APPROVAL OF STATE PROGRAMME IMPLEMENTATION PLAN 2012-13: CHHATTISGARH
Approval of Programme Implementation Plan- Chhattisgarh 2012-13
Foreword
I truly believe that the National Rural Health Mission affords us a
unique opportunity to be aspirational and to bring about transformational
change.
This document evolves out of a shared vision – about where the
Chhattisgarh State must reach and the path to be traversed. Strides in the
right direction get the State more money while there is danger too of losing
funds for slippages.
As NRHM embarks on the second phase of its journey, let us be
inspired by what Mahatma Gandhi said “A small body of determined spirits
fired by an unquenchable faith in their mission can alter the course of
history.’’
Let us believe in ourselves and our ability to make a difference.
Anuradha Gupta (Additional Secretary & Mission Director, NRHM)
Approval of Programme Implementation Plan- Chhattisgarh 2012-13
F.No. 10(19)/2012-NRHM-I Government of India
Ministry of Health & Family Welfare Department of Health & Family Welfare
Nirman Bhawan, New Delhi
Dated : 31st May 2012
To, The Mission Director National Rural Health Mission, Chhattisgarh Directorate of Health Services, Old Nursing Hostel Near Mantralaya Raipur Chhattisgarh
Subject: Approval of NRHM State Programme Implementation Plan for the year 2012-13
Sir,
1. This refers to the Programme Implementation Plan (PIP) for the year 2012-13 submitted by the State and subsequent discussions in the NPCC meeting held on 16th May 2012 at New Delhi.
2. Against a resource envelope of Rs 838.26, the administrative approval of the PIP for your
State is conveyed for an amount of Rs 659.4 crores .Details are provided in Table A, B and C below:
TABLE-A
(Rs. in Crore)
Uncommitted Unspent Balance Available under NRHM as on 1.4.2012 206.65
GOI Resource Envelope for 2012-13 under NRHM 473.71
25% UT share ( 2012-13) 157.90
Total 838.26
Approval of Programme Implementation Plan- Chhattisgarh 2012-13
TABLE-B
Sl No.
Programme Uncommitted Unspent balance available as on
1.4.2012 (Rs in Crore)
GoI Resource Envelope under NRHM (Rs in Crore)
Total (Rs in Crore)
1 RCH Flexible Pool 86.01 117.09 203.1
2 NRHM Flexible Pool 77.11 145.47 222.58
3 Routine Immunization 5.84 5.73 11.57
4 NVBDCP 6.96 33.39 40.35
5 RNTCP 8.10 27.39 35.49
6 NPCB 5.42 5.58 11.00
7 NLEP 1.16 1.68 2.84
8 IDSP 0.94 1.50 2.44
9 NIDDCP 0.00 0.24 0.24
10 Direction & Admn. (Treasury route)
12.30 130.74 143.04
11 PPI Operation Cost 2.79 4.90 7.69
12 25% State share 157.90
Total Resource Envelope
206.64 473.71 838.26
Committed Unspent Balance up to 2011-12 to be Revalidated in 2011-12 as on 01.04.2012
154.43 crore
Approval of Programme Implementation Plan- Chhattisgarh 2012-13
TABLE-C
SUMMARY OF APPROVAL
Sl. No.
Scheme /Programme Approved Amount (Rs. in Crores)
Annex ref.
1 RCH Flexible Pool 184.77 1
2 NRHM Flexible Pool 254.50 2
3 Immunization and PPI operation cost 20.31 3
4 NIDDCP 0.44 4A
5 IDSP 2.24 4B
6 NVBDCP 36.34 4C
7 NLEP 1.67 4D
8 NPCB 5.57 4E
9 RNTCP 10.50 4F
10 Infrastructure maintenance(Treasury route) 143.04
Total 659.4
Thus, there is a cushion of Rs.178.8 crores (Rs. 838.2 crores – Rs 659.4.crores) for which,
State is advised to send a supplementary PIP urgently.
Targets, Conditionalities and road map 3. State has been assigned mutually agreed goals and targets. The state is expected to
achieve them, adhere to key conditionalities introduced this year and implement the road map provided in each of the sections of the approval document.
Mandatory disclosures 4. In addition, the State is directed to ensure mandatory disclosure on the state NRHM
website of the following:
Facility wise deployment of all contractual staff engaged under NRHM with name and designation.
MMUs- total number of MMUs, registration numbers, operating agency, monthly schedule and service delivery data on a monthly basis.
Patient Transport ambulances and emergency response ambulances- total number of vehicles, types of vehicle, registration number of vehicles, service delivery data including clients served and kilometres logged on a monthly basis.
All procurements- including details of equipments procured (as per CIC directives).
Approval of Programme Implementation Plan- Chhattisgarh 2012-13
Buildings under construction/renovation –total number, name of the facility/hospital along with costs, executing agency and execution charges (if any).
Release of second tranche of funds 5. Action on the following issues would be looked at while considering the release of second tranche of funds:
Compliance with conditionality’s.
Physical and financial progress made by the State.
The State to ensure that 25% of the State share, based on release of funds by Government of India is credited to the account of the State Health Society.
Monitoring Requirements 6. State shall ensure submission of quarterly report on progress against targets and expenditure including an analysis of adverse variances and corrective action proposed to be taken.
Yours faithfully,
Dr. Suresh. K. Mohammed Director (NRHM-I)
Approval of Programme Implementation Plan- Chhattisgarh 2012-13
APPROVAL OF STATE PROGRAMME IMPLEMENTATION PLAN, 2012-13: CHHATTISGARH
CONTENTS PAGE NO.
SUMMARY 1-15
State specific goals 1
Key conditionality’s and incentives 3
Finance: key issues and guiding principles 4
Road map 6
Approved budget (by program and function) 10
REPRODUCTIVE AND CHILD HEALTH 16-86
Maternal Health 16
Child Health & Immunization 34
Family Planning 49
Adolescent Health 59
Urban RCH 65
Tribal RCH 67
PC-PNDT 70
Human Resources and programme management 74
MISSION FLEXI POOL 87-143
ASHA 88
Untied funds/RKS/AMG 93
New constructions/ renovation and setting up 98
Procurement 106
Mobile medical unit & Referral Transport 111
Mainstreaming of AYUSH 114
IEC / BCC 118
Monitoring and evaluation (HMIS) 120
Others 133
NATIONAL DISEASE CONTROL PROGRAMMES 144-276
National Iodine Deficiency Disorders Control Programme (NIDDCP)
145
Integrated Disease Surveillance Programme(IDSP) 148
National Vector Borne Disease Control Programme (NVBDCP) 152
National Leprosy Eradication Programme (NLEP) 162
National Programme for control of Blindness (NPCB) 166
Revised National Tuberculosis Control Programme (RNTCP) 170
Approval of Programme Implementation Plan- Chhattisgarh 2012-13
Annex (Detailed budgets)
1. RCH 2. Mission Flexi pool 3. Immunization 4A. National Iodine Deficiency Disorders Control Programme (NIDDCP) 4B. Integrated Disease Surveillance Programme (IDSP) 4C. National Vector Borne Disease Control Programme (NVBDCP) 4D. National Leprosy Eradication Programme (NLEP) 4E. National Programme for control of Blindness (NPCB) 4F. Revised National Tuberculosis Control Programme (RNTCP)
Approval of Programme Implementation Plan- Chhattisgarh 2012-13
SUMMARY
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 1
STATE-SPECIFIC GOALS The following are the goals and service delivery targets specifically laid out for the state
of Chhattisgarh
INDICATOR
INDIA Chhattisgarh STATE TARGETS
Current status
RCH II/ NRHM (2012)
goal
Trend (year & source) 2012-13 2013-14 2014-15
MATERNAL HEALTH
Maternal
Mortality Ratio
(MMR)
212
(SRS 07-09)
<100 379
(SRS 01-03)
335
(SRS 04-06)
269
(SRS 07-09)
205
(11-13)
191
(13-15)
179
(15-17)
CHILD HEALTH 2013 2014 2015 Under 5
Mortality 59
(SRS 2010)
71
(SRS 2008)
67
(SRS 2009)
61
(SRS 2010)
50 47 44
Infant Mortality
Rate (IMR) 47
(SRS 2010)
<30 57
(SRS 2008)
54
(SRS 2009)
51
(SRS 2010)
40 37 34
Neonatal
Mortality Rate
(NMR)
33
(SRS 2010)
39
(SRS 2008)
38
(SRS 2009)
37
(SRS 2010)
26 22 18
Early NMR 25
(SRS 2010)
36
(SRS 2008)
33
(SRS 2009)
26
(SRS 2010)
15 11 7
FAMILY PLANNING
2012-13 2013-14
2014-15
Total Fertility
Rate (TFR) 2.5
(SRS 2010)
2.1 3.0
(SRS 2008)
3.0
(SRS 2009)
2.8
(SRS 2010)
2.5 2.4 2.3
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 2
SERVICE DELIVERY TARGETS:
Indicators DLHS-2 (2002-
04)
DLHS-3 (2007-08)
CES (2009)
State Targets
2012-13 2013-14 2014-15
Maternal Health
Mothers who had 3 or more Ante Natal Check-ups
44.4 % 51.2 % 605660 650356 696874
Institutional delivery in public health facilities (%)
18.1% 18.1% 335153 50%
352810 52%
378157 55%
Line listing and follow up of Severely Anaemic pregnant women (nos)
8697 8803 8921
Child Health
Full Immunisation (%) 56.9 59.3 57.3 70 80 90
Line listing and follow up of Low Birth Weight babies RURAL Nos; (% of live births)
121630 18.1 % of live births (State HMIS)
28286 6 %
39600 6%
53744 10 %
Family Planning
Female sterilizations (lakhs)
142815 (HMIS: 2010-11)
160000 139945 142739
Post-Partum sterilizations (lakhs)
485 (HMIS: 2010-11)
1000 1500 2500
Male sterilisations (lakhs) 7216 (HMIS: 2010-11)
24000 15055 17261
IUD insertions (lakhs) 105100 (HMIS: 2010-11)
147437 118699 124634
Disease Control
ABER for malaria (%) 12.63%(2010) 12.52 % (2011) To sustain the ABER at the same level
API for malaria (per 1000 population)
< 5.0
Annualized New Smear Positive Detection Rate of TB (%)
60-65%
Success Rate of New Smear Positive Treatment initiated on DOTS (%)
87-90%
Cataract operations 610000
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 3
High focus districts Performance against the above service delivery indicator in the 16 high focus districts (Surguja Dantewada Korba , JAspur , Kanker , Bastar , Koriya Raigarh, Mahasamund, Janjgir Champa, Kawardha , Dhamtari Rajnandgaon , Bialpur Bijapur Narayanpur) out of a total 27 districts should be at least , on par with the State average ; and subsequently in line with the performance of the top 10% of Districts KEY CONDITIONALITIES AND INCENTIVES As agreed, the following key conditionalities would be enforced during the year 2012-13.
a) Rational and equitable deployment of HR with the highest priority accorded to high focus districts and delivery points1.
b) Facility wise performance audit and corrective action based thereon2.
Non-compliance with either of the above conditionalities may translate into a reduction in outlay upto 7 ½% and non-compliance with both translating into a reduction of upto 15%.
c) Gaps in implementation of JSSK may lead to a reduction in outlay upto 10%.
d) Continued support under NRHM for 2nd ANM would be contingent on improvement on ANC coverage and immunization as reflected in MCTS.
e) Vaccines, logistics and other operational costs would also be calculable on the basis of MCTS data.
INCENTIVES
Initiatives in the following areas would draw additional allocations by way of incentivisation of performance:
a) Responsiveness, transparency and accountability (upto 8% of the outlay).
b) Quality assurance (upto 3% of the outlay).
c) Inter-sectoral convergence (upto 3% of the outlay).
d) Recording of vital events including strengthening of civil registration of births and deaths (upto 2% of the outlay).
e) Creation of a public health cadre (by states which do not have it already) (upto 10% of the outlay)
f) Policy and systems to provide free generic medicines to all in public health facilities (upto 5% of the outlay)
Note: The Framework for Implementation of NRHM to be strictly adhered to while implementing the approved PIP.
1 Rational and equitable deployment would include posting of staff on the basis of case load, posting of
specialists in teams (eg. Gynaecologist and Anaesthetist together), posting of EmOC/ LSAS trained doctors in FRUs,optimal utilization of specialists in FRUs and above and filling up vacancies in high focus/ remote areas. 2 Performance parameters must include OPD/ IPD/ normal deliveries/ C. Sections (wherever applicable).
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 4
FINANCE: KEY ISSUES AND GUIDING PRINCIPLES
Quality FMRs must be submitted on time with both physical and financial progress fully reflected.
1. Status of 15% Contribution of state share:
Year Amounts required on basis of releases
(Rs. in Crore)
Amount Credited in SHS Bank A/C (Rs. in Crore)
Short/ (Excess) (Rs. In Crore)
2007-08 33.68 12.00 21.68 2008-09 44.07 35.00 9.07 2009-10 46.17 31.11 15.06 2010-11 57.75 47.00 10.75 2011-12 74.39 94.00 -19.61
Total 256.06 219.11 36.95
Further with effect from 2012-13, State’s share would be 25%.
2. Before the release of funds upto 100% of BE of your state for the year 2012-13, State needs to provide Utilization Certificates against the grant released to the State up to 2010-11. The details for such pending UCs is as under:
Pending utilisation certificates
Programme Amount in Crore RCH Flexi Pool (Year 2010-11) 58.82
Mission Flexi Pool (Year 2008-09) 0.34 (Year 2009-10) 82.42 (Year 2010-11) 80.00
Total Mission Flexi Pool 162.76
3. Release of 100% of funds for the year 2012-13 would be contingent on the state providing utilisation certificates upto 2010-11.
4. The appointment of Concurrent Auditor for the year 2012-13 is a prerequisite for release of 2nd tranche of funds. The State shall ensure timely appointment of Concurrent Auditor for State and District level so that concurrent audit shall be completed on time. The State shall submit the executive summary of the audit report to Govt of India on regular basis
5. Timely submission of Statutory Audit Report for the year 2011-12 is must for release of 2nd tranche of funds.
6. State is required to comply with the instructions and/or guidelines issued for maintenance of bank account vide D. O. No. G-27017/21/2010-NRHM-F dated January 23, 2012.
7. State should provide a confirmation of submission of Action Taken Report/ Compliance Report on the FMR Analysis (2011-12) and Audit Report Analysis for FY 2010-11.
8. State needs to prioritise the internal control procedures for all transactions.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 5
9. State should ensure proper maintenance of books of accounts at all districts and blocks within the State.
10. Appointment of Auditor for the year 2011-12 is pending and must be completed in the first quarter of 2012-13. The State shall submit the Audit report as per timelines of the RFP issued by the Govt of India for the appointment of Statutory Audit
11. The State shall ensure the reconciliation and of old advance lying at the state, district
and block level and also ensure the adjustment/recovery of old outstanding advances
within the first quarter of the year 2012-13.
12. The State shall refund the unspent grant of the closed programme like RCH-I and EC-SIP
to Govt of India within first quarter of the year 2012-13.
13. A full time Director (Finance & Accounts) from the State Finance Services not holding
any additional charge to be appointed.
14. The State shall submit the Monthly & Quarterly MIS report to the FMG, NRHM-finance,
and Govt of India on time.
15. The State should ensure integration of National Disease Control Programmes (NDCPs)
and timely submission of Consolidated Audit Report as per RFP under NRHM.
16. The state must ensure due diligence in expenditure and observe, in letter and spirit,
all rules, regulations, and procedures to maintain financial discipline and integrity
particularly with regard to procurement; competitive bidding must be ensured and
only need-based procurement should take place.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 6
ROAD MAP FOR PRIORITY ACTION
NRHM must take a ‘systems approach’ to Health. It is imperative that States take a holistic view
and work towards putting in place policies and systems in several strategic areas so that there
are optimal returns on investments made under NRHM. For effective outcomes, a sector wide
implementation plan would be essential. Some of the key strategic areas in this regard are
outlined below for urgent and accelerated action on the part of the State:
S.
NO.
STRATEGIC AREAS ISSUES THAT NEED TO BE ADDRESSED
PUBLIC HEALTH PLANNING & FINANCING
1. Planning and financing Mapping of facilities, differential planning for districts / blocks with
poor health indicators; resources not to be spread too thin /
targeted investments; at least 10% annual increase in state health
budget (plan) over and above State share to NRHM resource
envelope; addressing verticality in health programmes; planning for
full spectrum of RCH services; emphasis on quality assurance in
delivery points
2. Management
strengthening
Full time Mission Director for NRHM and a full-time Director/ Jt.
Director/ Dy. Director Finance, not holding any additional
responsibility outside the health department; fully staffed
programme management support units at state, district and block
levels; training of key health functionaries in planning and use of
data. Strong integration with Health & FW and AYUSH directorates
3. Developing a strong Public
Health focus
Separate public health cadre, induction training for all key cadres;
public health training for doctors working in health administrative
positions; strengthening of public health nursing cadre, enactment
of Public Health Act
HUMAN RESOURCES
4. HR policies for doctors,
nurses paramedical staff
and programme
management staff
Minimising regular vacancies; expeditious recruitment (eg. taking
recruitment of MOs out of Public Service Commission purview);
merit –based and transparent selection; opportunities for career
progression and professional development; rational and equitable
deployment; effective skills utilization; stability of tenure;
sustainability of contractual human resources under RCH / NRHM
and plan for their inclusion in State budget
5. HR Accountability Facility based monitoring; incentives for both the health service
provider and the facility based on functioning; performance
appraisal against benchmarks; renewal of contracts/ promotions
based on performance; incentives for performance above
benchmark; incentives for difficult areas
6. Medical, Nursing and Planning for enhanced supply of doctors, nurses, ANMs, and
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 7
S.
NO.
STRATEGIC AREAS ISSUES THAT NEED TO BE ADDRESSED
Paramedical Education
(new institutions and
Upgradation of existing
ones)
paramedical staff; mandatory rural posting after MBBS and PG
education; expansion of tertiary health care; use of medical colleges
as resource centres for national health programmes; strengthening/
revamping of ANM / GNM training centres and paramedical
institutions; re-structuring of pre service education; developing a
highly skilled and specialised nursing cadre
7. Training and capacity
building
Strengthening of State Institute of Health & Family Welfare
(SIHFW)/ District Training Centres (DTCs); quality assurance;
availability of centralised training log; monitoring of post training
outcomes; expanding training capacity through partnerships with
NGOs / institutions; up scaling of multi skilling initiatives,
accreditation of training
STRENGTHENING SERVICES
8. Policies on drugs,
procurement system and
logistics management
Articulation of policy on entitlements on free drugs for out / in
patients; rational prescriptions and use of drugs; timely
procurement of drugs and consumables; smooth distribution to
facilities from the district hospital to the sub centre; uninterrupted
availability to patients; minimisation of out of pocket expenses;
quality assurance; prescription audits; essential drug lists (EDL) in
public domain; computerised drugs and logistics MIS system; setting
up dedicated corporation eg: TNMSC
9. Equipments Availability of essential functional equipments in all facilities; regular
needs assessment; timely indenting and procurement; identification
of unused/ faulty equipment; regular maintenance and MIS/
competitive and transparent bidding processes
10. Ambulance Services and
Referral Transport
Universal availability of GPS fitted ambulances; reliable, assured free
transport for pregnant women and newborn/ infants; clear policy
articulation on entitlements both for mother and newborn;
establishing control rooms for timely response and provision of
services; drop back facility; a prudent mix of basic level ambulances
and emergency response vehicles
11. New infrastructure and
Maintenance of buildings;
sanitation, water,
electricity, laundry,
kitchen, facilities for
attendants
New infrastructure, especially in backward areas; 24x7 maintenance
and round the clock plumbing, electrical, carpentry services; power
backup; cleanliness and sanitation; upkeep of toilets; proper
disposal of bio medical waste; drinking water; water in toilets;
electricity; clean linen; kitchens, facilities for attendants
12. Diagnostics Rational prescription of diagnostic tests; reliable and affordable
availability to patients; partnerships with private service providers;
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 8
S.
NO.
STRATEGIC AREAS ISSUES THAT NEED TO BE ADDRESSED
prescription audits, free for pregnant women and sick neonates
COMMUNITY INVOLVEMENT
13. Patient’s feedback and
grievance redressal
Feedback from patients; expeditious grievance redressal; analysis of
feedback for corrective action
14. Community Participation Active community participation; empowered PRIs; strong VHSNCs;
social audit; effective Village Health & Nutrition Days (VHNDs),
strengthening of ASHAs, policies to encourage contributions from
public/ community
15. IEC Comprehensive communication strategy with a strong behaviour
change communication (BCC) component in the IEC strategy;
dissemination in villages/ urban slums/ peri urban areas
CONVERGENCE, COORDINATION & REGULATION
16. Inter Sectoral convergence Effective coordination with key departments to address health
determinants viz. water, sanitation, hygiene, nutrition, infant and
young child feeding, gender, education, woman empowerment,
convergence with SABLA, SSA, ICDS etc.
17. NGO/ Civil Society Mechanisms for consultation with civil society; civil society to be
part of active communitisation process; involvement of NGOs in
filling service delivery gaps; active community monitoring
18. Private Public Partnership
(PPP)
Partnership with private service providers to supplement
governmental efforts in underserved and vulnerable areas for
deliveries, family planning services and diagnostics
19. Regulation of services in
the private sector
Implementation of Clinical Establishment Act; quality of services,
e.g. safe abortion services; adherence to protocols; checking
unqualified service providers; quality of vaccines and vaccinators,
enforcement of PC-PNDT Act
MONITORING & SUPERVISION
20. Strengthening data
capturing, validity /
triangulation
100% registration of births and deaths under Civil Registration
System (CRS); capturing of births in private institutions; data
collection on key performance indicators; rationalising HMIS
indicators; reliability of health data / data triangulation mechanisms
21. Supportive Supervision Effective supervision of field activities/ performance; handholding;
strengthening of Lady Health Visitors (LHVs), District Public Health
Nurses (DPHNs), Multi Purpose Health Supervisors (MPHS) etc.
22. Monitoring and Review Regular meetings of State/ District Health Mission/ Society for
periodic review and future road map; clear agenda and follow up
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 9
S.
NO.
STRATEGIC AREAS ISSUES THAT NEED TO BE ADDRESSED
action; Regular, focused reviews at different levels viz. Union
Minister/ Chief Minister/ Health Minister/ Health Secretary/ Mission
Director/ District Health Society headed by Collector/ Officers at
Block/ PHC level; use of the HMIS/ MCTS data for reviews;
concurrent evaluation
23. Quality assurance Quality assurance at all levels of service delivery; quality
certification/ accreditation of facilities and services; institutionalized
quality management systems
24. Surveillance Epidemiological surveillance; maternal and infant death review at
facility level and verbal autopsy at community level to identify
causes of death for corrective action; tracking of services to
pregnant women and children under MCTS
25. Leveraging technology Use of GIS maps and databases for planning and monitoring; GPS for
tracking ambulances and mobile health units; mobile phones for
real time data entry; video conferencing for regular reviews; closed
user group mobile phone facility for health staff; endless
opportunities- sky is the limit!
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 10
PROGRAMME WISE BUDGET
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 11
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 12
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 13
SUMMARY BUDGET 2012-13: CHHATTISGARH
S. No. Budget Head
FY 2012-13 Budget ( Rs lakhs )
Proposed Approved %
1. RCH
A1 Maternal Health 4710.86 2023.54 3.07
A2 Child Health 2382.83 1132.26 1.72
A3 Family Planning 448.45 208.8 0.32
A4 ARSH 161.55 41.92 0.06
A5 Urban RCH 92 0 0.00
A6 Tribal RCH 140 49 0.07
A7 PNDT & Sex Ratio 14.5 14.5 0.02
A8 Infrastructure & HR 5614.75 2231.38 3.38
A9 Training 1538.98 1490.88 2.26
A10 Programme Management 5103.73 2920.77 4.43
A11 Vulnerable groups 28 23 0.03
Total Base Flexi Pool 20235.64 10136.04 15.36
A12 JSY 6659.13 6131.63 9.29
A13 Sterilization & IUD Compensation,
and NSV Camps
2210 2210
3.35
Total Demand Side 8869.13 8341.63 12.64
Total RCH Flexi Pool 29104.77 18477.67 28.00
B1 ASHA 2809.02 2747.62 4.16
B2 Untied Funds (ongoing) 2802.65 2768.45 4.20
B3 Annual Maintenance Grants
(ongoing) 884.3 564.5 0.86
B4 Hospital Strengthening 305 0 0.00
B5 New Constructions/ Renovation
and Setting up 19929.25 11338.75 17.18
B6 Corpus Grants to HMS/RKS 1181 1090 1.65
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 14
S. No. Budget Head
FY 2012-13 Budget ( Rs lakhs )
Proposed Approved %
(ongoing)
B7 District Action Plans (including
block, village) 101.2 32 0.05
B8 Panchayati Raj Initiative 82 82 0.12
B9 Mainstreaming of AYUSH 809.82 704.99 1.07
B10 IEC-BCC NRHM 711.75 250 0.38
B11 Mobile Medical Units (Including
recurring expenditures) 702 0 0.00
B12 Referral Transport 3166.96 2772.96 4.20
B13 PPP/ NGOs 435.4 35.4 0.05
B14 Innovations (if any) 0 0 0.00
B15 Planning, Implementation and
Monitoring 1612.21 490.51 0.74
B16 Procurement 2111.71 704.53 1.07
B17 Regional drugs warehouses 0.00
B18 New Initiatives 5084.08 50 0.08
B19 Health Insurance Scheme 0 0 0.00
B20 Research, Studies, Analysis 0 0 0.00
B21 State level Health Resources
Center 110.81 100 0.15
B22 Support Services 982.41 511.08 0.77
B23 Other Expenditures (Power
Backup, Convergence etc) 1207.06 1207.06 1.83
TOTAL MFP 45028.63 25449.85 38.57
C1 RI strengthening project (Review
meeting, Mobility support,
Outreach services etc)
818.34 1,001.57
1.52
C2 Salary of Contractual Staffs 50.3 33.84 0.05
C3 Training under Immunization 66.54 33.95 0.05
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 15
S. No. Budget Head
FY 2012-13 Budget ( Rs lakhs )
Proposed Approved %
C4 Cold chain maintenance 14.85 7.14 0.01
C5 ASHA Incentive 472.42 472.42 0.72
Total Immunization 1422.42 1548.92 2.35
C6 Pulse Polio Operational Cost 483.03 483.03 0.73
Total RI & PPO costs 1905.48 2031.95 3.08
4A. National Iodine Deficiency
Disorders Control Programme
(NIDDCP)
24 44.03
0.07
4B. Integrated Disease Surveillance
Programme(IDSP)
354.49 224.05
0.34
4C. National Vector Borne Disease
Control Programme (NVBDCP)
2343.11 3634.3
5.51
4D. National Leprosy Eradication
Programme (NLEP)
313.78 167.91
0.25
4E. National Programme for control
of Blindness (NPCB)
954 557.9
0.85
4F. Revised National Tuberculosis
Control Programme (RNTCP)
1400.42 1050.9
1.59
Total NDCP 5389.8 5679.09 8.61
Total Infrastructure Maintenance 14304 14304 21.68
GRAND TOTAL 95732.68 65942.56 99.93
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 16
MATERNAL HEALTH
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 17
GOALS AND SERVICE DELIVERY TARGETS: MATERNAL HEALTH
Indicator Target
Maternal Mortality Ratio (2011-13) 205 (2013-15) 160
4 ANCs 605660 in 2012-13
Institutional Deliveries (out of the total estimated deliveries) to be conducted in Public health institutions from 45 % in 2010-11 to 50 % in 2012-13
335153 in 2012-13
Caesarean Section rate in public health facilities from 3 % in 2010-11 to 5 % in 2012-13
16758 in 2012-13
Severely anaemic pregnant women out of total anaemic pregnant women (@2%)to be line listed and managed
8697 in 2012-13
DELIVERY POINTS:
Level of Facility Target
DHs & DH Women’s Hospitals 17
CHCs and other health facilities at sub district level 19
24*7 PHCs and Non FRUs 293
SCs 770
Total 1099
TRAINING:
Training Programme Target
LSAS 60
EmOC 32
BEmOC 145 MOs*, 200 SNs, 175 RMAs*
SBA 400 ANM/LHVs/SNs
MTP 60 MOs, 30 SNs
RTI/STI 300 RMA doctors
*initiated on pilot basis in Chhattisgarh.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 18
ROAD MAP FOR PRIORITY ACTION: MATERNAL HEALTH
Commitment No. 1- Operationalizing Delivery Points Gaps in the identified delivery points to be assessed and filled through prioritized allocation of the necessary resources in order to ensure quality of services and provision of comprehensive RMNCH (Reproductive Maternal Neonatal and Child Health) services at these facilities. These must be branded and positioned as quality RMNCH 24x7 Service Centres within the current year. The targets for different categories of facilities are:
A) All District Hospitals and other similar district level facilities to provide the following services:
24*7 service delivery for CS and other Emergency Obstetric Care.
1st and 2nd trimester abortion services.
Facility based MDR.
Essential newborn care and facility based care for sick newborns.
Family planning and adolescent friendly health services
RTI/STI services.
Functional BSU/BB.
B) CHCs and other health facilities at sub district level (above block and below district level) functioning as FRUs to provide the same comprehensive RMNCH Services as the district hospitals.
C) 24*7 PHCs and Non FRUs to provide the following services:
24*7 BeMOC services including conducting normal delivery and handling common obstetric complications.
1st trimester safe abortion services. (MVA upto 8 weeks and MMA upto 7 weeks)
RTI/STI services.
Essential newborn care and facility based care for sick newborns.
Family planning
D) All identified SCs/ facilities will:
Conduct Delivery by SBAs.
Provide IUD Services
Provide Essential New born care services.
Provide ANC, PNC and Immunization services.
Provide Nutritional and Family planning counseling.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 19
Conduct designated VHND and other outreach services.
Commitment No. 2- Implementing free entitlements under JSSK
A) JSSK entitlements to be ensured to all pregnant women and sick newborns accessing Public health facilities.
B) Drop back to be ensured to at least 70% of pregnant women delivering in the public health facilities.
C) Effective IEC and grievance redressal to be ensured.
Commitment No. 3- Centralized Call Centre and Assured Referral
A) To ensure availability of a centralized call centre for referral transport at State or district level as per requirements along with GPS fitted ambulances.
B) Response time for the ambulance to reach the beneficiary not to exceed 30 minutes.
Commitment No. 4- Essential Drug List
A) To formulate an Essential Drug List (EDL) for each level of facility viz. SC, PHCs, CHCs, DHs, and Medical colleges
B) Ensure timely procurement and supply linked to case load.
C) The EDL should include drugs for maternal and child health, safe abortion services, RTI/STI.
Commitment No. 5- Capacity Building
A) Delivery points to be first saturated with trained HR. Higgh focus/ remote areas to be covered first.
B) Shortfall in trained human resource at delivery points particularly sub centres and those in HFDs/ tribal/ remote areas to be addressed on priority.
C) Training load for skill based trainings to be estimated after gap analysis.
D) Certification /accreditation of the training sites is mandatory.
E) Training plan to factor in reorientation training of HR particularly for those posted at non functional facilities and being redeployed at delivery points. Orientation training of field functionaries on newer interventions e.g.MDR.
F) Performance Monitoring during training/post-deployment need to be ensured
G) Specific steps to strengthen SIHFW/ any other nodal institution involved in planning, implementation, monitoring and post training follow up of all skill based trainings under NRHM.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 20
Commitment No. 6– Tracking severe anaemia
A) All severely anaemic pregnant woman (2% of the anaemic pregnant woman) to be tracked and line listed for providing timely treatment of anaemia followed by micro birth planning.
Commitment No. 7– For High Focus Districts
A) The State to make use of the MCH sub plans made for these districts in the recent past and develops and operationalise the identified facilities as delivery points.
B) At least 25% of all sub centres under each PHC to be made functional as delivery points in the HFDs.
Commitment No. 8—Demarcation /Division of population and job clarity between the two ANMs working at the Sub-centre. Ensuring availability of one ANM at the SC, while the other visits the assigned population/villages.
Commitment No. 9: For 12 High Focus States: Pre service Nursing Training
A) At least one state Master Nodal centre shall be created and made functional.
B) State nursing cell will be created and made functional.
Commitment No.10: Proper implementation of JSY: A) JSY guidelines to be strictly followed and payments made as per the eligibility criteria.
B) No delays in JSY payments to the beneficiaries and full amount of financial assistance to
be given to the beneficiary before being discharged from the health facility after
delivery.
C) All payments to be made through cheques and preferably into bank/ post office
accounts.
D) Strict monitoring and physical (at least 5%) verification of beneficiaries to be done by
state and district level health authorities to check malpractices.
E) Grievance redressal mechanisms as stipulated under JSY guidelines to be activated at
the district and state levels.
F) Accuracy of JSY data reported at the HMIS portal of MOHFW to be ensured besides
furnishing quarterly progress reports to the Ministry within the prescribed timeframe.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 21
Commitment No. 11: Strengthening Mother & Child Tracking System A) State level MCTS call centre to be set up to monitor service delivery to pregnant women
and children.
MCTS to be made fully operational for regular and effective monitoring of service delivery
including tracking and monitoring of severely anaemic women, low birth weight babies and sick
neonates.
DETAILED BUDGET: MATERNAL HEALTH
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
A.1 Maternal Health (MH)
A.1.1 Operationalise Facilities
A.1.1.1 Operationalise FRUs 1,650.00 Indemnity Insurance of LSAS & EMOC Doc (131)
20.91 6.84 Rs. 2.15lakhs: Indemnity insurance. Recommended for approval with conditionality that performance needs to be monitored.
1) Insurance for LSAS trained doctors recommended for 69 doctors @Rs. 1650= Rs. 1.13 lakhs
Planning & Monitoring of service delivery (75)
2) Insurance for CEmOc trained doctors recommended for 62 doctors @ Rs.1650= 1.02 lakhs
Total = Rs.2.15lakhs
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 22
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
25,000.00
25% of Rs. 18.75lakhs for planning and monitoring approved.
Operationalise Non-FRU CH/CHCs
25,000.00 Planning and monitoring of service delivery (97)
24.25 0 Not recommended for approval. Since all the monitoring related activities must be prepared comprehensively.
A.1.1.2 Operationalisation of 24x7 PHCs
15000 Planning and Monitoring of service delivery (200)
230
0 Rs. 30.00lakhs for planning and monitoring not recommended for approval. Since all the monitoring related activities must be prepared comprehensively.
Night security services (200)
Rs. 200.00lakhs for night security services is not recommended for approval as the proposed is like an employment generation scheme. There is no rationality no. linkages with the DPs so any Additionalities are not recommended
10000
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 23
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
A.1.1.3 MTP - Safe abortion services
5000 150
7.5
0 Not recommended for approval. Since all the monitoring related activities must be prepared comprehensively.
A.1.1.4 RTI/STI Services at Health Facilities
5000 350 17.5 0 Not approved. Comprehensive plan
needed
A.1.1.5 Operationalise Sub Health Centre
A.1.2 Referral Transport 5000 Remuneration of drivers (225)
145 0 Not approved separately. JSSK funds may be utilized by the state judiciously to provide comprehensive patient transport
Incentive to drivers (10000)
100
A.1.3 Integrated Outreach RCH Services (Fixed day services)
300.00 /day LD Incentive to lady doctors/labtechs (15000)
135 135 For fixed day services.
100.00/day LT Rs. 60.00lakhs: Incentive to lady doctors
Mobility support to doctors/ labtechs (15000)
Rs. 75.00lakhs: Mobility support
400.00 /day LD
100.00/day LT
A.1.4 Janani Suraksha Yojana / JSY
A.1.4.1 JSY - Home Deliveries Rs. 500.00 50000 nos. 250 250 Approved.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 24
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
A.1.4.2 JSY - Institutional Deliveries
A.1.4.2.a
Rural 250 Incentive for travel (150000)
3875 3500 Rs.375 lakhs -Incentive for travel not recommended. Travel from home to hospital is provisioned under JSSK.
Incentive to beneficiary (250000)
Rs. 3500.00lakhs approved for incentive to beneficiary
1400
A.1.4.2.b
Urban 500 Incentive for travel from far towns (20000)
1100 1000 Incentive for travel not approved. Travel from home to hospital is provisioned under JSSK.
