
$7.50 Planning Fee DAC
$169.00 Consultative Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$39.00 Consultative Fee - Other
$142.50 Planning Fee (more than $100,001)
Builder: Conditions: Payments:
Page 24 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
24/06/2015 T LUTFI.
ADELAIDE SA 5000
165 Grenfell Street
Level 1Approved Private Certifier
7/2015/95 15/04/2015 495 Frost Road DUBLIN
LOT: 100 ALT: A HD: 2 PL: F017282 CT: 6162/359
Change in use of land to Light
Industry - Produce Processing
Works... Change in use of land to
light industry including conversion of
existing hay shed to a grain produce
roasting and drying processing
works, ancillary buildings including
office/control room, amenities
building, storage shed, 7 grain
storage tanks, 2 chaff tunnels, 3 fuel
storage tanks and 2 water tanks and
associated car parking, earthworks
and landscaping
$1,600,000 Approved by Private Certifier 12/08/2015
Category 3Category:
Approval:
GE HUGHES CONSTRUCTION CO. $58.50 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$100.00 Planning Fee DAC
$310.00 Consultative Fee DAC
$335.00 Advertising Fee
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$39.00 Consultative Fee - Other
$1,900.00 Planning Fee (more than $100,001)
planning non standard conditionPNS1
Private Certifer Consent ConditionsB11
Builder: Conditions: Payments:
21/05/2015S P BAIS
MIDDLE BEACH SA 5501
The EsplanadeApproved by Delegation
7/2015/96 16/04/2015 The Esplanade MIDDLE BEACH
ALT: S HD: 3 SEC: 752 PL: 140800 CT: 5483/512
Demolition of Existing Shed and
construction of Outbuilding (Shed)
$10,000 Decision Issued 21/05/2015
Category 1Category:
Approval:
S P BAIS $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls maintained in good condP7
planning non standard conditionPNS1
planning non standard conditionPNS3
approved for domestic purposes onlyP9
DisclaimerPNS6
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
7/03/2016 OUTBACK TRUCKSTOPS PTY LTD.
ALBION QLD 4010
PO BOX 301
C/- TFA Project GroupApproved Private Certifier
7/2015/97 16/04/2015 Road Train Drive TWO WELLS
LOT: 27 ALT: F HD: 3 PL: C023105 CT: 6094/827
Construction of petrol filling station
(unmanned truck refuelling...
Construction of petrol filling station
(unmanned truck refuelling facility)
and associated advertising signage
$190,000 Decision Issued 7/03/2016
Category 1Category:
Approval:
OUTBACK TRUCKSTOPS PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$11.88 Planning Fee DAC
$169.00 Consultative Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$39.00 Consultative Fee - Other
$225.62 Planning Fee (more than $100,001)
in accordance with plans submittedP1
comply to conditions imposedP2
dwelling connected to effluent systemP13
planning non standard conditionPNS1
planning non standard conditionPNS2
planning non standard conditionPNS3
planning non standard conditionPNS5
Site ConditionsP242
Stormwater drained and retained onsiteP243
planning non standard conditionPNS4
provisional building rules consentP101
Builder: Conditions: Payments:
Page 25 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
23/06/2015 N SCOTT.
MALLALA SA 5502
Lot 9 Dublin RoadApproved by Delegation
7/2015/98 16/04/2015 16/13 Dublin Road MALLALA
LOT: 9 ALT: A HD: 1 PL: C27154 CT: 6091/682
Construction of Verandah $8,000 Decision Issued 23/06/2015
Category 1Category:
Approval:
N SCOTT. $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
2/03/2016 MALLALA MENS SHED WORKING
GROUP.
MALLALA SA 5502
4 Dublin RoadApproved by Delegation
7/2015/99 20/04/2015 1-3 Dublin Road MALLALA
LOT: 740 ALT: A HD: 1 PL: F175207 CT: 5790/80
Construction of community centre
(Mens Shed)..... Construction of
community centre (Mens Shed) and
two 50,000 litre rainwater tanks
$40,000 Decision Issued 2/03/2016
Category 3Category:
Approval:
MALLALA MENS SHED WORKING GROUP. $5.05 Planning Fee DAC
$335.00 Advertising Fee
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
existing trees to be protectedP51
planning non standard conditionPNS1
Inspection of building workB5
Waste containmentB19
On site toilet facilityB20
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
5/08/2015K KING
LEWISTON SA 5501
Lot 311 Milbourne CourtApproved by Delegation
7/2015/100 20/04/2015 9 Milbourne Court LEWISTON
LOT: 311 ALT: A HD: 3 PL: D94528 CT: 6146/883
Construction of outbuilding - storage
shed
$14,795 Decision Issued 5/08/2015
Category 1Category:
Approval:
ALPHA INDUSTRIES. $58.50 Planning Lodgement Fee (up to $5,000)
$60.94 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.58 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
building non standard conditionBNS1
Manufacturers RecommendationB63
epa - practical measuresP140
Builder: Conditions: Payments:
Page 26 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
5/08/2015K KING
LEWISTON SA 5501
Lot 311 Milbourne CourtApproved by Delegation
7/2015/101 20/04/2015 9 Milbourne Court LEWISTON
LOT: 311 ALT: A HD: 3 PL: D94528 CT: 6146/883
Verandah
$8,066 Decision Issued 5/08/2015
Category 1Category:
Approval:
K KING $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$5.05 Planning Fee DAC
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
Manufacturers RecommendationB63
Builder: Conditions: Payments:
29/06/2015P R BAKER
MALLALA SA 5502
Old Dublin RoadApproval Bulding Consent
7/2015/102 20/04/2015 Turner Road MALLALA
LOT: 2 ALT: A HD: 1 PL: F014843 CT: 5320/652
Construction of Farm Building
(Machinery Shed) and 3 Rainwater
Tanks
$125,000 Decision Issued 29/06/2015
Category 1Category:
Approval:
P R BAKER $58.50 Planning Lodgement Fee (up to $5,000)
$7.81 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$148.44 Planning Fee (more than $100,001)
in accordance with plans submittedP1
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
building non standard conditionBNS1
Builder: Conditions: Payments:
1/07/2015 S B HOLLEY.
LEWISTON SA 5501
31 Bethesda Roadwithdrawn Application
7/2015/104 21/04/2015 31 Bethesda Road LEWISTON
LOT: 16 ALT: A HD: 3 PL: D77219 CT: 6012/582
2 Shipping Containers (Domestic
Storage)
$2,500 Decision Issued 1/07/2015
Category 1Category:
Approval:
S B HOLLEY. $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
Builder: Conditions: Payments:
2/07/2015 ALPHA INDUSTRIES.
CAVAN SA 5094
12 STOCK ROADApproved by Delegation
7/2015/105 22/04/2015 18 Gawler River Road LEWISTON
LOT: 184 ALT: A HD: 3 PL: F163152 CT: 5802/68
Construction of a Commercial Shed
(storage & packing)
$8,375 Decision Issued 3/07/2015
Category 2Category:
Approval:
ALPHA INDUSTRIES. $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$18.82 Building - DAC
$9.52 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$250.10 Class 7 & 8
$126.56 Class 7 & 8
stormwater dischargeB31
in accordance with plans submittedP1
external walls maintained in good condP7
external walls of building subduedP6
approved for domestic purposes onlyP9
Builder: Conditions: Payments:
Page 27 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
19/05/2015A K EDWARDS
WINDSOR SA 5501
Lot 5 Port Parham RoadApproved by Delegation
7/2015/106 22/04/2015 438 Port Parham Road WINDSOR
LOT: 5 ALT: A HD: 2 PL: F100548 CT: 5103/157
Domestic Outbuilding (Garage) $7,300 Decision Issued 19/05/2015
Category 1Category:
Approval:
A K EDWARDS $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
18/06/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEApproved Private Certifier
7/2015/107 22/04/2015 17 Bailey Road TWO WELLS
LOT: 49 ALT: A HD: 3 PL: 21519 CT: 5445/441
Dwelling
$233,780 Decision Issued 18/06/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$14.62 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$274.61 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
26/05/2015A F LEAR
MALLALA SA 5502
38 Dublin RoadApproved by Delegation
7/2015/108 22/04/2015 38 Dublin Road MALLALA
LOT: 11 ALT: A HD: 1 PL: D020382 CT: 5084/459
Shed
$8,845 Decision Issued 26/05/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
10/07/2015K J ECKERMANN
LEWISTON SA 5501
72 Bethesda RoadApproved by Delegation
7/2015/109 23/04/2015 72 Bethesda Road LEWISTON
LOT: 38 ALT: A HD: 3 PL: D019441 CT: 5275/878
Construction of Fence (in Flood
Hazard Zone 1)
$4,800 Decision Issued 10/07/2015
Category 1Category:
Approval:
K J ECKERMANN $58.50 Planning Lodgement Fee (up to $5,000)
$2.55 Planning Fee DAC
$5.95 Planning Fee DAC
$47.95 Planning Fee Non-Complying
$113.05 Planning Fee Non-Complying
$175.00 HYDROLOGICAL REPORT (FLOOD)
in accordance with plans submittedP1Builder: Conditions: Payments:
Page 28 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
R K FATCHEN
TWO WELLS SA 5501
1 Leilete Road
7/2015/110 24/04/2015 604 Williams Road KORUNYE
ALT: S HD: 3 SEC: 485 PL: H140800 CT: 5330/154
Parking of 5 trucks (prime movers)
and 10 trailers.... Parking of 5 trucks
(prime movers) and 10 trailers for
commercial purposes and
construction of 3 shipping containers
for domestic storage
$0 Additional Information Buildin 17/09/2015
Category 3Category:
Approval:
R K FATCHEN $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$335.00 Advertising Fee
$101.00 Category 2 Fee
$28.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
1 prime mover or truck, up to 10 tonnesP189
minor repairs & maintenance to vehicleP190
restriction times of truck movementsP197
planning non standard conditionPNS1
planning non standard conditionPNS2
planning non standard conditionPNS3
planning non standard conditionPNS4
planting approp bushes within first seasP48
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
no other egress shall be createdP40
advertising displays not in consentP102
epa - practical measuresP140
Builder: Conditions: Payments:
17/06/2015SELECTA HOMES & BUILDING
COMPANY
BURTON SA 5110
1-8 Deuter RoadPlanning Consent Only
7/2015/111 24/04/2015 18 Lionel Road LEWISTON
LOT: 68 ALT: A HD: 3 PL: D027864 CT: 5163/294
Dependent accomodation $76,270 Decision Issued 26/06/2015
Category 1Category:
Approval:
SELECTA HOMES & BUILDING COMPANY $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
Builder: Conditions: Payments:
N S FARRUGIA-GAY
TWO WELLS SA 5501
Lot 101 Williams Road
7/2015/112 27/04/2015 Williams Road TWO WELLS
LOT: 101 ALT: A HD: 3 PL: D83023 CT: 6055/679
Construction of shed - Store for
animal feed
$3,500 Additional Information Plannin 21/05/2015
Category 1Category:
Approval:
N S FARRUGIA-GAY $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
Builder: Conditions: Payments:
Page 29 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
6/08/2015 COMO GLASSHOUSE PTY LTD.
SOUTH YARRA VIC 3141
644 Chapel Street
Level 18, Como Office TowerApproved Private Certifier
7/2015/113 29/04/2015 687 Germantown Road KORUNYE
LOT: 10 ALT: S HD: 3 PL: D93356 CT: 6133/537
Construction of Store (Storage Shed) $20,000 Decision Issued 6/08/2015
Category 1Category:
Approval:
COMO GLASSHOUSE PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls maintained in good condP7
provisional building rules consentP101
Builder: Conditions: Payments:
14/09/2015FAIRMONT HOMES GROUP PTY LTD
ADELAIDE SA 5000
21 - 24 North TerraceApproved Private Certifier
7/2015/114 29/04/2015 Temby Road TWO WELLS
LOT: 3 ALT: A HD: 3 PL: F002634 CT: 5214/359
Dwelling
$278,941 Information Further Clarificat 29/10/2015
Category 1Category:
Approval:
FAIRMONT HOMES GROUP PTY LTD $427.00 Septic Tank application Fee
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
$375.00 HYDROLOGICAL REPORT (FLOOD)
in accordance with plans submittedP1
Waste containmentB19
On site toilet facilityB20
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
1/07/2015D K QUIN
THOMPSON BEACH SA 5501
7 Sandpiper DriveApproved by Delegation
7/2015/115 30/04/2015 7 Sandpiper Drive THOMPSON BEACH
LOT: 11 ALT: A HD: 2 PL: D029513 CT: 5370/273
Construction of Verandah with
stormwater system
$2,000 Decision Issued 1/07/2015
Category 1Category:
Approval:
D K QUIN $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
9/06/2015F INTINI
LEWISTON SA 5501
Lot 14 Bethesda RoadApproval Bulding Consent
7/2015/116 12/05/2015 39A Bethesda Road LEWISTON
LOT: 14 ALT: S HD: 3 PL: D77219 CT: 6012/580
Swimming Pool and Safety Fence
$40,000 Swim Pool Fence Inspection 21/12/2015
Category 1Category:
Approval:
FREEDOM POOLS $58.50 Planning Lodgement Fee (up to $5,000)
$175.00 Swimming Pool Lodgement Fee
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
26/06/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/117 13/05/2015 21B Williams Road TWO WELLS
LOT: 702 ALT: A HD: 3 PL: D078947 CT: 6021/868
Verandah
$16,000 Decision Issued 26/06/2015
Category 1Category:
Approval:
BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 30 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
15/05/2015S G MERTINEIT
LEWISTON SA 5501
225 Hayman RoadApproved by Delegation
7/2015/118 5/05/2015 225 Hayman Road LEWISTON
LOT: 51 ALT: A HD: 3 PL: D014929 CT: 5691/848
Dog Keeping (5 breeding dogs) and
whelping area within existing... Dog
Keeping (5 breeding dogs) and
whelping area within existing dwelling
$0 Decision Issued 15/05/2015
Category 1Category:
Approval:
S G MERTINEIT $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
in accordance with plans submittedP1Builder: Conditions: Payments:
23/09/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/119 13/05/2015 9 East Terrace WINDSOR
LOT: 26 ALT: A HD: 2 PL: D000493 CT: 5820/507
Construction of Outbuilding - Shed
14.4m x 9.1m x 3.4 m wall.......
height, existing Shed 9m x 6.5m x
3m wall height & two Verandahs
$15,000 Decision Issued 23/09/2015
Category 2Category:
Approval:
BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
provisional building rules consentP101
Builder: Conditions: Payments:
17/06/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/120 13/05/2015 17 Gilks Road LEWISTON
LOT: 12 ALT: A HD: 3 PL: D040106 CT: 5201/318
Construction of two carports $7,000 Decision Issued 17/06/2015
Category 1Category:
Approval:
BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Site ConditionsP242
Stormwater drained and retained onsiteP243
external appearance maintainedP10
external materials to match existing bldP12
structure not be enclosed with solidP11
provisional building rules consentP101
Builder: Conditions: Payments:
12/06/2015 E FRITTMANN.
LEWISTON SA 5501
87 Pederick RoadApproved by Delegation
7/2015/121 18/05/2015 87 Pederick Road LEWISTON
LOT: 3 ALT: A HD: 3 PL: D021970 CT: 5384/188
Construction of domestic outbuilding
- garage
$6,500 Decision Issued 12/06/2015
Category 1Category:
Approval:
E FRITTMANN. $58.50 Planning Lodgement Fee (up to $5,000)
$71.80 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$5.40 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
Builder: Conditions: Payments:
Page 31 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
12/06/2015 ALL CARE BUILDING & HOME
IMPROVEMENTS.
