aquapeutics · step 6: affix aluminum pole to left fixed glass. step 7: secure center column to...
TRANSCRIPT
AQUAPEUTICS MONACO INSTALLATION MANUAL
LUXURY
I M P O R T A N T S A F E T Y I N S T R U C T I O N S
THE INSTRUCTIONS PERTAINING IS TO A RISK OF FIRE , ELECTRIC SHOCK , OR INJURY TO PERSONS.
WARNINGWhen using this unit , basic precautions should always be followed , includingthe following:
1. READ AND FOLLOW ALL INSTRUCTION.2.DANGER: To reduce the risk of injury: do not permit childr en to use this
unit unless they are closely super vised all the times.
3.Use this only for its intended use as described use as in this manual: do not
use attac hments no recommended by the manufac turer.
4.Never drop or insert any object into any opening,
5.Do not operate this unit without the guard over the suction fitting.
6.The unit must be connected to supply circuit that is protected by a ground-
fault circuit-interrupter (GFCI). Such a GFCI should be provided by the
installer and should be tested on a routing basis . To test the GFCI ,push the test
button, the GFCI should interrupter power .Push the reset button. Power
should be restored. If the GFCI fails to operate in this matter , the GFCI is
defective. If the GFCI interrupter power to the bathtub without the test button
is being pushed, ground current is flowing ,indicating the possibility of an
electric shock . Do not use this hydro massage bathtub and have the problem
corrected by a qualified service rep resentative before using.
7.(For permanently connected units) A green-colored terminal(or a wise
connector marked G GR . Or Ground ) is provided within the terminal
compartment. To reduce the risk of electric shock , connect this terminal or
connector to the grounding terminal of your electric service or supply panel
with a connector equivalent in size to the circuit conductors supplying this
equipment.
SAVE THESE INSTRUCTIONS
¡ ¡ ¡ ¡ ¡ ¡
18
Monaco schmatic diagram
Cross sectional illustration of gaskets
Recommended tools
n
Troubleshooting
4
5
5
5
5
6
7
8Installation stepsSteam generator hook-upsSteam dispenser instructions 16
Operation Instructions ___________________________________________________________________________ 21
Thank you for choosing the Aquapeutics Monaco computerized steam shower. Please read the following manual in its entirety before assembling your unit. It is also very important to follow the safety suggestions outlined below at every use.
Safety Instructions
1. Please keep in mind that like most shiny bathroom surfaceswhen they get wet they may become slippery. Take care not to slip or fall.2. Children should only use this product under adult supervision.
3. Users who suffer from heart disease or have high blood pressureshould exercise greater care when using this product.4. Senior citizens, pregnant women and those who are of ill healthare advised to get a doctors opinion on the recommended frequency of use of this product.
Package & Preparation information
1. Upon arrival your Aquapeutics spa it is IMPERATIVE that you inspect forexterior damage to the shipping crates before signing the delivery receipt. DO NOT refuse the shipment if you see ex-ternal damage! Simply note the damage on the delivery receipt with the driver. Very rarely does external damage equate to in-ternal damage to the unit. In the rare event that there is internal damage we can replace the piece that is damaged rather then re-place the entire unit.
2. It is recommended that all rough plumbing and electrical work becompleted before the assembly of your Monaco begins.3. At least two people are required to lift the larger pieces into positionduring installation.
4
WARNING-When using electric products, basic precautions should
always be followed , including the following;
1.DANGER; RISK OF ELECTRIC . Connect only to a circuit
protected by a ground-fault circuit-interrrupter.
2. Grounding is required . The unit should be installed by a qualified
service representative and ground.
3 . INSTALL TO PERMIT ACCESS FOR SERVING.
4. An equipment -grounding terminal is provided in the fled-wiring
compartment . To reduce the risk of electric shock , this terminal must be
connected to the grounding means provided in the electric supply panel
with a conductor equivalent in size to the circuit conductors supplying
this equipment.
5. INSTALL THIS UNIT IN ACCORDANCE WITH THE CANADIAN
ELECTRICAL CODE PART . IF THE UNIT IS SOLD IN CANADA.
6.Steam Shower Room and Hydromassage with different poer source syst
em:
Steam Shower Room:240V~ ,60Hz ,3.6kW
7.After ins tal la t ion
To have no val leys or dips in the output s team l ine.
Not to instal l a valve in the s team l ine
Not to connect the drain valve into the s team l ine
Not to connect the over-pressure device output into the s team l ien.
Shower cover Front glass Rainfall shower Side panel
Shower pole
Handheld shower Control panel
Function selector Aluminum profile
Accupuncture jetsClampBack panelShower hoseIntegrated seat Steam dispenser Wooden grateShower tray Overhead light
Soap dispenser Back Panel Back rest cusion Center panel
Aluminum spacer Aluminum profile GasketTop aluminum track Left fixed glass panel Sliding door
Door handleLower aluminum track Door rollersPlastic seals
Schematic diagram
7
0column
n of rubber/plastic seals
Gasket for
Gasket Aluminum collumn Plastic seal
Tape measure Level
Allen wrench
Recommended tools
76
Rough in diagram
Drain pipe can be offset as much as 6 inches from tub drain.