Incentive to beneficiary (100000)
Rs. 1000.00lakhs approved for incentive to beneficiary
1000
A.1.4.2.c
Caesarean Section Rs. 3,500.00 2500 87.5 37.5 Approved @ Rs. 1500/ per C-section
A.1.4.3 JSY - Administrative Expenses (5%)
Admn charges( 1% IEC, 2% monitoring & mobility, 2% office expenses & others
269.13 269.13 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 25
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
A.1.4.4 Incentive to ASHA
200.00 /case
Incentive for motivation (350000)
1077.5 1075 Rs. 700.00lakhs: Incentive for motivation
Incentive for stay (250000)
Rs. 375.00lakhs: Incentive for stay
150.00 /case
Incentive for Maternal Death review (5000)
Incentive for MDR not recommended. No provision under JSY
50.00 /case
A.1.5 Maternal Death Review
100 Reporting of death (2000)
7.7 4.7 Rs. 1.00lakhs: Reporting of death incentive to Mitanin /Kotwar recommended for 2000 cases @ Rs. 0.50 each = 1.00lakhs
MDR external (lumpsum)
Rs. 2.00lakhs: External third party audit - not approved
200000
Review meetings state level (2)
Rs. 0.50lakhs: Review meetings state
25000 Review meetings regional
Rs. 3.20lakhs: Review meetings regional
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 26
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
level (16)
20000
A.1.6 Maternal Health - Other activities
For High Risk Pregnancy
1000.00 /case Incentive to medical team for HIV positive NDs (700)
21 21 Rs. 7.00lakhs: Incentive for HIV positive NDs
Incentive to medical team for HIV positive C-Sections (300)
Incentive to ANM for C-section Hard to reach area (2000)
Rs. 6.00lakhs: Incentive for HIV positive C-Sections
2000.00 /case Incentives to ANM/Mitanin for linking reactive ANCs to ICTC (2000)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 27
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
Rs. 6.00lakhs: Incentive to ANM for C-section hard to risk areas - only in high risk pregnancy identified during 3rd ANC and registered in MCTS
300.00 /case
Rs.2.00 lakhs for Incentives to ANM/Mitanin for linking reactive ANCs to ICTC @ 100 * 2000= 200000
100.00/case
A.1.7 JSSK (for Pregnant Women)
A.1.7.1 Drugs and Consumables (other than reflected in Procurement)
A.1.7.1.1
Drugs consumables & treatment for Normal Delivery
750.00 /case 150000 1125 450 Recommended for 150000 PW @ Rs. 300 /PW
A.1.7.1.2
Drugs consumables & treatment for Caesarean Delivery
4000.00 /case 5000 200 80 Recommended for 5000 C-Section deliveries at public health facilities @ Rs. 1600/delivery
A.1.7.2 Diagnostic
500.00 /case
5000 25 10 Recommended for 200 PW @ Rs. 500/PW for all JSSK cases
A.1.7.3 Blood transfusion
850.00 /case
2000 17 6 Recommended for 2000 PW @ Rs. 300/PW
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 28
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
A.1.7.4 Diet (3 days for ND and 7 days for C-section) 300.00 /case
Normal Deliveries (150000)
485 485 Rs. 450.00lakhs: Diet for normal delivery
700.00 /case
C-Sections (5000)
Rs. 35.00lakhs: Diet for all C-section cases in JSSK centres
A.1.7.5 Free Referral Transport (other than A1.2)
500.00 /case Home to hospital (150000)
2250 825 Rs. 325.00lakhs recommended for home to hospital RT for 150000 PW @Rs. 250/PW.
Interfacility (50000)
Rs. 75.00lakhsecommended for interfacility RT for 30000 PW @ Rs. 250.00/PW
750.00 /case
Hospital to home (150000)
Rs. 375.00lakhs recommended for hospital to home RT for 150000 PW @ Rs. 250.00/PW
750.00 /case
Sub-total Maternal Health (excluding
JSY)
4710.86 2023.54
Sub-total JSY 6659.13 6131.63
A.9.3 Maternal Health Training
A.9.3.1 Skilled Birth Attendance / SBA
A.9.3.1.1
SBA - Training of ANM / LHVs
Rs. 101,430.00 52 batches 52.74 52.74 52 batches with training centre
A.9.3.1.2
SBA - Training of ANM / LHVs
Rs. 111,430.00 48 batches 53.49 53.49 52 batches without training centre
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 29
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
A.9.3.2 EmOC Training
A.9.3.2.1
EmOC - Training of MO's
Rs. 1,477,540.00 4 batches 59.1 59.1
A.9.3.3 Life Saving Anesthesia Skills Training
A.9.3.3.1
Training of LSAS ( Medical college)
Rs. 706,387.50 6 batches 42.38 42.38
A.9.3.3.2
Training of MO's ( district hospital)
Rs. 267,663.00 6 batches 16.06 16.06
A.9.3.3.3
Training of experts for examination
Rs. 310,000.00 2 batches 6.2 6.2
A.9.3.4 MTP Training
A.9.3.4.1
Training of MO's Rs. 50,025.00 30 batches 15.01 15.01
A.9.3.4.2
Training of SN / OT Attendant
Rs. 60,030.00 1 0.6 0.6
A.9.3.4.3
Training of MO's(refresher)
Rs. 86,250.00 1 0.86 0.86 Can only be approved if they give an undertaking that they will perform.
A.9.3.5 RTI/STI Training
A.9.3.5.1
RTI/STI Training of MO's/RMA
Rs. 72,450.00 10 batches 7.25 7.25
A.9.3.5.2
RTI/STI Training of Laboratory technicians
Rs. 72,450.00 10 batches 7.25 7.25
A.9.3.5.3
RTI/STI Training of Staff Nurse
Rs. 72,450.00 10 batches 7.25 7.25
A.9.3.6 BEmoc Training
A.9.3.6.1
BEmOC - TOT for BEmOc
Rs. 69,575.00 8 batches 5.57 5.57 2 days pilot BEMOC training of SN
A.9.3.6.2
BEmOC- Training of Mos
Rs. 75,325.00 24 batches 18.08 18.08
A.9.3.6.3
BEmOC- Training of RMAs
Rs. 58,075.00 35 batches 20.33 20.33
A.9.3.7 Other- Training Rs. 86,825.00 1 0.87 0.87 2 days pilot BEMOC training
A.9.3.7.1
Blood Storage training- MO
Rs. 13,963.00 50 6.98 6.98
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 30
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
A.9.3.7.2
Blood Storage training-Lab Tech.
Rs. 10,868.00 50 5.43 5.43
A.9.4.2 Others- Quality ANC Care
A.9.4.2.1
ANC care TOT Rs. 135,700.00 1 1.36 1.36
A.9.4.2.2
ANC care ANM District TOT
Rs. 188,600.00 6 11.32 11.32
A.9.4.2.3
ANC care ANM Where DTC available
Rs. 120,980.00 45 54.44 108.88 Recommended for 90 batches @ Rs. 120980
A.9.4.2.4
ANC care ANM Where DTC NOT AVAILABLE
Rs. 130,980.00 30 39.29 78.59 Recommended for 60 batches @Rs. 130980
Sub Total
Training 431.86 525.6
B.16.2.1 Procurement - Equipment: FRU
24 no. of BSU 500000 120 120 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available
2) There should be competent human resource to handle the equipment
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 31
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
@ Rs 23 Lakh pre BSU this included 1 Boyles Apparatus at per facility
100000 23 23 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available 2) There should be competent human resource to handle the equipment
This Included OT table, Delivery Table, Shadow lam , Pulse oxymeter , Suction Machine, Diathermy, Foetal Heart Monitor, Fumigator, Sterilizer, Hysterectomy Sets Kelly ped etc according to facility needs
44 no. of FRUs for other equipments State has budgeted total Rs 22 Lakh per facility
50000 22 22 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available 2) There should be competent human resource to handle the equipment
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 32
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
Procurement -Equipments for 24x7 PHCs
90 25000 22.5 22.5 Approved for PHCs @ 25000*84 = Rs 21.00 Lakhs for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available 2) There should be competent human resource to handle the equipment
Procurement -whole blood finger prick test for HIV
275000 25 68.75 68.75 Approved
Sub Total
Procurement of equipment Maternal Health 256.25 256.25
B.16.2.1 Procurement - Drugs & Supplies for MH Mifepristone and Misoprostol (Rs 18 Lakhs )
6000 Rs 300 for MMA drugs
18 18 Approved
KITs 1-7 and RPR Kits ( Rs 31.1.Lakhs )
31.1 31.1 Approved
Procurement -Drug & Supplies - Parenteral Iron Therapy
Procurement -Drug & Supplies - JSSK Kit
250000 kits 350 875 0 Not Approved Already approved under JSSK
Sub Total
Drugs & supplies for Maternal Health
924.1 49.1
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 33
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs) Remarks
Expected Output Proposed
Approved
Total Maternal Health 12,982.20 8986.12
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 34
CHILD HEALTH & IMMUNIZATION
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 35
TARGETS: CHILD HEALTH AND IMMUNIZATION
A OUTCOME INDICATORS
Current Status (SRS 2010)
SRS 2012 SRS 2013 SRS 2014
1 Early Neonatal Mortality
26 14 10 6
Early neonatal deaths estimated
15,871
8,546 6,104 3,662
2 NMR 37 27 23 19
Neonatal deaths Estimated
22,585 16,481 14,039 11,598
3 IMR 51 41 37 33
Infant deaths Estimated
31,131 25,027 22,585 20,144
4 U5MR 61 50 45 40
Under 5 deaths Estimated in an
year
37,235 30,521 27,468 24,416
Current Status Target for 2012-13 2013-14 2014-15
B KEY PERFORMANCE INDICATORS (CUMULATIVE)
1 Establishment & operationalisation of SNCUs
11* 11
* in process of operationalisation # line listing of NBSU to be
provided by the state
2 Establishment & operationalisation of NBSU
67# 92
3 NBCC at delivery points
195 480
4 Establishment of NRCs
40 60
5 Personnel trained in IMNCI (ANM+LHV)
No. 2403 3653
% 55% 84%
6 Personnel trained in F-IMNCI (MO+SN)
No. 75 216
7 Personnel trained in NSSK (MO+ANM+SN)
No. 3530 6430
% 55% 99%
8 ASHA trained in Module 6&7
No. 52300 60092
% 87% 100%
C KEY PERFORMANCE INDICATORS (NON CUMULATIVE)
1 New borns visited by ASHA (as per HBNC guidelines)
No. 0 366247 518849 610411
% 0 60% 85% 100%
2 New borns No. 271022 457808 518849 610411
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 36
breastfed with one hour of birth (CES 2009)
% 44.40% 75% 85% 100%
3 Rural LBW children to be line listed and followed
No. 51032 25516 35723 48481
%
11%(state HMIS) 5% 8% 10%
D KEY PERFORMANCE INDICATORS- IMMUNIZATION (NON CUMULATIVE)
1 Fully immunized children by age of 12-23 months (CES 2009)
No. 349766 518849 579890 610411
% 57.30% 85% 95% 100%
2 DPT-3 coverage for 12-23 months (CES 2009)
No. 405923 549370 579890 610411
% 66.50% 90% 95% 100%
3 DPT 1st booster in children aged 18-23months (CES 2009)
No. 158707 366247 457808 518849
% 26.00% 60% 75% 85%
4 Sesssions held (HMIS)
No. 220000 252000 254000 256000
% 87% 100% 100% 100%
ROAD MAP FOR PRIORITY ACTION: CHILD HEALTH AND IMMUNIZATION
A. Priority Actions to be carried out by state for Child Health
1. All the delivery points should have a functional Newborn Care Corner consisting of
essential equipment and staff trained in NSSK. The staff must be trained in a 2 days
NSSK training package for skills development in providing Essential Newborn Care.
2. Special Newborn care Units (SNCU) for care of the sick newborn should be established
in all Medical Colleges and District Hospitals. All resources meant for establishment of
SNCUs should be aligned in terms of equipment, manpower, drugs etc. to make SNCUs
fully operational.
3. SNCUs are referral centres with provision of care to sick new bornthe entire district and
relevant information must be given to all peripheral health facilities including ANM and
ASHA for optimum utilisation of the facility. Referral and admission of outborn sick
neonates should be encouraged and monitored along with inborn admissions.
4. NBSUs being set up at FRUs should be utilised for stabilization of sick newborns referred
from peripheral units. Dedicated staff posted to NBSU must be adequately trained and
should have the skills to provide care to sick newborns.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 37
5. All ASHA workers are to be trained in Module 6 & 7 (IMNCI Plus) for implementing
Home Based Newborn Care Scheme. The ASHA kit and incentives for home visits should
be made available on a regular basis to ASHAs who have completed the Round 1 of
training in Module 6
6. All ANMs are to be trained in IMNCI. All Medical Officers and Staff Nurses, positioned in
FRUs/DH and 24x7 PHCs should be prioritised for F-IMNCI training so that they can
provide care to sick children with diarrhoea, pneumonia and malnutrition.
7. Infant and Under fives Death Review must be initiated for deaths occurring both at
community and facility level.
8. In order to promote early and exclusive breastfeeding, the counselling of all pregnant
and expectant mothers should be ensured at all delivery points and breastfeeding
initiated soon after birth. At least two health care providers should be trained in
‘Lactation Management’ at District Hospitals and FRUs; other MCH staff should be
provided 2 days training in IYCF and growth monitoring.
9. Nutrition Rehabilitation Centres are to be established in District Hospitals (and/or FRUs),
prioritising tribal and high focus districts with high prevalence of child malnutrition. The
optimum utilisation of NRCs must be ensured through identification and referral of
Severe Acute Malnutrition cases in the community through convergence with
Anganwadi workers under ICDS scheme.
10. Line listing of newly detected cases of SAM and Low birth weight babies must be
maintained by the ANM and their follow-up must be ensured through ASHA.
11. In order to reduce the prevalence of anaemia among children, all children between the
ages of 6 months to 5 years must receive Iron and Folic Acid tablets/ syrup (as
appropriate) as a preventive measure for 100 days in a year. Accordingly appropriate
formulation and logistics must be ensured and proper implementation and monitoring
should be emphasised through tracking of stocks using HMIS.
12. Use of Zinc should be actively promoted along with use of ORS in cases of diarrhoea in
children. Availability of ORS and Zinc should be ensured at all sub-centres and with
ASHAs.
13. Data from SNCU, NBSU and NRC utilisation and child health trainings (progress against
committed training load) must be transmitted on a regular basis to the Child Health
Division.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 38
B. Priority Actions to be carried out by state for Immunisation
1. The year 2012 has been declared as the ‘Year of Intensification’ of Routine
Immunisation. Therefore, state must prepare a detailed district plan for Intensification
of Routine Immunization with special focus on districts with low coverage.
2. The birth dose of immunisation should be ensured for all newborns delivered in the
institutions, before discharge.
3. A dedicated State Immunisation Officer should be in place. District Immunisation Officer
should be in place in all the districts. The placement of ANMs at all session sites must be
ensured.
4. Due list of beneficiaries must be available with ANM and ASHA and village wise list of
beneficiaries should be available with ASHA after each session.
5. The immunisation session must be carried out on a daily basis in District Hospitals and
FRUs/ 24x7 PHCs with considerable case load in the OPD.
6. Cold chain mechanics must be placed in every district with a definite travel plan so as to
ensure that at least 3 facilities are visited every month as a preventive maintenance of
cold chain equipment.
7. The paramedic person instead of a clerical staff should be identified as the Cold Chain
Handler in all cold chain points and their training must be ensured along with one more
person as a backup.
8. It has been observed that the coverage of DPT 1st booster and Measles 2nd dose to be
given at the age of 18 months is less than 50% across the country. Therefore coverage
of DPT 1st booster and measles 2nd dose must be emphasised and monitored.
9. District AEFI Committees must be in place and investigation report of every serious AEFI
case must be submitted within 15 days of occurrence.
10. Rapid response team should be in place in priority districts of the states to identify
pockets of low immunization coverage and to respond to any threat of polio.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 39
11. Special micro plans are to be developed for inaccessible, remote areas and urban slums.
The micro plans developed under polio programme must be utilised and special focus
should be given to the migrant population
DETAILED BUDGET: CHILD HEALTH AND IMMNUIZATION
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.2 CHILD HEALTH CH
A.2.1 IMNCI
A.2.1.1 IMNCI - Planning monitoring
Rs. 25,000.00 27 districts 6.75 6.75
A.2.1.2 IMNCI - Operationalisation
Rs. 25,000.00 27 districts
6.75 6.75
A.2.1.3 IMNCI - Pre-service training in medical college/ nursing college/ ANMTC
5 5
A.2.2 Facility Based New Born Care ( FBNC)( SNCU/NBSU/NBCC)
A.2.2.1 FBNC- Planning and Monitoring
Rs. 5,000.00 1500 delivery points
75 0 Not approved.
A.2.2.2 Sick New Born Care unit / SNCU
A.2.2.2.1
SNCU Establishment
A.2.2.2.2
SNCU Operational Cost+
Rs. 1,000,000.00
12; including power audit
120 60 Cost approved @10.00 lakhs for 4 units and @2.5 lakhs for 8 units (cost for 3 months for new
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 40
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
units)
A.2.2.2.2.1
SNCU Operational Cost- incentive to paediatrician
Rs. 750.00 5000 cases 37.5 0 Approval pending, criteria for providing incentives to be redefined.
Rs. 2500 for First 10 admissions thereafter Rs 250 per case per month
A.2.2.3 New Born Stabilization unit (NBSU)
A.2.2.3.1
NBSU Establishment
37 0 0 State has indicated that, this is to be met from committed amount of 2011-12 (Rs. 64.75 lakhs)
A.2.2.3.2
NBSU Operational Cost
Rs. 175,000.00
113 139.13 33.25 Approved for 38 NBSUs for 6 months. (38*Rs.87500)
(Full operational cost for 67 NBSU's & half operational cost for 25 NBSU's which will be made operational after 2nd quarter of 2012-13)
A.2.2.4 New Born Care Corner (NBCC)
A.2.2.4.1
NBCC Establishment
State has indicated that, this is to be met from committed amount of 2011-12 (Rs. 97.50
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 41
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
lakhs)
A.2.2.4.2
NBCC - Maintenance
Rs. 20,000.00 500 100 48 As per data there are 1126 delivery points. Cost being sanctioned for 195 existing NBCCs and 285 proposed for 2012-13 @ 10,000 for 6 months. (195*10000+285*10000)
A.2.3 Home Based New Born Care (HBNC)
A.2.3.1 HBNC Planning & Monitoring
A.2.4 Infant and Young Child Feeding / IYCF
A.2.5 Care of Sick Children and Severe Malnutrition CSCSM)
State has indicated that, establishment of NRCs to be met from committed amount of 2011-12 (Rs. 100.00 lakhs)
A.2.5.1 NRC - maintenance
Rs. 50,000.00 60 30 25 40 units @50,000 and 20units@25,000
A.2.5.2 NRC - Operational Cost
A.2.5.2.1
NRC - Salary of NRCs staff
A.2.5.2.1.1
NRC - Salary of NRCs staff - Feeding Demonstrator
Rs. 10,000.00 60 nos. 72 54 Cost for 30 units@ 6 months
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 42
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.2.5.2.1.2
NRC - Salary of NRCs staff - Cook
Rs. 4,500.00 60 nos. 32.4 24.3 Cost for 30 units @ 6 months
A.2.5.2.2
NRC - Food Mother & Child
Rs. 100.00 5000 nos. 80 80
A.2.5.2.3
NRC - Wage loss compensation to mother
Rs. 100.00 5000 cases 80 80 16 days Duration
A.2.5.2.4
NRC - Incentive to AWW for Referral
A.2.5.2.5
NRC - Contingency
Rs. 200.00 5000 nos. (SAM Referral
& Contingency)
10 3.33 provided for 33% cases only.
A.2.6 Mgmt of Diarrhoea, ARI and Micronutrient Mal / Shishu sanrashan Mahh
A.2.6.1 Mgmt of Diarrhoea, ARI Procurement of Zinc and Ors
A.2.6.2 Mgmt of Diarrhoea, others
Rs. 50,000.00 27 districts (referral &
treatment of patients.)
13.5 0 Approval pending. Details of activities needs to be shared.
A.2.7 Other strategies/activities - Shishu Sanrashan Mahh(SSM)
State has indicated that, establishment of NRCs to be met from committed amount of 2011-12 (Rs. 100.00 lakhs)
A.2.7.1 SSM - Drug & Nutrition suplliments
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 43
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.2.7.1.1
SSM - Drug - Vit. A solution Procurement
A.2.7.1.2
SSM - Drug - Tab Albendazole Procurment
A.2.7.1.3
SSM - Drug - Tab. IFA (Adult) Procurement
A.2.7.1.4
SSM - Drug - Syrup IFA Procurement
A.2.7.1.5
SSM - cost of drugs distribution
A.2.7.2 SSM - Social Mobilization -advertisement
Rs. 500,000.00
1 5 0 To be included in consolidated IEC/BCC budget
A.2.7.3 SSM - TV spots Rs. 500,000.00 1 5 0
A.2.7.4 SSM - Mobility support and monitoring
A.2.7.4.1
SSM - Mobility support and monitoring at District Level
Rs. 20,000.00 27 districts 5.4 1.35 25% approved.
A.2.7.4.2
SSM - Mobility support and monitoring at BlockLevel Rs. 5,000.00 146 blocks
7.3 1.83
A.2.7.5 SSM - Urban service delivery Rs. 20,000.00 27 districts
5.4 1.35
A.2.8 Infant Death Review (IDR)
A.2.8.1 IDR - Death Reporting
Rs. 50.00 20000 10 0 Duplication. Not approved. Incentive proposed for ASHAs under FMR 2.9.4
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 44
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.2.8.2 IDR - Death Audit
Rs. 500.00 20000 (Review of
infant deaths)
100 25 Rs. 500 (250 each for 2 investigators for community based child death review) for 5,000 deaths
A.2.8.3 IDR - Death Audit( External)
third party audit
5 5
A.2.9 Incentive Under Child Health
A.2.9.1 Incentive - ASHA - HBNC - Incentive for Services
Rs. 250.00 200000 500 500
A.2.9.2 Incentive - ASHA - FBNC - Incentive for Referral
Rs. 200.00 30000 60 0 Not approved.
A.2.9.3 Incentive - ASHA - NRC - Incentive for Referral
Rs. 150.00 5000 7.5 10 Approved @ Rs. 50 as per Operational guidelines for referral and Rs. 150 for follow-up visits for ASHAs only.
A.2.9.4 Incentive - ASHA - IDR - Incentive for Infant Death Reporting
Rs. 50.00 20000 10 10 Approved.
A.2.9.5 Incentive - JSSK - Incentive for Staff
Rs. 100.00 30000 (MO/RMA -
50%, support staff- 50%)
30 0 Not approved. Not backed by explanation or outputs.
A.2.10 JSSK (for Sick neonates up to 30 days)
A.2.10.1
JSSK - Child - Drugs & Consumables
Rs. 1,000.00 30000 cases 300 30 Rs.200 for 15000 cases
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 45
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.2.10.1.1
JSSK- Child - Blood transfusion
Rs. 850.00 200 cases 1.7 0.6 200 cases @ Rs.300
A.2.10.2
JSSK - Child - Diagnostics
Rs. 200.00 10000 cases 20 0 Already covered under drugs and consumables
A.2.10.2.1
JSSK- Child- Food for mother
Rs. 300.00 30000 cases 90 45 15000 cases @Rs.300
A.2.10.3
JSSK - Child - Referral Transport
A.2.10.3.1
JSSK - Child - Home to Hospital
Rs. 500.00 30000 cases 150
75.75
Rs.250 each for home to hospital, 2% interfacility, hospital to home 15000 cases
A.2.10.3.2
JSSK - Child - Interfacility Transfer
Rs. 750.00 5000 cases 37.5
A.2.10.3.3
JSSK - Child - Hospital to Home
Rs. 750.00 30000 cases
225
Sub-total Child Health
2382.83 1132.26
A.9.5 Child Health Training
A.9.5.1 IMNCI training
A.9.5.1.1
IMNCI - TOT on IMNCI
Rs. 252,080.00
5 batches 12.6 12.6 5batch x20 nos.
A.9.5.1.2
IMNCI - Training for ANMs
Rs. 226,320.00
20 batches 45.26 45.26 480 ANM
A.9.5.1.3
IMNCI - Training for LHS/MO/SN
Rs. 252,080.00
16 batches 40.33 40.33 384 SN/LHV
A.9.5.1.4
IMNCI - Training for RMA
Rs. 226,320.00
10 batches 22.63 22.63 240 RMA
A.9.5.2 F-IMNCI training
A.9.5.2.1
F-IMNCI - training-MO's
Rs. 283,360.00
12 batches 34 34
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 46
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.9.5.2.2
F-IMNCI - training- Staff Nurse
A.9.5.2.3
Facility Based Newborn Care training
A.9.5.2.3.1
FBNC- MOs Rs. 95,300.00 23 21.92 21.92 115 MOs
A.9.5.2.3.2
FBNC- SNs Rs. 22,831.00 155 35.39 35.39 413 SN
A.9.5.3 Home Based Newborn Care training
A.9.5.3.1
HBNC - TOT on HBNC
A.9.5.3.2
HBNC - Training for ASHA
Budgeted in ASHA Training
A.9.5.4 Care of Sick Children & Severe Malnutrition training at FRUs
A.9.5.4.1
CSCSM - TOT on CSCSM
A.9.5.4.2
CSCSM - Training for MO's
Rs. 10,000.00 40 4 4 Refresher training on NRC's
A.9.5.5 CH Other training
A.9.5.5.1
NSSK Training
A.9.5.5.1.1
NSSK Training- TOT on NSSK
A.9.5.5.1.2
NSSK - Training for MO's
A.9.5.5.1.3
NSSK - Training for RMAs
Rs. 74,170.00 17 12.61 12.61 RMA training
A.9.5.5.1.4
NSSK - Training for Staff Nurse
A.9.5.5.1.5
NSSK - Training for ANMs
Rs. 74,170.00 100 74.17 74.17
A.9.5.5.2
VHND training
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 47
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.9.5.5.2.1
VHND training- TOT
Rs. 80,000.00 2 1.6 1.6
A.9.5.5.2.2
VHND training- Block level
Rs. 80,000.00 18 14.4 14.4
A.9.5.5.2.3
VHND training- sector level
Rs. 80,000.00 104 83.2 83.2 training of AWW/ANM/LHV/MT/ Supervisor(ICDS)
A.9.5.5.3
CH-IYCF- Operational Exp.
Rs. 5,000.00 200 batches 10 10
Sub Total
Child Health Training 412.11 412.11
B.16.1.2
Procurement - Equipment: CH
Procurement - Equipment: CH- SNCU
9 no. of SNCU 100000 9 0 Approved As this is a Committed unspent balance State may use the last year’s fund
Procurement - Equipment: CH- NBSU
54 no. of NBSU
200000 108 16 Approved For Only 8 new units as per the data of delivery points.
Procurement - Equipment: CH- NBCC
no. of NBCC 0 0
Sub Total Procurement 117 16
16.2.2 Drugs for Sisu Sangrachan Mah
168.2 168.2 Approved
Sub Total
Drugs for Sisu Sangrachan Mah 168.2 168.2
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 48
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
Total Child Health 3080.14 1728.57
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 49
FAMILY PLANNING
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 50
5 YEARS PROJECTION OF KEY INDICATORS
SN. Indicator Current Status
Target/ ELA
2012-13 2013-14 2014-15 2015-16 2016-
17
1 Goal Indicators:
1.1 Total Fertility Rate (TFR)
2.8
(SRS 2010)
2.6 2.5 2.4 2.3 2.2
1.2 Contraceptive Prevalence Rate
(CPR)
47.1
(DLHS-3)
55.0 60.0 65.0 70.0 75.0
1.3 Unmet Need
20.9
(DLHS-3)
16.0 15.0 13.0 12.0 10.0
2 Service delivery:
2.1 IUCD - Total
105100
(HMIS: 2010-11)
150000 160000 175000 200000 210000
2.2 Post-partum IUCD (subset of IUCD-
total) 3000 5000 10000 15000 20000
2.3 Female Sterilisation
142815
(HMIS: 2010-11)
160000 165000 170000 175000 190000
2.4 Post-partum sterilisation (subset of
tubectomy)
485
(HMIS: 2010-11)
3000 5000 70000 15000 20000
2.5 Male sterilisation
7216
(HMIS: 2010-11)
24000 26000 28000 30000 32000
3 Input/ facility operationalisation:
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 51
SN. Indicator Current Status
Target/ ELA
2012-13 2013-14 2014-15 2015-16 2016-
17
3.1 Fixed Day service delivery:
3.1.1 IUCD (daily at DH, SDH, CHC)
2 days/ week at
PHCs and SHCs.
At DH, FRU and
CHCs on daily
basis
Weekly
@ PHC +
CHC
Weekly
@ PHC +
CHC
Weekly
@ PHC +
CHC
Weekly
@ PHC +
CHC
All SHC
3.1.2 Sterilisation 15 DH and 75
FRU All DH
DH + 1
SDH/
FRU per
dist
DH + all
FRU per
dist
DH + all
FRU +
25% PHC
per dist
DH + all
FRU +
50%
PHC
per dist
3.2 Appointment of FP counsellors 27 FP
Counsellors All DH
DH + 1
SDH/
FRU per
dist
DH + all
FRU per
dist
DH + all
FRU per
dist
DH + all
FRU per
dist
CONDITIONALITIES FOR 2012-13: FAMILY PLANNING
SN. Indicator Target / ELA-
2012-13
Minimum Level of Achievement Remarks
By Sep. 2012 By March 2013
1 Goal (target):
1.1 Reduction in TFR – 2013 2.6 NA NA
Current
TFR - 2.8
(SRS-
2010)
2 Service delivery (ELA):
2.1 IUCD: 0 0
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 52
SN. Indicator Target / ELA-
2012-13
Minimum Level of Achievement Remarks
By Sep. 2012 By March 2013
2.1.1 Post-partum IUCD 3000 1200 2700
2.1.2 Interval IUCD 147000 58800 132300
2.2 Sterilisation:
2.2.1 Tubectomy 160000 48000 128000
2.2.2 Post-partum sterilisation (subset of
tubectomy) 3000 900 2400
2.2.3 Vasectomy 24000 7200 19200
3 Training of personnel (target):
3.1 Post-partum IUCD
3.1.1 MO 630 158 473
3.1.2 SN/ ANM
3.2 interval IUCD
3.2.1 MO 225 56 169
3.2.2 SN 0 0
3.2.3 ANM/ LHV 500 125 375
3.3 Minilap 30 8 23 128
trained
3.4 NSV 20 5 15 84
trained
3.5 Laparoscopic 10 3 8 80
trained
4 Others (target):
4.1 Appointment of FP Counsellors 100% DH 100% DH NA
27 FP
Counsello
rs
4.3 Regular reporting of the scheme of “home
delivery of contraceptives by ASHAs”
Regular
reporting
Monthly
reporting till
Sep 12
Quarterly
reporting after
Sep 12
State's 16
districts
under the
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 53
SN. Indicator Target / ELA-
2012-13
Minimum Level of Achievement Remarks
By Sep. 2012 By March 2013
scheme
4.4 Fixed Day Services for IUCD
2 days/ week
at PHCs and
SHCs. At DH,
FRU and CHCs
on daily basis
NA 100%
Number
of
facilities
not
provided
4.5 Fixed Day Services for Sterilisation 15 DH and 75
FRU NA 100%
ROAD MAP FOR PRIORITY ACTION: FAMILY PLANNING
MISSION: “The mission of the national Family Planning Program is that all women and men (in
reproductive age group) in India will have knowledge of and access to
comprehensive range of family planning services, therefore enabling families to plan
and space their children to improve the health of women and children”.
GUIDING PRINCIPLES:
Target-free approach based on unmet needs for contraception; equal emphasis on spacing and
limiting methods; promoting ‘children by choice’ in the context of reproductive health.
STRATEGIES:
1. Strengthening spacing methods:
a. Increasing number of providers trained in IUCD 380A
b. Strengthening Fixed Day IUCD services at facilities
c. Introduction of Cu IUCD 375
d. Delivering contraceptives at homes of beneficiaries (in pilot states/ districts)
2. Emphasis on post-partum family planning services:
a. Strengthening Post-Partum IUCD (PPIUCD) services at least at DH level
b. Promoting Post-partum sterilisation (PPS)
c. Establishing Post-Partum Centers at women & child hospitals at district levels
d. Appointing counsellors at high case load facilities
3. Strengthening sterilization service delivery
a. Increasing pool of trained service providers (minilap, lap & NSV)
b. Operationalising FDS centers for sterilisation
c. Holding camps to clear back log
4. Strengthening quality of service delivery:
a. Strengthening QACs for monitoring
b. Disseminating/ following existing protocols/ guidelines/ manuals
c. Monitoring of FP Insurance
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 54
5. Development of BCC/ IEC tools highlighting benefits of Family Planning specially on
spacing methods
6. Focus on using private sector capacity for service delivery (exploring PPP availability):
7. Strengthening programme management structures:
a. Establishing new structures for monitoring and supporting the programme
b. Strengthening programme management support to state and district levels
KEY PERFORMANCE INDICATORS:
a. % IUD inserted against ELA
b. % PPIUCD inserted against total IUCD
c. % PPIUCD inserted against institutional deliveries
d. % of sterilisations conducted against ELA
e. % post-partum sterilisation against total female sterilisations
f. % of male sterilisation out of total sterilisations conducted
g. % facilities delivering FDS services against planned
h. % of personnel trained against planned
i. % point decline in unmet need
j. point decline in TFR
k. % utilisation of funds against approved
DETAILED BUDGET FAMILY PLANNING
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.3 FAMILY PLANNING
A.3.1 Terminal / Limiting Methods
A.3.1.1 Dissemination of Manuals on Sterilization & QA of Sevices
Rs. 10,000.00 27
2.7
2.7
A.3.1.1.1 Field Review Meeting and Monitoring on Camp and Fixed Day Service
Rs. 25,000.00 173 43.25 0 Not approved. No details available in the write-up.
A.3.1.2 Organise Female Sterilisation Camp
Rs. 15,000.00 550 camps 82.5 82.5
A.3.1.3 Organise NSV Camp Rs. 35,000.00 200 camps 70 70
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 55
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.3.1.4 Compensation for female sterilisation
A.3.1.4.1 Public - Compensation for Female Sterilization
1000 130000 nos. 1300 1300
A.3.1.5 Compensation for male sterilisation
Rs. 1,500.00 20000 300 300
A.3.1.6 Private - Compensation for Male Sterilization
Rs. 1,500.00 4000 nos. 60 60
A.3.1.6.1 Private - Compensation for Female Sterilization - Hospitals
Rs. 1,500.00 30000 nos. 450 450
A.3.1.6.2
Accreditation of Private Partner for Sterilization Servvice
1 1
A.3.2 Spacing Methods
A.3.2.1
IUD - fixed day service
Rs. 20.00 25000 nos.
5 5
A.3.2.2 IUD Services at Health Facilities
Rs. 20.00 125000 25 25
A.3.2.3
Accreditation of Private providers for IUD insertion services
A.3.2.4 Social Marketing of Contraceptives
A.3.2.5 Contraceptive update seminars
A.3.3 Mobility Support for Family Planning
Rs. 1,000.00 1000 camps 10 0 Fund for POL is already approved under camps; not recommended for approval.
A.3.4 Repairs of Laparoscopes
5 0 Not approved. No details available in the write-up.
A.3.5 Other Strategies / Activities
A.3.5.1 Monitoring of IUCD services - HLFPPT
Rs. 5,000,000.00
1 50 Shifted under training section (FMR code A.9.6.6.1).
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 56
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.3.5.2 World Population Day Celebration
A.3.5.2.1 World Population Day Celebration - District level
Rs. 400,000.00 27 108
122.6
State has proposed Rs. 1.00 lakhs/ block. State may note that as per GoI norm Rs. 10000/ block is approved.
A.3.5.2.2 World Population Day Celebration - Block level
Rs. 100,000.00 146
146
Sub-total Family Planning (excluding
compensation)
448.45 208.8
Sub-total Sterilisation and IUD
compensation & NSV camps
2210 2210
A.9.6 Family Planning Training
A.9.6.1 Laparoscopic Sterilization Training
A.9.6.1.1 Laparoscopic Sterilization - TOT on Leparoscop
A.9.6.1.2 Laparoscopic Sterilization - MO's / SN / OT asst.
Rs. 181,380.00 5 batches 9.07 5.44 Proposed rate is very high, Recommended for approval @ Rs. 43900/ batch for a batch of 2 doctors
A.9.6.2 Minilap Training - TOT on Minilap
0
A.9.6.2.1 Minilap Training - Training for MO's
Rs. 151,150.00 6 batches 9.07 5.7 (1) State may note that as per GoI norm, maximum of 4 participants are allowed/ batch and rate/ batch is Rs. 71240.
(2) Number of batches have been increased to 8 and accordingly recommended for approval.
A.9.6.3 NSV Training
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 57
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.9.6.3.1 NSV Training - Training for MO's
Rs. 66,625.00 4 2.67 1.63 (1) State may note that as per GoI norm, maximum of 4 participants are allowed/ batch and rate/ batch is Rs. 32600.
(2) Number of batches have been increased to 5 and accordingly recommended for approval.
A.9.6.4 IUD Insertion Training
A.9.6.4.1 TOT PPIUCD Rs. 49,950.00 6 3 3
A.9.6.4.2 PPIUCD Insertion Training-MO/SN/LHV
Rs. 111,025.00 22 24.43 24.43
A.9.6.4.3 IUD Insertion Training-ANM
Rs. 49,950.00 60 29.97 29.97
A.9.6.4.4 PPIUCD Insertion Training-MO/
Rs. 49,950.00 50 24.98 24.98
A.9.6.5 Contraceptive Update/ISD Training
A.9.6.6 Other FP training (pl. Specify)
A.9.6.6.1 IUCD training facilitated by HLFPPT
209.69 (1) Shifted from FMR A.3.4 of state budget sheet.
(2) State has proposed a lump sum amount of Rs. 50.00 lakhs.
(3) An amount of Rs. 206.69 lakhs is approved for IUCD training facilitated by HLFPPT.
