arc250c-instrukcja v1.0 13-04-02weldes.de/manuals/shermanarc250c/en.pdf · 2019. 5. 27. · welding...

8
1 USER MANUAL WELDING RECTIFIER Inverter ARC 250C Sherman

Upload: others

Post on 17-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ARC250C-instrukcja V1.0 13-04-02weldes.de/manuals/ShermanARC250C/en.pdf · 2019. 5. 27. · Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated

1

USER MANUAL

WELDING RECTIFIER Inverter

ARC 250C

Sherman

Page 2: ARC250C-instrukcja V1.0 13-04-02weldes.de/manuals/ShermanARC250C/en.pdf · 2019. 5. 27. · Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated

2

1. GENERAL

Commissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this andCommissioning and operation of the device and devices can with on the make Æ Only after a careful study ę with this and

instructions and Service. instructions and Service. instructions and Service.

Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the Because of ę du on you and Continuously development of technical devices and equipment, some of its functions may and is Æ modifications and their effects can with roses with than Æ si ę the

details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device. details of the description in the manual. This is not a bug ę dem devices and device, but the result of post ę progress and you and głych modification work devices and device.

Before starting devices and equipment should with y: Before starting devices and equipment should with y: Before starting devices and equipment should with y: Before starting devices and equipment should with y: Before starting devices and equipment should with y:

• check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation. check Æ connection status and June ñ electrical and mechanical. It is forbidden ę at with uses Æ brackets and wires pr and official with damaged insulation.

the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution the incorrect ś pistachio insulation brackets and wires pr and governmental threatens season with eniem pr and electrocution

• take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace. take care Æ about WŁA ś Competent working conditions, ie. will provide Æ WŁA ś CIW and temperatures é, humidity SC and ventilation ę in the workplace.

Closed off the premises ę protects those Æ from precipitation. Closed off the premises ę protects those Æ from precipitation. Closed off the premises ę protects those Æ from precipitation. Closed off the premises ę protects those Æ from precipitation. Closed off the premises ę protects those Æ from precipitation.

• Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.Place ś these Æ rectifier site allows with Livia and Its easy CYM and Supported are present.

people operating and ce welder ę should: people operating and ce welder ę should: people operating and ce welder ę should: people operating and ce welder ę should: people operating and ce welder ę should:

• It has Æ power to electric welding electrodes It has Æ power to electric welding electrodes It has Æ power to electric welding electrodes

• know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work know Æ and observes Æ Obligatory safety regulations and in force and ce in carrying out welding work

• at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably at with uses Æ WŁA ś proper, specialized equipment ę here the protective r ę gloves, apron, rubber boots, shield or welding helmet with a suitably

selected filter.

• know Æ tre SC this manual and operated Æ welder ę its intended purpose know Æ tre SC this manual and operated Æ welder ę its intended purpose know Æ tre SC this manual and operated Æ welder ę its intended purpose know Æ tre SC this manual and operated Æ welder ę its intended purpose know Æ tre SC this manual and operated Æ welder ę its intended purpose know Æ tre SC this manual and operated Æ welder ę its intended purpose know Æ tre SC this manual and operated Æ welder ę its intended purpose know Æ tre SC this manual and operated Æ welder ę its intended purpose know Æ tre SC this manual and operated Æ welder ę its intended purpose

Any repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device andAny repair device and devices can and would Æ made off and only after disconnecting and combined the power plug from the socket and lying. when the device and

device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current device is connected and connected to the network is not allowed to touch gol and r ę k and nor by the moist and boats Z any elements forming and circuit current

smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration smokers and the welding. It is forbidden to remove the guards outside ę Interior on the equipment and On device and included into the network. Any alteration

of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries. of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries. of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries. of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries. of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries. of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries. of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries. of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries. of the rectifier on their own s and prohibited and may and is Æ deterioration of the security ñ countries.

All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices All maintenance and repair may and would Æ carried off and only by authorized persons under the terms safety ñ State labor Obligatory and in force and devices

for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They for smokers and money ñ electric. It is forbidden ę welding operation in areas at risk with or explosive atmospheres with FIRE! Welding station equipment with They

should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the should be Æ in equipment ę t ga ś At the end-fighting ñ done using power cord and cy devices and device should with s disconnect and whether Æ from the

network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier network. damage to the device and equipment caused by the incorrect ś CIW and Supported and causes loss ę powers ñ under warranty. Any alteration rectifier

s and prohibited and cause and loss ę warranty. s and prohibited and cause and loss ę warranty. s and prohibited and cause and loss ę warranty. s and prohibited and cause and loss ę warranty. s and prohibited and cause and loss ę warranty. s and prohibited and cause and loss ę warranty. s and prohibited and cause and loss ę warranty.

2. GENERAL DESCRIPTION

Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods andWelding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated electrodes (MMA method). Umo with also, use with welding methods and

TIG arc ignition by friction (after application of the additional bracket). It is a device and second generation inverter device, manufactured with the most TIG arc ignition by friction (after application of the additional bracket). It is a device and second generation inverter device, manufactured with the most TIG arc ignition by friction (after application of the additional bracket). It is a device and second generation inverter device, manufactured with the most

technologically advanced components made in IGBT technology. Application of inverter resulted in a significant reduction in the dimensions and weight

of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas. of the device and money ñ, which allows with you to their exploitation ę in particular trudnodost ę areas.

office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status: office and equipped device with They are in the switch and VRD switch function allows with Livia and months of work ę an optional mode in idle status:

• voltage ę cut 65V, voltage ę cut 65V, voltage ę cut 65V,

• safe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and functionsafe voltage ę cut 9V, minimize and lying risk season with down pr and electrocution. Welding also has with adjustable and function

ę HOT START and easier and c and arc ignition. ARC 250C is designed for welding electrodes ś diameter of 2.5 - 4mm ę HOT START and easier and c and arc ignition. ARC 250C is designed for welding electrodes ś diameter of 2.5 - 4mm ę HOT START and easier and c and arc ignition. ARC 250C is designed for welding electrodes ś diameter of 2.5 - 4mm ę HOT START and easier and c and arc ignition. ARC 250C is designed for welding electrodes ś diameter of 2.5 - 4mm ę HOT START and easier and c and arc ignition. ARC 250C is designed for welding electrodes ś diameter of 2.5 - 4mm ę HOT START and easier and c and arc ignition. ARC 250C is designed for welding electrodes ś diameter of 2.5 - 4mm ę HOT START and easier and c and arc ignition. ARC 250C is designed for welding electrodes ś diameter of 2.5 - 4mm ę HOT START and easier and c and arc ignition. ARC 250C is designed for welding electrodes ś diameter of 2.5 - 4mm

Page 3: ARC250C-instrukcja V1.0 13-04-02weldes.de/manuals/ShermanARC250C/en.pdf · 2019. 5. 27. · Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated

3

3. SPECIFICATIONS

Napi ę of power Napi ę of power Napi ę of power 3x400V AC 50Hz

Maximum power consumption 9.2 kVA

rated current and d / welding cycle rated current and d / welding cycle rated current and d / welding cycle 250 A / 60%

Current adjustment range and the welding Current adjustment range and the welding Current adjustment range and the welding A 30-250

The method of regulating pr and the welding The method of regulating pr and the welding The method of regulating pr and the welding Liquid

Napi ę a barren Napi ę a barren Napi ę a barren 65 V

Maximum current consumption and du Maximum current consumption and du Maximum current consumption and du 14 And

Mass 14 kg

dimensions 450 x 190 x 320 mm

Fig. 1. General view of the device and equipment Fig. 1. General view of the device and equipment Fig. 1. General view of the device and equipment

4. CONSTRUCTION AND OPERATION

Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of Fundamentals and the construction of the power conversion welder s and electronics made in IGBT technology enables with Livia and ce work ę in terms of

Part ę frequency ś of 200 kHz. Part ę frequency ś of 200 kHz. Part ę frequency ś of 200 kHz. Part ę frequency ś of 200 kHz. Part ę frequency ś of 200 kHz.

The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body The principle of operation is based on rectified voltage ę cut single-phase mains and More on voltage ę a constant-voltage conversion obtained ę body

standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and standing on a rectangular course and passionate big part ę frequency ś Those voltage transformation ę provided within required by the welding process and

re-straightening of the resulting voltage ę photo on the voltage ę of a solid. re-straightening of the resulting voltage ę photo on the voltage ę of a solid. re-straightening of the resulting voltage ę photo on the voltage ę of a solid. re-straightening of the resulting voltage ę photo on the voltage ę of a solid. re-straightening of the resulting voltage ę photo on the voltage ę of a solid.

5. Cape AND CONNECTION TO SUPPLY NETWORK AND MORE 5. Cape AND CONNECTION TO SUPPLY NETWORK AND MORE 5. Cape AND CONNECTION TO SUPPLY NETWORK AND MORE 5. Cape AND CONNECTION TO SUPPLY NETWORK AND MORE 5. Cape AND CONNECTION TO SUPPLY NETWORK AND MORE 5. Cape AND CONNECTION TO SUPPLY NETWORK AND MORE

1. Rectifier inverter 250C are ARC and adapted to cooperate with the network and Three-phase and1. Rectifier inverter 250C are ARC and adapted to cooperate with the network and Three-phase and1. Rectifier inverter 250C are ARC and adapted to cooperate with the network and Three-phase and1. Rectifier inverter 250C are ARC and adapted to cooperate with the network and Three-phase and1. Rectifier inverter 250C are ARC and adapted to cooperate with the network and Three-phase and1. Rectifier inverter 250C are ARC and adapted to cooperate with the network and Three-phase and1. Rectifier inverter 250C are ARC and adapted to cooperate with the network and Three-phase and

3x400V 50 Hz fused 16A by time-delayed action. Power should be Æ3x400V 50 Hz fused 16A by time-delayed action. Power should be Æ

stable, with no voltage drops EC. It is forbidden to supply devices and Equipment aggregates pr and dotwórczych! stable, with no voltage drops EC. It is forbidden to supply devices and Equipment aggregates pr and dotwórczych! stable, with no voltage drops EC. It is forbidden to supply devices and Equipment aggregates pr and dotwórczych! stable, with no voltage drops EC. It is forbidden to supply devices and Equipment aggregates pr and dotwórczych! stable, with no voltage drops EC. It is forbidden to supply devices and Equipment aggregates pr and dotwórczych! stable, with no voltage drops EC. It is forbidden to supply devices and Equipment aggregates pr and dotwórczych! stable, with no voltage drops EC. It is forbidden to supply devices and Equipment aggregates pr and dotwórczych!

2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ2. office and equipped device with one is the power cord and months. before connect and EXCLUDING power should with make sure y Æ

si é, or switch and power switch (1) is in the OFF position (OFF and attached). si é, or switch and power switch (1) is in the OFF position (OFF and attached). si é, or switch and power switch (1) is in the OFF position (OFF and attached). si é, or switch and power switch (1) is in the OFF position (OFF and attached). si é, or switch and power switch (1) is in the OFF position (OFF and attached). si é, or switch and power switch (1) is in the OFF position (OFF and attached). si é, or switch and power switch (1) is in the OFF position (OFF and attached).

3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi 3. It should with make sure y Æ si E, E power cord and cy has been properly placed in the socket, and ff and pi

oxidation of the contacts.

Connect 5.1 and supply cables and smokers to plug network Connect 5.1 and supply cables and smokers to plug network Connect 5.1 and supply cables and smokers to plug network Connect 5.1 and supply cables and smokers to plug network Connect 5.1 and supply cables and smokers to plug network

Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N". Line with yellow-green (conductor) should be with s connected and whether Æ the mains plug in the place marked with "PE" b and d with "N".

Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains Wires black, red, blue s and Implement wires and cymi power to the office and lation (phase) and receivables with s connected and whether Æ a mains

plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a plug at the place indicated by symbols L1, L2, L3 b and d with R1, S2, T3. respectively SC Temp and phase conductors connection to plug in a

designated space is arbitrary and does not cause changes in the office workplace and device. designated space is arbitrary and does not cause changes in the office workplace and device. designated space is arbitrary and does not cause changes in the office workplace and device.

Page 4: ARC250C-instrukcja V1.0 13-04-02weldes.de/manuals/ShermanARC250C/en.pdf · 2019. 5. 27. · Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated

4

6. DESCRIPTION OF FUNCTION SWITCH AND Towels and POKR Ê Tel 6. DESCRIPTION OF FUNCTION SWITCH AND Towels and POKR Ê Tel 6. DESCRIPTION OF FUNCTION SWITCH AND Towels and POKR Ê Tel 6. DESCRIPTION OF FUNCTION SWITCH AND Towels and POKR Ê Tel 6. DESCRIPTION OF FUNCTION SWITCH AND Towels and POKR Ê Tel

Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment Prepared for the office workplace and Attachment device and switches off ę L and towel (1) are and CYM up ę on the back ś wall of the welding machine. On and connection devices and Equipment

will be confirmed inflammation of a ę LEDs (4) will be confirmed inflammation of a ę LEDs (4) will be confirmed inflammation of a ę LEDs (4)

For storage or transport office and device low temperature be with s before and device low temperature be with s before and device low temperature be with s before and device low temperature be with s before

start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!start ę any work lead Æ device and device to WŁA ś ciwej temperature !!!

setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the setting pr and the welding carried out ę knob ę background (10). It SC set pr and the welding points you ś display (7). recommended worth ś you pr and the

welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table. welding depending with Well ś you from ś diameter electrodes for the most-sample rts commonly used electrodes presented in the following with table.

