We build the future

Page 2: Apresentacao Ingles Infra Agosto10

HISTORY

1940 - Mr Avelino Gomes do Monte started his activity in public work

1980 – Mr Manuel and Mr Alípio do Monte carried on Mr Avelino Gomes do Monte’s legacy

1980 – The 2 Monte brothers found the company Monte & Monte – nowadays Monte Group

1996 – Internationalisation in CAPE VERDE

1999 - Launch of the Group's participation in road concessions by AENOR. We attend the following

holdings with Auto-Estrada da Costa de Prata, SA, Lusoscut - Auto-Estradas do Grande Porto, SA,

Lusoscut - Auto-Estrada das Beiras Litoral e Alta SA, LusoLisboa - Auto-Estrada da Grande Lisboa, SA

Douro e AENOR - Auto-Estradas do Douro Interior, S. A.

We build the future 2

Page 3: Apresentacao Ingles Infra Agosto10

3

HISTORY

2002 – The first steps for Monte & Monte internationalisation in ANGOLA

2004 – MonteAdriano Group develops Water utilities businesses through INDAQUA

2005 – MonteAdriano Group registers its branch in ROMANIA becoming an autonomous

company in the country

2007 - The family Monte acquires 100% of the MonteAdriano Group

2008 – MonteAdriano Group inaugurates 169 km of road in HUAMBO – ANGOLA

We build the future

Page 4: Apresentacao Ingles Infra Agosto10

4

HISTORY

2008 - MonteAdriano Group registers its branch business in MOROCCO, giving autonomy to

business in the country; MAEC first company in the field of engineering and construction to

obtain international certification

2009 - Creation of companies MonteAdriano BRAZIL and MonteAdriano OMAN.

2010 – Creation of companies MonteAdriano Mozambique and MonteAdriano São Tomé e

Príncipe.

We build the future

Page 5: Apresentacao Ingles Infra Agosto10

ENGINEERING&

CONSTRUCTION

AGGREGATES&

INDUSTRY

ENVIRONMENT &

ENERGY

REAL ESTATE&

TOURISMCAPITAL

MONTE, SGPS, SA

CONCESSIONS

MONTEADRIANO SGPS, SA

We build the future

ORGANISATION CHART

5

Page 6: Apresentacao Ingles Infra Agosto10

We build the future

DETAILED ORGANISATION CHART

BU Engineering&

Construction

BU Aggregates&

Industry

BU Environment &

Energy

BU Real Estate & Tourism

BU Concessions

• MonteAdriano Eng. & Construção, SA;

• MAEC - Angola Branch

• MAEC – C. Verde Branch

• MAEC – Romania Branch

•GPC, SRL (Romania)

• Betominho, SA

• GC, SA

• Habimarante, SA

• Fundasol, SA

• Constrotúnel, SA

• Geoexperts, Lda

• Firmes do Miño, SA

• Ecovisão, Lda

• Ecovisão Angola, Lda

• Resurb, Lda

• Ambisys, SA

• GeVRAFI, SA

• Adicionagest, SA

• Hidrante

• MonteAdriano Agregados, SA

• MonteAdriano Agregados de Angola, Lda

• Descavanor, SA

• ICV, Lda

•Betão STP, SA

• AENOR, SA

• Lusoscut Grd. Porto, SA

• Lusoscut Costa Prata, SA

• Lusoscut Beiras Litoral/Alta, SA

• Lusolisboa – Grd. Lisboa, SA

Road

Parking

• Parque Eça, SA

• IMACA, Lda

• EP Construções, SA

• Imorobaina, SA

• Incentivo, SA

• Montinveste, SA

• Montinveste Angola, SA

6

BU Capital

• MonteCar Service, Lda

• Monte Serviços Partilhados, SA

• Panidoce, Lda

•NósMonte, SA

•Montinovação, SA

Page 7: Apresentacao Ingles Infra Agosto10

INTERNACIONALISATION

MonteAdriano Group internationalisation is a recent achievement.

Nowadays it’s present in 10 markets:

• Portugal• Angola• Cape Verde• Morocco• Romania• Spain• Oman• Brazil• S. Tome and Principe• Mozambique

The Group is studying other markets, where it may develop its activity. However, strategically,

it wants to strengthen its position in the above-mentioned markets.