Sub total Training 103.19 304.84
B.16.1.3 Procurement - Equipment: FP
25 No. of Laproscope
600000 150 150 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 58
FMR Code Activity Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
1500 NSV kits,5000 IUCD KITS, 270 Minilaps other equipment
20 20 Approved Although state has not provided unit cost, proposed amount is less than the total cost of individual kits (as per standard rates).
sub total
Equipment procurement 170 170
Total FP 2931.64 2893.64
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 59
ADOLESCENT HEALTH
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 60
ROAD MAP FOR PRIORITY ACTION: ADOLESCENT HEALTH
SETTING UP OF AH CELL A unit for adolescent health at state level with a nodal officer supported by four consultants one each for ARSH, SHP, Menstrual hygiene and WIFS; one nodal officer (rank of ACMHO) for all the components of Adolescent Health at district level to take care of Adolescent health programme including the SHP.
PROGRAMME SPECIFIC ESSENTIAL STEPS FOR IMPLEMENTATION: I. Adolescent Reproductive Sexual Health (ARSH) Programme
Clinics
Number of functional clinics at the DH, CHC, PHC and Medical Colleges(dedicated
days, fixed time, trained manpower).
Number of clinics integrated with ICTCs
Quarterly Reporting from the ARSH clinics to be initiated to GoI.
Establish a Supportive supervision and Monitoring mechanism
Outreach
Utilisation of the VHND platform for improving the clinic attendance.
Demand generation in convergence with SABLA and also through Teen Clubs of
MOYAS
Capacity Building/Training:
Calculation of the training load and development of training plans/ refresher
trainings.
Deployment of trained manpower at the functional clinics.
II. School Health Programme:
GoI Guidelines including terms of reference of stakeholders adapted by States and
operational plan in place..
School health committee with diverse stakeholders beyond the health department; this
committee with representation of academia will be responsible for implementation
and monitoring of the programme.
Involvement of nodal teachers from schools in the programme (Screening and
communication - preventive and promotive) is to be ensured.
Height / weight measurement and BMI calculation should be part of School Health Card.
All children in government and government aided schools should be covered.
The programme should focus on three Ds- Deficiency, Disease and Disability.
Referral of children must be tied up and complete treatment at higher facilities to be
ensured.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 61
An effort should be made to have dedicated teams for school health. The teams should
also conduct health check- ups for children below 6 years at AWCs.
III. Menstrual Hygiene Scheme (MHS):
Formation of State and district level steering committees.
Training / re-orientation of service providers(MOs, ANMs, ASHAs)
Monthly meeting with BMO.
Regular feedback on quality of sanitary napkins to be sent to GoI
Identification of appropriate storage place for sanitary napkins.
Mechanism of distribution of SN right upto the user level.
Reporting and accounting system in place at various levels.
Utilizing MCTS for service delivery by checking with ASHAs and ANMs about supply
chain management of IFA tabs and Sanitary napkins.
Distribution of Sanitary Napkins to school going adolescent girls to be encouraged in
schools and preferably combined with Weekly Iron Folic Acid Supplementation (WIFS).
IV. Weekly Iron and Folic Acid Supplementation programme (WIFS):
Procurement policy in place for procurement of EDL including IFA and deworming
tablets.
Establish “Monday” as a fixed day for WIFS.
Plan for training and capacity building of field level functionaries of concerned
Departments(i.e. Department of Women and Child Development and Department of
Education) and plan for sensitization of Programme Planners on WIFS.
Ensure that monitoring mechanism as outlined in the operational framework (Shared
with the States during the National Adolescent Health Workshop) are put in place
across levels and departments.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 62
DETAIL BUDGET: ARSH
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.4 ADOLESCENT REPRODUCTIVE AND SEXUAL HEALTH (ARSH)
A.4.1 Adolescent Services at Health Facilities
A.4.1.1 Planning, Dissemination and Monitoring
Rs. 20,000.0
0
27
5.4
5.4 Approved
A.4.1.2 Establishment of stand alone AFHC
A.4.1.2.1
Establishment of model AFHC
Rs. 800,000.
00
2
16
16 Approved
A.4.1.2.2
Establishment of other AFHC
Rs. 50,000.0
0 52
26 11.5 In the write-up, State has proposed setting up of 23 Stand Alone Clinics, hence budget for 23 Clinics may be approved.
A.4.1.3 Clinics - Operational expenses- stand alone AFHC
Rs. 25,000.0
0
54 13.5 2.76 In the write-up, State has proposed operational expenses @ Rs 1000/- per month for 23 Stand Alone Clinics, hence budget for 23 clinics approved.
A.4.1.4 Establishment of integrated AFHC
Rs. 20,000.0
0
27 5.4 3.6 In the write up State has provided a list of 18 AFHCs to be integrated with ICTC, but budget proposed is for 27 AFHCs. Budget for 18 AFHCs approved.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 63
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.4.1.5 Clinics - Operational expenses- integrated AFHC
Rs. 25,000.0
0
27 6.75 2.16 In the writeup, Rs 1000/- per month is budgeted as operational expenses for the Integrated AFHCs but in the budget sheet,Rs 25000/- per clinic per month is proposed. Budget @ Rs 1000/- per clinic for 18 clinics approved.
A.4.1.6 Contractual appointment of Counsellors
A.4.1.7 Mobility support to ICTC councellor for Outreach activity
Rs. 100.00 500
0.5 0.5 Approved
A.4.2 School Health Programme
Approval pending. A revised proposal with dedicated team based approach is expected.
A.4.2.1 Planning, Dissemination and Monitoring
Rs. 50,000.0
0
27 13.5
A.4.2.2 Contractual Appointment of Dentists
A.4.2.3 Health education
A.4.2.3.1
Health cards Rs. 1.20 3000000 36
A.4.2.3.2
Health Education Books
Rs. 30.00 70000 21
A.4.2.4 Regional review meetings
Rs. 25,000.0
0
16 4
A.4.2.5 Online monitoring system of Sick students
Rs. 50,000.0
0
27 13.5
A.4.3 Other Stratigies/activities
Sub-total ARSH 161.55 41.92
A.9.7 TRG - ARSH Training
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 64
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.9.7.1 Training for MO's Rs. 112,987.
50
4 4.52 4.52 Approved
A.9.7.2 Training for ANMs / LHVs/RMA
Rs. 145,188.
00
8 11.62 5.81 In the write-up, 4 batches of training is proposed, budget for 4 batches may be approved.
A.9.7.3 Training for AWWs/ANM
Rs. 145,188.
00
4 5.81 5.81 Approved
Sub total training 21.95 16.14
B.16.2.2 Procurement - Drugs & Supplies for CH + ARSH
Approved 168.2 lakhs for SSM drugs (CH), Rs 44.98 for ARSH drugs detailed in write-up. School health drugs, drugs for diarrhoea management through VHND.13.5 added.
Procurement of IFA( For Out of School Adolescents)
6793700 0.6 40.76 40.76 Approved
Procurement of Albendazole(For Out of School Adolescents)
301340 1.4 4.22 4.22 Approved
Sub total ARSH drug 44.98 44.98
Total ARSH 228.48 103.04
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 65
URBAN RCH
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 66
ROAD MAP FOR PRIORITY ACTION: URBAN RCH
Carry out a comprehensive third party evaluation of UHCs/ NGO performance including an assessment of reasons for low expenditure (9.6 % in the first 9 months of 2011-12). State to apprise MoHFW of action taken on the basis of the findings of the evaluation by September 2012.
Monitor performance of UHCs/NGOs against targets.
Staffing at UHCs to be linked to case load
BUDGET: URBAN RCH
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.5 URBAN RCH Approval pending. Details of service
delivery is not clear. Existing UHCs and
their functioning not mentioned.
A.5.1 Urban RCH Services
A.5.1.1 Planning for urban bodies
Rs. 100,000.00
27 27 0
A.5.1.2 Minor civil works
A.5.1.3 Minor equipment &others
Rs. 50,000.00 30 15 0
A.5.1.4 Urban RCH - Operational Exp.
A.5.1.4.1 Salary of MO, SN& LT for urban slums
A.5.1.4.2 Drugs and Consumables other than RCH kit
Rs. 100,000.00
30 30 0
A.5.1.4.3 Monitoring and quality control
5 0
A.5.1.4.4 Contingency Rs. 50,000.00 30 15 0
Sub-total Urban Health
92 0
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 67
TRIBAL HEALTH
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 68
ROAD MAP FOR PRIORITY ACTION: TRIBAL HEALTH
State to closely monitor progress (physical, expenditure) on all health activities in notified tribal
areas.
On a quarterly basis, a progress report, including constraints faced and action proposed to be
sent to MoHFW.
The State shall focus on health entitlements of vulnerable social groups like SCs, STs, OBCs,
minorities, women, disabled, migrants etc.
BUDGET: TRIBAL HEALTH
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.6 TRIBAL RCH
A.6.1 Planning & Monitoring of Services
Rs. 100,000.00
10 10 10 Approved subject to details of planning & monitoring system being provided including break up of costs.
A.6.2 Health camps
A.6.3.1 Health camps in haat bazar
Rs. 25,000.00
120 30 12 120*Rs.10,000
A.6.3.2 Health camps In schools/others
Rs. 25,000.00
60 15 12 Should be a part of comprehensive school health
A.6.4 Incentives
A.6.4.1 Incentives- Institutional Deliveries - Incentive to attendant in LWE Blocks
Rs. 350.00 20000 70 0 Not approved
A.6.4.2 Incentive- ASHA- Additional Incentive to ASHA in LWE Blocks
Rs. 100.00 15000 15 15 for Insitutional delivery, NRC referral, FBNC
Sub-total Tribal Health
140 49
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 69
Detail budget: vulnerable group
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.11 Vulnerable Groups
A.11.1 Planning and monitoring.
5 0
A.11.2 Services for Vulnerable groups
Rs. 15,000.00
100 15 15
A.11.3 Special camps in PTG clusters
Rs. 20,000.00
40 8 8
Sub-total Vulnerable groups
28 23
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 70
PC-PNDT
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 71
MISSION: The mission of PNDT program is to improve the sex ratio at birth by regulating the pre-
conception and prenatal diagnostic techniques misused for sex selection.
Guiding Principle:
Deterrence for unethical practice sex selection to ensure improvement in the child sex ratio
STRATEGIES:
Strengthening programme management structures:
Appointment of Nodal officer
Strengthening of Human resource
Formation of PNDT Cell at state and district level
Establishment of statutory bodies under the PC&PNDT Act
Constitution of 20 member State Supervisory Board
Reconstitution every three years (other than ex-officio
members)
Four meetings in a year
Notification of three members Sate Appropriate Authority,
Constitution of 8 member State Advisory Committee
Reconstitution in every 3 years
At least 6 meetings in a year
Notification of District Appropriate Authorities
Constitution of 8 member district Advisory Committees
Reconstitution in every 3 years
At least 6 meetings in a year
Strengthening of monitoring mechanisms
Monitoring of sex ratio at birth through civil registration of birth data
Formulation of Inspection and Monitoring committees
Increasing the monitoring visits
Review and evaluation of registration records
Online availability of PNDT registration records
Online filling and medical audit of form Fs
Ensure regular reporting of sales of ultrasound machines from
manufactures
Enumeration of all Ultrasound machines and identification of un-registered
ultrasound machine
Ensure compliance for maintenance of records mandatory under the Act
Ensure regular quarterly progress reports at state and district level
Capacity building and sensitisation of program managers
Appropriate Authorities
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 72
Advisory committee members
Nodal officers both State and District
Sensitisation and Alliance building with
Judiciary
Medical Council / associations
Civil society
Development of BCC/ IEC/ IPC Campaigns highlighting provisions of PC& PNDT Act and
promotion of Girl Child
Convergence for Monitoring of Child sex Ratio at birth
KEY PERFORMANCE INDICATORS:
Improvement in child sex ratio at birth
% of civil registration of births
Statutory bodies in place
% registrations renewed
Increase in inspections and action taken
No. of unregistered machines identified
% of court cases filed
% of convictions secured
No. of medical licences of the convicted doctor cancelled or suspended
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 73
DEATIL BUDGET: PNDT
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.7 PNDT Activities - RCH PNDT budgeted in IEC
A.7.1 PNDT - Support to PNDT Cell
A.7.1.1 Operationalise PNDT Cell Rs. 25,000.00
Incentive to informers (50)
12.5 12.5 Approved.
A.7.1.2 Orientation of Programme Managers and service provider on PC&PNDT Act.
Rs. 1,000.00
200 2 2 Approved.
A.7.2 PNDT - Other activities
Sub-total PNDT & Sex Ratio 14.5 14.5
Total PNDT & Sex Ratio activites 14.5 14.5
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 74
HUMAN RESOURCES AND PROGRAM MANAGEMENT
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 75
ROAD MAP FOR PRIORITY ACTION: HUMAN RESOURCES
A comprehensive HR policy to be formulated and implemented; to be uploaded on the
website too.
Underserved facilities particularly in high focus districts/ areas, to be first strengthened
through contractual staff engaged under NRHM. Similarly high case load facilities to be
supplemented as per need
All appointments under NRHM to be contractual; contracts to be renewed not routinely
but based on structured performance appraisal
Decentralized recruitment of all HR engaged under NRHM by delegating recruitment
process to the District Health Society under the chairpersonship of the District
Collector/ Rogi Kalyan Samitis.
Preference to be given to local candidates to ensure presence of service providers
in the community. Residence at place of posting to be ensured.
Quality of HR ensured through appropriate qualifications and a merit-based,
transparent recruitment process.
Vacant regular posts to be filled on a priority basis: at least 75% by March 2013.
It has been observed that contractual HR engaged under NRHM i.e. Specialists,
Doctors (both MBBS and AYUSH), Staff Nurses and ANM are not posted to the desired
extent in inaccessible/hard to reach areas thereby defeating the very purpose of the
Mission to take services to the remotest parts of the country, particularly the un-
served and under-served areas. It must therefore be ensured that the remotest Sub-
Centres and PHCs are staffed first. Contractual HR must not be deployed in better
served areas until the remotest areas are adequately staffed. No Sub-Centre in
remote/difficult to reach areas should remain without any ANM. No PHC in these
areas should be without a doctor. Further, CHCs in remote areas must get contractual
HR ahead of District Hospitals. Compliance with these conditionalities will be closely
monitored and salaries for contractual HR dis-allowed in case of a violation.
Details of facility wise deployment of all HR engaged under NRHM to be displayed on
the state NRHM web site.
For SHCs with 2 ANMs, population to be covered to be divided between them. Further,
one ANM to be available at the sub-centre throughout the day while the other ANM
undertakes field visits; timings for ANM’s availability in the SHC to be notified.
AYUSH doctors to be more effectively utilised eg for supportive supervision, school
health and WIFS.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 76
All contractual staff to have job descriptions with reporting relationships and
quantifiable indicators of performance.
Performance appraisal and hence increments of contractual staff to be linked to
progress against indicators.
Staff productivity to be monitored. Continuation of additional staff recruited under
NRHM for 24/7 PHCs/FRUs/SDH, etc , who do not meet performance benchmarks, to
be reviewed by State on a priority basis.
All performance based payments/ difficult area incentives should be under the
supervision of RKS/ Community Organizations (PRI).
DETAILED BUDGET: HUMAN RESOURCES
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.8 INFRASTRUCTURE (MINOR CIVIL WORKS) & HUMAN RESOURCES
A.8.1 Contractual Staff & Services
A.8.1.1 ANMs,Supervisory Nurses, LHVs
9000 ANMs 24x7 PHCs (100)
1368 236.04 281 ANMs approved for SCs where deliveries are being conducted as per last year's (2011-12) approval. State to come up with redeployment plan for ANMs and SNs. State needs to come up with HR plan woven around the delivery points. Rest HR not approved.
9000 2nd ANMs in SHC (500)
12000 SNs CD (29)
12000 SNs FRUs (180)
12000 SNs SNCUs (96)
12000 SNs Non FRU CHC (95)
12000 SNs 24x7 PHC (100)
A.8.1.2 Laboratory Technicians, MPWs
10,000.00 LTs CD (29) 26.1 26.1 Approved. State to fill up the existing vacancies at the earliest from the State budget.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 77
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.8.1.3
Specialists (Anaesthetists, Paediatricians, Ob/Gyn, Surgeons, Physicians, Dental Surgeons, Radiologist, Sonologist, Pathologist, Specialist for CHC)
A.8.1.4 PHNs at CHC, PHC Level
A.8.1.5 Medical Officers at CHCs / PHCs
20000 Dentists at CHCs (141)
221.4 52.2 Approved : Rs. 52.20lakhs ( MOs at PHCs/CD) Not approved : Rs. 169.20lakhs (Dentists at CHCs)
30000 MOs at PHCs/CD (29)
A.8.1.6 Additional Allowances/ Incentives to M.O.S of PHCs and CHCs
A.8.1.7 Others - Computer Assistants/ BCC Co-Ordinator Etc
8000.00/ FP counsellor
27 0 19.44 (1) State was advised to propose for FP counsellors at high case load facilities; however, same has not been addressed in the revised PIP. As per the discussion with state nodal officer, it is recommended to approve 27 counsellors one at each district @ Rs. 8000/ month (2) Salary for counsellors is proposed for 9 months only considering it would take 2-3 months to complete recruitment process.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 78
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
A.8.1.8 HR - Incentive/ Awards Etc. to SN, ANMs Etc.
2571.65
500 Approved as per last year's (2011-12)
A.8.1.8.1
Incentive for EMoC and LSAS
500.00 /case
EMoC Incentives for C-Section (2500)
50 20 Performance incentive to the LSASand EmOC trained doctor can be approved as lump sum for Rs. 20.00 lakhs against proposed budget of Rs.25.00 lakhs. State to ensure that incentive is applicable after a threshold level. Rs.25 lakhs -Nurse and OT Incentive for C-Section: Not recommended for approval in the present format for those working in the LWE area. Proposal needs revision.
LSAS Incentives for C-Section (2500)
500.00 /case
Nurse and OT Incentive for C-Section (2500)
1000.00 /case
A.8.1.9 Human Resources Development (Other Than Above)
15000 RMAs at CHC (282)
1377.6 1377.6 Approved. Rs. 507.60lakhs: RMAs at CHC
15000 RMAs at 24x7 PHC (400)
Rs. 540.00lakhs: RMAs at 24x7 PHC
15000 RMAs at other PHC (550)
Rs. 330.00lakhs: RMAs at other PHC
A.8.1.9.1
Technical staff for DH strengthening (from MFP)
Rs.135 lakhs shifted from MFP not approved. State to provide comprehensive HR plan weaved around the
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 79
FMR Code Activity
Unit Rate (Rs.)
Physical Target/
BUDGET 12-13 (Rs. Lakhs)
Remarks Expected Output Proposed Approved
delivery points and OPD/IPD load.
Sub-total Infrastructure & HR 5614.75 2231.38
A.9.10 TRG - Training (Nursing)
A.9.10.1 Strengthening of Existing Training Institutions/Nursing School (HR)
Rs. 100,000.00
13 13 13
A.9.10.2 New Training Institutions/School (Other Strengthening)
A.9.11 Other Health Personnel
A.9.11.1 Training of emergency management of Mos
Rs. 10,000.00
146 14.6 14.6 at AIMS/ Hyderabad in co-ordination with GVK- EMRI
A.9.11.2 RMAs - programme management training
Rs. 10,000.00
750 75 0 at CMC Vellore
A.9.11.3 RMAs professional development prog
Rs. 15,000.00
100 15 0 at CMC Vellore on paediatrics.
A.9.11.3.2
Career Development of ANMs, Staff Nurses, AWW,AWS
A.9.11.3.2.1
Career Development of ANMs - GNM Course
Rs. 180,000.00
10 18 18
Sub-total Training 135.6 45.6
Total Infrastucture and HR 5750.35 2276.98
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 80
ROAD MAP FOR PRIORITY ACTION: PROGRAMME MANAGEMENT
A full time Mission Director is a prerequisite. Stable tenure of the Mission Director
should also be ensured.
A regular full time Director/ Joint Director/ Deputy Director (Finance) (depending on
resource envelope of State), from the State Finance Services not holding any additional
charge outside the Health Department must be put in place, if not already done,
considering the quantum of funds under NRHM and the need for financial discipline and
diligence.
Regular meetings of state and district health missions/ societies must take place.
Key technical areas of RCH to have a dedicated / nodal person at state/ district levels;
staff performance to be monitored against targets and staff sensitised across all areas of
NRHM such that during field visits they do not limit themselves only to their area of
functional expertise.
Performance of staff to be monitored against benchmarks; qualifications , recruitment
process and training requirements to be reviewed.
Delegation of financial powers to district/ sub-district levels in line with guidelines
should be implemented.
Funds for implementation of programmes both at the State level and the district level
must be released expeditiously and no delays should take place.
Evidence based district plans prepared, appraised against pre determined criteria;
district plans to be a “live” document. Variance analysis (physical and financial) reports
prepared and discussed/action taken to correct variances.
Supportive supervision system to be established with identification of nodal persons for
districts; frequency of visits; checklists and action taken reports.
Remote/ hard to reach/ high focus areas to be intensively monitored and supervised. An
integrated plan and budget for providing mobility support to be prepared and
submitted for review/approval; this should include allocation to State/ District and Block
Levels.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 81
DETAILED BUDGET: PROGRAMME MANAGEMENT
FMR Code Activity
Unit Rate (Rs.)
Physical Target
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.10 PROGRAMME / NRHM MANAGEMENT COST (PMC)
A.10.1 Strengthening of SHS /SPMU
209.68 125 SPMU salary approved as per last year's (2011-12) RoP.
A.10.1.1 Mobility support 42 10.5 25% approved on interim basis. State to provide comprehensive mobility plan and budget.
A.10.1.2 Office rent/renovation/admin cost/contingency
196 58 As per last year
A.4.1.8 ARSH cell 18.2 18.2
A.10.2 Strengthening of DPMU/DHMU
1373.23 720.9 27 District Programme Manager @ Rs.40700/PM 27 DAM @ Rs. 29700/PM 27 District Training Coordinator @ Rs. 16500/PM 27 District Data Officer @ Rs. 26400/PM 27 Sub-engineer @ Rs. 30000/PM 27 Account Assistant @ 12100/- PM 81 Data entry operators @ Rs. 8800/-PM 27 Hospital Consultant @ Rs. 28600/PM
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 82
FMR Code Activity
Unit Rate (Rs.)
Physical Target
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
27 Data Assistant @ Rs. 12100/-PM
Approved DPMU for 27 district staff including 9 new districts.
A.10.2.1 Mobility support Rs. 25,000.00
27 81 20.25 25% approved on interim basis. State to provide comprehensive mobility plan and budget.
A.10.2.2 Administrative exp. / Contingency exp
Rs. 10,000.00
27 48.6 48.6
A.10.3 Strengthening of Block PMU
2431.08 1493.82 Approved as per last year
A.10.3.1 Mobility support Rs. 10,000.00
146 175.2 43.8 25% approved on interim basis. State to provide comprehensive mobility plan and budget.
A.10.3.2 PHC Administrative exp./contingency
146 175.2 175.2
A.10.4 Other Strengthening - Strengthening of Commissioner's office
47.8 0 Not approved. State may use its own resources.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 83
FMR Code Activity
Unit Rate (Rs.)
Physical Target
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.10.4.1 PMC - Other - Strengthening of SHS
130.36 68.4 Based on the revised programme management strengthening proposal of the state following posts on contract /deputation approved: Director finance @ Rs75000, Programme manager-infrastructure, PM-procurement & logistics, PM-ASHA, PM-PPP/Referral transport, PM-HRD, PM-training, PM- Maternal health (2), PM-CH, PM-FP, PM-AH @Rs.45000 per month. State needs to share detailed job descriptions, key performance indicators, organization chart, and recruitment process to be followed to recruit the above mentioned personnel. It is suggested that steps to strengthen district and block PMU be taken only after completion of state level strengthening.
A.10.4.2 Strengthening of SIHFW
67.28 0 Not approved.
A.10.4.3 Financial Management
A.10.4.3 Tally
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 84
FMR Code Activity
Unit Rate (Rs.)
Physical Target
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
.1
A.10.4.3.2
Tally- New licenses
Rs. 8,100.00 743 60.18 60.18
A.10.4.3.3
Tally- Annual Fee Rs. 1,620.00 165 2.67 2.67
A.10.4.3.4
Technical Support From Tally & NFMIS
10 40 Rs.30 lakhs for NFMIS -Pilot State for NFMIS
A.10.5 Statutory audit Rs. 1,000,000.0
0
1 10 10
A.10.6 Concurrent Audit - State
Rs. 500,000.00
1 5 5
Concurrent Audit - Dist
Rs. 75,000.00
27 20.25 20.25
Sub-total Programme
Management
5103.73 2920.77
A.9.8 Programme Management Training
A.9.8.1 SPMU training
A.9.8.1 Induction training - Newly Recruited staff 5days
Rs. 5,000.00 400 20 20
A.9.8.2 DPMU training
A.9.8.2.1
CMO/CS/BMO 3 days
Rs. 5,000.00 250 12.5 0
A.9.8.2.2
SPMU/DPMU for 3 days
Rs. 5,000.00 150 7.5 7.5
A.9.8.2.3
BPMU- 3 days Rs. 3,500.00 500 17.5 17.5
A.9.8.2.4
5 days Rs. 5,000.00 220 11 0
A.9.8.2.5
RMA/LHV/ and BEE
Rs. 3,000.00 600 18 0
A.9.8.2.6
HMIS- 3 days Rs. 3,000.00 800 24 24
A.9.8.2.7
PIP Planning 3 days
Rs. 3,000.00 200 6 0
A.9.8.2.8
Monitoring and evaluation 3 days
Rs. 5,000.00 200 10 0
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 85
FMR Code Activity
Unit Rate (Rs.)
Physical Target
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.9.8.2.9
Change management and Leadership 5 days
Rs. 8,000.00 100 8 8
A.9.8.2.10
Workshops/ seminar
A.9.8.2.10.1
Workshops/ seminar National Level for 3 days
Rs. 1,000,000.0
0
1 10 0
A.9.8.2.10.2
Workshops/ seminar state Level for 3 days
Rs. 500,000.00
4 20 0
A.9.8.2.10.3
Workshops/ seminar regional level 3 days
Rs. 300,000.00
4 12 0
A.9.8.2.10.4
Workshops/ seminar District level 3 days
Rs. 200,000.00
10 20 0
Sub Total
Programme Management Training 196.5 77
Total 5300.23 2997.77
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 86
MISSION FLEXI POOL (MFP)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 87
ASHA
TARGETS:
S. No. Activity Targets
1. ASHAs with Drug kits Refilling 60000
2. ASHAs trained in 17th Round 60000
ROAD MAP FOR PRIORITY ACTION:
Clear criteria for selection of ASHA
Well functioning ASHA support system including ASHA days, ASHA coordinators
Performance Monitoring system for ASHAs designed and implemented (including
analysis of pattern of monthly payments; identification of non/under-performing ASHAs
and their replacement; and reward for well performing ASHAs). State to report on a
quarterly basis on ASHA’s average earnings/ range per month.
Timely replenishment of ASHA kits.
Timely payments to ASHAs and move towards electronic payment.
Detailed data base of ASHAs created and continuously updated; village wise name list of
ASHA to be uploaded on website with address and cell phone number
DETAIL BUDGET: ASHA
FMR Code Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.1 ASHA
B 1.1 ASHA COST
B.1.1.1 ASHA - Selection & Training (Mitanin Training)
Sub total
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 88
FMR Code Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
ASHA - TOT of State/ district coordinator (ASHA)
35 District Coordinator
3600 1.26 1.26 Approved
ASHA - TOT of Block coordinator (ASHA)
295 Block Coordinator (6 days)
3600 10.62 10.62 Approved
ASHA - TOT of Community Coordinators (ASHA)DHS
3100Mitanin Trainers (6 days)
3000 93 93 Approved
ASHA - Training for Mitanins
ASHA - Training for Mitanins 17th Module (6 days)
60000 No of Mitanins (6 days )
1200 720 720 Approved
Bridge Training for 6000 newly selected Mitanins (6 days)
6000 No of Mitanins
1200 72 72 Approved
ASHA - Development & Printing of training Materials SHRC
60000 50 30 30 Approved
ASHA - District level Meetings and review, contingencies
146X 12 months
500 8.76 8.76 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 89
FMR Code Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
ASHA - Block Co- coordinator
295 co-coordinators for 25 days per monthX 12 months
6200 219 219 Approved
ASHA - Compensation- Mitanin Trainers
3100 co-coordinators for 20 days per month X 12 months
2800 1041.6 1041.6 Approved
ASHA - Block level Meetings and contingencies
146 blocksX 12 months
4500 78.84 78.84 Approved
Subtotal training
2275.08 2275.08
B.1.1.2 ASHA - Mitanin Drug Kit
ASHA - Mitanin Drug Kit Procurement
0 0 0 0
ASHA - Drug Kit Refilling
60000 450 270 210 Approved As the unit cost approved for drug Kit in other State is Rs 350.00
ASHA - Drug Kit Transportation and Logistics
60000 75 45 45 Not Approved
Subtotal Drug Kit
315 255
B.1.1.4 ASHA - Awards
ASHA - Awards- state level for 10 programmes
10 no. of awards Non-cash awards will be given
0 0 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 90
FMR Code Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
ASHA - Awards- District level 1st prize-, 2nd prize
27 no. of districts Non-cash awards will be given
0 0 Approved
B.1.1.5. ASHA Resource centre /ASHA mentoring Group.
ASHA Resource Centre Team (in SHRC) for Design, Coordination and Monitoring of Mitanin Programme (includes State level costs and 35 District Coordinators)
1 13144000 131.44 131.44 Approved
ASHA- Mitanin Help Desk
197 3600 85.1 85.1 Approved.
ASHA -Mitanin Help Line
2.4 0 Not Approved.
Subtotal ARC,AWARDS,Incentives
218.94 217.54 Approved
SUB TOTAL ASHA
2809.02 2747.62
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 91
FMR Code Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
A.9.11.3 Other Training & Capacity Building Programmes - RCH
A.9.11.3.1 Career Development of MITANIN
A.9.11.3.1.2
Career Development of MITANIN - BSc Nursing course
Rs. 70,000.00
27 18.9 18.9
SUB TOTAL ASHA
2827.92 2766.52
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 92
UNTIED FUND, CORPUS GRANT AND ANNUAL MAINTAINENCE GRANT
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 93
UNTIED FUNDS/ RKS/ AMG ROAD MAP FOR PRIORITY ACTION:
Timely release of untied funds to all facilities; differential allocation based on case load. Funds to be utilized by respective RKS only and not by higher levels.
Review of practice of utilising RKS funds for procurement of medicines from commercial medical stores and accordingly revisit guidelines for fund utilisation by RKS.
Well functioning system for monitoring utilization of funds as well as purposes for which funds are spent.
Plan for capacity building of RKS members developed and implemented.
RKS meetings to take place regularly.
Audit of all untied, annual maintenance grants and RKS funds.
The State must take up capacity building of Village Health & Sanitation Committees Rogi
Kalyan Samitis and other community/ PRI institutions at all levels
The State shall ensure regular meetings of all community Organizations/ District / State
Mission with public display of financial resources received by all health facilities
The State shall also make contributions to Rogi Kalyan Samitis
BUDGET: UNTIED FUND, CORPUS GRANT AND ANNUAL MAINTAINENCE GRANT
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.2 Untied Funds
B.2.1 Untied Fund -CHCs
For 140 CHCs
50000 70 70 Approved. For 140 CHCs @ 50000 as per RHS 2011. As the Utilization in FY 2011-12 was more than 100%
B.2.2 Untied Fund -PHCs
For 741 PHCs
25000 185.25 160.05 Approved For 741 PHCs (RHS 2011) as per Utilization in the FY 2011-12. (86.40%).
B.2.3 Untied Fund -Sub Centers
For 5076 SHC
10000 507.6 507.6 Approved For 5076 SHCs (RHS 2011) as the Utilization in FY 2011-12 was more than 100%
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 94
B.2.4 Untied Fund -VHSNC
For 20308VHSCs
10000 2030.8 2030.8 Approved. For 20308 VHSNCs (RHS 2011) @Rs 10000 as the Utilization in the FY 2011-12 was more than 100%. State should make Joint Account Operational for all VHSNCs.
B.2.5 Untied Fund - Civil Dispensary
For 36 CD 25000 9 0 Not Approved
SUB TOTAL UNTIED
2802.65 2768.45
B.3 Annual Maintenance Grants (AMG)
B.3.1 AMG - CHCs - Annual Maintenance Grants
140 100000 140 135 Approved For 135 CHCs (RHS 2011) in government buildings @ Rs 1 Lakh.
B.3.2 AMG - PHCs - Annual Maintenance Grants
658 50000 329 194.5 Approved For 389 PHCs in government buildings (RHS 2011).
B.3.3 AMG - Sub Centers - Annual Maintenance Grants
4053 10000 405.3 235 Approved For 2350 SCs (RHS 2011) functional in government buildings @ Rs 10,000.
B.3.4 AMG - Civil Dispensary - Annual Maintenance Grants
20 50000 10 0 Not Approved
SUB TOTAL AMG
884.3 564.5
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 95
B.6 Corpus Grants to HMS/RKS (JDS)
B.6.1 JDS - District Hospital
26 500000 130 85 Approved For 17 District Hospitals functional As per MIS 31.12.2011 Registered JDS @ Rs 5 lakhs Approval is Subjected to the implementation of deferential financing by the state.
B.6.2 JDS - CHCs 140 100000 140 140 Approved For 140 JDS at CHCs @ Rs 1 lakh each. Approval is Subjected to the implementation of deferential financing by the state.
B.6.3 JDS - PHCs 741 100000 741 695 Approved For 695 JDS registered at PHCs as per MIS 31.12.2011 PHCs @ Rs 1 lakh each. Approval is Subjected to the implementation of deferential financing by the state.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 96
B.6.4 Other. JDS -Civil Hospitals
16 500000 80 80 Approved For 16 Civil Hospitals @ Rs 5 lakh.As per MIS 26 Registered above to CHC and below District level facilities. Approval is Subjected to the implementation of deferential financing by the state.
JDS – Training of JDS members 3 days training including training Material
3000 3000 90 90 Approved
SUB TOTAL JDS
1181 1090
Total 4867.95 4422.95
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 97
NEW CONSTRUCTIONS/ RENOVATION AND SETTING UP
Construction of new SCs only in high focus districts. All newly constructed SCs to be strengthened with 2 ANMs and service delivery closely monitored. ROAD MAP FOR PRIORITY ACTION:
Works must be completed within a definite time frame. For new constructions upto CHC level, a maximum of two years and for a District Hospital, a maximum period of 3 years is envisaged. Renovation/ repair should be completed within a year. Requirement of funds should be projected accordingly. Funds would not be permissible for constructions/ works that spill over beyond the stipulated timeframe. Progress of works being excecuted to be closely monitored
Standardized drawing/ detailed specifications and standard costs must be evolved keeping in view IPHS.
Third party monitoring of works through reputed institutions to be introduced to ensure quality.
Information on all ongoing works to be displayed on the NRHM website
Approved locations for constructions/ renovations will not be altered
All government health institutions in rural areas should carry a logo of NRHM as recognition of support provided by the Mission in English/ Hindi & Regional languages.
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.5 Infrastructure ( INFRA)
B.5.1 INFRA- HOSPITAL
INFRA- HOSPITAL- New- SHC
120 2281000 2737 0 Approved As this is a Committed unspent balance State may use the last year’s fund
INFRA- HOSPITAL- Upgradation- DH
12 Rs. 15 Cr per unit cost for 12MCH centre in District hospitals ( 6 in Old Dist and 6 in New Dist.)
3600 3600 Approved This activity should be complete in 3 financial year conditionality’s for MCH wing The MCH wing will be created within the premises of the District Hospital. Approved This activity should be completed in 3 financial year Conditionality for MCH wing 1) The MCH wing will be created
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 98
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
total cost is Rs. 180 Cr.to develop compressive MCH centre proposed amount for current Financial year is 20 % of the total projected amount = Rs.36.00 Cr.
within the premises of the District Hospital. 2)The State will give commitment that the manpower and other service requirement at DH with support from State budget and GoI will not give any operational expenses for running the MCH wing. 3) Advanced planning shall be done by the State Govt. for provision of additional manpower and other ancillary services if required, so that the centre remains functional 4) All the Technical Protocols of a Tertiary level delivery point such as maintaining partograph, ENBC and resuscitation, 48 hrs stay, birth doses, post natal care and counseling, Family planning services, etc shall be provided comprehensively for RMNCH (Reproductive & Maternal, Neonatal and Child Health services). 5) In addition, the hospital should be the hub for conduction of skill based training programs like LSAS, EmOC, Safe Abortion services, Mini-Lap, Child Health and FP trainings, etc 6) Last but not the least all procurements should be done based on competitive bidding and by following Government protocols. Procurement of equipment should be need based, linked with its utilization and availability of required manpower within the premises of the District Hospital.
INFRA- HOSPITAL- Upgradation- DH 50 bedded MCH wing in 3 New District
3 Rs. 9 Cr per unit cost for 3MCH centre in 3 new District hospitals total cost is Rs. 27 Cr.to develop compressive MCH centre proposed amount for current Financial year is 20 % of the total projected amount Rs.5.4 Cr.
540 540
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 99
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
INFRA-HOSPITAL- Upgradation- CHC
20 Rs. 9 Cr per unit cost for 20 MCH centre CHC ( FRU and non FRU) where there is delivery load. Total cost is Rs.180 cr.to develop compressive MCH centre proposed amount for current Financial year is 15 % of the Total projected amount = Rs.27 cr.
