approx quants 2.docx
DESCRIPTION
Approximate Quantities Example for the refurbishment of a building to comply with DDA standardsTRANSCRIPT
Danielle-Louise ReidStage 2
Integrative Studies 2
Approximate Quantities for the proposed work at Templars Park to comply with DDA regulations
Due: 26 February 2013
1
Contents
2 Superstructure 2 - 32D Stairs and Ramps2F Windows and External Doors2G Internal Walls and Partitions2H Internal Doors
3 Internal Finishes 53A Wall Finishes3B Floor Finishes
4 Furniture Fittings and Equipment 6- 74A Furniture Fittings and Equipment
5 Services 8 - 95A Sanitary Installations5E Space Heating and Air Conditioning5G Ventilation Systems5K Fire and Lighting Protection
7 Work to Existing Building 107A Minor Demolition and Alteration Works (strip-out)
8 External Works 118B Roads, Paths, Pavings and Surfacing
Provisional Sums 12
Contingencies 12
Preliminaries 12
Appendix 1 – Back-up Calculations 13 - 16
Appendix 2 – Plan with Marked Changes 17
2
Approximate Quantities
Ref No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
2 SUPERSTURCTURE
2D Stairs and Ramps1800mm x 3800mm x 155mm; hardcore bed blinded with sand; In-Situ Concrete 20.00 N/mm2 – 20mm aggregate (1:2:4)
Balustrading and HandrailsMild steel balustrading and steel handrail
2E External WallsCommon brick solid walls; one and a half brick thick
2F Windows and External DoorsStandard external softwood doors and hardwood frames; doors painted; including ironmongery. Add extra 390.00 for fire exit
Standard external softwood doors and hardwood frames; doors painted; including ironmongery.
2.901
25.4
1.60
1
1
M3
M
M2
Nr
Nr
68.00
295.00
110.00
1100.00
720.00
197.27
7493.00
176.00
1100.00
720.00
3
Ref No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
2 SUPERSTURCTURE CONTINUED
2G Internal Walls and PartitionsSoftwood stud and plasterboard partitions; tape and fill joints; emulsion finish
2H Internal DoorsStandard softwood doors and frames; including lintel; ironmongery and painting. Flush hollow core.
10.48
2
M2
Nr
55.00
360.00
576.95
720.00
Approximate Quantities
4
Total Cost of Substructure £10,983.22
Approximate QuantitiesRef No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
3 INTERNAL FINISHES
3A Wall FinishesIn-situ wall finish. One mist and two coats emulsion paint.
3B Floor FinishesFlexible tiling. Vinyl safety flooring.
Refurbishment to the existing doorsPainting to existing doors; emulsion paint
PC Sum
244.51
171.69
10.10
M2
M2
M2
4.10
33.00
4.10
1030.08
5665.77
41.41
5
Total Cost of Internal Finishes £6737.26
Approximate QuantitiesRef No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
4 FURNITURE FITTINGS AND EQUIPMENT
4A Furniture Fittings and EquipmentBunk bed, 1.975 x 1.075, in compliance with DDA regulations
PC Sum
Internal fire action for disabled people signage. Rigid plastic; 250 x 300; pre-drilled holes
PC Sum
External disabled ramp this way arrow signage. Stoved aluminium; 150 x 200; pre-drilled holes
PC Sum
External disables access ramp signage. Stoved aluminium; 150 x 200; pre-drilled holes
PC Sum
Internal BS disabled fire exit signage. Self-adhesived rigid plastic; 400 x 150
PC Sum
1
1
1
1
1
Nr
Nr
Nr
Nr
Nr
385.00
12.16
12.16
65.48
7.83
770.00
12.16
12.16
65.48
7.83
6
Approximate Quantities
Ref No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
4 FURNITURE FITTINGS AND EQUIPMENT CONTINUED
Internal disabled toilet signage. Rigid plastic; 150 x 150; pre-punched/drilled holes
PC Sum
DOOR HANDLESPair of handles; stainless steel; rose size; 6mm thick; 50mm diameter; 1 hour fire rating; DDA compliant
PC Sum
1
8
Nr
Nr
3.29
34.30
3.29
274.40
7
Total Cost of Furniture Fittings and Equipment £1145.32
Approximate Quantities
Ref No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
5 SERVICES
5A Sanitary InstallationsFully DDA compliant bathroom including wall mounted basin; TVM3 tap; easy operational flush; raised height seat with soft closing lid; grab rails; alarm and pull cord and other washroom equipment
Swift 1095 shower cubicle. Level, anti-slip, access tray; 1095 x 795; patterned PET or white propylene glazed privacy windows
PC Sum
5E Space Heating and Air ConditioningCreda Nobo slimline panel heater. 0.75kW rating; single electronic thermostat with module control unit
PC Sum
5G Ventilation SystemsXpelair extraction fan. 115 x 165; white plastic; 220-240V 50Hz
PC Sum
5H Electrical InstallationsSwitch socket outlet; PVC cables; double socket; to be raised to 900mm above ground level
PC Sum
1
1
3
1
7
Nr
Nr
Nr
Nr
Nr
1440.00
872.00
196.49
42.95
76.00
2312.00
589.47
42.59
532.00
Ref Description and Price Build-Up Quantity Unit Rate (£) (£)
8
No. per unit5 SERVICES CONTINUED
Single switch; PVC cables; to be lowered to 900mm above ground level
PC Sum