We build the future7

Page 8: Apresentacao Ingles Infra Agosto10

We build the future

MAIN CONSOLIDATED INDICATORS

More than 353 million EUR of consolidated invoicing in 2009

More than 2600 Employees, in 7 geographical areas

8

263.6

343.1 353.6

0

50

100

150

200

250

300

350

400

2007 2008 2009

Mill

ion

s €

TURNOVER

783

1

338

3

1373

132 5

Angola Brasil Cabo Verde Marrocos

Portugal Romenia Omã

Geographical Distributions RH’s

Page 9: Apresentacao Ingles Infra Agosto10

ENGINEERING & CONSTRUCTION

2008 - 308 million EUR

TURNOVER:

2009 - 336 million EUR

We build the future 9

First company in the area with international certification

Page 10: Apresentacao Ingles Infra Agosto10

Eg. A17

Eg. structural works

We build the future

MonteAdriano Eng. & Const. – the Operation

• In the last years, MonteAdriano participated actively in

• The construction of infrastructures

• Drainage and water supply projects

• 6 road concessions (motorways)

10

Page 11: Apresentacao Ingles Infra Agosto10

We build the future

MonteAdriano Eng. & Const. – the Operation

• Infrastructure Works

- This area is one of the most productive pillar of MonteAdriano Engenharia e Construção, for

which the company is particularly endowed with human and material resources. Long

experience gives MonteAdriano the ability to deal with this type of work, with levels of

performance and remarkable perfection.

11

Page 12: Apresentacao Ingles Infra Agosto10

We build the future

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

12

Eg. Pretarouca Dam

This new infrastructure integratesBalsemão System and serves thetowns ofLamego, Tarouca, Resende, easternpart of Cinfães, Castro D'Aire and Vila Nova de Paiva, a total population of118 146 inhabitants.

Beyond the Pretarouca Dam, theBalsemão System consists of DrinkingWater Treatment Plant with a treatment capacity of 19,872 m3/day, 3 Pumping Stations, a Pipeline System about 145 km long, and 3 reservoirs.

Page 13: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

Eg. Odelouca Dam

The Odelouca Dam stores water from a basin of 393 km2, a reservoir with approximately 7.8 km2. The water is then transported by 8.15 km tunnel Odelouca- Funcho until it intersects the adductorAlcantarilha, 200 m downstream of the dam's Funcho. After over 11.5 kilometers, the water reservoir reaches Odelouca Water Treatment Plant of Alcantarilha, where is treated and distributed to municipalities.

We build the future13

Page 14: Apresentacao Ingles Infra Agosto10

Eg. Sambade Dam Eg. Water Treatment Station Sambade

The Sambade system serves a population of 5440 inhabitants, including the municipal Alfandega da Fé and Vila Flor, andbeyond the dam Sambade, there is a Water Treatment Plant with a treatment capacity of 2793 m3/day, 2 PumpingStations, a Pipeline System with about 20 km long and 2 tanks.

We build the future

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

14

Page 15: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

We build the future15

Eg. Wastewater Treatment Station Serzedelo

Page 16: Apresentacao Ingles Infra Agosto10

Eg. Wastewater Treatment Station Ave

This Wastewater Treatment will serve the Ave municipalities in Povoa de Varzim and Vila do Conde, covering a population of about 258.000 inhabitants in the high season, and 184.000 in the low season.

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

We build the future16

Page 17: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

Eg. Rabagão Water Treatment Plant

We build the future17

Eg. S. Jorge Water Treatment Plant

Page 18: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

Eg. Detail of reservoir pipes – EDIA - Alqueva

We build the future18

Page 19: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

Eg. Water supply, collection, treatment and disposal of wastewater - INDAQUA

We build the future19

Page 20: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

Eg. Landfill of Alto Tamega

We build the future20

Page 21: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

Eg. Valorlis

We build the future21

Page 22: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

Eg. Suldouro

We build the future22

Page 23: Apresentacao Ingles Infra Agosto10

MonteAdriano Eng. & Const. – the Operation - Infrastructure Works

Eg. Aquiculture Unit – Pescanova

The largest unit of world aquiculture production of turbot.

We build the future23

Page 24: Apresentacao Ingles Infra Agosto10

24

MonteAdriano Eng. & Const. – the Operation

> The six road concessions total 847 km of roads, highways and complementary, involving a total

investment of 5041 million EUR. It is the Group's aim to expand this business, so we are committed

to the development and implementation of new projects that may also pass through

diversification.