Electrical Parameters
16 amps220V
Dimensions
65"x35"x85"
MODEL: Monaco Installation instructions:
A.Water supply: Hot and cold water supply lines are half inch NPT pipe thread B. Power supply:A 220Volt,16 amp service with GFI is necessary to energize the steam room-spa . C.The size of breakers and wire gages needed is determined by local, state and national codes as interpreted by the installing electrician. The length of the wire going to the steam generator from the wall should be 5 feet, while the length of the telephone line needed is 7 feet. This allows the unit to be pulled out from the side walls if maintenance is ever needed.D. Drainage: The diameter of the drain pipe needs to be at least 2 inches. The position of the drain hole can be within 6 inches from the hole shown in the drawing on the previous page.
Notes:
(1) The distance from the top of the steam room to the ceiling of the area where it is installed should be 4 inches or greater. (The room should be at least 4 inches taller than the spa.)(2) It is recommended that the water pressure be at least 43 PSI and both the cold and hot water pressure should be as equal as possible. If the pressure is lower than required, have your plumber install the necessary equipment to increase the water supply pressure.(3) Please have ground fault interrupter (GFI) protection on all power supply lines to the spa.(4) It is easier to line up all panels with the hardware loose. During initial assembly please attach all fasteners loosely, then when the unit is completely erected, snug up all bolts and screws.
9
1. Place the shower floor unit 16-24 inches from its final installed location. Now adjust theleveling feet to bring the unit flat and level by using a 3 foot level and an open end or adjustable wrench to turn the adjusting nuts. This will raise or lower each corner as needed. Once the unit is level and flat lock each leg into position with its locking nut.
Tray
8
Step 1:Affix aluminum pole # 1 to aluminum center column.
Tray
Step 2: Affix left integrated seat to shower tray
Step 3: Affix alluminum columns to integrated seat as pictured.
Step 4: Insert left back fixed glass into left integrated seat column
Step 5: Seal the joint using marine grade silicone.
Step 6: Affix aluminum pole to left fixed glass.
Step 7: Secure center column to tray using screws in illustration.
Step 8: Seal the joint using marine grade silicone.
M6X20 hex head machine bolts
M6 nuts
M6 stainless screw washer
M6 nuts
Back-fixing straight glass
Coping
11
Step 9: Affix left integrated seat to shower tray
Step 10: Affix aluminum pole to right fixed glass.
Step 11: Seal the joint using marine grade silicone.
Step 12: Affix alluminum column to integrated seat as pictured.
Step 13: Affix aluminum column to right integrated seat as illustrated. Step 14: Seal the joint using marine grade
silicone.
M6X20 hex head machine bolts
M6 nuts
M6 stainless screw washer
M6 nuts
Back-fixing straight glass
10
Top rail
Bottom rail
Step 16: Installing the top and bottom aluminum rails
Step 18: Attach steam shower cover to center aluminum column using illustration above.
Step 19: Affix shower cover using screws in illustration.
cover
Step 20: Secure back fixed glass to shower cover.
Step 17: Affix aluminum profile to integrated seat.
13
B618 columnEdge-sealing Aluminum
Side sealing edge
ST4X16 round head self tapping screws
Step 21: Secure front fixed glass to shower cover
Step 22: Connect the water lines.
Step 23: Install side sealing edge
Step 26: Hang doors on upper and lower track
B618 columnEdge-sealing Aluminum
Side sealing edge
ST4X16 round head self tapping screws
12
1. Unscrew nut
Steam outlet
Cold water feed connector
Steam drain
Electrical feed
Steam generator
1.) Connect all hoses to and from the Steam generator. The appropriate outlets/ inlets are labeled in the above diagram and are visible in the photo below. The Steam generator drain hose is pushed onto the fitting (straight or elbow) connected to the Steam Generator. It is secured to this fitting by a clamp and a 3/16 X 5/8 inch round head fastener as is shown in the above figure. It is also shown assembled in the photo below.
final installation steps
2.)When bending the insulated steam hose, please Use Extreme Care not to crimp the hose as you feed it through the appropriate hole in the tub section
3.) The all silver hose is the water supply feed hose to the Steam generator. It is attached here
4.) The rubber washer (gasket) that is secured by a wire tie is inserted into the end of Steam hose④ Connect the insulated black high temperature steam pipe, which is on the steam outlet, to the steamjet’s connector on the spa’s back panel. (Figure 10)
5.) Please refer to the labels (with icons) on the wires of the various low voltage components. They may includeTelephone, CD player/ radio, loudspeaker, LED lights, fan, control panel, etc... Connect the wires sharing the same labels and/or properly mated connector pairs. The radio antenna will need to be unrolled and placed for best reception. See figure 12
6.) Connect the hot and cold water hoses, the red one is for hot water, while the blue one is for cold. Both the hot and cold water supply lines are half inch NPT pipe thread.
