april 2014 amended november 2016 - rtc: home page 1‐1: map of skamania county location .....5...
TRANSCRIPT
Regional Transportation Plan for
Skamania County, Washington
April 2014 Amended November 2016
Southwest Washington Regional Transportation Council
Regional Transportation Plan for
Skamania County, Washington
Skamania County, Washington
Published: May2014 Amended: November 2016
Southwest Washington Regional Transportation Council
Street Address Mailing Address1300 Franklin Street
Vancouver, WA 98660 P.O. Box 1366
Vancouver, WA 98666‐1366
Phone: 360‐397‐6067 Fax: 360‐397‐6132
http://www.rtc.wa.gov
Clark County
Skamania County
Klickitat County
City of Vancouver
City of Camas
City of Washougal
City of Battle Ground
City of Ridgefield
City of La Center
Town of Yacolt
City of Stevenson
City of North Bonneville
City of White Salmon
City of Bingen
City of Goldendale
C‐TRAN
Washington DOT
Port of Vancouver
Port of Camas‐Washougal
Port of Ridgefield
Port of Skamania County
Port of Klickitat
Metro
Oregon DOT
14th Legislative District
17th Legislative District
18th Legislative District
20th Legislative District
49th Legislative District
Introduction ii
Regional Transportation Plan for Skamania County
Preparation of this Report was funded by grants from the Washington State Department of Transportation and local funds from RTC member jurisdictions.
Title VI Compliance The Southwest Washington Regional Transportation Council (RTC) assures that no person shall, on the grounds of race, color, national origin, or sex as provided by Title VI of the Civil Rights Act of 1964 and the Civil Rights Restoration Act of 1987 (P.L. 100.259), be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity. RTC further assures that every effort will be made to ensure nondiscrimination in all of its programs and activities, whether or not those programs and activities are federally funded.
Americans with Disabilities Act (ADA) Information
Materials can be provided in alternative formats by contacting the
Southwest Washington Regional Transportation Council (RTC)
at 360‐397‐6067 or [email protected].
Introduction iii
Regional Transportation Plan for Skamania County
Table of Contents Chapter 1: Introduction: RTP Vision, Purpose and Goals .......................................................... 1
Vision ...................................................................................................................................................................... 1Purpose ................................................................................................................................................................... 1Goals ....................................................................................................................................................................... 2
Management Plan for the Columbia River National Scenic Area ..................................................................... 3SR‐14 Corridor Management Plan ................................................................................................................... 3
Transportation Strategy .......................................................................................................................................... 3Guidelines and Principles ........................................................................................................................................ 4Scope ...................................................................................................................................................................... 4Transportation Issues Addressed in RTP ................................................................................................................. 5Statutory Requirements ......................................................................................................................................... 6
State ................................................................................................................................................................. 6Intergovernmental Coordination .......................................................................................................................... 10
Skamania County Transportation Policy Committee ..................................................................................... 10Bi‐State Coordination ..................................................................................................................................... 11
Skamania County Regional Transportation Plan: Work Plan ................................................................................ 11
Chapter 2: Land Use, Growth and Transportation .................................................................. 13Land Use and Transportation ............................................................................................................................... 13
Management Plan for Columbia River Gorge National Scenic Area .............................................................. 14Growth and Development .................................................................................................................................... 15
Growth in Skamania County .......................................................................................................................... 15General Land Uses in Skamania County................................................................................................................ 16Planned Land Use ................................................................................................................................................. 17Population and Employment Forecast.................................................................................................................. 18Demographic and Travel Trends ........................................................................................................................... 18
Chapter 3: Identification of Regional Transportation Needs .................................................. 21Current Functional Classification of the Regional Roadway System .................................................................... 21
Rural Principal Arterials .................................................................................................................................. 22Rural Minor Arterials ...................................................................................................................................... 22Rural Major Collector Roads .......................................................................................................................... 22Rural Minor Collector Roads .......................................................................................................................... 22Rural Local Roads ........................................................................................................................................... 22
Designation of the RTP Regional Transportation System ..................................................................................... 23Rural Major Collectors ................................................................................................................................... 24Forest Service Road System ........................................................................................................................... 24Port Facilities .................................................................................................................................................. 24Airport Facilities ............................................................................................................................................. 25Bridges ........................................................................................................................................................... 25
Introduction iv
Regional Transportation Plan for Skamania County
Columbia River ............................................................................................................................................... 25Public Transportation ..................................................................................................................................... 26Rail Facilities ................................................................................................................................................... 26Enhancements ............................................................................................................................................... 27
Growth in Traffic Volumes .................................................................................................................................... 27Future Travel Demand .......................................................................................................................................... 28Levels of Service .................................................................................................................................................... 28Level of Service Standards .................................................................................................................................... 29Capacity Analysis .................................................................................................................................................. 30Safety Analysis ...................................................................................................................................................... 30
Unstable Slopes .............................................................................................................................................. 32Tunnels ........................................................................................................................................................... 32Trucks ............................................................................................................................................................. 33
Preservation and Maintenance Need ................................................................................................................... 33Enhancement Need .............................................................................................................................................. 34Economic Development Need .............................................................................................................................. 34
Chapter 4: Financial Plan ....................................................................................................... 37Overview ............................................................................................................................................................... 37Challenges and Accomplishments ........................................................................................................................ 37Revenue Sources ................................................................................................................................................... 38
Federal Funding ............................................................................................................................................. 38State Funding ................................................................................................................................................. 39Local Funding ................................................................................................................................................. 41Transit Revenues ............................................................................................................................................ 42
Revenue Assumptions .......................................................................................................................................... 42Cost Assumptions ................................................................................................................................................. 44Balancing Revenue and Cost ................................................................................................................................. 44
Chapter 5: System Improvement and Strategy Plan ............................................................... 47Overview ............................................................................................................................................................... 47Maintenance ......................................................................................................................................................... 47Improvements ...................................................................................................................................................... 48Illustrative ............................................................................................................................................................. 48Miscellaneous Strategies and Solutions ............................................................................................................... 49
Bridge Deficiencies ......................................................................................................................................... 49Safety Deficiencies ......................................................................................................................................... 49Economic Development and Freight Transportation Deficiencies ................................................................. 49Non‐Motorized Transportation Deficiencies ................................................................................................. 50Transit Deficiencies ........................................................................................................................................ 50
Conclusion ............................................................................................................................................................ 50
Chapter 6: Performance Monitoring ...................................................................................... 53
Introduction v
Regional Transportation Plan for Skamania County
Overview ............................................................................................................................................................... 53Safety .................................................................................................................................................................... 53Capacity Analysis .................................................................................................................................................. 53Preservation and Maintenance ............................................................................................................................ 54Special Studies ...................................................................................................................................................... 54
Chapter 7: Plan Development and Implementation ............................................................... 55Public Involvement in Regional Transportation Planning Process ........................................................................ 55RTP Implementation ............................................................................................................................................. 55RTP Update Process .............................................................................................................................................. 55
Glossary ................................................................................................................................ 57
List of Figures Figure 1‐1: Map of Skamania County Location ....................................................................................................... 5Figure 1‐2: Agency Structure ................................................................................................................................ 10Figure 1‐3: RTP Process ......................................................................................................................................... 12Figure 2‐1: Land Use/Transportation Cycle .......................................................................................................... 13Figure 2‐2: Growth in Skamania County ............................................................................................................... 16Figure 2‐3: Population, Housing & Employment, 1980 to Forecast 2030 ............................................................. 18Figure 4‐1: Transportation Revenue and Cost, 2014‐2035 ................................................................................... 45
List of Tables Table 2‐1: Skamania Workflow by County ............................................................................................................ 19Table 2‐2: Work Travel Mode ............................................................................................................................... 20Table 3‐1: Skamania County Public Railroad Crossings ........................................................................................ 27Table 3‐2: Traffic Volumes‐All Day (ADT) .............................................................................................................. 27Table 3‐3: Deficient Capacity Segment ................................................................................................................. 30Table 3‐4: Deficient Safety Segments, 2010‐2012 ................................................................................................ 31Table 3‐5: Rockfall Hazard Locations .................................................................................................................... 32Table 4‐1: Projected Revenue ............................................................................................................................... 43Table 4‐2: Projected Costs .................................................................................................................................... 44Table 5‐1: Transportation Improvement Projects ................................................................................................ 51Table 5‐2: Illustrative Needs ................................................................................................................................. 52
Introduction vi
Regional Transportation Plan for Skamania County
Skamania County Transportation Policy Committee
Policy/Mission Statement
TheCommitteesupportstheimprovementofsafetyandefficiencyoftheregionaltransportationsysteminSkamaniaCounty.
TheCommitteesupportstransportationplanningandprojectdevelopmentthataddressestheimprovementofpublicsafetyalongtheregionaltransportationsystem.
TheCommitteesupportstheidentificationof“corridorsegments”throughouttheSkamaniaCountyregion,whichshouldbethefocusoftransportationimprovement,enhancement,multimodal,andmobilityfunding.
TheCommitteesupportsthecoordinationbetweenagenciesinidentifyingandaddressing,whenpractical,theneedsofamultimodaltransportationsystem.
Skamania County Member Jurisdictions SkamaniaCountyCityofNorthBonnevilleCityofStevensonPortofSkamaniaCountyWashingtonStateDepartmentofTransportation
Skamania County Transportation Policy Committee Members DougMcKenzie SkamaniaCountyCommissionerBenShumaker CityofStevenson,PlanningDirectorStevenHasson NorthBonneville,CityManagerPatAlbough PortofSkamaniaCounty, ManagerKrisStrickler WSDOT,SWRegionAdministrator
Staff and Other Participants: DevinReck WSDOT,SWRegionKenBurgstahler WSDOT,SWRegionMichaelWilliams WSDOT,SWRegionLarryDouglass SkamaniaCounty,PublicWorksTimHomann SkamaniaCounty,PublicWorksArleneJohnson SkamaniaCounty,SeniorServicesEricHansen CityofStevenson,PublicWorksPaulKoch PortofCascadeLocks,GeneralManagerMichelleSpatz MCEDD,Mobility ManagerMattRansom RegionalTransportationCouncilDaleRobins RegionalTransportationCouncil
Chapter 1: Introduction: RTP Vision, Purpose and Goals 1
Regional Transportation Plan for Skamania County
Chapter 1: Introduction: RTP Vision, Purpose and Goals
TheRegionalTransportationPlan(RTP)forSkamaniaCountyistheregion’sprincipaltransportationplanningdocument.ItrepresentsaregionaltransportationplanforSkamaniaCountyareadevelopedthroughacoordinatedprocessbetweenlocaljurisdictionsinordertodevelopregionalsolutionstotransportationneeds.ThefirstRTPforSkamaniaCountywasadoptedinApril1995.ThisupdatetotheSkamaniaCountyRTPwilluse2035asthehorizonyearandincorporatethelatestavailabledata.TheRTPisintendedtobeaplantomeetthetransportationneedsoverthenext20yearsbyimplementingaregionaltransportationplanningprocess.Thisintroductorychapterpresentsthevision,purpose,goals,scope,statutoryrequirements,anddecision‐makingprocessinvolvedindevelopmentoftheRTPforSkamaniaCounty.
Vision TheRTPisacollectiveefforttoaddressthedevelopmentofasaferegionaltransportationsystemthatwillsupportplannedeconomicgrowthandmaintaintheregion’sruralqualityoflife.
Purpose TheRTPidentifiesfutureregionaltransportationsystemneedsandoutlinestransportationplansandimprovementsnecessarytomaintainadequatemobilityandsafetywithinandthroughouttheSkamaniaCountyregion.Theregionmustplanforafutureregionaltransportationsystemthatadequatelyservesthepopulation,employment,andvisitorgrowthprojectedforSkamaniaCounty.The
Chapter 1: Introduction: RTP Vision, Purpose and Goals 2
Regional Transportation Plan for Skamania County
RTP’sgoals,objectives,andpolicieswillguidethevariousjurisdictionsandagenciesinvolvedinplanningandprogrammingoftransportationprojectsthroughoutSkamaniaCounty.
Goals ThefollowinggoalswereusedtoguidethedevelopmentoftheSkamaniaCountyRegionalTransportationPlan:
Preservation:Maintainandpreservetheexistingregionaltransportationsystem.
SafetyandSecurity:Provideasafeandsecuretransportationsystem.
Economy:Provideatransportationsystemthatfosterseconomicdevelopment.
Finance:Provideforthedevelopmentofatransportationsystemthatefficientlyusesfinancialresources.
AccessibilityandMobility:Provideanintegratedandcoordinatedtransportationsystemthatincludesavarietyofmobilityoptions.
Environment:Provideatransportationsystemthatissensitivetothequalityoftheenvironmentandnaturalresources.
VisionandValues:Provideforviableandlivablelocalcommunities.
ManagementandOperations:Maximizeefficientmanagementandoperationofthetransportationsystem.
ThereisconsistencybetweenthegeneralRTPgoalsandthepoliciesestablishedbylocaljurisdictionsandagenciesaspartoftheirlocalcomprehensiveplanningprocess.TheRegionalTransportationPlan(RTP)forSkamaniaCounty,where
applicable,willconsiderthegoalsestablishedintheManagementPlanfortheColumbiaRiverGorgeNationalScenicArea,SR‐14CorridorManagementPlan,andconsiderotherlongrangeplans.
Chapter 1: Introduction: RTP Vision, Purpose and Goals 3
Regional Transportation Plan for Skamania County
Management Plan for the Columbia River National Scenic Area
Providetransportationfacilitiesthatmeettheneedsofthetravelingpublicandimplementthisplan’srecreationgoalsandobjectiveswhileprotectingscenic,natural,cultural,andrecreationresources.
Promotealternativemodesoftransportationtoimprovesafetyandenjoymentofthetravelingpublicandtohelpalleviatefuturetrafficdemand.
SR‐14 Corridor Management Plan
ImprovesafetyalongSR‐14withrespectfortheprotectionandenhancementofresources.
Enhancetheeconomyofcommunitiesalongthehighway.
DesignHighway14asanationalattractionbyprotectingandenhancingscenic,natural,cultural,andrecreationresourceswithinthehighwaycorridor,withrespecttolocalresidences,andbusiness.
ManagetheSR‐14Corridorinthemostefficientandeffectivemannerpossible.
Transportation Strategy TheRegionalTransportationPlanforSkamaniaCountyistheregion’stransportationstrategy.