EVANSTON GARDENS SA 5116
8 Houston CourtApproved by Delegation
7/2015/122 14/05/2015 1 Fifth Street DUBLIN
LOT: 62 PL: D76536 CT: 6006/616
Construction of verandah $7,500 Decision Issued 12/06/2015
Category 1Category:
Approval:
ALL CARE BUILDING & HOME IMPROVEMENTS. $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$49.00 Planning Lodgement Fee (over $5,000)
$17.50 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external appearance maintainedP10
external materials to match existing bldP12
structure not be enclosed with solidP11
stormwater dischargeB31
building non standard conditionBNS1
Builder: Conditions: Payments:
19/08/2015AHRENS ENGINEERING PTY LTD
SHEAOAK LOG 5371
PO Box 2withdrawn Application
7/2015/123 18/05/2015 Carslake Road DUBLIN
LOT: 11 ALT: A HD: 2 PL: D019148 CT: 5452/708
Bulk grain handling and storage
facility comprising conveyor.... silos,
weighbridge, site office and
associated site works
$4,000,000 Decision Issued 19/08/2015
Category 2Category:
Approval:
AHRENS ENGINEERING PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$250.00 Planning Fee DAC
$39.00 Consultative Fee - EPA
$310.00 Consultative Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$4,750.00 Planning Fee (more than $100,001)
Builder: Conditions: Payments:
RIVERGUM HOMES PTY LTD.
TORRENSVILLE SA 5031
PO Box 191
7/2015/124 14/05/2015 7 Kestrel Crescent THOMPSON BEACH
LOT: 347 ALT: A HD: 2 PL: D031537 CT: 5142/847
Construction of single storey dwelling $181,413 Waste Control Approval 18/11/2015
Category 1Category:
Approval:
RIVERGUM HOMES PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$11.33 Planning Fee DAC
$169.00 Consultative Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$39.00 Consultative Fee - Other
$215.42 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
Builder: Conditions: Payments:
Page 32 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
14/09/2015 A ROZHKOV.
NORTHGATE SA 5085
47 Cityside DriveApproved Private Certifier
7/2015/125 22/05/2015 12 Coats Road TWO WELLS
LOT: 47 ALT: A HD: 3 PL: D006683 CT: 5651/669
2 Wheller Road TWO WELLS
LOT: 101 ALT: A HD: 3 PL: D112335 CT: 6173/579
Construction of Single Storey
Dwelling
$150,000 Decision Issued 14/09/2015
Category 1Category:
Approval:
A ROZHKOV. $58.50 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$9.36 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$178.14 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
finished floor level not less 700mmP18
external surfaces painted durable paintP17
water storage tank 22400 litresP174
planning non standard conditionPNS1
dwelling connected to effluent systemP13
Vehicle AccessP236
no other egress shall be createdP40
provisional building rules consentP101
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
30/03/2016M A BEJAN
LEWISTON SA 5501
38 Bethesda Roadwithdrawn Application
7/2015/126 25/05/2015 5 Greens Road LEWISTON
LOT: 806 ALT: A HD: 3 PL: D94057 CT: 6145/209
Construction of Dwelling $150,000 Decision Issued 30/03/2016
Category 1Category:
Approval:
M A BEJAN $58.50 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$9.38 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$178.12 Planning Fee (more than $100,001)
$30.00 Certificate of Title Request
Builder: Conditions: Payments:
12/08/2015S ALMOND
LEWISTON SA 5501
37 Bethesda RoadApproved by Delegation
7/2015/127 25/05/2015 37 Bethesda Road LEWISTON
LOT: 19 ALT: A HD: 3 PL: D038019 CT: 5150/602
Keeping of 9 dogs - conversion of
existing rumpus room.... Keeping of
9 dogs - conversion of existing
rumpus room to dog kennels - and
associated dog runs
$5,700 Decision Issued 12/08/2015
Category 1Category:
Approval:
S ALMOND $58.50 Planning Lodgement Fee (up to $5,000)
$209.00 Septic Tank application Fee
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$6.11 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$81.19 Class 7 & 8
in accordance with plans submittedP1
no more than dogs kept on an allotmentP128
animals be restrained from making noiseP109
solid waste waterproof containerP137
kennels be cleaned regularlyP129
floor, waste system be maintainedP133
kenenls painted in subdued coloursP134
Site ConditionsP242
Stormwater drained and retained onsiteP243
epa - practical measuresP140
dogs to be registered in dog/cat actP141
Builder: Conditions: Payments:
19/06/2015HICKINBOTHAM GROUP OF
COMPANIES
HACKNEY SA 5069
25 North TerraceApproval Land Division
7/2015/128 26/05/2015 Gawler Road TWO WELLS
LOT: 58 ALT: Q HD: 3 PL: D064975 CT: 5966/721
Land Division - one allotment into
two
$0 Decision Issued 19/06/2015
Category 1Category:
Approval:
HICKINBOTHAM GROUP OF COMPANIES planning non standard conditionPNS1Builder: Conditions: Payments:
Page 33 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
23/06/2015I M MCMILLAN
MALLALA SA 5502
30B Adelaide RoadApproved by Delegation
7/2015/129 26/05/2015 30 Adelaide Road MALLALA
LOT: 3 ALT: A HD: 1 PL: F002723 CT: 5381/778
Construction of garage $4,900 Decision Issued 23/06/2015
Category 1Category:
Approval:
I M MCMILLAN $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
$28.00 Certificate of Title Request
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
28/04/2016R ROSE
LEWISTON SA 5501
140 Dawkins RoadApproval Land Division
7/2015/130 26/05/2015 140 Dawkins Road LEWISTON
LOT: 2 ALT: A HD: 3 PL: D015412 CT: 5747/223
Land Division - one allotment into
two
$0 Decision Issued 28/04/2016
Category 3Category:
Approval:
R ROSE $109.80 Planning Fee DAC
$350.00 Advertising Fee
$103.00 Category 2 Fee
$12.20 Planning Fee Non-Complying
in accordance with plans submittedP1Builder: Conditions: Payments:
1/10/2015R M FIORETTI
TWO WELLS SA 5501
27 Dawkins RoadApproval Land Division
7/2015/131 26/05/2015 4 Coats Road TWO WELLS
LOT: 50 ALT: A HD: 3 PL: D006683 CT: 6159/596
4A Coats Road TWO WELLS
LOT: 2 ALT: A HD: 3 PL: D111793 CT: 6172/728
Land Division - one allotment into
two
$0 Decision Issued 1/10/2015
Category 1Category:
Approval:
R M FIORETTI in accordance with plans submittedP1
contact council after conditions compileP164
Builder: Conditions: Payments:
1/10/2015 WEEKS AND MACKLIN HOMES.
HINDMARSH SA 5007
193-195 Port RoadApproved by Delegation
7/2015/132 2/06/2015 16/4 Dublin Road MALLALA
LOT: 1 ALT: A HD: 1 PL: C27154 CT: 6091/674
Construction of dwelling $240,419 Decision Pending 1/10/2015
Category 1Category:
Approval:
WEEKS AND MACKLIN HOMES. $58.50 Planning Lodgement Fee (up to $5,000)
$15.03 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$285.49 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
21/07/2015T PHEASE
DUBLIN SA 5501
227 Port Parham RoadApproved by Delegation
7/2015/133 1/06/2015 227 Port Parham Road DUBLIN
LOT: 10 ALT: A HD: 2 PL: D016418 CT: 5277/732
Installation of two elevated ground
Solar Panels
$2,500 Decision Issued 21/07/2015
Category 1Category:
Approval:
T PHEASE $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$4.05 Building - DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
Page 34 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
31/07/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/134 1/06/2015 300 Hayman Road LEWISTON
LOT: 122 ALT: A HD: 3 PL: D017603 CT: 5691/480
Construction of Shed $6,500 Decision Issued 31/07/2015
Category 1Category:
Approval:
ADELAIDE FENCING & STEEL SUPPLIES $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
5/08/2015K R RICHARDSON
DUBLIN SA 5501
30 Harris RoadApproval Land Division
7/2015/135 2/06/2015 30 Harris Road DUBLIN
ALT: S HD: 2 SEC: 279 PL: H140400 CT: 5662/394
Harris Road DUBLIN
LOT: 10 ALT: S HD: 2 PL: D111819 CT: 6169/296
Land Division - one allotment into
two
$0 Decision Issued 5/08/2015
Category 1Category:
Approval:
K R RICHARDSON in accordance with plans submittedP1Builder: Conditions: Payments:
31/07/2015F C MAIOLO
TWO WELLS SA 5501
50 Dawkins RoadApproved by Delegation
7/2015/136 2/06/2015 50 Dawkins Road TWO WELLS
LOT: 16 ALT: A HD: 3 PL: D006682 CT: 5730/840
Land Division - one allotment into
two
$0 Decision Issued 31/07/2015
Category 1Category:
Approval:
F C MAIOLO in accordance with plans submittedP1Builder: Conditions: Payments:
8/07/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproval Bulding Consent
7/2015/137 3/06/2015 34 Walter Avenue TWO WELLS
LOT: 31 ALT: A HD: 3 PL: D84941 CT: 6064/410
Construction of Verandah $3,000 Decision Issued 8/07/2015
Category 1Category:
Approval:
ADELAIDE STEEL AND FENCE SUPPLIES $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
9/07/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/138 3/06/2015 18 Sanders Avenue DUBLIN
ALT: S HD: 2 SEC: 239 PL: H140400 CT: 5438/536
Construction of shed and shed
extension
$9,500 Decision Issued 9/07/2015
Category 1Category:
Approval:
A K CARLEY $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 35 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
21/08/2015 A DOLMAN.
LEWISTON SA 5501
14 Milbourne CourtApproved by Delegation
7/2015/139 5/06/2015 14 Milbourne Court LEWISTON
LOT: 307 ALT: A HD: 3 PL: D94528 CT: 6146/879
Construction of Shed $20,000 Decision Issued 21/08/2015
Category 2Category:
Approval:
A DOLMAN. $58.50 Planning Lodgement Fee (up to $5,000)
$171.08 Class 10
$5.05 Planning Fee DAC
$12.88 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Building good & workmanlike mannerB2
Stormwater disposalB33
Engineers ReportB64
Builder: Conditions: Payments:
N ROZHKOV.
TWO WELLS SA 5501
12 Coats Road
7/2015/140 9/06/2015 12 Coats Road TWO WELLS
LOT: 47 ALT: A HD: 3 PL: D006683 CT: 5651/669
2 Wheller Road TWO WELLS
LOT: 101 ALT: A HD: 3 PL: D112335 CT: 6173/579
Land Division - one allotment into
two allotments
$0 Planning Assessment 9/06/2015
Category 1Category:
Approval:
N ROZHKOV. in accordance with plans submittedP1Builder: Conditions: Payments:
26/06/2015SA QUALITY HOME IMPROVEMENTS
CLARENCE GARDENS SA 5039
SOUTH RDApproved Private Certifier
7/2015/141 9/06/2015 203 Dawkins Road LEWISTON
LOT: 474 ALT: A HD: 3 PL: F174941 CT: 5606/898
Construction of Verandah $11,610 Decision Issued 26/06/2015
Category 1Category:
Approval:
SA QUALITY HOME IMPROVEMENTS $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
12/11/2015Murray Machining
MURRAY BRIDGE SA 5253
110 Maurice RoadApproved by Delegation
7/2015/142 11/06/2015 90 The Esplanade PARHAM
LOT: 61 ALT: A HD: 2 PL: D90750 CT: 6105/768
Construction of Shed (12m x 12m x
4.1m wall height)
$30,657 Decision Issued 12/11/2015
Category 2Category:
Approval:
Murray Machining $58.50 Planning Lodgement Fee (up to $5,000)
$150.77 Class 10
$5.05 Planning Fee DAC
$173.00 Consultative Fee DAC
$11.35 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$95.95 Planning Fee ($10,000-$100,000)
$40.00 Consultative Fee - Other
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
planning non standard conditionPNS1
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 36 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
7/04/2016DECHELLIS HOMES PTY LTD
Evandale SA 5069
170 Payneham RoadApproved Private Certifier
7/2015/143 11/06/2015 50 Dawkins Road TWO WELLS
LOT: 16 ALT: A HD: 3 PL: D006682 CT: 5730/840
Construction of Dwelling $152,245 Decision Issued 7/04/2016
Category 1Category:
Approval:
DECHELLIS HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$415.50 Septic Tank application Fee
$22.50 Septic Tank application Fee
$9.52 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$180.79 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
29/06/2015BGI Building Group
Nuriootpa 5355
21-23 Tanunda RoadApproval Bulding Consent
7/2015/144 11/06/2015 10 Noble Crescent TWO WELLS
LOT: 3 ALT: A HD: 3 PL: D058967 CT: 5869/703
Construction of Verandah $10,500 Decision Issued 29/06/2015
Building Rules Consent OnlyCategory:
Approval:
BGI Building Group $58.50 Planning Lodgement Fee (up to $5,000)
$59.95 Class 10
$5.05 Planning Fee DAC
$4.05 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
stormwater dischargeB31
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
23/06/2015 AUSTRALIAN OUTDOOR LIVING.
WEST LAKES SA 5021
PO Box 7361Approved Private Certifier
7/2015/145 18/06/2015 129 Old Port Wakefield Road WINDSOR
LOT: 813 ALT: A HD: 2 PL: F175280 CT: 6099/424
Construction of Swimming Pool and
Safety Fence
$37,700 Swim Pool Completion 21/12/2015
Building Rules Consent OnlyCategory:
Approval:
AUSTRALIAN OUTDOOR LIVING. $58.50 Planning Lodgement Fee (up to $5,000)
$175.00 Swimming Pool Lodgement Fee
$46.55 Building Rules Consent Only Fee
$2.45 DAC - Building Rules Consent Only Fee
Dwelling occupation requirementsB69Builder: Conditions: Payments:
19/06/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/146 19/06/2015 23 Harniman Road LEWISTON
LOT: 75 ALT: A HD: 3 PL: D020952 CT: 5284/788
Construction of Shed $8,000 Decision Issued 8/07/2015
Category 1Category:
Approval:
V CAVALLARO $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$66.50 Planning Lodgement Fee (over $5,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
provisional building rules consentP101
Builder: Conditions: Payments:
Page 37 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
12/11/2015 A C RADFORD.
TWO WELLS SA 5501
92 Hayman RoadApproved by Delegation
7/2015/147 19/06/2015 92 Hayman Road TWO WELLS
LOT: 111 ALT: A HD: 3 PL: D059936 CT: 6047/694
Construction of three verandahs, bull
nose verandah and front........
decking and placement of two
transportable outbuildings
$15,000 Decision Issued 12/11/2015
Category 1Category:
Approval:
A C RADFORD. $58.50 Planning Lodgement Fee (up to $5,000)
$196.08 Class 10
$5.05 Planning Fee DAC
$14.76 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
building non standard conditionBNS1
building non standard conditionBNS2
building non standard conditionBNS3
building non standard conditionBNS4
Builder: Conditions: Payments:
26/08/2015H THOEUN
BURTON SA 5110
325 Burton RoadApproved by Delegation
7/2015/148 24/06/2015 170 Port Parham Road WINDSOR
LOT: 20 ALT: A HD: 2 PL: F101978 CT: 5117/393
Construction of 12 Plastic Covered
Greenhouses
$304,000 Decision Issued 26/08/2015
Category 1Category:
Approval:
H THOEUN $58.50 Planning Lodgement Fee (up to $5,000)
$19.00 Planning Fee DAC
$686.00 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$361.00 Planning Fee (more than $100,001)
$9,114.00 Class 7 & 8
in accordance with plans submittedP1
faulty or unsuitable materials not usedB3
Engineers report acceptanceB27
Engineers ReportB64
schedule of essential safety provisionsB9
Builder: Conditions: Payments:
17/09/2015 COMO GLASSHOUSE PTY LTD.