7.) While the Monaco shower Spa is still 16-24 inches away from its final installed position all joints and seams should be calked with a high grade silicone sealant. Then fully test the unit. Then slide it into its final installed position.
1.) Connect the hose of the hand-held shower head (B) by screwing it into nozzle (A ) as depicted below and, then put the hand-held shower head into its cradle. (C)
Spray and foot massager installation:
2.) Use the same technique to install the foot massage unit. Its nozzle is located approximately 16 inches below the right side (as you enter) hand held sprayer nozzle. When using the foot massager open the cover of the unit as depictedin the illustration below
15
Function control knob
Rainfall shower
Accupuncturejets
Hot/Cold water faucet
Water on position
Water off position
steam dispenser
Open the steam dispenser Remover basin Pour in essential oils Reconnect basin
Plastic basin
Faucet control instructions
14
3Power Failure
- no sound
Troubleshooting
Call our toll free service line at 800-290-6812 x102 for further assistance.
Problem Possible causes Resolution
Attention: Within your warranty period please do not break the seal on the electrical box or the steam generator. Doing so will void your warranty. There are no user serviceable parts inside. DO NOT repair or replace these units on your own. If you do experience any problems, please contact Aquapeutics’ Toll Free Customer Service line 1 (800) 290-6812 for after-sale service.
accupressure jets
generator cleaner
Overhead light
Steam
Exhaust Fan
Radio
Alarm
Steam Generator
Steam time: 5-50 minutes
Maximum radio volume: 20 decibalsTemperature range: 68-131 degrees20-55 C
Steam Generator
User Guide
BF600 ELECTRICAL SCHEMATICS
BF600 CONTROL PANEL
Accupuncture Jets
Overhead light
Radio station memory
Function button
LCD Panel
Steam generator cleaning function
Power light
REMOTE CONTROL
Power
Function button
Accupuncture Jets
Radio station memory
Overhead light
Radio station
Radio frequency
Steam generator cleaner
To turn the power on press the icon from the control panel or remote control. To turn off press
the icon again.
This will turn onthe overhead light as well as display the room temperature, time, and overhead light icon on the display.
Press again to shut down.
Accupuncture Jet operationJet Operation
The Aspen accupuncture jets offer a series of options. The lower jets and upper jets can be operatedindependently or simultaneously depending on your preference. See diagram below:
Press Once Press twice
the number of times you press the accupuncture jet icon.
First press Second Press Third Press Fourth PressUpper Nozzles On
Lower Nozzles off
Upper nozzles off
Lower Nozzle On
Upper and Lower
Alternate
Upper and LowerOperateIndependently
Upper and Lower
Turn Off
3. Steam Operation
Turn control panel on then pressTurn controller on and press key on control panel or remote control. Once button is depressedyou will see the steam icon appear on the control panel. Water will begin to fill in the steam generatorand the room temperature will be displayed on your control panel. The steam setup time automaticallydefaults to 45 minutes and the temperature automatically defaults to 45 degrees celsius. If there is no water running to the steam generator then the LCD screen will indicate a lack of water. If this happenspress the steam icon again to shut off. After the steam function is shut down the solenoid valve will One minute after the steam has been shut off the solenoid valvewill
steam generatorwill automatically drain any excess water from the steam basin.
5th Press
4. Steam duration and temperature setup
While the control panel is on, press the key on the panel to increase or decrease the steam timekeeping in mind that the default time is 45 minutes.To adjust the temperature click the time key to increase or decrease by one degree celsius.temTo adjust the temperature click on the Presscontinuously for 1.5 seconds to adjust the time automaticallyand hold the and continuously. The temperatureranges from 5-50 degrees celsius.
5.
5. Exhaust Fan
When the panel is on, press the key on the panel or remote control to start up the exhaust fan. Pressagain to turn off.
6. Clock instructions To adjust the time press the "FUN" key for 1.5 seconds and the time icon will flash on the display.
When the time icon begins to flash press the hour icon to change the hour and press theto adjust the minutes.
7. Alarm
When there is an emergency, press the key on the panel or remote control. and the speakers willgive off an alarm sound. The alarm will also sound when there is something wrong with the system. When this happens there will be an EE message on the LCD screen. To turn off the alarm you must turn on theoverhead light and exhaust fan at the same time and make sure all other functionsare turned off. Only then can you disengage the alarm by pressing the on/off icon.
8.
9. Overhead light
When you turn the steam shower on the overhead light will turn on automatically. To turn off simply touchthe overhead light icon on the display or remote.