architects - strathfield · gk gk 12679-11 a122 72 units + 2 commercial construction certificate...

7
UP UP UP UP UP 4 A128 3 A128 MAIN SWITCH BOARD MAIN DISTRIBUTION FRAME SPRINKLER VALVE & FIRE HYDRANT PUMP ROOM COMMUNITY ROOM COMMERCIAL GARBAGE ROOM BULKY STORE ROOM F.H.B. Retail C01 109 m² Retail C02 46 m² LOBBY RESIDENTIAL GARBAGE ROOM LIFT 1 LIFT 2 F.S.4 1:8.0 1:4.0 12.55 10.00 9.75 1:8.0 9.75 1:8.0 FAN ROOM LOADING DOCK RAMP DOWN TO B1 +RL 12.80 +RL 12.80 +RL 12.80 +RL 12.80 +RL 12.80 COURTYARD AREA REFER TO LANDSCAPE PLAN +RL 12.80 S UBSTATION 300mm KERB LETTERBOXES TO AUSTRALIAN STANDARDS DEEP SOIL AREA REFER TO LANDSCAPE PLAN LANDSCAPED PAVED ISLAND SAME HEIGHT AS FOOTPATH LEFT TURN PAVEMENT ARROW UA3(L) ALL TRAFFIC TURN LEFT SIGN R2-14(L) CONCEALED AWNING LIGHTING TO BE BUILT IN ACCORDANCE WITH CONDITION 13 OF THE DA CONSENT INTERCOM SYSTEM TO AUSTRALIAN STANDARDS PHOENIX PALM TO BE TRANSPLANTED TO A NEW LOCATION IN ACCORDANCE WITH CONDITION 62 OF THE DA CONSENT F.H.R F.H.R 1 A126 1 A126 2 A127 2 A127 Accessible WC 6 A601 5 A601 1.8m HIGH SECURITY GATE & DOOR IS TO FAIL-SAFE IN THE UNLOCKED POSITION ON THE ACTIVATION OF THE BUILDINGS SPRINKLER & FIRE ALARM SYSTEMS 1:8.0 1:8.0 +RL 12.80 SUBSTATION EASEMENT 5.3m x 3.3m APPROXIMATE SEWER LINE LOCATION SUBSTATION TO ENGINEERS DETAILS & SPECIFICATION RAMPS TO STRUCTURAL ENGINEERS DETAILS AND SPECIFICATION CONCRETE IN-SITU FLOOR SLAB REFER TO ENGINEERS DETAILS & SPECIFICATION FIRE HYDRANTS IN ALL FIRE- ISOLATED STAIRS CONCRETE IN-SITU STAIRS REFER TO STRUCTURAL ENGINEERS DETAILS AND SPECIFICATION VERTICAL LIFT INSTALL TO MANUFACTURERS DETAIL AND SPECIFICATION METER ROOM REFER TO CONSULTANCY DRAWINGS AND FURTHER DETAILS MECHANICAL SHAFTS AND DUCTS REFER TO MECHANICAL ENGINEERS DETAILS AND SPECIFICATION 4.0m WIDE BY 4.0m HIGH SUBSTATION RIGHT OF WAY ACCESS 2.0m WIDE OVERLAPPING CABLE EASEMENT 6x125mm CONDUITS ENCASED IN 150mm CONCRETE ON ALL SIDES CURTAIN WALL TO MANUFACTURERS DETAIL & SPECIFICATION COMBINED FIRE HYDRANT & SPRINKLER BOOSTER TO ENGINEERS DETAILS & SPECIFICATION FOOTPATH TO BE BUILT IN ACCORDANCE WITH CONDITION 68 OF THE DA CONSENT 1:40.0 F.S.2 CARETAKER FIRE CONTROL CENTRE F.H.R W.M F.H F.H.R PARRAMATTA RD STAIR PRESS. FAN ROOM GAS METER ROOM 7 A601 F.S.1 +RL 12.80 +RL 12.80 F.S.2 F.S.3 850mm clear 850mm clear 850mm clear 850mm clear 850mm clear (each) 850mm clear 850mm clear 850mm clear 850mm clear 850mm clear 850mm clear +RL 12.80 ROLLER SHUTTER WITH SWING DOOR +RL 12.80 F.I.P. 12.75 12.80 12.52 12.80 850mm clear 2x660 BIN LINEAR WITH COMPACTOR & GARBAGE CHUTE TO MANUFACTURERS DETAIL AND SPECIFICATION EXTERNAL WALLS, INTERNAL WALLS, FLOORS & CEILINGS IN COMMERCIAL AREAS REQUIRE INSULATION REFER TO SECTION-J REPORT +RL 12.80 1:14.0 12.52 12.80 clear ø 1500 12.52 850mm clear 12.80 N PROJECT CLIENT TITLE DRAWN DATE DWG No CHECKED SCALE architects p +61 2 9797 1599 f +61 2 9797 1533 330a Parramatta Rd HOMEBUSH WEST NSW 2140 DO NOT SCALE. USE FIGURED DIMENSIONS IN PREFERENCE TO SCALED, CHECK ALL DIMENSIONS ON SITE BEFORE FABRICATION. COPYRIGHT. ALL RIGHTS RESERVED. CANNONT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF GM ARCHITECTS. ANY LICENSE EXPRESSED OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE TERMS OF THE AGREEMENT OR IMPLIED AGREEMENT BETWEEN GM ARCHITECTS AND THE INSTRUCTING PARTY. A1 1 : 100 NOT FOR CONSTRUCTION A3 1 : 200 26/10/2017 4:05 PM Homebush Construction P/L 153 Parramatta Rd Homebush Ground Floor GK GK 12679-11 A107 72 Units + 2 Commercial CONSTRUCTION CERTIFICATE Ground Floor Issue Date Description 8 26.10.2017 S96 & CC

