28
APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk 8 th BTA Workshop #1 May 15, 2014

Upload: dinhdan

Post on 30-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

APS Ten Year Transmission Plan 2014-2023

Arizona Corporation Commission 2014 Biennial Transmission Assessment

Jerry Dolyniuk

8th BTA Workshop #1

May 15, 2014

Page 2: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Overview

• Description of APS’s filed 2014-2023 Transmission Plan

• Project changes from previous BTA

• RMR update

• Responses to preliminary questions

– Subregional and stakeholder involvement

– Transmission system adequacy

• Potential coal plant retirement

• September 8, 2011 event

• Increased penetration of variable energy resources

5/15/2014 2

Page 3: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

3 5/15/2014

Page 4: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

4 5/15/2014

Page 5: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Hassayampa-North Gila 500kV update

• Work is currently on schedule to be energized 6/1/15

– Foundations scheduled to be complete in September

– Structure assembly is in progress

– Wire stringing began in April

– Construction at North Gila substation will resume after summer season

– Construction work at Hassayampa Switchyard started in April

– Major equipment due to arrive fall 2014

5/15/2014 5

Page 6: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Progress - North Gila Substation

5/15/2014 6

Page 7: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Progress - Line

5/15/2014 7

Page 8: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

8 5/15/2014

Page 9: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

9 5/15/2014

Page 10: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

10 5/15/2014

Page 11: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

11 5/15/2014

Page 12: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

12 5/15/2014

2017

Page 13: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

13 5/15/2014

2017

Page 14: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

14 5/15/2014

2017

Page 15: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

15 5/15/2014

2017

Page 16: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Ocotillo Modernization Project Site Plan

5/15/2014 16

Page 17: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

17 5/15/2014

2017

Page 18: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

18 5/15/2014

2017

Page 19: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

19 5/15/2014

Page 20: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

20 5/15/2014

Page 21: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Changes from 2012 to 2014

Project Change in Status

7th BTA 8th BTA

Youngs Canyon 345/69kV substation In-service 12/9/13

Delaney-Palo Verde 500kV line 2013 2016

Delaney-Sun Valley 500kV line 2015 2016

Mazatzal 345/69kV substation 2015 2017

Bagdad 115kV line relocation 2014 2017

North Gila-Orchard (TS8) 230kV Line 2015 2018

21 5/15/2014

Page 22: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Changes from 2012 to 2014

Project Change in Status

7th BTA 8th BTA

Sun Valley-Trilby Wash 230kV line 2015 2016

Sun Valley-Morgan 500kV line 2016 2018

Pinal Central-Sundance 230kV line 2014 TBD

Desert Basin-Pinal Central 230kV line

2014 No longer participating

TS12 230/69kV substation 2021 Replaced

OMP 230kV Generator Interconnections

N/A 2017

22 5/15/2014

Page 23: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

RMR Studies

• 7th BTA resulted in an ACC order to suspend RMR studies – Four factors established for restarting RMR studies

• Increase of load forecast by more than 2.5%

• Planned retirement (or expected long-term outage during summer) of transmission/substation

• Planned retirement (or expected long-term outage during summer) of a generating unit in an RMR area

• Significant customer outage in an RMR load pocket during summer months

• 8th BTA - APS analysis showed no triggering events have occurred that would require restarting a RMR study for Phoenix or Yuma load pockets

5/15/2014 23

Page 24: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Subregional & Stakeholders

• APS’s projects are included in Southwest Area Transmission (SWAT), WestConnect, and Transmission Expansion Planning Policy Committee (TEPPC) plans

• APS projects are modeled in all WECC cases

• Regional transmission projects are reviewed and studied within regional/subregional forums

• APS/SRP Joint Stakeholder meetings (FERC Order 890) – 6/20/2013 and 12/19/2013

5/15/2014 24

Page 25: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

System Adequacy

• Coal Plant Retirement Analysis

– APS’s IRP considers a number of different scenarios

• Studies performed included the effects of retiring Four Corners Units 1-3

– SWAT recently established the Coal Reduction Assessment Task Force

• Evaluate the impact of coal retirements long-term and on a wider regional basis

5/15/2014 25

Page 26: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

System Adequacy

• 9/8/2011 Take-Aways

– Increased situational awareness, cooperation and coordination

– Developing a wider view

• Neighboring systems are monitored for effects of outages to the APS system

• Determination of effects on APS system from outages on neighboring systems

5/15/2014 26

Page 27: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

System Adequacy

• Variable Energy Resources

– Natural gas generation will become the energy source of choice

• Operational flexibility

– Cleaner energy mix

• Customer resources such as roof-top solar and energy efficiency projected to triple

– Advanced technology will change the electricity grid

• Communication and automation

• Integration of renewable energy

5/15/2014 27

Page 28: APS Ten Year Transmission Plan 2014-2023 BTA/10 Yr... · APS Ten Year Transmission Plan 2014-2023 Arizona Corporation Commission 2014 Biennial Transmission Assessment Jerry Dolyniuk

Questions?

28 5/15/2014