2700 2700 Approved This activity should be complete in 3 financial year conditionality’s for MCH wing The MCH wing will be created within the premises of the District Hospital.
INFRA- HOSPITAL- Upgradation- FRU CHC 75 % Civil Works for OT & Store and BSU
46 Rs 12 Lakh pre facilities Total projected amount is Rs 5.52 Cr proposed for Current financial year is 75 % of Total projected amount =Rs 4.14 Cr
414 414 Approved Approval is subjected to condition that this activity should be completed in two financial years
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 100
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
INFRA- HOSPITAL- Upgradation- CHC Non FRU
50 Rs 12 Lakh per facilities total projected amount is 6 Cr . Proposed for current financial year is 75 % of total projected amount = 450 Lakhs
450 450 Approved Approval is subjected to condition that this activity should be completed in next two financial years
INFRA- HOSPITAL- Upgradation- PHC
150 Rs 12 Lakhs per facilities Total projected amount is 18 Cr. Projected amount for Current Financial Year is 75% of total projected amount=13.50 Cr
1350 900 Approved for 100 PHCs @ 9 Lakhs per PHCs (75 % of the total projected amount )
INFRA- HOSPITAL- Upgradation- SHC
50 400000 200 0 Approved As this is a Committed unspend balance State may use the last year’s fund
INFRA- HOSPITAL- Upgradation- CH75 % Civil Works for OT & Store and BSU
2 1200000 18 0 Not Approved
INFRA- HOSPITAL-
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 101
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Renovation
INFRA- HOSPITAL- Renovation- CHC for establishment of NBSU
54 575000 310.5 0 Approval is pending State may give a revised proposal. Last year’s progress is poor state send a realistic proposal with plan to fulfill the manpower requirement for NBSU
Renovation of CHC, Baghbahera
2000000 20 0 Approved As this is a Committed unspent balance State may use the last year’s fund
INFRA- HOSPITAL- Renovation- CD
29 500000 145 0 Not Approved New Activity
B.5.2 INRFA- RESIDENTIAL
INRFA- RESIDENTIAL- 4F
1500 0 Approved As this is a Committed unspent balance State may use the last year’s fund
INRFA- RESIDENTIAL-2F (25% budget ) 52 Staff Quarter at 16 District Hospital 45 Staff Quarter at FRU CHCs and 3 at Civil Hospital Kondagaon
100 3243000 810.75 810.75 Approved for 100 2F type quarters in CHCs and PHCs (identified delivery points ) 25 % of total projected amount Approval is subjected to condition that this activity should be completed in two financial years
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 102
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
INRFA- RESIDENTIAL- 4G
1600 0 Approved As this is a Committed unspent balance State may use the last year’s fund
INRFA- RESIDENTIAL-2G (25% budget ) 64 staff quarter at 16 District Hospital 67 staff quarter at 42 FRU CHCs 64 Staff quarter at 30 Non FRU CHC and 5 at Kondagaon civil hospital
200 1786000 893 893 Approved for 200 2G type quarters in PHCs and CHCs (identified delivery points ) 25 % of the projected amount Approval is subjected to condition that this activity should be completed in next two financial years
INRFA- RESIDENTIAL-4H
1350 0 Approved As this is a Committed unspent balance State may use the last year’s fund
INRFA- RESIDENTIAL-2H (25% budget ) 147 staff quarter at 147 24X7 PHCs, 58 staff quarter for 16 Diatrict Hospital 64 staff
400 1006000 1006 1006 Approved for 400 2G type quarters in PHCs and CHCs (identified delivery points ) 25 % of the projected amount Approval is subjected to condition that this activity should be completed in two financial years
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 103
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
quarter at 45 FRU CHCs and 126 Staff quarter at 56 Non FRU CHCs
B.5.3 INFRA-INSTITUTIONS
INFRA-INSTITUTIONS- Renovation
INFRA-INSTITUTIONS- Renovation- - ANMTC
2 250000 5 5 Approved
INFRA-INSTITUTIONS- Renovation- - SIHFW
1 2000000 20 20 Approved
B.5.4 INFRA- Others
INFRA- Others -New
INFRA- Others -New - ERC/Health Info centre ERC info center new
1 50000000 125 0 Approved State may use the last year’s fund
INFRA- Others -New -
27 1000000 135 0 Not Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 104
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
District data Centre (50% Budget )
Total 19929.25 11338.75
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 105
PROCUREMENT ROAD MAP FOR PRIORITY ACTION:
Strict compliance of procurement procedures for purchase of medicines, equipments etc as per state guidelines.
Competitive bidding through open tenders and transparency in all procurements to be ensured.
Only need based procurement to be done strictly on indent/requisition by the concerned facility.
Procurement to be made well in time & not to be pushed to the end of the year.
Audit of equipment procured in the past to be carried out to ensure rational deployment.
Annual Maintenance Contract (AMC) to be built into equipment procurement contracts.
A system for preventive maintenance of equipment to be put in place.
BUDGET:
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.16 Procurement
B.16.1 Procurement of Equipment (Eqpt.)
B.16.1.1 Procurement - Equipment: MH
Procurement - Equipment: FRU
24 no. of BSU
500000 120 120 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 106
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
2) There should be competent human resource to handle the equipment
@ Rs 23 Lakh pre BSU this included 1 Boyles Apparatus at per facility
100000 23 23 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available
2) There should be competent human resource to handle the equipment
This Included OT table, Delivery Table, Shadow lam , Pulse oxymeter , Suction Machine, Diathermy, Foetal Heart Monitor, Fumigator, Sterilizer, Hysterectomy Sets Kelly ped etc according to facility needs
44 no. of FRUs for other equipments State has budgeted total Rs 22 Lakh per facility
50000 22 22 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available
2) There should be competent human resource to handle the equipment
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 107
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Procurement -Equipments for 24x7 PHCs
90 25000 22.5 22.5 Approved for PHCs @ 25000*84 = Rs 21.00 Lakhs for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available 2) There should be competent human resource to handle the equipment
Procurement -whole blood finger prick test for HIV
275000 25 68.75 68.75 Approved
B.16.1.2 Procurement - Equipment: CH
Procurement - Equipment: CH- SNCU
9 no. of SNCU
100000 9 0 Approved As this is a Committed unspend balance State may use the last year’s fund
Procurement - Equipment: CH- NBSU
54 no. of NBSU
200000 108 16 Approved For Only 8 new units as per the data of delivery points.
Procurement - Equipment: CH- NBCC
no. of NBCC
0 0
B.16.1.3 Procurement - Equipment: FP
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 108
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
25 No. of Laproscope
600000 150 150 Approved
1500 NSV kits,5000 IUCD KITS, 270 Minilaps other equipment
20 20 Approved Although state has not provided unit cost, proposed amount is less than the total cost of individual kits (as per standard rates).
B.16.2 Procurement of Drugs and Supplies
B.16.2.1 Procurement - Drugs & Supplies for MH Mifepristone and Misoprostol (Rs 18 Lakhs )
6000 Rs 300 for
MMA
drugs
18 18 Approved
KITs 1-7 and RPR Kits ( Rs 31.1.Lakhs )
31.1 31.1 Approved
Procurement -Drug & Supplies - Parenteral Iron Therapy
Procurement -Drug & Supplies - JSSK Kit
250000 kits 350 875 0 Not Approved Already approved under JSSK
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 109
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.16.2.2 Procurement - Drugs & Supplies for CH + ARSH
Approved 168.2 lakhs for SSM drugs (CH), Rs 44.98 for ARSH drugs detailed in write-up. School health drugs, drugs for diarrohea management through VHND.13.5 added.
Procurement of IFA( For Out of School Adolescents)
6793700 0.6 40.76 40.76 Approved
Procurement of Albendazole(For Out of School Adolescents)
301340 1.4 4.22 4.22 Approved
Drugs for Sisu Sangrachan Mah
168.2 168.2 Approved
B.16.2.3 Procurement - Drugs & Supplies for FP
B.16.2.4 Procurement - Supplies for IMEP
B.16.2.5 Procurement - Drugs & Supplies for health facilities (general)
SUB TOTAL Procurement
2111.71 704.53
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 110
MOBILE MEDICAL UNIT (MMU) ROAD MAP FOR PRIORITY ACTION:
Route chart to be widely publicised
GPS to be installed for tracking movement of vehicles
Performance of MMUs to be monitored on a monthly basis (including analysis of number of patients served and services rendered).
MMUs to be well integrated with Primary Health Care facilities and VHND.
Engagement with village panchayats / communities for monitoring of services
AWCs to be visited for services to children below 6 years of age
AWCs to maintain record of services rendered
Service delivery data to be regularly put in public domain on NRHM website.
A universal name ‘Rashtriya Mobile Medical Unit’ to be used for all MMUs funded under NRHM. Also uniform color with emblem of NRHM (in English/ Hindi & Regional languages), Government of India and State Government to be used on all the MMUs.
Budget
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.11 B.11 Mobile Medical Units
MMU - CAPEX
27 Nos of unit
1200000 324 0 Approved State may use last year’s approved amount
MMU - OPEX For 7 months
27 Nos of unit
200000 378 0 Approved State may use last year’s approved amount @ Rs 1.65 Lakh per month as per MMU guideline
SUB TOTAL MMU
702 0
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 111
REFERRAL TRANSPORT Free referral transport to be ensured for all pregnant women and sick neonates
accessing public health facilities.
Universal access to referral transport throughout the State, including to difficult and
hard to reach areas, to be ensured.
A universal toll free number to be operationalized and 24x7 call centre based approach
adopted.
Vehicles to be GPS fitted for effective network and utilization.
Rigorous and regular monitoring of usage of vehicles to be done
Service delivery data to be regularly put in public domain on NRHM website.
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.12 B.12 Referral Transport
B.12.1 EMRI - CAPEX
EMRI - CAPEX- Procurement of Ambulance
34 ambulances
Rs 11.59 Lakhs
394 0 Approved As this is a Committed unspent balance State may use the last year’s fund
300 Basic Ambulances
Rs 5 Lakh
1500 1500 Approved Operational cost may be made from JSSK funds
B.12.2 EMRI - Operational Cost (Opex)
34 Ambulances
20 % of 14.4 Lakh per year
97.92 97.92 Approved for 34 Ambulances @ 2.88 Lakh per year for 34 ambulances for 12 month ( 20 % of 14.4 lakhs per year for 34 procured in 2010-11)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 112
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
136 ambulances
40 % of 14.4 Lakhs per year
783.36 783.36 Approved for 136 ambulances @ 5.56 Lakhs per year for 12 month (40 % of 14.4 lakhs per year for 136 ambulances procured in 2011-12)
34 ambulances
60 % of 14.4 Lakhs per year
195.84 195.84 Approved for 34 new Ambulances @ 5.76 Lakhs for 8 month (1.20 Lakh per month )
34 Ambulances
60 % of 14.4
Lakhs per year
195.84 195.84 Approved for 34 New State Government's ambulances @ 5.76 Lakhs for 8 month (1.20 Lakhs per month )
SUB TOTAL Referral transport/EMRI
3166.96 2772.96
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 113
MAINSTREAMING OF AYUSH ROAD MAP FOR PRIORITY ACTION:
State to co-locate AYUSH in district hospitals and provide post graduate doctors for at least two streams: Ayurveda and homoeopathy (or Unani, Siddha, Yoga as per the local demand). Panchakarma Unit should also be considered.
OPD in Ayush clinics will be monitored alongwith IPD/OPD for the facility as a whole.
The AYUSH pharmacist/compounder to be engaged only in facilities with a minimum case load.
Adequate availability of AYUSH medicines at facilities where AYUSH doctors are posted to enable them to practice their own system of Medicine without difficulty.
At CHCs and PHCs any one system viz., Homeopathy/Ayurveda/ Unani/Sidha to be considered depending on local preference.
At CHC/PHC level, Post-Graduate Degree may not be insisted upon.
District Ayurveda Officer should be a member of District Health Society in order to participate in decision making with regard to indent, procurement and issue of AYUSH drugs.
Infrastructure at facilities proposed to be collocated would be provided by Department of AYUSH.
Those PHC/CHC/Sub-Divisional hospitals which have been identified as delivery points under NRHM should be given priority for collocation of AYUSH as these are functional facilities with substantial footfalls.
AYUSH medical officers should increasingly be involved in the implementation of national health programmes and for the purpose of supportive supervision and monitoring in the field. They should be encouraged to oversee VHND and outreach activities and in addition programmes such as school health, weekly supplementation of iron and folic acid for adolescents, distribution of contraceptives through ASHA, menstrual hygiene scheme for rural adolescent girls etc.
AYUSH medical officer should also be member of the RKS of the facility and actively participate in decision making.
AYUSH doctors need to be provided under NRHM first in the remotest locations and only thereafter in better served areas.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 114
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.9 Mainstreaming of AYUSH
B.9.1 AYUSH - strengthening of AYUSH hospitals
B.9.1 AYUSH - strengthening of Co located AYUSH centers
AYUSH - strengthening of Co located AYUSH centers- Mos-DH
For 95 no 20000 171 231.12 Approved As per approval of FY 2011-12 for 107 AYUSH Medical Officers @ 18000/pm 101 PHC and CHC 6
AYUSH - strengthening of Co located AYUSH centers- MO-CHCs ayurvedgram
For 50 No 20000 90
AYUSH - strengthening of Co located AYUSH centers- MOs-PHCf or 24x7 PHC and malaria endemic block
For 100 no 20000 180 180 Approved for 100 Homeopathy Doctors @ 15000/pm ( implementation of prevention of Malaria through prophylaxis by Chinum Sulph for 20 Blocks along with other National Health programme )
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 115
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B9.2 AYUSH - strengthening of Co located AYUSH centers- Para. Med-CHCs paramedical for CHCs
For 95 no 6600 37.62 0 Not Approved New Staff is not Approved
B.9.3 Other Activity (Excluding HR)
AYUSH - Health Camps in Ayurved grams
B.9.3.1 AYUSH-Yoga
AYUSH-Yoga popularization in Ayurved gram.
146 10,000 14.6 14.6 Approved
AYUSH-Yoga - integration with RCH services
146 15,000 21.9 0 Not Approved
B.9.3.2 AYUSH - new innovations
Prevention of Malaria through Homoeopathy in 20 blocks
Rs6.40/person for 20 blocks of average population of 1.5 lakhs each.
960000 192 192 Approved Subject to the condition that state may document the process along with outcome and share the finding with the GOI
Distribution of Decoction(kadha )for Prevention and Treatment of Seasonal Diseases
6 District Hospital
200000 12 12 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 116
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Prevention of Disability in Leprosy Cured Person Through AYUSH in 2 Districts in Janjgir Champa and Korba
2 District 2160000 43.2 43.2 Approved Subject to the condition that state may document the process along with outcome and share the finding with the GOI
Provision of pure Drinking Water in Ayurved g ramin florosis affected villages
3 1000000 30 30 Approved
B.9.3.3 Training for AYUSH
Training of AYUSH based treatment and National Health programme for AYUSH doctors in Collocated centre
250 1000 2.5 2.07 Approved For Training 207 AYUSH Doctors @ Rs 1000.
Training of ANM in AYUSH principle in home remedies
1000 1500 15 0 Not Approved
SUB TOTAL AYUSH
809.82 704.99
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 117
IEC/BCC NRHM ROAD MAP FOR PRIORITY ACTION:
Comprehensive IEC/ BCC strategy prepared. IPC given necessary emphasis and improved inter-sectoral convergence particularly with WCD.
Details of activities carried out to be displayed on the website
Budget
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.10 IEC/BCC- NRHM (IEC)
B.10.1 IEC - Strengthening of BCC/IEC Bureaus
250 Approved State may submit a comprehensive plan for further approval
IEC - Strengthening of IEC/BCC Bureaus-State Level
1 100000 1
IEC - Strengthening of IEC/BCC Bureaus-District Level
27 25000 6.75
B.10.2 IEC - IEC/BCC strategy
0
B.10.2.1 IEC - development of State IEC/BCC strategy
1 2500000 25
B.10.2.2.1 IEC - IEC/BCC Activities for MH
Lumpsum 240
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 118
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.10.2.2.2 IEC - IEC/BCC Activities for CH
Lumpsum 130
B.10.2.2.3 IEC - IEC/BCC Activities for FP
Lumpsum 120
B.10.2.2.4 IEC - IEC/BCC Activities for ARSH
Lumpsum 25
B.10.2.2.5 IEC - Other Activities - IEC/BCC-PNDT
10
B.10.3 IEC - IEC/BCC Health Mela
IEC - IEC/BCC Health Mela
IEC - IEC/BCC Health Mela - Dist level
27 200000 54
IEC - IEC/BCC - through ASHA the IEC/BCC material for door to door campaign by ASHA in Village
For 10000 No of panchayats.
1000/Per panchayats
100
SUB TOTAL IEC 711.75 250
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 119
MONITORING AND EVALUATION (HMIS)/ MCTS ROAD MAP FOR PRIORITY ACTION:
Data is uploaded, validated and committed; data for the month available by the 15th of the following month.
Uploading of facility wise data by the first quarter of 2012-13.
Facility based HMIS to be implemented. HMIS data to be analysed, discussed with concerned staff at state and district levels and necessary corrective action taken.
Program managers at all levels use HMIS for monthly reviews.
MCTS to be made fully operational for regular and effective monitoring of service delivery including tracking and monitoring of severely anemic women, low birth weight babies and sick neonates.
Pace of registration under MCTS to be speeded up to capture 100% pregnant women and children
Service delivery data to be uploaded regularly.
Progress to be monitored rigorously at all levels
MCTS call centre to be set up at the State level to check the veracity of data and service delivery.
Budget:
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.15 Planning, Implementation and Monitoring
B.15.1.2 Community Monitoring ( CM)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 120
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
CM-District level community monitoring review meetings
27 50000 13.5 6.47 Approved for ongoing 70 Blocks @ Rs 9247 per block
CM - Exposure visit 27 200000 54 25.89 Approved for Ongoing 70 Blocks @ 36986 per block
CM-Community Audits based reporting system
27 200000 54 25.89 Approved for Ongoing 70 Blocks @ 36986 per block
B.15.2 Quality Assurance (QA)
Approved Except for the activities indicated at Regional level all other activities for QAC can be approved. With conditionality that all DPs must practice infection prevention protocols in the labour room and OT as a task for this FY year. Approved Amount Rs 107.8 lakhs
QA Cell establishment
QA Cell - state
QA Cell - state- HR
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 121
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
QA Cell - state- HR- State Quality Assurance Manager
1Nos of Person
45000 4.05 4.05 Approved
QA Cell - state- HR- Programme Associate
2 30000 5.4 5.4 Approved
QA Cell - state- HR- Office assistant
2 15000 2.7 2.7 Approved
QA Cell - state- Mobility support
1 No. of vehicle
25000 2.25 2.25 Approved
QA Cell - state- Admin. Exp
1 10000 0.9 0.9 Approved
QA Cell - regional
QA Cell - regional- HR
QA Cell - regional- HR- Regional Quality Assurance Manager
4 35000 12.6 0 Not Approved
QA Cell - regional- HR- Office assistant
4 15000 5.4 0 Not Approved
QA Cell - regional- Mobility support
4 25000 9 0 Not Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 122
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
QA Cell - regional- Admin. Exp
4 10000 3.6 0 Not Approved
QA Cell - Protocols
QA Cell - Protocols Devlopment
1 50000 0.5 0.5 Approved
QA Cell - Expousure visit
60 Nos of person
10000 6 6 Approved
QA Cell - Training on protocols,Including SOP
4 no of batch
100000 4 4 Approved
QA Cell - Workshops and seminars
4 25000 1 1 Approved
QA Cell - Monitoring of quality Including annual report.
27 300000 81 81 Approved
B.15.3 Monitoring and Evaluation (HMIS/ M & E)
B.15.3.1 HMIS
B.15.3.1.1 HMIS - establishment of health info. Center-
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 123
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS - establishment of health info. Center- equipments
Not Approved
HMIS - establishment of health info. Center- equipments-IT
1Blade servers-3, padastal-1. 1Chasis rack 42 Unit, KVM Unit full set, FC switch, Fibre patch cords, 1. UPS 20KVA,
6200000
62
HMIS - establishment of health info. Center- equipments-IT
11server padastal, 25 desktop, networking, cooling system AC
2900000
29
HMIS - establishment of health info. Center- equipments- GIS
11Blade server, Internet GIS, GIS Plotter Big, GIS scanner big,
1600000
16
HMIS - establishment of health info. Center- equipments- GIS
115 desktop, 5 laptop, networking
1100000
11
HMIS - establishment of health info. Center- equipments- Others
1office equipment
1000000
10
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 124
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.15.3.1.1.3 HMIS - establishment of health info. Center- Operating software
HMIS - establishment of health info. Center- Operating software-IT
1SQL server, Window server 2010-x3 , virtual studio- 1 license
8500000
85
HMIS - establishment of health info. Center- Operating software-GIS
1ARC GIS 4500000
45
HMIS - establishment of health info. Center- Operating software-Others
5
B.15.3.1.1.4 HMIS -Procurement-Data
HMIS -Procurement-Data-ISRO
10
HMIS -Procurement-Data-Other
10
B.15.3.1.1.5 HMIS - Operationalisation
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 125
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS - DSS-Software development and upgradation (IT/GIS/SMS)
1 500000 5 0 Not Approved Sub systems Parallel to National HMIS are not desirable.
HMIS-DSS-Integrated HMIS
1 500000 5 0
HMIS-DSS-Convergence of HMIS with other dept MIS
1 1000000
10 0
HMIS-DSS-GIS based DSS
1 500000 5 0
HMIS-DSS-Hospital Management
1 1500000
15 15 Approved
HMIS-DSS-Procurement Management (PROMIS)
1 1000000
10 10 Approved
HMIS-DSS-Financial management
1 1000000
10 0 Not Approved Sub system Parallel to national HMIS is not desirable.
HMIS - DSS- Software testing
1 500000 5 0
B.15.3.1.1.6 HMIS - Recurring expenditure
HMIS - Recurring expenditure - State -
1 100000 9 Not Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 126
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS - State - HR-IT
0
HMIS - State - HR- IT-system analyst
1Nos of person
60000 5.4
HMIS - State - HR- IT-Programmer
3 40000 10.8
HMIS - State - HR- Data -IT-Manager
1 40000 3.6
HMIS - State - HR- IT-Hardware Engineer-
2 25000 4.5
HMIS - State - HR- IT-Hardware -Data assistant
25 15000 33.75
HMIS - State - HR- GIS
HMIS - State - HR- GIS-analyst
1 80000 7.2
HMIS - State - HR- GIS-programmer
2 50000 9
HMIS - State - HR- GIS-Software specialist
2 40000 7.2
HMIS - State - HR- GIS-Operator
5 15000 6.75
HMIS - State - HR-Other
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 127
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS - State - HR-Admin officer
1 45000 4.05 4.05 Approved (Existing Position as conveyed by State HMIS Officer)
HMIS - State - HR-Accountant
1 25000 2.25 Not Approved
HMIS - State - HR-store keeper
1 25000 2.25
HMIS - State - HR-relationship manager
1 25000 2.25
HMIS - State - HR-Training co-ordinator
1 30000 2.7
HMIS - Recurring expenditure - District
HMIS - Recurring expenditure - District level
27AMC, Internet etc
25000 81
HMIS - Recurring expenditure - Block level
146 10000 175.2
HMIS - Other Activities(MCTS)
HMIS -SMS based HMIS
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 128
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS - SMS charges: Rs. 250.00 lakh including service tax (This includes mobile cost, software cost, SMS Cost, CUG Charges, system management & Support charges)
Target: 75 lakh transactional SMS @ Rs. 3.31/- plus service tax regarding Registration, ANC, PNC, Delivery, migration of patient, vaccination, deaths, expenditure, JSY amount distribution etc to be send by ANMs
3.31 250 0 Approved State may carry forward the approved budget of this activity held under ROP for 2011-12. State may ensure for universal coverage in terms of registration from all the health facility on MCTS Portal. Also and its regular updating as per the services delivered to the beneficiaries on real time basis on the MCTS Portal. As this is a Committed unspent balance State may use the last year’s fund
Handholding cost of 27 person (one for each district) for one year
50 Approved for this year only
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 129
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Set up of 10 - seat Call centre with one year operational cost with automated outbound dialling facility for campaigns, reminders etc {assumption: 12,000 incoming calls per month and 80,000 outbound calls per month)
50 50 Approved Provided that state may share activity wise details of Budget
HMIS - SMS- training
Training cost for 6000 ANMs
15.00
15 15 Approved
HMIS - Printing of registers and Formats
No of Register SHC Register(village wise)-25000;Delivery register-1000;Reporting Format-6000
46.86 46.86 Approved Subject to condition that registers are compatible with the integrated RCH Register (Village wise) designed by MOHFW.
B.15.3.2 Monitoring and Evaluation (M & E)
B.15.3.2.1 M&E- State review mission
B.15.3.2.1.1 M&E-SRM-HR
B.15.3.2.1.1.1 M&E-SRM-HR- SRM leader
2 40000 9.6 9.6 Approved (Existing Position as conveyed by State HMIS Officer)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 130
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.15.3.2.1.1.2 M&E-SRM-HR- Project Associates- (SRM)
12 30000 21.6 21.6
B.15.3.2.1.1.3 M&E-SRM-HR- Project Associates- logistic
1 30000 1.8 1.8
B.15.3.2.1.1.4 M&E-SRM-HR- Office Assistant
6 15000 5.4 5.4
M&E- State review mission-Mobility support
27(2 visit per district-with 3 vehicles@20000/vehicle)
20000 32.4 32.4 Approved
M&E- State review mission- Allowances
27(5 person per visit for 5daysX2 times for each district )
200000 54 54 Approved
M&E- State review mission- Report- State
2(1 midterm and 1 annual report )
500000 10 10 Approved
M&E- State review mission- Report- District
27(2 visit report)
25000 6.75 6.75 Approved
B.15.3.2.2 M&E- Review workshops
M&E- Review workshops- State
4 500000 20 20 Approved
M&E- Review workshops-Regional
8 200000 16 16 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 131
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
M&E- Review workshops-District
12 50000 6 6 Approved
B.15.3.2.3 M&E- Helpline
M&E- Helpline 1 Integrated Call Centre
1000000
10 0 Not Approved for HMIS. A call centre has already been proposed under MCTS fmr.No.(B.15.3.1.3.2)
B.15.4. M&E- Tech. support agency
1 2500000
For Discussion Statistics Division: Details not submitted. Needs to be discussed
PIM Technical Support - Architecture & Engineering
Lump sum 4
PIM- Technical Support
Lump sum 2
-Procurement & supply chain Management
Lump sum 2
PIM - Technical Support
Lump sum 14
-HRD Support including recruitment & training
Lump sum 10
SUB TOTAL M&E 1612.21 490.51
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 132
OTHERS Budget: Hospital Strengthening
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.4 Hospital Strengthening- (Hosp)
B.4.1 Hosp. Strength.- DH
50 305 0 Approved As this is a Committed unspent balance State may use the last year’s fund .
B.4.2 Hosp. Strength.- CHC
0 0
B.4.3 Hosp. Strength.- PHC
0 0
B.4.4 Hosp. Strength.- SHC
0 0
B.4.5 Hosp. Strength.- Civil hospital
0 0
B.4.6 Hosp. Strength.- Civil dispensary
0 0
SUB TOTAL HOS Strengthening
305 0
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 133
Budget: District Action Plans FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.7 State / District Action Plans (Including Block, Village) AP)
AP - State Action Plans - State Level
1 500000 5 5 Approved
AP - District Action Plans
AP - District Action Plans - District Level
27 100000 27 27 Approved
AP - District Action Plans - Block Level
146 20000 29.2 0 Not Approved
AP - District Action Plans - Village Level
20000 200 40 0 Not Approved
SUB TOTAL Dist Action Plan
101.2 32 Approved
Budget: Panchayti Raj Initiative
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.8 Panchayti Raj Initiative (PRI)
B.8.1 PRI- Orientation of PRI Members Towards Health issues and VHSNC. For members of 18500 VHSNCs
1,000 5,000 50 50 Approved. Subject to the condition that state may document the process along with outcome.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 134
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.8.2 PRI - Orientation Workshops of PRI at State/Dist. Health Societies, CHC,PHC
1 State Level 500000 5 5 Approved Subject to the condition that state may document the process along with outcome.
27 District Level
100000 27 27 Approved Subject to the condition that state may document the process along with outcome.
B.8.3 PRI - Others
SUB TOTAL PRI
82 82
Budget: PPP/NGOs
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.13 PPP/ NGOs
B.13.1 Non Governmental Providers of Health Care RMPs/TBAs
B.13.2 Public Private Partnership diagnostic services and out sourcing 141 CHCs +59 PHCs
200 200000 400 0 Not Approved
B.13.3 NGO Programme / Grant in Aid to NGOs
NGO -RK Mission Narayanpur
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 135
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
NGO -RK Mission Narayanpur-HR- Doctors
4 50000 18 18 Approved
NGO -RK Mission Narayanpur-HR- Staff nurse
4 15000 5.4 5.4 Approved
NGO -RK Mission Narayanpur-NRC- Operational cost - 20 beded
20 no. of beds
30000 6 6 Approved
Grant in Aid to RK Mission Bastar ( NRC 20 bedded)
20 no. of beds
30000 6 6 Approved
SUB TOTAL PPP/NGO
435.4 35.4
Budget : New Initiatives/Strategic Interventions
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.18 New Initiatives/Strategic Interventions (NI)
NI - Bal Hriday Suraksha Yojna Including 35 Lacs for Technical Support Unit
500 surgery
cases
130000 650 0 Not Approved As advised in last year’s RoP state should bear cost out of their own resources. The State also explore the possibilities to getting the surgeries done in public health facilities
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 136
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
NI - CM Bal Shravan yojana Chochler in plant
50 600000 300 Approved Approved in 2010-11 ROP Amount was Rs 100 Lakhs @ 6 Lakhs per Case
NI-Cleft lip& Cleft palate for 100 normal cases and 50 severe surgery
25 0 Not Approved.
NI - Sickle Cell management (Rs.200.00 Carry forward from last year, new initiative of neonatal sickle cell screening.)
300 0 Approved. As this is a Committed unspent balance State may use the last year’s fund
NI- Cervica; Cancer Prevention and control
200 0 Not Approved
NI - Food and Drug Control Carried forward for up gradation of drug testing lab.
450 0 Not Approved. As this is a Committed unspent balance State may use the last year’s fund
NI - Blood Safety 1000 0 Not Approved Blood Processing
Centre through NGO is not approved. State may Strengthen their own system and capacities for blood processing including its companionate. The areas of support from NACO should be identified 1st before NRHM
NI - Online 104medical advice services
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 137
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
NI - Online 104 medical advice services- CAPEX
NI - Online 104 medical advice services- OPEX
50 50 Approved : State need to provide detail break up of Operational cost
B.18.12 NI-CG State Medical Service Corporation (CGMSC State has budgted ) 4 regional drug ware houses Rs 300 Lakh + 7 District drug ware houses Rs 420 Lakh + 16 drug ware houses Rs 800 Lakhs +Head office construction Rs 50 Lakhs + 539.08 for HR and other activity
2109.08 0 Approved State may utilize last year’s funds .No New Approval In the FY 2011-12 Total Rs 2199.60 Lakh was approved for Drug warehouse with condition that state need to provide name of drug warehouses along with the time line of construction. In wirte up state has not provided the details of Physical achievement of last year is only 1% (22.1 /2199.60)
SUB TOTAL New Initiatives/Strategic Interventions (NI)
5084.08 50
Budget: Research, Studies, Analysis FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.20 Research, Studies, Analysis
B.20 Operational research
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 138
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Research - study on Maternal & infant death
10 100000 10 0 Not Approved: New activity State may 1st implement the programme
Research- Dissertation by district
6 200000 12 0 Not Approved
Research- Dissertation by Medical College
6 200000 12 0 Not Approved
SUB TOTAL RESEARCH
34 0
Budget: Support Services
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.22 Support Services - Support Strengthening NPCB
B.22.1 Support Services - NPCB - Camp
Support Services - NPCB - Operation
Support Services - NPCB - Others
146.19 0 Not Approved
B22.2 Support Services - Support Strengthening Midwifery Services
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 139
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.22.3 Support Services - Support Strengthening - NVBDCP
Support Services - NVBDCP - Procurement
Support Services - NVBDCP - Rent for Hiring of store
Support Services: in NVBDCP
Biological and Environmental Management
6.92 6.92 Approved To intensify malaria control activities in the state
Wages for Spraying 300 300 Approved
B.22.4 Support Services - Support Strengthening - RNTCP
181.9 102.08 Approved.
Intermediate level references Lab (IRL)
29.85 19.85 Approved Proposal for IRL support. The proposal for electricity bill, wages for staff is not approved.
Multi-Drug Resistance TB (MDR-TB) and DOTS Plus. Dots Plus site Bilaspur and Raipur. Infrastructure and HR
37.03 37.03 Approved. The proposal for Bilaspur is Ongoing (Approved in 11-12). Similar proposal for Raipur hence approved.
Sputum Collection Kit @ Rs 600/kit for 4776 Sub-Centres
28.66 28.66 Approved May be approved as this is an innovative approach.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 140
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Communication Charges (132 STS/STLS+307 LT) @100*450*12
5.04 5.04 Approved May be approved if converted into CUG.
1.5 ton Split Air Conditioners for District Durg Store for storage of 2nd line ATT = 18 @ 45,000
8.1 0 Not Approved There is budget provision under RNTCP, State can utilize that.
Illuminator Display Board - 1 each for 18 DTC + 3 Med Coll +1STC = 22 @ 30,000
22 6.6 0 Not Approved There is budget provision under RNTCP IEC head, State can utilize that.
Office Table - 1 for each TU - 66 @ 5000
3.3 0 Not approved.
Office Chair - 1 for each TU - 66 @ 2000
1.32 0 Not approved.
Almirah for 4 new Tus (2 per TU) & 23 new DMCs (1 per DMC) @ 10500
3.26 0 Not approved.
Wall Paintings in all PHI’s (950*3000)
28.5 0 Not Approved There is budget provision under RNTCP IEC head, State can utilize that.
State Drug Store (Rent @ 25000*12)
3 3 Approved There is no provision for this under RNTCP, can be approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 141
FMR Code
Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Hiring one 4 wheeler on monthly/ per day basis (as per NRHM norms - @ 1800* 15 days* 12)
3.24 0 Not Approved There is budget provision under RNTCP vehicle hiring head, State can utilise that.
LCD for 18 Districts @ 75000 for improving quality of training
13.5 0 Not approved.
For storing PPD in ILR at SDS @ 1 Lakhs and 27 vaccine carriers
3 1 Approved. PPD can be stored in domestic/Commercial refrigerators, so deducted accordingly
One time support intended to cover the costs of the first visit to ART centre after diagnosis of HIV-TB
7.5 7.5 Approved There is no provision for this under RNTCP
B.22.5 Support Services - Other NDCP Support Programmes
B.22.6 Support Services - Other NDCP - Immunization
Support Services - Support Strengthening - NLEP
SUB TOTAL SUPPORT SERVICE
982.41 511.08
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 142
Budget: Solar Power
FMR Code
Activity Physical Targets
Unit cost Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.23 INFRA- Others - Solar Power
INFRA- Others - Solar Power - CHC
Other Expenditure - Power Backup -CHC
42 1368000 574.56 574.56 Approved
Other Expenditure - Power Backup -PHC
125 506000 632.5 632.5 Approved
SUB TOTAL Infra - Solar Power
1207.06 1207.06
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 143
NATIONAL DISEASE CONTROL PROGRAMMES (NDCP)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 144
NATIONAL IODINE DEFICIENCY DISORDERS CONTROL PROGRAMME (NIDDCP)
TARGETS:
Bring the prevalence of IDD to below 5% by 2017
To ensure 100% consumption of adequately iodated salt (15ppm) at the household
level.
ROAD MAP FOR PRIORITY ACTION: Priority Actions to be carried out by State/UTs (i) to achieve goal to bring the prevalence of IDD to below 5% in the entire country by 2017 and (ii) to ensure 100% consumption of adequately iodated salt (15ppm) at the household level under National Iodine Deficiency Disorders Control programme:
1. Establishment of State IDD Cell, if not established in the State/UT for
implementation programme activities.
2. Establishment of State IDD monitoring laboratory, if not established in the State/UT
for conducting quantitative analysis of iodated salt and urine for iodine content
and urinary iodine excretion.
3. All the sanctioned posts i.e. Technical Officer, Statistical Assistant, LDC/DEO, Lab
Technician and Lab Assistant of State IDD Cell and State IDD Monitoring Laboratory
should be filled on regular/contractual basis on priority for smooth
implementation of programme.
4. Supply, availability and consumption of adequately iodated salt in the state should
be monitored.
5. District IDD survey/re-surveys should be undertaken as per NIDDCP guidelines to
assess the magnitude of IDD in the respective districts as approved in the PIP and
reports accordingly submitted.
6. Use of Salt testing kits by ASHA/Health Personnel being supplied in the endemic
districts for creating awareness & monitoring of iodated salt consumption at
household level should be monitored and monthly reports are to be submitted as
per the prescribed proforma.
7. ASHA incentives Rs. 25/- per month for testing 50 salt samples per month in
endemic districts should be made available on regular basis to ASHA.