Upload: others

Post on 17-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: architects - Strathfield · GK GK 12679-11 A122 72 Units + 2 Commercial CONSTRUCTION CERTIFICATE Elevations South Elevation Parramatta Rd Key Finishes 1 Vitracore G2 Cladding - Zinc

UP

UP

UP

UP

UP

4

A128

3

A128

MAIN SWITCH

BOARD

MAIN

DISTRIBUTION

FRAME

SPRINKLER

VALVE & FIRE

HYDRANT

PUMP ROOM

COMMUNITY

ROOM

COMMERCIAL

GARBAGE

ROOM

BULKY STORE

ROOM

F.H

.B.

Retail C01

109 m²

Retail C02

46 m²

LOBBY RESIDENTIAL

GARBAGE

ROOM

LIFT 1

LIFT 2

F.S.4

1:8.0 1:4.0

12.55 10.00 9.75

1:8

.0

9.75

1:8.0

FAN ROOM

LOADING

DOCK

RA

MP

DO

WN

TO

B1

+RL 12.80

+RL 12.80

+RL 12.80

+RL 12.80+RL 12.80

COURTYARD AREA

REFER TO LANDSCAPE PLAN

+RL 12.80

SU

BS

TA

TIO

N

300mm KERB

LETTERBOXES TO

AUSTRALIAN STANDARDS

DEEP SOIL AREA

REFER TO LANDSCAPE PLAN

LANDSCAPED PAVED

ISLAND SAME HEIGHT AS

FOOTPATH

LEFT TURN PAVEMENT

ARROW UA3(L)

ALL TRAFFIC TURN LEFT

SIGN R2-14(L)

