Advanced Product Quality Planning APQP

QUALITY PRODUCTIVITY MANAGEMENT CONSULTANCY

(QPMC)

1

Page 2: APQP Training

Advanced Product Quality Planning (APQP)

Synopsis:Advanced Product Quality Planning (APQP) is the technique, adopted by most of the companies, which helps to establish the steps necessary to assure that a product satisfies the customer.The goals of product quality planning are effective communication in a team with everyone involved, on time completion of all required steps, minimal or no quality problem. APQP should be used as a guideline to utilize the resources towards customer satisfaction, to identify the required changes early, to provide a quality product on time at competitive cost.Effective product quality planning depends on a company’s top management commitment to the effort required in achieving customer satisfaction.

PurposeThe purpose of this workshop is to provide individuals and teams with the knowledge and skills to the different phases of APQP requirement. The training program covers Plan and Define program, Product design and development, Process design and development, Product and Process validation, Feedback assessment and Corrective action.

Objectives:After completion of this workshop, participant will be able to:1. Explain the importance of thinking.2. Understand different stages of APQP3. Able to take decision fast

Precaution:The participant manual was designed for use in the context of an instructor-led workshop and as a reference outside the workshop. All presentations are in transparent sheet material. It was not designed as a self-study text.This material should not be photocopied without the permission of author. Also this material should not be shown or given to any Consultant or Consultancy Organization.

Dr. S Bhuniya

2

Page 3: APQP Training

Advanced Product Quality Planning (APQP)

What is APQP?Advanced Product Quality Planning (APQP) is a structured method of defining and establishing the steps necessary to assure that a product satisfies the customer.Effective product quality planning depends on a company’s top management commitment to the effort required in achieving customer satisfaction.

Objectives of APQPThe goals of product quality planning are

* effective communication in a team with everyone involved* on time completion of all required steps* minimal or no quality problem. * minimal product launch quality risk

Benefits of APQP* Resources are directed towards customer satisfaction* Required changes are identified early* A quality product on time at competitive cost.

Phases of APQPPhase I- Plan and Define programPhase II- Product design and developmentPhase III- Process design and developmentPhase IV- Product and Process validationPhase V- Feedback assessment and Corrective action.

Phase –I ( Plan and Define the Program)

1. Organization will interface with the customer& get all the necessary customer inputs like customer drawings, specifications, sample parts etc. to enable to do a preliminary feasibility study.

2. An initial feasibility study, preliminary process flow & risk assessment are done based on the checklist to evaluate the suitability of designing and manufacturing the new product. This initial feasibility and risk assessment will be done in a team.

3. In some cases, when the customer requires some sample parts before submitting the quotation, the same is submitted.

4. Based on the initial feasibility studies, the new product development will be considered. The cost estimation will be done for the new product.

5. The quotation package will be prepared & submitted to the customer for acceptance. The qualities planning activities starts once the customers conforms the orders either verbally or give it in writing.

3

Page 4: APQP Training

6. The team will do a detailed contract and feasibility review based on the customer confirmation and order placement.

7. Organizer will conduct a Quality system requirements review with the customer to ensure that all TS 16949:2002 system requirements are clarified and any additional customer specific requirements are required. Organizer will ensure that all customer standards like packaging standards, engineering standards; inspection standards are received from the customer.

8. Organizer will combine feasibility review & quality system requirements review.

9. Organizer will prepare a detailed Product quality planning and introduction Gantt chart. This chart will show all the activities of APQP in detail along with the responsibilities, start-date and end-date. The progress of the product introduction is also monitored using this chart.

10. Organizer will initiate the APQP Status reporting form. The program need dates and the supplier timing dates are planned depending on when the customer requires the product. If the customer requires the APQP status reporting form to be sent to him at a determined frequency, Organizer will ensure that the status reporting form are sent to the customer as per the agreed frequency.

11. Organizer will prepare the Bill of Material for the new product. Based on the BOM and the similarity of the new product components with the existing ones, Organizer will review the existing Family data sheet and decide the part families for the new product for all components made in-house.

12. Organizer will select the subcontractors from the Approved subcontractors list. If any new subcontractors are required, then the selection will be done. Quality system development of existing subcontractors will be done. Product development with the subcontractors (new/existing) will be done.