Chapter 1: Introduction: RTP Vision, Purpose and Goals 4
Regional Transportation Plan for Skamania County
Guidelines and Principles In1994,theStateLegislaturepassedlegislationthatrequiredRTPO’stoestablishGuidelinesandPrinciplesthatprovidedirectionforthedevelopmentofthetransportationelementsofcomprehensiveplans.Thefollowingrepresenttheseguidelinesandprinciples:
Identifyadequateareasforfuturecommercial,retail,andindustrialeconomicgrowth.Coordinateidentifiedeconomicgrowthareaswithanefficienttransportationsystem.
Identifyadequatelandforresidentialdevelopmentanddensitywithinurbanareasthatiscoordinatedwiththetransportationsystem.
Provideatransportationsystemthatsupportstheeconomicvitalityoftheregion,andprovidesforlong‐termfreightmobilityneedsandportaccess.
Providearangeofnon‐motorizedopportunitieswithintheregionaltransportationsystem.
Worktowardthedevelopmentofacoresystemofall‐weatherroadsforfreighttravel.
Encouragereducingtherelianceonthesingleoccupantvehiclebyprovidingothermodesoftransportation.
Encouragepresentandfuturerailroadrightofwaytobeutilizedfortransportationpurposes.
Enhanceintermodalfreightconnections.
Scope TheRTPforSkamaniaCountytakestheyear2035asitshorizonyear.Traveldemandfortheregionisforecastedforthisfutureyearandimprovementstothetransportationsystemarerecommendedbasedontheprojecteddemand.
TheareacoveredbytheRTPisthewholeofSkamaniaCounty.SkamaniaCountyislocatedinthesouthernpartofthestateofWashingtonalongthenorthbanksoftheColumbiaRiver.Stevenson,thecountyseat,liesapproximately45mileseastofPortland,OregonandVancouver,Washington(Figure1‐1).
Chapter 1: Introduction: RTP Vision, Purpose and Goals 5
Regional Transportation Plan for Skamania County
Figure 1‐1: Map of Skamania County Location
Peopleandfreightmovethroughoutaregionaltransportationsystemwithoutconsiderationforcity,county,orstateboundaries.Sincetransportationproblemsextendbeyondjurisdictionalboundaries,theRTPmustanalyzethefuturetransportationneedsfortheentireregionwhilecreatingacooperativeframeworkforcoordinatingtheindividualactionsofvariousjurisdictions.
Transportation Issues Addressed in RTP
Transportationsystemmaintenance,preservation,andsafety.
Developmentofcorridorstoimproveeconomicdevelopmentpotential.
AccessibilityacrosstheColumbiaRiverintermsofcapacity,economicdevelopment,corridorlocation,andconnectingroadways.
Federal,state,local,andprivatesourcesofrevenuefortransportationprojects.
Accesstoports,airports,intermodaltransportationfacilities,majorfreightdistributionroutes,andrecreationareas.
Theneedtorelieveandpreventcongestionfromoccurringwhereitdoesnotyetoccur.
Chapter 1: Introduction: RTP Vision, Purpose and Goals 6
Regional Transportation Plan for Skamania County
Theneedtoimprovecorridorswithsafetyproblems,includingfreightcorridors.
Theneedtoprovideamultimodaltransportationsystem;includingpedestrian,bicycle,bus,truck,rail,marine,andauto.
Theneedtoprovideenhancements(signs,viewpoints,kiosk,etc.),toassistvisitors.
Statutory Requirements
State
WithinWashingtonState,MetropolitanTransportationPlansareexpectedtobeconsistentwiththepolicyframeworkandobjectivesdescribedinthetransportationplanforWashingtonState.ThemostrecentWashingtonTransportationPlanWTP2030wasdevelopedbytheWashingtonTransportationCommissionandadoptedinDecember2010.
TheWTPisbasedonthefollowingfivetransportationpolicygoalsestablishedbytheLegislature:
EconomicVitality:Topromoteanddeveloptransportationsystemsthatstimulate,support,andenhancethemovementofpeopleandgoodstoensureaprosperouseconomy.
Preservation:Tomaintain,preserve,andextendthelifeandutilityofpriorinvestmentsintransportationsystemsandservices;
Safety:Toprovideforandimprovethesafetyandsecurityoftransportationcustomersandthetransportationsystem;
Mobility:ToimprovethepredictablemovementofgoodsandpeoplethroughoutWashingtonState;
Environment:ToenhanceWashington’squalityoflifethroughtransportationinvestmentsthatpromoteenergyconservation,enhancehealthycommunities,andprotecttheenvironment;and
Chapter 1: Introduction: RTP Vision, Purpose and Goals 7
Regional Transportation Plan for Skamania County
Stewardship:Tocontinuouslyimprovethequality,effectiveness,andefficiencyofthetransportationsystem.
TheWashingtonStateHighwaySystemPlan(HSP)istheelementofWashington’sTransportationPlan(WTP)thataddressescurrentandforecaststatehighwayneeds.TheHSPincludesacomprehensiveassessmentofexistingandprojected20‐yeardeficienciesonthestate’shighwaysystem.Italsolistspotentialsolutionsthataddressthesedeficiencies.TheHSPisupdatedperiodicallywitheachversionbuildingonthelast.Thedocumentcoversallissuesrelatedtothestate’shighwaysystem.The2007‐2026versionoftheHSPtakestheWTP’sinvestmentguidelines,andidentifiesthehighwaysystemneeds,strategiesandperformancemeasurementsassociatedwiththeguidelines.
HSPPreservation:Pavementmaintenance,preservationof3,596statewidestructuresincludingbridges,andpreservationofotherhighwayassetsthatincludeunstableslopes,restareas,weighstationsanddrainageandelectricalrehabilitation.
HSPSafety:Theobjectiveofthesafetyprogramfocusesonprojectsreducingandpreventingfatalities,decreasingthefrequencyandseverityofdisablinginjuriesandminimizingthesocietalcostsofaccidents.Thepreventionofcrossoveraccidentsandrunofftheroadaccidentsisapriority.
HSPEconomicVitality:Identificationofhighly‐productivefreightinvestments.
HSPMobility:Bottlenecks,trafficincidents,badweather,workzones,poorsignaltimingandspecialeventsarethemostsignificantcausesofcongestion.HSPmobilitysolutionsincludestrategiestoaddresscongestionatbottleneckandchokepointlocations,timelyresponsetoandclearanceofincidents,aswellasprojectstoimprovesystemefficiencywheretrafficincongestedcorridorstravelsatspeedsbelow70%ofthepostedspeedduringthepeakhour.
HSPEnvironmentalQualityandHealth:Projectstoremoveculvertstorestorefishpassage,reducehighwaynoise,treatstormwater,reduceflooding,providepedestriancrossingsandbicycleconnections.
RecentWSDOTplansaredocumentedonWSDOT’sPlanningsectionwebsite.
Chapter 1: Introduction: RTP Vision, Purpose and Goals 8
Regional Transportation Plan for Skamania County
Washington State’s Regional Transportation Planning Program
WashingtonState'sGrowthManagementAct,enactedin1990,approvedtheRegionalTransportationPlanningProgramwhichcreatedaformalmechanismforlocalgovernmentsandthestatetocoordinatetransportationplanningforregionaltransportationfacilities.TheGrowthManagementAct(GMA)authorizedthecreationofRegionalTransportationPlanningOrganizations(RTPOs)byunitsoflocalgovernment.SouthwestWashingtonRegionalTransportationCouncil(RTC)isthedesignatedRTPOforthethree‐countyareaofClark,SkamaniaandKlickitat.In1994furtherstatelegislationclarifiedthedutiesoftheRTPOoutlinedintheGMAandfurtherdefinedRTPOplanningstandards.
ThedutiesoftheRTPO,asoutlinedintheGMAandSHB1928,include:
Designationoftheregionaltransportationsystem.
DevelopmentofasixyearregionalTransportationImprovementProgram(TIP),includingregionallysignificantprojects.TheTIPmustincludeafinancialplan.
DevelopmentofaRegionalTransportationPlan(RTP),toincludearegionaltransportationstrategy,identificationofexistingandplannedfacilitiesandprograms,LevelofServicestandards,afinancialplan,assessmentofregionaldevelopmentpatternsandcapitalinvestmentusingaregionaltransportationapproach.TheconceptofleastcostplanningistobeusedindevelopmentoftheRTP.TheRTPmustbereviewedatleasteverytwoyearstoensurethatitiscurrent.
Establishguidelinesandprinciplesfordevelopmentandevaluationofthetransportationelementsoflocalcomprehensiveplans.
DeveloparegionalLevelofService(LOS)standardfortheregionalsystemasrequiredbytheLOSBill.
TheRegionalTransportationPlanningProgramisdesignedtobeintegratedwith,andaugment,thefederallyrequiredMetropolitanPlanningOrganization(MPO)
program.TheRegionalTransportationPlanningProgramextendstransportationplanningbytheRTPO’storuralareasnotcoveredbythefederalprogram.TheRegionalTransportationPlanningProgramisalsointendedtotieinandbeconsistentwithlocalcomprehensiveplanning.
Theregionaltransportationplanningprocessshould:
Guidetheimprovementoftheregionaltransportationsystem.
Chapter 1: Introduction: RTP Vision, Purpose and Goals 9
Regional Transportation Plan for Skamania County
Useregionallyconsistenttechnicalmethodsanddata.
Considerenvironmentalimpacts.
Ensureearlyandcontinuouspublicinvolvement.
Beconsistentwiththelocalcomprehensiveplanningprocess.
Beanongoingprocess.
Incorporatemultimodalplanningactivities.
Addressmajorcapacityexpansionandoperationalimprovementstotheregionaltransportationsystem.
Beapartnership,includingfederal,state,andlocalgovernments,specialdistricts,privatesector,generalpublic,andothersduringconception,technicalanalysis,policydevelopment,anddecision‐making.
TocomplywithStatestandardstheRTPshallincludethefollowingcomponents:
Descriptionofthedesignatedregionaltransportationsystem.
Regionaltransportationgoals,policies,andstrategy.
Regionallandusestrategy.Existingandproposedlandusesdefinedonlocalandregionalcomprehensivelanduseplansdeterminetheregionaldevelopmentstrategy.
Identificationofregionaltransportationneeds.Aninventoryofexistingregionaltransportationfacilitiesandservices,identificationofcurrentdeficiencies,andforecastoffuturetraveldemandwillbecarriedout.
DevelopmentofLOSstandardsconsistentwiththeLevelofServiceBill.
Developmentoffinancialplanfornecessarytransportationsystemimprovements.
Regionaltransportationsystemimprovementandstrategyplan.Specificfacilityorserviceimprovementswillbeidentifiedandprioritiesdetermined.
Establishmentofaperformancemonitoringprogram.Theperformanceofthetransportationsystemwillbemonitoredovertime.Themonitoringmethodology,datacollection,andanalysistechniquestobeusedwillbeoutlined.
PlansforimplementationoftheRTP.
Chapter 1: Introduction: RTP Vision, Purpose and Goals 10
Regional Transportation Plan for Skamania County
Intergovernmental Coordination InordertomaketheRTPnotonlyaPlantoprovidecarefullythought‐outsolutionstotransportationissuesandproblemsbutalsoaPlanthatalljurisdictionscanimplement,aregionaltransportationplanningcommitteestructurehasbeenestablished.Consistentwiththe1990GMAlegislation,athree‐countyRTCBoardofDirectorshasbeenestablishedtoservetheRTPOregion.IndividualCountyCommitteesandBoardsalsoplayapartintheregionaltransportationdecision‐making.TheSkamaniaCountyTransportationPolicyCommitteecontinuestoguideSkamaniaCountyregionaltransportationpolicy.Theroleof,andrepresentationon,theRTCBoardofDirectorsandindividualCountyPolicyCommitteesisdescribedintheBylawsofSouthwestWashingtonRegionalTransportationCouncil(lastamendedNovember2010)andInterlocalAgreementforEstablishmentoftheSouthwestWashingtonRegionalTransportationCouncil.TheregionaltransportationcommitteestructureisoutlinedinFigure1‐2.
Figure 1‐2: Agency Structure
Skamania County Transportation Policy Committee
TheSkamaniaCountyTransportationPolicyCommitteewasestablishedtoprovideafocusforSkamaniaCountyregionaltransportationissuesandpolicies.ItiscomposedofrepresentativesofWashingtonStateDepartmentofTransportation
Chapter 1: Introduction: RTP Vision, Purpose and Goals 11
Regional Transportation Plan for Skamania County
(WSDOT),SkamaniaCounty,theCityofStevenson,theCityofNorthBonneville,andthePortofSkamaniaCounty.
TheSkamaniaCountyTransportationPolicyCommitteecarriesoutregionaltransportationplanningactivitieswithinSkamaniaCounty.Otheragenciesandorganizationsarewelcometoparticipateasnon‐votingmembersofthecommittee.Specifically,theColumbiaRiverGorgeCommission,U.S.ForestService,andOregonpartneragenciesareinvitedtoparticipateontheSkamaniaCountyTransportationPolicyCommittee.
Bi‐State Coordination
SkamaniaCountyislocatedontheWashingtonsideoftheColumbiaRiverGorgeRegionandbi‐statetravelissignificantwithinthisregion.OregonandWashingtonjurisdictionsintheregionhaveahistoryofcoordinatingtheirtransportationandlanduseplans.Theseplanningeffortsensurethatregionallysignificantaspectsofthetransportationsystemareconsideredwithinabi‐statecontext.
RTCrepresentativesparticipateinbi‐statetransportationopportunitieswithOregonrepresentatives.ThisincludestheGorgeTransLinkgroup,bi‐statestudies,andotherbi‐stateopportunities.Inaddition,RTCwelcomesparticipationofOregonrepresentativesintheSkamaniaCountytransportationplanningprocess.CoordinationbetweenWashingtonandOregononbi‐statetransportationneedswillcontinuethroughtheregionaltransportationplanningprocess.
Skamania County Regional Transportation Plan: Work Plan AsafirststepinpreparationoftheSkamaniaCountyRTP,aworkplanwasdeveloped.(SeeFigure1‐3).TheworkplanoutlinesmajortaskstobecoveredinthedevelopmentoftheRTP.TheRTPisdesignedasabenchmarkplantomeetRTPOelementsrequiredbythe1990GMAlegislationandSHB1928legislationof1994.
Outline of RTP Chapters Chapter1: Introduction:RTPVision,Purpose,andGoals.TheRTPisintroducedanditsgeneralgoals,policies,statutoryauthority,andpurposearedescribed.TheRTPprocessisoutlinedaswellasregionaltransportationcommitteestructureandintergovernmentalcooperationandcoordinationoftheRTP.