CONCEALED AWNING LIGHTING TO BE

BUILT IN ACCORDANCE WITH

CONDITION 13 OF THE DA CONSENT

INTERCOM SYSTEM TO AUSTRALIAN

STANDARDS

PHOENIX PALM TO BE TRANSPLANTED TO

A NEW LOCATION IN ACCORDANCE WITH

CONDITION 62 OF THE DA CONSENT

F.H.R

F.H.R

1

A126

1

A126

2

A127

2

A127

Accessible

WC

6

A601

5

A601

1.8m HIGH SECURITY GATE & DOOR IS TO

FAIL-SAFE IN THE UNLOCKED POSITION

ON THE ACTIVATION OF THE BUILDINGS

SPRINKLER & FIRE ALARM SYSTEMS

1:8.0

1:8.0

+RL 12.80

SUBSTATION EASEMENT 5.3m x 3.3m

APPROXIMATE SEWER LINE LOCATION

SUBSTATION TO ENGINEERS DETAILS &

SPECIFICATION

RAMPS TO STRUCTURAL ENGINEERS

DETAILS AND SPECIFICATION

CONCRETE IN-SITU FLOOR SLAB REFER TO

ENGINEERS DETAILS & SPECIFICATION

FIRE HYDRANTS IN ALL FIRE-

ISOLATED STAIRS

CONCRETE IN-SITU STAIRS REFER

TO STRUCTURAL ENGINEERS

DETAILS AND SPECIFICATION

VERTICAL LIFT INSTALL TO

MANUFACTURERS DETAIL AND

SPECIFICATION

METER ROOM REFER TO CONSULTANCY

DRAWINGS AND FURTHER DETAILS

MECHANICAL SHAFTS AND DUCTS REFER

TO MECHANICAL ENGINEERS DETAILS

AND SPECIFICATION

4.0m WIDE BY 4.0m HIGH SUBSTATION RIGHT OF WAY ACCESS

2.0m WIDE OVERLAPPING CABLE EASEMENT

6x125mm CONDUITS ENCASED IN 150mm CONCRETE ON ALL SIDES

CURTAIN WALL TO

MANUFACTURERS

DETAIL &

SPECIFICATION

COMBINED FIRE HYDRANT &

SPRINKLER BOOSTER TO

ENGINEERS DETAILS &

SPECIFICATION

FOOTPATH TO BE

BUILT IN

ACCORDANCE WITH

CONDITION 68 OF

THE DA CONSENT

1:40.0

F.S.2

CARETAKER

FIRE

CONTROL

CENTRE

F.H.R

W.M

F.H

F.H.R

PA

RR

AM

ATT

A R

D

STA

IR P

RE

SS

.

FA

N R

OO

M

GA

S M

ETE

R R

OO

M

7

A601

F.S.1

+RL 12.80

+RL 12.80F.S.2

F.S.3

850mm

clear

850mm

clear

850mm

clear

850mm

clear 850mm

clear (each)

850mm

clear

850mm

clear

850mm

clear

850mm

clear

850mm

clear

850mm

clear

+RL 12.80

ROLLER SHUTTER WITH

SWING DOOR

+R

L 1

2.8

0

F.I.P.

12.7512.80

12.52

12.80

850mm

clear

2x660 BIN LINEAR WITH

COMPACTOR & GARBAGE CHUTE

TO MANUFACTURERS DETAIL AND

SPECIFICATION

EXTERNAL WALLS, INTERNAL

WALLS, FLOORS & CEILINGS IN

COMMERCIAL AREAS REQUIRE

INSULATION REFER TO

SECTION-J REPORT

+RL 12.80

1:14.012.52 12.80

clear

ø 1500

12.52

850mm

clear

12.80

N

PROJECT

CLIENT

TITLE

DRAWN

DATE

DWG No

CHECKED

SCALE

architects p +61 2 9797 1599 f +61 2 9797 1533

330a Parramatta Rd HOMEBUSH WEST

NSW 2140

DO NOT SCALE. USE FIGURED DIMENSIONS IN PREFERENCE TO SCALED, CHECK ALL DIMENSIONS ON SITE BEFORE FABRICATION.