13. The following are the outputs are the end of phase-1 of APQP:* Customer inputs like drawings, specs, and correspondences* Initial feasibility and risk assessment checklist* Quotation * Customer’s Purchase order* Contract and feasibility review checklist* Quality system review checklist* New product planning and introduction Gantt chart* Bill of Material* Family data sheet* APQP status reporting form* List of subcontractors* Customer specified special characteristics

14. Management review will be conducted by organizer to ensure the adequacy of all the activities conducted during Phase-1.

4

Page 5: APQP Training

Phase II- Product design and development

15. Product design and development will be done ( only for design-responsibility organization)* Design FMEA* Design for manufacturability and assembly* Design Verification* Design reviews* Prototype build* Engineering Drawing* Engineering specification* Material specification* Drawing and specification changes

16. Organization prepares detailed drawing using customer drawing / sample wherever required and make tooling drawing accordingly.

17. A detailed plan for any new facilities, equipment or tool if required will be prepared by organization. Facilities planning and review will be done.

18. Organization will ensure that the existing gauges/measuring equipment is capable of measuring the characteristics for the new product made. If any new gauges/measuring equipment is required, then team will prepare a list of new gauges/measuring equipment for procurement and to be procured.

19. Organization will review whether any customer specified testing is needed and any additional test equipment are required for doing the testing. If any new test equipment is required, team will prepare a list of test equipment for procurement.

20. Organization will review the tooling/die/fixture requirements and identifies the existing tools/dies/fixtures and the tools/dies/fixtures to be manufactured for making the new product. This also includes any tooling/dies/fixtures, which have to be given to the subcontractor.

21. The following are the outputs at the end of Phase-2:* Drawings, specs

* Design FMEA * Preliminary list of special characteristics * Prototype control plan (if contracted to produce prototype parts) * Design verification plan * Design verification test results

* Design reviews* List of new equipment/facilities (if required)* List of new gauges/measuring equipment (if required)* List of new test equipment (if required)* List of tool /die/fixture

5

Page 6: APQP Training

22. Management review will be conducted at the end of Phase-2 to ensure the adequacy of all the activities done during phase-2.

Phase III- Process design and development

23. The APQP team will prepare Process Flow Diagram, Process FMEA, Special characteristics & Pre launch Control, Tool/ Die/ Fixture Drawing.

24. Organization will prepare work / operation instructions based on the activities required

25. Process development and Qualification will be done. 26. Organization will prepare floor plant layout.

27. Packaging drawings and specifications will be done as per the customer specified packaging standard (if provided) or internal standards by organization.

28. Any training required for the operators as part of the new process are identified by team and provided.

29. Prepare sample and submit to customer for initial verification with dimensional report.

30. Conduct MSA study (Bias, Linearity, Stability, Gage R & R) for similar type of components or have the plan for those studies at the time of PPAP sample.

31. Prepare preliminary capability study plan for special characteristics.

32. At the end of Phase-3, Leader along with the APQP team ensures that the following are available for conducting the Production part approval process.

TYPE REQUIREMENTSMan 1. Trained operatorsMachine 2. Facilities/equipment (including facilities at subcontractor)Method 3. Validated tooling (including tooling at subcontractor) Measurement 4. Calibrated gauges/measuring equipment

5. Test equipmentMaterial 6. Raw materials

7. Subcontractor processes developed and qualified.8. Packaging requirements

Atmosphere 9. Good housekeeping10. Any other environmental conditions (if any)

Documents 11. Drawings/specifications12. Process flow chart13. Process FMEA14. Control plans/any other customer equivalents15. Customer standards 16. List of special characteristics17. Work / Operation instructions

6

Page 7: APQP Training

33. Review is conducted at the end of Phase-3 to ensure the adequacy of all the activities done during phase-3.Phase IV- Product and Process validation

34. Production Part Approval Process will be followed as per the PPAP reference manual after tool/die/fixture validation or those can be verified thoroughly by lay out inspection of component. If the customer wants a different process to be followed, then it will be agreed during Quality systemsreview with the customer.

35. PPAP sample (quantity as agreed or 300 nos minimum) will be produced as per Pre launch Control plan, Work/ Operations instruction.

36. MSA studies (Bias, Linearity, Stability, Gage R &R) to be carried out, if it was planned in Phase 3.

37. Preliminary process capability studies ( Pp, Ppk) will be carried for special characteristics as per plan.

38. Dimensional, Performance testing or Production validation testing will be carried out.

39. One master sample of PPAP, will be kept.

40. Packaging evaluation will be done

41. PPAP sample will be sent to customer for approval with PSW (Part submission warrant).

42. If customer approves the PPAP part for regular production, then APQP team prepares the Production control plan and releases it to the shop floor.