Chapter 1: Introduction: RTP Vision, Purpose and Goals 12
Regional Transportation Plan for Skamania County
Chapter2: RegionalLandUseandGrowth.SkamaniaCounty’sdemographicdata,developmenttrends,andregionaldevelopmentstrategyarediscussed.Existingandfuturelandusesanddevelopmentpatternsareidentified.
Chapter3: IdentificationofRegionalTransportationNeeds.Theregionaltransportationsystemisdesignatedanddefined.Thecharacteristicsandpatternsoftoday’sandfutureregionaltraveldemand,today’stransportationproblemlocations,andfutureregionalneedsaredescribed.Needscriteriasuchasaccessibility,levelsofservice,andsafetyareoutlined.
Chapter4: FinancialPlan.Revenuesourcesareidentifiedanddescribed,andaplanforfinancingtransportationsystemimprovementsispresented.
Chapter5: SystemImprovementandStrategyPlan.Recommendationsfordevelopmentoftheregionaltransportationsystemaremade.Regionaltransportationgoalsandpoliciesarereviewed.
Chapter6: PerformanceMonitoring.Performancemonitoringmeasuresaredescribed.MonitoringtheRTP’sconsistencywiththestatetransportationplan,localtransportationplans,landuseregulations,andregionaldemographicprojectionsareoutlined.
Chapter7: PlanDevelopmentandImplementation.ProvisionsfortheimplementationofthepublicindevelopmentoftheRTParedescribed.Provisionsfortheimplementationofregionaltransportationgoals,policies,andactionsestablishedbytheRTParedescribed.TheRTPreviewandamendmentprocessisoutlinedshouldchangingpolicies,financialconditions,orgrowthpatternswarrantamendmentofthePlan.TherequiredbiennialupdateoftheRTPisdescribed.
Figure 1‐3: RTP Process
Chapter 2: Land Use, Growth and Transportation 13
Regional Transportation Plan for Skamania County
Chapter 2: Land Use, Growth and Transportation
Land Use and Transportation Transportationplanningisaboutmeetingthetraveldemandsofpeopleandgoods.Thetransportationsystemmustconnectpeopletojobsandservicesandconnectfreightandgoodstomarketsandconsumers.Indevelopingaregionaltransportationplan,thefundamentalrelationshipbetweentransportationandlandusemustberecognized,andtheeffectthatlanduseandgrowthhaveontransportationmustbetakenintoconsideration.TheLandUse/TransportationcycleisillustratedinFigure2‐1.
Figure 2‐1: Land Use/Transportation Cycle
Thelinkagebetweenlanduseandtransportationisacomplexissue,butonasimplelevelthelinkagecanbethoughtofasworkingintwoways:
Chapter 2: Land Use, Growth and Transportation 14
Regional Transportation Plan for Skamania County
1. Thespatialdistributionandtypeoflanduseactivityinfluencesboththedemandfortravelandtravelcharacteristics.Differenttypesoflandusegenerateandattractdifferingtrafficrates;forexample,retaillanduseswillgeneratemoretripsthanresidentiallanduses.
2. Improvingaccessbyexpandingthetransportationsystemallowsforthedevelopmentoflandthatwasformerlyinaccessible.
Landuseandtransportationareinter‐linkedbecauselanduseactivitieslargelydeterminetraveldemandanddesire.Whendifferentlandusesaresegmentedorsegregated,lengthoftripstendstoincrease.Forexample,peoplehavetotravelbetweentheirhomesandtheirworkplaces.Tomeetmobilityneeds,theselongertripsusuallyhavetobeservedbytheautomobile,thusreducingtheuseoftransportationalternatives,suchaswalkingortransit.
Management Plan for Columbia River Gorge National Scenic Area
Mostofthesouthern,morepopulousportionofSkamaniaCountyislocatedintheColumbiaRiverGorgeNationalScenicArea(ScenicArea).Thus,locallanduseisaffectedbytheguidelinesoftheManagementPlanfortheColumbiaRiverGorgeNationalScenicArea(ManagementPlan).In1993,SkamaniaCountyadoptedlanduseordinancesthatareconsistentwiththeManagementPlan.TheseordinancesadoptedbytheCountyprovideforlocalimplementationoftheManagementPlan.
TheManagementPlanincludesdirectionforfuturelanduseintheScenicArea.Thislandusedirectionwillinfluencetheregionaltransportationsystemandtravelpatterns.NewindustrialdevelopmentintheScenicAreacanonlybelocatedwithintheurbanareas.Thereisprovisionforsomenewcommercialandruralresidentialdevelopmentoutsideofurbanareas,mainlyinexistingruralcommunitieslikeSkamania.Denserresidentialdevelopmentandmoreintensivecommercialusesareencouragedtooccurwithintheexistingurbanareas.
ThecommunitiesofStevenson,NorthBonneville,Carson,andHomeValleyaredesignatedurbanareasthatareexemptfromtheManagementPlanguidelines.Landuseplanninginthesecommunitiesisgovernedbylocalcomprehensiveplans.
Chapter 2: Land Use, Growth and Transportation 15
Regional Transportation Plan for Skamania County
Growth and Development Sustainedeconomicdevelopmentandgrowthwithinaregionisdesirablebecauseoftheeconomicbenefitsthatincreasedemploymentandalargertaxbasecanbring.However,whilegrowthcancontributetothehealthofaregion’seconomy,itcanalsohavenegativeimpacts.Unmanaged,fastratesofgrowthcanhaveasevereimpactontheabilityofacommunitytoprovideservicesandinfrastructure.
Theneedtomaintaineconomicviability,andatthesametime,qualityoflifeisachallenge.Elementsthatcontributetoadesirablequalityoflifeincludejobopportunities,affordablehousing,ahealthyenvironmentwithcleanair,andrecreationalopportunities.Anefficient,safetransportationsystemcontributestothequalityoflifeforresidentsofaregionandcanactasanattractorforeconomicdevelopment.Conversely,atransportationsystemdependentondeterioratingandoutmodedfacilitiescanbeaninhibitortotheefficient,safemovementofpeopleandgoods.
Growth in Skamania County
SkamaniaCountyhasseenmoderategrowthinthelastfewdecades.TheU.S.CensusBureau,WashingtonState’sOfficeofFinancialManagement(OFM),andBureauofEconomicAnalysis(BEA)providedthefollowingdata.BEAemploymentincludesallwageandsalariedjobsaswellasproprietorsjobsthatincludessoleproprietor,self‐employed,andfarmemployment.
Between1990and2010thepopulationofthecountyincreasedby34%from8,289to11,066,whilethenumberofhousingunitsincreasedby43%from3,922to5,628.TheincreaseinBEAemploymentwas17%from2,582in1990to3024in2010.(SeeFigure2‐2)Muchofthegrowthoccurredbetween1990and2007,whilegrowthslowedbetween2007and2010.
Chapter 2: Land Use, Growth and Transportation 16
Regional Transportation Plan for Skamania County
Figure 2‐2: Growth in Skamania County
SkamaniaCountyhasseenalargeincreaseinrecreationactivity,duetotheColumbiaRiverGorgeNationalScenicArea,GiffordPinchotNationalForest,Mt.St.HelensVolcanicMonument,BeaconRockStatePark,SkamaniaLodge,InterpretiveCenter,andwindsurfing.Thegrowthofrecreationalactivitiesseeninthecountyinthelasttwodecadeshasincreasedseasonaldemandsontheregionaltransportationsystem.
Developmentofatransportationpolicyplanmustconsiderhowtoplanforatransportationsystemthatcansupportincreasesintraveldemandcausedbygrowthinpopulation,employment,andrecreationalactivity.Atthesametime,thissystemmustbeaffordableandminimizeenvironmentalimpactstomaintaintheruralqualityoflife.Asafe,efficienttransportationsystemcanworktoenhanceeconomicdevelopmentwithinaregion.
General Land Uses in Skamania County ThepopulationofSkamaniaCountyisconcentratedinthesouthernquarterofthecountyneartheColumbiaRiverandintheWindRiverValley.Thecountyhasdiverseenvironments,rangingfromthegentlyslopinglandsneartheColumbiaRivertoruggedandsteepmountainousevergreenforest.TheCascadeMountainstraverseSkamaniaCountyfromnorthtosouth.SkamaniaCountyhasatotalareaof1,656squaremiles,90%ofSkamaniaCountyisforestedand80%isapartofGiffordPinchotNationalForest.MuchoftheprivatelandownershipiswithintheNationalScenicArea.
AlmostathirdofthejobsinSkamaniaCountywereinthepublicsector,withlocalgovernmentaccountingforthemajorityofthejobs,especiallythoseineducational
0
2000
4000
6000
8000
10000
12000
Population Housing Units BEA Employment
1990
2000
2010
Chapter 2: Land Use, Growth and Transportation 17
Regional Transportation Plan for Skamania County
services.Majorprivateemploymentsectorsincludeleisureandhospitalityandmanufacturing.
Theprovisionofpublicfacilitiesandservices,includingtransportation,isaprincipaldeterminantoflandusepatterns.AlthoughthegrowthinSkamaniaCountyhasbeenmoderate,muchofgrowthanddevelopmenthastakenplacenearthetransportationcorridorsoftheColumbiaRiverandStateRoute14.
Planned Land Use Comprehensiveplansarethemeansbywhichlocaljurisdictionscanplanfortheirfuturegrowthanddevelopment;theycanprovideaprocessforanticipatingandinfluencingtheorderlyandcoordinateddevelopmentofland.WithinWashingtonState,planningauthorityisdelegatedbythestatetolocalgovernmentsinRCW36.70A,35.63and35A.63.Comprehensiveplansarerequiredtohavealanduseelementshowingthegeneraldistributionandlocationoflandforvarioususes,aswellasacirculationelementshowingthestreetsystemandtransportationroutes.SkamaniaCounty,CityofStevenson,andCityofNorthBonnevilleallhavecurrentlyadoptedcomprehensiveplans.
TheScenicAreaActrequiredthataManagementPlanbedeveloped,whichincludeslandusedesignationsoutsideofurbanareas.In1991,theManagementPlanforScenicAreawasadopted.In1993,SkamaniaCountyadoptedlanduseordinancesthatareconsistentwiththeManagementPlan.TheseordinancesadoptedbytheCountyprovideforlocalimplementationoftheManagementPlan.
LocalcomprehensiveplansandtheManagementPlanfortheColumbiaRiverGorgeNationalScenicAreaencouragethefuturedevelopmentofresidential,commercial,andindustriallandsintheUrbanAreas.Thereisprovisionforthedevelopmentofsomecommercialandresidentiallandsoutsideoftheurbanareas.Inaddition,theSkamaniaCountyComprehensivePlanprovidesforotherlandusessuchasagricultureandtimber.
Chapter 2: Land Use, Growth and Transportation 18
Regional Transportation Plan for Skamania County
Population and Employment Forecast TheWashingtonStateOfficeofFinancialManagement(OFM)developspopulationforecastforallcountiesintheStateofWashington.Theirforecastcontainsalow,medium,andhighestimate.TheApril2012forecastdevelopedbyOFMfor2035populationinSkamaniaCountyrangedfromalowof11,325toahighof14,991.ForthepurposeoftheRegionalTransportationPlanamedium‐highforecastof13,279willbeused.The2035forecastrepresentsa20%or2,213increaseinpopulationfrom2010to2035.
HousingandemploymentforecastforSkamaniaCountyweredevelopedbyRTCbasedonpopulationforecastandhistoricaltrends.Estimated2035housingis6,772units.The2035forecastrepresentsa20%or1,144increaseinhousingunitsfrom2010to2035.Estimated2035BEAemploymentis3,607.This2035forecastrepresentsa17%or528increaseinemploymentfrom2010to2035(seeFigure2‐3).
Figure 2‐3: Population, Housing & Employment, 1980 to Forecast 2030
Demographic and Travel Trends Growthinpopulationandemployment,developmentandresultinglandusepatternstogetherwithitsdistributionallaffecttraveldemand.However,otherdemographicfactorsalsoinfluencetraveldemand.Thesefactorsincludehouseholdsize,workforceparticipation,employmentpatterns,andvehicleownership.
Householdsizeisoneofthemostsignificantdemographicfactorsthatinfluenceslanduseanddemandfortransportationservices.Between1970and2010there
0
2000
4000
6000
8000
10000
12000
14000
Population Housing Units BEA Employment
Chapter 2: Land Use, Growth and Transportation 19
Regional Transportation Plan for Skamania County
wasatrendtowardsmallerhouseholdsizeinSkamaniaCountyduetomoresingle‐personhouseholdsandsmallerfamilysize.Theaveragenumberofpersonsperhousingunitwas2.69in1970,buthadfallento1.97by2010.The2035forecastis1.95personsperhousingunit.
Anotherdemographictrendthateffectstraveldemandistheincreaseintwoormoreautohouseholds.Typically,theautosareusedtogettowork,forworkpurposeswhileatwork,torunerrandsatlunchtime,beforeorafterwork,andiftheyhaveafamilytotaketheirchildrentotheiractivities.Allresultinpeople’sincreasedrelianceontheautomobilethatpeopleconsidertheirmostconvenienttransportationmode.
Employmentpatternshavealsobeenchanging,witharelativedeclineseeninthetraditionalindustrialortimberjobsandanincreaseinservicesectoremployment.Withmoderntechnology,therehasalsobeenarapidgrowthinworkerswhoareabletoworkathome.Inaddition,asthetraditionaltimberjobsarelost,thereisatrendforSkamaniaCountyresidentstobeemployedinothercounties.TheU.S.CensusBureauAmericanCommunitySurvey2006‐2010showsthatapproximately51.2%ofthecountyresidentsworkedoutsideofSkamaniaCounty.Table2‐1showsdataofthoselivingand/orworkinginSkamaniaCounty.
Table 2‐1: Skamania Workflow by County
Place of Residence Place of Work 2000 2000
Percent 2010 2010
Percent 2000‐2010 Change
Skamania County Skamania County 2,032 47.7% 2,340 48.8% 308
Clark County, WA 896 21.0% 1,060 22.1% 164
Multnomah Co., OR 535 12.6% 510 10.6% ‐25
Hood River Co., OR 353 8.3% 260 5.4% ‐95
Klickitat Co., WA 205 4.8% 340 7.1% 135
Other Washington 63 1.5% 59 1.2% ‐4
Other Oregon 148 3.5% 179 3.7% 31
Other 27 0.6% 43 0.9% 16
Skamania Co. Employed Workforce 4,261 4,791 530
Skamania County Skamania County 2.032 79.4% 2,340 72.2% 308
Clark Co., WA 124 4.8% 260 8.0% 136
Multnomah Co., OR 61 2.4% 35 1.1% ‐26
Hood River Co., OR 70 2.7% 115 3.5% 45
Klickitat Co., WA 147 5.7% 340 10.5% 193
Other Washington 24 0.9% 43 1.3% 19
Other Oregon 76 3.0% 109 3.4% 33
Other 24 0.9% 0 0.0% ‐24
Employment within Skamania County 2,558 3,242 684
Chapter 2: Land Use, Growth and Transportation 20
Regional Transportation Plan for Skamania County
TraveldemandhasalsogrownasthenumberofregisteredvehiclesandpassengercarsinSkamaniaCountyhasincreasedinthepastseveraldecades.In2010,therewere5,500registeredpassengervehicleswithapproximately74.6%oftheSkamaniaCountyhouseholdshavingtwoormorevehiclesavailable.Therelationshipbetweenlanduseandtransportationshouldbecarefullyconsideredwhendevelopingavisionforfuturegrowthandgrowthpatterns.