COPYRIGHT. ALL RIGHTS RESERVED. CANNONT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF GM

ARCHITECTS. ANY LICENSE EXPRESSED OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE

TERMS OF THE AGREEMENT OR IMPLIED AGREEMENT BETWEEN GM ARCHITECTS AND THE INSTRUCTING PARTY.

A1 1 : 100

NOT FOR

CONSTRUCTION

A3 1 : 200

26/10/2017

4:05 PMHomebush Construction P/L

153 Parramatta Rd Homebush

Ground Floor

GKGK

12679-11 A107

72 Units + 2 CommercialCONSTRUCTION CERTIFICATE

Ground Floor

Issue Date Description

8 26.10.2017 S96 & CC

Page 2: architects - Strathfield · GK GK 12679-11 A122 72 Units + 2 Commercial CONSTRUCTION CERTIFICATE Elevations South Elevation Parramatta Rd Key Finishes 1 Vitracore G2 Cladding - Zinc

Ground Floor

RL 12.80

Level 1

RL 17.62

Level 2

RL 20.67

Level 3

RL 23.72

Level 4

RL 26.77

Level 5

RL 29.82

Level 6

RL 32.87

Level 7

RL 36.10

Level 8

RL 39.15

Level 9

RL 42.20

Level 10

RL 45.25

Level 11

RL 48.30

Level 12

RL 51.35

Level 13

RL 54.40

Level 14

RL 57.45

Basement 1

RL 9.10

Basement 2

RL 6.10

Basement 3

RL 3.10

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

3050

3050

3050

3050

3050

3050

3050

3230

3050

3050

3050

3050

3050

4820

3700

3000

3000

1 1

5

6

7

68 8 8

6 6

1

6

1

5

7

11

5 5

7 71 1

5 55 5

2 2

2 2

2

8

4

4

7

4

4

4

6

5 5

5 5

4

7

4

4

4

6

7 7

2

2

2

2

2

2 2

2

2

2 2

2

2

2

2

2

2

2

2

2

3 3

3 3

8 8

8

PROVIDE GLAZING STRIPS TO ALL FULLY

GLAZED AREAS ON THE GROUND FLOOR LEVEL

5

8

5

5

RL 59.12 Lift Overun

PROJECT

CLIENT

TITLE

DRAWN

DATE

DWG No

CHECKED

SCALE

architects p +61 2 9797 1599 f +61 2 9797 1533

330a Parramatta Rd HOMEBUSH WEST

NSW 2140

DO NOT SCALE. USE FIGURED DIMENSIONS IN PREFERENCE TO SCALED, CHECK ALL DIMENSIONS ON SITE BEFORE FABRICATION.

COPYRIGHT. ALL RIGHTS RESERVED. CANNONT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF GM

ARCHITECTS. ANY LICENSE EXPRESSED OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE

TERMS OF THE AGREEMENT OR IMPLIED AGREEMENT BETWEEN GM ARCHITECTS AND THE INSTRUCTING PARTY.

A1 1 : 100

NOT FOR

CONSTRUCTION

A3 1 : 200

26/10/2017

4:01 PMHomebush Construction P/L

153 Parramatta Rd Homebush

Elevations

GKGK

12679-11 A122

72 Units + 2 CommercialCONSTRUCTION CERTIFICATE

Elevations South Elevation Parramatta Rd

Key Finishes

1 Vitracore G2 Cladding - Zinc Light 5790

2 Vitracore G2 Cladding - Bright Yellow 1140

3 Vitracore G2 Cladding - Zinc Dark 5220

4 Vitracore G2 Cladding - Classic Beige 1310

5 Rendered & Painted - Bristol South Pole P201-N1

6 Aluminium Windows & Doors - Powder Coated Dulux

Electro Black Ace Flat 9069116F

7 Balustrades - Frosted Glass

8 Rendered & Painted - Bristol Heather Ashes P202-N3

Issue Date Description

8 26.10.2017 S96 & CC

Page 3: architects - Strathfield · GK GK 12679-11 A122 72 Units + 2 Commercial CONSTRUCTION CERTIFICATE Elevations South Elevation Parramatta Rd Key Finishes 1 Vitracore G2 Cladding - Zinc