8. Health education and publicity should be conducted with more focus in the endemic
districts emphasizing about IDD and promotion of consumption of adequately
iodated salt. Should observe Global IDD Celebrations on 21st October by
conducting awareness activities at various level and submission of reports.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 145
DETAILED BUDGET: NATIONAL IODINE DEFICIENCY DISORDERS CONTROL PROGRAMME (NIDDCP)
FMR Code
Activity Unit cost Physical target Amount Proposed
Amount Approved
Remarks
D IDD
D.1 Establishment of IDD Control Cell-
Implementation & monitoring of the programme
10.00* 10 Filling up of sanctioned vacant posts i.e. Technical Officer, Statistical Assistant & LDC on regular/contract basis on priority.
D.1.a Technical Officer 1 State Government may conduct and co-ordinate approved programme activities and furnish quarterly financial & physical achievements as per prescribed format.
D.1.b Statistical Assistant 1
D.1.c LDC Typist 1
D.2 IDD Monitoring Lab-
Monitoring of district level iodine content of salt and urinary iodine excretion as per Policy Guidelines.
5.00* 5.00 The vacant sanctioned post of Lab Technician & Lab Asst. should be filled on regular/ contract basis on priority.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 146
FMR Code
Activity Unit cost Physical target Amount Proposed
Amount Approved
Remarks
D.2.a Lab Technician 1 State Government may conduct quantitative analysis of salt & urine as per NIDDCP Guidelines and furnish monthly/quarterly statements.
D.2.b Lab. Assistant 1
D.3 Health Education & Publicity
Increased awareness about IDD and iodated salt
7.00 7.00 IDD publicity activities including Global IDD Day celebrations at various level.
D.4 IDD Survey/resurvey
Rs. 50,000 per district
4 districts 2 2 State Government may under take 4 district IDD survey as per guidelines and furnish report.
D.5 Salt Testing Kits supplies by GOI inform of kind grant for 2 endemic districts
12 STK per annum per ASH A
Creating iodated salt demand and monitoring of the same at the community level.
State Govt. to monitor the qualitative analysis of iodated salt by STK through ASHA in 2 endemic districts i.e. Bilaspur and Raigar
D.6 ASHA Incentive Rs. 25/- per month for testing 50 salt sample/month
50 salt samples per month per ASHA in 2 endemic district
20.03
TOTAL 24 44.03
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 147
INTEGRATED DISEASE SURVEILLANCE PROGRAMME (IDSP)
There are 11 vacant posts of technical contractual staff (8 Epidemiologists, 2
Microbiologist & 1 Entomologist) under IDSP in the State. The State needs to expedite the
recruitment of these staff by September 2012.
The training of Master trainers (ToT) and 2-week FETP for District Surveillance Officers
under IDSP has been completed for the State/Districts. However, the State may give the
additional list of participants to be trained for ToT and 2-week FETP.
In 2011, 61% of all the Reporting Units are reporting weekly surveillance data in P-form
through IDSP Portal. The State needs to ensure regular weekly reporting of all surveillance
data (S, P, L) by all the Reporting Units of all Districts through IDSP Portal.
Following district are reporting irregularly (50% or less reporting) /not reporting in IDSP
portal.
Narayanpur
Dantewada
The State has to ensure regular reporting from all districts by September 2012.
The State has to ensure consistent reporting of L form in portal by the district priority lab
at JLN Medical College, Raipur.
Appropriate clinical samples need to be sent for the required lab investigations for all
outbreaks. In 2011, clinical samples were sent for laboratory investigation for 71% of the
disease outbreaks in which 18% were lab confirmed.
The State has to report about the outbreaks every week. Even weekly “NIL” reporting
under IDSP is mandatory.
The State needs to send full investigation report for each disease outbreak. Presently,
such investigation reports are available for only a few outbreaks.
The Audit Report for the financial year 2010-11 has not been received.
State has to ensure timely submission of quarterly Financial monitoring Report and annual
audit report.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 148
DETAILED BUDGET: INTEGRATED DISEASE SURVEILLANCE
PROGRAMME (IDSP)
FMR Code
Activity Unit Cost (where-ever applicable)
Amount Proposed
Amount Approved
Remarks
E.1 Operational Cost
Field Visits Rs 2,40,000 per District Surveillance Unit per annum Rs 5,00,000 State Surveillance Unit per annum
108.61 48.2(5x1+2.4x18)
Approved Office Expenses
Broad Band expenses
Outbreak investigations including Collection and Transport of samples
Review Meetings
Any other expenses
Sub Total 108.61 48.2
* Laboratory Support
District Priority Lab Rs. 4,00,000 per district priority lab per annum
7.5 4.0 Approved
Referral Network Lab Rs. 5,00,000 per referral lab per annum
4.00 Not Approved There is no approved referral lab network under IDSP in the state
Sub Total 11.50 4.0
E.2 Human Resources
E.2.1 Remuneration of Epidemiologists
Rs.25,000 - Rs. 40,000/ per month
95.1 (50,000 x 1 x12+30000x 18 x12+ 30000 x 9 x 12)
62.4 (40,000 × 1× 12+ 30000 x 10 x12 +30000x8x9)
Approved Remunerations for vacant posts are calculated for 9 months. Human resources for the newly formed districts may be requested
E.2.2 Remuneration of Microbiologists
Rs. 25,000 - Rs. 40,000 (Medical Graduates) Rs. 15,000 - Rs. 25,000
12.0 (50000 x 2 x 12)
7.2 (40,000 × 2 × 9)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 149
FMR Code
Activity Unit Cost (where-ever applicable)
Amount Proposed
Amount Approved
Remarks
(Others) subsequently.
E.2.3 Remuneration of Entomologists
Rs. 15,000 - Rs. 25,000
3.0 (25000 x 1 x 12)
2.25 (25,000 × 1 × 9)
Veterinary Consultant
Rs. 25,000 -Rs.40,000
4.5 (50000 x1x 9)
0.00
E.3 Consultant-Finance/ Procurement
Rs. 14,000 1.68 for 12 months
1.68 (14,000x1x 12)
E.3.1 Consultant-Training/ Technical
Rs. 28,000 3.36 for 12 months
2.52 (28,000x1x 9)
E.3.2 Data Manager Rs. 14,000 (State) Rs. 13,500 (District)
75.75 30.84 ([14,000 × 1 × 12] + [13,500 × 18 × 12])
E.3.3 Data Entry Operator Rs. 8,500 28.78 20.91 (8,500 × 13 × 12+8500 x10x9 )
E.3.4 State Helper Rs 5000 0.60 0.00
Sub Total 226.02 127.8
E.8 Training As per NRHM Guidelines
One day training of Hospital Doctors
9.09 (181,700 × 5)
1.1
Approved
One day training of Hospital Pharmacist / Nurses
7.20 (40,000 × 18)
1.5
One day training of Medical College Doctors
0.61 (60,500 × 1)
0.40
One day training for Data Entry and analysis for Block Health Team
23.33 (61,400 × 38)
2.0
One day training of DM & DEO
0.55 (54,600 × 1)
0.55
Sub Total 40.77 5.55
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 150
FMR Code
Activity Unit Cost (where-ever applicable)
Amount Proposed
Amount Approved
Remarks
* New formed Districts Rs. 3,50, 000/- per newly formed district
38.50 38.50 Approved , if these districts are included in the NRHM, the same can be the part of IDSP
Total 354.49 224.05
Proposal under Additionalities
Establishment of New Districts - 11 DSUs for Computer Hardware & Accessories etc
350000 38.50 0.00 Not approved May be budgeted in IDSP budget
GIS Mapping of Epidemic Places
10 000 32.40 0.00 Not approved GIS mapping is budgeted in the expenditure of Central Surveillance unit.
Total 70.90 0.00
*FMR Code not allotted.
1. The following heads will be approved once approval from EFC is obtained.
Remuneration of Veterinary Consultant @ Rs. 25,000 - Rs.40, 000.
2. Based on past trend, Rs. 150.00 lakhs has been approved for Chhattisgarh under IDSP
for 2012-13. However, if there is increase in expenditure by State as per IDSP approved
norm, the budget for State could be increased at RE stage.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 151
NATIONAL VECTOR BORNE DISEASE CONTROL PROGRAMME (NVBDCP)
TARGETS :
Sr. No.
Physical Targets
Indicator 2010 2011 2012 Remarks
1 Annual Blood Examinate Rate (ABER) i.e. percentage of persons screened annually for Malaria
13.82% 13.73% To sustain the ABER at the same level
Since this is annual figure the proportionate target for six months by monthly blood examination rate should also be fixed. Two districts Durg and Kawardha needs strengthening of surveillance and should be monitored at regular interval.
2 Annual Parasite Incidence (API) i.e. Malaria cases per 1000 population annually
6.14 6.13 < 5.0 Some districts have shown high API, Dantewada (55.45), Narayanpur (39.63) and Bijapur (30.7). Total 9 districts reporting more than 5 API and need to be focussed for micro level monitoring.
3 Sentinel Surveillance Hospital made functional for Dengue & Chikungunya
2 2 2 The functionality to be sustained & ensured and should be monitored by their regular reports
4 No. of districts with Mf rate less than 1% out of total endemic districts
4 out of 6
5 out of 6
6 out of 6
Sustaining Mf rate less than 1%.
Sr. No.
Priority Area for Focussed Attention
1 The districts Dantewada, Bijapur, Narayanpur and allmost all the districts need to be focussed for micro level monitoring to reduce API
2 Malaria control activities in Dantewada, Bijapur and Narayanpur has to be monitored regularly.
3 Mf rate is most crucial parameter and should be done under proper supervision
Sr. Essential Conditionality
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 152
No. Post Sanctioned In position
Vacant Target for 2012-13
1 District VBD Officer (VBDO)
18 0 18 Process to be initiated and recruitment to be made for VBDOs
2 Contactual Posts under EAC Project, (State consultants-6; District VBD consultants-16; Malaria Technical Supervisors-96; MPWs1144- LTs-48, FLA-16, DEO-16, IC-2
1361 951 410 All the posts 2 State Consultants, 7-District VBD Consultants, 260- MPWs, 61 MTS, 16 FLA, 1 IC and 34 LTs need to be filled up.
3 Two review meetings in a year to be conducted under the Chairmanship of Principal Secretary (Health)/Mission Director - one before transmission period and second during transmission period.
DesirableConditionality
1 MPWs (Regular) Desirable Conditionality
4918 2531 2387 2387 MPWs posts needs to be filled up on priority basis along with the training to be imparted in this year for malaria control actitvities.
District wise goals (To be done by State)
ABER API Deaths Mf Rate
Name of Districts 2011 2012
2011 2012
2011 2012
2011 2012
Road Map: Surveillance & monitoring under NVBDCP is done throughout the year. Following salient points are to monitor the implementation of programme activities in different quarters. • June- to July - 1st round spraying and observance of anti-malaria month to be ensured and accordingly funds availability at districts to be ensured • Sept. to Oct. - 2nd round of spray and observance of anti-dengue month. Preparatory activities for observance of Mass Drug Administration towards filaria elimination to be started. • Oct. to Dec.-Review and Monitor physical and financial performance and preparation of next annual plan. • Jan. to March - Consolidation of previous year's physical and financial achievement and plan for next year.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 153
DETAILED BUDGET: NATIONAL VECTOR BORNE DISEASES CONTROL PROGRAMME
(NVBDCP)
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.1 Domestic Budget Support (DBS)
F.1.1 Malaria
F.1.1.a Contractual Payments
F.1.1.a.i MPW contractual 995.73 450.00 Approved
F.1.1.a.ii Lab Technicians ( against vacancy)
F.1.1.a.iii VBD Technical Supervisor (one for each block)
F.1.1.a.iv District VBD Consultant (one per district) (Non- Project States)
F.1.1.a.v State Consultant (Non – Project States), M&E Consultant (Medical Graduate with PH qualification) - VBD Consultant (preferably entomologist)
F.1.1.b ASHA Incentive 50.00 50.00 Approved For surveillance by active involvement of ASHA,S
F.1.1.c Operational Cost
F.1.1.c.i Spray Wages
F.1.1.c.ii Operational cost for IRS 34.50 Approved From state resource
F.1.1.c.iii Impregnation of Bed nets- for NE states
F.1.1.d Monitoring , Evaluation & Supervision & Epidemic Preparedness including mobility
29.25 30.00 Approved M & E should be done intensively under strict supervision
F.1.1.e IEC/BCC 32.96 30.00 Approved Comprehensive IEC/BCC activities for all VBD,s
F.1.1.f PPP / NGO and Intersectoral Convergence
F.1.1.g Training / Capacity Building
23.36 25.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 154
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.1.1.h Zonal Entomological units This include EMP implementation plan F.1.1.i Biological and
Environmental Management through VHSC
F.1.1.j Larvivorous Fish support
F.1.1.k Construction and maintenance of Hatcheries
F.1.1.l Any other Activities (Pl. specify)
ASHA Talent Search/Annual Meet of ASHAs in 2 Zones
Sentinel Sites 50.00 0.00 Not approved
TA/DA to spray team, storage and procurement of PPE
Total Malaria (DBS) 1215.80 585.00
F.1.2 Dengue & Chikungunya
F.1.2.a Strengthening surveillance (As per GOI approval)
Approved To strenghten diagonsis facilities and case management .As per Norms, but balance may be used to another VBD also The State should plan the activities as per guidelines to achieve mid- term plan objectives The amount under vector control and Environmental management may also be utilised for Malaria Environmental Management
F.1.2.a(i) Apex Referral Labs recurrent
3.50 0.00
F.1.2.a(ii) Sentinel surveillance Hospital recurrent
0.00 2.00
F.1.2.a(iii) ELISA facility to Sentinel Surv Labs
F.1.2.b Test kits (Nos.) to be supplied by GoI (kindly indicate numbers of ELISA based NS1 kit and Mac ELISA Kits required separately)
F.1.2.c Monitoring/supervision and Rapid response
1.80 2.00
F.1.2.d Epidemic preparedness 4.05 6.00
F.1.2.e Case management
F.1.2.f Vector Control & environmental management
F.1.2.g IEC BCC for Social Mobilization
8.10 5.20
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 155
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.1.2.h Inter-sectoral convergence
F.1.2.i Training & printing of guidelines, formats etc. including operational research
4.86 4.80
Total Dengue/Chikungunya
22.31 20.00
F.1.3 AES/JE
F.1.3.a Strengthening of Sentinel sites which will include Diagnostics and Case Management, supply of kits by GoI
F.1.3.b IEC/BCC specific to J.E. in endemic areas
F.1.3.c Capacity Building
F.1.3.d Monitoring and supervision
F.1.3.e Procurement of Insecticides (Technical Malathion)
F.1.3.f Fogging Machine
F.1.3.g Operational costs for malathion fogging
F.1.3.h Operational Research
F.1.3.i Rehabilitation Setup for selected endemic districts
F.1.3.j ICU Establishment in endemic districts
F.1.3.k ASHA Insentivization for sensitizing community
F.1.3.l Other Charges for Training /Workshop Meeting & payment to NIV towards JE kits at Head Quarter
Total AES/JE 0.00 0.00
F.1.4 Lymphatic Filariasis
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 156
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.1.4.a State Task Force, State Technical Advisory Committee meeting, printing of forms/registers, mobility support, district coordination meeting, sensitization of media etc., morbidity management, monitoring & supervision and mobility support for Rapid Response Team and contingency support
55.25 12.25
Approved
F.1.4.b Microfilaria Survey
4.23 4.50
Approved Critical parameter; the state needs to ensure the activities
F.1.4.c Post MDA assessment by medical colleges (Govt. & private)/ICMR institutions
2.52 0.00
Not approved
F.1.4.d Training/sensitization of district level officers on ELF and drug distributors including peripheral health workers
27.00 42.40
Approved Specific training to be plan as per guidelines
F.1.4.e Specific IEC/BCC at state,district, PHC, Sub-centre and village level including VHSC/GKs for community mobilization efforts to realize the desired drug compliance of 85% during MDA
23.00 23.10
Approved
F.1.4.f Honorarium for Drug Distribution including ASHAs and supervisors involved in MDA
56.00 74.40
Approved
F.1.4.g Verification and validation for stoppage of MDA in LF endemic districts
1.35
Approved
F.1.4.g.i a) Additional MF Survey
F.1.4.g.ii b) ICT Survey
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 157
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.1.4.g.iii c) ICT Cost 0.00
F.1.4.h Verification of LF endemicity in non-endemic districts
2.00
Approved
F.1.4.h.i a) LY & Hy Survey in 350 distt
F.1.4.h.ii b) Mf Survey in Non- endemic distt
F.1.4.h.iii c) ICT survey in 200 distt 0.00
F.1.4.i Post-MDA surveillance 1.00 0.00
Total Lymphatic Filariasis 169.00 160.00
F.1.5 Kala-azar
F.1.5 Case search/ Camp Approach
-- --
F.1.5.a Spray Pumps & accessories
F.1.5.b Operational cost for spray including spray wages
F.1.5.c Mobility/POL/supervision
F.1.5.d Monitoring & Evaluation
F.1.5.e Training for spraying
F.1.5.f IEC/ BCC/ Advocacy
Total Kala-azar 0.00 0.00
Total (DBS) 1407.11 765.00
F.2 Externally aided component
F.2.a World Bank support for Malaria (Identified state)
F.2.b Human Resource 259.05 145.00 Approved
F.2.c Training /Capacity building
45.60
40 Approved
F.2.d Mobility support for Monitoring Supervision & Evaluation including printing of format & review meetings, Reporting format (for printing formats)
22.90
15
Approved
Kala-azar World Bank assisted Project
F.2.e Human resource Not Applicable
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 158
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.2.f Capacity building
F.2.g Mobility
F.3 GFATM support for Malaria (NEStates)
Not Applicable
F.3.a Project Management Unit including human resource of N.E. states
F.3.b Training/Capacity Building
F.3.c Planning and Administration( Office expenses recurring expenses, Office automation , printing and stationary for running of project)
F.3.d Monitoring Supervision (supervisory visits including travel expenses, etc) including printing of format and review meetings,
F.3.e IEC / BCC activities as per the project
F.3.f Operational cost for treatment of bednet and Infrastructure and Other Equipment (Computer Laptops, printers, Motor cycles for MTS )
Total : EAC component 327.55 200.00
F.4 Any Other Items ( Please Specify)
0.00 0.00
F.5 Operational costs ( mobility, Review Meeting, communication, formats & reports)
0.00 0.00
Grand total for cash assistance under NVBDCP (DBS + EAC) 1734.66 965.00
F.6 Cash grant for decentralized commodities
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 159
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.6.a Chloroquine phosphate tablets
49.90 55.50 Approved
F.6.b Primaquine tablets 7.5 mg
3.88
F.6.c Primaquine tablets 2.5 mg
1.34
F.6.d Quinine sulphate tablets 0.00
F.6.e Quinine Injections 4.44
F.6.f DEC 100 mg tablets 71.08
F.6.g Albendazole 400 mg tablets
F.6.h Dengue NS1 antigen kit
F.6.i Temephos, Bti (AS) / Bti (wp) (for polluted & non polluted water)
10.00
F.6.j Pyrethrum extract 2% for spare spray
5.00
F.6.k ACT ( For Non Project states)
55.58
Approved Being project state the ACT would be supplied by Centre
F.6.l RDT Malaria – bi-valent (For Non Project states)
F.6.m Any Other Items ( Please Specify)
Synthetic Pyrethroids 313.25 0.00 Not Approved To be met from state resources
Spray Pumps & accessories
42.88 0.00
Lancets/slides/swab/lab reagents etc.
7.30 0.00
Microscopes 43.80 0.00
Not approved May be procured from NRHM flexifund
Total grant for decentralized commodities
608.45 55.50
Grand Total for grant-in-aid under NVBDCP
2343.11 1020.50
Commodity Grants 0.00 2613.80
Total NVBDCP Cash + Commodity 2343.11 3634.30
Cash assistance required under NRHM flexi fund
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 160
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
Biological and Environmental Management through VHSC
6.92
306.92
Not approved To intensify malaria control activities in the state
Spray Wages 300.00
Total 306.92 306.92
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 161
NATIONAL LEPROSY ERADICATION PROGRAMME (NLEP) TARGETS FOR 2012-13:
S.No Goals & Target September'12 March 2013
1 Elimination at Sate level 0 0
2 Elimination at District level 1 2
3 Case detection through ASHA 2600 5167
4 Special activity plan in 91 blocks 91 Blocks Complete 91 Blocks
5 MCR footwear procurement & supply 1200 2400
6 RCS 125 250
7 Development of leprosy expertise 50% of Plan 100% of Plan
8 Treatment Completion Rate assessment for 2011-12 Completed -
9 Audited Report for the year 2011-12 Completed -
10 Expenditure incurred against approved plan budget 50% 100%
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 162
DETAILED BUDGET: NATIONAL LEPROSY ERADICATION PROGRAMME (NLEP)
FMR code
Activity Unit Cost (In Rupees)
Physical Targets
Amount proposed
Amount approved
Remarks
G 1.
Improved early case detection
G 1.1 Incentive to ASHA MB 500 2584 12.92 5.00 Approved No reduced to MB-1000 & PB-1000 Cases
PB300 2583 7.75 3.00
G1.1 a
Sensitization of ASHA 50 - -
G 1.2
Specific -plan for High Endemic Distrcts
12 D 91 Blocks
17.82 17.82
G 2
Improved case management
MCR - 250/- Aids/Appliance -12500 Welfare/RCS - 10,000
2400 18
250
7.20 0.54
25.00
6.00 0.54
25.00
Approved
G 2.2
Urban L:eprosy Control, (Mega city - 0 , Medium
city (1) -3 , Med. City (2)- 1 Township -19)
Meg -280000 Med (1)- 120000 Med. (2) - 236000 Town - 57000
0 8 2 7
0 16.88 14.16
6.84
0 9 60 4.72 3.99
G 2.3 Material & Supplies
G 2.3 a
Supportive drugs, lab. reagents & equipments and printing works
52,000 18 14.40 9.36
G 2.4 NGO - SET Scheme 500000 - - -
G 3 Stigma Reduced
G 3.1
Mass media, Outdoor media, Rural media, Advocacy media
50,000 18 18.00 9.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 163
FMR code
Activity Unit Cost (In Rupees)
Physical Targets
Amount proposed
Amount approved
Remarks
G 4.
Development of Leprosy Expertise sustained
G 4.1 Training of new MO 60000 - - - Approved As NLEP rates are very low, higher rates agreed in keeping with other programmes
G 4.2 Refresher training of MO 40000 600 14.90 8.00
G 4.3 Training to New H.S/H.W. 30000 900 10.80 9.00
G 4.4
Other training -Physiotherapist
30000 30 0.50 0.30
G 4.5 Training to Lab. Tech. 30000 60 1.00 0.60
G 4.6
Management training for District Nucleus Team
30000 90 3.24 0.90
G 5.
Monitoring, Supervision and Evaluation System improved
G 5.1
Travel Cost and Review Meeting
Approved
G 5.1 a
travel expenses - Contractual Staff at State level
50000 1 27.00 0.50
G 5.1 b
travel expenses - Contractual Staff at District level
15000 18 6.75 2.70
G 5.1 c Review meetings 25000 4 2.00 1.00
G 5.2
Office Operation & Maintenance
G 5.2 a Office operation - State Cell
38000 1 - 0.38 Approved
G 5.2 b
Office operation - District Cell
18000 18 14.40 3.24 Approved
G 5.2 c
Office equipment maint. State
30000 1 - 0.30 Approved
G 5.3 Consumables
G 5.3 a State Cell 28000 1 - 0.28 Approved
G 5.3 b District Cell 14000 18 - 2.52
G 5.4 Vehicle Hiring and POL
G 5.4 a State Cell 85000 2 9.60 1.70
G 5.4 b District Cell 75000 18 23.76 13.50
G 6. Programme Management ensured
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 164
FMR code
Activity Unit Cost (In Rupees)
Physical Targets
Amount proposed
Amount approved
Remarks
G 6.1
Contractual Staff at State level
G 6.1 a SMO 40000 1x12 7.20 4.80 Approved
G 6.1 b BFO cum Admn. Officer 30000 1x13 3.60 3.60
G 6.1 c Admn. Asstt. 16000 1x14 1.92 1.92
G 6.1 d DEO 12000 1x15 1.44 1.44
G 6.1 e Driver 11000 1x16 1.32 1.32
G 6.2 Contractual Staff at Disrrict level
G 6.2 a Driver 11000 9x12 15.84 11.88 Approved
G 6.2 b
Contractual Staff in selected States, NMS 20000
- - -
G 7. Others
G 7.1
Travel expenses for regular staff for specific programme / training need, awards etc
27.00 4.00
TOTAL 313.78 167.91
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 165
NATIONAL PROGRAMME FOR CONTROL OF BLINDNESS (NPCB)
ROAD MAP FOR PRIORITY ACTION: 1. The emphasis will be on primary health centre all vision centres will be established
immediately after receipt of grant with PMOA is in position to facilitate eye care
delivery at the primary health centre.
2. Eye Bank to be established only in Government Hospital and Government Medical
College. The names and address may be furnished in the reports submitted to GOI.
3. Management of Health Society be restricted within Rs.14 lakh only.
4. Payment of Rs.750/- will be made to NGO per operated case if the NGO has used all
facilities of their own like Drugs & Consumables, Sutures, Spectacles, Transports/POL,
organization and publicity and IOL, Viscoelastics & addl. Consumables including their
own Eye Hospital and Doctors.
5. For organizing and motivating identified persons & transporting them to Govt. / NGO
fixed facilities, the NGO would be eligible for support not exceeding Rs.175/- per
operated case. (Transport/POL and organization & publicity.)
6. No payment will be released towards reimbursement to be made to NGOs w. e. f.
01.04.2012 if data entry on Management Information System (MIS) is not completed by
them.
Full details of the NGO funded be provided including the facilities created and the free operations being done by them in lieu thereof
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 166
DETAILED BUDGET : NATIONAL PROGRAMME FOR CONTROL OF BLINDNESS (NPCB)
FMR CODE
ACTIVITY Physical Target Amount Proposed
Amount Approved
Remarks
H *Recurring Grant-in aid
H 1.1 For Free Cataract Operation @Rs.750/- per case
61000 458 212.5 Approved on reimbursement basis
H 1.2 Other Eye Diseases@ Rs.1000/-
500 5 5 Approved
H 1.3 School Eye Screening Programme@ Rs.200/- per case
30000 60 60 Approved
H 1.4 Blindness Survey 18 18 0 Not approved
H 1.5 Private Practitioners @as per NGO norms
5000 38 37.5 Approved
H 1.6 Management of State Health Society and Dist. Health Society Remuneration (salary , review meeting, hiring of vehicle and Other Activities & Contingency) @ Rs.14 lakh/ Rs.7 lakh depending on the size of state
15 14 Approved
H 1.7 Recurring GIA to Eye Donation Centers @ Rs.1000/- per pair
0 0
H 1.8 Eye Ball Collection by Eye Bank @ Rs.1500/- per pair
300 5 4.5 Approved
H 1.9 Training PMOA and MIS training
200 10 10 Approved for PMOA and MIS training for 1 time
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 167
FMR CODE
ACTIVITY Physical Target Amount Proposed
Amount Approved
Remarks
H 1.10 IEC, Eye Donation Fortnight, World Sight Day & awareness programme in state & districts etc
663 45 18 Approved
1lac per District and 2 lac for state
H 1.11 Procurement of Ophthalmic Equipment
47 186 100 Approved
H 1.12 Maintenance of Ophthalmic Equipments
18 18 5 Approved
H.2 Non- Recurring Grant-in-aid
H.2.1 For RIO (new) @ Rs.60 lakh
0 0
H.2.2 For Medical College@ Rs.40 lakh
0 0
H.2.3 For vision Centre @ Rs.50000/-
100 50 50 Approved for 100 vision centre
H.2.4 For Eye Bank @ Rs.15 lakh
0 0
H.2.5 For Eye Donation Centre @ Rs.1 lakh
8 8 8 Approved for 8 EDC
H.2.6 For NGOs @ Rs.30 lakh 0 0
H.2.7 For Eye Wards and Eye OTS @ Rs.75 lakh
0 0
H.2.8 For Mobile Ophthalmic Units with tele-network @ Rs.60 lakh
0 0
H.2.9 Grant-in-aid for strengthening of Distt. Hospitals @ Rs.20 lakh
1 20 20 Approved for 1 Distt. Hospital
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 168
FMR CODE
ACTIVITY Physical Target Amount Proposed
Amount Approved
Remarks
H.2.10 Grant-in-aid for strengthening of Sub Divisional. Hospitals@ Rs.5 lakh
1 5 5 Approved for 1 Sub-Distt. Hospital
H.3 Contractual Man Power
H.3.1 Ophthalmic Surgeon@ Rs.25000/- p.m
2 10 6 Approved
H.3.2 Ophthalmic Assistant @ Rs.8000/- p.m
0 0
H.3.3 Eye Donation Counsellors @ Rs.10000/- p.m.
2 3 2.4 Approved
Total 954 557.9
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 169
REVISED NATIONAL TUBERCULOSIS CONTROL PROGRAMME (RNTCP)
TARGETS:
Annualized New Smear
Positive Case Detection
rate per lakh population
(April to September 2012)
Annualized New Smear
Positive Case Detection rate
per lakh population
(October to March 2013)
for Treatment Success
rate
(April to September
2012)
Treatment Success
rate
(October to March
2013)
60% 65% 87% 90%
S.No Indicators 2011 2012
1 Annual Suspects Examined Per Lakh
Population 107 180
2 Annual Smear Positive Case Notification
Rate (%) 60% 65%
3 Treatment Success Rate among new
smear positive cases 87% 90%
4 Default Rate among New Smear Positive
TB cases 8% 4%
5 Treatment Success rate among Smear
Positive Re-treatment cases 70% 85%
ROAD MAP FOR PRIORITY ACTION:
All the Key RNTCP contractual staff positions at State/Districts should be filled and
ensuring timely payment of salaries
The State level RNTCP review meetings to be chaired by Health Secretary/Mission
Director (NRHM) at least once in a quarter
To conduct State TB control society meeting, State Coordination committee meeting
(TBHIV) atleast once in a quarter
Scaling up of DOTS Plus services as per the State DOTS Plus action plan
Conduct ACSM/Training activities at State/Districts as per the State annual action plan
To involve Private Practitioners and NGOs in the RNTCP
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 170
Timely payment of DOT Providers honorarium at Districts
Strengthening Supervision and Monitoring at all levels
The state could be approved more funds based on expenditure pattern in the first six
months
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 171
DETAILED BUDGET: REVISED NATIONAL TUBERCULOSIS CONTROL
PROGRAMME (RNTCP)
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
I.1 Civil works
As per Revised Norms
and Basis of Costing
for RNTCP
1) Civil work Up gradation and maintenance completed as
planned; 2) Funds in the head utilized against the approved amount
30.15 30.15 Approved 100%. Approved the proposal for 3rd DOTS Plus site, 3 new DTCs.
I.2 Laboratory materials
As per Revised Norms and Basis of Costing for RNTCP
1) Sputum of TB Suspects Examined per lac population per quarter; 2) All districts subjected to IRL On Site Evaluation and Panel Testing in the year; 3) IRLs accredited and functioning optimally; 4) Funds in the head utilized against the approved amount
42.14 42.14 Approved 100%.
I.3 Honorarium
As per Revised Norms and Basis of Costing for RNTCP
1) All eligible Community DOT Providers are paid honorarium in all districts in the FY; 2) Funds in the head utilized against the
49.60 25.00 Approved 80% of the budget proposed for honorarium of DOTS patients. For DOTS Plus 30% approved.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 172
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
approved amount
I.4 IEC/ Publicity
As per Revised Norms and Basis of Costing for RNTCP
1) All IEC/ACSM activities proposed in PIP completed; 2) Increase in case detection and improved case holding; 3) Funds in the head utilized against approved amount
40.10 10.00 Approved Amountlimited to fit into the budget envelop approved by GOI.
I.5 Equipment maintenance
As per Revised Norms and Basis of Costing for RNTCP
1) Maintenance of Office Equipments at State/Districts and IRL equipments completed as planned; 2) All BMs are in functional condition; 3) Funds in the head utilized against approved amount
15.79 11.05 Approved 70%.
I.6 Training
As per Revised Norms and Basis of Costing for RNTCP
1) Induction training, Update and Re-training of all cadre of staff completed as planned; 2) Funds in the head utilized against approved amount
171.35 70.81 Approved limited to the norm.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 173
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
I.7 Vehicle maintenance
As per Revised Norms and Basis of Costing for RNTCP
1) All 4 wheelers and 2 wheelers in the state are in running condition and maintained; 2) Funds in the head utilized against approved amount
32.75 26.20 Approved 80% of the estimated budget.
I.8 Vehicle hiring
As per Revised Norms and Basis of Costing for RNTCP
1) Increase in supervisory visit of DTOs and MOTCs; 2) Increase in case detection and improved case holding; 3) Funds in the head utilized against approved amount
67.00 56.40 Approval limited to the norm.
I.9 NGO/PP support
As per Revised Norms and Basis of Costing for RNTCP
1) Increase in number of NGOs/PPs involved in signed schemes of RNTCP; 2) Contribution of NGOs/PPS in case detection and provision of DOT 3) Funds in the head utilized against approved amount
122.19 55.08 Approved 45%. *If the state is anticipating deficit in laboratory capacity to conduct C&DST test, then state may budget for funds under C&DST scheme in the NGO /PP head as the RNTCP guidelines for NGO and PPs, as a priority.
I.10 Miscellaneous
As per Revised Norms and Basis of
1) All activities proposed under miscellaneous head in PIP completed; 2)
51.05 43.31 Approved amount as per the norm.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 174
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
Costing for RNTCP
Funds in the head utilized against approved amount
I.11 Contractual services
As per Revised Norms and Basis of Costing for RNTCP
1) All contractual staff appointed and paid regularly as planned; 2) Funds in the head utilized against approved amount
559.61 559.61 Approved 100%.
I.12 Printing
As per Revised Norms and Basis of Costing for RNTCP
1) All printing activities at state and district level completed as planned; 2) Funds in the head utilized against approved amount
36.49 18.24 Approved 50%.
I.13 Research and studies
As per Revised Norms and Basis of Costing for RNTCP
1) Proposed Research has been initiated or completed in the FY as planned; 2) Funds in the head utilized against approved amount
4.00 4.00 Approved 100%.
I.14 Medical Colleges
As per Revised Norms and Basis of Costing for RNTCP
1) All activities proposed under Medical Colleges head in PIP completed; 2) Funds in the head utilized against
21.92 19.30 Not approved Proposal for STLS in Medical College is not approved.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 175
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
approved amount
I.15
Procurement –vehicles
As per Revised Norms and Basis of Costing for RNTCP
1) Procurement of vehicles completed as planned; 2) Funds in the head utilized against approved amount
Approved for amount as per the norm.
Four wheeler 5.00 4.30
Two Wheeler 0 0
I.16 Procurement – equipment
As per Revised Norms and Basis of Costing for RNTCP
1) Procurement of equipments completed as planned; 2) Funds in the head utilized against approved amount
24.00 15.30 Approved proposal for Procurement of A/C and Computers .Amount budgeted for Photocopier procurement not approved as there is no provision.
I.17 Tribal Action Plan
127.29 60.00 Approved amount as per the norm.
Total (A) 1400.42
1050.90
B22.4 Additionality funds from NRHM (B) 182.26 102.44
TOTAL (A+B) Rs. 1153.34
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 176
Annexure-1
DETAILED BUDGET: RERODUCTIVE CHILD HEALTH (RCH)
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks Proposed Approved
A.1 Maternal Health (MH)
A.1.1 Operationalise Facilities
A.1.1.1 Operationalise FRUs
1,650.00 25,000.00
Indemnity Insurance of LSAS & EMOC Doc (131) Planning & Monitoring of service delivery (75)
20.91 6.84 Rs. 2.15lakhs: Indemnity insurance. Recommended for approval with conditionality that performance needs to be monitored. 1) Insurance for LSAS trained doctors recommended for 69 doctors @Rs. 1650= Rs. 1.13 lakhs 2) Insurance for CEmOc trained doctors recommended for 62 doctors @ Rs.1650= 1.02 lakhs Total = Rs.2.15lakhs 25% of Rs. 18.75lakhs for planning and monitoring approved.
Operationalise Non-FRU CH/CHCs
25,000.00 Planning and monitoring of service delivery (97)
24.25 0.00 Not recommended for approval. Since all the monitoring related activities must be prepared comprehensively.
A.1.1.2 Operationalisation of 24x7 PHCs
15000.00 10000.00
Planning and Monitoring of service delivery (200) Night security services (200)
230.00
0.00 Rs. 30.00lakhs for planning and monitoring not recommended for approval. Since all the monitoring related activities must be prepared comprehensively. Rs. 200.00lakhs for night security services is not recommended for approval as the proposed is like an employment
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 177
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
generation scheme. There is no rationality no. linkages with the DPs so any Additionalities are not recommended
A.1.1.3 MTP - Safe abortion services
5000.00 150.00
7.50
0.00 Not recommended for approval. Since all the monitoring related activities must be prepared comprehensively.
A.1.1.4 RTI/STI Services at Health Facilities
5000.00 350 17.50 0.00 Not approved. Comprehensive plan
needed
A.1.1.5 Operationalise Sub Health Centre
A.1.2 Referral Transport 5000.00 100.00
Remuneration of drivers (225) Incentive to drivers (10000)
145.00 0.00 Not approved separately. JSSK funds may be utilized by the state judiciously to provide comprehensive patient transport
A.1.3 Integrated Outreach RCH Services (Fixed day services)
300.00 /day LD 100.00/day LT 400.00 /day LD 100.00/day LT
Incentive to lady doctors/labtechs (15000) Mobility support to doctors/ labtechs (15000)
135.00 135.00 For fixed day services. Rs. 60.00lakhs: Incentive to lady doctors Rs. 75.00lakhs: Mobility support
A.1.4 Janani Suraksha Yojana / JSY
A.1.4.1 JSY - Home Deliveries
Rs. 500.00 50000 nos. 250.00 250.00 Approved.