TraveldemandforfreighttruckspassingthroughtheregiononSR‐14appearstobeincreasing.Trucksaccountforapproximately20%ofthevehicletrafficonSR‐14.TheadditionofthesetruckscreatesconflictswithothervehiclesusingtheSR‐14corridor.
ThereareseveraltrendsthataffectseasonaltraveldemandwithinSkamaniaCounty.First,isthetrendofadditionalretiredresidentswholiveinSkamaniaCounty,butspendtheirwintersinawarmerclimate.Theseresidentsaddtothelocaltrafficfromspringtofall.Second,istheincreasedpopularityoftheColumbiaRiverGorgeareaasarecreationalattractor.SinceitsdesignationasaNationalScenicArea,summertrafficvolumeshaverapidlyincreased.
Table2‐2alsoprovidesinformationthatcompares2000and2010CensusJourneytoWorkdata.Thisdatadisplaysseveraltrendsimpactingthecommutertraveltimes.First,thedatashowsthatcommutetimeshaveremainedaboutthesame.Second,theuseofcarpoolsdecreased.Third,therehasbeenanincreaseinthenumberofpeopledrivealoneandworkingfromhome.
Table 2‐2: Work Travel Mode
Skamania County 2000 2000
Percent 2010 2010
Percent
2000 to 2010
Growth
2000 to 2010
Percent Change
2010 WA State
Percent
Drive Alone 3,238 76.0% 3,785 78.9% 547 16.9% 72.3%
Carpool 631 14.8% 425 8.9% ‐206 ‐32.6% 11.6%
Transit 21 0.5% 15 0.3% ‐6 ‐28.6% 5.6%
Bicycle or Walked 104 2.4% 100 2.1% ‐4 ‐3.8% 4.3%
Motorcycle/Other 26 0.6% 45 0.9% 19 73.1% 1.2%
Worked at Home 241 5.7% 425 8.9% 184 76.3% 5.1%
Totals 4,261 100.0% 4,795 100.0% 534 12.5% 100.0%
Mean Travel Time to Work (minutes) 29.2 n/a 30.0 n/a 0.8 n/a 25.4
Chapter 3: Identification of Regional Transportation Needs 21
Regional Transportation Plan for Skamania County
Chapter 3: Identification of Regional Transportation Needs
Current Functional Classification of the Regional Roadway System Functionalclassificationisthegroupingofhighways,roads,andstreetsbythecharacterofservicetheyprovide.Comprehensivetransportationplanningusesfunctionalclassificationtodeterminehowtravelcanbechannelizedwithinthenetworkinalogicalandefficientmanner.Afunctionalclassificationdefinesthemajorrolethataroadorstreetserveswithinthetotalexistingandfutureroadwaynetwork.Insimpleterms,highways,streets,androadsfunctionasarterials,collectors,orlocalaccess.Arterialsprovidethehighestdegreeofmobilityandlimitedaccesstolocalproperty.Collectorsgenerallyprovideequalemphasisuponmobilityandlandaccess.Localroadsandstreetsemphasizelandaccessinlieuofmobility.
TheWashingtonStateDepartmentofTransportation(WSDOT)hastheprimaryresponsibilityfordevelopingandupdatingthehighwayfunctionalclassificationsystem.Theyworkcooperativelywithlocalandregionalagenciesindevelopingandupdatingthefunctionalclassificationsystem.TheFederalFunctionalClassificationsystemforSkamaniaCountyroadshasbeencompletedandresultedinacountywideuniformclassificationsystem.Generally,facilitiesclassifiedasMajorCollectororaboveinruralareasareeligibleforfederalfunding.FurtherinformationonthefunctionalclassificationofroadscanbefoundonWSDOT’swebsite.Astatewidemapofthefederalfunctional
Chapter 3: Identification of Regional Transportation Needs 22
Regional Transportation Plan for Skamania County
classificationisavailable,allowingthezoomingintoKlickitatCountyandCitydetail.
ISTEAalsorequiredthatroadsbedesignatedasNationalHighwaySystem(NHS)facilities.CongressapprovedtheNHSSystemwithpassageoftheNationalHighwaySystemDesignationActof1995(NHSAct).InSkamaniaCounty,SR‐14hasbeendesignatedasanNHSfacility.In1999,thestatelegislatureadoptedHighwaysofStatewideSignificance.InSkamaniaCounty,theonlyhighwayfacilitydefinedas“ofStatewideSignificance”isSR‐14.
Adescriptionoftheruralfunctionalclassificationcategoriesfollows:
Rural Principal Arterials
Ruralprincipalarterialsaresub‐dividedintotwosets(1)interstatefacilitiesand(2)otherprincipalarterials.Ruralprincipalarterialsservecorridormovementshavingtriplengthandtraveldensitycharacteristicsofstatewideorinterstatetravel.Theyconsistofaconnectedruralnetworkofcontinuousroutes.
Rural Minor Arterials
Inconjunctionwiththeprincipalarterials,theruralminorarterialsformaruralnetworkwhichlinkcitiesandlargertownstogetherwithothermajortrafficgenerators.Theprincipalarterialsandruralminorarterialsarespacedatsuchintervalsthatalldevelopedareasofthestatearewithinareasonabledistanceofanarterialhighway.Minorarterialsshouldbeexpectedtoprovideforrelativelyhighoveralltravelspeedswithminimuminterferencetothroughmovement.
Rural Major Collector Roads
Ruralmajorcollectorsprovideservicetolargertownsnotdirectlyservedbythehighersystemsandtoothertrafficgeneratorsofequivalentimportance.Ruralmajorcollectorsservethemoreimportanttravelcorridorswithinthecounty.
Rural Minor Collector Roads
Ruralminorcollectorsarespacedatintervals,consistentwithpopulationdensity,tocollecttrafficfromlocalroadsandprovidedevelopedareaswithreasonabledistancetoacollectorroad.Ruralminorcollectorsprovideservicetotheremainingsmallercommunitiesandlinkthelocallyimportanttrafficgeneratorswithsurroundingruralareas.
Rural Local Roads
Localstreetsprovidedirectaccesstoabuttinglandandaccesstothehigherclassificationfacilities.Theyofferthelowestlevelofmobility.Theyarenot
Chapter 3: Identification of Regional Transportation Needs 23
Regional Transportation Plan for Skamania County
intendedtocarrythroughtraffic;however,theydomakeupalargepercentageofthetotalstreetmileage.
Designation of the RTP Regional Transportation System Consistentwiththestate’sRegionalTransportationPlanningProgramPlanningStandardstheRTPregionaltransportationsystemhasbeendesignatedtoinclude:
1. Allstatetransportationfacilitiesandservices(includingstatehighways)
2. Alllocalprincipalarterials(thedefinitionofruralprincipalarterialscanbethesameasusedforfederalclassificationorberegionallydetermined).
3. Allothertransportationfacilitiesandservices,includingairports,transitservicesandfacilities,roadways,railfacilities,marinetransportationfacilitiesetc.thattheRTPOconsidersnecessarytocompletetheregionalplan.
4. Anytransportationfacilityorservicethatisregionallyneededorimpactsplacesintheplan,asdeterminedbytheRTPO.
AdetaileddescriptionofthedesignatedRTPRegionalTransportationSystemfollows:
1. AllstatetransportationfacilitiesandservicesInSkamaniaCountythiscategoryincludesStateRouteSR‐14andSR‐504.SR‐14providesthemaineast‐westaccessfromsouth‐westClark/SkamaniaCountylinetosouth‐eastKlickitat/SkamaniaCountylinealongthenorthbankoftheColumbiaRiver.Thefacilityhastwolanesineachdirectionandextends41.71milesthroughSkamaniaCountybetweenClarkCountyandKlickitatCountylines.SR‐504providesthemainaccessfromI‐5(CowlitzCounty)easttotheMountSt.HelensNationalVolcanicMonument.SkamaniaCountyhasidentifiedtheneedtoconnectSR‐504easttoU.S.ForestServicehighways.
2. Alllocalprincipalarterials:SR‐14andSR‐504aretheonlylocalruralprinciplearterials.
3. Allothertransportationfacilitiesandservicesconsiderednecessarytocompletetheregionaltransportationplan.Theseincludetransitservicesandfacilities,roadways,railfacilities,airports,marinetransportationfacilities,etc.
Chapter 3: Identification of Regional Transportation Needs 24
Regional Transportation Plan for Skamania County
Rural Major Collectors
Alllocalruralmajorcollectorsaredesignatedaspartoftheregionaltransportationsystem.MajorcollectorsincludesuchfacilitiesasFirstStreet,RockCreek,FosterCreek,Gropper,Vancouver,Russell,Cascade,andColumbiaintheCityofStevenson;Evergreen,HotSprings,andEastCascadeintheCityofNorthBonneville;WindRiverRoad,Cook‐UnderwoodRoad,WashougalRiverRoad,SalmonFallsRoad,CanyonCreekRoad,Ryan‐Allen,Loop,KanakaCreek,andCurlyCreekintheCounty.
Forest Service Road System
WithmuchofSkamaniaCountylocatedwithintheGiffordPinchotNationalForest,theForestHighwaySystemplaysanimportantpartintheeconomyofSkamaniaCounty.ForestHighwaystobeincludedintheregionaltransportationsystemareForestRoads23,25,30,88,and90.
Port Facilities
SkamaniaCountyhasonePortDistrict;thePortofSkamaniaCounty,whichcoversmuchofthesouthernportionofSkamaniaCounty.ThePortofSkamaniaCountyisamunicipalcorporationoftheStateofWashington.ThePortcurrentlymaintainsanassetbaseofcommercial,industrial,recreationallands,buildings,andotherfacilities.
ThePort’sprimarymissioniseconomicdevelopmentandjobcreationinindustrialandcommercial‐relatedbusinesses.ThePortowns162acresinStevenson,Carson,andNorthBonnevilleincludingapproximately30,000squarefeetofcommercialspaceand120,000squarefeetofindustrialusespace.PublicaccesstorecreationalopportunitiesisanimportantpriorityforthePort.ThePortownsandmaintainsapproximately6acresofparklandwith1.5milesofwaterfrontinStevenson,andhasdeveloped1.1milesofwalkingpathswithinterpretivesignsandamenities.TheStevensonLandingdock,parks,beaches,andboatlaunchrampfacilitiesdrawavarietyofwater‐sportenthusiastsandtouristshelpingtoinvigoratethelocaleconomy.ThePort’sStevensonWaterfrontareaincludesaLevelIIElectricVehiclechargingstation.
Chapter 3: Identification of Regional Transportation Needs 25
Regional Transportation Plan for Skamania County
Airport Facilities
TherearenopublicairfieldscurrentlyoperatinginSkamaniaCounty.However,thereareafewprivateairfields.PortlandInternationalAirport(PDX)islocatedinPortland,Oregonapproximately45mileswestofStevenson,south‐westoftheI‐205GlennJacksonBridge.Thisisaregionalairportwithdomesticandinternationalpassengerandfreightservice.
Bridges
AllpublicbridgesincludingColumbiaRiverbridgesaredesignatedaspartoftheregionaltransportationsystem.Thereareover30publicbridgeslocatedinSkamaniaCounty.TheBridgeoftheGodsandtheHoodRiverBridgearetheonlybridgescrossingtheColumbiaRiverfromOregontoWashingtonintheSkamaniaCountyregion.BothofthesebridgesaretollBridgeswhichareownedandoperatedbyOregonPortDistricts.Allbridgesareimportanttothemovementofpeopleandgoodswithintheregion.However,thosealongtheregionaltransportationsystemareessentialtotheregion.
Inaddition,theWashingtonStateLegislaturedesignatedanSR‐35corridorinthe1997legislativesession.SR‐35willprovideafuturelinkacrosstheColumbiaRivertoOregonintheBingen/WhiteSalmonarea.ADraftEnvironmentalImpactStatementforafuturerivercrossingintheSR‐35corridorwascompletedin2004,aTypeSizeandLocationStudywascompletedin2011,andaFinalEnvironmentalImpactStatementwillbethenextstepintheprojectdevelopmentprocess.
Columbia River
Historically,theColumbiaRiverhasalwaysbeenanimportanttransportationcorridortoSkamaniaCounty.TheColumbiaRiver,asatransportationcorridor,isusedtomovegoodsandpeople.TourboatsvisittheColumbiaRiveranddockinStevenson.
Chapter 3: Identification of Regional Transportation Needs 26
Regional Transportation Plan for Skamania County
Public Transportation
SkamaniaCountySeniorServicesprovidesgeneralpublicDial‐A‐RideserviceinSkamaniaCounty,adeviatedfixedrouteservicealongSR‐14intoClarkCounty,andoperatesavolunteerdriverprogram.Inaddition,SkamaniaCountySeniorServicesparticipatesinacoordinatedeffortlinkingtransitagenciesintheMid‐ColumbiaRiverGorgearea.Thesystemhasanumberofvehicletypesfromaccessibleminivanstoa26‐passengerbus.InadditiontoSeniorServices,thereareprivatefirmsthatprovidetransit/taxiservicetoPortlandInternationalAirport.
Although,thedial‐a‐rideserviceprovidespreferencetoseniorsandpersonswithdisabilities,allCountyresidentsareeligible.Themajorityofsystemtripsareformedical,socialservice,andshoppingpurposes.ThisservicedoesprovidetransportationserviceasfarwestasVancouver/PortlandandeasttoTheDalles.Out‐of‐countymedicaltripsaregivenpriorityovershoppingorpersonaltrips,althoughtrippurposesaregroupedwhenpossible.
TheSR‐14deviatedfixedrouteserviceconnectstoC‐TRAN’sFisherLandingTransitCenterinVancouver,makingthreeroundtripsperday(morning,midday,evening).TheservicebeganinJanuary2004andhasbeenverysuccessful.Thisserviceprovidesaccesstojobs,schooling,andothertrippurposeswithinthegreaterPortland/Vancouverregion.