SOUTH YARRA VIC 3141
644 Chapel Street
Level 18, Como Office TowerApproved Private Certifier
7/2015/149 24/06/2015 687 Germantown Road KORUNYE
LOT: 10 ALT: S HD: 3 PL: D93356 CT: 6133/537
Kenner Road KORUNYE
ALT: S HD: 3 SEC: 506 PL: H140800 CT: 5657/53
Construction of three gas micro
turbines, removal of... Construction
of three gas micro turbines, removal
of one existing diesel generator and
alterations to three existing diesel
generators
$5,000,000 Decision Issued 17/09/2015
Category 1Category:
Approval:
COMO GLASSHOUSE PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$312.50 Planning Fee DAC
$310.00 Consultative Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$39.00 Consultative Fee - Other
$5,937.50 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
planning non standard conditionPNS1
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
27/10/2015 RIVERGUM HOMES PTY LTD.
TORRENSVILLE SA 5031
PO Box 191Approved Private Certifier
7/2015/150 24/06/2015 Ruskin Road DUBLIN
LOT: 521 ALT: S HD: 2 PL: D93501 CT: 6137/295
Construction of Dwelling $173,079 Decision Issued 27/10/2015
Category 1Category:
Approval:
RIVERGUM HOMES PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$10.82 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$205.53 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
Page 38 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
28/08/2015FAIRMONT HOMES GROUP PTY LTD
ADELAIDE SA 5000
21 - 24 North TerraceApproved Private Certifier
7/2015/151 25/06/2015 17 Milbourne Court LEWISTON
LOT: 315 ALT: A HD: 3 PL: D94528 CT: 6146/887
Construction of Dwelling $293,400 Decision Issued 28/08/2015
Category 1Category:
Approval:
FAIRMONT HOMES GROUP PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$18.34 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$348.41 Planning Fee (more than $100,001)
in accordance with plans submittedP1
Private Certifer Consent ConditionsB11
Builder: Conditions: Payments:
CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACE
7/2015/152 25/06/2015 Old Port Wakefield Road TWO WELLS
LOT: 115 ALT: A HD: 3 PL: D95613 CT: 6156/807
Construction of Dwelling $251,305 Additional Information Plannin 9/07/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$15.71 Planning Fee DAC
$5.95 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$113.05 Planning Fee Non-Complying
$298.42 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
Builder: Conditions: Payments:
1/03/2016 CONCORDE MODEL FLYING CLUB.
TWO WELLS SA 5501
6 Port Wakefield RoadApproved DAP
7/2015/153 25/06/2015 3,341B Port Wakefield Road LOWER LIGHT
LOT: 6 ALT: A HD: 3 PL: D026285 CT: 5940/164
Radio Controlled Flying Club, Shade
Cloth Pergolas, Verandah,.........
Shipping Container Storage Unit and
Advertising Sign
$9,000 Planning Assessment 3/03/2016
Category 3Category:
Approval:
CONCORDE MODEL FLYING CLUB. $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$335.00 Advertising Fee
$66.50 Planning Lodgement Fee (over $5,000)
$101.00 Category 2 Fee
in accordance with plans submittedP1Builder: Conditions: Payments:
10/07/2015 A G HOSKIN.
DUBLIN SA 5501
Lot 523 Ruskin RoadApproved by Delegation
7/2015/154 1/07/2015 Ruskin Road DUBLIN
LOT: 523 ALT: S HD: 2 PL: D93501 CT: 6137/297
Keeping of animals - 4 Sheep 2
Alpacas and 1 Goat
$200 Decision Issued 10/07/2015
Category 1Category:
Approval:
A G HOSKIN. $58.50 Planning Lodgement Fee (up to $5,000)
$1.85 Planning Fee DAC
$34.65 Planning Fee (up to $10,000)
$28.00 Certificate of Title Request
in accordance with plans submittedP1
structures & yards be maintained in goodP110
epa - practical measuresP140
Builder: Conditions: Payments:
P T IRISH
MALLALA SA 5502
Old Dublin Road
7/2015/155 1/07/2015 175 Hill Road MALLALA
ALT: S HD: 1 SEC: 576 PL: 140500 CT: 5139/117
Dublin Road MALLALA
LOT: 15 ALT: S HD: 1 PL: D96313 CT: 6160/541
Feltwell Road MALLALA
ALT: S HD: 1 SEC: 571 PL: H140500 CT: 5733/934
Land division - boundary realignment $0 Planning Assessment 1/10/2015
Category 1Category:
Approval:
P T IRISHBuilder: Conditions: Payments:
Page 39 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
31/07/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/156 1/07/2015 1,061 Germantown Road KORUNYE
LOT: 454 ALT: A HD: 3 PL: F174921 CT: 5771/126
Construction of Shed $14,000 Decision Issued 3/11/2015
Category 1Category:
Approval:
ADELAIDE FENCING & STEEL SUPPLIES $58.50 Planning Lodgement Fee (up to $5,000)
$5.05 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
floor level no less than 2.3 metresP181
approved for domestic purposes onlyP9
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
23/07/2015I M EATTS
DUBLIN SA 5501
Lot 521 Ruskin RoadApproved by Delegation
7/2015/157 1/07/2015 Ruskin Road DUBLIN
LOT: 521 ALT: S HD: 2 PL: D93501 CT: 6137/295
Construction of Shed and placing of
a 115,0000 litre......... rain water tank
$20,000 Decision Issued 23/07/2015
Category 1Category:
Approval:
I M EATTS $58.50 Planning Lodgement Fee (up to $5,000)
$99.99 Class 10
$5.05 Planning Fee DAC
$7.53 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
stormwater dischargeB31
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
5/11/2015 ALPHA INDUSTRIES.
CAVAN SA 5094
12 STOCK ROADApproved by Delegation
7/2015/158 1/07/2015 170 Port Parham Road WINDSOR
LOT: 20 ALT: A HD: 2 PL: F101978 CT: 5117/393
Construction of packing shed for
horticulture purposes
$12,890 Health Assessment 6/11/2015
Category 2Category:
Approval:
H THOEUN $58.50 Planning Lodgement Fee (up to $5,000)
$150.00 Class 10
$5.05 Planning Fee DAC
$11.30 Building - DAC
$22.33 Building - DAC
$66.50 Planning Lodgement Fee (over $5,000)
$95.95 Planning Fee ($10,000-$100,000)
$296.67 Class 7 & 8
building non standard conditionBNS1
building non standard conditionBNS2
building non standard conditionBNS3
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Builder: Conditions: Payments:
21/07/2015H G DOWLING
TWO WELLS SA 5501
10 Noble CrescentApproved by Delegation
7/2015/159 8/07/2015 10 Noble Crescent TWO WELLS
LOT: 3 ALT: A HD: 3 PL: D058967 CT: 5869/703
Construction of Carport $11,950 Decision Issued 21/07/2015
Category 1Category:
Approval:
C WUTTKE $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$5.15 Planning Fee DAC
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
building non standard conditionBNS1
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Builder: Conditions: Payments:
Page 40 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
4/11/2015METRICON HOMES PTY LTD
NORWOOD SA 5067
88 Fullarton RoadApproved Private Certifier
7/2015/160 6/07/2015 15 Milbourne Court LEWISTON
LOT: 314 ALT: A HD: 3 PL: D94528 CT: 6146/886
Construction of Dwelling $276,625 Decision Issued 4/11/2015
Category 1Category:
Approval:
METRICON HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$17.29 Planning Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$328.49 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
10/08/2015T I ESPOSITO
TWO WELLS SA 5501
8 McCord RoadApproved by Delegation
7/2015/161 2/07/2015 8 McCord Road TWO WELLS
LOT: 54 ALT: A HD: 3 PL: D006687 CT: 5448/950
Construction of Shed (21.1m x 9.1m
x 3.9m wall height)
$9,200 Decision Issued 10/08/2015
Category 1Category:
Approval:
ALPHA INDUSTRIES. $60.00 Planning Lodgement Fee (up to $5,000)
$152.92 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$11.51 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
planting bushes to and replace when dieP44
propagted from locall indigenous speciesP45
Building not for human habitationB1
Manufacturers RecommendationB63
Builder: Conditions: Payments:
3/11/2015 V H NGUYEN.
TWO WELLS SA 5501
14 Old Port Wakefield RoadApproved by Delegation
7/2015/162 9/07/2015 14 Old Port Wakefield Road TWO WELLS
LOT: 169 ALT: A HD: 3 PL: 163137 CT: 5401/177
Horticulture comprising 3 plastic
covered greenhouses............. &
water storage dam
$90,000 Decision Issued 29/10/2015
Category 2Category:
Approval:
V H NGUYEN. $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$300.06 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$97.85 Planning Fee ($10,000-$100,000)
$3,986.46 Class 3, 5 & 6
in accordance with plans submittedP1
schedule of essential safety provisionsB9
Builder: Conditions: Payments:
5/11/2015 S A STACEY.
TWO WELLS SA 5501
10 Clydesdale DriveApproved by Delegation
7/2015/163 14/07/2015 10 Clydesdale Drive TWO WELLS
LOT: 55 ALT: A HD: 3 PL: D045869 CT: 5365/345
Construction of outbuilding (shed)
and conversion of existing......
Construction of outbuilding (shed)
and conversion of existing carport to
partially enclosed entertaining area
$6,500 Decision Issued 5/11/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$106.02 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$7.98 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$30.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
external walls of building subduedP6
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 41 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
26/11/2015BAYLIES ROAD PROPERTY
INVESTMENTS PTY LTD.
TWO WELLS SA 5501
Section 194 Bailey Road WestApproved by Delegation
7/2015/164 14/07/2015 Shellgrit Road MIDDLE BEACH
ALT: S HD: 3 SEC: 218 PL: H140800 CT: 6155/358
Change of land use from primary
production to open field... Change of
land use from primary production to
open field horticulture and
construction of two canopies
$2,000 Decision Issued 26/11/2015
Category 2Category:
Approval:
BAYLIES ROAD PROPERTY INVESTMENTS PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$101.00 Category 2 Fee
$30.00 Certificate of Title Request
$30.00 Certificate of Title Request
in accordance with plans submittedP1
provisional building rules consentP101
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
17/09/2015A J LEANEY
REEVES PLAINS SA 5502
Sec 134 Day RoadApproved by Delegation
7/2015/165 15/07/2015 522 Day Road REEVES PLAINS
ALT: S HD: 3 SEC: 624 PL: H140800 CT: 5692/760
Shed
$7,000 Decision Issued 17/09/2015
Category 1Category:
Approval:
A J LEANEY $60.00 Planning Lodgement Fee (up to $5,000)
$91.80 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$6.90 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
M KAFANTARIS
DUBLIN SA 5501
Bubner Road
7/2015/166 14/07/2015 Bubner Road DUBLIN
ALT: S HD: 2 SEC: 269 PL: H140400 CT: 5662/418
Land Division 1 into 3 $0 Health Assessment 12/11/2015
Category 1Category:
Approval:
M KAFANTARIS in accordance with plans submittedP1Builder: Conditions: Payments:
16/12/2015E VOUGAMALIS
LEWISTON SA 5501
Lot 15 Hayman RoadApproved by Delegation
7/2015/167 15/07/2015 94 Hayman Road LEWISTON
LOT: 15 HD: 3 PL: D83018 CT: 6053/183
Filling of land in flood plain $0 Decision Issued 16/12/2015
Category 1Category:
Approval:
E VOUGAMALIS $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
in accordance with plans submittedP1Builder: Conditions: Payments:
3/11/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/168 15/07/2015 9 Cavallaro Place LEWISTON
LOT: 15 HD: 3 PL: D81621 CT: 6041/31
Construction of Domestic
Outbuilding - Storage Shed and
Verandah
$25,000 Decision Issued 3/11/2015
Category 1Category:
Approval:
R A LEPLEY $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls maintained in good condP7
comply to conditions imposedP2
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 42 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
28/10/2015 RIVERGUM HOMES PTY LTD.
TORRENSVILLE SA 5031
PO Box 191Approved Private Certifier
7/2015/169 15/07/2015 10A Tatura Avenue TWO WELLS
LOT: 22 ALT: A HD: 3 PL: D93205 CT: 6139/615
Construction of dwelling $131,566 Decision Issued 28/10/2015
Category 1Category:
Approval:
RIVERGUM HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$8.22 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$156.23 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
30/07/2015 GREENWHEAT FREEKEH.
ADELAIDE SA 5000
165 Grenfell Street
Level 1Approval Bulding Consent
7/2015/170 16/07/2015 149 Sharpe Road TWO WELLS
ALT: S HD: 3 SEC: 462 PL: H140800 CT: 5200/512
Demolition
$10,000 Decision Issued 31/07/2015
Building Rules Consent OnlyCategory:
Approval:
GREENWHEAT FREEKEH. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$4.15 Building - DAC
Demolition of structureB83Builder: Conditions: Payments:
A H ROUTLEY
TWO WELLS SA 5501
76 Old Port Wakefield Road
7/2015/171 16/07/2015 76 Old Port Wakefield Road TWO WELLS
LOT: 367 ALT: A HD: 3 PL: F174834 CT: 5410/612
Construction of new verandah and
replacement of exisitng verandah.....
to provide sheltered area for alfresco
dining
$20,000 Building Assessment 29/04/2016
Category 1Category:
Approval:
A H ROUTLEY $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external appearance maintainedP10
external materials to match existing bldP12
planning non standard conditionPNS1
planning non standard conditionPNS2
planning non standard conditionPNS3
Builder: Conditions: Payments:
2/10/2015BAYLIES ROAD PROPERTY
INVESTMENTS PTY LTD.
TWO WELLS SA 5501
Section 194 Bailey Road WestApproved by Delegation
7/2015/172 17/07/2015 Bailey Road West TWO WELLS
LOT: 10 ALT: S HD: 3 PL: D93213 CT: 6155/360
Construction of packing shed $13,000 Decision Issued 2/10/2015
Category 2Category:
Approval:
BAYLIES ROAD PROPERTY INVESTMENTS PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$38.71 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$97.85 Planning Fee ($10,000-$100,000)
$514.25 Class 7 & 8
in accordance with plans submittedP1
external walls maintained in good condP7
Site ConditionsP242
floodlighting restricted for securityP69
Site in neat tidy conditionP244
Stormwater drained and retained onsiteP243
Stormwater disposalB33
building non standard conditionBNS1
building non standard conditionBNS2
Stormwater drained & retained on siteP245
Builder: Conditions: Payments:
Page 43 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
GERMANTOWN ROAD PTY LTD.
KORUNYE SA 5502
1061 Germantown Road
7/2015/173 17/07/2015 1,061 Germantown Road KORUNYE
LOT: 454 ALT: A HD: 3 PL: F174921 CT: 5771/126
Construction of Transportable Site
Office
$5,000 Additional Information Plannin 29/07/2015
Category 1Category:
Approval:
GERMANTOWN ROAD PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$61.35 Class 7 & 8
Builder: Conditions: Payments:
1/02/2016 D M TRAN.