A.1.4.2 JSY - Institutional Deliveries
A.1.4.2.a Rural 250.00 1400.00
Incentive for travel (150000) Incentive to beneficiary (250000)
3875.00 3500.00 Rs.375 lakhs -Incentive for travel not recommended. Travel from home to hospital is provisioned under JSSK. Rs. 3500.00lakhs approved for incentive to
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 178
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
beneficiary
A.1.4.2.b Urban 500.00 1000.00
Incentive for travel from far towns (20000) Incentive to beneficiary (100000)
1100.00 1000.00 Incentive for travel not approved. Travel from home to hospital is provisioned under JSSK. Rs. 1000.00lakhs approved for incentive to beneficiary
A.1.4.2.c Caesarean Section Rs. 3,500.00 2500 87.50 37.50 Approved @ Rs. 1500/ per C-section
A.1.4.3 JSY - Administrative Expenses (5%)
Admn charges( 1% IEC, 2% monitoring & mobility, 2% office expenses & others
269.13 269.13 Approved
A.1.4.4 Incentive to ASHA 200.00 /case 150.00 /case 50.00 /case
Incentive for motivation (350000) Incentive for stay (250000) Incentive for Maternal Death review (5000)
1077.50 1075.00 Rs. 700.00lakhs: Incentive for motivation Rs. 375.00lakhs: Incentive for stay Incentive for MDR not recommended. No provision under JSY
A.1.5 Maternal Death Review
100.00 200000.00 25000.00 20000.00
Reporting of death (2000) MDR external (lumpsum) Review meetings state level (2) Review meetings regional level (16)
7.70 4.70 Rs. 1.00lakhs: Reporting of death incentive to Mitanin /Kotwar recommended for 2000 cases @ Rs. 0.50 each = 1.00lakhs Rs. 2.00lakhs: External third party audit - not approved Rs. 0.50lakhs: Review meetings state Rs. 3.20lakhs: Review meetings regional
A.1.6 Maternal Health - Other activities
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 179
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
For High Risk Pregnancy
1000.00 /case 2000.00 /case 300.00 /case 100.00/case
Incentive to medical team for HIV positive NDs (700) Incentive to medical team for HIV positive C-Sections (300) Incentive to ANM for C-section Hard to reach area (2000) Incentives to ANM/Mitanin for linking reactive ANCs to ICTC (2000)
21.00 21.00 Rs. 7.00lakhs: Incentive for HIV positive NDs Rs. 6.00lakhs: Incentive for HIV positive C-Sections Rs. 6.00lakhs: Incentive to ANM for C-section hard to risk areas - only in high risk pregnancy identified during 3rd ANC and registered in MCTS Rs.2.00 lakhs for Incentives to ANM/Mitanin for linking reactive ANCs to ICTC @ 100 * 2000= 200000
A.1.7 JSSK (for Pregnant Women)
A.1.7.1 Drugs and Consumables (other than reflected in Procurement)
A.1.7.1.1 Drugs consumables & treatment for Normal Delivery
750.00 /case 150000 1125.00 450.00 Recommended for 150000 PW @ Rs. 300 /PW
A.1.7.1.2 Drugs consumables & treatment for Caesarean Delivery
4000.00 /case
5000 200.00 80.00 Recommended for 5000 C-Section deliveries at public health facilities @ Rs. 1600/delivery
A.1.7.2 Diagnostic 500.00 /case
5000 25.00 10.00 Recommended for 200 PW @ Rs. 500/PW for all JSSK cases
A.1.7.3 Blood transfusion 850.00 /case
2000 17.00 6.00 Recommended for 2000 PW @ Rs. 300/PW
A.1.7.4 Diet (3 days for ND and 7 days for C-section) 300.00 /case
700.00 /case
Normal Deliveries (150000) C-Sections (5000)
485.00 485.00 Rs. 450.00lakhs: Diet for normal delivery Rs. 35.00lakhs: Diet for all C-section cases in JSSK centres
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 180
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.1.7.5 Free Referral Transport (other than A1.2)
500.00 /case 750.00 /case 750.00 /case
Home to hospital (150000) Interfacility (50000) Hospital to home (150000)
2250.00 825.00 Rs. 325.00lakhs recommended for home to hospital RT for 150000 PW @Rs. 250/PW. Rs. 75.00lakhsecommended for interfacility RT for 30000 PW @ Rs. 250.00/PW Rs. 375.00lakhs recommended for hospital to home RT for 150000 PW @ Rs. 250.00/PW
Sub-total Maternal Health (excluding
JSY)
4710.86 2023.54
Sub-total JSY 6659.13 6131.63
A.2 CHILD HEALTH CH
A.2.1 IMNCI
A.2.1.1 IMNCI - Planning monitoring
Rs. 25,000.00
27 districts 6.75 6.75
A.2.1.2 IMNCI - Operationalisation
Rs. 25,000.00
27 districts 6.75 6.75
A.2.1.3 IMNCI - Pre-service trainning in medical college/ nursing college/ ANMTC
5.00 5.00
A.2.2 Facility Based New Born Care ( FBNC)( SNCU/NBSU/NBCC)
A.2.2.1 FBNC- Planning and Monitoring
Rs. 5,000.00 1500 delivery points
75.00 0.00 Not approved.
A.2.2.2 Sick New Born Care unit / SNCU
A.2.2.2.1 SNCU Establishment
A.2.2.2.2 SNCU Operational Cost+
Rs. 1,000,000.00
12; including power audit
120.00 60.00 Cost approved @10.00 lakhs for 4 units and @2.5 lakhs for 8 units (cost for 3 months for new units)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 181
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.2.2.2.2.1 SNCU Operational Cost- incentive to Paedtirician
Rs. 750.00 5000 cases Rs. 2500 for First 10 admissions thereafter Rs 250 per case per month
37.50 0.00 Approval pending, criteria for providing incentives to be redefined.
A.2.2.3 New Born Stablization unit (NBSU)
A.2.2.3.1 NBSU Establishment
37 0.00 0.00 State has indicated that, this is to be met from committed amount of 2011-12 (Rs. 64.75 lakhs)
A.2.2.3.2 NBSU Operational Cost
Rs. 175,000.00
113 (Full operational cost for 67 NBSU's & half operational cost for 25 NBSU's which will be made operational after 2nd quarter of 2012-13)
139.13 33.25 Approved for 38 NBSUs for 6 months. (38*Rs.87500)
A.2.2.4 New Born Care Corner (NBCC)
A.2.2.4.1 NBCC Establishment
State has indicated that, this is to be met from committed amount of 2011-12 (Rs. 97.50 lakhs)
A.2.2.4.2 NBCC - Maintenance
Rs. 20,000.00
500 100.00 48 As per data there are 1126 delivery points.Cost being santioned for 195 existing NBCCs and 285 proposed for 2012-13 @ 10,000 for 6 months. (195*10000+285*10000)
A.2.3 Home Based New Born Care (HBNC)
A.2.3.1 HBNC Planning & Monitoring
A.2.4 Infant and Young Child Feeding / IYCF
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 182
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.2.5 Care of Sick Children and Severe Malnutrition CSCSM)
State has indicated that, establishment of NRCs to be met from committed amount of 2011-12 (Rs. 100.00 lakhs)
A.2.5.1 NRC - maintainence
Rs. 50,000.00
60 30.00 25.00 40 units @50,000 and 20units@25,000
A.2.5.2 NRC - Operational Cost
A.2.5.2.1 NRC - Salary of NRCs staff
A.2.5.2.1.1 NRC - Salary of NRCs staff - Feeding Demonstrator
Rs. 10,000.00
60 nos. 72.00 54.00 Cost for 30 units@ 6 months
A.2.5.2.1.2 NRC - Salary of NRCs staff - Cook
Rs. 4,500.00 60 nos. 32.40 24.30 Cost for 30 units @ 6 months
A.2.5.2.2 NRC - Food Mother & Child
Rs. 100.00 5000 nos. 80.00 80.00
A.2.5.2.3 NRC - Wage loss compensation to mother
Rs. 100.00 5000 cases 80.00 80.00 16 days Duration
A.2.5.2.4 NRC - Incentive to AWW for Referral
A.2.5.2.5 NRC - Contingency Rs. 200.00 5000 nos. (SAM Referral
& Contingency)
10.00 3.33 provided for 33% cases only.
A.2.6 Mgmt of Diarrohea,ARI and Micronutrient Mal / Shishu sanrashan Mahh
A.2.6.1 Mgmt of Diarrohea, ARI Procurement of Zinc and Ors
A.2.6.2 Mgmt of Diarrohea, others
Rs. 50,000.00
27 districts (referral &
treatment of patients.)
13.50 0.00 Approval pending. Details of activities needs to be shared.
A.2.7 Other strategies/activities - Shishu Sanrashan Mahh(SSM)
State has indicated that, establishment of NRCs to be met from committed amount of 2011-12 (Rs. 100.00 lakhs)
A.2.7.1 SSM - Drug & Nutrition
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 183
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
suplliments
A.2.7.1.1 SSM - Drug - Vit. A solution Procurment
A.2.7.1.2 SSM - Drug - Tab Albendazole Procurment
A.2.7.1.3 SSM - Drug - Tab. IFA (Adult) Procurment
A.2.7.1.4 SSM - Drug - Syrup IFA Procurment
A.2.7.1.5 SSM - cost of drugs distribution
A.2.7.2 SSM - Social Mobilization -advertisement
Rs. 500,000.00
1 5.00 0.00 To be included in consolidated IEC/BCC budget
A.2.7.3 SSM - TV spots Rs. 500,000.00 1 5.00 0.00
A.2.7.4 SSM - Mobility support and monitoring
A.2.7.4.1 SSM - Mobility support and monitoring at District Level
Rs. 20,000.00
27 districts 5.40 1.35 25% approved.
A.2.7.4.2 SSM - Mobility support and monitoring at BlockLevel Rs. 5,000.00 146 blocks
7.30 1.83
A.2.7.5 SSM - Urban service delivery
Rs. 20,000.00
27 districts 5.40 1.35
A.2.8 Infant Death Review (IDR)
A.2.8.1 IDR - Death Reporting
Rs. 50.00 20000 10.00 0.00 Duplication. Not approved. Incentive proposed for ASHAs under FMR 2.9.4
A.2.8.2 IDR - Death Audit Rs. 500.00 20000 (Rewiew of
infant deaths)
100.00 25.00 Rs. 500 (250 each for 2 investigators for community based child death review) for 5,000 deaths
A.2.8.3 IDR - Death Audit( External)
third party audit
5.00 5.00
A.2.9 Incentive Under Child Health
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 184
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.2.9.1 Incentive - ASHA - HBNC - Incentive for Services
Rs. 250.00 200000 500.00 500.00
A.2.9.2 Incentive - ASHA - FBNC - Incentive for Referral
Rs. 200.00 30000 60.00 0.00 Not approved.
A.2.9.3 Incentive - ASHA - NRC - Incentive for Referral
Rs. 150.00 5000 7.50 10.00 Approved @ Rs. 50 as per Operational guidelines for referral and Rs. 150 for follow-up visits for ASHAs only.
A.2.9.4 Incentive - ASHA - IDR - Incentive for Infant Death Reporting
Rs. 50.00 20000 10.00 10.00 Approved.
A.2.9.5 Incentive - JSSK - Incentive for Staff
Rs. 100.00 30000 (MO/RMA -
50%, support staff- 50%)
30.00 0.00 Not approved. Not backed by explanation or outputs.
A.2.10 JSSK (for Sick neonates up to 30 days)
A.2.10.1 JSSK - Child - Drugs & Consumables
Rs. 1,000.00 30000 cases 300.00 30.00 Rs.200 for 15000 cases
A.2.10.1.1 JSSK- Child - Blood transfusion
Rs. 850.00 200 cases 1.70 0.60 200 cases @ Rs.300
A.2.10.2 JSSK - Child - Diagnostics
Rs. 200.00 10000 cases 20.00 0.00 Already covered under drugs and consumables
A.2.10.2.1 JSSK- Child- Food for mother
Rs. 300.00 30000 cases 90.00 45.00 15000 cases @Rs.300
A.2.10.3 JSSK - Child - Referral Transport
A.2.10.3.1 JSSK - Child - Home to Hospital
Rs. 500.00 30000 cases 150.00
75.75
Rs.250 each for home to hospital, 2% interfacility, hospital to home 15000 cases
A.2.10.3.2 JSSK - Child - Interfacility Transfer
Rs. 750.00 5000 cases 37.50
A.2.10.3.3 JSSK - Child - Hospital to Home
Rs. 750.00 30000 cases 225.00
Sub-total Child Health
2382.83 1132.26
A.3 FAMILY PLANNING
A.3.1 Terminal / Limiting Methods
A.3.1.1 Dissemination of Manuals on
Rs. 10,000.00
27 2.70
2.70
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 185
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
Sterilization & QA of Sevices
A.3.1.1.1 Field Review Meeting and Monitoring on Camp and Fixed Day Service
Rs. 25,000.00
173 43.25 0.00 Not approved.No details available in the write-up.
A.3.1.2 Organise Female Sterilisation Camp
Rs. 15,000.00
550 camps 82.50 82.50
A.3.1.3 Organise NSV Camp
Rs. 35,000.00
200 camps 70.00 70.00
A.3.1.4 Compensation for female sterilisation
A.3.1.4.1 Public - Compensation for Female Sterilization
1000.00 130000 nos. 1300.00 1300.00
A.3.1.5 Compensation for male sterilisation
Rs. 1,500.00 20000 300.00 300.00
A.3.1.6 Private - Compensation for Male Sterilization
Rs. 1,500.00 4000 nos. 60.00 60.00
A.3.1.6.1 Private - Compensation for Female Sterilization - Hospitals
Rs. 1,500.00 30000 nos. 450.00 450.00
A.3.1.6.2 Accreditation of Private Partner for Sterilization Servvice
1.00 1.00
A.3.2 Spacing Methods
A.3.2.1 IUD - fixed day service
Rs. 20.00 25000 nos. 5.00 5.00
A.3.2.2 IUD Services at Health Facilities
Rs. 20.00 125000 25.00 25.00
A.3.2.3 Accreditation of Private providers for IUD insertion services
A.3.2.4 Social Marketing of Contraceptives
A.3.2.5 Contraceptive update seminars
A.3.3 Mobility Support for Family Planning
Rs. 1,000.00 1000 camps 10.00 0.00 Fund for POL is already approved under camps; not recommended for approval.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 186
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.3.4 Repairs of Laparoscopes
5.00 0.00 Not approved.No details available in the write-up.
A.3.5 Other Strategies / Activities
A.3.5.1 Monitoring of IUCD services - HLFPPT
Rs. 5,000,000.00
1 50.00 Shifted under training section (FMR code A.9.6.6.1).
A.3.5.2 World Population Day Celebration
A.3.5.2.1 World Population Day Celebration - District level
Rs. 400,000.00
27 108.00
122.60
State has proposed Rs. 1.00 lakhs/ block. State may note that as per GoI norm Rs. 10000/ block is approved.
A.3.5.2.2 World Population Day Celebration - Block level
Rs. 100,000.00
146 146.00
Sub-total Family Planning
(excluding compensation)
448.45 208.80
Sub-total Sterilisation and
IUD compensation & NSV camps
2210.00 2210.00
A.4 ADOLESCENT REPRODUCTIVE AND SEXUAL HEALTH (ARSH)
A.4.1 Adolescent Services at Health Facilities
A.4.1.1 Planning, Dissemination and Monitoring
Rs. 20,000.00
27 5.40
5.40 Approved
A.4.1.2 Establishment of stand alone AFHC
A.4.1.2.1 Establishment of model AFHC
Rs. 800,000.00
2 16.00
16.00 Approved
A.4.1.2.2 Establishment of other AFHC
Rs. 50,000.00
52
26.00 11.50 In the write-up, State has proposed setting up of 23 Stand Alone Clinics, hence budget for 23 Clinics may be approved.
A.4.1.3 Clinics - Operational expenses- stand alone AFHC
Rs. 25,000.00
54 13.50 2.76 In the write-up, State has proposed operational expenses @ Rs 1000/- per month for 23 Stand Alone Clinics, hence budget for
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 187
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
23 clinics approved.
A.4.1.4 Establishment of integrated AFHC
Rs. 20,000.00
27 5.40 3.60 In the write up State has provided a list of 18 AFHCs to be integrated with ICTC, but budget proposed is for 27 AFHCs. Budget for 18 AFHCs approved.
A.4.1.5 Clinics - Operational expenses- integrated AFHC
Rs. 25,000.00
27 6.75 2.16 In the writeup, Rs 1000/- per month is budgeted as operational expenses for the Integrated AFHCs but in the budget sheet,Rs 25000/- per clinic per month is proposed. Budget @ Rs 1000/- per clinic for 18 clinics approved.
A.4.1.6 Contractual appointment of Counsellors
A.4.1.7 Mobility support to ICTC councellor for Outreach activity
Rs. 100.00 500 0.50 0.50 Approved
A.4.2 School Health Programme
Approval pending. A revised proposal with dedicated team based approach is expected.
A.4.2.1 Planning, Dissemination and Monitoring
Rs. 50,000.00
27 13.50
A.4.2.2 Contractual Appointment of Dentists
A.4.2.3 Health education
A.4.2.3.1 Health cards Rs. 1.20 3000000 36.00
A.4.2.3.2 Health Education Books
Rs. 30.00 70000 21.00
A.4.2.4 Regional review meetings
Rs. 25,000.00
16 4.00
A.4.2.5 Online monitoring system of Sick students
Rs. 50,000.00
27 13.50
A.4.3 Other Stratigies/activities
Sub-total ARSH 161.55 41.92
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 188
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.5 URBAN RCH
Approval pending. Details of service delivery is not clear. Existing UHCs and
their functioning not mentioned.
A.5.1 Urban RCH Services
A.5.1.1 Planning for urban bodies
Rs. 100,000.00
27 27.00 0.00
A.5.1.2 Minor civil works
A.5.1.3 Minor equipment &others
Rs. 50,000.00
30 15.00 0.00
A.5.1.4 Urban RCH - Operational Exp.
A.5.1.4.1 Salary of MO, SN& LT for urban slums
A.5.1.4.2 Drugs and Consumables other than RCH kit
Rs. 100,000.00
30 30.00 0.00
A.5.1.4.3 Monitoring and quality control
5.00 0.00
A.5.1.4.4 Contingency Rs. 50,000.00
30 15.00 0.00
Sub-total Urban Health
92.00 0.00
A.6 TRIBAL RCH
A.6.1 Planning & Monitoring of Services
Rs. 100,000.00
10 10.00 10.00 Approved subject to details of planning & monitoring system being provided including break up of costs.
A.6.2 Health camps
A.6.3.1 Health camps in haat bazar
Rs. 25,000.00
120 30.00 12.00 120*Rs.10,000
A.6.3.2 Health camps In schools/others
Rs. 25,000.00
60 15.00 12.00 Should be a part of comprehensive school health
A.6.4 Incentives
A.6.4.1 Incentives- Institutional Deliveries - Incentive to attendant in LWE Blocks
Rs. 350.00 20000 70.00 0.00 Not approved
A.6.4.2 Incentive- ASHA- Additional Incentive to ASHA in LWE Blocks
Rs. 100.00 15000 15.00 15.00 for Insitutional delivery, NRC referral, FBNC
Sub-total Tribal Health
140.00 49.00
A.7 PNDT Activities - RCH PNDT budgeted in IEC
A.7.1 PNDT - Support to
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 189
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
PNDT Cell
A.7.1.1 Operationalise PNDT Cell
Rs. 25,000.00
Incentive to informers (50)
12.50 12.50 Approved.
A.7.1.2 Orientation of Programme Managers and service provider on PC&PNDT Act.
Rs. 1,000.00 200 2.00 2.00 Approved.
A.7.2 PNDT - Other activities
Sub-total PNDT & Sex Ratio 14.50 14.50
A.8 INFRASTRUCTURE (MINOR CIVIL WORKS) & HUMAN RESOURCES
A.8.1 Contractual Staff & Services
A.8.1.1 ANMs,Supervisory Nurses, LHVs
9000.00 9000.00 12000.00 12000.00 12000.00 12000.00 12000.00
ANMs 24x7 PHCs (100) 2nd ANMs in SHC (500) SNs CD (29) SNs FRUs (180) SNs SNCUs (96) SNs Non FRU CHC (95) SNs 24x7 PHC (100)
1368.00 236.04 281 ANMs approved for SCs where deliveries are being conducted as per last year's (2011-12) approval. State to come up with redeployment plan for ANMs and SNs. State needs to come up with HR plan woven around the delivery points. Rest HR not approved.
A.8.1.2 Laboratory Technicians, MPWs
10,000.00 LTs CD (29) 26.10 26.1 Approved. State to fill up the existing vacancies at the earliest from the State budget.
A.8.1.3
Specialists (Anaesthetists, Paediatricians, Ob/Gyn, Surgeons, Physicians, Dental Surgeons, Radiologist, Sonologist, Pathologist, Specialist for CHC)
A.8.1.4 PHNs at CHC, PHC Level
A.8.1.5 Medical Officers at CHCs / PHCs
20000.00 30000.00
Dentists at CHCs (141) MOs at PHCs/CD (29)
221.40 52.2 Approved : Rs. 52.20lakhs ( MOs at PHCs/CD) Not approved : Rs. 169.20lakhs (Dentists at CHCs)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 190
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.8.1.6 Additional Allowances/ Incentives to M.O.S of PHCs and CHCs
A.8.1.7 Others - Computer Assistants/ BCC Co-Ordinator Etc
8000.00/ FP counsellor
27.00 0.00 19.44 (1) State was advised to propose for FP counsellors at high case load facilities; however, same has not been addressed in the revised PIP. As per the discussion with state nodal officer, it is recommended to approve 27 counsellors one at each district @ Rs. 8000/ month (2) Salary for counsellors is proposed for 9 months only considering it would take 2-3 months to complete recruitment process.
A.8.1.8 HR - Incentive/ Awards Etc. to SN, ANMs Etc.
2571.65
500.00 Approved as per last year's (2011-12)
A.8.1.8.1 Incentive for EMoC and LSAS
500.00 /case 500.00 /case 1000.00 /case
EMoC Incentives for C-Section (2500) LSAS Incentives for C-Section (2500) Nurse and OT Incentive for C-Section (2500)
50.00 20.00 Performance incentive to the LSASand EmOC trained doctor can be approved as lump sum for Rs. 20.00 lakhs against proposed budget of Rs.25.00 lakhs. State to ensure that incentive is applicable after a threshold level. Rs.25 lakhs -Nurse and OT Incentive for C-Section: Not recommended for approval in the present format for those working in the LWE area. Proposal needs revision.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 191
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.8.1.9 Human Resources Development (Other Than Above)
15000.00 15000.00 15000.00
RMAs at CHC (282) RMAs at 24x7 PHC (400) RMAs at other PHC (550)
1377.60 1377.6 Approved. Rs. 507.60lakhs: RMAs at CHC Rs. 540.00lakhs: RMAs at 24x7 PHC Rs. 330.00lakhs: RMAs at other PHC
A.8.1.9.1 Technical staff for DH strengthening (from MFP)
Rs.135 lakhs shifted from MFP not approved. State to provide comprehensive HR plan weaved around the delivery points and OPD/IPD load.
Sub-total Infrastructure & HR 5614.75 2231.38
A.9 TRAINING (TRG)
A.9.1 Strengthening of Training Institutions
A.9.1.1 Equipment and trainning aids to Training Institutions- ANMTC
Rs. 230,000.00
11 centres 25.30 25.30
A.9.1.2 Equipment and trainning aids to Training Institutions- skill lab at ANMTC
Rs. 1,500,000.00
4 centres 60.00 0.00 Not approved.
A.9.1.3 Equipment and trainning aids to Training Institutions- GNMS
Rs. 230,000.00
3 centres 6.90 6.90
A.9.1.4 Equipment and trainning aids to Training Institutions- RHFWTC
Rs. 230,000.00
3 centres 6.90 2.30
A.9.1.5 Equipment and trainning aids to Training Institutions- SIHFW
Rs. 1,500,000.00
1 15.00 15.00
A.9.1.6 Equipment and trainning aids to Training Institutions- DTC
Rs. 40,000.00
27 centres 10.80 7.20
A.9.2 Development of Training Packages
Rs. 200,000.00
10 20.00 20.00
A.9.3 Maternal Health Training
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 192
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.9.3.1 Skilled Birth Attendance / SBA
A.9.3.1.1 SBA - Training of ANM / LHVs
Rs. 101,430.00
52 batches 52.74 52.74 52 batches with training centre
A.9.3.1.2 SBA - Training of ANM / LHVs
Rs. 111,430.00
48 batches 53.49 53.49 52 batches without training centre
A.9.3.2 EmOC Training
A.9.3.2.1 EmOC - Training of MO's
Rs. 1,477,540.00
4 batches 59.10 59.10
A.9.3.3 Life Saving Anesthesia Skills Training
A.9.3.3.1 Training of LSAS ( Medical college)
Rs. 706,387.50
6 batches 42.38 42.38
A.9.3.3.2 Training of MO's ( district hospital)
Rs. 267,663.00
6 batches 16.06 16.06
A.9.3.3.3 Training of experts for examination
Rs. 310,000.00
2 batches 6.20 6.20
A.9.3.4 MTP Training
A.9.3.4.1 Training of MO's Rs. 50,025.00
30 batches 15.01 15.01
A.9.3.4.2 Training of SN / OT Attendant
Rs. 60,030.00
1 0.60 0.60
A.9.3.4.3 Training of MO's(refresher)
Rs. 86,250.00
1 0.86 0.86 Can only be approved if they give an undertaking that they will perform.
A.9.3.5 RTI/STI Training
A.9.3.5.1 RTI/STI Training of MO's/RMA
Rs. 72,450.00
10 batches 7.25 7.25
A.9.3.5.2 RTI/STI Training of Laboratory technicians
Rs. 72,450.00
10 batches 7.25 7.25
A.9.3.5.3 RTI/STI Training of Staff Nurse
Rs. 72,450.00
10 batches 7.25 7.25
A.9.3.6 BEmoc Training
A.9.3.6.1 BEmOC - TOT for BEmOc
Rs. 69,575.00
8 batches 5.57 5.57 2 days pilot BEMOC training of SN
A.9.3.6.2 BEmOC- Training of Mos
Rs. 75,325.00
24 batches 18.08 18.08
A.9.3.6.3 BEmOC- Training of RMAs
Rs. 58,075.00
35 batches 20.33 20.33
A.9.3.7 Other- Training Rs. 86,825.00
1 0.87 0.87 2 days pilot BEMOC training
A.9.3.7.1 Blood Storage training- MO
Rs. 13,963.00
50 6.98 6.98
A.9.3.7.2 Blood Storage training-Lab Tech.
Rs. 10,868.00
50 5.43 5.43
A.9.4 IMEP Training
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 193
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.9.4.1 IMEP Training of Medical & para medical
Rs. 2,800.00 500 participants
14.00 14.00
A.9.4.2 Others- Quality ANC Care
A.9.4.2.1 ANC care TOT Rs. 135,700.00
1 1.36 1.36
A.9.4.2.2 ANC care ANM District TOT
Rs. 188,600.00
6 11.32 11.32
A.9.4.2.3 ANC care ANM Where DTC available
Rs. 120,980.00
45 54.44 108.88 Recommended for 90 batches @ Rs. 120980
A.9.4.2.4 ANC care ANM Where DTC NOT AVAILABLE
Rs. 130,980.00
30 39.29 78.59 Recommended for 60 batches @Rs. 130980
A.9.5 Child Health Training
A.9.5.1 IMNCI training
A.9.5.1.1 IMNCI - TOT on IMNCI
Rs. 252,080.00
5 batches 12.60 12.60 5batch x20 nos
A.9.5.1.2 IMNCI - Training for ANMs
Rs. 226,320.00
20 batches 45.26 45.26 480 ANM
A.9.5.1.3 IMNCI - Training for LHS/MO/SN
Rs. 252,080.00
16 batches 40.33 40.33 384 SN/LHV
A.9.5.1.4 IMNCI - Training for RMA
Rs. 226,320.00
10 batches 22.63 22.63 240 RMA
A.9.5.2 F-IMNCI training
A.9.5.2.1 F-IMNCI - training-MO's
Rs. 283,360.00
12 batches 34.00 34.00
A.9.5.2.2 F-IMNCI - training- Staff Nurse
A.9.5.2.3 Facility Based Newborn Care training
A.9.5.2.3.1 FBNC- MOs Rs. 95,300.00
23 21.92 21.92 115 MOs
A.9.5.2.3.2 FBNC- SNs Rs. 22,831.00
155 35.39 35.39 413 SN
A.9.5.3 Home Based Newborn Care training
A.9.5.3.1 HBNC - TOT on HBNC
A.9.5.3.2 HBNC - Training for ASHA
Budgeted in ASHA Training
A.9.5.4 Care of Sick Children & Severe Malnutrition
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 194
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
training at FRUs
A.9.5.4.1 CSCSM - TOT on CSCSM
A.9.5.4.2 CSCSM - Training for MO's
Rs. 10,000.00
40 4.00 4.00 Refresher training on NRC's
A.9.5.5 CH Other training
A.9.5.5.1 NSSK Training
A.9.5.5.1.1 NSSK Training- TOT on NSSK
A.9.5.5.1.2 NSSK - Training for MO's
A.9.5.5.1.3 NSSK - Training for RMAs
Rs. 74,170.00
17 12.61 12.61 RMA training
A.9.5.5.1.4 NSSK - Training for Staff Nurse
A.9.5.5.1.5 NSSK - Training for ANMs
Rs. 74,170.00
100 74.17 74.17
A.9.5.5.2 VHND training
A.9.5.5.2.1 VHND training- TOT
Rs. 80,000.00
2 1.60 1.60
A.9.5.5.2.2 VHND training- Block level
Rs. 80,000.00
18 14.40 14.40
A.9.5.5.2.3 VHND training- sector level
Rs. 80,000.00
104 83.20 83.20 training of AWW/ANM/LHV/MT/ Supervisor(ICDS)
A.9.5.5.3 CH-IYCF- Operational Exp.
Rs. 5,000.00 200 batches 10.00 10.00
A.9.6 Family Planning Training
A.9.6.1 Laparoscopic Sterilization Training
A.9.6.1.1 Laparoscopic Sterilization - TOT on Leparoscop
A.9.6.1.2 Laparoscopic Sterilization - MO's / SN / OT asst.
Rs. 181,380.00
5 batches 9.07 5.44 Proposed rate is very high, Recommended for approval @ Rs. 43900/ batch for a batch of 2 doctors
A.9.6.2 Minilap Training - TOT on Minilap
0.00
A.9.6.2.1 Minilap Training - Training for MO's
Rs. 151,150.00
6 batches 9.07 5.70 (1) State may note that as per GoI nrom, maximum of 4 participants are allowed/ batch and rate/ batch is Rs. 71240.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 195
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
(2) Number of batches have been increased to 8 and and accordingly recommended for approval.
A.9.6.3 NSV Training
A.9.6.3.1 NSV Training - Training for MO's
Rs. 66,625.00
4 2.67 1.63 (1) State may note that as per GoI nrom, maximum of 4 participants are allowed/ batch and rate/ batch is Rs. 32600. (2) Number of batches have been increased to 5 and and accordingly recommended for approval.
A.9.6.4 IUD Insertion Training
A.9.6.4.1 TOT PPIUCD Rs. 49,950.00
6 3.00 3.00
A.9.6.4.2 PPIUCD Insertion Training-MO/SN/LHV
Rs. 111,025.00
22 24.43 24.43
A.9.6.4.3 IUD Insertion Training-ANM
Rs. 49,950.00
60 29.97 29.97
A.9.6.4.4 PPIUCD Insertion Training-MO/
Rs. 49,950.00
50 24.98 24.98
A.9.6.5 Contraceptive Update/ISD Training
A.9.6.6 Other FP trainig (pl. Specify)
A.9.6.6.1
IUCD training facilitated by HLFPPT
209.69
(1) Shifted from FMR A.3.4 of state budget sheet. (2) State has proposed a lump sum amount of Rs. 50.00 lakhs. (3) An amount of Rs. 206.69 lakhs is approved for IUCD training facilitated by HLFPPT.
A.9.7 TRG - ARSH Training
A.9.7.1 Training for MO's Rs. 112,987.50
4 4.52 4.52 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 196
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.9.7.2 Training for ANMs / LHVs/RMA
Rs. 145,188.00
8 11.62 5.81 In the write-up, 4 batches of training is proposed, budget for 4 batches may be approved.
A.9.7.3 Training for AWWs/ANM
Rs. 145,188.00
4 5.81 5.81 Approved
A.9.8 Programme Management Training
A.9.8.1 SPMU training
A.9.8.1 Induction training - Newly Recruited staff 5days
Rs. 5,000.00 400 20.00 20.00
A.9.8.2 DPMU training
A.9.8.2.1 CMO/CS/BMO 3 days
Rs. 5,000.00 250 12.50 0.00
A.9.8.2.2 SPMU/DPMU for 3 days
Rs. 5,000.00 150 7.50 7.50
A.9.8.2.3 BPMU- 3 days Rs. 3,500.00 500 17.50 17.50
A.9.8.2.4 5 days Rs. 5,000.00 220 11.00 0.00
A.9.8.2.5 RMA/LHV/ and BEE Rs. 3,000.00 600 18.00 0.00
A.9.8.2.6 HMIS- 3 days Rs. 3,000.00 800 24.00 24.00
A.9.8.2.7 PIP Planning 3 days
Rs. 3,000.00 200 6.00 0.00
A.9.8.2.8 Monitoring and evaluation 3 days
Rs. 5,000.00 200 10.00 0.00
A.9.8.2.9 Change management and Leadership 5 days
Rs. 8,000.00 100 8.00 8.00
A.9.8.2.10 Workshops/ seminar
A.9.8.2.10.1
Workshops/ seminar National Level for 3 days
Rs. 1,000,000.00
1 10.00 0.00
A.9.8.2.10.2
Workshops/ seminar state Level for 3 days
Rs. 500,000.00
4 20.00 0.00
A.9.8.2.10.3
Workshops/ seminar regional level 3 days
Rs. 300,000.00
4 12.00 0.00
A.9.8.2.10.4
Workshops/ seminar District level 3 days
Rs. 200,000.00
10 20.00 0.00
A.9.9 TRG - Other Training
A.9.9.1 Exposure visits
A.9.9.1.1 Exposure visits- CMO/ Nodal
Rs. 30,000.00
50 15.00 0.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 197
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
officers 5 days
A.9.9.1.2 Exposure visits- SPMU /DPMU
Rs. 30,000.00
50 15.00 0.00
A.9.9.1.3 Exposure visits- BMOs.
Rs. 30,000.00
100 30.00 0.00
A.9.10 TRG - Training (Nursing)
A.9.10.1 Strengthening of Existing Training Institutions/Nursing School (HR)
Rs. 100,000.00
13 13.00 13.00
A.9.10.2 New Training Institutions/School (Other Strengthening)
A.9.11 Other Health Personnel
A.9.11.1 Training of emergency management of Mos
Rs. 10,000.00
146 14.60 14.60 at AIMS/ Hyderabad in co-ordination with GVK- EMRI
A.9.11.2 RMAs - programme management training
Rs. 10,000.00
750 75.00 0.00 at CMC Vellore
A.9.11.3 RMAs professional development prog
Rs. 15,000.00
100 15.00 0.00 at CMC Vellore on paediatrics.
A.9.11.3 Other Training & Capacity Building Programmes - RCH
A.9.11.3.1 Career Development of MITANIN
A.9.11.3.1.2
Career Development of MITANIN - BSc Nursing course
Rs. 70,000.00
27 18.90 18.90
A.9.11.3.2 Career Development of ANMs, Staff Nurses, AWW,AWS
A.9.11.3.2.1
Career Development of ANMs - GNM Course
Rs. 180,000.00
10 18.00 18.00
Sub-total Training 1538.98 1490.88
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 198
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
A.10 PROGRAMME / NRHM MANAGEMENT COST (PMC)
A.10.1 Strengthening of SHS /SPMU
209.68 125.00 SPMU salary approved as per last year's (2011-12) RoP.
A.10.1.1 Mobility support 42.00 10.50 25% approved on interim basis. State to provide comprehensive mobility plan and budget.
A.10.1.2 Office rent/renovation/admin cost/contingency
196.00 58.00 As per last year
A.4.1.8 ARSH cell 18.20 18.20
A.10.2 Strengthening of DPMU/DHMU
1373.23 720.90 27 District Programme Manager @ Rs.40700/PM 27 DAM @ Rs. 29700/PM 27 District Training Coordinator @ Rs. 16500/PM 27 District Data Officer @ Rs. 26400/PM 27 Sub-engineer @ Rs. 30000/PM 27 Account Assistant @ 12100/- PM 81 Data entry operators @ Rs. 8800/-PM 27 Hospital Consultant @ Rs. 28600/PM 27 Data Assistant @ Rs. 12100/-PM Approved DPMU for 27 district staff including 9 new districts.