Ground Floor

RL 12.80

Level 1

RL 17.62

Level 2

RL 20.67

Level 3

RL 23.72

Level 4

RL 26.77

Level 5

RL 29.82

Level 6

RL 32.87

Level 7

RL 36.10

Level 8

RL 39.15

Level 9

RL 42.20

Level 10

RL 45.25

Level 11

RL 48.30

Level 12

RL 51.35

Level 13

RL 54.40

Level 14

RL 57.45

Basement 1

RL 9.10

Basement 2

RL 6.10

Basement 3

RL 3.10

3050

3050

3050

3050

3050

3050

3050

3230

3050

3050

3050

3050

3050

4820

3700

3000

3000

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

5

7

8

8 8

6

5

8

5

8

5

5

5

5

7

8

8

8

8

6 6 6

5

5

5

5

7

5

8

6

5

5

7

3 3

3 3

7

6

5

5

8

8

7

6

5

5

6 6

7

6 6

7

88

83 3

5 5 5 5 5

66

8 8

RL 59.12 Lift Overun

PROJECT

CLIENT

TITLE

DRAWN

DATE

DWG No

CHECKED

SCALE

architects p +61 2 9797 1599 f +61 2 9797 1533

330a Parramatta Rd HOMEBUSH WEST

NSW 2140

DO NOT SCALE. USE FIGURED DIMENSIONS IN PREFERENCE TO SCALED, CHECK ALL DIMENSIONS ON SITE BEFORE FABRICATION.

COPYRIGHT. ALL RIGHTS RESERVED. CANNONT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF GM

ARCHITECTS. ANY LICENSE EXPRESSED OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE

TERMS OF THE AGREEMENT OR IMPLIED AGREEMENT BETWEEN GM ARCHITECTS AND THE INSTRUCTING PARTY.

A1 1 : 100

NOT FOR

CONSTRUCTION

A3 1 : 200

26/10/2017

4:01 PMHomebush Construction P/L

153 Parramatta Rd Homebush

Elevations

GKGK

12679-11 A123

72 Units + 2 CommercialCONSTRUCTION CERTIFICATE

ElevationsNorth Elevation

Key Finishes

1 Vitracore G2 Cladding - Zinc Light 5790

2 Vitracore G2 Cladding - Bright Yellow 1140

3 Vitracore G2 Cladding - Zinc Dark 5220

4 Vitracore G2 Cladding - Classic Beige 1310

5 Rendered & Painted - Bristol South Pole P201-N1

6 Aluminium Windows & Doors - Powder Coated Dulux

Electro Black Ace Flat 9069116F

7 Balustrades - Frosted Glass

8 Rendered & Painted - Bristol Heather Ashes P202-N3

Issue Date Description

8 26.10.2017 S96 & CC

Page 4: architects - Strathfield · GK GK 12679-11 A122 72 Units + 2 Commercial CONSTRUCTION CERTIFICATE Elevations South Elevation Parramatta Rd Key Finishes 1 Vitracore G2 Cladding - Zinc

Ground Floor

RL 12.80

Level 1

RL 17.62

Level 2

RL 20.67

Level 3

RL 23.72

Level 4

RL 26.77

Level 5

RL 29.82

Level 6

RL 32.87

Level 7

RL 36.10

Level 8

RL 39.15

Level 9

RL 42.20

Level 10

RL 45.25

Level 11

RL 48.30

Level 12

RL 51.35

Level 13

RL 54.40

Level 14

RL 57.45

Basement 1

RL 9.10

Basement 2

RL 6.10

Basement 3

RL 3.10

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

3050

3050

3050

3050

3050

3050

3050

3230

3050

3050

3050

3050

3050

4820

3700

3000

3000

8

8 8

8

5

5

5

6

7

6 6

7

4

4

4

4

4

4

4

3

3

8 8

8

3

3

33 3

3 3

2

2

5

5

5

5

6

57

5

5

6

5

4

4

4

RL 59.12 Lift Overun

PROJECT

CLIENT

TITLE

DRAWN

DATE

DWG No

CHECKED

SCALE

architects p +61 2 9797 1599 f +61 2 9797 1533

330a Parramatta Rd HOMEBUSH WEST

NSW 2140

DO NOT SCALE. USE FIGURED DIMENSIONS IN PREFERENCE TO SCALED, CHECK ALL DIMENSIONS ON SITE BEFORE FABRICATION.