LEWISTON SA 5501
273 Bakers RoadApproved Private Certifier
7/2015/174 17/07/2015 273 Bakers Road LEWISTON
LOT: 186 ALT: A HD: 3 PL: F163154 CT: 5690/664
Construction of five plastic covered
greenhouses, stormwater.....
retention and water storage dam and
ancillary site works
$110,200 Decision Issued 25/02/2016
Category 2Category:
Approval:
SOUTHERN STEEL SUPPLIES. $60.00 Planning Lodgement Fee (up to $5,000)
$6.89 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$130.86 Planning Fee (more than $100,001)
in accordance with plans submittedP1Builder: Conditions: Payments:
11/11/2015 DOMESTIC DRAFTING SERVICE.
GAWLER SA 5118
32 King StreetApproved by Delegation
7/2015/175 20/07/2015 12 Wasleys Road MALLALA
LOT: 13 ALT: A HD: 1 PL: D017968 CT: 5837/243
Single storey addition to existing
dwelling
$11,500 Decision Issued 11/11/2015
Category 1Category:
Approval:
P JUVAN $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$318.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
Stormwater disposalB33Builder: Conditions: Payments:
17/09/2015T E SWITALA
TWO WELLS SA 5501
17 Wilson RoadApproved by Delegation
7/2015/176 22/07/2015 17 Wilson Road TWO WELLS
LOT: 2 ALT: A HD: 3 PL: D022449 CT: 5580/566
Construction of a free standing
carport within Flood Hazard Zone 3
of the Gawler River Floodplain
$5,350 Decision Issued 17/09/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$109.80 Planning Fee DAC
$2.60 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$39.90 Planning Fee Non-Complying
$12.20 Planning Fee Non-Complying
Stormwater disposalB33
building non standard conditionBNS1
in accordance with plans submittedP1
Builder: Conditions: Payments:
Page 44 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
14/09/2015 SA MUSHROOMS.
VIRGINIA SA 5120
PO Box 1076Approved Private Certifier
7/2015/177 24/07/2015 327 Crabb Road LOWER LIGHT
ALT: S HD: 3 SEC: 203 PL: D91883 CT: 6141/486
Construction of Implement Shed $16,638 Decision Issued 14/09/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
14/10/2015 RIVERINA POOLS & SPAS.
GILLES PLAINS SA 5086
641 North East RoadApproved Private Certifier
7/2015/178 23/07/2015 156 Dawkins Road LEWISTON
LOT: 100 ALT: A HD: 3 PL: D027763 CT: 5348/766
Swimming Pool $41,000 Decision Issued 14/10/2015
Category 1Category:
Approval:
RIVERINA POOLS & SPAS. $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$179.00 Swimming Pool Lodgement Fee
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
floor level no less than 2.3 metresP181
provisional building rules consentP101
Builder: Conditions: Payments:
26/08/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/179 24/07/2015 4 Milbourne Court LEWISTON
LOT: 302 ALT: A HD: 3 PL: D94528 CT: 6146/874
Construction of an outbuilding -
storage shed
$9,000 Decision Issued 26/08/2015
Category 1Category:
Approval:
P J TOMNEY. $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$68.00 Planning Lodgement Fee (over $5,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
provisional building rules consentP101
Private Certifer Consent ConditionsB11
Builder: Conditions: Payments:
12/08/2015 N Parker.
GRACE PLAINS SA 5502
426 Hallion RoadApproved by Delegation
7/2015/180 28/07/2015 426 Hallion Road GRACE PLAINS
ALT: S HD: 1 SEC: 629 PL: H140500 CT: 5394/517
Construction of free standing
outbuilding - garage and verandah
$9,000 Decision Issued 12/08/2015
Category 1Category:
Approval:
N Parker. $60.00 Planning Lodgement Fee (up to $5,000)
$97.09 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$7.31 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$30.00 Certificate of Title Request
faulty or unsuitable materials not usedB3
Stormwater disposalB33
Engineers ReportB64
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Builder: Conditions: Payments:
Page 45 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
12/08/2015 R J SEELANDER.
THOMPSON BEACH SA 5501
111 The EsplanadeApproved by Delegation
7/2015/181 29/07/2015 111 The Esplanade THOMPSON BEACH
LOT: 167 ALT: A HD: 2 PL: D029513 CT: 5370/588
Construction of an outbuilding -
garage
$7,500 Decision Issued 12/08/2015
Category 1Category:
Approval:
STRATCO $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
floor level no less than 2.3 metresP181
stormwater dischargeB31
Manufacturers RecommendationB63
Builder: Conditions: Payments:
28/09/2015 J N NORRIS.
TWO WELLS SA 5501
16 Glover RoadPlanning Consent Only
7/2015/182 31/07/2015 16 Glover Road TWO WELLS
LOT: 3 ALT: A HD: 3 PL: D90576 CT: 6104/710
Construction of group dwelling -
dependent accommodation and deck
$80,000 Decision Pending 4/01/2016
Category 1Category:
Approval:
J N NORRIS. $60.00 Planning Lodgement Fee (up to $5,000)
$20.07 Class 10
$5.15 Planning Fee DAC
$18.68 Building - DAC
$1.51 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$248.12 Class 1, 2 & 4
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
9/11/2015J M JENKINSON
THOMPSON BEACH SA 5501
4 Heron CrescentApproved by Delegation
7/2015/183 31/07/2015 4 Heron Crescent THOMPSON BEACH
LOT: 238 ALT: A HD: 2 PL: D029513 CT: 5062/961
Construction of a free standing
verandah
$3,000 Decision Issued 9/11/2015
Category 1Category:
Approval:
J M JENKINSON $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
planning non standard conditionPNS1
planning non standard conditionPNS2
building non standard conditionBNS1
Stormwater disposalB33
building non standard conditionBNS2
building non standard conditionBNS3
Builder: Conditions: Payments:
Page 46 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
21/10/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/184 31/07/2015 29 Chapman Street TWO WELLS
LOT: 1 ALT: A HD: 3 PL: D065709 CT: 5930/846
Construction of an outbuilding -
garage
$5,000 Decision Issued 21/10/2015
Category 1Category:
Approval:
BARGAIN STEEL CENTRE $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
floor level no less than 2.3 metresP181
provisional building rules consentP101
approved for domestic purposes onlyP9
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
NADANT CONSULTING.
KENT TOWN SA 5071
PO Box 477
7/2015/186 3/08/2015 175 The Esplanade THOMPSON BEACH
LOT: 237 ALT: A HD: 2 PL: D029513 CT: 5370/722
Removal of internal and external
walls of existing dwelling..... Removal
of internal and external walls of
existing dwelling, alteration to
existing dwelling, construction of
dwelling extension, construction of
two verandahs and enclosure of
existing verandah
$99,500 Additional Information Plannin 7/08/2015
Category 1Category:
Approval:
NADANT CONSULTING. $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$173.00 Consultative Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$40.00 Consultative Fee - Other
Builder: Conditions: Payments:
J A ZAMMIT
LEWISTON SA 5501
100 Gawler Road
7/2015/187 4/08/2015 100 Gawler Road LEWISTON
LOT: 100 ALT: A HD: 3 PL: D012781 CT: 5368/914
Variation to development approval
312/324/2011 - remove condition 6
an d remove internal enclosure
gates,exercise yards and kennel
fencing and reduce tree planting
$0 Planning Assessment 5/08/2015
Category 1Category:
Approval:
J A ZAMMIT $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$103.00 Category 2 Fee
Builder: Conditions: Payments:
J A ZAMMIT
LEWISTON SA 5501
100 Gawler Road
7/2015/188 4/08/2015 100 Gawler Road LEWISTON
LOT: 100 ALT: A HD: 3 PL: D012781 CT: 5368/914
Increase dog numbers to 70 $0 Planning Assessment 5/08/2015
Category 1Category:
Approval:
J A ZAMMIT $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$103.00 Category 2 Fee
Builder: Conditions: Payments:
Page 47 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
3/02/2016 S BROOK
MEADOWS SA 5201
35 Battunga RoadApproved DAP
7/2015/189 6/08/2015 6 Lawrie Road LEWISTON
LOT: 31 ALT: A HD: 3 PL: D036223 CT: 5111/789
Keeping of 16 greyhounds and 2
horses -..... conversion of shed into
dog kennelling, stables and yards
$0 Decision Issued 10/02/2016
Category 2Category:
Approval:
J RICE. $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
in accordance with plans submittedP1Builder: Conditions: Payments:
9/10/2015 R & M TIMBER.
WILLASTON SA 5118
PO Box 71Approved by Delegation
7/2015/190 6/08/2015 Hart Road LOWER LIGHT
ALT: S HD: 3 SEC: 344 PL: H140800 CT: 6009/418
Construction of a verandah $6,519 Decision Issued 9/10/2015
Category 1Category:
Approval:
R & M TIMBER. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
external appearance maintainedP10
building non standard conditionBNS1
Stormwater disposalB33
building non standard conditionBNS2
Builder: Conditions: Payments:
S G MERTINEIT
LEWISTON SA 5501
225 Hayman Road
7/2015/191 6/08/2015 225 Hayman Road LEWISTON
LOT: 51 ALT: A HD: 3 PL: D014929 CT: 5691/848
Use of land for dog obedience
training, dog conformation... Use of
land for dog obedience training, dog
conformation training and dog
socialisation
$0 Planning Assessment 7/12/2015
Category 3Category:
Approval:
S G MERTINEIT $335.00 Advertising FeeSite in neat tidy conditionP244Builder: Conditions: Payments:
7/12/2015John Scheepens Design and
Construction
LEWISTON SA 5501
288 Hayman RoadApproved Private Certifier
7/2015/192 11/08/2015 255 Hart Road LOWER LIGHT
LOT: 100 ALT: A HD: 3 PL: D070158 CT: 6156/227
Construction of swimming pool
enclosure and covered alfresco area
$50,000 Decision Issued 7/12/2015
Category 1Category:
Approval:
John Scheepens Design and Construction $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Site ConditionsP242
Stormwater drained and retained onsiteP243
external surfaces painted durable paintP17
provisional building rules consentP101
Dwelling occupation requirementsB69
Waste containmentB19
Builder: Conditions: Payments:
16/12/2015G K LOCKYER
DUBLIN SA 5501
Harris RoadApproved by Delegation
7/2015/193 12/08/2015 Harris Road DUBLIN
ALT: S HD: 2 SEC: 283 PL: H140400 CT: 5662/398
Conversion of existing outbuilding to
dwelling
$4,500 Decision Issued 16/12/2015
Category 1Category:
Approval:
G K LOCKYER $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$12.93 Building - DAC
$171.66 Class 1, 2 & 4
$30.00 Certificate of Title Request
in accordance with plans submittedP1
building non standard conditionBNS1
building non standard conditionBNS2
building non standard conditionBNS3
Builder: Conditions: Payments:
Page 48 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
27/10/2015G CARBONE
TWO WELLS SA 5501
Lot 42 Walter AvenueApproved by Delegation
7/2015/194 12/08/2015 18 Walter Avenue TWO WELLS
LOT: 42 ALT: A HD: 3 PL: D84941 CT: 6064/421
Construction of Domestic Shed $11,900 Decision Issued 27/10/2015
Category 1Category:
Approval:
G CARBONE $60.00 Planning Lodgement Fee (up to $5,000)
$68.16 Class 10
$5.15 Planning Fee DAC
$6.43 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
1/10/2015S M MCARDLE
MALLALA SA 5502
5 Aerodrome RoadApproved Private Certifier
7/2015/195 12/08/2015 13 Butler Street MALLALA
LOT: 8 ALT: A HD: 1 PL: D018916 CT: 5391/889
Extension to Dwelling
$45,000 Health Assessment 8/10/2015
Category 1Category:
Approval:
MCARDLE PROJECTS $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
provisional building rules consentP101
external materials to match existing bldP12
dwelling connected to effluent systemP13
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
9/10/2015K M SPARKS
LEWISTON SA 5501
2 Elouise CourtApproved by Delegation
7/2015/196 13/08/2015 2 Elouise Court LEWISTON
LOT: 8 HD: 3 PL: D77160 CT: 6010/482
Construction of Storage Shed $5,000 Decision Issued 9/10/2015
Category 1Category:
Approval:
K M SPARKS $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$30.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
finished floor level not less 700mmP18
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
9/10/2015 ALPHA INDUSTRIES.
CAVAN SA 5094
12 STOCK ROADApproved by Delegation
7/2015/197 17/08/2015 82 Bethesda Road LEWISTON
LOT: 33 ALT: A HD: 3 PL: D019441 CT: 5393/166
Construction of Shed $0 Decision Issued 9/10/2015
Category 1Category:
Approval:
ALPHA INDUSTRIES. $60.00 Planning Lodgement Fee (up to $5,000)
$111.30 Class 10
$5.15 Planning Fee DAC
$8.38 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
finished floor level not less 700mmP18
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
certificate building indemnity insuranceB7
Builder: Conditions: Payments:
Page 49 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
3/05/2016P W COCKS
KORUNYE SA 5502
Sec 497 Temby RoadApproved by Delegation
7/2015/198 18/08/2015 11 Forby Road KORUNYE
LOT: 13 ALT: S HD: 3 PL: D79837 CT: 6031/17
Transportable outbuilding - domestic
storage purposes
$0 Decision Issued 3/05/2016
Category 1Category:
Approval:
P W COCKS $60.00 Planning Lodgement Fee (up to $5,000)
$66.15 Class 10
$5.15 Planning Fee DAC
$4.98 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
floor level no less than 2.3 metresP181
base perimeter infilled suitable materiaP23
approved for domestic purposes onlyP9
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
24/02/2016 I DUNCAN.
WILLASTON SA 5118
PO Box 501Approved Private Certifier
7/2015/199 18/08/2015
LOT: 122 ALT: A HD: 3 PL: D88783 CT: 6091/50
Construction of Dwelling and
Domestic Outbuilding - Storage Shed
with Attached Carport
$470,000 Decision Issued 24/02/2016
Category 1Category:
Approval:
I DUNCAN. $60.00 Planning Lodgement Fee (up to $5,000)
$91.80 Class 10
$438.00 Septic Tank application Fee
$29.37 Planning Fee DAC
$6.91 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$558.13 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
$30.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
Vehicle AccessP236
dwelling connected to effluent systemP13
external walls of building subduedP6
planning non standard conditionPNS1
provisional building rules consentP101
approved for domestic purposes onlyP9
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
building non standard conditionBNS1
Builder: Conditions: Payments:
2/12/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/200 19/08/2015 16 Milbourne Court LEWISTON
LOT: 308 ALT: A HD: 3 PL: D94528 CT: 6146/880
Construction of swimming pool and
safety fence, deck and...
