Page 1: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

IAIA 2015

Page 2: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

EIA ALTERNATIVE ANALYSIS: CASE STUDIES

Pedro BettencourtNuno SilvaMaria Grade

Page 3: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

1. INTRODUCTION

Page 4: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Alternative Analysis – key issue of EIA

• Successful cases of EIA Alternatives Analysis demonstrate that this effort,

when serious and profound, has very positive effects

• Two examples of good practise in this matter are:

� EIA of Western Bahia Motorway System (Brazil)

� EIA of Mira Estuary Dredging Works (Portugal)

� EIA of Western Bahia Motorway System (Brazil)

� EIA of Mira Estuary Dredging Works (Portugal)

• Following the case studies presentation, a discussion is shown

4

Page 5: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

2. Case Study I: Western Bahia MotorwaySystem

(Brazil)

Page 6: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Location of Bahia West Road System

6

Page 7: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Definition of four Alternative Corridors

7

Page 8: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Definition of 15 Locational / Technical Alternatives

Page 9: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Multi-criteria selection of Corridors and Alternatives

Domain Environmental factor

Alt. 1.1

Alt. 1.2

Alt. 2 Alt. 3 Alt. 4.1 Alt. 4.2 Alt. 5.1 Alt. 5.2 Alt. 6

Air and Noise 3.3

Physical Geol./Geot.

Geomorphology 3.1 4.2.1

Soils 3.1 4.1.1 or 4.2.1

Seismicity

Surface water(quantitative)

3.1 4.1.1 or 4.2.1

Surface water(qualitative)

4.2.1

Growndwater

Sediments

OceanographyAlts. w/ bridge

Alt. w/ bridge

Biological Land Flora 3.1 4.1.1 4.2.1

Land Fauna 3.1 4.1.1 4.2.1

Aquatic Biota3.1 (Alt.

w/ bridge)4.2.1

ConservationAreas

4.2.1

Social Socioeconomy 3.2 4.1.2 4.2.2

Corridor III

Note: Green color indicates the preferential alternative(s) for each factor

Page 10: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Refined Seletion of Alternatives

AlternativesDomain

Physical Biological Social

3.1

3.2

3.3

4.1.1

4.1.2

4.1.3

4.2.1

4.2.2

PreferentialLessfavorable

Notadvisable

10

Page 11: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Final configuration

Page 12: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

3. Case Study II: Mira Estuary Dredging Works

(Portugal)

Page 13: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Location of Mira River Estuary

13

Page 14: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

The main problem : Erosion and dune degradation

14

Page 15: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Understanding the causes of the problem

15

Strong outflow currents

Page 16: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Alternative A: Dredging Works and beachrehabilitation

16

A

Page 17: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Alternatives B and C: Dredging Works / beach and dune rehabilitation

17B C

Page 18: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Multi-criteria analysis for the dunes rehabilitation

18

Page 19: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

4. Discussion

Page 20: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Sucessful cases – The exception

The shown cases demonstrate how EIA Alternative Analysis can :

• minimize negative impacts

• maximize benefits

20

However:

successful cases of detailed and participative EIA Alternative Analysisare, unfortunately, an exception

In most cases EIA Alternative Analysis is simply not done or is doneimproperly

However:

successful cases of detailed and participative EIA Alternative Analysisare, unfortunately, an exception

In most cases EIA Alternative Analysis is simply not done or is doneimproperly

Page 21: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Growing challenges in a world ofaccelerating development

• In many countries, a very rapiddevelopment is observed

• The best practise in EIA are oftennot followed , particularly onAlternative Analysis

• Nemus’ experience in Africa andSouth America has allowed to take consciousness that significantsocial and environmental impactshave been produced

Despite EIA process, the best technical and locational options for most interventions are not chosen

Despite EIA process, the best technical and locational options for most interventions are not chosen

21

Page 22: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

Need for new approaches in the future

• National governments

• Multinational organizations and

• Financial institutions

Should give more attentionto the process of AlternativeAnalysis as a critical tool inthe EIA process

Should give more attentionto the process of AlternativeAnalysis as a critical tool inthe EIA process

22

Page 23: Apresentacao IAIA 2015-Alternatives...Final configuration. 3. Case Study II: Mira Estuary Dredging Works (Portugal) Location of Mira River Estuary 13. The main problem: Erosion and

THANK YOU!