knob ę background (9) adjust the parameters of the function ARC FORCE. It causes with e static characteristic knob ę background (9) adjust the parameters of the function ARC FORCE. It causes with e static characteristic knob ę background (9) adjust the parameters of the function ARC FORCE. It causes with e static characteristic knob ę background (9) adjust the parameters of the function ARC FORCE. It causes with e static characteristic knob ę background (9) adjust the parameters of the function ARC FORCE. It causes with e static characteristic

with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows with sources below with above the contractual voltage ę cut out shapes ę so that shortening long ś you arc accompanied by an increase pr and the welding. This allows

you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting you to adjust ę pr and by changing the welding ę long ś you bow. knob ę background (8) adjust the parameters of the functions Hot Start and easier and more starting

performance. switch and Appendix (2) serving with to control the operating state of the idle mode: performance. switch and Appendix (2) serving with to control the operating state of the idle mode: performance. switch and Appendix (2) serving with to control the operating state of the idle mode: performance. switch and Appendix (2) serving with to control the operating state of the idle mode: performance. switch and Appendix (2) serving with to control the operating state of the idle mode:

• off and VRD function turned on (switch and switch in the OFF position) - voltage ę a sterile 65V. off and VRD function turned on (switch and switch in the OFF position) - voltage ę a sterile 65V. off and VRD function turned on (switch and switch in the OFF position) - voltage ę a sterile 65V. off and VRD function turned on (switch and switch in the OFF position) - voltage ę a sterile 65V. off and VRD function turned on (switch and switch in the OFF position) - voltage ę a sterile 65V. off and VRD function turned on (switch and switch in the OFF position) - voltage ę a sterile 65V. off and VRD function turned on (switch and switch in the OFF position) - voltage ę a sterile 65V.

• On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down On and VRD function turned on (switch and switch in the ON position) - the safe voltage ę a sterile 9V, minimize and ce the risk of time with down

pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5) pr and electrocution. inflammation of a ę a diode (3) indicates an active and function ę On the front VRD device and Equipment is located ę as with LED (5)

signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding. signifying and ca overheating device and equipment and LED (6) indicate and ca irregulari and wash ę welding.

1. Off and main switch 1. Off and main switch 1. Off and main switch

2. Switch and VRD switch functions 2. Switch and VRD switch functions 2. Switch and VRD switch functions

3. LED signaling the and ca function VRD 3. LED signaling the and ca function VRD 3. LED signaling the and ca function VRD

4. LED signaling the and On ca and connection 4. LED signaling the and On ca and connection 4. LED signaling the and On ca and connection 4. LED signaling the and On ca and connection 4. LED signaling the and On ca and connection

device and Network equipment device and Network equipment device and Network equipment

5. LED signaling the and ca overheating 5. LED signaling the and ca overheating 5. LED signaling the and ca overheating

device and equipment device and equipment device and equipment

6. LED signifying and the incorrect ca ś CIW and wash ę6. LED signifying and the incorrect ca ś CIW and wash ę6. LED signifying and the incorrect ca ś CIW and wash ę6. LED signifying and the incorrect ca ś CIW and wash ę6. LED signifying and the incorrect ca ś CIW and wash ę6. LED signifying and the incorrect ca ś CIW and wash ę6. LED signifying and the incorrect ca ś CIW and wash ę6. LED signifying and the incorrect ca ś CIW and wash ę

device and equipment device and equipment device and equipment

7. You ś display 7. You ś display 7. You ś display

8. knob ę background adjustment function Hot Start 8. knob ę background adjustment function Hot Start 8. knob ę background adjustment function Hot Start

9. knob ę background regulating the function of the ARC FORCE 9. knob ę background regulating the function of the ARC FORCE 9. knob ę background regulating the function of the ARC FORCE

10. knob ę background asking pr and du 10. knob ę background asking pr and du 10. knob ę background asking pr and du 10. knob ę background asking pr and du 10. knob ę background asking pr and du

11. Switch and towel MMA / TIG 11. Switch and towel MMA / TIG 11. Switch and towel MMA / TIG

12. Socket "+"12. Socket "+"

13. Nest "-"13. Nest "-"

Fig. 2. View of the front panel and ś rear walls Fig. 2. View of the front panel and ś rear walls Fig. 2. View of the front panel and ś rear walls

Page 5: ARC250C-instrukcja V1.0 13-04-02weldes.de/manuals/ShermanARC250C/en.pdf · 2019. 5. 27. · Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated

5

7. WELDING coated electrodes (MMA)

7.1. Preparing device and Equipment for work 7.1. Preparing device and Equipment for work 7.1. Preparing device and Equipment for work

Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder Ko ñ welding cables should tip with s connected and whether Æ the seats (12) and (13) located and radiant ę on the front panel so that the electrode holder

was a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plugwas a ę WŁA ś competent for the electrode pole. Clamp the second cable should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug

ę device and device to a wall socket 3x400V 50Hz. ę device and device to a wall socket 3x400V 50Hz. ę device and device to a wall socket 3x400V 50Hz. ę device and device to a wall socket 3x400V 50Hz.

7.2. Setting the welding parameters

knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly knob ę Background (10) set C. dan and worth SC pr and the welding. Recommended parameters pr and ent to most-welding rts species commonly

used in the electrode shown in the table:

marking

electrodes

Ś diameter Ś diameter

electrodes

[Mm]

recommended pr and welding recommended pr and welding recommended pr and welding

current [A] Application

ER 142 2 40 - 60 Welding of steel, for example .: St0S, St1S, St2S, St3Sx, and similar St4Sx mostly thin

sheets 2.5 60 - 90

3.25 100 - 150

ER 146 2 40 - 60 Welding steel, e.g. .: St0S, St1S, St2S, St3Sx, St4Sx and the like mainly of sheet metal

tubular steel grade and R 35 2.5 50 - 80

3.25 80 - 130 4

120 - 180 5

160 - 230

ER 346 2 45 - 80 Welding steel, e.g. .: St0S, St1S, St2S, St3Sx, St4Sx and the like mainly of sheet metal

tubular steel grade R, R 35, R 45, round steel ę towych St41, St41A, St41D, St1KO, tubular steel grade R, R 35, R 45, round steel ę towych St41, St41A, St41D, St1KO, tubular steel grade R, R 35, R 45, round steel ę towych St41, St41A, St41D, St1KO,

St45KO, boiler steel St41k, St45k, St36P, St36X

2.5 60 - 110

3.25 100 - 150 4

150 - 200 5

180 - 250

EB 146 2 50 - 75 St0S steel welding, St1S, St2S, St3SX, St4S, St4SX, round steel ę towych St41, St41A, St0S steel welding, St1S, St2S, St3SX, St4S, St4SX, round steel ę towych St41, St41A, St0S steel welding, St1S, St2S, St3SX, St4S, St4SX, round steel ę towych St41, St41A,

St41D, St1KO, St45KO, steel pipe

R, R35, R45, K10, K18, boiler steel St36K, St45K, St36P, St36X, K22H and steel of

increased with withstand elevated ś you gat. 09G2, 18G2, etc. 18G2A. increased with withstand elevated ś you gat. 09G2, 18G2, etc. 18G2A. increased with withstand elevated ś you gat. 09G2, 18G2, etc. 18G2A. increased with withstand elevated ś you gat. 09G2, 18G2, etc. 18G2A. increased with withstand elevated ś you gat. 09G2, 18G2, etc. 18G2A.