Construction of swimming pool and
safety fence, deck and partially
enclosed verandah
$0 Decision Issued 2/12/2015
Category 1Category:
Approval:
D A PUDDY. $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$179.00 Swimming Pool Lodgement Fee
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 50 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
25/09/2015H R HARRISON
TWO WELLS SA 5501
2 Kay AvenueApproved by Delegation
7/2015/201 24/08/2015 2 Kay Avenue TWO WELLS
LOT: 35 ALT: A HD: 3 PL: D064975 CT: 5919/349
Construction of Domestic
Outbuilding / Storage Shed
$5,900 Decision Issued 25/09/2015
Category 1Category:
Approval:
H R HARRISON $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$30.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external materials to match existing bldP12
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
10/12/2015FIRST CHOICE VERANDAHS AND
CARPORTS
MILE END 5031
2 Railway TerraceApproved by Delegation
7/2015/202 24/08/2015 39-43 Elizabeth Street TWO WELLS
LOT: 4 ALT: A HD: 3 PL: D024657 CT: 5164/456
Construction of Carport $10,270 Decision Issued 10/12/2015
Category 1Category:
Approval:
FIRST CHOICE VERANDAHS AND CARPORTS $60.00 Planning Lodgement Fee (up to $5,000)
$6.10 Planning Fee DAC
$9.30 Planning Fee DAC
$100.50 Planning Fee DAC
$12.20 Planning Fee Non-Complying
$96.50 Planning Fee Non-Complying
$115.90 Planning Fee Non-Complying
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
2/12/2015A OWEN
TWO WELLS SA 5501
11 Jean AvenueApproved by Delegation
7/2015/203 26/08/2015 21 Jean Avenue TWO WELLS
LOT: 29 ALT: A HD: 3 PL: D92086 CT: 6117/288
Construction of Shed for Domestic
Use
$17,000 Decision Issued 2/12/2015
Category 1Category:
Approval:
A OWEN $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$30.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
external walls maintained in good condP7
planning non standard conditionPNS1
external walls of building subduedP6
Stormwater disposalB33
Builder: Conditions: Payments:
21/10/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/204 31/08/2015 16 Dawkins Road TWO WELLS
LOT: 50 ALT: A HD: 3 PL: D058467 CT: 5864/439
Construction of Domestic Outbuilding
- Storage Shed
$11,000 Decision Issued 21/10/2015
Category 1Category:
Approval:
M G HEENAN $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
external walls of building subduedP6
approved for domestic purposes onlyP9
provisional building rules consentP101
planning non standard conditionPNS1
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 51 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
23/09/2015K A WARREN
TWO WELLS SA 5501
17 Old Mallala RoadApproved by Delegation
7/2015/205 31/08/2015 17 Old Mallala Road TWO WELLS
LOT: 387 ALT: A HD: 3 PL: F174854 CT: 5377/486
Construction of verandah $6,134 Decision Issued 23/09/2015
Building Rules Consent OnlyCategory:
Approval:
PETER ELLIS FENCING. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$47.50 Building Rules Consent Only Fee
$2.50 DAC - Building Rules Consent Only Fee
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
27/10/2015E CARTER
*********************************** 550
***** error while formatting ******
***********************************Approved by Delegation
7/2015/206 31/08/2015 Port Wakefield Road LOWER LIGHT
LOT: 92 ALT: A HD: 2 PL: F175374 CT: 6118/182
Construction of domestic outbuilding
- storage shed
$7,000 Decision Issued 27/10/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
floor level no less than 2.3 metresP181
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
27/10/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEApproved Private Certifier
7/2015/207 1/09/2015 72 Hayman Road TWO WELLS
LOT: 702 ALT: A HD: 3 PL: D93694 CT: 6138/672
Construction of a single storey
dwelling
$214,424 Information Further Clarificat 7/04/2016
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$13.40 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$254.63 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
existing trees to be protectedP51
water storage tank 22400 litresP174
Fire fighting water tankP238
Vehicle AccessP236
Site ConditionsP242
Stormwater drained and retained onsiteP243
provisional building rules consentP101
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
22/02/2016FAIRMONT HOMES GROUP PTY LTD
ADELAIDE SA 5000
21 - 24 North TerraceApproved Private Certifier
7/2015/208 3/09/2015 Lawrie Road CALOMBA
LOT: 93 ALT: S HD: 2 PL: F216245 CT: 5798/168
Construction of a single storey
dwelling
$379,100 Decision Issued 22/02/2016
Category 1Category:
Approval:
FAIRMONT HOMES GROUP PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$23.70 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$450.18 Planning Fee (more than $100,001)
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
Page 52 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
27/10/2015M H BOON
LOWER LIGHT SA 5501
Sec 736 Gordon RoadApproved by Delegation
7/2015/209 8/09/2015 15 Hayman Road TWO WELLS
LOT: 333 ALT: A HD: 3 PL: F174800 CT: 5772/693
Construction of 2x verandahs &
internal renovations
$90,000 Decision Issued 27/10/2015
Category 1Category:
Approval:
M H BOON $60.00 Planning Lodgement Fee (up to $5,000)
$80.06 Class 10
$214.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$5.99 Building - DAC
$6.03 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$79.56 Class 1, 2 & 4
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
certificate building indemnity insuranceB7
Stormwater disposalB33
building non standard conditionBNS1
building non standard conditionBNS2
building non standard conditionBNS3
building non standard conditionBNS4
building non standard conditionBNS5
Builder: Conditions: Payments:
23/09/2015R J BONE
DUBLIN SA 5501
Lot 112 Bubner RoadApproved Private Certifier
7/2015/210 9/09/2015 146 Bubner Road DUBLIN
LOT: 112 HD: 2 PL: D79500 CT: 6025/684
Construction of Garage $9,202 Decision Issued 23/09/2015
Category 1Category:
Approval:
STRATCO (SA) PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$68.00 Planning Lodgement Fee (over $5,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
provisional building rules consentP101
Builder: Conditions: Payments:
K DOE.
TWO WELLS SA 5501
211 Brownes Road
7/2015/211 11/09/2015 211 Jefferies Road PORT GAWLER
LOT: 47 ALT: A HD: 3 PL: F100407 CT: 5097/873
Construction of shed and storage
container
$3,200 Additional Information Plannin 17/09/2015
Category 1Category:
Approval:
K DOE. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$30.00 Certificate of Title Request
Builder: Conditions: Payments:
6/10/2015S R RODELL
TWO WELLS SA 5501
Lot 26 Jean AvenueApproved by Delegation
7/2015/212 10/09/2015 15 Jean Avenue TWO WELLS
LOT: 26 ALT: A HD: 3 PL: D92086 CT: 6117/285
Construction of garage and carport $16,659 Decision Issued 6/10/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$76.63 Class 10
$5.15 Planning Fee DAC
$5.77 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
planning non standard conditionPNS1
planning non standard conditionPNS2
structure not be enclosed with solidP11
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 53 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
12/10/2015C R BILLING
WEBB BEACH SA 5501
10 Jury StreetApproved by Delegation
7/2015/213 15/09/2015 10 Jury Street WEBB BEACH
ALT: S HD: 2 SEC: 581 PL: H140400 CT: 5500/771
Construction of Freestanding Carport $4,587 Decision Issued 12/10/2015
Category 1Category:
Approval:
C R BILLING $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
in accordance with plans submittedP1
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Stormwater disposalB33
Builder: Conditions: Payments:
25/09/2015M F PIETSCH
KORUNYE SA 5502
Wasley RoadApproval Bulding Consent
7/2015/214 15/09/2015 Wasley Road KORUNYE
ALT: S HD: 3 SEC: 529 PL: H140800 CT: 5509/973
Construction of a domestic
outbuilding - storage shed
$3,000 Decision Issued 25/09/2015
Building Rules Consent OnlyCategory:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$4.15 Building - DAC
$47.50 Building Rules Consent Only Fee
$2.50 DAC - Building Rules Consent Only Fee
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
12/10/2015M H LAWRENCE
TWO WELLS SA 5501
Lot 12 Bailey RoadApproved by Delegation
7/2015/215 15/09/2015 4A Bailey Road TWO WELLS
LOT: 12 ALT: A HD: 3 PL: D049355 CT: 5508/780
Construction of verandah and
freestanding carport
$3,000 Decision Issued 12/10/2015
Category 1Category:
Approval:
M H LAWRENCE $60.00 Planning Lodgement Fee (up to $5,000)
$139.65 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$10.51 Building - DAC
Stormwater disposalB33
in accordance with plans submittedP1
external materials to match existing bldP12
Stormwater drained and retained onsiteP243
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
21/10/2015 RIVERGUM HOMES PTY LTD.
TORRENSVILLE SA 5031
PO Box 191Planning Consent Only
7/2015/216 16/09/2015 255 Hart Road LOWER LIGHT
LOT: 100 ALT: A HD: 3 PL: D070158 CT: 6156/227
Construction of single storey dwelling
with carport under main roof
$90,272 Planning Assessment 21/10/2015
Category 1Category:
Approval:
RIVERGUM HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$5.64 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$107.20 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
Page 54 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
28/01/2016LONGRIDGE GROUP
MILE END SA 5031
158 Railway TerraceApproved Private Certifier
7/2015/217 16/09/2015 Old Port Wakefield Road TWO WELLS
LOT: 32 ALT: A HD: 3 PL: D94768 CT: 6147/583
Construction of a single storey
dwelling
$67,484 Wall Framing Inspection 23/05/2016
Category 1Category:
Approval:
LONGRIDGE GROUP $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
existing trees to be protectedP51
water storage tank 22400 litresP174
Fire fighting water tankP238
Vehicle AccessP236
Stormwater drained and retained onsiteP243
Site ConditionsP242
provisional building rules consentP101
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
H I O'LOAN.
MALLALA SA 5502
14 Redbanks Road
7/2015/218 17/09/2015 18 Butler Street MALLALA
LOT: 9 ALT: A HD: 1 PL: D004133 CT: 5712/479
Land Division - one allotment into
three
$0 Health Assessment 2/02/2016
Category 1Category:
Approval:
H I O'LOAN. in accordance with plans submittedP1
planning non standard conditionPNS1
planning non standard conditionPNS2
planning non standard conditionPNS3
Builder: Conditions: Payments:
H I O'LOAN.
MALLALA SA 5502
14 Redbanks Road
7/2015/219 17/09/2015 18 Butler Street MALLALA
LOT: 9 ALT: A HD: 1 PL: D004133 CT: 5712/479
Community Title Land Division - one
allotment into three allotments
Community Title Land Division - One
allotment into three and common
property
$0 Planning Assessment 17/09/2015
Category 1Category:
Approval:
H I O'LOAN.Builder: Conditions: Payments:
8/03/2016 P J BLACKET.
REDBANKS SA 5502
Lot 65 Redbanks RoadApproved by Delegation
7/2015/220 18/09/2015 2,376 Redbanks Road REDBANKS
LOT: 138 ALT: Q HD: 1 PL: F216465 CT: 5664/652
Construction of a farm shed and
160,000 litre rain water tank
$48,000 Decision Issued 8/03/2016
Category 1Category:
Approval:
S J LIGHTFOOT $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$116.13 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$30.00 Certificate of Title Request
$1,542.75 Class 7 & 8
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 55 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
6/10/2015 G J GILBERT.
WINDSOR SA 5501
128 Gilberts RoadApproved by Delegation
7/2015/221 18/09/2015 Gilberts Road WINDSOR
ALT: S HD: 2 SEC: 346 PL: H140400 CT: 5273/488
Construction of a domestic
outbuilding - garage
$8,000 Decision Issued 6/10/2015
Category 1Category:
Approval:
G J GILBERT. $60.00 Planning Lodgement Fee (up to $5,000)
$87.38 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$6.58 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
Stormwater drained and retained onsiteP243
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
9/12/2015M A GREGORY
REEVES PLAINS SA 5502
Sec 94 Richter RoadApproved Private Certifier
7/2015/222 21/09/2015 303 Richter Road REEVES PLAINS
ALT: S HD: 3 SEC: 94 PL: H140800 CT: 5303/12
Construction of outbuilding - storage
shed
$20,900 Decision Issued 9/12/2015
Category 1Category:
Approval:
M A GREGORY $60.00 Planning Lodgement Fee (up to $5,000)
$203.89 Class 10
$5.15 Planning Fee DAC
$15.35 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$30.00 Certificate of Title Request
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
M CROSS.
BALAKLAVA SA 5461
PO Box 312
7/2015/223 24/09/2015 62 Mallala Road MALLALA
LOT: 90 ALT: A HD: 1 PL: D80481 CT: 6054/203
Construction of two bunkers for grain
storage
$900,000 Planning Assessment 24/09/2015
Category 1Category:
Approval:
M CROSS. $60.00 Planning Lodgement Fee (up to $5,000)
$68.00 Planning Lodgement Fee (over $5,000)
Builder: Conditions: Payments:
26/11/2015SELECTA HOMES & BUILDING
COMPANY
BURTON SA 5110
1-8 Deuter RoadPlanning Consent Only
7/2015/224 24/09/2015 7 Kestrel Crescent THOMPSON BEACH
LOT: 347 ALT: A HD: 2 PL: D031537 CT: 5142/847
Construction of a single storey
dwelling
$111,120 Decision Pending 11/01/2016
Category 1Category:
Approval:
SELECTA HOMES & BUILDING COMPANY $58.50 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$6.95 Planning Fee DAC
$169.00 Consultative Fee DAC
$66.50 Planning Lodgement Fee (over $5,000)
$39.00 Consultative Fee - Other
$131.95 Planning Fee (more than $100,001)
$38.90 Staged Consent Fee
$19.60 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
Page 56 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
5/11/2015 R VERBIS.
THOMPSON BEACH SA 5501
53 Sandpiper DriveApproved by Delegation
7/2015/225 30/09/2015 53 Sandpiper Drive THOMPSON BEACH
LOT: 70 ALT: A HD: 2 PL: D029513 CT: 5369/639
Shipping Container with Verandah for
Domestic Storage
$0 Decision Issued 5/11/2015
Category 1Category:
Approval:
R VERBIS. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
22/02/2016 J HARDER.
SALISBURY SA 5108
22 Harvey AveApproved Private Certifier
7/2015/226 30/09/2015 Shellgrit Road PORT GAWLER
LOT: 743 ALT: A HD: 3 PL: D89602 CT: 6099/269
Construction of 3 plastic covered
greenhouses and dam
$80,000 Decision Issued 22/02/2016
Category 1Category:
Approval:
J HARDER. $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
building non standard conditionBNS1
Builder: Conditions: Payments:
22/02/2016 V CHHIM.
DUBLIN SA 5501
22 Ruskin RoadApproved Private Certifier
7/2015/227 30/09/2015 Ruskin Road DUBLIN
LOT: 22 ALT: S HD: 2 PL: D88499 CT: 6090/419
Construction of 8 plastic covered
greenhouses,..... dam and packing
shed
$150,000 Decision Issued 22/02/2016
Category 1Category:
Approval:
V CHHIM. $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$9.38 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$178.12 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
22/02/2016 V CHHIM.
DUBLIN SA 5501
22 Ruskin RoadApproved Private Certifier
7/2015/227 30/09/2015 Ruskin Road DUBLIN
LOT: 22 ALT: S HD: 2 PL: D88499 CT: 6090/419
Construction of 8 plastic covered
greenhouses,..... dam and packing
shed
$150,000 Decision Issued 22/02/2016
Category 1Category:
Approval:
V CHHIM. $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$9.38 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$178.12 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 57 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
22/02/2016 V CHHIM.
DUBLIN SA 5501
22 Ruskin RoadApproved Private Certifier
7/2015/227 30/09/2015 Ruskin Road DUBLIN
LOT: 22 ALT: S HD: 2 PL: D88499 CT: 6090/419
Construction of 8 plastic covered
greenhouses,..... dam and packing
shed
$150,000 Decision Issued 22/02/2016
Category 1Category:
Approval:
V CHHIM. $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$9.38 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$178.12 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
27/10/2015 S A CHANDLER.
TWO WELLS SA 5501
Lot 32 Old Port Wakefield RoadApproved by Delegation
7/2015/228 1/10/2015 Old Port Wakefield Road TWO WELLS
LOT: 32 ALT: A HD: 3 PL: D94768 CT: 6147/583
Construction of domestic outbuilding
- storage shed
$3,500 Decision Issued 27/10/2015
Category 1Category:
Approval:
S A CHANDLER. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
in accordance with plans submittedP1
comply to conditions imposedP2
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
external surfaces painted durable paintP17
Stormwater drained and retained onsiteP243
Site ConditionsP242
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
7/12/2015 P J TOMNEY.