43. Quality Planning sign off will be done.

44. Changes for which as agreed with the customer during Quality systems review, PPAP has to be submitted

Phase V- Feedback assessment and Corrective action.

45. If customer has not accepted the PPAP part, then relevant above activities have to be reviewed and make those effective for approval of customer.

46. Product quality planning data and experience will be used as an input for the future same type of product development.

Common activities:47. APQP timing plan initiated during Phase-1 will be reviewed and updated. and the progress of the product planning tracked. The review frequency will depend on the following:

* Type of the new product * Difference in the processes from the existing processes * Customer requirement date

7

Page 8: APQP Training

Failure Mode & Effects Analysis (FMEA)

Definitions & TypesFMEA is an analytical technique, which combines the technology and experience of several engineering disciplines in identifying foreseeable failure modes of a product or process and planning for its elimination.Mainly FMEA are Design FMEA and Process FMEA.

What FMEA will do:* Identify known and foreseeable failure modes.* Rank failures according to relative impact on the product.* Help to establish priorities based on expected failures and severity of those failures.* Help to uncover oversights, misjudgments and errors that may have been made.* Help to reduce development time and cost of manufacturing process by eliminating many potential failure modes prior to operation of the process and by specifying the appropriates tests to prove the designed product.

What FMEA will not:* Will not fix the identified problems.* Will not define the action that needs to be taken.* Will not replace the PDCA (Plan, Do, Check, Act) plan, which should be used to track major potential problems to resolution.

How to get started:Select 4 to 8 people who are knowledgeable of the process or the design to be used for a new process.

* Always best to include end users in the process.* Should be a team effort.

Design FMEA Process FMEACustomer End user, Design responsible

engineers or Higher assemblies or Mfg. Process responsible engineers in activities such as Mfg., Assembly, Service

End user, Subsequent or downstreamMfg. or Assembly operation

Assumptions Takes the technical / physical limits of a Mfg. / Assembly process into consideration

The product as designed will meet design intent

8

Page 9: APQP Training

PROCESS FMEA

What is it?A process potential FMEA is an analytical technique, utilized primarily by Manufacturing Responsible Engineer / Team as a means to assure that, to the extent possible; potential failure modes and their associated causes / mechanisms have been considered and addressed.

What it does?It

- Identifies the process functions and requirements.- Identifies potential product and process-related failure modes.- Assesses the effects of potential failures on the customer.- Identifies the potential manufacturing or assembly process causes and identifies process variables on which to focus controls for occurrence reduction or detection of the failure conditions.- Develops a ranked list of potential failure modes, thus establishing a priority system for preventive /corrective action considerations.- Documents the result of the manufacturing or assembly process.

Which customer is to be considered?“Customer” for a Process potential FMEA is seen as the ‘Next Process (NP)’, ‘Assembly’, ‘OEM’ and ‘Application / Vehicle’ or ‘government regulation’.

Team EffortDuring the initial process potential FMEA process, the responsible engineer is expected to direct and actively involve representatives from all affected areas.

Development of a Process FMEAFMEA begins by developing a list of what the process is expected to do and what it is expected not to do i.e. process intent.

FMEA details should include:* FMEA Number* Item* Process Responsibility* Prepared by* Model Year (s) / Vehicle (s)* Key Date* FMEA Date* Core Team

9

Page 10: APQP Training

Process Function/ Requirements* What is the process?* What is it supposed to achieve?

Potential Failure Mode* How can the process / part fail to meet the specification?* List each potential failure mode for the particular operation in terms of a component, subsystem, system or process characteristic.* Typical failure modes could be bent, Cracked, Handling damages, Surface too rough, Open circuited, Burred, Hole too shallow, Dirty, Deformed, Short circuited, Hole off-location, Hole missing, Hole too deep, Surface too smooth, Mis-labeled etc. Potential Effect (s) of Failure* In what form, would the customer define the failure?* What are the effects of this failure mode that the customer sees?* Typical failure effects could be

- Noise, Erratic operation, Effort, Operation impaired, Intermittent operation, Leaks, Rework /Repairs, Scrap, Rough, Excessive, Unstable, Inoperative, Draft, Poor appearance, Vehicle control impaired, Customer dissatisfaction etc., in case of final operation. - Can not fasten, Does not fit, Does not connect, Does not match, Can not mount, Can not bore/tap, Cannot face, Damages equipment, Causes excessive tool wear, endangers operator etc., in case of customer being next operation or subsequent operation.