5K Fire and Lighting ProtectionFire alarms/appliances; single stage smoke detectors; alarms and controls up to 3000m2
PC at 10% for addition of disabled needs for visible alarms
6
171.69
Nr
M2
30.00
9.62
0.96
180.00
1651.66
Approximate Quantities
Approximate Quantities
9
Total Cost of Services £5307.72
Ref No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
7 WORK TO EXISTING BUILDING
Minor Demolition and Alteration Works (strip-out)
Internal demolitionDemolition of softwood stud partitions; including finishing on both sides
PC Sum
External demolitionDemolition of an external brick wall in cement mortar; 1 ½ brick thick; extra for plaster, render or pebble dash per side
PC Sum
4.17
1.61
M2
M2
10.29
64.10
42.91
103.20
10
Total Cost of Work to Existing Building £146.11
Approximate Quantities
Ref No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
8 EXTERNAL WORKS
8B Roads, Paths, Pavings and Surfacing
Paved areas; Tarmacadam paving; two layers; limestone or igneous chipping finish paving on sub-base; including excavation
Car parking alternatives; Surface level parking, including lighting and drainage
Resurfacing of remaining courtyard area; Tarmacadam paving; two layers; limestone or igneous chipping finish paving on sub-base; including excavation
PC Sum
43.22
3
147.79
M2
Car
M2
28.00
1700.00
28.00
1210.16
5100.00
4138.12
11
Total Cost of External Works £10448.28
Provisional Sums, Preliminaries and ContingenciesRef 1. Provisional SumsRef 2. PreliminariesRef 3. Contingencies
Ref No.
Description and Price Build-Up Quantity Unit Rate (£) per unit
(£)
1.
2.
3.
PROVISIONAL SUMSResurfacing of main car park; to the same specification as the main courtyard and pathway; ; Tarmacadam paving; two layers; limestone or igneous chipping finish paving on sub-base; including excavation
PRELIMINARIES12% of the total collection of costs for elemental work to cover any associated costs that contractors incur in the completion of the project
CONTINGENCIES5% of the total collection of costs for elemental work to cover any unpredictable changes in the project
447.37 (approx.)
M228.00 12426.12
4172.15
1738.36
12
Final Collection of Costs
Element Cost (£)Superstructure 10983.22Internal Finishes 6737.26Furniture Fittings and Equipment 1145.32Services 5307.72Work to Existing Building 146.11External Works 10448.28
Sub-Total of Elements 34767.91
Provisional Sums 12426.12Preliminaries 4172.15Contingencies 1738.36
Sub-Total of Extras 18336.63
Total Collection of Costs £53,104.54
13
Appendix 1Back-up Calculations
2 SUPERSTRUCTURE
2D Stairs and RampsThis has been calculated to account for 5 ramps – 2 leading up to the landing at door 1 and 2 marked on appendix 2 and 1 leading up to door 3.
LandingVolume = lbh = 1.800 x 1.800 x 0.155 = 0.502
Sloped RampVolume = (lbh)*2 = (1.800 x 2.000 x 0.155) = 0.558/2 = 0.279
Total Volume of Concrete Required= (3 x 0.502) + (5 x 0.279)= 2.901
Balustrading and HandrailsThis has been calculated to have a handrail at each side of the ramp and at the exposed edge of the landing.
(5 x 2) x 2 = 203 x 1.8 = 5.4
Total Hand-railing Required= 25.4
2E External WallsOn surveying, we noticed 0.72mm of the wall has to be removed in order to fit the new 800mm door
0.72 x 2.23= 1.60
(continues on to next page)
14
2G Internal Walls and PartitionsPartitions are to be erected in the common room and to divide the store into a disabled friendly dormitory
Dormitory3.2 x 2.74= 8.77
Common Room0.7 x 2.45=1.72
Total Partitions= 8.77 + 1.72= 10.49
3 INTERNAL FINISHES
3A Wall FinishesArea of wall from each room added together (refer to back of calculations for individual data)= 244.51
3B Floor FinishesArea of floor from each room added together (refer to back of calculations for individual data)= 171.69
Refurbishment to the Existing DoorsKitchen > store door= 2.02 x 0.85= 1.71
Hallway > common room and dining room doors= (2.02 x 0.827) x 2= 3.34
Total (5.05 multiplied by 2 to account for both sides of the door)= 10.1
5 SERVICES
5K Fire and Lighting ProtectionArea of floor from each room added together (refer to back of calculations for individual data)= 171.69
15
7 WORK TO EXISTING BUILDING
Internal Wall DemolitionWall at chicane leading into common room to be shortened
1.70 x 2.45= 4.17
External Wall DemolitionWall at front entrance into porch to be widened
0.72 x 223= 1.61
8 EXTERNAL WORKS
8B Roads, Paths, Pavings and SurfacingPaving round the exterior of the building
70.74 (entire length of pathway) – 27.52 (deductions made for ramps and landings)= 43.22
ResurfacingResurfacing of the remainder of the courtyard minus the allocated car park area of 52.8m
Area 1= 11 x 2.87= 31.57
Area 2= 13.84 x 8.05= 111.41
Area 3= 11.43 x 5.04= 57.61
Total Area minus car park= 200.59 – 52.80= 147.79