Design and construction of Model Fish Farms in Denmark
Background
The Fish Farm Committee was appointed by a former Danish minister ofagriculture, fisheries and food.
The Committee should clarify the possibility of an environmentally neutralincrease in the production from the Danish Aquaculture sector throughimplementation of new technologies.
The committee proposed: Three types of fish farms using less water, andsimultaneously an increased degree of recirculation of the water volume.These farms were also intended to be established with standardized watertreatment plants.
Results of the Fish FarmCommittee’s recommendations
The model fish farm project was described and started in 2004 - 2005 withparticipation of 8 Danish trout farms. The fish farmers have received 30 %of the building cost as funding from the Danish government and EU.
A project dealing with the environmental impact was formed by the NationalEnvironmental Institute, Danish Institute for Fisheries Research and theOrganization Danish Aquaculture with 100 % funding from the DanishGovernment and EU.
This project is presently being implemented, and the final report from the projectis expected at the end of 2007.
Participants in model Fish farm project
8 Danish trout farms are participating in the project and these have been rebuiltto so-called model fish farms. All of the participating farms have been rebuilt to“model 3 farms”.
The production at the rebuilt farms has been initiated accordingly during 2004and 2005.
During the project period the allowed amount of feed is increased by 100 %.
After the project period of 2 years, a new maximum allowed amount of feed,based on the removal rate of Nitrogen, Phosphor and BOD on each farm, willbe decided by the environmental authorities.
Three types of model fish farms
958570Recirculation %minimum.
YesYesYesMicro filtration
15 l/second60 l/second125 l/secondWater use l/s/100 t ofproduction
ConcreteEarth pond or concreteEarth pondsType of productionunits
Type 3Type 2Type 1
YesNoYesWetlands
YesYesNoMoving bed filters
YesYesNoFixed bed filters
YesYesYesSludge cones
Mainly used technology for model 3
YesAeration by air-lifts pumps
Only a fewAdding liquid oxygen
95Recirculation % minimum.
YesMicro filtration
15 l/secondWater use l/s/100 t of production
ConcreteType of production units
YesWetlands
YesMoving bed filters
YesFixed bed filters
YesSludge cones
Nørå Dambrug
Nørå air-lift
Airlifts
•Only one central blower isrequired.•Effective aeration of the water•Can handle large volumeof water.•Low energy efficiency as a pump•Some maintenance of blowerand diffuser units.
Sludge cones
Low energy costs Continued removal ofparticles bigger than100 µ
Microsiewes
•Continued removal of particlesdown to 50 – 75 u
•Little manual work isrequired
•Certain degree of maintenance
•High energy cost
Nørå biofilter
Specification for biofilters
RequirementsRequirements Type 2 and type 3Type 2 and type 3
Maximum hydraulic loadMaximum hydraulic load 5,55 l/second/m25,55 l/second/m2Specific biological media surface of the filter media perSpecific biological media surface of the filter media perpermitted t/feed/yearpermitted t/feed/year 500 m2500 m2
Tingkærvad Dambrug
vsp: 21,79 m
vsp: 21,69 m
Indløb til og udløb fra damme
Damme og kanaler med opdræt
Vandets strømningsretning
Bundfældningsbassiner og slambede
Vandløb og fødekanaler
Stemmeværker
Adgangsvej
Rist
Anvendte farver/signaturer:
Broer
Nabo-dambrug
Nedgravede rør
Skellinie, matr.nr.
Bygninger
Tilløb fra væld ogboring
Slamtankø 10 meter
Slamkegler
Mammutbelufter
O mløbsgrøft
Stem
Udløb med målebygværk
Vejle Å
Foderhus
Vejle Å
I ndlø bskanal
Ilttank
Adgangsvej
Bækvej 8, FarreDK-7323 Give
Tlf.
75.7
3.32
.69
Fax.
75.73
.32.
66
Tegnet af:Preben Ikkala Tingkærvad Dambrug
Oversigtsplanmed modelanlæg og biofilter
Målestoksforhold:1:500
Tegn.: 12. maj 1998. Rev.: 4/1-06.
Tingkærvad DambrugBeliggende på adressen:Dalen 20, Randbøldal, 7183 Randbøl.Matr.nr. 1 a, 2 p, 2 r, 2 e, 2 l, 2 z, 3 s, 4 tDalover By, Randbøl.Egtved Kommune, Vejle Amt.
010 10 20 30 40 50 60 70 80 90 100 meter
Matr.nr. 2 r
Mat r
. nr. 2
z
Matr.nr. 2 p
Matr.nr. 2 e
Matr.nr. 2 l
Matr.nr. 1 a
Matr.nr. 4 t
N edg ravede rør fo roml øb
ved ren snin g af bun df ælni ngs bassi n
Rist ved udløb
Betonplade
S temmeværk,
Flo demål: Kot e2 3,6 1mDN N
vsp= vandspejlskote i m DNNvsp: 26,37 m
Bu ndfæl dni ngsba ssin f or i ndlø bsvand
2 34 5
6 7 8
Optegnet på grundlag af tidligere tegninger, luftfoto samt enkelte opmålinger på stedet.File: Plan_10
Le ve
reda
m
L ev e re
d a m
Plantelagune
Plantelagune
Plantelagune
P lantelagune
Overløb til lagune
Hus for blæsere til biofiltreFodersiloer
Rum for blæsere tilmammutbeluftere
Luftrør
Fordelerkanal til plantelaguner
A
A
Jordvold
Slamsilo Jordvoldca. 2 mca. 2,5 m
Snit A - ASnit af silo, grøft og jordvold
Grøft
Grøft, ca. 0,5 m dybbundbredde, ca. 5 m
Ozonanlæg
V andf orsynin gf rad ræn
V andf orsyni ngf ra bor ing
Dræn
Sættefiskanlæg
Slambeholder
Pumpebrønd for drænvand
Til løbfra væld ogboring
Tank for toiletspildevand
PumpebrøndMellemtank
Udløbsrør, ø 400 mm
Overløbsrør, 160 mm
Sl ambed 2
Combined fixed bed andmoving bed filter.
50
Inlet
50
500 600 500
40
100
70
20
50
Outlet
Snit drawing of the biological purification filter, Biostyr principle
300
28
0
210
Sludge outlet
Hydraulic capacity upto 700 l/s
70
70
Wetlands
•High removal of nitrogenand BOD
•Cost effective
•Low maintenance
•Requires large land area
•The response time islong.