SeveritySeverity is an assessment of the seriousness of the effect of the potential failure mode to the customer. Severity applies to the effect only.A reduction in Severity Ranking Index can be effected only through design change.Severity should be estimated on a “1” to “10”scale.

10

Page 11: APQP Training

Effect Criteria: Severity of effect(Customer Effect)

Criteria: Severity of effect(Manufacturing / Assembly Effect)

Rank

Hazardous without warning

Very high severity ranking when a potential failure mode affects safe vehicle operation and / or involves noncompliance with government regulation without warning

May endanger operator (machine or assembly) without warning

10

Hazardous withWarning

Very high severity ranking when a potential failure mode affects safe vehicle operation and / or involves noncompliance with government regulation with warning

May endanger operator (machine or assembly) with warning

9

Very High Vehicle / item inoperable, with loss of primary function.

100% of product may have to be scraped. Or Vehicle / item repaired in repair dept. with a repair time greater than one hour.

8

High Vehicle / item operable, but at a reduced level of performance. Customer very dissatisfied.

Product may have to be sorted and portion (less than 100%) scrapped. Vehicle / item repaired in repair dept. with a repair time between a half-hour and an hour.

7

Moderate Vehicle / item operable, but comfort / convenience item (s) inoperable. Customer dissatisfied.

A portion (less than 100%) of the product may have to be scrapped (no sorting) or Vehicle / item repaired in repair dept. with a repair time less than a half-hour.

6

Low Vehicle / item operable, but comfort / convenience item (s) operable at reduced level of performance.

100% of the product may have to be reworked. Or Vehicle / item repaired in offline but does not go to repair dept.

5

Very Low Fit & Finish / Squeak & Rattle item does not conform. Defect noticed by most customers (greater than 75%).

The product may have to be sorted, with no scrap and a portion (less than 100%) reworked.

4

Minor Fit & Finish / Squeak & Rattle item does not conform. Defect noticed by 50% of customers.

A portion (less than 100%) of the product may have to be reworked with no scrap, on-line but out-of-station.

3

Very Minor

Fit & Finish / Squeak & Rattle item does not conform. Defect noticed by discriminating customers (less than 25%)

A portion (less than 100%) of the product may have to be reworked with no scrap, on-line but in-station.

2

None No discernible effect Slight inconvenience to operation or operator, or no effect

1

ClassificationClassify any special product characteristics (e.g. Critical, Key, Major/ Significant) for components, subsystems or systems that may require additional process controls.If a classification is identified in the process FMEA, notify the design responsible engineer since this may affect the engineering documents concerning control item identification.

11

Page 12: APQP Training

Potential Cause (s) / Mechanism (s) of failure* What are the ways in which this process failure could occur?* Describe in terms of something that can be corrected / controlled.* Typical failure causes may be Improper torque (over, under), improper weld (Current, time, pressure), Inaccurate gauging, Improper heat treatment (time, temperature), Inadequate gating / venting, Inadequate or no lubrication, Part missing or mislocated, Worn locator, Worn tool, Chip on locator, Broken tool, Improper machine set up, Improper programming etc.

OccurrenceOccurrence is how frequently the specific failure cause / mechanism will occur.Occurrence should be estimated on a “1” to “10” scale.Probability of Failure Likely Failure Rate Ppk RankVery High: Persistent Failure 100 per thousand pieces < 0.55 10

50 per thousand pieces 0.55 9High: Frequent Failures 20 per thousand pieces 0.78 8

10 per thousand pieces 0.86 7Moderate: Occasional Failure 5 per thousand pieces 0.94 6

2 per thousand pieces 1.00 5 1 per thousand pieces 1.10 4

Low: Relatively Few Failures 0.5 per thousand pieces 1.20 3 0.1 per thousand pieces 1.30 2

Remote: Failure is Unlikely 0.01 per thousand pieces 1.67 1

Current Process ControlsWhat are the existing process controls that:

* Prevent to the extent possible the failure mode or cause/ mechanism of failure from occurring.* Detect the failure mode or cause / mechanism of failure

Controls can be process controls such as error / mistake proofing or Statistical Process Control (SPC) or can be post-process evaluation.Two types of process controls to be considered

* Prevent the cause / mechanism of failure or the failure mode from occurring, or reduce their rate of occurrence* Detect the cause / mechanism of failure or the failure mode, and lead to corrective action (s).