We build the future

SUBCONCESSÃO DO DOURO INTERIOR

Page 25: Apresentacao Ingles Infra Agosto10

25

MonteAdriano Eng. & Const. – the Operation

> Aenor - Highway North, SA - extension: 175 km

> Lusoscut - Motorways of the Silver Coast, SA - extension: 110 km

> Lusoscut - Motorways of Porto, SA - extension: 56 Km

> Lusoscut - Highway Beiras Litoral e Alta SA - extension: 173 km

> LusoLisboa - Motorways of the Grande Lisboa, SA - extension: 25 + 66 km

> Aenor Douro - Motorways of the Douro Interior, SA - extension: 242 km

We build the future

Page 26: Apresentacao Ingles Infra Agosto10

AGGREGATES & INDUSTRY

We build the future

2008 - 37 million EUR

TURNOVER:

2009 – 31,6 million EUR

26

Page 27: Apresentacao Ingles Infra Agosto10

We build the future

MonteAdriano Agregados – the Operation

• In Portugal, MonteAdriano Agregados has 8 production plants, strategically distributed in the Central Northern region of Portugal.

• Internationally, in the market of Angola, the Group has 7 production plants, namely Pedreira do Tombo, do Libongos, da Cuca and in Benguela. A Concrete and Bituminous Plant in Huambo, a Concrete Plant in Benguela and a Bituminous Plant in Viana.

27

Page 28: Apresentacao Ingles Infra Agosto10

ENVIRONMENT & ENERGY

A recent area, plenty of growth

potential, either in Portugal or

abroad, namely in Angola.

We build the future

2008 – 8,5 million EUR

TURNOVER:

2009 – 10,3 million EUR

28

Page 29: Apresentacao Ingles Infra Agosto10

29

ECOVISÃO

• Ecovisão is a company whose areas of influence are:

Environment, Quality, Safety and Health at Work, Road

Surveys, Archaeology, Vocational Training, Implementation of

Management and Ecotourism Systems.

We build the future

Page 30: Apresentacao Ingles Infra Agosto10

We build the future

RESURB

•RESURB – Ambiente, Lda. is an Angolan company of the MonteAdriano Group, founded in 2007

It resulted from the increasing need to execute, in a correct way, in terms of technique and environment:

• collection management of Solid Waste

• treatment solutions and final destination of waste

• preservation of green areas and public cleansing.

30

Page 31: Apresentacao Ingles Infra Agosto10

ECOVISÃO - ANGOLA

•Ecovisão Angola works in Environmental Provision Services, Water Treatment and

Monitoring, Vocational Training and Environment and Public Health Awareness

Campaigns, Landscape Projects, Regional Planning and Ecotourism.

We build the future 31

Page 32: Apresentacao Ingles Infra Agosto10

AMBYSIS, SA

It works as a complement to the services performed by Ecovisão, namely in Environmental Bio/Technology area (waste and liquid effluent treatment,reusing or not the energy).

32We build the future

Page 33: Apresentacao Ingles Infra Agosto10

33

GEVRAFI and GINTEGRAL

• Management of industrial, agricultural and forestry waste;

• Development of wast management projects;

• Recycling of sludge in agriculture and forests;

• Degraded soils recovery projects.

We build the future

Page 34: Apresentacao Ingles Infra Agosto10

INDAQUA

•Water concessions are a participation of the Group

with Mota-Engil and Soares da Costa;

• INDAQUA is present in Angola, in partnership with

BPA. through Vista Water

We build the future 34

Page 35: Apresentacao Ingles Infra Agosto10

CAPITAL & SERVICES

We build the future

2008 – 4,7 million EUR

TURNOVER:

2009 – 10,9 million EUR

A business area that takes advantage of

new investment opportunities and/or

works as company incubator.

35

Panidoce

Page 36: Apresentacao Ingles Infra Agosto10

REAL ESTATE & TOURISM

EP CONSTRUÇÕES

EDIFÍCIO S. PAULO EDIFÍCIO TPA

EDIFÍCIO DA ILHA ETONA

We build the future

2008 – 9,7 million EUR

TURNOVER:

2009 – 8 million EUR

36

Page 37: Apresentacao Ingles Infra Agosto10

We build the future

REAL ESTATE & TOURISM – THE OPERATION

•Besides its influence on residential and commercial buildings, services and tourism, it has a

strong international presence, with the same level as MonteAdriano Engenharia &

Construção, and also gives great relevance to Angola;

•It is strongly based on the international field, in which 77% of the foreseen investment comes from abroad, specially from Angola.

• Real estate investments include strategic partnerships for various regions. At this moment, MonteAdriano Group has 4 partnership groups in the scope of its real estate activity.