TheGorgeTransLinkisanallianceoftransportationprovidersofferingpublictransportationservicesthroughouttheMid‐ColumbiaRiverGorgeareaaswellastodestinations,suchasPortlandandVancouver.ThegoalofthiscoordinationeffortistoimproveinterconnectivitybetweenthevarioustransitprovidersintheMid‐ColumbiaRiverRegioninbothOregonandWashington.
Rail Facilities
ThereisonemainraillineinuseinSkamaniaCountywhichprovidesfreightandpassengerservice.BurlingtonNorthernSantaFe(BNSF)ownsthismainline.The
BNSFVancouver/EasternWashingtonlinehastwotracksingoodconditionwithupto60trainsoperatingonthelinedaily.AmtrakalsohasanagreementwithBNSFtooperatepassengerserviceonthefreightcarrier’sraillines,providingservicefromVancouvertravelingeastthroughSkamaniaCountytowardSpokane.Sevendaysaweek,theAMTRAKEmpireBuildertravelsthroughSkamaniaCountybotheastandwestbetweenPortland,OregonandChicago,Illinois.AlthoughtherearenoAmtrakstationsinSkamaniaCounty,mostSkamaniaCountyresidentsarewithinanhourdriveofstationsinBingenorVancouver.
Alongthemainrailline,therearesevenpublicandnumerousprivaterailroadcrossingsinSkamaniaCounty.ThepublicrailroadcrossingsarelistedinTable3‐1.
Chapter 3: Identification of Regional Transportation Needs 27
Regional Transportation Plan for Skamania County
Table 3‐1: Skamania County Public Railroad Crossings
Road Warning System
Cape Horn Road Stop Signs
SR 14 (St. Cloud) Warning Lights
SR 14 (Skamania Landing) Warning Lights
SR 14 (Skamania Landing) Warning Lights
Russell/SR 14 (Stevenson) Warning Lights and Drawbars
SR 14 (Cemetery) Stop Sign, Tracks Warning
SR 14 (Home Valley Park) Overhead/Side Lights, Drawbars
Enhancements
Transportationenhancementsaredesignatedaspartoftheregionaltransportationsystem.Enhancementsincludefacilitiesforbicyclesandpedestrians,scenicvistas,thematicsignage,reststops,androadsidebeautificationalongtheregionalroadnetwork.ExistingenhancementswouldincludefacilitiessuchasthePacificCrestTrail,CapeHornVista,theSR‐14bicycleroute,FranzLakeviewpoint,andotherenhancementswithintheCounty.Theregionhasidentifiedtheneedtodevelopasafeeast‐westbicyclefacilitythroughthecounty.
Growth in Traffic Volumes Asaresultofsocio‐economicanddemographicchangesdescribedinChapter2,SkamaniaCountyhasseenanincreaseintrafficvolumesovertheyears.WashingtonStateDepartmentofTransportationcompilestrafficcountdataalongStateRoutes.TrafficvolumesalongSR‐14intheColumbiaRiverGorgeNationalScenicAreavarybyseason,withsummertrafficvolumessignificantlyhigherthanwintertrafficvolumes.ExamplesofgrowthintrafficvolumesatselectedlocationsalongSR14inSkamaniaCountyarelistedinTable3‐2.
Table 3‐2: Traffic Volumes‐All Day (ADT)
Location Leg
2002
Volumes
2012
Volumes
%
Increase
Annual %
Increase
Bridge of The Gods S 2,500 2,800 12% 1.2%
SR‐14 at Clark Co. Line E 4,000 4,300 8% 0.8%
SR‐14 at Bridge of The Gods E 5,900 6,800 15% 1.5%
SR‐14 at Russell Ave. W 6,800 7,600 12% 1.2%
SR‐14 at Wind River Rd. W 6,100 6,700 10% 1.0%
SR‐14 at Wind River Rd. E 2,400 2,800 17% 1.7%
SR‐14 at Klickitat Co. Line W 5,200 8,900 71% 7.1%
Chapter 3: Identification of Regional Transportation Needs 28
Regional Transportation Plan for Skamania County
Future Travel Demand FuturetraveldemandwasforecastedfortheSkamaniaregionbasedonhistorictrends,netchangesinlanduseandactivitylevels,applyingappropriatetrafficgenerationrates,andthenusingtripdistributioninformationtodeterminethedirectionoftravel.
TheRTPnetworkisconsideredtobethesametransportationnetworkasexiststoday.Itisusedonlyasabasecasescenarioforforecastingfuturetraveldemandandpotentialtrafficvolumesonroadsegmentsanddoesnotconstitutearecommendednetwork.TrafficvolumescoulddiffersignificantlyfromthosethatresultfromthefuturetripassignmentontotheRTPnetworkifsignificantchangestothepopulation,landuse,ortransportationsystemoccur.
BurlingtonNorthernSantaFeoperatestheeast‐westrailroadroutealongtheWashingtonsideoftheColumbiaRiverGorgeandthroughSkamaniaCounty.Thisrouteiscurrentlyexperiencingcapacityconstraintsandwillcontinueinthefuturewithoutsomekindofexpansion.TheColumbiaRiversystemisanimportanttransportationcorridorforthemovementofgoods.Inordertomeetthetraveldemandassociatedwiththiscorridor,itwillbeessentialtopreserveappropriatechanneldepthsandwidthsforshipping,andtomaintaincurrentlockhandlingcapacity.Walkingandbicyclingareintegralpartsofthetransportationsystem.Peoplewalkandbikeforvarioustrips.Walkingandbicyclingtripsareusuallyshortanddemandisgreaterinurbanareas.However,thereisademandforbicyclingfacilitiesalongSR‐14fortouringbicyclist.Publictransitisanimportantaspectofthetransportationsystem,especiallyforthosewithlimitedincome,elderly,anddisabled.Withanagingpopulationandpercapitaincomelowerthanthestateaverage,thedemandforpublictransitwillincreaseinSkamaniaCounty.
Levels of Service Levelsofservicestandardsrepresenttheminimumperformanceleveldesiredfortransportationfacilitiesandserviceswithintheregion.Theyareusedasagaugeforevaluatingthequalityofserviceonthetransportationsystemandcanbedescribedbytraveltimes,travelspeed,freedomtomaneuver,trafficinterruptions,comfort,convenience,andsafety.TheselevelsofservicearedesignatedAthroughF,frombesttoworst.LevelofserviceEdescribesconditionsapproachingandatcapacity.Foruninterruptedflowconditions,thefollowingdefinitions1apply:
LevelofServiceAdescribesfreeflowconditions,withlowvolumesandhighspeeds.Thegenerallevelofcomfortandconvenienceprovidedtothemotorist,passenger,orpedestrianisexcellent.
1 From Highway Capacity Manual, Transportation Research Board, 1985
Chapter 3: Identification of Regional Transportation Needs 29
Regional Transportation Plan for Skamania County
LevelofServiceBisintherangeofstableflowbutthepresenceofotherusersinthetrafficstreambeginstobenoticeable.Freedomtoselectdesiredspeedsisrelativelyunaffected,butthereisaslightdeclineinthefreedomtomaneuverwiththetrafficstreamfromLevelofServiceA.
LevelofServiceCisstillintherangeofstableflow,butmarksthebeginningoftherangeofflowinwhichtheoperationofindividualusersbecomessignificantlyaffectedbyinteractionswithothersinthetrafficstream.Thegenerallevelofcomfortandconveniencedeclinesnoticeablyatthislevel.
LevelofServiceDrepresentshigh‐density,butstableflow.Speedandfreedomtomaneuverareseverelyrestricted,andthedriverorpedestrianexperiencesagenerallypoorlevelofcomfortandconvenience.
LevelofServiceErepresentsoperatingconditionsatornearthecapacitylevel.Allspeedsarereducedtoalow,butrelativelyuniformvalue.Comfortandconveniencelevelsareextremelypooranddriverorpedestrianfrustrationisgenerallyhigh.
LevelofServiceFdescribesforcedorbreakdownflow.Theseconditionsusuallyresultfromqueuesofvehiclesbackingupfromarestrictiondownstream.Operationswithinthequeuearecharacterizedbystop‐and‐gowaves,andtheyareextremelyunstable.
Level of Service Standards In1998theWashingtonStateLegislaturepassedHouseBill1487,otherwiseknownastheLevelofService(LOS)Bill.TheBillsetnewrequirementsrelatingtotransportationandgrowthmanagementplanning.Theintentofthelegislationwastoenhancethecoordinationofplanningeffortsandplanconsistencyatthelocal,regional,andstatelevel.Thekeyapplicableelementsinclude:
HighwaysofStatewideSignificance:TheStatemustgivehigherprioritytocorrectingidentifieddeficienciesontransportationfacilitiesofstatewidesignificance.DesignationofHighwaysofStatewideSignificance(HSS)wascompletedin1999.IntheSkamaniaCountyregion,theHSSsystemincludesSR‐14.WSDOThasestablishedanLOS‘C’forruralHSSfacilitieslikeSR‐14.
Non‐HighwaysofStatewideSignificance:Non‐HSSstatehighways,otherwiseknownasHighwaysofRegionalSignificance,inSkamaniaCountyincludeSR‐504.TheRTPOhasestablishedanLOS‘C’forruralnon‐HSS.
Chapter 3: Identification of Regional Transportation Needs 30
Regional Transportation Plan for Skamania County
Capacity Analysis TheHighwayCapacitySoftwarewasusedtoanalyzelevelofservicewithintheSkamaniaCountyRegionbasedonP.M.peakhourtraffic.Inaddition,thereareseverallocationswithcapacitydeficienciesassociatedwithsubstandardcurvesandsteepgrades,whichcreateaparticularproblemintheColumbiaRiverGorgeareaduetothemixoftrucks,recreationalvehicles,andautos.DeficientsegmentsassociatedwithcapacityarelistedinTable3‐3.
Table 3‐3: Deficient Capacity Segment
Road Mile Post Deficient Capacity Segment LOS
SR‐14 21.77 ‐ 24.92 Clark Co. line to Half Bridge C
SR‐14 24.92 ‐ 27.87 Half Bridge to Prindle Rd. Vicinity C
SR‐14 27.87 ‐ 37.04 Prindle Rd. to North Bonneville. C
SR‐14 43.90 ‐ 47.44 Rock Creek Br. to Wind River Rd. C
Safety Analysis Improvingsafetyforallmodesoftransportationiscriticaltoimprovingqualityoflifeandimprovingaccessforallthecitizensoftheregion.WashingtonState’sStrategicHighwaySafetyPlan,TargetZero,establishesastatewidepolicyofzerofatalitiesandzerodisablinginjurycollisionsby2030.TargetZero,helpstoassessthesafetyneedsstatewide,encouragingandpromotinggoodsafetypracticesinthedesignandoperationofthetransportationsystem,aswellaspromotingsafetybysystemusers.TargetZerosetsstate‐widepriorities,providesaresourceforpotentialstrategies,andmonitorsoutcomeatastatewidelevel.
Attheregionalleveltrafficsafetyprioritiesaresetbaseduponthemostfrequentlycitedcontributingfactors.Morethanonefactoriscommonlyinvolvedinmostcollisions.Thisresultsineachfatalityandseriousinjurycollisionbeingrepresentedundermultiplefactors.Thefactorsinfatalandserioustrafficcollisionsareprioritizedbasedonthepercentageoftrafficfatalitiesandseriousinjuriesassociatedwitheachfactor.Table3‐4showstheSkamaniaCountyFatalityandSeriousInjuryFactorsbyPriorityLevels,basedonthe2010‐2012collisiondata.
Chapter 3: Identification of Regional Transportation Needs 31
Regional Transportation Plan for Skamania County
TargetZeroincludesspecificobjectivesandstrategiestohelpreducetrafficfatalitiesandseriousinjuriesforeachoftheprimaryfactors.WithinSkamaniaCounty,thefocusshouldbeonimplementingstrategiesthataddressthehighestprioritizedfactors.
Table 3‐4: Deficient Safety Segments, 2010‐2012
Fatalities Serious Injuries
# of People % of Total # of People % of Total
Priority Level One
Motorcyclist 2 28.6% 29 59.2%
Speeding Involved 4 57.1% 15 30.6%
Impaired Driver Involved 4 57.1% 2 4.1%
Run Off the Road 2 28.6% 24 49.0%
Distracted Driver Involved 3 42.9% 8 16.3%
Priority Level Two
Opposite Direction 2 28.6% 7 14.3%
Young Driver 16‐25 Involved 1 14.3% 11 22.4%
Priority Level Three
Unrestrained Vehicle Occupants 1 14.3% 7 14.3%
Drowsy Driver Involved 1 14.3% 4 8.2%
Wildlife 1 14.3% 3 6.1%
Older Driver 75+ Involved 1 14.3% 1 2.0%
Heavy Truck Involved 0 0.0% 3 6.1%
Intersection Related 0 0.0% 2 4.1%
Work Zone 0 0.0% 0 0.0%
Unlicensed Driver Involved 0 0.0% 0 0.0%
Pedestrian 0 0.0% 0 0.0%
School Bus Involved 0 0.0% 0 0.0%
Bicyclist 0 0.0% 0 0.0%
Vehicle‐Train 0 0.0% 0 0.0%
Total 7 49
Chapter 3: Identification of Regional Transportation Needs 32
Regional Transportation Plan for Skamania County
Unstable Slopes
WashingtonStateDepartmentofTransportation(WSDOT)begantheirUnstableSlopeManagementSystemin1993.Thismanagementsystemincorporatedanumericalslopehazardratingsystem.Theratingsystemutilizesamatrixevaluatingelevencategories.In2004anenvironmentalassessmentofSR‐14unstableslopeswascompleted.Ofthesitesinvestigated,26priorityprojectswereidentifiedinSkamaniaCounty.PriorityprojectshadanUnstableSlopeManagementSystemratinggreaterthan200.Thosewithratingsabove300totalpointsrepresentarelativelyhighhazardslope.ABenefittoCost(B/C)Ratioisthenusedtodetermineprojectpriority.Table3‐4liststhe17remainingpriorityprojectsalongSR‐14inSkamaniaCounty.