2.5 70 - 100

3.25 100 - 140 4

140 - 190 5

180 - 250

EA 146 2 40 - 70 St0S steel welding, St1S, St2S, St3SX, St4S, St4SX, round steel ę towych St41, St41A, St0S steel welding, St1S, St2S, St3SX, St4S, St4SX, round steel ę towych St41, St41A, St0S steel welding, St1S, St2S, St3SX, St4S, St4SX, round steel ę towych St41, St41A,

St41D, St1KO, St45KO, steel pipe

R, R35, R45, etc.

2.5 50 - 100

3.25 90 - 130 4

140 - 200 5

180 - 240

E WITH M (-) E WITH M (-) E WITH M (-) 2 30 - 60 Welding with cast cold Welding with cast cold Welding with cast cold

2.5 50 - 80

3.25 80 - 120 4

110 - 170 5

150 - 200

E WITH Fe, Ni E WITH Fe, Ni E WITH Fe, Ni 3.25 75 - 100 Welding with cold iron, in some cases as withWelding with cold iron, in some cases as withWelding with cold iron, in some cases as withWelding with cold iron, in some cases as with

nickel

7.3. initiation arc

Initiation of arc welding electrodes and wrapped and It involves affected ę five of the electrode to the workpiece, and short rubbed isolation. In the case of Initiation of arc welding electrodes and wrapped and It involves affected ę five of the electrode to the workpiece, and short rubbed isolation. In the case of Initiation of arc welding electrodes and wrapped and It involves affected ę five of the electrode to the workpiece, and short rubbed isolation. In the case of Initiation of arc welding electrodes and wrapped and It involves affected ę five of the electrode to the workpiece, and short rubbed isolation. In the case of Initiation of arc welding electrodes and wrapped and It involves affected ę five of the electrode to the workpiece, and short rubbed isolation. In the case of Initiation of arc welding electrodes and wrapped and It involves affected ę five of the electrode to the workpiece, and short rubbed isolation. In the case of Initiation of arc welding electrodes and wrapped and It involves affected ę five of the electrode to the workpiece, and short rubbed isolation. In the case of

initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip initiation of the arc electrodes which hardens after lagging ę forms a five Deenergized and cy with at with El should with s ribbon, ę then eyes ś these Æ the tip

of the electrode by repeated impact on a hard andof the electrode by repeated impact on a hard and

surface ę and with to obtain metal contact with the work piece. surface ę and with to obtain metal contact with the work piece. surface ę and with to obtain metal contact with the work piece. surface ę and with to obtain metal contact with the work piece. surface ę and with to obtain metal contact with the work piece.

8. WELDING ELECTRODE AND infusible ¥ ( METHOD TIG) 8. WELDING ELECTRODE AND infusible ¥ ( METHOD TIG) 8. WELDING ELECTRODE AND infusible ¥ ( METHOD TIG) 8. WELDING ELECTRODE AND infusible ¥ ( METHOD TIG) 8. WELDING ELECTRODE AND infusible ¥ ( METHOD TIG)

8.1. Preparing device and Equipment for work 8.1. Preparing device and Equipment for work 8.1. Preparing device and Equipment for work

Page 6: ARC250C-instrukcja V1.0 13-04-02weldes.de/manuals/ShermanARC250C/en.pdf · 2019. 5. 27. · Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated

6

Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel. Handle welding methods and TIG connect and whether Æ the (-) terminal (13) and the ground cable to the (+) (12) located and radiant ę on the front panel.

Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V Cable clamp mass should with be carefully fasten Æ on the material workpiece. connect and whether Æ plug ę device and device to a wall socket 3x400V

50Hz.

8.2. Setting the welding parameters

switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding. switch and switch function TIG LIFT (5) set Æ in the lower position with up. knob ę Background (10) set C. dan and worth SC pr and the welding.

8.3. initiation arc

Initiation of arc welding methods and TIG is affected by the ę five of the electrode to the workpiece, and short rubbed isolation Initiation of arc welding methods and TIG is affected by the ę five of the electrode to the workpiece, and short rubbed isolation Initiation of arc welding methods and TIG is affected by the ę five of the electrode to the workpiece, and short rubbed isolation Initiation of arc welding methods and TIG is affected by the ę five of the electrode to the workpiece, and short rubbed isolation Initiation of arc welding methods and TIG is affected by the ę five of the electrode to the workpiece, and short rubbed isolation

9. The instruction BHP

office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed office and ARC 250C device must with s connected and whether Æ to the mains and More 3x400V + PE, 50Hz fused 16A by time-delayed

action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to action. workers operate and cy devices and device should have Æ the necessary ę coordinates qualifications entitling and Allow them to

perform welding work:

• they should have Æ powers in the field of electric welder MMA welding and gas-shielded, they should have Æ powers in the field of electric welder MMA welding and gas-shielded, they should have Æ powers in the field of electric welder MMA welding and gas-shielded,

• know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power know Æ health and safety devices during operation and money ñ electricity which are and device and Welding equipment and fittings ę t Auxiliary Power

Supply and electric and,Supply and electric and,Supply and electric and,Supply and electric and,

• know Æ safety rules when handling and installing the cylinder with spring concentrations salty gas (argon) know Æ safety rules when handling and installing the cylinder with spring concentrations salty gas (argon) know Æ safety rules when handling and installing the cylinder with spring concentrations salty gas (argon) know Æ safety rules when handling and installing the cylinder with spring concentrations salty gas (argon) know Æ safety rules when handling and installing the cylinder with spring concentrations salty gas (argon)

• know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA know Æ tre SC this manual and operated Æ device and device for its intended purpose. During electric arc welding methods and MMA

exist and ff ę following and ce risk with up: exist and ff ę following and ce risk with up: exist and ff ę following and ce risk with up: exist and ff ę following and ce risk with up: exist and ff ę following and ce risk with up: exist and ff ę following and ce risk with up: exist and ff ę following and ce risk with up: exist and ff ę following and ce risk with up: exist and ff ę following and ce risk with up:

• time with up pr and electrocution time with up pr and electrocution time with up pr and electrocution time with up pr and electrocution time with up pr and electrocution

• the negative impact of the arc to eyes and skin ę human the negative impact of the arc to eyes and skin ę human the negative impact of the arc to eyes and skin ę human

• poisoning vapors and gases

• Burns

• threat with to an explosion and after with arem Time with pr-up and electrocution threat with to an explosion and after with arem Time with pr-up and electrocution threat with to an explosion and after with arem Time with pr-up and electrocution threat with to an explosion and after with arem Time with pr-up and electrocution threat with to an explosion and after with arem Time with pr-up and electrocution threat with to an explosion and after with arem Time with pr-up and electrocution threat with to an explosion and after with arem Time with pr-up and electrocution threat with to an explosion and after with arem Time with pr-up and electrocution threat with to an explosion and after with arem Time with pr-up and electrocution

can with to prevent: can with to prevent: can with to prevent:

• Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset Temp and when wireless and c devices and the device technically efficient electrical installation in WŁA ś securing competent and effectiveness ś you reset

(additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment (additional protection Fouling with Resettable); should with s check Æ and correctly connected and whether Æ network so with e other devices and equipment

at the workplace welder,

• wires pr and governmental mounts Æ off the and assorted devices and device, wires pr and governmental mounts Æ off the and assorted devices and device, wires pr and governmental mounts Æ off the and assorted devices and device, wires pr and governmental mounts Æ off the and assorted devices and device, wires pr and governmental mounts Æ off the and assorted devices and device, wires pr and governmental mounts Æ off the and assorted devices and device, wires pr and governmental mounts Æ off the and assorted devices and device, wires pr and governmental mounts Æ off the and assorted devices and device, wires pr and governmental mounts Æ off the and assorted devices and device,

• do not touch Æ at the same time ś not non-insulated parts rts you handle the electrode, the electrode and the workpiece, including housing do not touch Æ at the same time ś not non-insulated parts rts you handle the electrode, the electrode and the workpiece, including housing do not touch Æ at the same time ś not non-insulated parts rts you handle the electrode, the electrode and the workpiece, including housing do not touch Æ at the same time ś not non-insulated parts rts you handle the electrode, the electrode and the workpiece, including housing do not touch Æ at the same time ś not non-insulated parts rts you handle the electrode, the electrode and the workpiece, including housing do not touch Æ at the same time ś not non-insulated parts rts you handle the electrode, the electrode and the workpiece, including housing do not touch Æ at the same time ś not non-insulated parts rts you handle the electrode, the electrode and the workpiece, including housing

office and equipment office and equipment office and equipment

• not at with uses Æ brackets and wires pr and official with damaged insulation, not at with uses Æ brackets and wires pr and official with damaged insulation, not at with uses Æ brackets and wires pr and official with damaged insulation, not at with uses Æ brackets and wires pr and official with damaged insulation, not at with uses Æ brackets and wires pr and official with damaged insulation, not at with uses Æ brackets and wires pr and official with damaged insulation, not at with uses Æ brackets and wires pr and official with damaged insulation,

• under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed under conditions of a specific risk with down time with eniem pr and electrocution (in work ś environments with high with humidity above ś and you closed

tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with tanks ę these) to work Æ augmentation of helper and CYM work ę welder and vigilant and CYM over safety ñ stwem ARE USED Æ clothing ir ę gloves with

good WŁA ś properties ś snip insulation good WŁA ś properties ś snip insulation good WŁA ś properties ś snip insulation good WŁA ś properties ś snip insulation good WŁA ś properties ś snip insulation

• if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting. if you noticed with pose any improperly ś you should with s return Æ si ę people who are competent in order to be removed ę cutting.

• It is forbidden to operate devices and devices with photo ę these covers. Negative effects of electric arc on the eyes and skin ę prevents It is forbidden to operate devices and devices with photo ę these covers. Negative effects of electric arc on the eyes and skin ę prevents It is forbidden to operate devices and devices with photo ę these covers. Negative effects of electric arc on the eyes and skin ę prevents It is forbidden to operate devices and devices with photo ę these covers. Negative effects of electric arc on the eyes and skin ę prevents It is forbidden to operate devices and devices with photo ę these covers. Negative effects of electric arc on the eyes and skin ę prevents It is forbidden to operate devices and devices with photo ę these covers. Negative effects of electric arc on the eyes and skin ę prevents It is forbidden to operate devices and devices with photo ę these covers. Negative effects of electric arc on the eyes and skin ę prevents

a man ę by: a man ę by: a man ę by:

• The use of clothes ñ protective (r ę gloves, apron, boots, leather) The use of clothes ñ protective (r ę gloves, apron, boots, leather) The use of clothes ñ protective (r ę gloves, apron, boots, leather) The use of clothes ñ protective (r ę gloves, apron, boots, leather) The use of clothes ñ protective (r ę gloves, apron, boots, leather)

• The use of protective shield or visor with WŁA ś properly matched filter The use of protective shield or visor with WŁA ś properly matched filter The use of protective shield or visor with WŁA ś properly matched filter

• The use of protective curtains of non-combustible materials and WŁA ś properly selected colors ś absorbing walls and smokers harmful The use of protective curtains of non-combustible materials and WŁA ś properly selected colors ś absorbing walls and smokers harmful The use of protective curtains of non-combustible materials and WŁA ś properly selected colors ś absorbing walls and smokers harmful The use of protective curtains of non-combustible materials and WŁA ś properly selected colors ś absorbing walls and smokers harmful The use of protective curtains of non-combustible materials and WŁA ś properly selected colors ś absorbing walls and smokers harmful The use of protective curtains of non-combustible materials and WŁA ś properly selected colors ś absorbing walls and smokers harmful The use of protective curtains of non-combustible materials and WŁA ś properly selected colors ś absorbing walls and smokers harmful

radiation.

Poisoning vapors and gases evolved at the time of welding of coatings for welding electrodes and the metal evaporation can be prevented with on the: Poisoning vapors and gases evolved at the time of welding of coatings for welding electrodes and the metal evaporation can be prevented with on the: Poisoning vapors and gases evolved at the time of welding of coatings for welding electrodes and the metal evaporation can be prevented with on the:

• The use of devices and money ñ ventilation and cut off and pipelines installed in limited air exchange, The use of devices and money ñ ventilation and cut off and pipelines installed in limited air exchange, The use of devices and money ñ ventilation and cut off and pipelines installed in limited air exchange, The use of devices and money ñ ventilation and cut off and pipelines installed in limited air exchange, The use of devices and money ñ ventilation and cut off and pipelines installed in limited air exchange, The use of devices and money ñ ventilation and cut off and pipelines installed in limited air exchange, The use of devices and money ñ ventilation and cut off and pipelines installed in limited air exchange,

• purging ś know with white air at work in closed space ę this (tanks) purging ś know with white air at work in closed space ę this (tanks) purging ś know with white air at work in closed space ę this (tanks) purging ś know with white air at work in closed space ę this (tanks) purging ś know with white air at work in closed space ę this (tanks) purging ś know with white air at work in closed space ę this (tanks) purging ś know with white air at work in closed space ę this (tanks)

• The use of masks and respirators. Prevents

burns up ę by: burns up ę by: burns up ę by:

• Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and Wear appropriate clothing with s protective footwear and protects and lying from burns ñ dating and smokers from the arc radiation and

spatter,

Page 7: ARC250C-instrukcja V1.0 13-04-02weldes.de/manuals/ShermanARC250C/en.pdf · 2019. 5. 27. · Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated

7

• avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation avoiding dirt ñ boats with s lubricants and oils can and cymi lead Æ its inflammation

It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire. It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire. It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire. It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire. It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire. It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire. It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire. It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire. It is forbidden ę operating devices and welding equipment and premises at risk with or explosive atmospheres with fire.