A.10.2.1 Mobility support Rs. 25,000.00
27 81.00 20.25 25% approved on interim basis. State to provide comprehensive mobility plan and budget.
A.10.2.2 Administrative exp. / Contingency exp
Rs. 10,000.00
27 48.60 48.60
A.10.3 Strengthening of Block PMU
2431.08 1493.82 Approved as per last year
A.10.3.1 Mobility support Rs. 10,000.00
146 175.20 43.80 25% approved on interim basis. State to provide comprehensive mobility
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 199
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
plan and budget.
A.10.3.2 PHC Administrative exp./contingency
146 175.20 175.20
A.10.4 Other Strengthening - Strengthening of Commissioner's office
47.80 0.00 Not approved. State may use its own resources.
A.10.4.1 PMC - Other - Strengthening of SHS
130.36 68.4 Based on the revised programme management strengthening proposal of the state following posts on contract /deputation approved: Director finance @ Rs75000, Programme manager-infrastructure, PM-procurement & logistics, PM-ASHA, PM-PPP/Refrerral transport, PM-HRD, PM-training, PM- Maternal health (2), PM-CH, PM-FP, PM-AH @Rs.45000 per month. State needs to share detailed job descriptions, key performance indicators, organization chart, and recruitment process to be followed to recruit the above mentioned personnel. It is suggested that steps to strengthen district and block PMU be taken only after completion of state level strenghtening.
A.10.4.2 Strengthening of SIHFW
67.28 0.00 Not approved.
A.10.4.3 Financial Management
A.10.4.3.1 Tally
A.10.4.3.2 Tally- New licences Rs. 8,100.00 743 60.18 60.18
A.10.4.3.3 Tally- Annual Fee Rs. 1,620.00 165 2.67 2.67
A.10.4.3.4 Technical Suport From Tally & NFMIS
10.00 40.00 Rs.30 lakhs for NFMIS -Pilot State for NFMIS
A.10.5 Statutory audit Rs. 1 10.00 10.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 200
FMR Code Activity Unit Rate
(Rs.)
Physical Target/
Expected Output
BUDGET 12-13 (Rs. Lakhs)
Remarks
Proposed Approved
1,000,000.00
A.10.6 Concurrent Audit - State
Rs. 500,000.00
1 5.00 5.00
Concurrent Audit - Dist
Rs. 75,000.00
27 20.25 20.25
Sub-total Programme
Management
5103.73 2920.77
A.11 Vulnerable Groups
A.11.1 Planning and monitoring.
5.00 0.00
A.11.2 Services for Vulnerable groups
Rs. 15,000.00
100 15.00 15.00
A.11.3 Special camps in PTG clusters
Rs. 20,000.00
40 8.00 8.00
Sub-total Vulnerable groups
28.00 23.00
Total RCH II Base Flexi Pool
20235.64 10136.04
Total RCH II Demand Side
8869.13 8341.63
GRAND TOTAL RCH II
29104.77 18477.67
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 201
Annexure-2 Detailed Budget Sheet Mission Flexible Pool 2011-12- Chhattisgarh
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.1 ASHA
B 1.1 ASHA COST
B.1.1.1 ASHA - Selection & Training (Mitanin Training)
Sub total
ASHA - TOT of State/ district coordinator (ASHA)
35 District Coordinator
3600 1.26 1.26 Approved
ASHA - TOT of Block coordinator (ASHA)
295 Block Coordinator (6 days)
3600 10.62 10.62 Approved
ASHA - TOT of Community Coordinators (ASHA)DHS
3100Mitanin Trainers (6 days)
3000 93.00 93.00 Approved
ASHA - Training for Mitanins
ASHA - Training for Mitanins 17th Module (6 days)
60000 No of Mitanins (6 days )
1200 720.00 720.00 Approved
Bridge Training for 6000 newly selected Mitanins (6 days)
6000 No of Mitanins
1200 72.00 72.00 Approved
ASHA - Development & Printing of training Materials SHRC
60000 50 30.00 30.00 Approved
ASHA - District level Meetings and review, contingencies
146X 12 months
500 8.76 8.76 Approved
ASHA - Block Co- coordinator
295 co-coordinators for 25 days per monthX 12 months
6200 219.00 219.00 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 202
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
ASHA - Compensation- Mitanin Trainers
3100 co-coordinators for 20 days per month X 12 months
2800 1041.60 1041.60 Approved
ASHA - Block level Meetings and contingencies
146 blocksX 12 months
4500 78.84 78.84 Approved
Sub total training
2275.08 2275.08
B.1.1.2 ASHA - Mitanin Drug Kit
ASHA - Mitanin Drug Kit Procurement
0 0 0.00 0.00
ASHA - Drug Kit Refilling
60000 450 270.00 210.00 Approved As the unit cost approved for drug Kit in other State is Rs 350.00
ASHA - Drug Kit Transportation and Logistics
60000 75 45.00 45.00 Not Approved
Sub total Drug Kit
315.00 255.00
B.1.1.4 ASHA - Awards
ASHA - Awards- state level for 10 programmes
10 no. of awards Non-cash awards will be given
0.00 0.00 Approved
ASHA - Awards- District level 1st prize-, 2nd prize
27 no. of districts Non-cash awards will be given
0.00 0.00 Approved
B.1.1.5. ASHA Resource centre /ASHA mentoring Group.
ASHA Resource Centre Team (in SHRC) for Design, Coordination and Monitoring of Mitanin Programme
1 13144000
131.44 131.44 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 203
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
(includes State level costs and 35 District Coordinators)
ASHA- Mitanin Help Desk
197 3600 85.10 85.10 Approved.
ASHA -Mitanin Help Line
2.40 0.00 Not Approved.
Sub total ARC,AWARDS,Incentives
218.94 217.54 Approved
SUB TOTAL ASHA 2809.02 2747.62
B.2 Untied Funds
B.2.1 Untied Fund -CHCs For 140 CHCs 50000 70 70 Approved. For 140 CHCs @ 50000 as per RHS 2011. As the Utilization in FY 2011-12 was more than 100%
B.2.2 Untied Fund -PHCs For 741 PHCs 25000 185.25 160.05 Approved For 741 PHCs (RHS 2011) as per Utilization in the FY 2011-12 .(86.40% ).
B.2.3 Untied Fund -Sub Centers
For 5076 SHC 10000 507.6 507.6 Approved For 5076 SHCs (RHS 2011) as the Utilisation in FY 2011-12 was more than 100%
B.2.4 Untied Fund -VHSNC
For 20308VHSCs
10000 2030.8 2030.8 Approved. For 20308 VHSNCs (RHS 2011) @Rs 10000 as the Utilisation in the FY 2011-12 was more than 100%. State should make Joint Account Operational for all VHSNCs.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 204
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.2.5 Untied Fund - Civil Dispensary
For 36 CD 25000 9 0 Not Approved
SUB TOTAL UNTIED
2802.65 2768.45
B.3 Annual Maintenance Grants (AMG)
B.3.1 AMG - CHCs - Annual Maintenance Grants
140 100000 140.00 135.00 Approved For 135 CHCs (RHS 2011) in government buildings @ Rs 1 Lakh.
B.3.2 AMG - PHCs - Annual Maintenance Grants
658 50000 329.00 194.50 Approved For 389 PHCs in government buildings (RHS 2011).
B.3.3 AMG - Sub Centers - Annual Maintenance Grants
4053 10000 405.30 235.00 Approved For 2350 SCs (RHS 2011) functional in government buildings @ Rs 10,000.
B.3.4 AMG - Civil Dispensary - Annual Maintenance Grants
20 50000 10.00 0.00 Not Approved
SUB TOTAL AMG 884.30 564.50
B.4 Hospital Strengthening- (Hosp)
B.4.1 Hosp. Strength.- DH
50 305.00 0.00 Approved As this is a Committed unspent balance State may use the last year’s fund .
B.4.2 Hosp. Strength.- CHC
0.00 0.00
B.4.3 Hosp. Strength.- PHC
0.00 0.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 205
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.4.4 Hosp. Strength.- SHC
0.00 0.00
B.4.5 Hosp. Strength.- Civil hospital
0.00 0.00
B.4.6 Hosp. Strength.- Civil dispensary
0.00 0.00
SUB TOTAL HOS Strengthening
305.00 0.00
B.5 Infrastructure ( INFRA)
B.5.1 INFRA- HOSPITAL
INFRA- HOSPITAL- New- SHC
120 2281000 2737.00 0.00 Approved As this is a Committed unspent balance State may use the last year’s fund
INFRA- HOSPITAL- Upgradation- DH
12 Rs. 15 Cr per unit cost for 12MCH centre in District hospitals ( 6 in Old Dist and 6 in New Dist.) total cost is Rs. 180 Cr.to develop compressive MCH centre proposed amount for current Financial year is 20 % of the total
3600.00 3600.0000 Approved This activity should be completed in 3 financial year Conditionality for MCH wing 1) The MCH wing will be created within the premises of the District Hospital. 2)The State will give commitment that the manpower and other service requirement at DH with support from State budget and GoI will not give any operational expenses for running the MCH wing. 3) Advance planning shall be done by the State
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 206
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
projected amount = Rs.36.00 Cr.
Govt. for provision of additional manpower and other ancillary services if required, so that the centre remains functional 4) All the Technical Protocols of a Tertiary level delivery point such as maintaining partograph, ENBC and resuscitation, 48 hrs stay, birth doses, post natal care and counseling, Family planning services, etc shall be provided comprehensively for RMNCH (Reproductive & Maternal, Neonatal and Child Health services). 5) In addition, the hospital should be the hub for conduction of skill based training programs like LSAS, EmOC, Safe Abortion services, Mini-Lap, Child Health and FP trainings, etc 6) Last but not the least all procurements should be done
INFRA- HOSPITAL- Upgradation- DH 50 badded MCH wing in 3 New District
3 Rs. 9 Cr per unit cost for 3MCH centre in 3 new District hospitals total cost is Rs. 27 Cr.to develop compressive MCH centre proposed amount for current Financial year is 20 % of the total projected amount Rs.5.4 Cr.
540.00 540.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 207
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
INFRA-HOSPITAL- Upgradation- CHC
20 Rs. 9 Cr per unit cost for 20 MCH centre CHC ( FRU and non FRU) where there is delivery load. Total cost is Rs.180 cr.to develop compreshive MCH centre proposed amount for current Financial year is 15 % of the Total projected amount = Rs.27 cr.
2700.00 2700.0000 based on competitive bidding and by following Government protocols. Procurement of equipment should be need based, linked with its utilization and availability of required manpower
INFRA- HOSPITAL- Upgradation- FRU CHC 75 % Civil Works for OT & Store and BSU
46 Rs 12 Lakh pre facilities Total projected amount is Rs 5.52 Cr proposed for
414.00 414.00 Approved Approval is subjected to condition that this activity should be completed in two financial years
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 208
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Current financial year is 75 % of Total projected amount =Rs 4.14 Cr
INFRA- HOSPITAL- Upgradation- CHC Non FRU
50 Rs 12 Lakh per facilities total projected amount is 6 Cr . Proposed for current financial year is 75 % of total projected amount = 450 Lakhs
450.00 450.00 Approved Approval is subjected to condition that this activity should be completed in two financial years
INFRA- HOSPITAL- Upgradation- PHC
150 Rs 12 Lakhs per facilities Total projected amount is 18 Cr. Projected amount for Current Fiancial Year is 75% of
1350.00 900.00 Approved for 100 PHCs @ 9 Lakhs per PHCs (75 % of the total projected amount )
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 209
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
total projected amount=13.50 Cr
INFRA- HOSPITAL- Upgradation- SHC
50 400000 200.00 0.00 Approved As this is a Committed unspent balance State may use the last year’s fund
INFRA- HOSPITAL- Upgradation- CH75 % Civil Works for OT & Store and BSU
2 1200000 18.00 0.00 Not Approved
INFRA- HOSPITAL- Renovation
INFRA- HOSPITAL- Renovation- CHC for establishment of NBSU
54 575000 310.50 0.00 Approval is pending State may give a revised proposal. Last year’s progress is poor state send a realistic proposal with plan to fulfill the manpower requirement for NBSU
Renovation of CHC, Baghbahera
2000000 20.00 0.00 Approved As this is a Committed unspent balance State may use the last year’s fund
INFRA- HOSPITAL- Renovation- CD
29 500000 145.00 0.00 Not Approved New Activity
B.5.2 INRFA- RESIDENTIAL
INRFA- RESIDENTIAL- 4F
1500 0.00 Approved As this is a Committed unspent balance State may use the last year’s
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 210
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
fund
INRFA- RESIDENTIAL-2F (25% budget ) 52 Staff Quarter at 16 District Hospital 45 Staff Quarter at FRU CHCs and 3 at Civil Hospital Kondagaon
100 3243000 810.75 810.75 Approved for 100 2F type quarters in CHCs and PHCs (identified delivery points ) 25 % of total projected amount Approval is subjected to condition that this activity should be completed in two financial years
INRFA- RESIDENTIAL- 4G
1600.00 0.00 Approved As this is a Committed unspent balance State may use the last year’s fund
INRFA- RESIDENTIAL-2G (25% budget ) 64 staff quarter at 16 District Hospital 67 staff quarter at 42 FRU CHCs 64 Staff quarter at 30 Non FRU CHC and 5 at Kondagaon civil hospital
200 1786000 893.00 893.00 Approved for 200 2G type quarters in PHCs and CHCs (identified delivery points ) 25 % of the projected amount Approval is subjected to condition that this activity should be completed in next two financial years
INRFA- RESIDENTIAL-4H
1350.00 0.00 Approved As this is a Committed unspent balance State may use the last year’s fund
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 211
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
INRFA- RESIDENTIAL-2H (25% budget ) 147 staff quarter at 147 24X7 PHCs, 58 staff quarter for 16 Diatrict Hospital 64 staff quarter at 45 FRU CHCs and 126 Staff quarter at 56 Non FRU CHCs
400 1006000 1006.00 1006.00 Approved for 400 2G type quarters in PHCs and CHCs (identified delivery points ) 25 % of the projected amount Approval is subjected to condition that this activity should be completed in two financial years
B.5.3 INFRA-INSTITUTIONS
INFRA-INSTITUTIONS- Renovation
INFRA-INSTITUTIONS- Renovation- - ANMTC
2 250000 5.00 5.00 Approved
INFRA-INSTITUTIONS- Renovation- - SIHFW
1 2000000 20.00 20.00 Approved
B.5.4 INFRA- Others
INFRA- Others -New
INFRA- Others -New - ERC/Health Info centre ERC info center new
1 50000000
125.00 0.00 Approved State may use the last year’s fund
INFRA- Others -New - District data Centre (50% Budget )
27 1000000 135.00 0.00 Not Approved
SUB TOTAL INFRA 19929.25 11338.75
B.6 Corpus Grants to HMS/RKS (JDS)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 212
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.6.1 JDS - District Hospital
26 500000 130.00 85.00 Approved For 17 District Hospitals functional As per MIS 31.12.2011 Registered JDS @ Rs 5 lakhs Approval is Subjected to the implementation of deferential financing by the state.
B.6.2 JDS - CHCs 140 100000 140.00 140.00 Approved For 140 JDS at CHCs @ Rs 1 lakh each. Approval is Subjected to the implementation of deferential financing by the state.
B.6.3 JDS - PHCs 741 100000 741.00 695.00 Approved For 695 JDS registered at PHCs as per MIS 31.12.2011 PHCs @ Rs 1 lakh each. Approval is Subjected to the implementation of deferential financing by the state.
B.6.4 Other. JDS -Civil Hospitals
16 500000 80.00 80.00 Approved For 16 Civil Hospitals @ Rs 5 lakh. As per MIS 26 Registered above to CHC and below District level facilities. Approval is Subjected to the implementation of deferential financing by the state.
JDS – Training of JDS members 3 days training including training
3000 3000 90.00 90.00 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 213
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Material
SUB TOTAL JDS 1181.00 1090.00
B.7 State / District Action Plans (Including Block, Village) AP)
AP - State Action Plans - State Level
1 500000 5 5 Approved
AP - District Action Plans
AP - District Action Plans - District Level
27 100000 27 27 Approved
AP - District Action Plans - Block Level
146 20000 29.2 0 Not Approved
AP - District Action Plans - Village Level
20000 200 40 0 Not Approved
SUB TOTAL Dist Action Plan
101.20 32.00 Approved
B.8 Panchayti Raj Initiative (PRI)
B.8.1 PRI- Orientation of PRI Members Towards Health issues and VHSNC. For members of 18500 VHSNCs
1,000 5,000 50 50 Approved. Subject to the condition that state may document the process along with outcome.
B.8.2 PRI - Orientation Workshops of PRI at State/Dist. Health Societies, CHC,PHC
1 State Level 500000 5 5 Approved Subject to the condition that state may document the process along with outcome.
27 District Level
100000 27 27 Approved Subject to the condition that state may document the process along with outcome.
B.8.3 PRI - Others
SUB TOTAL PRI 82 82
B.9 Mainstreaming of AYUSH
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 214
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.9.1 AYUSH - strengthening of AYUSH hospitals
B.9.1 AYUSH - strengthening of Co located AYUSH centers
AYUSH - strengthening of Co located AYUSH centers- Mos-DH
For 95 no 20000 171 231.12 Approved As per approval of FY 2011-12 for 107 AYUSH Medical Officers @ 18000/pm 101 PHC and CHC 6
AYUSH - strengthening of Co located AYUSH centers- MO-CHCs ayurvedgram
For 50 No 20000 90
AYUSH - strengthening of Co located AYUSH centers- MOs-PHCf or 24x7 PHC and malaria endemic block
For 100 no 20000 180.00 180.00 Approved for 100 Homeopathy Doctors @ 15000/pm ( implementation of prevention of Malaria through prophylaxis by Chinum Sulph for 20 Blocks along with other National Health programme )
B9.2 AYUSH - strengthening of Co located AYUSH centers- Para. Med-CHCs paramedical for CHCs
For 95 no 6600 37.62 0.00 Not Approved New Staff is not Approved
B.9.3 Other Activity (Excluding HR)
AYUSH - Health Camps in Ayurved grams
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 215
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.9.3.1 AYUSH-Yoga
AYUSH-Yoga popularization in Ayurved gram.
146 10,000 14.6 14.6 Approved
AYUSH-Yoga - integration with RCH services
146 15,000 21.9 0 Not Approved
B.9.3.2 AYUSH - new innovations
Prevention of Malaria through Homoeopathy in 20 blocks
Rs6.40/person for 20 blocks of average population of 1.5 lakhs each.
960000 192.00 192.00 Approved Subject to the condition that state may document the process along with outcome and share the finding with the GOI
Distribution of Decoction(kadha )for Prevention and Treatment of Seasonal Diseases
6 District Hospital
200000 12.00 12.00 Approved
Prevention of Disability in Leprosy Cured Person Through AYUSH in 2 Districts in Janjgir Champa and Korba
2 District 2160000 43.20 43.20 Approved Subject to the condition that state may document the process along with outcome and share the finding with the GOI
Provision of pure Drinking Water in Ayurved gramin florosis affected viillages
3 1000000 30.00 30.00 Approved
B.9.3.3 Training for AYUSH
Training of AYUSH based treatment and National Health programme for AYUSH doctors in Collocated centre
250 1000 2.50 2.07 Approved For Training 207 AYUSH Doctors @ Rs 1000.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 216
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Training of ANM in AYUSH principle in home remedies
1000 1500 15.00 0.00 Not Approved
SUB TOTAL AYUSH 809.82 704.99
B.10 IEC/BCC- NRHM (IEC)
B.10.1 IEC - Strengthening of BCC/IEC Bureaus
250.00 Approved State may submit a comprehensive plan for further approval
IEC - Strengthening of IEC/BCC Bureaus-State Level
1 100000 1.00
IEC - Strengthening of IEC/BCC Bureaus-District Level
27 25000 6.75
B.10.2 IEC - IEC/BCC strategy
0.00
B.10.2.1 IEC - development of State IEC/BCC strategy
1 2500000 25.00
B.10.2.2.1 IEC - IEC/BCC Activities for MH
Lumpsum 240.00
B.10.2.2.2 IEC - IEC/BCC Activities for CH
Lumpsum 130.00
B.10.2.2.3 IEC - IEC/BCC Activities for FP
Lumpsum 120.00
B.10.2.2.4 IEC - IEC/BCC Activities for ARSH
Lumpsum 25.00
B.10.2.2.5 IEC - Other Activities - IEC/BCC-PNDT
10.00
B.10.3 IEC - IEC/BCC Health Mela
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 217
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
IEC - IEC/BCC Health Mela
IEC - IEC/BCC Health Mela - Dist level
27 200000 54.00
IEC - IEC/BCC - through ASHA the IEC/BCC material for door to door campaign by ASHA in Village
For 10000 No of panchayats.
1000/Per panchayats
100.00
SUB TOTAL IEC 711.75 250.00
B.11 B.11 Mobile Medical Units
MMU - CAPEX 27 Nos of unit 1200000 324.00 0.00 Approved State may use last year’s approved amount
MMU - OPEX For 7 months
27 Nos of unit 200000 378.00 0.00 Approved State may use last year’s approved amount @ Rs 1.65 Lakh per month as per MMU guideline
SUB TOTAL MMU 702.00 0.00
B.12 B.12 Referral Transport
B.12.1 EMRI - CAPEX
EMRI - CAPEX- Procurement of Ambulance
34 ambulances
Rs 11.59 Lakhs
394.00 0.00 Approved As this is a Committed unspent balance State may use the last year’s fund
300 Basic Ambulances
Rs 5 Lakhs
1500.00 1500.00 Approved Operational cost may be made from JSSK funds
B.12.2 EMRI - Operational Cost (Opex)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 218
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
34 Ambulances
20 % of 14.4 Lakh per year
97.92 97.92 Approved for 34 Ambulances @ 2.88 Lakh per year for 34 ambulances for 12 month ( 20 % of 14.4 lakhs per year for 34 procured in 2010-11)
136 Ambulances
40 % of 14.4 Lakhs per year
783.36 783.36 Approved for 136 ambulances @ 5.56 Lakhs per year for 12 month (40 % of 14.4 lakhs per year for 136 ambulances procured in 2011-12)
34 Ambulances
60 % of 14.4 Lakhs per year
195.84 195.84 Approved for 34 new Ambulances @ 5.76 Lakhs for 8 month (1.20 Lakh per month )
34 Ambulances
60 % of 14.4
Lakhs per year
195.84 195.84 Approved for 34 New State Government's ambulances @ 5.76 Lakhs for 8 month (1.20 Lakhs per month )
SUB TOTAL Referral transport/EMRI
3166.96 2772.96
B.13 PPP/ NGOs
B.13.1 Non Governmental Providers of Health Care RMPs/TBAs
B.13.2 Public Private Partnership diagnostic services and out sourcing 141 CHCs +59 PHCs
200 200000 400.00 0.00 Not Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 219
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.13.3 NGO Programme / Grant in Aid to NGOs
NGO -RK Mission Narayanpur
NGO -RK Mission Narayanpur-HR- Doctors
4 50000 18.00 18.00 Approved
NGO -RK Mission Narayanpur-HR- Staff nurse
4 15000 5.40 5.40 Approved
NGO -RK Mission Narayanpur-NRC- Operational cost - 20 beded
20 no. of beds 30000 6.00 6.00 Approved
Grant in Aid to RK Mission Bastar ( NRC 20 bedded)
20 no. of beds 30000 6.00 6.00 Approved
SUB TOTAL PPP/NGO
435.40 35.40
B.14 Innovations( If Any)
B.14.1 Innovations( If Any) 0
SUB TOTAL 0 0
B.15 Planning, Implementation and Monitoring
B.15.1.2 Community Monitoring ( CM)
CM-District level community monitoring review meetings
27 50000 13.50 6.47 Approved for ongoing 70 Blocks @ Rs 9247 per block
CM - Exposure visit 27 200000 54.00 25.89 Approved for Ongoing 70 Blocks @ 36986 per block
CM-Community Audits based reporting system
27 200000 54.00 25.89 Approved for Ongoing 70 Blocks @ 36986 per block
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 220
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.15.2 Quality Assurance (QA)
Approved Except for the activities indicated at Regional level all other activities for QAC can be approved. With conditionality that all DPs must practice infection prevention protocols in the labour room and OT as a task for this FY year. Approved Amount Rs 107.8 lakhs
QA Cell establishment
QA Cell - state
QA Cell - state- HR
QA Cell - state- HR- State Quality Assurance Manager
1Nos of Person
45000 4.05 4.05 Approved
QA Cell - state- HR- Programme Associate
2 30000 5.40 5.40 Approved
QA Cell - state- HR- Office assistant
2 15000 2.70 2.70 Approved
QA Cell - state- Mobility support
1 No. of vehicle
25000 2.25 2.25 Approved
QA Cell - state- Admin. Exp
1 10000 0.90 0.90 Approved
QA Cell - regional
QA Cell - regional- HR
QA Cell - regional- HR- Regional Quality Assurance Manager
4 35000 12.60 0.00 Not Approved
QA Cell - regional- HR- Office assistant
4 15000 5.40 0.00 Not Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 221
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
QA Cell - regional- Mobility support
4 25000 9.00 0.00 Not Approved
QA Cell - regional- Admin. Exp
4 10000 3.60 0.00 Not Approved
QA Cell - Protocols
QA Cell - Protocols Devlopment
1 50000 0.50 0.50 Approved
QA Cell - Expousure visit
60 Nos of person
10000 6.00 6.00 Approved
QA Cell - Training on protocols,Including SOP
4 no of batch 100000 4.00 4.00 Approved
QA Cell - Workshops and seminars
4 25000 1.00 1.00 Approved
QA Cell - Monitoring of quality Including annual report.
27 300000 81.00 81.00 Approved
B.15.3 Monitoring and Evaluation (HMIS/ M & E)
B.15.3.1 HMIS
B.15.3.1.1 HMIS - establishment of health info. Center-
HMIS - establishment of health info. Center- equipments
Not Approved
HMIS - establishment of health info. Center- equipments-IT
1Blade servers-3, padastal-1. 1Chasis rack 42 Unit, KVM Unit full set, FC switch, Fibre patch cords, 1. UPS 20KVA,
6200000 62.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 222
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS - establishment of health info. Center- equipments-IT
11server padastal, 25 desktop, networking, cooling system AC
2900000 29.00
HMIS - establishment of health info. Center- equipments- GIS
11Blade server, Internet GIS, GIS Plotter Big, GIS scanner big,
1600000 16.00
HMIS - establishment of health info. Center- equipments- GIS
115 desktop, 5 laptop, networking
1100000 11.00
HMIS - establishment of health info. Center- equipments- Others
1office equipment
1000000 10.00
B.15.3.1.1.3 HMIS - establishment of health info. Center- Operating software
HMIS - establishment of health info. Center- Operating software-IT
1SQL server, Window server 2010-x3 , virtual studio- 1 license
8500000 85.00
HMIS - establishment of health info. Center- Operating software-GIS
1ARC GIS 4500000 45.00
HMIS - establishment of health info. Center- Operating software-Others
5.00
B.15.3.1.1.4 HMIS -Procurement-Data
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 223
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS -Procurement-Data-ISRO
10.00
HMIS -Procurement-Data-Other
10.00
B.15.3.1.1.5 HMIS - Operationalisation
HMIS - DSS-Software development and upgradation (IT/GIS/SMS)
1 500000 5.00 0.00 Not Approved Sub systems Parallel to National HMIS are not desirable.
HMIS-DSS-Integrated HMIS
1 500000 5.00 0.00
HMIS-DSS-Convergence of HMIS with other dept MIS
1 1000000 10.00 0.00
HMIS-DSS-GIS based DSS
1 500000 5.00 0.00
HMIS-DSS-Hospital Management
1 1500000 15.00 15.00 Approved
HMIS-DSS-Procurement Management (PROMIS)
1 1000000 10.00 10.00 Approved
HMIS-DSS-Financial management
1 1000000 10.00 0.00 Not Approved Sub system Parallel to national HMIS is not desirable.
HMIS - DSS- Software testing
1 500000 5.00 0.00
B.15.3.1.1.6 HMIS - Recurring expenditure
HMIS - Recurring expenditure - State -
1 100000 9.00 Not Approved
HMIS - State - HR-IT
0.00
HMIS - State - HR- IT-system analyst
1Nos of person
60000 5.40
HMIS - State - HR- IT-Programmer
3 40000 10.80
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 224
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS - State - HR- Data -IT-Manager
1 40000 3.60
HMIS - State - HR- IT-Hardware Engineer-
2 25000 4.50
HMIS - State - HR- IT-Hardware -Data assistant
25 15000 33.75
HMIS - State - HR- GIS
HMIS - State - HR- GIS-analyst
1 80000 7.20
HMIS - State - HR- GIS-programmer
2 50000 9.00
HMIS - State - HR- GIS-Software specialist
2 40000 7.20
HMIS - State - HR- GIS-Operator
5 15000 6.75
HMIS - State - HR-Other
HMIS - State - HR-Admin officer
1 45000 4.05 4.05 Approved (Existing Position as conveyed by State HMIS Officer)
HMIS - State - HR-Accountant
1 25000 2.25 Not Approved
HMIS - State - HR-store keeper
1 25000 2.25
HMIS - State - HR-relationship manager
1 25000 2.25
HMIS - State - HR-Training co-ordinator
1 30000 2.70
HMIS - Recurring expenditure - District
HMIS - Recurring expenditure - District level
27AMC, Internet etc
25000 81.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 225
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
HMIS - Recurring expenditure - Block level
146 10000 175.20
HMIS - Other Activities(MCTS)
HMIS -SMS based HMIS
HMIS - SMS charges: Rs. 250.00 lakh including service tax (This includes mobile cost, software cost, SMS Cost, CUG Charges, system management & Support charges)
Target: 75 lakh transactional SMS @ Rs. 3.31/- plus service tax regarding Registration, ANC, PNC, Delivery, migration of patient, vaccination, deaths, expenditure, JSY amount distribution etc to be send by ANMs
3.31 250.00 0.00 Approved State may carry forward the approved budget of this activity held under ROP for 2011-12. State may ensure for universal coverage in terms of registration from all the health facility on MCTS Portal. Also and its regular updating as per the services delivered to the beneficiaries on real time basis on the MCTS Portal. As this is a Committed unspent balance State may use the last year’s fund
Handholding cost of 27 person (one for each district) for one year
50.00 Approved for this year only
Set up of 10 - seat Call centre with one year operational cost with automated outbound dialing facility for campaigns, reminders etc {assumption:
50.00 50.00 Approved Provided that state may share activity wise details of Budget
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 226
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
12,000 incoming calls per month and 80,000 outbound calls per month)
HMIS - SMS- training
Training cost for 6000 ANMs
15.00 15.00 15.00 Approved
HMIS - Printing of registers and Formats
No of Register SHC Register(village wise)-25000;Delivery register-1000;Reporting Format-6000
46.86 46.86 Approved Subject to condition that registers are compatible with the integrated RCH Register (Village wise) designed by MOHFW.
B.15.3.2 Monitoring and Evaluation (M & E)
B.15.3.2.1 M&E- State review mission
B.15.3.2.1.1 M&E-SRM-HR
B.15.3.2.1.1.1
M&E-SRM-HR- SRM leader
2 40000 9.60 9.60 Approved (Existing Position as conveyed by State HMIS Officer)
B.15.3.2.1.1.2
M&E-SRM-HR- Project Associates- (SRM)
12 30000 21.60 21.60
B.15.3.2.1.1.3
M&E-SRM-HR- Project Associates- logistic
1 30000 1.80 1.80
B.15.3.2.1.1.4
M&E-SRM-HR- Office Assistant
6 15000 5.40 5.40
M&E- State review mission-Mobility support
27(2 visit per district-with 3 vehicles@20000/vehicle)
20000 32.40 32.40 Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 227
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
M&E- State review mission- Allowances
27(5 person per visit for 5daysX2 times for each district )
200000 54.00 54.00 Approved
M&E- State review mission- Report- State
2(1 midterm and 1 annual report )
500000 10.00 10.00 Approved
M&E- State review mission- Report- District
27(2 visit report)
25000 6.75 6.75 Approved
B.15.3.2.2 M&E- Review workshops
M&E- Review workshops- State
4 500000 20.00 20.00 Approved
M&E- Review workshops-Regional
8 200000 16.00 16.00 Approved
M&E- Review workshops-District
12 50000 6.00 6.00 Approved
B.15.3.2.3 M&E- Helpline
M&E- Helpline 1 Integrated Call Centre
1000000 10.00 0.00 Not Approved for HMIS. A call centre has already been proposed under MCTS fmr.No.(B.15.3.1.3.2)
B.15.4. M&E- Tech. support agency
1 2500000 For Discussion Statistics Division: Details not submitted. Needs to be discussed
PIM Technical Support - Architecture & Engineering
Lump sum 4.00
PIM- Technical Support
Lump sum 2.00
-Procurement & supply chain
Lump sum 2.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 228
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Management
PIM - Technical Support
Lump sum 14.00
-HRD Support including recruitment & training
Lump sum 10.00
SUB TOTAL M&E 1612.21 490.51
B.16 Procurement
B.16.1 Procurement of Equipment (Eqpt.)
B.16.1.1 Procurement - Equipment: MH
Procurement - Equipment: FRU
24 no. of BSU 500000 120 120.00 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available 2) There should be competent human resource to handle the equipment
@ Rs 23 Lakh pre BSU this included 1 Boyles Apparatus at per facility
100000 23 23.00 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available 2) There should be competent human resource to handle
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 229
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
the equipment
This Included OT table, Delivery Table, Shadow lam , Pulse oxymeter , Suction Machine, Diathermy, Foetal Heart Monitor, Fumigator, Sterilizer, Hysterectomy Sets Kelly ped etc according to facility needs
44 no. of FRUs for other equipments State has budgeted total Rs 22 Lakh per facility
50000 22 22.00 Approved for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available 2) There should be competent human resource to handle the equipment
Procurement -Equipments for 24x7 PHCs
90 25000 22.5 22.5 Approved for PHCs @ 25000*84 = Rs 21.00 Lakhs for identified delivery points with condition 1) Equipment should be procured only for the facilities with adequate infrastructure is available 2) There should be competent human resource to handle the equipment
Procurement -whole blood finger prick test for HIV
275000 25 68.75 68.75 Approved
B.16.1.2 Procurement - Equipment: CH
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 230
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Procurement - Equipment: CH- SNCU
9 no. of SNCU 100000 9.00 0.00 Approved As this is a Committed unspend balance State may use the last year’s fund
Procurement - Equipment: CH- NBSU
54 no. of NBSU
200000 108 16.00 Approved For Only 8 new units as per the data of delivery points.
Procurement - Equipment: CH- NBCC
no. of NBCC 0 0.00
B.16.1.3 Procurement - Equipment: FP
25 No. of Laproscope
600000 150 150.00 Approved
1500 NSV kits,5000 IUCD KITS, 270 Minilaps other equipment
20 20.00 Approved Although state has not provided unit cost, proposed amount is less than the total cost of individual kits (as per standard rates).
B.16.2 Procurement of Drugs and Supplies
B.16.2.1 Procurement - Drugs & Supplies for MH Mifepristone and Misoprostol (Rs 18 Lakhs )
6000 Rs 300 for MMA drugs
18.00 18.00 Approved
KITs 1-7 and RPR Kits ( Rs 31.1.Lakhs )
31.10 31.10 Approved
Procurement -Drug & Supplies - Parenteral Iron Therapy
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 231
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Procurement -Drug & Supplies - JSSK Kit
250000 kits 350 875.00 0.00 Not Approved Already approved under JSSK
B.16.2.2 Procurement - Drugs & Supplies for CH + ARSH
Approved 168.2 lakhs for SSM drugs (CH), Rs 44.98 for ARSH drugs detailed in write-up. School health drugs, drugs for diarrohea management through VHND.13.5 added.
Procurement of IFA( For Out of School Adolescents)
6793700 0.6 40.76 40.76 Approved
Procurement of Albendazole(For Out of School Adolescents)
301340 1.4 4.22 4.22 Approved
Drugs for Sisu Sangrachan Mah
168.20 168.20 Approved
B.16.2.3 Procurement - Drugs & Supplies for FP
B.16.2.4 Procurement - Supplies for IMEP
B.16.2.5 Procurement - Drugs & Supplies for health facilities (general)
SUB TOTAL Procurement
2111.71 704.53
B.17
SUB TOTAL 0
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 232
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
B.18 New Initiatives/Strategic Interventions (NI)
NI - Bal Hriday Suraksha Yojna Including 35 Lacs for Technical Support Unit
500 surgery cases
130000 650 0 Not Approved As advised in last year’s RoP state should bear cost out of their own resources. The State also explore the possibilities to getting the surgeries done in public health facilities
NI - CM Bal Shravan yojana Chochler in plant
50 600000 300 Approved Approved in 2010-11 ROP Amount was Rs 100 Lakhs @ 6 Lakhs per Case
NI-Cleft lip& Cleft palate for 100 normal cases and 50 severe surgery
25 0 Not Approved.
NI - Sickle Cell management (Rs.200.00 Carry forward from last year, new initiative of neonatal sickle cell screening.)
300 0 Approved. As this is a Committed unspent balance State may use the last year’s fund
NI- Cervica; Cancer Prevention and control
200 0 Not Approved
NI - Food and Drug Control Carried forward for up gradation of drug testing lab.