COPYRIGHT. ALL RIGHTS RESERVED. CANNONT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF GM

ARCHITECTS. ANY LICENSE EXPRESSED OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE

TERMS OF THE AGREEMENT OR IMPLIED AGREEMENT BETWEEN GM ARCHITECTS AND THE INSTRUCTING PARTY.

A1 1 : 100

NOT FOR

CONSTRUCTION

A3 1 : 200

26/10/2017

4:01 PMHomebush Construction P/L

153 Parramatta Rd Homebush

Elevations

GKGK

12679-11 A124

72 Units + 2 CommercialCONSTRUCTION CERTIFICATE

ElevationsEast Elevation

Key Finishes

1 Vitracore G2 Cladding - Zinc Light 5790

2 Vitracore G2 Cladding - Bright Yellow 1140

3 Vitracore G2 Cladding - Zinc Dark 5220

4 Vitracore G2 Cladding - Classic Beige 1310

5 Rendered & Painted - Bristol South Pole P201-N1

6 Aluminium Windows & Doors - Powder Coated Dulux

Electro Black Ace Flat 9069116F

7 Balustrades - Frosted Glass

8 Rendered & Painted - Bristol Heather Ashes P202-N3

Issue Date Description

8 26.10.2017 S96 & CC

Page 5: architects - Strathfield · GK GK 12679-11 A122 72 Units + 2 Commercial CONSTRUCTION CERTIFICATE Elevations South Elevation Parramatta Rd Key Finishes 1 Vitracore G2 Cladding - Zinc

Ground Floor

RL 12.80

Level 1

RL 17.62

Level 2

RL 20.67

Level 3

RL 23.72

Level 4

RL 26.77

Level 5

RL 29.82

Level 6

RL 32.87

Level 7

RL 36.10

Level 8

RL 39.15

Level 9

RL 42.20

Level 10

RL 45.25

Level 11

RL 48.30

Level 12

RL 51.35

Level 13

RL 54.40

Level 14

RL 57.45

Basement 1

RL 9.10

Basement 2

RL 6.10

Basement 3

RL 3.10

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

3050

3050

3050

3050

3050

3050

3050

3230

3050

3050

3050

3050

3050

4820

3700

3000

3000

8

8

5

8

6

5

5

5

5

5

6

5

3

5

3 8

8

6

7

3 3

4

8

3 3 8

4

44

3

4

4

3 3

7

6

2

2

4

5

7

2

6

5

5

5

4

4

RL 59.12 Lift Overun

PROJECT

CLIENT

TITLE

DRAWN

DATE

DWG No

CHECKED

SCALE

architects p +61 2 9797 1599 f +61 2 9797 1533

330a Parramatta Rd HOMEBUSH WEST

NSW 2140

DO NOT SCALE. USE FIGURED DIMENSIONS IN PREFERENCE TO SCALED, CHECK ALL DIMENSIONS ON SITE BEFORE FABRICATION.

COPYRIGHT. ALL RIGHTS RESERVED. CANNONT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF GM

ARCHITECTS. ANY LICENSE EXPRESSED OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE

TERMS OF THE AGREEMENT OR IMPLIED AGREEMENT BETWEEN GM ARCHITECTS AND THE INSTRUCTING PARTY.