Once the process controls have been identified, review all prevention controls to determine if any occurrence rankings need to be revised.

DetectionDetection is the rank associated with the best detection control listed in process control column. In order to achieve a lower ranking, generally the planned process control has to be improved.

Detection should be estimated on a “1”to “10” scale.

12

Page 13: APQP Training

Detection Criteria: Insp Types

Suggested Range of Detection Methods Rank

A B CAlmost Impossible

Absolute certainty of non detection

X Cannot detect or is not checked 10

Very Remote

Controls will probably not detect

X Control is achieved with indirect or random checks only

9

Remote Controls have poor chance of detection

X Control is achieved with visual inspection only 8

Very Low Controls have poor chance of detection

X Control is achieved with double visual inspection only 7

Low Controls may detect

X X Control is achieved with charting methods, such as SPC.

6

Moderate Controls may detect

X Control is based on variable gauging after parts left the station, or Go / No Go gauging performed on 100% of the parts after parts left the station.

5

Moderate High

Controls have a good chance to detect

X X Error detection in subsequent operations, or gauging performed on setup and first piece check (for setup causes only)

4

High Controls have a good chance to detect

X X Error detection in-station, or error detection in subsequent operations by multiple layers of acceptance: supply, select, install, verify, and cannot accept discrepant part.

3

Very High Controls almost certain to detect

X X Error detection in-station (automatic gauging with automatic stop feature). Cannot pass discrepant part.

2

Very High Controls certain to detect

X Discrepant parts cannot be made because item has been error-proofed by process/product design.

1

A- Error Proofed, B- Gauging, C- Manual Operation

Risk Priority Number (RPN)RPN = SEVERITY (S) * OCCURANCE (O) * DETECTION (D)Within the scope of the individual FMEA, RPN will be between “1” and “1000”.For higher RPN, the team must undertake efforts to reduce through corrective action.Regardless of the resultant RPN, special attention should be given when severity high. Recommended Action(s)Intent is to reduce the severity, occurrence, and / or detection rankingAction such as following should be considered - Only a design and or process revision can bring about a reduction in the severity ranking.- To reduce the probability of occurrence, process and / or design revisions are required. An action-oriented study of the process using statistical methods could be implemented for continuous improvement and defect prevention.- To increase the probability of detection, use of error / mistake proofing / process and / or design revisions are required.

13

Page 14: APQP Training

Generally, improving detection controls is costly and ineffective for quality improvements. Increasing quality controls inspection frequency is not positive corrective action, should only be utilized as temporary measure, permanent corrective action is required. If engineering assessment leads to no recommended actions for a specific failure mode / cause/ control combination, indicate this entering “None” in this column.

Responsibility (for recommended action)Enter the organization and individual responsible for the recommended action and the target completion date.

Action takenAfter an action has been implemented, enter a brief description of the actual action and effective date.

Resulting RPN

Follow upThe process responsible engineer is responsible for assuring that all the actions recommended have been implemented or adequately addressed.

The process responsible engineer has several means of ensuring that concerns are identified and that recommended actions to be implemented. They include

* Ensuring that process / product requirements are achieved* Reviewing engineering drawings, process /product specification, process flow* Confirming the incorporation of changes in assembly/ manufacturing documentation* Reviewing control plans and operation instructions.

______________X______________

14

Page 15: APQP Training

Guidelines for preparation of “Process Flow Diagram”

1. Mention Serial No. 2. Mention Operation Description .

3. Mention Flow diagram with symbol

4. Mention Operation Sketch

5. Mention incoming source of variation

6. Mention Process Characteristics

7. Mention Product characteristics

Sl No. Operation

descriptionFlow diagram

Flow Sketch

Incoming Source of Variation

ProcessCharacteristic

Product Characteristic

15

Page 16: APQP Training

Guidelines to Carry out PFMEACorrective action (CA) for existing problemPreventive action (PA) for potential problem(1) Failure Mode

Opposite of desired outcome of that process Mention oversize / undersize in case of dimensional (if effect is same then no need to

differentiate) How much? Last six months problem should be covered.