Table 3‐5: Rockfall Hazard Locations
Road Mile Post Rating B/C Ratio Improvement
SR‐14 24.91‐25.00 315 1.70 Reslope
SR‐14 25.00‐25.20 369 0.34 Realign: Move Bridge
SR‐14 30.20‐30.34 279 2.27 Reslope
SR‐14 30.37‐30.46 345 1.22 Retaining/Buttress Wall
SR‐14 30.90‐31.10 219 1.12 Reslope/Realign/Bolts
SR‐14 46.46‐46.55 309 7.52 Reslope/Scaling/Bolts/Trim
SR‐14 46.61‐46.68 309 1.80 Realignment/Scaling/Bolts
SR‐14 53.33‐53.44 267 5.93 Scaling/Shotcrete/Bolts
SR‐14 53.56‐53.62 267 3.56 Euromesh/Scaling/Bolts/Mesh
SR‐14 54.80‐54.97 249 2.54 Reslope/Erosion Fabric
SR‐14 55.05‐55.35 327 1.59 Reslope/Erosion Fabric
SR‐14 55.60‐55.66 285 1.06 Scaling/Euromesh
SR‐14 55.88‐55.96 375 1.75 Reslope/Scaling
SR‐14 58.84‐58.93 315 1.03 Reslope/Scaling/Bolts
SR‐14 59.07‐59.14 261 8.06 Reslope
SR‐14 62.50‐63.00 501 1.31 Scaling/Euromesh
SR‐14 63.05‐63.20 429 3.14 Realign
Tunnels
TherearefivetunnelsalongSR‐14inSkamaniaCountybetweenmilepost58.08and60.27.Thesetunnelshavea24footpavementwidth,nolighting,andabicyclewarningsystem.Thetunnelsarearchedwithacenterclearanceseveralfeethigherthanthe12.9footclearanceattheouteredgeofthepavement.Severalofthetunnelsarelocatedoncurves.
Chapter 3: Identification of Regional Transportation Needs 33
Regional Transportation Plan for Skamania County
Trucks
Interstate84(I‐84)andStateRoute14(SR‐14)areparalleleast/westhighwaystravelingthroughtheColumbiaRiverGorge.I‐84isa4‐laneInterstatefacilitylocatedinOregonandSR‐14isarural2‐laneStateHighwaylocatedinWashington.BothroutesarepartoftheNationalHighwaySystem(NHS).Bothroutesarepublicroutesthatareopentoalllegaltrucks.Asaruralhighway,SR‐14islessconducivetothroughtrucktrafficbecauseofsharpcurves,steepgrades,andheightrestriction.I‐84asanInterstateHighwayisthehighestroadclassificationandprovidesthehighestlevelofmobility,atthehighestspeed,foralonguninterrupteddistance.Assuch,throughtrucktrafficshouldbeencouragedtouseI‐84.
Preservation and Maintenance Need Ofoverwhelmingimportanceintheplanningfortheregionaltransportationsystemistheneedtomaintainandpreservetheexistingsysteminordertoprotecttheheavyinvestmentsalreadymadeinthesystem.TheRTPsupportsprojectsprogrammedintheTransportationImprovementProgramtomaintainandpreservetheregionaltransportationsystem.
APavementManagementSystemhasbeendevelopedforpavementconditiononallstateroadfacilities.Thissystemisintendedtoassistwiththeprioritizationofpavementpreservationandtorespondtorecentlyobservedconditionsandpredictprobablefutureconditions.WSDOTandlocaljurisdictionsvisuallyinspectpavementconditionsoffacilitiestodetermineneededmaintenanceandpreservation.ProjectsthathavereachedaconditionthatwarrantsrehabilitationareprogrammedintotheStateandlocalSix‐YearTransportationImprovementPrograms.
Chapter 3: Identification of Regional Transportation Needs 34
Regional Transportation Plan for Skamania County
WashingtonStatehasdevelopedaBridgeManagementSystem,aproceduretovisuallysurveybridgeconditions.Thissystemisintendedtoassistwiththeprioritizationofbridgereplacementandmaintenance.Projectswithimmediateneedsareprogrammedintothe
StateorlocalSix‐YearTransportationImprovementProgram.Thereareseveralbridgesindeterioratingcondition,orofsubstandardwidth,andcannotaccommodatebicyclistandpedestriantraffic.Thesebridgeswillneedtobereplacedwithinthenext20years.BoththeHoodRiverBridge(PortofHoodRiver)andtheBridgeoftheGods(PortofCascadeLocks)areregularlyinspectedbytheOregonDepartmentofTransportation.MaintenanceandrepairsaremadebythePortsthatowneachbridge.
BurlingtonNorthernSantaFeRailroadmaintainstheBNSFmainraillinethroughSkamaniaCounty.PortofCascadeLocksmaintainstheBridgeoftheGods.ThePortofHoodRivermaintainstheHoodRiverBridge.TheU.S.ForestServicemaintainstheForestServiceroads.UnderthedirectionoftheU.S.ArmyCorpsofEngineerstheColumbiaRiverismaintained.LocaljurisdictionandWSDOTmaintainbicycleandpedestrianfacilities.
TheRegionalTransportationPlansupportsadditionaltransportationdollarsforthepreservationandmaintenanceoftheregionaltransportationsystem.Priorityshouldbegiventomaintaintheheavyinvestmentalreadymadeintheregionaltransportationsystem.
Enhancement Need Thereisaneedtodevelopandimprovefacilitiesforbicycles,pedestrians,scenicvistas,restareas,thematicsignage,roadsidebeautification,andotherenhancementswithintheSkamaniaCountyregion.TheRegionalTransportationPlansupportscosteffectiveenhancementstothetransportationsystem.
Economic Development Need Theprosperityofaregionisdependentontheprovisionoftransportationinfrastructuretosupporteconomicdevelopment.Themovementofgoodsbyhighway,rail,water,andairareessentialtotheeconomyofSkamaniaCounty.
Chapter 3: Identification of Regional Transportation Needs 35
Regional Transportation Plan for Skamania County
TheRTPsupportsimprovementstothetransportationsystemthatwillgiveprimeconsiderationtoeconomicdevelopmentandthesafe,efficientmovementofpeopleandfreight.Specifically,freightproducedbyormaterialnecessaryfortheoperationofbusinessesandindustriesintheSkamaniaCountyregion.
TheRTPsupportstheimplementationofthe10‐YearPlanfortheBridgeoftheGods,whichidentifiesvitalimprovementsandmaintenanceneeds.TheBridgeoftheGodsisacriticalaccesspointforpeopleandgoodsinthemostpopulationportionofSkamaniaCounty.Theeconomicwell‐beingoftheregionisdependentontheBridgeoftheGods,whichprovidesessentialaccesstoemployment,services,andgoods.Thefacilityisaginganditisessentialthatexistingtollrevenuebededicatedtowardsfundingthe10‐YearPlan,toguaranteetheBridge’scontinualoperationformanymoreyears.
TheRTPsupportsthereplacementoftheHoodRiverBridge.TheHoodRiverBridgeprovidestheprincipleaccessforeasternSkamaniaCountytoemployment,services,andgoods.Thisfacilityisessentialtotheregionsdiversificationbyprovidingaccessandemploymentopportunities.Thisfacilityisimportantforthemovementoflocalgoodstomarket.Theexistingfacilityisnarrowandinadequatetohandlethedemandsoftheregion.Thefacilityisagingandwilllikelyneedtobereplacedwiththenext20years.ThelocaleconomydependsheavilyontheHoodRiverBridge,ensuringanadequatereplacementfacilityisahighpriorityfortheregion.
TheRTPsupportsimprovementstothetransportationsystemthatwillgiveprimeconsiderationtoeconomicdevelopmentandthesafe,efficientmovementofpeopleandfreight.Specifically,freightproducedbyormaterialsnecessaryfortheoperationofbusinessesandindustrieswithinSkamaniaCounty.
Chapter 3: Identification of Regional Transportation Needs 36
Regional Transportation Plan for Skamania County
Chapter 4: Financial Plan 37
Regional Transportation Plan for Skamania County
Chapter 4: Financial Plan
Overview PotentialtransportationimprovementprojectsproposedinthisPlanareintendedtomeettheRTPgoalsandpolicyobjectiveasoutlinedinChapterOne.Thesegoalsandpoliciesincludemakingthemostefficientuseofandenhancingtheexistingtransportationsystem.
Theavailabilityoffederal,state,andlocalmoneyswillhaveasignificantimpactontheabilitytofundproposedprojects.Thischapterdescribesrevenuesourcesanddiscusseschangestorevenuesourcesasaresultoffederalandstatelegislation.Theprojectionoffundingabilityisbasedonhistoricalfundinglevels.TheabilityoftheprojectedfundingtomeetRTPcostsisdetermined.
Transportationhastraditionallybeenfundedby“userfees”.Today,themajortaxsourcestofundtransportationarethegastax,vehiclelicenses,permits,andfees.Gastaxisimposedatthefederallevel($0.184pergallon)andatthestatelevel($0.375pergallon)andisdevotedtoroadwaypurposes.
Challenges and Accomplishments TheRTPfacesconsiderablechallengesforfundingthetransportationsystemintothefuture.Overthelastdecadefewerdollarshavebeenspentonthetransportationsystemastransportationrevenueshavedeclined.Asthetransportationsystemages,thecostofpreservingandmaintainingtheexistingtransportationsystemhasincreased.Thereisaneedtohaveapublicdiscussiononhowtransportationcostwillbepaidforinthefuture.
Chapter 4: Financial Plan 38
Regional Transportation Plan for Skamania County
TheRTPwaslastadoptedin2012;sincethattime,anumberofimprovementshavebeencompletedontheregionalsystemwithinSkamaniaCounty.CompletedimprovementsincludetheCurlyCreekRoad,SR‐14CapeHornImprovements,andmaintenanceandpreservationprojects.
Plannedfuturetransportationimprovements,willcontinuetomaintainandenhancetheexistingtransportationsystem.WithoutadditionalrevenuetherewillbelimitedopportunitiestoimprovetheSkamaniaCountyregionaltransportationsystem.
Revenue Sources
Federal Funding
Thefederalgastaxandothertransportationfeesandtaxesarethemajorfederalrevenuesourcesforfederaltransportationfunding.OnJuly6,2012,thePresidentsignedintolawtheMovingAheadforProgressinthe21stCenturyAct(MAP‐21).MAP‐21providesfundingforfiscalyears2013and2014.MAP‐21restructurescoretransportationprogramswithprogramscreated,eliminated,orrestructuredunderotherprograms.ThisdocumentincludesabriefdescriptionofMAP‐21programs.
NationalHighwayPerformanceProgram(NHPP):ThisprogramprovidessupportfortheconditionandperformanceoftheNationalHighwaySystem(NHS),fortheconstructionofnewfacilitiesontheNHS,andtoensurethatinvestmentsofFederal‐aidfundsinhighwayconstructionaredirectedtosupportprogresstowardtheachievementofperformancetargetsestablishedintheState’sassetmanagementplanfortheNHS.UnderMAP‐21theNationalHighwaySystemisexpandedtoincludeallprincipalarterials.
SurfaceTransportationProgram(STP):ThisprogramprovidesflexiblefundingthatmaybeusedforprojectstopreserveandimprovetheconditionsandperformanceofanyFederal‐aidhighway,bridge,andtunnelonanypublicroad.Thisincludesimprovementstoroads,pedestrianandbicycleinfrastructure,andtransitcapitalprojects.STPfundsaredividedbetweenthefollowprograms:
STP‐Rural(STP‐R):FormulaallocationforprojectsoutsidetheUrbanAreaboundary.RTC(MPO)selectsprojectsforfunding.
STP‐State(STP‐S):FormulaallocationtotheWashingtonStateDepartmentofTransportation,foruseonStatehighwayprojects.TheStateselectsprojects.
Chapter 4: Financial Plan 39
Regional Transportation Plan for Skamania County
Highway Safety Improvement Program (HSIP)
Thisprogramisintendedtoachieveasignificantreductionintrafficfatalitiesandseriousinjuriesonallpublicroads.TheHSIPrequiresadata‐driven,strategicapproachtoimprovinghighwaysafety.
Transportation Alternatives Program (TAP)
MAP‐21establishedanewprogramtoprovideforavarietyofalternativetransportationprojects,includingmanythatwerepreviouslyeligibleactivitiesunderseparatelyfundedprograms.TheTAPreplacesthefundingfromRecreationalTrails,SafeRoutestoSchools,andseveralotherdiscretionaryprograms,wrappingthemintoasinglefundingsource.
Community Development Block Grant (CDBG)
CDBGfundsareadministeredbytheDepartmentofHousingandUrbanDevelopment(HUD).Fundscanbeusedforpublicfacilities,economicdevelopment,housing,andcomprehensiveprojectswhichbenefitlowandmoderateincomehouseholds.Projectsareselectedbythecounty.
Federal Lands Highways
TheFederalLandsHighwaysProgramprovidesfundsforprojectsthatimproveaccesswithinfederallands.
State Funding
TheStateGasTaxistheprimaryStatesourceofhighwaymaintenanceandarterialconstructionfunds:
Washington State Department of Transportation (WSDOT)
TheWashingtonStateDepartmentofTransportationadministersstateandfederalfundedstatehighwayprojects.Statetransportationrevenuesaredividedinto
separateprograms.Thebudgetfortheseprogramsisdeterminedbythestatelegislature.WSDOTthenprioritizesprojectsanddetermineswhichprojectscanbeconstructedwithinthebudgetofeachprogram.
Transportation Improvement Board (TIB) Programs
TheWashingtonStateLegislaturecreatedtheTransportationImprovementBoard(TIB)tofosterstateinvestmentinqualitylocal
Chapter 4: Financial Plan 40
Regional Transportation Plan for Skamania County
transportationprojects.TheTIBdistributesgrantfunding,whichcomesfromtherevenuegeneratedbythreecentsofthestatewidegastax,tocitiesandcountiesforfundingtransportationprojects.TheTIBidentifiesandfundsthehighest‐rankingtransportationprojectsbasedoncriteriaestablishedbytheBoardforeachprogram.
SmallCityProgram(SCP):Fundsprojectsthatpreserveandimprovetheroadwaysysteminamannerthatisconsistentwithlocalneeds(Incorporatedcitiesunder5,000population).Alocalmatchof5%orgreaterisrequired.
PedestrianSafety&MobilityProgram(PSMP):Fundsprojectsthatenhanceandpromotepedestriansafetyandmobilitybyprovidingaccessandaddressingpedestriansystemcontinuityandconnectivity.Alocalmatchof5%orgreaterisrequired.
FederalMatch:Providesthelocalmatchforfederallyfundedprojectsmeetingroutinesmallcityprogrameligibility.
PavementPreservationProgram:Providesfundingforrehabilitationandmaintenanceofthesmallcityroadwaysystem,insomecasesinpartnershipwithWSDOTorcountypavingprojects.