A1 1 : 100

NOT FOR

CONSTRUCTION

A3 1 : 200

26/10/2017

4:01 PMHomebush Construction P/L

153 Parramatta Rd Homebush

Elevations

GKGK

12679-11 A125

72 Units + 2 CommercialCONSTRUCTION CERTIFICATE

ElevationsWest Elevation

Key Finishes

1 Vitracore G2 Cladding - Zinc Light 5790

2 Vitracore G2 Cladding - Bright Yellow 1140

3 Vitracore G2 Cladding - Zinc Dark 5220

4 Vitracore G2 Cladding - Classic Beige 1310

5 Rendered & Painted - Bristol South Pole P201-N1

6 Aluminium Windows & Doors - Powder Coated Dulux

Electro Black Ace Flat 9069116F

7 Balustrades - Frosted Glass

8 Rendered & Painted - Bristol Heather Ashes P202-N3

Issue Date Description

8 26.10.2017 S96 & CC

Page 6: architects - Strathfield · GK GK 12679-11 A122 72 Units + 2 Commercial CONSTRUCTION CERTIFICATE Elevations South Elevation Parramatta Rd Key Finishes 1 Vitracore G2 Cladding - Zinc

N

PROJECT

CLIENT

TITLE

DRAWN

DATE

DWG No

CHECKED

SCALE

architects p +61 2 9797 1599 f +61 2 9797 1533

330a Parramatta Rd HOMEBUSH WEST

NSW 2140

DO NOT SCALE. USE FIGURED DIMENSIONS IN PREFERENCE TO SCALED, CHECK ALL DIMENSIONS ON SITE BEFORE FABRICATION.

COPYRIGHT. ALL RIGHTS RESERVED. CANNONT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF GM

ARCHITECTS. ANY LICENSE EXPRESSED OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE

TERMS OF THE AGREEMENT OR IMPLIED AGREEMENT BETWEEN GM ARCHITECTS AND THE INSTRUCTING PARTY.

NOT FOR

CONSTRUCTION

A3 1 : 1000

26/10/2017

4:02 PMHomebush Construction P/L

153 Parramatta Rd Homebush

Shadows

GKGK

12679-11 A700

72 Units + 2 CommercialCONSTRUCTION CERTIFICATE

Shadows

A1 1 : 500

Shadows 21st June 9am Shadows 21st June 10am

Shadows 21st June 11am Shadows 21st June 12pm

Issue Date Description

8 26.10.2017 S96 & CC

DA APPROVED SHADOW OUTLINE

Page 7: architects - Strathfield · GK GK 12679-11 A122 72 Units + 2 Commercial CONSTRUCTION CERTIFICATE Elevations South Elevation Parramatta Rd Key Finishes 1 Vitracore G2 Cladding - Zinc

N

PROJECT

CLIENT

TITLE

DRAWN

DATE

DWG No

CHECKED

SCALE

architects p +61 2 9797 1599 f +61 2 9797 1533

330a Parramatta Rd HOMEBUSH WEST

NSW 2140

DO NOT SCALE. USE FIGURED DIMENSIONS IN PREFERENCE TO SCALED, CHECK ALL DIMENSIONS ON SITE BEFORE FABRICATION.

COPYRIGHT. ALL RIGHTS RESERVED. CANNONT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF GM

ARCHITECTS. ANY LICENSE EXPRESSED OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE

TERMS OF THE AGREEMENT OR IMPLIED AGREEMENT BETWEEN GM ARCHITECTS AND THE INSTRUCTING PARTY.

NOT FOR

CONSTRUCTION

A3 1 : 1000

26/10/2017

4:02 PMHomebush Construction P/L

153 Parramatta Rd Homebush

Shadows

GKGK

12679-11 A701

72 Units + 2 CommercialCONSTRUCTION CERTIFICATE

Shadows

A1 1 : 500

Issue Date Description

8 26.10.2017 S96 & CC

Shadows 21st June 1pm

Shadows 21st June 2pm

Shadows 21st June 3pm

DA APPROVED SHADOW OUTLINE