Welding station should be Æ equipment with They clutch ę t ga ś -fighting. Welding station should be Æ equipment with They clutch ę t ga ś -fighting. Welding station should be Æ equipment with They clutch ę t ga ś -fighting. Welding station should be Æ equipment with They clutch ę t ga ś -fighting. Welding station should be Æ equipment with They clutch ę t ga ś -fighting. Welding station should be Æ equipment with They clutch ę t ga ś -fighting. Welding station should be Æ equipment with They clutch ę t ga ś -fighting. Welding station should be Æ equipment with They clutch ę t ga ś -fighting. Welding station should be Æ equipment with They clutch ę t ga ś -fighting.

Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not Welding station should strewn Æ si ę a safe distances ś those from flammable materials. The above with above risk with drill and general safety rules is not

exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety exhaustive and safety issues ñ State welder working when with not take into ę account the and job site. Wa with NYM supplemented s and bench safety

instructions, training and instructional with e given by supervisors. instructions, training and instructional with e given by supervisors. instructions, training and instructional with e given by supervisors.

10. CAUSES not been included Ś CIWEJ WORK 10. CAUSES not been included Ś CIWEJ WORK 10. CAUSES not been included Ś CIWEJ WORK

symptoms Methods for removing ę photos Methods for removing ę photos Methods for removing ę photos

The Power ś lit é, the fan is not working, no The Power ś lit é, the fan is not working, no The Power ś lit é, the fan is not working, no The Power ś lit é, the fan is not working, no The Power ś lit é, the fan is not working, no

voltage ę cut output ś processing industry voltage ę cut output ś processing industry voltage ę cut output ś processing industry voltage ę cut output ś processing industry voltage ę cut output ś processing industry

1. Make sure Æ si é, or off and switch is in position with ON-up 1. Make sure Æ si é, or off and switch is in position with ON-up 1. Make sure Æ si é, or off and switch is in position with ON-up 1. Make sure Æ si é, or off and switch is in position with ON-up 1. Make sure Æ si é, or off and switch is in position with ON-up 1. Make sure Æ si é, or off and switch is in position with ON-up 1. Make sure Æ si é, or off and switch is in position with ON-up 1. Make sure Æ si é, or off and switch is in position with ON-up 1. Make sure Æ si é, or off and switch is in position with ON-up

2. Check Æ if there is voltage ę a network 2. Check Æ if there is voltage ę a network 2. Check Æ if there is voltage ę a network 2. Check Æ if there is voltage ę a network 2. Check Æ if there is voltage ę a network

power indicator ś lit é, the fan is not power indicator ś lit é, the fan is not power indicator ś lit é, the fan is not power indicator ś lit é, the fan is not power indicator ś lit é, the fan is not

working, no voltage ę cut output ś partial. working, no voltage ę cut output ś partial. working, no voltage ę cut output ś partial. working, no voltage ę cut output ś partial. working, no voltage ę cut output ś partial.

1. Check æ, or devices and device is not connected and connected to the network 1. Check æ, or devices and device is not connected and connected to the network 1. Check æ, or devices and device is not connected and connected to the network 1. Check æ, or devices and device is not connected and connected to the network 1. Check æ, or devices and device is not connected and connected to the network 1. Check æ, or devices and device is not connected and connected to the network 1. Check æ, or devices and device is not connected and connected to the network

you with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æyou with st voltage ę five. them ś If so, connect and whether Æ to 230V and owned and whether Æ

again

2. Napi ę the power of and which it is unstable and causes incl and connection 2. Napi ę the power of and which it is unstable and causes incl and connection 2. Napi ę the power of and which it is unstable and causes incl and connection 2. Napi ę the power of and which it is unstable and causes incl and connection 2. Napi ę the power of and which it is unstable and causes incl and connection 2. Napi ę the power of and which it is unstable and causes incl and connection 2. Napi ę the power of and which it is unstable and causes incl and connection

overvoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whetherovervoltage protection ę partial. off and whether Æ device and take 2-3 minutes and owned and whether

Æ again Æ again

3. On Short and connection and off and connection switch and switch 3. On Short and connection and off and connection switch and switch 3. On Short and connection and off and connection switch and switch 3. On Short and connection and off and connection switch and switch 3. On Short and connection and off and connection switch and switch 3. On Short and connection and off and connection switch and switch 3. On Short and connection and off and connection switch and switch

caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take caused incl and overvoltage protection connection ę partial. off and whether Æ device and take

2-3 minutes and owned and whether Æ again 2-3 minutes and owned and whether Æ again 2-3 minutes and owned and whether Æ again 2-3 minutes and owned and whether Æ again 2-3 minutes and owned and whether Æ again

4. ff and drank other damage requiring and ce-repair 4. ff and drank other damage requiring and ce-repair 4. ff and drank other damage requiring and ce-repair 4. ff and drank other damage requiring and ce-repair 4. ff and drank other damage requiring and ce-repair

authorized service

11. OPERATION MANUAL

Operation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not withOperation of devices and ARC 250C devices should be done Æ si ę in an atmosphere free from components with r and smokers and du with ego dust. Do not with

s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity s sets Æ device and equipment in a dusty, near with at work and smokers should grinders, etc .. with avoided Æ operation in ś environments with high with humidity

above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal above ś you, and in particular ś in these situations occur ę proceedings of dew on the metal parts. In the case of occurrence and sleep dew on the metal

parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding parts, eg. after the cold office and Equipment to be a warm room with s wait Æ until disappearance ę cut dew. It is recommended ę in the case of welding

operation outdoor place it under a roof to protect against adverse weather conditions. office and ARC 250C device should be Æ operated in next ę followingoperation outdoor place it under a roof to protect against adverse weather conditions. office and ARC 250C device should be Æ operated in next ę followingoperation outdoor place it under a roof to protect against adverse weather conditions. office and ARC 250C device should be Æ operated in next ę followingoperation outdoor place it under a roof to protect against adverse weather conditions. office and ARC 250C device should be Æ operated in next ę followingoperation outdoor place it under a roof to protect against adverse weather conditions. office and ARC 250C device should be Æ operated in next ę followingoperation outdoor place it under a roof to protect against adverse weather conditions. office and ARC 250C device should be Æ operated in next ę followingoperation outdoor place it under a roof to protect against adverse weather conditions. office and ARC 250C device should be Æ operated in next ę following

and conditions: and conditions:

- value changes ś you effective voltage ę Power cut no wi ę greater than with 10% value changes ś you effective voltage ę Power cut no wi ę greater than with 10% value changes ś you effective voltage ę Power cut no wi ę greater than with 10% value changes ś you effective voltage ę Power cut no wi ę greater than with 10% value changes ś you effective voltage ę Power cut no wi ę greater than with 10% value changes ś you effective voltage ę Power cut no wi ę greater than with 10% value changes ś you effective voltage ę Power cut no wi ę greater than with 10% value changes ś you effective voltage ę Power cut no wi ę greater than with 10% value changes ś you effective voltage ę Power cut no wi ę greater than with 10%