DUBLIN SA 5501
Harris RoadApproval Land Division
7/2015/229 2/10/2015 76 Harris Road DUBLIN
LOT: 151 ALT: S HD: 2 PL: D83415 CT: 6056/553
Land Division - one allotment into
two
$0 Decision Issued 7/12/2015
Category 1Category:
Approval:
P J TOMNEY. planning non standard conditionPNS1
planning non standard conditionPNS2
planning non standard conditionPNS3
in accordance with plans submittedP1
planning non standard conditionPNS4
Builder: Conditions: Payments:
9/11/2015ASPIRE HOMES
GAWLER SA 5118
55 Murray StreetPlanning Consent Only
7/2015/230 2/10/2015 Kay Avenue TWO WELLS
LOT: 35 ALT: A HD: 3 PL: D84941 CT: 6064/414
Construction of single storey dwelling
with garage under main roof
$245,000 Decision Pending 6/01/2016
Category 1Category:
Approval:
ASPIRE HOMES $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$15.22 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$289.03 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
dwelling connected to effluent systemP13
Vehicle AccessP236
provisional building rules consentP101
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
Page 58 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
29/03/2016P N LEAV
PORT GAWLER SA 5501
Lot 13 Port Gawler RoadApproved Private Certifier
7/2015/231 2/10/2015 Shellgrit Road PORT GAWLER
LOT: 741 ALT: A HD: 3 PL: D89602 CT: 6099/267
Construction of 15 plastic covered
greenhouses, 3 dams and... a
packing shed
$25,000 Decision Issued 29/03/2016
Category 2Category:
Approval:
P N LEAV $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$15.63 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$296.87 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
29/03/2016P N LEAV
PORT GAWLER SA 5501
Lot 13 Port Gawler RoadApproved Private Certifier
7/2015/231 2/10/2015 Shellgrit Road PORT GAWLER
LOT: 741 ALT: A HD: 3 PL: D89602 CT: 6099/267
Construction of 15 plastic covered
greenhouses, 3 dams and... a
packing shed
$25,000 Decision Issued 29/03/2016
Category 2Category:
Approval:
P N LEAV $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$15.63 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$296.87 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
29/03/2016P N LEAV
PORT GAWLER SA 5501
Lot 13 Port Gawler RoadApproved Private Certifier
7/2015/231 2/10/2015 Shellgrit Road PORT GAWLER
LOT: 741 ALT: A HD: 3 PL: D89602 CT: 6099/267
Construction of 15 plastic covered
greenhouses, 3 dams and... a
packing shed
$25,000 Decision Issued 29/03/2016
Category 2Category:
Approval:
P N LEAV $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$15.63 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$296.87 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
28/01/2016 RIVERGUM HOMES PTY LTD.
TORRENSVILLE SA 5031
PO Box 191Approved Private Certifier
7/2015/232 6/10/2015 7 Thompson's Beach Road THOMPSON BEACH
LOT: 224 ALT: A HD: 2 PL: D029513 CT: 5119/929
Construction of two storey dwelling
with garage under main roof
$240,627 Decision Issued 28/01/2016
Category 1Category:
Approval:
RIVERGUM HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$15.04 Planning Fee DAC
$173.00 Consultative Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$40.00 Consultative Fee - Other
$285.74 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
Page 59 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
16/12/2015A W RICKARDS
LEWISTON SA 5501
40 Pederick RoadApproved by Delegation
7/2015/233 7/10/2015 40 Pederick Road LEWISTON
LOT: 62 ALT: A HD: 3 PL: D021995 CT: 5235/857
Construction of a shed $9,500 Decision Issued 16/12/2015
Category 1Category:
Approval:
A W RICKARDS $60.00 Planning Lodgement Fee (up to $5,000)
$74.02 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$5.58 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
floor level no less than 2.3 metresP181
planning non standard conditionPNS1
approved for domestic purposes onlyP9
Stormwater disposalB33
Builder: Conditions: Payments:
9/11/2015 R & M TIMBER.
WILLASTON SA 5118
PO Box 71Approved by Delegation
7/2015/234 8/10/2015 5 Cockatoo Road LEWISTON
LOT: 91 ALT: A HD: 3 PL: D020952 CT: 5138/807
Construction of a verandah $3,983 Decision Issued 9/11/2015
Category 1Category:
Approval:
R & M TIMBER. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$4.15 Building - DAC
$10.00 Building Rules Consent Only Fee
$37.50 Building Rules Consent Only Fee
$2.50 DAC - Building Rules Consent Only Fee
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
11/02/2016 RIVERGUM HOMES PTY LTD.
TORRENSVILLE SA 5031
PO Box 191Approved Private Certifier
7/2015/235 12/10/2015 12 Artesian Road TWO WELLS
LOT: 202 ALT: A HD: 3 PL: D029726 CT: 5408/674
Construction of a single storey
dwelling
$186,258 Decision Issued 11/02/2016
Category 1Category:
Approval:
RIVERGUM HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$11.65 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$221.17 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
provisional building rules consentP101
Vehicle AccessP236
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
Page 60 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
10/11/2015 ALPHA INDUSTRIES.
CAVAN SA 5094
12 STOCK ROADApproved by Delegation
7/2015/236 9/10/2015 7 Wasleys Road MALLALA
LOT: 620 ALT: A HD: 1 PL: F175087 CT: 6021/528
Construction of Shed $8,270 Decision Issued 10/11/2015
Category 1Category:
Approval:
ALPHA INDUSTRIES. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
external surfaces painted durable paintP17
Site ConditionsP242
Stormwater drained and retained onsiteP243
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
23/12/2015 A POLE.
THOMPSON BEACH SA 5501
1 The EsplanadeApproved by Delegation
7/2015/237 15/10/2015 1 The Esplanade THOMPSON BEACH
LOT: 301 ALT: A HD: 2 PL: D031537 CT: 5346/926
Construction of elevated single
storey dwelling
$40,000 Decision Issued 23/12/2015
Category 1Category:
Approval:
A POLE. $60.00 Planning Lodgement Fee (up to $5,000)
$52.59 Class 10
$438.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$173.00 Consultative Fee DAC
$11.17 Building - DAC
$3.96 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$40.00 Consultative Fee - Other
$148.33 Class 1, 2 & 4
certificate building indemnity insuranceB7
in accordance with plans submittedP1
comply to conditions imposedP2
dwelling connected to effluent systemP13
finished floor level not less 700mmP18
external surfaces painted durable paintP17
no other egress shall be createdP40
water storage tank 22400 litresP174
Vehicle AccessP236
Site ConditionsP242
Stormwater drained and retained onsiteP243
planning non standard conditionPNS1
planning non standard conditionPNS2
approval remove native vegetationP100
provisional building rules consentP101
Waste containmentB19
On site toilet facilityB20
building non standard conditionBNS1
building non standard conditionBNS2
building non standard conditionBNS3
building non standard conditionBNS4
building non standard conditionBNS5
Builder: Conditions: Payments:
Page 61 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
22/02/2016T TRAN
TWO WELLS SA 5501
Lot 8 Bailey Road WestApproved Private Certifier
7/2015/238 19/10/2015 Bailey Road West TWO WELLS
LOT: 8 ALT: S HD: 3 PL: D93213 CT: 6135/132
Construction of 2 greenhouses,
packing shed and water storage dam
$80,000 Decision Issued 22/02/2016
Category 2Category:
Approval:
T TRAN $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
$30.00 Certificate of Title Request
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
21/12/2015J L VERNER
REDBANKS SA 5502
Hall RoadApproved Private Certifier
7/2015/239 20/10/2015 1,520 Germantown Road REDBANKS
ALT: S HD: 1 SEC: 45 PL: H140500 CT: 5469/566
Construction of Grain Storage shed $95,000 Decision Issued 22/12/2015
Category 1Category:
Approval:
J L VERNER $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
external walls of building subduedP6
external walls maintained in good condP7
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
21/04/2016OASIS TRANSPORTABLE
BUILDINGS & HOMES PTY LTD.
SMITHFIELD 5114
PO BOX 169Approved Private Certifier
7/2015/240 19/10/2015 211 Dawkins Road LEWISTON
LOT: 472 ALT: A HD: 3 PL: F174939 CT: 5356/966
Construction of transportable
dwelling (dependent
accommodation)
$0 Decision Issued 21/04/2016
Category 1Category:
Approval:
OASIS TRANSPORTABLE BUILDINGS & HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
15/12/2015CONSTRUCTION SERVICES
AUSTRALIA PTY LTD
HACKNEY SA 5069
25 NORTH TERRACEApproved Private Certifier
7/2015/241 22/10/2015 22 Jean Avenue TWO WELLS
LOT: 20 ALT: A HD: 3 PL: D92086 CT: 6117/279
Construction of single storey dwelling
with garage under main roof
$210,534 Decision Issued 15/12/2015
Category 1Category:
Approval:
CONSTRUCTION SERVICES AUSTRALIA PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$427.00 Septic Tank application Fee
$13.16 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$250.01 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
Page 62 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
10/11/2015C J LEMM
TWO WELLS SA 5501
2 Trim RoadApproved by Delegation
7/2015/242 21/10/2015 2A Trim Road TWO WELLS
LOT: 120 ALT: A HD: 3 PL: D84395 CT: 6063/679
Construction of outbuilding - storage
shed
$6,200 Decision Issued 10/11/2015
Category 1Category:
Approval:
C J LEMM $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
16/03/2016DECHELLIS HOMES PTY LTD
Evandale SA 5069
170 Payneham RoadApproved Private Certifier
7/2015/243 22/10/2015 13 Milbourne Court LEWISTON
LOT: 313 ALT: A HD: 3 PL: D94528 CT: 6146/885
Construction of single storey dwelling
with garage under main roof
$224,895 Decision Issued 16/03/2016
Category 1Category:
Approval:
DECHELLIS HOMES PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$14.06 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$267.06 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
18/02/2016PLANNING CHAMBERS PTY LTD
Adelaide SA 5000
Halifax Street
PO Box 6196Approved by Delegation
7/2015/244 27/10/2015 294 Hayman Road LEWISTON
LOT: 119 ALT: A HD: 3 PL: D017603 CT: 5390/203
Construction of outbuilding - storage
shed and relocation of...... existing
outbuilding - shipping container in
Development Authorisation
312/3/2013
$5,000 Decision Issued 18/02/2016
Category 1Category:
Approval:
PLANNING CHAMBERS PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$2.60 Planning Fee DAC
$4.15 Building - DAC
$48.90 Planning Fee Non-Complying
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
Builder: Conditions: Payments:
10/11/2015K E BURFORD
TWO WELLS SA 5501
Lot 1 Windmill RoadApproved by Delegation
7/2015/245 27/10/2015 34 Windmill Road TWO WELLS
LOT: 1 ALT: A HD: 3 PL: F006893 CT: 5117/775
Removal of transportable dwelling $10,000 Decision Issued 10/11/2015
Category 1Category:
Approval:
K E BURFORD $60.00 Planning Lodgement Fee (up to $5,000)
$4.15 Building - DAC
$61.35 Class 1, 2 & 4
building non standard conditionBNS1Builder: Conditions: Payments:
7/03/2016MCARDLE PROJECTS
MALLALA SA 5502
PO BOX 151Approved Private Certifier
7/2015/246 29/10/2015 44 The Esplanade PARHAM
LOT: 103 ALT: A HD: 2 PL: T140402 CT: 5992/591
Second storey addition to single
storey dwelling
$120,000 Information Further Clarificat 7/04/2016
Category 1Category:
Approval:
MCARDLE PROJECTS $60.00 Planning Lodgement Fee (up to $5,000)
$7.50 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$142.50 Planning Fee (more than $100,001)
in accordance with plans submittedP1
external materials to match existing bldP12
Dwelling occupation requirementsB69
Waste containmentB19
Builder: Conditions: Payments:
Page 63 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
23/11/2015M S LEVER
LEWISTON SA 5501
Lot 21 Germantown RoadApproved by Delegation
7/2015/247 29/10/2015 54 Germantown Road LEWISTON
LOT: 21 HD: 3 PL: D85982 CT: 6074/452
Construction of Verandah $8,500 Decision Issued 23/11/2015
Category 1Category:
Approval:
M S LEVER $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
15/01/2016LONGRIDGE GROUP
MILE END SA 5031
158 Railway TerraceApproved Private Certifier
7/2015/248 29/10/2015 31 The Esplanade THOMPSON BEACH
LOT: 316 ALT: A HD: 2 PL: D031537 CT: 5173/199
Construction of two storey dwelling $163,362 Wall Framing Inspection 18/05/2016
Category 1Category:
Approval:
LONGRIDGE GROUP $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$10.38 Planning Fee DAC
$173.00 Consultative Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$40.00 Consultative Fee - Other
$197.19 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
18/12/2015FAIRMONT HOMES GROUP PTY LTD
ADELAIDE SA 5000
21 - 24 North TerraceApproved Private Certifier
7/2015/249 29/10/2015 14 Kathleen Road TWO WELLS
LOT: 150 ALT: A HD: 3 PL: D72778 CT: 6002/863
Construction of single storey dwelling
with garage under main roof
$255,000 Wall Framing Inspection 20/05/2016
Category 1Category:
Approval:
FAIRMONT HOMES GROUP PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$15.94 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$302.81 Planning Fee (more than $100,001)
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
Vehicle AccessP236
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
provisional building rules consentP101
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
21/12/2015D J HEARNE
DUBLIN SA 5501
Sec 330 Old Dublin RoadApproval Land Division
7/2015/250 3/11/2015 136 Long Plains Road DUBLIN
ALT: S HD: 2 SEC: 330 PL: H140400 CT: 5663/17
Land Division - one allotment into
two
$0 Decision Issued 21/12/2015
Category 1Category:
Approval:
HENNIG & CO PTY LTD in accordance with plans submittedP1Builder: Conditions: Payments:
Page 64 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
TELSTRA CORPORATION.
CRAFERS SA 5152
PO Box 138
C/- SK Planning Pty Ltd
7/2015/251 30/10/2015 Horseshoe Crescent TWO WELLS
LOT: 138 ALT: A HD: 3 PL: F162487 CT: 5520/894
Construction of telecommunications
facility
$125,000 Additional Information Plannin 30/11/2015
Category 3Category:
Approval:
TELSTRA CORPORATION. $60.00 Planning Lodgement Fee (up to $5,000)
$7.82 Planning Fee DAC
$350.00 Advertising Fee
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$103.00 Category 2 Fee
$148.43 Planning Fee (more than $100,001)
Builder: Conditions: Payments:
18/12/2015Metal As Anything
KADINA SA 5554
3-5 Price StreetApproved by Delegation
7/2015/252 30/10/2015 53 Wasleys Road MALLALA
LOT: 512 ALT: A HD: 1 PL: D050336 CT: 5731/983
Construction of farm shed $141,200 Decision Issued 18/12/2015
Category 1Category:
Approval:
Metal As Anything $60.00 Planning Lodgement Fee (up to $5,000)
$7.50 Planning Fee DAC
$169.35 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$142.50 Planning Fee (more than $100,001)
$2,249.85 Class 7 & 8
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
Builder: Conditions: Payments:
AUSTRALIAN OUTDOOR LIVING.
WEST LAKES SA 5021
PO Box 7361
7/2015/253 2/11/2015 31 Pederick Road LEWISTON
LOT: 102 ALT: A HD: 3 PL: D027763 CT: 5073/325
Construction of swimming pool and
safety fence
$39,460 Swim Pool Fence Inspection 21/12/2015
Category 1Category:
Approval:
AUSTRALIAN OUTDOOR LIVING. $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$179.00 Swimming Pool Lodgement Fee
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
planning non standard conditionPNS2
Builder: Conditions: Payments:
16/11/2015 T B PALMER.