450 0 Not Approved. As this is a Committed unspent balance State may use the last year’s fund
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 233
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
NI - Blood Safety 1000 0 Not Approved: Blood Processing Centre through NGO is not approved. State may Strengthen their own system and capacities for blood processing including its companionate. The areas of support from NACO should be identified 1st before NRHM
NI - Online 104medical advice services
NI - Online 104 medical advice services- CAPEX
NI - Online 104 medical advice services- OPEX
50 50 Approved : State need to provide detail break up of Operational cost
B.18.12 NI-CG State Medical Service Corporation (CGMSC State has budgeted ) 4 regional drug ware houses Rs 300 Lakh + 7 District drug ware houses Rs 420 Lakh + 16 drug ware houses Rs 800 Lakhs +Head office construction Rs 50 Lakhs + 539.08 for HR and other activity
2109.08 0 Approved State may utilize last year’s funds .No New Approval In the FY 2011-12 Total Rs 2199.60 Lakh was approved for Drug warehouse with condition that state need to provide name of drug warehouses along with the time line of construction. In write up state has not provided the details of Physical achievement of last year is only 1% (22.1 /2199.60)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 234
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
SUB TOTAL New Initiatives/Strategic Interventions (NI)
5084.08 50
B.19 Health Insurance Scheme
SUB TOTAL HIS 0 0
B.20 Research, Studies, Analysis
B.20 Operational reseach
Research - study on Maternal & infant death
10 100000 10 0 Not Approved: New activity State may 1st implement the programme
Research- Dissertation by district
6 200000 12 0 Not Approved
Research- Dissertation by Medical College
6 200000 12 0 Not Approved
SUB TOTAL RESEARCH
34 0
B.21 State Level Health Resources Centre(SHRC)
B.21 SHRC - HR- (only for state office)
SHRC - HR- State - support
110.81 100 Approved As per the approval of ROP 2011-12 for existing staff with same salary
SUB TOTAL SHRC 110.81 100
B.22 Support Services - Support Strengthening NPCB
B.22.1 Support Services - NPCB - Camp
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 235
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Support Services - NPCB - Operation
Support Services - NPCB - Others
146.19 0.00 Not Approved
B22.2 Support Services - Support Strengthening Midwifery Services
B.22.3 Support Services - Support Strengthening - NVBDCP
Support Services - NVBDCP - Procurment
Support Services - NVBDCP - Rent for Hiring of store
Support Services: in NVBDCP
Biological and Environmental Management
6.92 6.92 Approved To intensify malaria control activities in the state
Wages for Spraying
300 300 Approved
B.22.4 Support Services - Support Strengthening - RNTCP
181.9 102.08 Approved.
Intermediate level references Lab (IRL)
29.85 19.85 Approved Proposal for IRL support. The proposal for electricity bill, wages for staff is not approved.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 236
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Multi-Drug Resistance TB (MDR-TB) and DOTS Plus.Dots Plus site Bilaspur and Raipur.Infrastructure and HR
37.03 37.03 Approved. The proposal for Bilaspur is Ongoing (Approved in 11-12). Similar proposal for Raipur hence approved.
Sputum Collection Kit @ Rs 600/kit for 4776 Sub-Centres
28.66 28.66 Approved May be approved as this is an innovative approach.
Communication Charges (132 STS/STLS+307 LT) @100*450*12
5.04 5.04 Approved May be approved if converted into CUG.
1.5 ton Split Air Conditioners for District Durg Store for storage of 2nd line ATT = 18 @ 45,000
8.1 0 Not Approved There is budget provision under RNTCP, State can utilize that.
Illuminator Display Board - 1 each for 18 DTC + 3 Med Coll +1STC = 22 @ 30,000
22 6.6 0 Not Approved There is budget provision under RNTCP IEC head, State can utilize that.
Office Table - 1 for each TU - 66 @ 5000
3.3 0 Not approved.
Office Chair - 1 for each TU - 66 @ 2000
1.32 0 Not approved.
Almirah for 4 new Tus (2 per TU) & 23 new DMCs (1 per DMC) @ 10500
3.26 0 Not approved.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 237
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Wall Paintings in all PHI’s (950*3000)
28.5 0 Not Approved There is budget provision under RNTCP IEC head, State can utilize that.
State Drug Store (Rent @ 25000*12)
3 3 Approved There is no provision for this under RNTCP, can be approved
Hiring one 4 wheeler on monthly/ per day basis (as per NRHM norms - @ 1800* 15 days* 12)
3.24 0 Not Approved There is budget provision under RNTCP vehicle hiring head, State can utilise that.
LCD for 18 Districts @ 75000 for improving quality of training
13.5 0 Not approved.
For storing PPD in ILR at SDS @ 1 Lakhs and 27 vaccine carriers
3 1 Approved. PPD can be stored in domestic/Commercial refrigerators, so deducted accordingly
One time support intended to cover the costs of the first visit to ART centre after diagnosis of HIV-TB
7.5 7.5 Approved There is no provision for this under RNTCP
B.22.5 Support Services - Other NDCP Support Programmes
B.22.6 Support Services - Other NDCP - Immunization
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 238
FMR Code Activity Physical Targets
Unit cost
Amount Proposed in Lakhs
Amount Approved in Lakhs
Remarks
Support Services - Support Strengthening - NLEP
SUB TOTAL SUPPORT SERVICE
982.41 511.08
B.23 INFRA- Others - Solar Power
INFRA- Others - Solar Power - CHC
Other Expenditure - Power Backup -CHC
42 1368000 574.56 574.56 Approved
Other Expenditure - Power Backup -PHC
125 506000 632.5 632.5 Approved
SUB TOTAL Infra - Solar Power
1207.06 1207.06
GRANT TOTAL OF MISSION FLEXIPOOL 45028.63 25449.85
DETAILED BUDGET : MISSION FLEXI POOL (MFP)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 239
Annexure-3
DETAILED BUDGET : IMMUNISATION and PPI OPERATION COST
FMR Code
Activities Unit Cost Physical Target
Amount Proposed(in
lakhs)
Amount Approved(i
n lakhs)
Remarks
C.1 RI Strengthninig Project (Review meeting, Mobility Support, Outreach services etc
c.1.a Mobility Support for supervision for distict level officers.
Rs.50000/ Year /district level officers.
13.50
13.50
Approved
c.1.b Mobility support for supervision at state level
Rs. 100000 per year.
1.00
1.00
Approved
c.1.c Printing and dissemination of Immunization cards, tally sheets, monitoring forms etc.
Rs. 5 beneficiaries
24.29
34.29
Approved
c.1.d Support for Quarterly State level review meetings of district officer
4.05
4.05
Approved
c.1.e Quarterly review meetings exclusive for RI at district level with one Block Mos, CDPO, and other stake holders
7.30
7.30
Approved
c.1.f Quarterly review meetings exclusive for RI at block level
22.99
22.99
Approved
c.1.g Focus on slum & underserved areas in urban areas/alternative vaccinator for slums
85.76
85.76
Approved
c.1.h Mobilization of children through ASHA or other mobilizers
Rs. 150 per session
386.59
386.59
Approved
c.1.i Alternative vaccine delivery in hard to reach areas
Rs. 100 per session
48.00
48.00
Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 240
FMR Code
Activities Unit Cost Physical Target
Amount Proposed(in
lakhs)
Amount Approved(i
n lakhs)
Remarks
c.1.j Alternative Vaccine Deliery in other areas
Rs. 50 per session
102.00
102.00
Approved
c.1.k To develop microplan at sub-centre level
@ Rs 100/- per subcentre
5.08
5.08
Approved
c.1.l For consolidation of microplans at block level
Rs. 1000 per block/ PHC and Rs. 2000 per district
9.41
9.41
Approved
c.1.m POL for vaccine delivery from State to district and from district to PHC/CHCs
Rs100,000/ district/year
27.00
27.00
Approved
c.1.n Consumables for computer including provision for internet access for RIMs
@ 400/ - month/ district
1.30
1.30
Approved
c.1.o Red/Black plastic bags etc.
Rs. 2/bags/session
11.60
11.60
Approved
c.1.p Hub Cutter/Bleach/Hypochlorite solution/ Twin bucket
Rs. 900 per PHC/CHCper year
8.15
7.98
Approved
c.1.q Safety Pits
19.51
18.21
Approved
c.1.r State specific requirement
40.81
-
c.1.s Teeka Express Operational cost
215.51
Approved
C.1-Sub Total
818.34
1,001.57
Approved
C.2 Salary of Contractual Staffs -Sub Total
c.2.a Computer Assistants support for State level
Rs.12000-15000 per person per month
1.80
1.44
Approved
c.2.b Computer Assistants support for District level
8000-10000 per person per month
48.50
32.40
Approved
C.2-Sub Total
50.30
33.84
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 241
FMR Code
Activities Unit Cost Physical Target
Amount Proposed(in
lakhs)
Amount Approved(i
n lakhs)
Remarks
C.3 Traininng under Immunization
c.3.a District level Orientation training including Hep B, Measles & JE(wherever required) for 2 days ANM, Multi Purpose Health Worker (Male), LHV, Health Assistant (Male/Female), Nurse Mid Wives, BEEs & other staff ( as per RCH norms)
9.69
9.69
Approved
c.3.b Three day training including Hep B, Measles & JE(wherever required) of Medical Officers of RI using revised MO training module)
43.47
21.10
Approved
c.3.c One day refresher traning of distict Computer assistants on RIMS/HIMS and immunization formats
0.25
0.25
Approved
c.3.d One day cold chain handlers traning for block level cold chain hadlers by State and district cold chain officers
11.34
1.38
Approved
c.3.e One day traning of block level data handlers by DIOs and District cold chain officer
1.79
1.53
Approved
C.3-Sub Total
66.54
33.95
C.4 Cold chain maintenance Rs.500/PHC/CHCs per year District Rs.10000/year
14.85
7.14
Approved
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 242
FMR Code
Activities Unit Cost Physical Target
Amount Proposed(in
lakhs)
Amount Approved(i
n lakhs)
Remarks
C.5 ASHA incentive for full Immunization
472.42
472.42 Approved
Activity approved. It has been factored into part C from MFP as per discussion in NPCC.
Total
1,422.45
1,548.92
C.6 Pulse Polio Operational Cost (Tentative)
483.03
483.03 Approved
Total
1,905.48
2,031.95
The amount recommended is more than the amount projected because of the provisioning of Teeka
Express Operational cost
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 243
Annexure-4A
DETAILED BUDGET: NATIONAL IODINE DEFICIENCY DISORDERS CONTROL PROGRAMME (NIDDCP)
FMR Code
Activity Unit cost Physical target Amount Proposed
Amount Approved
Remarks
D IDD
D.1 Establishment of IDD Control Cell-
Implementation & monitoring of the programme
10.00* 10 Filling up of sanctioned vacant posts i.e. Technical Officer, Statistical Assistant & LDC on regular/contract basis on priority.
D.1.a Technical Officer 1 State Government may conduct and co-ordinate approved programme activities and furnishes quarterly financial & physical achievements as per prescribed format.
D.1.b Statistical Assistant 1
D.1.c LDC Typist 1
D.2 IDD Monitoring Lab-
Monitoring of district level iodine content of salt and urinary iodine excretion as per Policy Guidelines.
5.00* 5.00 The vacant sanctioned post of Lab Technician & Lab Asst. should be filled on regular/ contract basis on priority.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 244
FMR Code
Activity Unit cost Physical target Amount Proposed
Amount Approved
Remarks
D.2.a Lab Technician 1 State Government may conduct quantitative analysis of salt & urine as per NIDDCP Guidelines and furnish monthly/quarterly statements.
D.2.b Lab. Assistant 1
D.3 Health Education & Publicity
Increased awareness about IDD and iodated salt
7.00 7.00 IDD publicity activities including Global IDD Day celebrations at various level.
D.4 IDD Survey/resurvey
Rs. 50,000 per district
4 districts 2 2 State Government may under take 4 district IDD survey as per guidelines and furnish report.
D.5 Salt Testing Kits supplies by GOI inform of kind grant for 2 endemic districts
12 STK per annum per ASH A
Creating iodated salt demand and monitoring of the same at the community level.
State Govt. to monitor the qualitative analysis of iodated salt by STK through ASHA in 2 endemic districts i.e. Bilaspur and Raigar
D.6 ASHA Incentive Rs. 25/- per month for testing 50 salt sample/month
50 salt samples per month per ASHA in 2 endemic district
20.03
TOTAL 24 44.03
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 245
Annexure-4B
DETAILED BUDGET: INTEGRATED DISEASE SURVEILLANCE PROGRAMME (IDSP)
FMR Code
Activity Unit Cost (where-ever applicable)
Amount Proposed
Amount Approved
Remarks
E.1 Operational Cost
Field Visits Rs 2,40,000 per District Surveillance Unit per annum Rs 5,00,000 State Surveillance Unit per annum
108.61 48.2(5x1+2.4x18)
Approved Office Expenses
Broad Band expenses
Outbreak investigations including Collection and Transport of samples
Review Meetings
Any other expenses
Sub Total 108.61 48.2
* Laboratory Support
District Priority Lab Rs. 4,00,000 per district priority lab per annum
7.5 4.0 Approved
Referral Network Lab Rs. 5,00,000 per referral lab per annum
4.00 Not Approved There is no approved referral lab network under IDSP in the state
Sub Total 11.50 4.0
E.2 Human Resources
E.2.1 Remuneration of Epidemiologists
Rs.25,000 - Rs. 40,000/ per month
95.1 (50,000 x 1 x12+30000x 18 x12+ 30000 x 9 x 12)
62.4 (40,000 × 1× 12+ 30000 x 10 x12 +30000x8x9)
Approved Remunerations for vacant posts are calculated for 9 months. Human resources for the newly formed districts may be
E.2.2 Remuneration of Microbiologists
Rs. 25,000 - Rs. 40,000 (Medical Graduates) Rs. 15,000 -
12.0 (50000 x 2 x 12)
7.2 (40,000 × 2 × 9)
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 246
Rs. 25,000 (Others)
requested subsequently.
E.2.3 Remuneration of Entomologists
Rs. 15,000 - Rs. 25,000
3.0 (25000 x 1 x 12)
2.25 (25,000 × 1 × 9)
Veterinary Consultant
Rs. 25,000 -Rs.40,000
4.5 (50000 x1x 9)
0.00
E.3 Consultant-Finance/ Procurement
Rs. 14,000 1.68 for 12 months
1.68 (14,000x1x 12)
E.3.1 Consultant-Training/ Technical
Rs. 28,000 3.36 for 12 months
2.52 (28,000x1x 9)
E.3.2 Data Manager Rs. 14,000 (State) Rs. 13,500 (District)
75.75 30.84 ([14,000 × 1 × 12] + [13,500 × 18 × 12])
E.3.3 Data Entry Operator Rs. 8,500 28.78 20.91 (8,500 × 13 × 12+8500 x10x9 )
E.3.4 State Helper Rs 5000 0.60 0.00
Sub Total 226.02 127.8
E.8 Training As per NRHM Guidelines
One day training of Hospital Doctors
9.09 (181,700 × 5)
1.1
Approved
One day training of Hospital Pharmacist / Nurses
7.20 (40,000 × 18)
1.5
One day training of Medical College Doctors
0.61 (60,500 × 1)
0.40
One day training for Data Entry and analysis for Block Health Team
23.33 (61,400 × 38)
2.0
One day training of DM & DEO
0.55 (54,600 × 1)
0.55
Sub Total 40.77 5.55
* New formed Districts Rs. 3,50, 000/- per newly formed district
38.50 38.50 Approved , if these districts
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 247
are included in the NRHM, the same can be the part of IDSP
Total 354.49 224.05
Proposal under Additionalities
Establishment of New Districts - 11 DSUs for Computer Hardware & Accessories etc
350000 38.50 0.00 Not approved May be budgeted in IDSP budget
GIS Mapping of Epidemic Places
10 000 32.40 0.00 Not approved GIS mapping is budgeted in the expenditure of Central Surveillance unit.
Total 70.90 0.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 248
Annexure-4C
DETAILED BUDGET: NATIONAL VECTOR BORNE DISEASES CONTROL PROGRAMME (NVBDCP)
FMR code Activity Unit Cost Physical
target Amount
Proposed Amount
Approved Remarks
F.1 Domestic Budget Support (DBS)
F.1.1 Malaria
F.1.1.a Contractual Payments
F.1.1.a.i MPW contractual 995.73 450.00 Approved
F.1.1.a.ii Lab Technicians ( against vacancy)
F.1.1.a.iii VBD Technical Supervisor (one for each block)
F.1.1.a.iv District VBD Consultant (one per district) (Non- Project States)
F.1.1.a.v State Consultant (Non – Project States), M&E Consultant (Medical Graduate with PH qualification) - VBD Consultant (preferably entomologist)
F.1.1.b ASHA Incentive 50.00 50.00 Approved For surveillance by active involvement of ASHA,S
F.1.1.c Operational Cost
F.1.1.c.i Spray Wages
F.1.1.c.ii Operational cost for IRS 34.50 Approved From state resource
F.1.1.c.iii Impregnation of Bed nets- for NE states
F.1.1.d Monitoring , Evaluation & Supervision & Epidemic Preparedness including mobility
29.25 30.00 Approved M & E should be done intensively under strict supervision
F.1.1.e IEC/BCC 32.96 30.00 Approved Comprehensive IEC/BCC activities for all VBD,s
F.1.1.f PPP / NGO and Intersectoral Convergence
F.1.1.g Training / Capacity 23.36 25.00
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 249
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
Building
F.1.1.h Zonal Entomological units This include EMP implementation plan F.1.1.i Biological and
Environmental Management through VHSC
F.1.1.j Larvivorous Fish support
F.1.1.k Construction and maintenance of Hatcheries
F.1.1.l Any other Activities (Pl. specify)
ASHA Talent Search/Annual Meet of ASHAs in 2 Zones
Sentinel Sites 50.00 0.00 Not approved
TA/DA to spray team, storage and procurement of PPE
Total Malaria (DBS) 1215.80 585.00
F.1.2 Dengue & Chikungunya
F.1.2.a Strengthening surveillance (As per GOI approval)
Approved To strenghten diagonsis facilities and case management .As per Norms, but balance may be used to another VBD also The State should plan the activities as per guidelines to achive mid-term plan objectives The amount under vector control and Environmental management may also be utilised for Malaria Environmental Management
F.1.2.a(i) Apex Referral Labs recurrent
3.50 0.00
F.1.2.a(ii) Sentinel surveillance Hospital recurrent
0.00 2.00
F.1.2.a(iii) ELISA facility to Sentinel Surv Labs
F.1.2.b Test kits (Nos.) to be supplied by GoI (kindly indicate numbers of ELISA based NS1 kit and Mac ELISA Kits required separately)
F.1.2.c Monitoring/supervision and Rapid response
1.80 2.00
F.1.2.d Epidemic preparedness 4.05 6.00
F.1.2.e Case management
F.1.2.f Vector Control & environmental management
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 250
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.1.2.g IEC BCC for Social Mobilization
8.10 5.20
F.1.2.h Inter-sectoral convergence
F.1.2.i Training & printing of guidelines, formats etc. including operational research
4.86 4.80
Total Dengue/Chikungunya
22.31 20.00
F.1.3 AES/JE
F.1.3.a Strengthening of Sentinel sites which will include Diagnostics and Case Management, supply of kits by GoI
F.1.3.b IEC/BCC specific to J.E. in endemic areas
F.1.3.c Capacity Building
F.1.3.d Monitoring and supervision
F.1.3.e Procurement of Insecticides (Technical Malathion)
F.1.3.f Fogging Machine
F.1.3.g Operational costs for malathion fogging
F.1.3.h Operational Research
F.1.3.i Rehabilitation Setup for selected endemic districts
F.1.3.j ICU Establishment in endemic districts
F.1.3.k ASHA Insentivization for sensitizing community
F.1.3.l Other Charges for Training /Workshop Meeting & payment to NIV towards JE kits at Head Quarter
Total AES/JE 0.00 0.00
F.1.4 Lymphatic Filariasis
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 251
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.1.4.a State Task Force, State Technical Advisory Committee meeting, printing of forms/registers, mobility support, district coordination meeting, sensitization of media etc., morbidity management, monitoring & supervision and mobility support for Rapid Response Team and contingency support
55.25 12.25
Approved
F.1.4.b Microfilaria Survey
4.23 4.50
Approved Critical parameter; the state needs to ensure the activities
F.1.4.c Post MDA assessment by medical colleges (Govt. & private)/ICMR institutions
2.52 0.00
Not approved
F.1.4.d Training/sensitization of district level officers on ELF and drug distributors including peripheral health workers
27.00 42.40
Approved Specific training to be plan as per guidelines
F.1.4.e Specific IEC/BCC at state,district, PHC, Sub-centre and village level including VHSC/GKs for community mobilization efforts to realize the desired drug compliance of 85% during MDA
23.00 23.10
Approved
F.1.4.f Honorarium for Drug Distribution including ASHAs and supervisors involved in MDA
56.00 74.40
Approved
F.1.4.g Verification and validation for stoppage of MDA in LF endemic districts
1.35
Approved
F.1.4.g.i a) Additional MF Survey
F.1.4.g.ii b) ICT Survey
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 252
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.1.4.g.iii c) ICT Cost 0.00
F.1.4.h Verification of LF endemicity in non-endemic districts
2.00
Approved
F.1.4.h.i a) LY & Hy Survey in 350 distt
F.1.4.h.ii b) Mf Survey in Non- endemic distt
F.1.4.h.iii c) ICT survey in 200 distt 0.00
F.1.4.i Post-MDA surveillance 1.00 0.00
Total Lymphatic Filariasis 169.00 160.00
F.1.5 Kala-azar
F.1.5 Case search/ Camp Approach
-- --
F.1.5.a Spray Pumps & accessories
F.1.5.b Operational cost for spray including spray wages
F.1.5.c Mobility/POL/supervision
F.1.5.d Monitoring & Evaluation
F.1.5.e Training for spraying
F.1.5.f IEC/ BCC/ Advocacy
Total Kala-azar 0.00 0.00
Total (DBS) 1407.11 765.00
F.2 Externally aided component
F.2.a World Bank support for Malaria (Identified state)
F.2.b Human Resource 259.05 145.00 Approved
F.2.c Training /Capacity building
45.60
40 Approved
F.2.d Mobility support for Monitoring Supervision & Evaluation including printing of format & review meetings, Reporting format (for printing formats)
22.90
15
Approved
Kala-azar World Bank assisted Project
F.2.e Human resource Not Applicable
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 253
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.2.f Capacity building
F.2.g Mobility
F.3 GFATM support for Malaria (NEStates)
Not Applicable
F.3.a Project Management Unit including human resource of N.E. states
F.3.b Training/Capacity Building
F.3.c Planning and Administration( Office expenses recurring expenses, Office automation , printing and stationary for running of project)
F.3.d Monitoring Supervision (supervisory visits including travel expenses, etc) including printing of format and review meetings,
F.3.e IEC / BCC activities as per the project
F.3.f Operational cost for treatment of bednet and Infrastructure and Other Equipment (Computer Laptops, printers, Motor cycles for MTS )
Total : EAC component 327.55 200.00
F.4 Any Other Items ( Please Specify)
0.00 0.00
F.5 Operational costs ( mobility, Review Meeting, communication, formats & reports)
0.00 0.00
Grand total for cash assistance under NVBDCP (DBS + EAC) 1734.66 965.00
F.6 Cash grant for decentralized commodities
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 254
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
F.6.a Chloroquine phosphate tablets
49.90 55.50 Approved
F.6.b Primaquine tablets 7.5 mg
3.88
F.6.c Primaquine tablets 2.5 mg
1.34
F.6.d Quinine sulphate tablets 0.00
F.6.e Quinine Injections 4.44
F.6.f DEC 100 mg tablets 71.08
F.6.g Albendazole 400 mg tablets
F.6.h Dengue NS1 antigen kit
F.6.i Temephos, Bti (AS) / Bti (wp) (for polluted & non polluted water)
10.00
F.6.j Pyrethrum extract 2% for spare spray
5.00
F.6.k ACT ( For Non Project states)
55.58
Approved Being project state the ACT would be supplied by Centre
F.6.l RDT Malaria – bi-valent (For Non Project states)
F.6.m Any Other Items ( Please Specify)
Synthetic Pyrethroids 313.25 0.00 Not Approved To be met from state resources
Spray Pumps & accessories
42.88 0.00
Lancets/slides/swab/lab reagents etc.
7.30 0.00
Microscopes 43.80 0.00
Not approved May be procured from NRHM flexifund
Total grant for decentralized commodities
608.45 55.50
Grand Total for grant-in-aid under NVBDCP
2343.11 1020.50
Commodity Grants 0.00 2613.80
Total NVBDCP Cash + Commodity 2343.11 3634.30
Cash assistance required under NRHM flexi fund
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 255
FMR code Activity Unit Cost Physical target
Amount Proposed
Amount Approved
Remarks
Biological and Environmental Management through VHSC
6.92
306.92
Not approved To intensify malaria control activities in the state
Spray Wages 300.00
Total 306.92 306.92
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 256
Annexure-4D
DETAILED BUDGET: NATIONAL LEPROSY ERADICATION PROGRAMME (NLEP)
FMR code
Activity Unit Cost (In Rupees)
Physical Targets
Amount proposed
Amount approved
Remarks
G 1.
Improved early case detection
G 1.1 Incentive to ASHA MB 500 2584 12.92 5.00 Approved No reduced to MB-1000 & PB-1000 Cases
PB300 2583 7.75 3.00
G1.1 a
Sensitization of ASHA 50 - -
G 1.2
Specific -plan for High Endemic Distrcts
12 D 91 Blocks
17.82 17.82
G 2
Improved case management
MCR - 250/- Aids/Appliance -12500 Welfare/RCS - 10,000
2400 18
250
7.20 0.54
25.00
6.00 0.54
25.00
Approved
G 2.2
Urban L:eprosy Control, (Mega city - 0 , Medium
city (1) -3 , Med. City (2)- 1 Township -19)
Meg -280000 Med (1)- 120000 Med. (2) - 236000 Town - 57000
0 8 2 7
0 16.88 14.16
6.84
0 9 60 4.72 3.99
G 2.3 Material & Supplies
G 2.3 a
Supportive drugs, lab. reagents & equipments and printing works
52,000 18 14.40 9.36
G 2.4 NGO - SET Scheme 500000 - - -
G 3 Stigma Reduced
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 257
FMR code
Activity Unit Cost (In Rupees)
Physical Targets
Amount proposed
Amount approved
Remarks
G 3.1
Mass media, Outdoor media, Rural media, Advocacy media
50,000 18 18.00 9.00
G 4.
Development of Leprosy Expertise sustained
G 4.1 Training of new MO 60000 - - - Approved As NLEP rates are very low, higher rates agreed in keeping with other programmes
G 4.2 Refresher training of MO 40000 600 14.90 8.00
G 4.3 Training to New H.S/H.W. 30000 900 10.80 9.00
G 4.4
Other training -Physiotherapist
30000 30 0.50 0.30
G 4.5 Training to Lab. Tech. 30000 60 1.00 0.60
G 4.6
Management training for District Nucleus Team
30000 90 3.24 0.90
G 5.
Monitoring, Supervision and Evaluation System improved
G 5.1
Travel Cost and Review Meeting
Approved
G 5.1 a
travel expenses - Contractual Staff at State level
50000 1 27.00 0.50
G 5.1 b
travel expenses - Contractual Staff at District level
15000 18 6.75 2.70
G 5.1 c Review meetings 25000 4 2.00 1.00
G 5.2
Office Operation & Maintenance
G 5.2 a Office operation - State Cell
38000 1 - 0.38 Approved
G 5.2 b
Office operation - District Cell
18000 18 14.40 3.24 Approved
G 5.2 c
Office equipment maint. State
30000 1 - 0.30 Approved
G 5.3 Consumables
G 5.3 a State Cell 28000 1 - 0.28 Approved
G 5.3 b District Cell 14000 18 - 2.52
G 5.4 Vehicle Hiring and POL
G 5.4 a State Cell 85000 2 9.60 1.70
G 5.4 b District Cell 75000 18 23.76 13.50
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 258
FMR code
Activity Unit Cost (In Rupees)
Physical Targets
Amount proposed
Amount approved
Remarks
G 6. Programme Management ensured
G 6.1
Contractual Staff at State level
G 6.1 a SMO 40000 1x12 7.20 4.80 Approved
G 6.1 b BFO cum Admn. Officer 30000 1x13 3.60 3.60
G 6.1 c Admn. Asstt. 16000 1x14 1.92 1.92
G 6.1 d DEO 12000 1x15 1.44 1.44
G 6.1 e Driver 11000 1x16 1.32 1.32
G 6.2 Contractual Staff at Disrrict level
G 6.2 a Driver 11000 9x12 15.84 11.88 Approved
G 6.2 b
Contractual Staff in selected States, NMS 20000
- - -
G 7. Others
G 7.1
Travel expenses for regular staff for specific programme / training need, awards etc
27.00 4.00
TOTAL 313.78 167.91
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 259
Annexure-4E DETAILED BUDGET : NATIONAL PROGRAMME FOR CONTROL OF BLINDNESS (NPCB)
FMR CODE
ACTIVITY Physical Target Amount Proposed
Amount Approved
Remarks
H *Recurring Grant-in aid
H 1.1 For Free Cataract Operation @Rs.750/- per case
61000 458 212.5 Approved on reimbursement basis
H 1.2 Other Eye Diseases@ Rs.1000/-
500 5 5 Approved
H 1.3 School Eye Screening Programme@ Rs.200/- per case
30000 60 60 Approved
H 1.4 Blindness Survey 18 18 0 Not approved
H 1.5 Private Practitioners @as per NGO norms
5000 38 37.5 Approved
H 1.6 Management of State Health Society and Distt. Health Society Remuneration (salary , review meeting, hiring of vehicle and Other Activities & Contingency) @ Rs.14 lakh/ Rs.7 lakh depending on the size of state
15 14 Approved
H 1.7 Recurring GIA to Eye Donation Centers @ Rs.1000/- per pair
0 0
H 1.8 Eye Ball Collection by Eye Bank @ Rs.1500/- per pair
300 5 4.5 Approved
H 1.9 Training PMOA and MIS training
200 10 10 Approved for PMOA and MIS training for 1 time
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 260
FMR CODE
ACTIVITY Physical Target Amount Proposed
Amount Approved
Remarks
H 1.10 IEC, Eye Donation Fortnight, World Sight Day & awareness programme in state & districts etc
663 45 18 Approved
1lac per District and 2 lac for state
H 1.11 Procurement of Ophthalmic Equipment
47 186 100 Approved
H 1.12 Maintenance of Ophthalmic Equipments
18 18 5 Approved
H.2 Non- Recurring Grant-in-aid
H.2.1 For RIO (new) @ Rs.60 lakh
0 0
H.2.2 For Medical College@ Rs.40 lakh
0 0
H.2.3 For vision Centre @ Rs.50000/-
100 50 50 Approved for 100 vision centre
H.2.4 For Eye Bank @ Rs.15 lakh
0 0
H.2.5 For Eye Donation Centre @ Rs.1 lakh
8 8 8 Approved for 8 EDC
H.2.6 For NGOs @ Rs.30 lakh 0 0
H.2.7 For Eye Wards and Eye OTS @ Rs.75 lakh
0 0
H.2.8 For Mobile Ophthalmic Units with tele-network @ Rs.60 lakh
0 0
H.2.9 Grant-in-aid for strengthening of Distt. Hospitals @ Rs.20 lakh
1 20 20 Approved for 1 Distt. Hospital
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 261
FMR CODE
ACTIVITY Physical Target Amount Proposed
Amount Approved
Remarks
H.2.10 Grant-in-aid for strengthening of Sub Divisional. Hospitals@ Rs.5 lakh
1 5 5 Approved for 1 Sub-Distt. Hospital
H.3 Contractual Man Power
H.3.1 Ophthalmic Surgeon@ Rs.25000/- p.m
2 10 6 Approved
H.3.2 Ophthalmic Assistant @ Rs.8000/- p.m
0 0
H.3.3 Eye Donation Counsellors @ Rs.10000/- p.m.
2 3 2.4 Approved
Total 954 557.9
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 262
Annexure-4F DETAILED BUDGET: REVISED NATIONAL TUBERCULOSIS CONTROL PROGRAMME
(RNTCP)
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
I.1 Civil works
As per Revised Norms
and Basis of Costing
for RNTCP
1) Civil work Up gradation and maintenance completed as
planned; 2) Funds in the head utilized against the approved amount
30.15 30.15 Approved 100%. Approved the proposal for 3rd DOTS Plus site, 3 new DTCs.
I.2 Laboratory materials
As per Revised Norms and Basis of Costing for RNTCP
1) Sputum of TB Suspects Examined per lac population per quarter; 2) All districts subjected to IRL On Site Evaluation and Panel Testing in the year; 3) IRLs accredited and functioning optimally; 4) Funds in the head utilized against the approved amount
42.14 42.14 Approved 100%.
I.3 Honorarium
As per Revised Norms and Basis of Costing for RNTCP
1) All eligible Community DOT Providers are paid honorarium in all districts in the FY; 2) Funds in the head utilized against the
49.60 25.00 Approved 80% of the budget proposed for honorarium of DOTS patients. For DOTS Plus 30% approved.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 263
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
approved amount
I.4 IEC/ Publicity
As per Revised Norms and Basis of Costing for RNTCP
1) All IEC/ACSM activities proposed in PIP completed; 2) Increase in case detection and improved case holding; 3) Funds in the head utilized against approved amount
40.10 10.00 Approved Amount limited to fit into the budget envelop approved by GOI.
I.5 Equipment maintenance
As per Revised Norms and Basis of Costing for RNTCP
1) Maintenance of Office Equipments at State/Districts and IRL equipments completed as planned; 2) All BMs are in functional condition; 3) Funds in the head utilized against approved amount
15.79 11.05 Approved 70%.
I.6 Training
As per Revised Norms and Basis of Costing for RNTCP
1) Induction training, Update and Re-training of all cadre of staff completed as planned; 2) Funds in the head utilized against approved amount
171.35 70.81 Approved limited to the norm.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 264
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
I.7 Vehicle maintenance
As per Revised Norms and Basis of Costing for RNTCP
1) All 4 wheelers and 2 wheelers in the state are in running condition and maintained; 2) Funds in the head utilized against approved amount
32.75 26.20 Approved 80% of the estimated budget.
I.8 Vehicle hiring
As per Revised Norms and Basis of Costing for RNTCP
1) Increase in supervisory visit of DTOs and MOTCs; 2) Increase in case detection and improved case holding; 3) Funds in the head utilized against approved amount
67.00 56.40 Approval limited to the norm.
I.9 NGO/PP support
As per Revised Norms and Basis of Costing for RNTCP
1) Increase in number of NGOs/PPs involved in signed schemes of RNTCP; 2) Contribution of NGOs/PPS in case detection and provision of DOT 3) Funds in the head utilized against approved amount
122.19 55.08 Approved 45%. *If the state is anticipating deficit in laboratory capacity to conduct C&DST test, then state may budget for funds under C&DST scheme in the NGO /PP head as the RNTCP guidelines for NGO and PPs, as a priority.
I.10 Miscellaneous
As per Revised Norms and Basis of
1) All activities proposed under miscellaneous head in PIP completed; 2)
51.05 43.31 Approved Amount as per the norm.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 265
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
Costing for RNTCP
Funds in the head utilized against approved amount
I.11 Contractual services
As per Revised Norms and Basis of Costing for RNTCP
1) All contractual staff appointed and paid regularly as planned; 2) Funds in the head utilized against approved amount
559.61 559.61 Approved 100%.
I.12 Printing
As per Revised Norms and Basis of Costing for RNTCP
1) All printing activities at state and district level completed as planned; 2) Funds in the head utilized against approved amount
36.49 18.24 Approved 50%.
I.13 Research and studies
As per Revised Norms and Basis of Costing for RNTCP
1) Proposed Research has been initiated or completed in the FY as planned; 2) Funds in the head utilized against approved amount
4.00 4.00 Approved 100%.
I.14 Medical Colleges
As per Revised Norms and Basis of Costing for RNTCP
1) All activities proposed under Medical Colleges head in PIP completed; 2) Funds in the head utilized against
21.92 19.30 Not approved Proposal for STLS in Medical College is not approved.
Approval of Programme Implementation Plan Chhattisgarh , 2012-13 Page 266
FMR CODE.
Activity
Unit cost
Physical target/expected
output
Proposed amount
Approved amount
Remarks
approved amount
I.15
Procurement –vehicles
As per Revised Norms and Basis of Costing for RNTCP
1) Procurement of vehicles completed as planned; 2) Funds in the head utilized against approved amount
Approved for amount as per the norm.
Four wheeler 5.00 4.30
Two Wheeler 0 0
I.16 Procurement – equipment
As per Revised Norms and Basis of Costing for RNTCP
1) Procurement of equipments completed as planned; 2) Funds in the head utilized against approved amount
24.00 15.30 Approved proposal for Procurement of A/C and Computers .Amount budgeted for Photocopier procurement not approved as there is no provision.
I.17 Tribal Action Plan
127.29 60.00 Approved amount as per the norm.
Total (A) 1400.42
1050.90
B22.4 Additionality funds from NRHM (B) 182.26 102.44
TOTAL (A+B) Rs. 1153.34