- ambient temperature of from -10 ° C to + 40 ° C

- these ś Atmospheric pressure 860 to 1060 hPa these ś Atmospheric pressure 860 to 1060 hPa these ś Atmospheric pressure 860 to 1060 hPa

- humidity SC or ę the bottom of the air no wi ę greater than with 80% humidity SC or ę the bottom of the air no wi ę greater than with 80% humidity SC or ę the bottom of the air no wi ę greater than with 80% humidity SC or ę the bottom of the air no wi ę greater than with 80% humidity SC or ę the bottom of the air no wi ę greater than with 80% humidity SC or ę the bottom of the air no wi ę greater than with 80% humidity SC or ę the bottom of the air no wi ę greater than with 80% humidity SC or ę the bottom of the air no wi ę greater than with 80% humidity SC or ę the bottom of the air no wi ę greater than with 80%

- high SC above sea level to 1000m high SC above sea level to 1000m high SC above sea level to 1000m

12. INSTRUCTIONS FOR MAINTENANCE

As part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñAs part of the daily operation should with be maintained at Æ welder ę in a purely ś these checks and Æ connection status and June ñ

external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you: external ę Interior. Not less than with once every six months should with s will Æ general overview and du and the state calls and June ñ electrical, and in particular ś you:

- Fouling protection status with Resettable Fouling protection status with Resettable Fouling protection status with Resettable

- the insulation

- Security system status ñSecurity system status ñ

- correctness ś those actions cooling system correctness ś those actions cooling system correctness ś those actions cooling system

13. INSTRUCTION STORAGE AND TRANSPORT

office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust. office and device should with s store Æ at -10 ° C to + 40 ° C and relative humidity ś of relative ę org to 80% free with r and smokers fumes and dust.

Transportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should withTransportation of packaged devices and money ñ It should take place Æ si ę indoor ś by public transport. Packaged for transport devices and device should with

be secured Æ before moving up ębe secured Æ before moving up ębe secured Æ before moving up ębe secured Æ before moving up ę

and ensure Æ the WŁA ś CIW and position are present.and ensure Æ the WŁA ś CIW and position are present.and ensure Æ the WŁA ś CIW and position are present.and ensure Æ the WŁA ś CIW and position are present.and ensure Æ the WŁA ś CIW and position are present.and ensure Æ the WŁA ś CIW and position are present.and ensure Æ the WŁA ś CIW and position are present.and ensure Æ the WŁA ś CIW and position are present.

Page 8: ARC250C-instrukcja V1.0 13-04-02weldes.de/manuals/ShermanARC250C/en.pdf · 2019. 5. 27. · Welding rectifier ARC 250C serve with s welding r ę handwriting structural steel coated

8

14. COMPLETE SPECIFICATION

1. WITH Source ARC 250C 1. WITH Source ARC 250C 1. WITH Source ARC 250C 1 piece.

2. Connect the electrode holder 1 piece.

3. The return line with a clamp 1 piece.

4. Manual 1 piece.

5. Packaging 1 piece.

15. Warranty Warranty is granted a ę for a period of 12 months ę months from the date of sale with y located on the warranty card 15. Warranty Warranty is granted a ę for a period of 12 months ę months from the date of sale with y located on the warranty card 15. Warranty Warranty is granted a ę for a period of 12 months ę months from the date of sale with y located on the warranty card 15. Warranty Warranty is granted a ę for a period of 12 months ę months from the date of sale with y located on the warranty card 15. Warranty Warranty is granted a ę for a period of 12 months ę months from the date of sale with y located on the warranty card 15. Warranty Warranty is granted a ę for a period of 12 months ę months from the date of sale with y located on the warranty card 15. Warranty Warranty is granted a ę for a period of 12 months ę months from the date of sale with y located on the warranty card

.

warranty b ę be respected after the presentation by advertise warranty b ę be respected after the presentation by advertise warranty b ę be respected after the presentation by advertise and lying proof of purchase (receipt and lying proof of purchase (receipt

or invoice) and warranty card inscribed with and names and product serial number, date or invoice) and warranty card inscribed with and names and product serial number, date or invoice) and warranty card inscribed with and names and product serial number, date or invoice) and warranty card inscribed with and names and product serial number, date or invoice) and warranty card inscribed with and names and product serial number, date and

he'll sell with y and bearing seal and tk and point of sale with s. In the case of he'll sell with y and bearing seal and tk and point of sale with s. In the case of he'll sell with y and bearing seal and tk and point of sale with s. In the case of he'll sell with y and bearing seal and tk and point of sale with s. In the case of he'll sell with y and bearing seal and tk and point of sale with s. In the case of he'll sell with y and bearing seal and tk and point of sale with s. In the case of he'll sell with y and bearing seal and tk and point of sale with s. In the case of he'll sell with y and bearing seal and tk and point of sale with s. In the case of he'll sell with y and bearing seal and tk and point of sale with s. In the case of

warranty repair advertised devices and device should with y sends Æ the company TECWELD and device should with y sends Æ the company TECWELD and device should with y sends Æ the company TECWELD and device should with y sends Æ the company TECWELD and device should with y sends Æ the company TECWELD and device should with y sends Æ the company TECWELD

companies and forwarding service and GLS. Shipments sent at the expense of the TECWELDcompanies and forwarding service and GLS. Shipments sent at the expense of the TECWELDcompanies and forwarding service and GLS. Shipments sent at the expense of the TECWELDcompanies and forwarding service and GLS. Shipments sent at the expense of the TECWELDcompanies and forwarding service and GLS. Shipments sent at the expense of the TECWELD after ś through other companies after ś through other companies after ś through other companies

forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by forwarding will not ę d and accepted !! office and complaints sent to the device must be Æ packed in the original carton, and protected by

Styrofoam original fittings. Company Tecw

eld is not responsible ś you for eld is not responsible ś you for eld is not responsible ś you for

welding damage caused during transport.

them with If you plan to get rid of Æ si ę this product, do not dispose of together with normal household them with If you plan to get rid of Æ si ę this product, do not dispose of together with normal household them with If you plan to get rid of Æ si ę this product, do not dispose of together with normal household them with If you plan to get rid of Æ si ę this product, do not dispose of together with normal household them with If you plan to get rid of Æ si ę this product, do not dispose of together with normal household them with If you plan to get rid of Æ si ę this product, do not dispose of together with normal household them with If you plan to get rid of Æ si ę this product, do not dispose of together with normal household

waste. According to the WEEE Directive (Directive 2002/96 / EC) Obligatory and in force and More in waste. According to the WEEE Directive (Directive 2002/96 / EC) Obligatory and in force and More in waste. According to the WEEE Directive (Directive 2002/96 / EC) Obligatory and in force and More in waste. According to the WEEE Directive (Directive 2002/96 / EC) Obligatory and in force and More in waste. According to the WEEE Directive (Directive 2002/96 / EC) Obligatory and in force and More in

the European Union for u with ywanego equipment ę electrical and electronic equipment should with y the European Union for u with ywanego equipment ę electrical and electronic equipment should with y the European Union for u with ywanego equipment ę electrical and electronic equipment should with y the European Union for u with ywanego equipment ę electrical and electronic equipment should with y the European Union for u with ywanego equipment ę electrical and electronic equipment should with y the European Union for u with ywanego equipment ę electrical and electronic equipment should with y the European Union for u with ywanego equipment ę electrical and electronic equipment should with y

USE Æ methods of utilization. USE Æ methods of utilization. USE Æ methods of utilization.