TWO WELLS SA 5501
19 Germantown RoadApproved by Delegation
7/2015/254 2/11/2015 19 Germantown Road TWO WELLS
LOT: 50 ALT: A HD: 3 PL: D054093 CT: 5781/91
Construction of outbuilding - storage
shed
$10,670 Decision Issued 16/11/2015
Category 1Category:
Approval:
T B PALMER. $60.00 Planning Lodgement Fee (up to $5,000)
$137.64 Class 10
$5.15 Planning Fee DAC
$7.24 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external walls maintained in good condP7
external walls of building subduedP6
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
29/02/2016MALAVON NOMINEES PTY LTD
MALLALA SA 5502
Farrelly Roadwithdrawn Application
7/2015/255 3/11/2015 121 Farrelly Road MALLALA
LOT: 641 ALT: A HD: 1 PL: F175108 CT: 5406/462
549 Davies Road MALLALA
LOT: 1 ALT: A HD: 1 PL: D028870 CT: 5176/148
Land Division - boundary realignment
- Non-complying - WITHDRAWN
$0 Planning Assessment 3/11/2015
Category 1Category:
Approval:
MALAVON NOMINEES PTY LTDBuilder: Conditions: Payments:
Page 65 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
D J HUNTER
TWO WELLS SA 5501
Lot 13 Coats Road
7/2015/256 2/11/2015 18C Coats Road TWO WELLS
LOT: 13 ALT: A HD: 3 PL: D93865 CT: 6139/775
Construction of outbuilding - garage $9,000 Additional Information Buildin 14/01/2016
Category 1Category:
Approval:
D J HUNTER $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
metal cladding on roof to be colourbondP3
external surfaces of building paintedP4
iron clad buildings to be colourbondP5
external walls maintained in good condP7
external appearance maintainedP10
approved for domestic purposes onlyP9
Site ConditionsP242
Builder: Conditions: Payments:
7/12/2015 TREVOR JOHN AND ASSOCIATES.
GLEN OSMOND SA 5064
367 Glen Osmond RoadApproved by Delegation
7/2015/257 5/11/2015 Port Wakefield Road LOWER LIGHT
LOT: 92 ALT: A HD: 2 PL: F175374 CT: 6118/182
Construction of outbuilding - storage
shed
$8,000 Decision Issued 7/12/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
floor level no less than 2.3 metresP181
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
3/02/2016BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadPlanning Consent Only
7/2015/258 5/11/2015 16 Cavallaro Place LEWISTON
LOT: 8 HD: 3 PL: D80783 CT: 6037/842
Construction of gable barn shed -
mixed use domestic storage &.....
horse stable, and keeping of 3
horses
$15,000 Planning Assessment 8/03/2016
Category 2Category:
Approval:
C W TORNEY $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Stormwater disposalB33
Builder: Conditions: Payments:
10/11/2015 M E ROACH.
LEWISTON SA 5501
Lot 58 Hayman RoadApproved by Delegation
7/2015/259 5/11/2015 Hayman Road LEWISTON
LOT: 58 HD: 3 PL: D89849 CT: 6098/306
Horse Keeping (2 horses) and
associated day yards
$0 Decision Issued 10/11/2015
Category 1Category:
Approval:
M E ROACH. $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
in accordance with plans submittedP1
certificate from licensed surveyorP183
Builder: Conditions: Payments:
Page 66 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
18/12/2015A E WEBB
TWO WELLS SA 5501
21 Hayman RoadApproved by Delegation
7/2015/260 5/11/2015 21 Hayman Road TWO WELLS
LOT: 2 ALT: A HD: 3 PL: F001980 CT: 5338/638
Construction of outbuilding - storage
shed
$12,600 Decision Issued 18/12/2015
Category 1Category:
Approval:
A E WEBB $60.00 Planning Lodgement Fee (up to $5,000)
$131.07 Class 10
$5.15 Planning Fee DAC
$9.87 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
floor level no less than 2.3 metresP181
planning non standard conditionPNS1
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
J P JONES
LEWISTON SA 5501
98 Dawkins Road
7/2015/261 9/11/2015 98 Dawkins Road LEWISTON
LOT: 7 ALT: A HD: 3 PL: D031412 CT: 5138/554
Construction of Carport $5,000 Decision Issued 18/12/2015
Category 1Category:
Approval:
J P JONES $60.00 Planning Lodgement Fee (up to $5,000)
$96.29 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$7.24 Building - DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
1/03/2016 S SALVEMINI.
MALLALA SA 5502
PO Box 95Approved by Delegation
7/2015/262 9/11/2015 30 Harris Road DUBLIN
ALT: S HD: 2 SEC: 279 PL: H140400 CT: 5662/394
Harris Road DUBLIN
LOT: 10 ALT: S HD: 2 PL: D111819 CT: 6169/296
Construction of three stables and
horse keeping - 2 horses
$5,000 Decision Issued 1/03/2016
Category 1Category:
Approval:
S SALVEMINI. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
planning non standard conditionPNS1
Stormwater disposalB33
Builder: Conditions: Payments:
16/03/2016M B COOMBE
TWO WELLS SA 5501
5 Fertile AvenueApproval Land Division
7/2015/263 9/11/2015 5 Fertile Avenue TWO WELLS
LOT: 7 ALT: A HD: 3 PL: D006229 CT: 5321/310
Land Division - one allotment into
two
$0 Decision Issued 16/03/2016
Category 1Category:
Approval:
HENNIG & CO PTY LTD in accordance with plans submittedP1Builder: Conditions: Payments:
Page 67 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
27/04/2016J WASHINGTON
REDBANKS SA 5502
1806 Redbanks RoadApproved Private Certifier
7/2015/264 11/11/2015 Gawler Road REDBANKS
LOT: 17 ALT: Q HD: 1 PL: D80667 CT: 6043/877
Construction of Dwelling - Inground
Cellar - Separate Garage and
Alfresco Area - Outbuilding and
Rainwater Tanks
$365,000 Decision Issued 27/04/2016
Category 1Category:
Approval:
J WASHINGTON $60.00 Planning Lodgement Fee (up to $5,000)
$23.27 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$441.98 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Vehicle AccessP236
dwelling connected to effluent systemP13
external walls of building subduedP6
approved for domestic purposes onlyP9
provisional building rules consentP101
Builder: Conditions: Payments:
10/05/2016 JBG ARCHITECTS.
TANUNDA SA 5352
38 Murray StreetApproved by Delegation
7/2015/265 11/11/2015 121 The Esplanade THOMPSON BEACH
LOT: 162 ALT: A HD: 2 PL: D029513 CT: 5370/481
Construction of single story dwelling
on poles and outbuilding- garage
$200,000 Decision Issued 10/05/2016
Category 1Category:
Approval:
UNDERWOOD BUILDING. $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$12.50 Planning Fee DAC
$173.00 Consultative Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$40.00 Consultative Fee - Other
$237.50 Planning Fee (more than $100,001)
in accordance with plans submittedP1
provisional building rules consentP101
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
water storage tank 22400 litresP174
finished floor level not less 700mmP18
comply to conditions imposedP2
Vehicle AccessP236
Site ConditionsP242
Stormwater drained and retained onsiteP243
no other egress shall be createdP40
planning non standard conditionPNS1
planning non standard conditionPNS2
Inspection of building workB5
certificate building indemnity insuranceB7
Building good & workmanlike mannerB2
Boundary locationB18
footing construction & designB4
Termite managementB60
Manufacturers RecommendationB63
Dwelling occupation requirementsB69
Asbestos demolition, transport and dispoB84
Exit doors protected with bollardsB98
building non standard conditionBNS1
building non standard conditionBNS2
building non standard conditionBNS3
Builder: Conditions: Payments:
Page 68 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
8/12/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/266 11/11/2015 10 Gameau Road TWO WELLS
LOT: 6 ALT: A HD: 3 PL: D064975 CT: 5919/336
Construction of verandah $10,000 Approved by Private Certifier 12/01/2016
Category 1Category:
Approval:
S D O'CALLAHAN. $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$68.00 Planning Lodgement Fee (over $5,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
23/11/2015A W LAIRD
MALLALA SA 5502
Lot 22 Butler StreetApproved by Delegation
7/2015/267 16/11/2015 30 Butler Street MALLALA
LOT: 22 ALT: A HD: 1 PL: D93594 CT: 6137/314
Construction of Verandah $3,713 Decision Issued 23/11/2015
Category 1Category:
Approval:
A W LAIRD $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$30.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Stormwater disposalB33
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
5/05/2016FAIRMONT HOMES GROUP PTY LTD
ADELAIDE SA 5000
21 - 24 North TerraceApproved Private Certifier
7/2015/268 16/11/2015 98 Frost North Road LEWISTON
LOT: 2 ALT: A HD: 3 PL: F156341 CT: 5284/250
Construction of Dwelling $226,136 Decision Issued 5/05/2016
Category 1Category:
Approval:
FAIRMONT HOMES GROUP PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$14.14 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$268.53 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
Page 69 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
16/12/2015 B BRAVINGTON.
LEWISTON SA 5501
33 Bethesda RoadApproved by Delegation
7/2015/269 16/11/2015
LOT: 15 ALT: S HD: 3 PL: D77219 CT: 6012/581
Construction of Shed for Domestic
Storage
$9,000 Decision Issued 16/12/2015
Category 1Category:
Approval:
ALPHA INDUSTRIES. $60.00 Planning Lodgement Fee (up to $5,000)
$92.85 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$6.99 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
29/03/2016V KHATH
PARALOWIE SA 5108
22 Belmar StreetApproved Private Certifier
7/2015/270 16/11/2015 Shellgrit Road PORT GAWLER
LOT: 742 ALT: A HD: 3 PL: D89602 CT: 6099/268
Six plastic covered
greenhouses,....... & one water
storage dam
$100,000 Decision Issued 29/03/2016
Category 1Category:
Approval:
V KHATH $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
17/03/2016D W WOULLEMAN
TWO WELLS SA 5501
Lot 21 Jean AvenueApproved by Delegation
7/2015/271 16/11/2015 20 Jean Avenue TWO WELLS
LOT: 21 ALT: A HD: 3 PL: D92086 CT: 6117/280
Construction of outbuilding - storage
shed
$8,000 Decision Issued 17/03/2016
Category 1Category:
Approval:
D W WOULLEMAN $60.00 Planning Lodgement Fee (up to $5,000)
$72.81 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$5.49 Building - DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Site ConditionsP242
Stormwater drained and retained onsiteP243
external walls of building subduedP6
planning non standard conditionPNS1
Stormwater disposalB33
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
16/12/2015 J N NORRIS.
TWO WELLS SA 5501
16 Glover RoadApproved by Delegation
7/2015/272 16/11/2015 16 Glover Road TWO WELLS
LOT: 3 ALT: A HD: 3 PL: D90576 CT: 6104/710
Construction of Swimming Pool and
Safety Fence
$2,000 Decision Issued 16/12/2015
Category 1Category:
Approval:
J N NORRIS. $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$4.15 Building - DAC
$179.00 Swimming Pool Lodgement Fee
Swimming pool safety barriersB35
Inspection of building workB5
building non standard conditionBNS1
Swimming Pool Backwash DisposalB74
Builder: Conditions: Payments:
Page 70 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
16/03/2016 J R MARSH.
TWO WELLS SA 5501
Lot 17 Mallee CourtApproved by Delegation
7/2015/273 19/11/2015 4 Mallee Court TWO WELLS
LOT: 17 ALT: A HD: 3 PL: D95828 CT: 6153/552
Construction of outbuilding - garage $17,620 Decision Issued 16/03/2016
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$109.10 Class 10
$5.15 Planning Fee DAC
$5.74 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
15/02/2016SELECTA HOMES & BUILDING
COMPANY
BURTON SA 5110
1-8 Deuter RoadApproved Private Certifier
7/2015/274 19/11/2015 Bubner Road DUBLIN
LOT: 716 HD: 2 PL: D81477 CT: 6042/430
Construction of Dwelling $149,100 Decision Issued 15/02/2016
Category 1Category:
Approval:
SELECTA HOMES & BUILDING COMPANY $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$9.32 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$177.06 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
provisional building rules consentP101
dwelling connected to effluent systemP13
comply to conditions imposedP2
Vehicle AccessP236
Site ConditionsP242
existing trees to be protectedP51
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
18/12/2015 N P BAKER.
MALLALA SA 5502
26 Butler StreetApproved by Delegation
7/2015/275 19/11/2015 26 Butler Street MALLALA
LOT: 21 ALT: A HD: 1 PL: D93594 CT: 6137/313
Construction of Verandah $4,717 Decision Issued 18/12/2015
Category 1Category:
Approval:
STRATCO $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$30.00 Certificate of Title Request
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
building non standard conditionBNS1
Stormwater disposalB33
Builder: Conditions: Payments:
Page 71 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
18/05/2016KOTZUR PTY LTD
WALLA WALLA NSW 2659
Commercial StreetApproved Private Certifier
7/2015/276 1/12/2015 Carslake Road DUBLIN
LOT: 11 ALT: A HD: 2 PL: D019148 CT: 5452/708
Bulk grain storage and export facility
comprising... silos and associated
plant, storage containers,
weighbridge, office and control room,
car park, advertising sign,
landscaping and ancillary site works
$4,100,000 Decision Issued 18/05/2016
Category 2Category:
Approval:
KOTZUR PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$256.25 Planning Fee DAC
$317.00 Consultative Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$40.00 Consultative Fee - Other
$4,868.75 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
A M JONES.
LEWISTON SA 5501
Lot 203 Pederick Road
7/2015/277 25/11/2015 Pederick Road LEWISTON
LOT: 203 ALT: A HD: 3 PL: D83809 CT: 6065/500
Construction of Domestic Storage
Shed
$20,000 Decision Issued 21/01/2016
Category 1Category:
Approval:
A M JONES. $60.00 Planning Lodgement Fee (up to $5,000)
$218.45 Class 10
$5.15 Planning Fee DAC
$16.45 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Stormwater disposalB33
Builder: Conditions: Payments:
24/11/2015C GEORGOPOULOS
TWO WELLS SA 5501
21 Garden AvenueApproved by Delegation
7/2015/278 23/11/2015 21 Garden Avenue TWO WELLS
LOT: 3 ALT: A HD: 3 PL: D023208 CT: 5148/119
Demolition of dwelling $0 Decision Issued 24/11/2015
Building Rules Consent OnlyCategory:
Approval:
C GEORGOPOULOS $60.00 Planning Lodgement Fee (up to $5,000)
$4.15 Building - DAC
$61.35 Class 1, 2 & 4
Asbestos demolition, transport and dispoB84
in accordance with plans submittedP1
Builder: Conditions: Payments:
4/02/2016D O'DONNELL
ANDREWS FARM SA 5114
30 Crawford GroveApproved by Delegation
7/2015/279 25/11/2015 58 Dublin Road MALLALA
LOT: 61 ALT: A HD: 1 PL: D78729 CT: 6031/28
Construction of Verandah $11,500 Referral Katnich Dodd 4/04/2016
Category 1Category:
Approval:
D O'DONNELL $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$5.15 Planning Fee DAC
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$30.00 Certificate of Title Request
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 72 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
18/12/2015 L P ABALOS.