County Road Administration Board (CRAB)
TheCountyRoadAdministrationBoardwascreatedbytheLegislaturein1965toprovidestatutoryoversightofWashington’sthirty‐ninecountyroaddepartments.Theagencyandthetwograntprogramstheyadministerarefundedfromaportionofthecounties’shareoftheStatefueltax.
RuralArterialProgram(RAP):Thisprogramprovidesfundingforreconstructionofruralarterialroads.Proposedprojectsforthisprogramareratedbyaspecificsetofcriteriaincluding(1)structuralabilitytocarryloads,(2)capacitytomovetrafficatreasonablespeeds,(3)adequacyofalignmentandrelatedgeometrics,(4)accidentrates,and(5)fatalaccidentrates.Thisprogramgeneratesapproximately$19millionayearforcountyroadimprovements.
CountyArterialPreservationProgram(CAPP):Thisprogramprovidesfundingtoassistcountiesinpreservingtheirexistingpavedarterialroadnetworks.Fundingisprovidedtocountiesasdirectallocationbasedonpavedarteriallanemiles.Thisprogramgeneratesapproximately$14millionayearforcountyroadimprovements.
Chapter 4: Financial Plan 41
Regional Transportation Plan for Skamania County
Washington State Public Works Board
ThePublicWorksBoardwascreatedbythe1985legislature.Themissionofthisboardis“toassistWashington’slocalgovernmentsandprivatewatersystemsinmeetingtheirpublicworksneedstosustainlivablecommunities.”Theyloanmoneyforpublicfacilities,includingroadsandbridges.
Public Works Trust Fund (PWTF)
ThePublicWorksTrustFundhasapre‐constructionandaconstructionloanprogram.Theseloanprogramsprovidefundsfordesignwork,engineering,permitacquisition,environmentalreview,right‐of‐wayacquisition,andconstruction.Theseloanshavea5‐yeartermforpre‐constructionanda20‐yeartermforconstructionwithaninterestrateofonlyone‐halfpercent.
Community Economic Revitalization Board (CERB)
Thisfundwasestablishedbythelegislaturetomakeloansand/orgrantsforpublicfacilities,includingroads,whichwillstimulateinvestmentandjobopportunities,reduceunemployment,andfostereconomicdevelopment.TheDepartmentofCommunityTradeandEconomicDevelopmentadministerthisprogram.
WSDOT Grant Programs
WSDOTadministersmanytransportationrelatedgrantsthatareavailabletoagencies.However,manyoftheseprogramsaredependentonthelegislatureallocatingfunding.Theseprogramsoftenvaryfromyeartoyear.
Local Funding
Localrevenuecomesfromavarietyofsourcessuchasgastax,propertytax,salestax,permits,fees,andprivatedevelopment.
Local Gas Tax Revenue
Thisisthedistributionofthestategasolinetaxtothecitiesandcountiesbasedoneachjurisdiction’spopulation.
Road Improvement District (RID)
RID’scanbeformedandfundedbypropertiesbenefitingfromanimprovement.Theyareusuallyformedattherequestofpropertyowners.Localgovernmentwillbuildtheprojectusingrevenuebondsfromtheroadimprovementdistrict.
Chapter 4: Financial Plan 42
Regional Transportation Plan for Skamania County
Frontage Improvement Agreements
Developmentsareoftenrequiredtoconstructfrontageimprovementsasaconditionoftheirdevelopment.Incaseswherethedevelopmentabutsaproposedroadimprovementproject,itmaybebeneficialforthedevelopertopaylocalgovernmentfortheirshareofthefrontageimprovementandforlocalgovernmenttoconstructtheimprovementaspartoftheoverallcapitalproject.
Transit Revenues
Revenuesourcesthathavebeendescribedpreviouslyaregenerallyintendedforroadwayimprovements.Thetransitsystem,includingseniortransportation,isgenerallyfundedbyfareboxproceeds,consolidatedstateandfederalgrants,Medicaid,andotherlocalfunds.Thesefundsareusedtopayforbothoperatingandcapitalcosts.
Farebox
PatronsoftheSkamaniadeviatedfixrouteservicepayafaretousetheservicebetweenSkamaniaCountyandVancouver.Thefarerevenuespayforaportionoftheoperatingcost.
Consolidated State and Federal Grants
TheWashingtonStateDepartmentofTransportationisresponsiblefordistributingavarietyofstateandfederalgrantsforpublictransportationprograms.TheseprogramsincludeFederalSections5310,5311,5311(f),3037andStateRuralMobility,Paratransit/SpecialNeeds,andTransitFormulaRevenueEquity.WSDOTcreatedaconsolidatedapplicationprocessthatisusedforbothstateandfederalpublictransportationgrants.Bycreatingaconsolidatedapplicationprocess,applicantsonlyneedtosubmittheirproposalsforallfundingonceeverytwoyears.
Medicaid
EligiblemedicaltripsarefundedbyMedicaidtransportationfunds.
Local Funds
SeniorTransportationisfundedinpartbytheSouthwestAgencyonAgingandSkamaniaCounty.Inaddition,donationsfromlocalagenciesandpassengersassistwithoperatingcost.
Revenue Assumptions SHB1928requirestheRTPbe‘fiscallyconstrained’or“includeafinancialplandemonstratinghowtheregionaltransportationplancanbeimplemented,indicating
Chapter 4: Financial Plan 43
Regional Transportation Plan for Skamania County
resourcesfrompublicandprivatesourcesthatarereasonablyexpectedtobemadeavailabletocarryouttheplan,andrecommendinganyinnovativefinancingtechniquestofinanceneededfacilities,services,andprograms.”Theremustbeabalancebetweenforecastrevenuesandcostsofidentifiedtransportationsystemimprovements.Withlimitedrevenuesavailableforfundingtransportationimprovements,themostcost‐effectivetransportationsolutionsmustbeidentifiedandselected.ThefollowingoutlinestheassumptionsandmethodologyusedfortheRTPrevenueforecast.
WSDOTprovidedhistoricaldatafortransportationrevenuesforyears2004‐2012(9‐yearperiod).
Totaltransportationrevenuewasestimatedfora21‐yearperiodthrough2035,usingthefollowingapproach:
1. CalculatedannualSkamaniaCountytransportationrevenueforyears2004‐2012;
2. Increasedannualrevenueby10%toreflecttherecoveryoftheeconomy;
3. Multipliedtransportationrevenueby80%toreflecttherevenueavailablefortheregionaltransportationsystem;
4. Multipliedregionaltransportationrevenueby21yearstoestimatetotalregionalrevenuegeneratedbySkamaniaCountythrough2035.
TheregionalrevenueestimateaccountsforthetrendthatSkamaniaCountyreceivesa$1.28returnforeverydollarcontributedbySkamaniaCountyresidents.
Assumedtheequivalentofanewstatewidetransportationfundingpackageof11.5centspergallon.WithSkamaniaCountyreceivingapproximately$5milliondollarsallocatedtoasingleproject,withadditionaldistributiontolocalgovernmentsformaintenanceandpreservation.
Assumedthecontinuationofthefederaltransportationrevenueatcurrentlevels.
TheRTPAssumesrevenueandcostsin2012dollars.
Table4‐1containsprojectedtransportationrevenuefortheregionaltransportationsystem.Basedonthisestimate,theSkamaniaCountyregionwouldhaveapproximately$91.7millionintransportationrevenueavailableoverthenext21years.
Table 4‐1: Projected Revenue
Revenues Annual Average 21 Years
Transportation Revenue $4,300,000 $90,300,000
State Revenue Package $240,000 $5,040,000
Totals $4,540,000 $95,340,000
Chapter 4: Financial Plan 44
Regional Transportation Plan for Skamania County
Cost Assumptions
Thefollowingoutlinestheassumptionsandmethodologyusedtoestimatecosts:
Futuremaintenanceandpreservationcostwerebasedontrendsfromyears2004‐2009.Thefullmaintenanceandpreservationneedissignificantlyhigherthantheavailablecost.
Costfortransportationimprovementsarebasedonplanninglevelcostestimates.
Costforothermodessuchasrail,air,andriverareassumedtobemetoutsideoftheRTP.
Table4‐2containsprojectedtransportationcostfortheregionaltransportationsystem.Basedonthisestimate,theSkamaniaCountyregionwouldhave$69.3Millioninmaintenanceandpreservationcost,$26Millioninimprovementcosts,and$79.0Millioninillustrativeneeds
Table 4‐2: Projected Costs
Cost Type 21 Year Forecast
Maintenance & Preservation $69,300,000
Improvement Projects $26,040,000
Illustrative Needs $79,000,000
Balancing Revenue and Cost The“fiscallyconstrained”testfocusesonassuringthatthereisareasonableexpectationthatrevenueswillbeavailabletoprovideforthetransportationImprovementsidentifiedintheRTP.Basedontherevenueassumptionsdescribedinthischapter,thereareinsufficientresourceswithintheregiontomeetthemaintenance,preservation,andimprovementneedsoftheregionaltransportationsystem.Ifadditionalresourcesarenotobtained,therewillbeinadequatefundsforallofthetransportationimprovementneeds.ThefundingandcostdifferenceisillustratedinFigure4‐1.TomeetthefinancialconstraintsoftheRTP,someimprovementneedshavebeenmovedtoanillustrativelist.
Chapter 4: Financial Plan 45
Regional Transportation Plan for Skamania County
Figure 4‐1: Transportation Revenue and Cost, 2014‐2035
$69.3 $26.0 $86.0
$95.3
0 50 100 150 200
Costs
Revenues
Millions of Dollars
Maintenance and Preservation
Improvement Projects
Illustrative Needs
Transportation Revenue
Chapter 5: System Improvement and Strategy Plan 47
Regional Transportation Plan for Skamania County
Chapter 5: System Improvement and Strategy Plan
Overview Thischaptersummarizesthesolutionsandstrategiesneededtoprovideanadequatelevelofregionalmobilityoverthenext20years.Awiderangeofsolutionsandstrategiesareneededtomeettheregionaltraveldemand.Therearestrategiestoaddressthetraveldemandsideaswellastransportationsystemsupplyside,andstrategiestoincreasetheefficiencyoftheexistingregionaltransportationsystemaswellasstrategiestoprovideforasafertransportationsystem.ThesolutionsandstrategiesoutlinedinthischapterwillprovideSkamaniaCountyresidentswithawell‐maintained,structurallysound,saferegionaltransportationsystem.Indevelopingabalancedregionaltransportationsystem,itisnotonlycapacityandsafetydeficienciesthatmustbeaddressedbutalsopreservationandmaintenanceoftheexistingregionaltransportationsystem.Thischapterconcludeswithaprioritizedlistoftransportationsystemimprovements.
ThesolutionsandstrategiesfortheSkamaniaCountyregionaltransportationsystemhavebeendividedintosubheadings.Maintenanceisthedailyoperationsthatkeepthetransportationsystemsafe,clean,andefficient.Preservationisaninvestmentthatprolongsthelifeofthetransportationsystem.Improvementsaremodificationsthatincreasethesafety,mobility,andeffectivenessofthetransportationsystem.Miscellaneousincludesspecificimprovementswhichmaybeincludedunderoneoftheothersubheadingsoristiedtoaspecificfundingsource,thusnocostestimateisprovidedforthesestrategies.Illustrativeincludesadditionaltransportationprojectsthathavebeenidentifiedandcurrentlylacksourcesoffunding.
Maintenance
Ofprimeimportanceintheplanningfortheregionaltransportationsystemistheneedtomaintaintheexistingsystem.
Maintenancewilladdresstheday‐to‐dayactivitiesneededtokeepthetransportationsystemingoodworkingorder;dailyoperationsthatkeepthesystem
Chapter 5: System Improvement and Strategy Plan 48
Regional Transportation Plan for Skamania County
safe,clean,reliableandefficient.Suchactivitiesincludefillingpotholes,repairingbridges,repairingdrainageditches,repairingguardrails,replacingdamagedsigns,plowingsnow,removingrocks,andefficientlyoperatingtrafficsignals.Preservationcanprolongthelifeoftheexistingtransportationsystemthroughsuchprojectsasrepavingroads,rehabilitatingbridges,androckfallprotection.
TheWashingtonStateDepartmentofTransportation(WSDOT)andlocaljurisdictionsmonitortheconditionandoperationoftheexistingsystemandprogramprojectstomaintainandpreservethesystem.TheRTPsupportstheroutine,regularly‐scheduled,andnecessarymaintenanceandpreservationworkidentifiedbylocaljurisdictions.TheRTPsupportsmaintenanceandpreservationbeinggivenhighpriorityintheprogrammingoftransportationfunds.Theestimated21yearpublicmaintenanceandpreservationcostfortheregionaltransportationsystemis$69.3million.Thisdoesnotreflectthefullmaintenanceandpreservationneed.
Improvements Inaddition,theRegionalTransportationPlanrecommendstransportationimprovementsneededtoprovideanadequatelevelofsafetyandregionalmobilityfortheanticipatedgrowthintraveldemand.Improvementsshouldberelatedtoanidentifieddeficiency,asidentifiedinChapter3(safety,capacity,economicdevelopment,non‐motorizedmode,andbridge).Improvementswouldincludeaddinglanes,removingadangerouscurve,addingrestareas,addingscenicvistas,improvingsightdistance,addingaclimbinglane,realignmentofaroadway,andaddingalternativemodesoftransportation.Theestimated21yearimprovementcostis$26.0million.
Illustrative Projectsthataddressanidentifieddeficiency,butdonothaveidentifiedrevenue,arecontainedintheIllustrativeProjectList.Theseprojectsareconsidered“financiallyunconstrained,”becauseestimatedresourceswouldnotcoverprojectcosts.
TheIllustrativeProjectshave“conceptualimprovements”indicatedandestimatedcostsidentified.Theseconceptualimprovementswillnotbecomecommittedprojectsuntilfurtherstudyiscompleted,includingmovingthroughtheregionaltransportationplanningprocessandpotentialrevenuehasbeenidentified.Inmanycases,theIllustrativeprojectswillrequirefurtherstudyoffeasiblealternatives.Theestimated21yearimprovementcostis$74.5million.
Chapter 5: System Improvement and Strategy Plan 49
Regional Transportation Plan for Skamania County
Miscellaneous Strategies and Solutions TheRTPsupportsstrategiesforbridges,safety,economicdevelopment,non‐motorizedmodes,andtransitwhichwillsupportthemobilityofpeopleandgoodswithinSkamaniaCounty.
Bridge Deficiencies
Maintenance,preservation,andreplacementprojectsrequiredonbridgesareidentifiedthroughtheBridgeManagementSystem(BMS)administeredbyWSDOT.