(2) Effect Effect to be written for

o Next process (NP)o Assemblyo OEMo Vehicle / Applicationo Government Regulation

(3) Severity Follow guide lines for ranking severity number Circle the max no., which will be used for RPN calculation.

(4) Class Corresponds to product characteristic For those product characteristic having effect on Application or Customer

o Severity ranking 10, 9 - Critical , Safety, Government regulationo Severity ranking 8,7 – Significant / Major

(5) Cause Cause related to failure mode. Write those, which are related Incoming source of variation, mentioned in Process Flow Write those, which are related process characteristic

(6) Occurrence Check the data related to causes

o If exists, then straightway go to the Occurrence table and rank accordinglyo If it is not there,

Depending on the probabilities, give the ranking Not able to take decision in the meeting / confusion, then go to failure mode

data and give the same ranking to all causes Check the rejection percentage corresponding to that failure mode

o If it exists, then straightway go to the occurrence table and rank accordinglyo If it is not existed, then go by probability

For each cause, there will be one occurrence no.(7) Current process Control

If the cause happens then what is the method, we have to detect the cause? What is the method do we have to prevent the cause? What is the method; do we have to detect the failure mode?

16

Page 17: APQP Training

Note: Difference between prevention and detection:Example: There is a sensor to stop the production process, if anything goes wrong- DetectionIf something goes wrong, but sensor doesn’t allow to stop the production or no inconsistency in production criteria, then it is ’Prevention’.

(8) Detection Whenever cause occurs, would it detect? Rank as per table

(9)Risk Priority Number (RPN)RPN = S X O X D

(10) Recommended Action To be taken, only when occurrence no. is more than 3, preferably; because our ultimate aim

is to reduce the frequency of cause’s occurrence. It should be completed within target date

Outcome of the PFMEA List of critical, significant or major and key characteristics of the part List of recommended action to be implemented

Customer Complaint & Rejection AnalysisCustomer Complaint Rejection

Directly from customer Field failure

Effect on Application / Vehicle

Failure Mode Identify failure mode Failure mode

Identify Causes

Look for Preventive controlLook for Detection control

Corrective ActionCorrective Action Impact

------------------------X------------------------

17

Page 18: APQP Training

Guideline to carry out CONTROL PLAN1. Copy the Process No. and Process Description from Process Flow.

2. Write the Process machine/ Device/ Jig/ Tool used for doing that Process.

3. Go to the Process FMEA. Copy the first product characteristics for that process into Product characteristic column of Control Plan.

4. Copy the Potential Causes of FMEA into Process characteristics of Control Plan.

5. Copy the Class Column of FMEA into Special Characteristics column of Control plan.

6. Write Product specification from drawing against Product characteristic.

7. Write the Process specification if applicable in the same column.

8. Write the evaluation / Measuring Equipment used for controlling Product and Process characteristic.

9. Write control method (prevention and detection) used for controlling product and Process characteristic.

10. Write Reaction Plan for Product and Process characteristic when it goes out of specification.

18

Page 19: APQP Training

Production part Approval Process (PPAP)Purpose:To determine whether all customer engineering design record and specification requirements are properly understood by the organization &whether process has the potential to produce product consistently meeting the requirements during an actual production run as quoted production rate.

Section II.1 GeneralOrganization shall obtain full approval from the customer for

A new part or product Correction of a discrepancy on a previous submitted part Product modified by an engineering change to design records, specification or materials

I.2 PPAP Process requirements:I.2.1 Significant Production Run:Product run shall be from 1 hour to 8 hours of production with 300 minimum consecutive parts or specified by customer. Run shall be manufactured at the production site using productionised tooling, gaging, process, materials and operators from the production environment.

I.2.2 PPAP requirementsOrganization shall meet all specified requirements. Blanket statements of conformance are unacceptable for any test results. All records shall be in a PPAP part file or referenced in such file, which will be readily available.

I.2.2.1 Design RecordsOrganization shall have all design records.

I.2.2.2 Any authorized Engineering Change DocumentOrganizer shall have any authorized engineering change documents not yet recorded in the design record but incorporated in the product, part or tooling.

I.2.2.3 Engineering Approval, when requiredWhere specified by the design record, organization shall have evidence of customer engineering approval.