In Poland, in accordance with the provisions of the Act of July 1, 2005. about zu with the used In Poland, in accordance with the provisions of the Act of July 1, 2005. about zu with the used In Poland, in accordance with the provisions of the Act of July 1, 2005. about zu with the used

equipment ę of electrical and electronic equipment it is prohibited to place ł and Including other wastes withequipment ę of electrical and electronic equipment it is prohibited to place ł and Including other wastes withequipment ę of electrical and electronic equipment it is prohibited to place ł and Including other wastes withequipment ę of electrical and electronic equipment it is prohibited to place ł and Including other wastes withequipment ę of electrical and electronic equipment it is prohibited to place ł and Including other wastes withequipment ę of electrical and electronic equipment it is prohibited to place ł and Including other wastes with

ytego equipment ę MARK crossed here ś PARTICULAR trash.ytego equipment ę MARK crossed here ś PARTICULAR trash.ytego equipment ę MARK crossed here ś PARTICULAR trash.ytego equipment ę MARK crossed here ś PARTICULAR trash.ytego equipment ę MARK crossed here ś PARTICULAR trash.

AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point AT with user who intends to get rid of Æ si ę this is the obligations and tied to donate zu with ytego equipment ę electrical and electronic collection point

zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the zu with ytego equipment ę here. Collection points are conducted and among others by wholesalers and retailers of equipment ę here and the

communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been communal organizational units conducting and ce activity SC in waste collection. above with Obligatory six and Compounds laws have been

introduced to limit the amount ś you waste resulting from wear with ytego equipment ę electrical and electronic equipment and to ensure an introduced to limit the amount ś you waste resulting from wear with ytego equipment ę electrical and electronic equipment and to ensure an introduced to limit the amount ś you waste resulting from wear with ytego equipment ę electrical and electronic equipment and to ensure an introduced to limit the amount ś you waste resulting from wear with ytego equipment ę electrical and electronic equipment and to ensure an introduced to limit the amount ś you waste resulting from wear with ytego equipment ę electrical and electronic equipment and to ensure an introduced to limit the amount ś you waste resulting from wear with ytego equipment ę electrical and electronic equipment and to ensure an introduced to limit the amount ś you waste resulting from wear with ytego equipment ę electrical and electronic equipment and to ensure an

adequate level of collection, recovery and recycling of with ytego equipment ę here. Proper implementation of these Obligatory and not display is adequate level of collection, recovery and recycling of with ytego equipment ę here. Proper implementation of these Obligatory and not display is adequate level of collection, recovery and recycling of with ytego equipment ę here. Proper implementation of these Obligatory and not display is adequate level of collection, recovery and recycling of with ytego equipment ę here. Proper implementation of these Obligatory and not display is adequate level of collection, recovery and recycling of with ytego equipment ę here. Proper implementation of these Obligatory and not display is adequate level of collection, recovery and recycling of with ytego equipment ę here. Proper implementation of these Obligatory and not display is adequate level of collection, recovery and recycling of with ytego equipment ę here. Proper implementation of these Obligatory and not display is

particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative particularly important in the case when zu with the used equipment ę located close and si ę dangerous ingredients that have and particularly negative

impact on ś environment and human health. Weight equipment ę herein 13.06 kgimpact on ś environment and human health. Weight equipment ę herein 13.06 kgimpact on ś environment and human health. Weight equipment ę herein 13.06 kgimpact on ś environment and human health. Weight equipment ę herein 13.06 kgimpact on ś environment and human health. Weight equipment ę herein 13.06 kg

Declaration of Compliance ś these Declaration of Compliance ś these Declaration of Compliance ś these

Tecweld Peter Polak

ul. Emerald 21/3/6 41-943 Piekary Ś l and State Department: ul. cross withul. Emerald 21/3/6 41-943 Piekary Ś l and State Department: ul. cross withul. Emerald 21/3/6 41-943 Piekary Ś l and State Department: ul. cross withul. Emerald 21/3/6 41-943 Piekary Ś l and State Department: ul. cross withul. Emerald 21/3/6 41-943 Piekary Ś l and State Department: ul. cross withul. Emerald 21/3/6 41-943 Piekary Ś l and State Department: ul. cross with

Half of 3 41-924 Bytom POLAND

We declare, with that the product We declare, with that the product We declare, with that the product

MMA inverter welder type ARC 250C

It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the It is consistent with the standards and BS EN 60974-1: 2002 "Equipment ę t arc welding. part ESC 1: Welding with sources of energy, "according to the

conditions laid down in the EU Directive LVD 2006/95 / EC and standards and BS EN 60974-10: 2004 (U), "Groce ę t arc welding. part ESC 10: conditions laid down in the EU Directive LVD 2006/95 / EC and standards and BS EN 60974-10: 2004 (U), "Groce ę t arc welding. part ESC 10: conditions laid down in the EU Directive LVD 2006/95 / EC and standards and BS EN 60974-10: 2004 (U), "Groce ę t arc welding. part ESC 10: conditions laid down in the EU Directive LVD 2006/95 / EC and standards and BS EN 60974-10: 2004 (U), "Groce ę t arc welding. part ESC 10: conditions laid down in the EU Directive LVD 2006/95 / EC and standards and BS EN 60974-10: 2004 (U), "Groce ę t arc welding. part ESC 10: conditions laid down in the EU Directive LVD 2006/95 / EC and standards and BS EN 60974-10: 2004 (U), "Groce ę t arc welding. part ESC 10: conditions laid down in the EU Directive LVD 2006/95 / EC and standards and BS EN 60974-10: 2004 (U), "Groce ę t arc welding. part ESC 10:

Requirements for and ce compatibility ś electromagnetic "according to the conditions established European Union EMC Directive 2004/108 / EC. Requirements for and ce compatibility ś electromagnetic "according to the conditions established European Union EMC Directive 2004/108 / EC. Requirements for and ce compatibility ś electromagnetic "according to the conditions established European Union EMC Directive 2004/108 / EC. Requirements for and ce compatibility ś electromagnetic "according to the conditions established European Union EMC Directive 2004/108 / EC. Requirements for and ce compatibility ś electromagnetic "according to the conditions established European Union EMC Directive 2004/108 / EC.

Bytom, dn. 03.01.2011 Peter Polak