SALISBURY SA 5108
22 Harvey AvenuePlanning Consent Only
7/2015/280 25/11/2015 Shellgrit Road PORT GAWLER
LOT: 743 ALT: A HD: 3 PL: D89602 CT: 6099/269
Construction of 3 plastic covered
greenhouses and 1 water storage
dam
$80,000 Decision Pending 11/02/2016
Category 1Category:
Approval:
L P ABALOS. $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
18/12/2015BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadPlanning Consent Only
7/2015/281 3/12/2015 6 Williams Road TWO WELLS
LOT: 53 ALT: A HD: 3 PL: D006683 CT: 5621/434
Construction of a verandah $11,000 Decision Pending 12/01/2016
Category 1Category:
Approval:
M A FRANK. $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Site ConditionsP242
Stormwater drained and retained onsiteP243
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
16/05/2016STERLING HOMES PTY LTD
ALLENBY GARDENS SA 5009
110-114 GRANGE ROADPlanning Consent Only
7/2015/282 2/12/2015 17 Dawkins Road TWO WELLS
LOT: 701 ALT: A HD: 3 PL: D078947 CT: 6021/867
Construction of single storey dwelling
with garage and alfresco under. main
roof
$209,295 Planning Assessment 16/05/2016
Category 1Category:
Approval:
STERLING HOMES PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$13.09 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$248.53 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
21/12/2015 E S AYERS.
TWO WELLS SA 5501
5 Buckland Park RoadApproved by Delegation
7/2015/283 3/12/2015 5 Buckland Park Road TWO WELLS
LOT: 3 ALT: A HD: 3 PL: D041466 CT: 5253/913
Construction of an outbuilding -
garage
$7,840 Decision Issued 21/12/2015
Category 1Category:
Approval:
OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external walls of building subduedP6
external walls maintained in good condP7
floor level no less than 2.3 metresP181
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 73 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
ALLSTEEL TRANSPORTABLES
ELIZABETH WEST SA 5113
40 Barfield Crescent
7/2015/284 3/12/2015 130 Dawkins Road LEWISTON
LOT: 50 ALT: A HD: 3 PL: 15070 CT: 5696/933
Demolition of existing dwelling and
construction of detached dwelling
$191,987 Health Assessment 9/02/2016
Category 1Category:
Approval:
ALLSTEEL TRANSPORTABLES $60.00 Planning Lodgement Fee (up to $5,000)
$11.37 Class 10
$12.00 Planning Fee DAC
$34.77 Building - DAC
$0.86 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
$227.98 Planning Fee (more than $100,001)
$461.93 Class 1, 2 & 4
in accordance with plans submittedP1
provisional building rules consentP101
dwelling connected to effluent systemP13
external surfaces painted durable paintP17
water storage tank 22400 litresP174
comply to conditions imposedP2
Vehicle AccessP236
Fire fighting water tankP238
Site ConditionsP242
Stormwater drained and retained onsiteP243
existing trees to be protectedP51
Builder: Conditions: Payments:
28/01/2016BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/285 7/12/2015 170 Hayman Road LEWISTON
LOT: 100 ALT: A HD: 3 PL: D053847 CT: 5755/507
Construction of a verandah $6,000 Decision Issued 28/01/2016
Category 1Category:
Approval:
ADELAIDE FENCING & STEEL SUPPLIES $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$68.00 Planning Lodgement Fee (over $5,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
provisional building rules consentP101
Builder: Conditions: Payments:
V M HA
PARALOWRIE SA 5108
26 Brazil Drive
7/2015/286 7/12/2015 587C Ellis Road TWO WELLS
LOT: 4 ALT: A HD: 3 PL: D013832 CT: 6099/237
Construction of 4 plastic covered
greenhouses, a water storage dam....
and a storage shed
$80,000 Planning Assessment 7/12/2015
Category 1Category:
Approval:
V M HA $60.00 Planning Lodgement Fee (up to $5,000)
$214.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
21/12/2015K J ECKERMANN
LEWISTON SA 5501
72 Bethesda RoadApproved by Delegation
7/2015/287 7/12/2015 72 Bethesda Road LEWISTON
LOT: 38 ALT: A HD: 3 PL: D019441 CT: 5275/878
Construction of Carport $1,500 Decision Issued 21/12/2015
Category 1Category:
Approval:
K J ECKERMANN $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
Page 74 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
7/03/2016BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/288 7/12/2015 Pederick Road LEWISTON
LOT: 206 ALT: A HD: 3 PL: D83809 CT: 6065/503
Construction of outbuilding - storage
shed
$17,500 Decision Issued 15/03/2016
Category 1Category:
Approval:
M L HARRIS. $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$68.00 Planning Lodgement Fee (over $5,000)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external walls of building subduedP6
external walls maintained in good condP7
approved for domestic purposes onlyP9
Builder: Conditions: Payments:
N CIRILLO
TWO WELLS SA 5501
17 Gawler River Road
7/2015/289 7/12/2015 17 Gawler River Road TWO WELLS
LOT: 6 ALT: A HD: 3 PL: D006094 CT: 5726/737
Construction of ten plastic covered
greenhouses, water storage dam and
hardstand area (Non-complying)
$100,000 Planning Assessment 7/12/2015
Category 1Category:
Approval:
N CIRILLO $60.00 Planning Lodgement Fee (up to $5,000)
$109.80 Planning Fee DAC
$5.15 Planning Fee DAC
$6.10 Planning Fee DAC
$350.00 Advertising Fee
$68.00 Planning Lodgement Fee (over $5,000)
$103.00 Category 2 Fee
$115.90 Planning Fee Non-Complying
$96.50 Planning Fee Non-Complying
$12.20 Planning Fee Non-Complying
$97.85 Planning Fee ($10,000-$100,000)
$28.50 Staged Consent Fee
$11.40 Staged Consent Fee
$20.10 Staged Consent Fee DAC
Builder: Conditions: Payments:
8/12/2015B JOHNSON
GAWLER BELT SA 5118
22 Kentish RoadApproval Bulding Consent
7/2015/290 7/12/2015 182 Nairn Road GRACE PLAINS
ALT: S HD: 1 SEC: 486 PL: H140500 CT: 5496/450
Nairn Road GRACE PLAINS
LOT: 14 ALT: S HD: 1 PL: D95580 CT: 6167/931
Demolition of Dwelling and Shed $11,000 Decision Issued 8/12/2015
Building Rules Consent OnlyCategory:
Approval:
B JOHNSON $60.00 Planning Lodgement Fee (up to $5,000)
$4.15 Building - DAC
$47.50 Building Rules Consent Only Fee
$2.50 DAC - Building Rules Consent Only Fee
$61.35 Class 1, 2 & 4
Asbestos demolition, transport and dispoB84Builder: Conditions: Payments:
5/05/2016DISTRICT COUNCIL OF MALLALA
MALLALA SA 5502
2A Wasleys RoadApproved by Delegation
7/2015/291 14/12/2015 North Terrace PARHAM
LOT: 1 ALT: A HD: 2 PL: D029502 CT: 5753/646
Upgrade to existing coastal levee $52,200 Decision Issued 5/05/2016
Category 1Category:
Approval:
DISTRICT COUNCIL OF MALLALABuilder: Conditions: Payments:
16/12/2015C M KLUSKE
REDBANKS SA 5502
Sec 99 Wasleys RoadApproved by Delegation
7/2015/292 15/12/2015 347 Woolsheds Road REDBANKS
ALT: S HD: 1 SEC: 227 PL: H140500 CT: 5886/227
Demolition of fire damaged buildings
- 2 dwellings and 5 outbuildings
$4,000 Decision Issued 16/12/2015
Category 1Category:
Approval:
C M KLUSKE $60.00 Planning Lodgement Fee (up to $5,000)Demolition of structureB83
Asbestos demolition, transport and dispoB84
Builder: Conditions: Payments:
Page 75 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
21/04/2016LONGRIDGE GROUP
MILE END SA 5031
158 Railway TerraceApproved Private Certifier
7/2015/293 16/12/2015 Germantown Road LEWISTON
LOT: 24 HD: 3 PL: D89231 CT: 6094/947
Construction of detached dwelling,
pergola and outbuilding - garage
$234,415 Decision Issued 21/04/2016
Category 1Category:
Approval:
LONGRIDGE GROUP $60.00 Planning Lodgement Fee (up to $5,000)
$14.65 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$278.36 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1
Dwelling occupation requirementsB69
Waste containmentB19
On site toilet facilityB20
Builder: Conditions: Payments:
28/01/2016J L COLLINS
TWO WELLS SA 5501
Lot 202 Bailey RoadApproved by Delegation
7/2015/294 16/12/2015 2A Bailey Road TWO WELLS
LOT: 202 ALT: A HD: 3 PL: D89020 CT: 6094/870
Construction of Verandah $8,130 Decision Issued 28/01/2016
Category 1Category:
Approval:
J L COLLINS $60.00 Planning Lodgement Fee (up to $5,000)
$88.19 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$6.64 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
Stormwater disposalB33
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
7/03/2016RENDITION HOMES PTY LTD
CAMPBELLTOWN SA 5074
503 Lower North East RoadPlanning Consent Only
7/2015/295 16/12/2015 11 East Terrace WINDSOR
LOT: 27 ALT: A HD: 2 PL: D000493 CT: 6169/706
Construction of Dwelling $64,044 Planning Assessment 7/03/2016
Category 1Category:
Approval:
RENDITION HOMES PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
dwelling connected to effluent systemP13
Vehicle AccessP236
provisional building rules consentP101
Builder: Conditions: Payments:
16/02/2016CREATIVE OUTDOORS
ST AGNES SA
PO Box 350Approved Private Certifier
7/2015/296 17/12/2015 21 Kain Road BARABBA
ALT: S HD: 1 SEC: 192 PL: H140500 CT: 5195/38
Construction of verandah $69,000 Decision Issued 16/02/2016
Category 1Category:
Approval:
CREATIVE OUTDOORS $60.00 Planning Lodgement Fee (up to $5,000)
$5.15 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$97.85 Planning Fee ($10,000-$100,000)
in accordance with plans submittedP1
comply to conditions imposedP2
Stormwater drained and retained onsiteP243
Site ConditionsP242
external appearance maintainedP10
structure not be enclosed with solidP11
external materials to match existing bldP12
provisional building rules consentP101
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Page 76 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
12/01/2016S J LIGHTFOOT
REDBANKS SA 5502
Lot 1 Paddy's Bridge RoadApproved by Delegation
7/2015/297 16/12/2015 166 Davies Road MALLALA
ALT: S HD: 1 SEC: 63 PL: H140500 CT: 5425/440
Construction of a farm building $0 Decision Issued 12/01/2016
Category 1Category:
Approval:
S J LIGHTFOOT $60.00 Planning Lodgement Fee (up to $5,000)
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$16.93 Building - DAC
$224.99 Class 7 & 8
in accordance with plans submittedP1
comply to conditions imposedP2
existing trees to be protectedP51
Stormwater drained and retained onsiteP243
Site ConditionsP242
external walls maintained in good condP7
external walls of building subduedP6
Stormwater disposalB33
building non standard conditionBNS1
building non standard conditionBNS2
Builder: Conditions: Payments:
18/12/2015KEY BUILDING SERVICES
BEULAH PARK SA 5067
295 The ParadeApproved by Delegation
7/2015/298 18/12/2015 458 Owen Road GRACE PLAINS
LOT: 501 ALT: A HD: 1 PL: D014362 CT: 5659/328
Demolition of fire damaged dwelling $0 Health Assessment 18/12/2015
Building Rules Consent OnlyCategory:
Approval:
KEY BUILDING SERVICES $60.00 Planning Lodgement Fee (up to $5,000)Demolition of structureB83
Asbestos demolition, transport and dispoB84
Builder: Conditions: Payments:
12/05/2016STERLING HOMES PTY LTD
ALLENBY GARDENS SA 5009
110-114 GRANGE ROADPlanning Consent Only
7/2015/299 18/12/2015 Clonan Road DUBLIN
LOT: 862 ALT: A HD: 2 PL: D81240 CT: 6039/524
Construction of detached dwelling
with garage
$289,099 Planning Assessment 12/05/2016
Category 1Category:
Approval:
STERLING HOMES PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)
$438.00 Septic Tank application Fee
$438.00 Septic Tank application Fee
$18.06 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$343.31 Planning Fee (more than $100,001)
$39.90 Staged Consent Fee
$20.10 Staged Consent Fee DAC
in accordance with plans submittedP1Builder: Conditions: Payments:
29/03/2016M GREEN
TWO WELLS SA 5501
10A Tatura Avenuewithdrawn Application
7/2015/300 21/12/2015 10A Tatura Avenue TWO WELLS
LOT: 22 ALT: A HD: 3 PL: D93205 CT: 6139/615
Construction of outbuilding - garage $6,500 Decision Issued 29/03/2016
Category 1Category:
Approval:
M GREEN $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
Stormwater disposalB33
Builder: Conditions: Payments:
Page 77 of 78
Applications Lodged Listing - Combined Development Applic
From 1/01/2015 to 31/12/2015Sorted by Application Number
Document Applicant Name/
Address
Current ActionDevelopment
DeterminationLodged
Date
Subject LandProposalEstimated
Cost
3/02/2016BETTER BUILT INDUSTRIES
ATHOL PARK 5012
40 ATHOL STREETApproved by Delegation
7/2015/301 21/12/2015 12 Canala Court TWO WELLS
LOT: 24 ALT: A HD: 3 PL: D033249 CT: 5060/203
Construction of verandah $5,400 Decision Issued 3/02/2016
Building Rules Consent OnlyCategory:
Approval:
G FALCO $60.00 Planning Lodgement Fee (up to $5,000)
$61.35 Class 9B
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$4.15 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
Stormwater disposalB33Builder: Conditions: Payments:
22/02/2016W P MOLLOY
TWO WELLS SA 5501
19 Leilete RoadApproved by Delegation
7/2015/302 23/12/2015 5 Leilete Road TWO WELLS
LOT: 1 ALT: A HD: 3 PL: D93938 CT: 6140/803
Shed
$8,720 Decision Issued 22/02/2016
Category 1Category:
Approval:
W P MOLLOY $60.00 Planning Lodgement Fee (up to $5,000)
$111.18 Class 10
$1.90 Planning Fee DAC
$35.60 Planning Fee (up to $10,000)
$8.37 Building - DAC
$68.00 Planning Lodgement Fee (over $5,000)
in accordance with plans submittedP1
comply to conditions imposedP2
external appearance maintainedP10
external materials to match existing bldP12
Site ConditionsP242
Stormwater drained and retained onsiteP243
approved for domestic purposes onlyP9
Stormwater disposalB33
building non standard conditionBNS1
Builder: Conditions: Payments:
7/04/2016BARGAIN STEEL CENTRE
BURTON SA 5110
Lot 10 Heaslip RoadApproved Private Certifier
7/2015/303 23/12/2015 3 Cavallaro Place LEWISTON
LOT: 18 HD: 3 PL: D81621 CT: 6041/32
Shed and Verandah $45,000 Decision Issued 7/04/2016
Category 1Category:
Approval:
ADELAIDE FENCING & STEEL SUPPLIES $60.00 Planning Lodgement Fee (up to $5,000)
$6.10 Planning Fee DAC
$68.00 Planning Lodgement Fee (over $5,000)
$43.00 Certificate of Occupancy
$115.90 Planning Fee Non-Complying
in accordance with plans submittedP1
provisional building rules consentP101
comply to conditions imposedP2
Site ConditionsP242
external walls of building subduedP6
approved for domestic purposes onlyP9
planning non standard conditionPNS1
planning non standard conditionPNS2
Dwelling occupation requirementsB69
Builder: Conditions: Payments:
Number of Document Type 7 ( Combined Development Applic ): 301
Total number of Applications Reported: 301
Page 78 of 78