Theregionhasidentifiedthelong‐termneedtoreplacethefunctionallyobsoleteHoodRiverBridge.Theregionmustcontinuetoworkcollaborativelyonthislong‐termtransportationneed.
Safety Deficiencies
Accidentsandtheirnumber,location,andtypearemonitoredbyWSDOTandlocaljurisdictions.Ifthereisdeemedtobeasafetydeficiency,thenremedialmeasuresareconsideredandcorrectiveactiontaken.
Economic Development and Freight Transportation Deficiencies
Theprosperityofaregionisdependentontheprovisionoftransportationinfrastructuretosupporteconomicdevelopment.EconomicdevelopmentemergedasaprimeevaluationcriterionforprioritizingprojectsfortheRegionalTransportationPlan.
WSDOThasadoptedaStatewideFreightandGoodsTransportationSystem,whichcategorizeshighwaysandlocalroadsaccordingtothetonnageoffreighttheycarry.WashingtonStatealsocreatedtheFreightMobilityStrategicInvestmentBoard(FMSIB)withamissiontocreateacomprehensiveandcoordinatedstateprogramtofacilitatefreightmovementbetweenandamonglocal,national,andinternationalmarketswhichenhancestradeopportunities.
TheWashingtonStateLegislaturehasdefinedthepurposeofthestate’sfreightrailprogramandplanningactivitiesandestablishedacomprehensivefreightrailpolicy.ThispolicydirectsWSDOTtomaintainandimprovethestatefreightrailsystemthroughbetterfreightrailplanning,bettercooperationtopreserveraillines,andincreasedfinancialassistancefromthestate.
WashingtonandOregonhaveidentifiedthedeepeningofthelowerColumbiaRiverchannelto43feetasessentialforthemovementoffreight.Thisimprovementwillhelpkeeptheregioneconomicallycompetitiveinthefuture.
Chapter 5: System Improvement and Strategy Plan 50
Regional Transportation Plan for Skamania County
Non‐Motorized Transportation Deficiencies
Thedevelopmentofnon‐motorizedtransportationmodesisastrategythatwillmaximizethecapacityoftheexistingtransportationsysteminurbanareas.Reducedrelianceonautomobilesislargelydependentonthedevelopmentofadequatesidewalksandbikeways.Pedestrianandbicycleneedsaremostappropriatelyidentifiedatthelocallevel.
Transportationdemandmanagement(TDM)strategiestoreducevehicletripsontheregionaltransportationsystemcanincludeuseoftransit,carpooling,vanpooling,workingofflex‐hoursand/orcompressedworkweek,andworkingfromhomewithuseofcommunicationstechnology.
Transportationsystemmanagement(TSM)isalsoastrategytomaximizetheefficiencyoftheexistingtransportationsystem.TSMmeasuresincludeawiderangeofstrategies,mostofwhicharerelatedtotheuseofintelligenttransportationsystems.Theseincludeincidentresponseprograms,programstomonitortravelconditions(weather/congestion),variablemessagesignagetoalertmotoristoftravelconditions,improvedcommunicationmeans,andIntelligentVehicle/HighwaySystems.OtherTSMelementsincludeminorcapitalupgradessuchaschannelizationattrafficintersections.
Transit Deficiencies
Transitisimportantinmeetingthemobilityneedsofthetransitdependent;thoseunabletodriveautomobilesbecauseofage,infirmity,disability,orlowincome.Transitcanalsomeetthemobilityneedsforcommutetripstoandfromemploymentcenters.
Conclusion TheRTPprovidesforstrategiesandsolutionstomeetregionaltraveldemandandtodevelopabalancedregionaltransportationsystemoverthe20‐yearplanningperiod.ProjectsareidentifiedintheRTPandthenprogrammedinthelocalTransportationImprovementProgram.Table5‐1providesalistingofneededimprovementsfortheregionaltransportationsystem.Thistableincludesalistofprojectsforwhichregionalneedhasbeenidentifiedandforwhichthereisstrongregionalcommitment.Thelistfocusesonsafetyimprovementssincethesearetheprojectsthataremostreadilyneeded.Thelistalsoidentifiesawiderangeoftransportationsystemimprovementsthatwillcontributetothedevelopmentofabalancedregionaltransportationsystem.
Aprioritizationprocesshelpstheregiontomakemosteffectiveuseoflimitedtransportationfundingtomeettransportationsystemimprovementneeds.TheprojectslistedinTable5‐1wereprioritizedbasedontheregionalprioritizationprocess.Thefollowingkeyissueswereconsideredintheprioritizationprocess:
Chapter 5: System Improvement and Strategy Plan 51
Regional Transportation Plan for Skamania County
1. Safety,
2. EconomicDevelopment,
3. Congestion,
4. Connectivity,
5. Support,and
6. Cost/Funding.
Table 5‐1: Transportation Improvement Projects
Rank Facility Mile Post Location Existing Condition Improvement Cost*
(millions)
Unranked All N/A Skamania County Existing transportation system
Preservation and Maintenance
Ongoing
Unranked All N/A Skamania County Existing transportation system
Safety Improvements Ongoing
Unranked All N/A Skamania County Existing transportation system
Transportation Enhancements
Ongoing
Unranked All N/A Skamania County Existing transit system Maintain and improve public transit
Ongoing
1 SR‐14 22.7‐26.4 Marble Rd. to Salmon Falls Rd.
One lane each direction Phase 3: Realign curves $8.0
2 SR‐14 47.5/49.3 Wind River Rd. Intersection
Skewed intersection Improve Intersection $5.0
3 SR‐14 41.5 Bridge of the Gods Intersection Improve Intersection $1.0
4 SR‐14 38.5 Hot Spring Way /Dam
At‐grade intersections Add WB deceleration and acceleration lanes
$0.5
5 SR‐14 21.7‐63.5 Countywide Rockfall
Rockfall Rockfall protection $10.0
6 SR‐14 44.9‐48.1 E. of Stevenson to Carson
One lane each direction with sharp curves
Corridor Feasibility Study
$0.2
7 SR‐14 58.0‐60.2 Tunnels 1‐5 Height restricted tunnels Feasibility Study: Lower grade by 6", ITS
$0.5
8 SR‐14 24.9‐27.9 Half Bridge to Prindle Rd.
One lane each direction Study: Extend WB Climbing Lane
$0.2
9 SR‐14 21.7‐63.5 Countywide Limited shoulders Study: Widen shoulder to 4'
$0.2
10 SR‐14 30.1‐30.7 East of Smith‐Cripe Rd.
One lane each direction, with sharp curves
Study: Realignment $0.1
11 SR‐14 63.32 Cook‐Underwood Intersection
At‐grade intersections Study: Intersection improvement
$0.1
12 Columbia River
N/A Stevenson Landing
Dock Study: Replace Public Dock
$0.1
13 SR‐14 42.9‐43.3 Stevenson Industrial Land
Driveways Feasibility Study: Industrial Land Access
$0.1
Total $26.0
*Theseareplanninglevelestimatesandadditionalworkwillbeneededtodetermineactualcost.
Table5‐2providesalistingofneededimprovementsalongtheregionaltransportationsystemthatdonothaveanidentifiedrevenuesource.Theseprojectswillbeaddedtothecommittedlistwhenadequatefinancialresourcesareidentified.
Chapter 5: System Improvement and Strategy Plan 52
Regional Transportation Plan for Skamania County
Table 5‐2: Illustrative Needs
Rank Facility Mile Post Location Existing Condition Improvement Cost*
(millions)
1 SR‐14 22.7‐26.4 Marble Rd. to Salmon Falls Rd.
One lane each direction Phase 4: Realign curves $7.0
2 SR‐14 21.7‐63.5 Countywide Rockfall
Rockfall Rockfall protection $10.0
3 SR‐14 44.9‐48.1 E. of Stevenson to Carson
One lane each direction with sharp curves
Realignment, widen shoulders, and rockfall
$20.0
4 SR‐14 58.0‐60.2 Tunnels 1‐5 Height restricted tunnels Lower grade by 6", ITS $5.0
5 SR‐14 24.9‐27.9 Half Bridge to Prindle Rd.
One lane each direction Extend WB Climbing Lane
$16.0
6 SR‐14 21.7‐63.5 Countywide Limited shoulders Widen shoulder to 4' $20.0
7 SR‐14 30.1‐30.7 East of Smith‐Cripe Rd.
One lane each direction, with sharp curves
Realignment $5.0
8 SR‐14 63.32 Cook‐Underwood Intersection
At‐grade intersections Intersection improvements
$2.0
9 Columbia River
N/A Stevenson Landing
Dock Replace Public Dock $1.0
Total $86.0
*Theseareplanninglevelestimatesandadditionalworkwillbeneededtodetermineactualcost.
Chapter 6: Performance Monitoring 53
Regional Transportation Plan for Skamania County
Chapter 6: Performance Monitoring
Overview Thetransportationplanningprocessrequiresthatmonitoringofsystemperformancetakesplace.Monitoringoftheregionaltransportationsystem’sperformanceisanongoingactivity,whichataminimum,willoccuraspartofthereviewoftheRegionalTransportationPlan(RTP).TheRTPmustbereviewedatleasteverytwoyears.Severalelementsofsystemmonitoringactivitiesaredescribedbelow.
Safety Monitoringofaccidentratesandrockfallisanongoingactivityoftheregionaltransportationsystem.AccidentdatawillbecollectedandstudiedbasedonathreeyearaccidentrateaspartofeachRTPreview.Theaccidentrateswillbeusedtoidentifytheperformanceofthetransportationsystembyidentifyingdeficientroadsegments.Highaccidentlocationswillbeusedasatoolforidentifyingimprovementstrategiestoalleviateasafetyproblem.
Inaddition,WSDOTwillmonitorrockfall.FutureupdatesoftheRTPwillcontainthemostrecentrockfallinformation.Rockfalllocationswillbeusedasatoolforprioritizingrockfallimprovements.
Capacity Analysis Trafficvolumeswillbeusedasatoolformonitoringtrafficcongestionandforidentifyingimprovementstrategiestoalleviatethecongestion.TheHighwayCapacitySoftwarewillbeusedtoanalyzethelevelofservicealongtheregionaltransportationnetwork.Deficientsegmentswillbeanalyzedtoidentifyimprovementstrategiestoalleviatecongestion.
Chapter 6: Performance Monitoring 54
Regional Transportation Plan for Skamania County
Preservation and Maintenance Local,regional,andstatetoolsarebeingusedtomonitorpreservationandmaintenanceneeds.WashingtonStatehasdevelopedaBridgeManagementSystemandPavementManagementSystemtoidentifydeficientconditionsalongroadwaysandbridges.Thesetoolsalongwithothertoolsareongoingactivitieswhichmonitorpreservationandmaintenanceneedsoftheregionaltransportationsystem.
Special Studies Localandstatestudiesandplansareoccasionallyundertakenwhichmonitortheperformanceofthetransportationsystem.Asthesespecialstudiesorplansarecompleted,theassociatedinformationwillbeincludedinthenextupdateoftheRegionalTransportationPlan.
Chapter 7: Plan Development and Implementation 55
Regional Transportation Plan for Skamania County
Chapter 7: Plan Development and Implementation
Public Involvement in Regional Transportation Planning Process SouthwestWashingtonRegionalTransportationCouncil(RTC)hasanadoptedpublicinvolvementprocessoutliningthepublicinvolvementeffortsinthedevelopmentofregionaltransportationplansandprograms.CopiesofthepublicinvolvementprocessareavailablefromRTC’sWebsiteoroffice.AllRTCBoardmeetingsandtheSkamaniaCountyTransportationPolicyCommitteemeetingsareopentothepublic.Publicinvolvementeffortsbuildfromthosecarriedoutatthelocallevelindevelopmentoflocalplansandprogrammingoftransportationprojects.
ApublicmeetingisheldtoadopttheSkamaniaCountyRegionalTransportationPlan.AmendmentstotheRTParepresentedtoboththeSkamaniaCountyTransportationPolicyCommitteeandtheRTCBoardofDirectorsfortheirconsiderationandadoption.Transportationissues,studies,plans,andprogramsareoutlinedandreportedonRTC’swebsiteathttp://www.rtc.wa.gov.
RTP Implementation Implementationofregionaltransportationgoals,policies,andactionsestablishedbytheSkamaniaCountyRegionalTransportationPlan(RTP)arecarriedforwardthroughalocalandregionaldecision‐makingprocess.ThroughthelocaldevelopmentofaTransportationImprovementProgram(TIP),transportationneedsidentifiedintheRTPareprogrammedforreceiptoffunds.
RTP Update Process TheRTPistobereviewedatleasteverytwoyearsandhasbeenupdatedoramendedmanytimesovertheyears.Shouldchangingpolicies,financialconditions,orgrowthpatternswarrant,anRTPupdateoramendmentwilloccur.
Chapter 7: Plan Development and Implementation 56
Regional Transportation Plan for Skamania County
ResultsandrecommendationsfromtransportationstudiesandimprovementswillbeincorporatedintofutureRTPupdates.Thenextreview/updatetotheRTPisanticipatedin2016.
Glossary 57
Regional Transportation Plan for Skamania County
Glossary
Abbreviation Description
ADT Average Daily Traffic
BEA Bureau of Economic Analysis
BNSF Burlington Northern Santa Fe Railroad
BMS Bridge Management System
CAPP County Arterial Preservation Program
CDBG Community Development Block Grant
CERB Community Economic Revitalization Board
CRAB County Road Administration Board
FMSIB Freight Mobility Strategic Investment Board
GMA Growth Management Act
HSP State Highway System Plan
HSIP Highway Safety Improvement Program
HSS Highways of Statewide Significance
ISTEA Intermodal Surface Transportation Efficiency Act (1991)
LOS Level of Service
MPO Metropolitan Planning Organization
NHS National Highway System
NHPP National Highway Performance Program
OFM Washington State’s Office of Financial Management
Scenic Area Columbia River Gorge National Scenic Area
NHS National Highway System
PMS Pavement Management System
PTBA Public Transportation Benefit Area
RID Road Improvement District
RTC Southwest Washington Regional Transportation Council
RTP Regional Transportation Plan
RCO Washington State Recreation and Conservation Office
RTPO Regional Transportation Planning Organization
SHB Senate House Bill
SR‐ State Route
STP Surface Transportation Program
TAP Transportation Alternatives Program
TDM Transportation Demand Management
TIB Transportation Improvement Board
TIP Transportation Improvement Program
TSM Transportation System Management
VMT Vehicle Miles Travelled
WSDOT Washington State Department of Transportation
WTP Washington Transportation Plan