I.2.2.4 Design FMEA (for design responsible)

I.2.2.5 Process Flow DiagramProcess flow diagram in organization-specified format that clearly describes the production process steps and sequence, as appropriate and meets the specified customer needs, requirements and expectation.

I.2.2.6 Process FMEAAs per PFMEA manual

I.2.2.7 Dimension ResultsOrganization shall provide the evidence that dimensional verifications required by the design record (Layout inspection) and Control Plan has been completed and results indicate compliance with specified requirements.

19

Page 20: APQP Training

Organization shall identify one of the parts measured as the master sample.

I.2.2.8 Record of Material / Performance test resultOrganization shall have records of material / performance/ functional test specified on design records or Control Plan.In Material test result, wherever chemical, physical or metallurgical requirements specified by design record or control plan to be verified form in-house laboratory or outside-accredited laboratories. Material test report shall indicate

Design record change level of parts tested, number, date, change level of specification date on which the testing took place material subcontractor’s name

In Performance test result, whatever specified by design record or control plan to be verified form in-house laboratory or outside-accredited laboratories. Performance test report shall indicate

design record change level of parts tested, number, date, change level of specification any authorized engineering change documents that have not yet been incorporated in the

design record. date on which the testing took place

I.2.2.9 Initial Process StudiesI.2.2.9.1 The level of initial process capability or performance to be evaluated for special characteristics only. Organization shall use calibrated measuring instrument with permissible measurement uncertainty.

I.2.2.9.2 Quality IndicesCpk – Capability Index for a stable processPpk performance indexShort-term studies

I.2.2.9.3 Acceptance Criteria for Initial StudyFor appearing stable process (Ppk) or stable process (Cpk)

Results Interpretation

>1.67 Process currently meets Customer requirements. After approval, begin production and follow control plan

1.33 to 1.67

Process is currently acceptable, but may require some improvement

<1.33 Process does not currently meet the acceptance criteria

I.2.2.9.4 Unstable processAn unstable process does not meet customer requirements. Supplier shall identify the nature of instability, evaluate and wherever possible eliminate special causes of variation prior to PPAP submission.

I.2.2.9.5 Process with one-sided specification or Non Normal DistributionOrganization shall establish an alternative acceptance criterion or different type of index or some method of transformation data for special characteristics which are not bilateral equidistant tolerance or non normal distribution.

20

Page 21: APQP Training

I.2.2.9.6 Strategy when acceptance criteria are not satisfiedOrganization shall submit corrective action plan and a modified control plan providing 100% inspection. Continue variation reduction efforts till Cpk greater than equal to 1.33.

I.2.2.10 Measurement System Analysis StudiesOrganization shall carry our Bias, Linearity, stability, gage R & R for all equipment used for measurement or performance test.

I.2.2.11 Qualified laboratory RequirementsOrganization shall have laboratory scope, policy and documentation as per QS 9000 (4.10.6 and / or 4.10.7)

I.2.2.12 Control Plan

I.2.2.13 Part Submission Warrant (PSW)Separate PSW shall be completed for each customer part numberIf production parts will be produced from more than one cavity, mould, tool, die, pattern or production process (e.g. line or cell) organization shall complete dimensional evaluation on one part from each with identified “Mold/ Cavity/ Production Process”.

I.2.2.13.1 Part WeightOrganization shall record part weight upto 4 decimal places unless otherwise specified by customer.

I.2.2.14 Appearance Approval Report (AAR)Appearance approval report to be completed for each part or series of parts for which submission required for parts with color, grain or surface appearance requirements.

I.2.2.15 Bulk Material Requirements checklist (apply only to bulk material only)

I.2.2.16 Sample Production Parts:Organization shall provide sample product as requested by the customer and as defined by the submission request.

I.2.2.17 Master Sample:Organization shall retain a master sample for the same period as the production part approval records, or until a new master sample is produced for the same customer part number for customer approval or where a master sample is required by design record, control plan or inspection criteria, as a reference or standard.Master sample shall be identified with approval date on the sample. Organization shall retain a master sample for each position of a multiple cavity die, mold, tool or pattern or production process unless otherwise specified by customer.

I.2.2.18 Checking Aid:Organization shall certify that aspects of the checking aids agree with part dimensional requirements.

I.2.2.19 Customer-Specific Requirement:Organization shall have the records of compliance to all applicable customer specific requirements.

21