architectural_technology
DESCRIPTION
Middlesbrough project detailsTRANSCRIPT
![Page 1: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/1.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Adate_27.1.2011
![Page 2: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/2.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_nts
The location of the building is site A, which is the site that is enclosed between two buildings and opens up to exchange square. The building utilises only one form of struc-ture. The structural system employed is a steel frame system with precast concrete slab floors. Additionally a structural fixing cladding system was used. The particu-lar cladding system is used because of the project’s reasonably large scale, additionally it allows for the integration of the cladding into the entire facade, even the insu-lation and glazing. The structure of the building is significant due to Middlesbrough’s thrive for modernity, while also relating back to the industrial past of Middlesbrough.
1
SITE_PLAN
![Page 3: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/3.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_1:500
2
SECTIONS_ELEVATION_MODEL
![Page 4: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/4.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_1:250
BUILDING_PLANS
3
detail section
detail section
![Page 5: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/5.jpg)
BUILDING_PLANS
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_1:250
4
BUILDING_PLANS
detail section
detail section
![Page 6: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/6.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_1:200
primary_structure. steel frame primary beams and columns.
5
![Page 7: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/7.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Adate_1:200
secondary_structure. additional secondary beams.
6
![Page 8: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/8.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_1:200
tertiary_structure. precast concrete floors.
7
![Page 9: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/9.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_nts
8
BUILDING_in_CONTEXT
![Page 10: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/10.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_1:20
9
CONSTRUCTION_DRAWING
![Page 11: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/11.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_nts
4_GROUND_floorfloor covering_4.5mmchipboard_18mmscreed_50mminsulation_75mmprecast concrete slab_150mminsulation_50mmdamp proof membranebinding & compact hardcore_150mm
3_UPPER_floors_same for first & second floorsfloor covering_4.5mmscreed_65mmpolythylene_isolating layer_5mmmineral wool_isolating layer_25mmprecast concrete slab_150mm
2_EXTERNAL_wallcladding_40mmcavity_55mmmineral fibre_50mmcement fibre board_18mmmineral wool_50mmvapour control layerdouble layer of gypsum board_12mm
1_ROOF_solar reflective chippingsdamp proof memebraneinsulation_200mmvapour checkinsulation_50mmprecast concrete slab_150mm
10
5_STRUCTURAL_frame7000x5220mm for infill part7360x3845 for unenclosed area250x150 rectangular hollow section columns254x146 universal beamsintumescent paint finish on exposed steel
6_CURTAIN_WALL_glazingdouble glazed curtain wall glazing panelsfitted onto glazing gaskets that are part of the structural fixing cladding system
![Page 12: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/12.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Adate_nts
11
BREE
AM E
stim
ator
BREE
AM C
redi
ts
New
Bui
ldR
efur
bP
ass
Goo
dV
ery
Goo
dE
xcel
lent
Out
stan
ding
Achi
eved
?YE
SYE
SN
ON
ON
O
1743
1
Man
agem
ent
Man
1C
omm
issi
onin
g
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
an
appr
opria
te p
roje
ct
team
mem
ber h
as b
een
appo
inte
d to
mon
itor c
omm
issi
onin
g on
beh
alf o
f the
cl
ient
to e
nsur
e co
mm
issi
onin
g w
ill b
e ca
rrie
d ou
t in
line
with
cur
rent
bes
t pr
actic
e.
Two
cred
its w
here
, in
addi
tion
to th
e ab
ove,
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
sea
sona
l com
mis
sion
ing
will
be
carr
ied
out d
urin
g th
e fir
st y
ear o
f oc
cupa
tion,
pos
t con
stru
ctio
n (o
r pos
t fit
out).
22.
001
11
12
Man
2C
onsi
dera
te C
onst
ruct
ors
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
ther
e is
a c
omm
itmen
t to
com
ply
with
bes
t pra
ctic
e si
te m
anag
emen
t prin
cipl
es.
Two
cred
its w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
ther
e is
a c
omm
itmen
t to
go
beyo
nd b
est p
ract
ice
site
man
agem
ent p
rinci
ples
.
22.
00-
--
12
Man
3C
onst
ruct
ion
Site
Impa
cts
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
2 o
r mor
e of
item
s a-
g (li
sted
bel
ow) a
re a
chie
ved.
Two
cred
its w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
4 o
r mor
e of
item
s a-
g (li
sted
bel
ow) a
re a
chie
ved.
Thre
e cr
edits
whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at 6
or m
ore
of it
ems
a-g
are
achi
eved
:a.
Mon
itor,
repo
rt an
d se
t tar
gets
for C
O2
or e
nerg
y ar
isin
g fro
m s
ite a
ctiv
ities
b. M
onito
r, re
port
and
set t
arge
ts fo
r CO
2 or
ene
rgy
aris
ing
from
tran
spor
t to
and
from
site
c. M
onito
r, re
port
and
set t
arge
ts fo
r wat
er c
onsu
mpt
ion
aris
ing
from
site
ac
tiviti
esd.
Impl
emen
t bes
t pra
ctic
e po
licie
s in
resp
ect o
f air
(dus
t) po
llutio
n ar
isin
g fro
m
the
site
e. Im
plem
ent b
est p
ract
ice
polic
ies
in re
spec
t of w
ater
(gro
und
and
surfa
ce)
pollu
tion
occu
rrin
g on
the
site
f. M
ain
cont
ract
or h
as a
n en
viro
nmen
tal m
ater
ials
pol
icy,
use
d fo
r sou
rcin
g of
co
nstru
ctio
n m
ater
ials
to b
e ut
ilise
d on
site
g. M
ain
cont
ract
or o
pera
tes
an E
nviro
nmen
tal M
anag
emen
t Sys
tem
.
One
add
ition
al c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at a
t lea
st 8
0%
of s
ite ti
mbe
r is
resp
onsi
bly
sour
ced
and
100%
is le
gally
sou
rced
.
42.
00-
--
--
Man
4B
uild
ing
user
gui
de
Firs
t cre
dit
A B
uild
ing
Use
r Gui
de th
at c
onta
ins
the
info
rmat
ion
desc
ribed
und
er th
e ‘U
ser
Gui
de C
onte
nts’
hea
ding
(see
add
ition
al g
uida
nce)
has
bee
n de
velo
ped.
The
gu
ide
is re
leva
nt to
the
non-
tech
nica
l bui
ldin
g us
er a
nd a
ppro
pria
te to
the
stak
ehol
der(
s) th
at w
ill o
ccup
y th
e bu
ildin
g.
Sec
ond
cred
itA
Lab
orat
ory
Use
r Gui
de th
at c
onta
ins
the
info
rmat
ion
desc
ribed
und
er th
e ‘U
ser G
uide
Con
tent
s’ h
eadi
ng (s
ee a
dditi
onal
gui
danc
e) h
as b
een
deve
lope
d.
The
guid
ance
is re
leva
nt to
the
labo
rato
ry u
sers
that
will
occ
upy
and
use
the
faci
litie
s
10.
00-
--
11
Man
5S
ite In
vest
igat
ion
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
desi
gn te
am h
as
carr
ied
out a
det
aile
d si
te in
vest
igat
ion
of th
e se
lect
ed s
ite.
11.
00-
--
--
Man
6C
onsu
ltatio
n
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
con
sulta
tion
has
been
, or
is b
eing
, und
erta
ken
and
feed
back
giv
en to
the
loca
l com
mun
ity a
nd b
uild
ing
user
s.
Hig
her E
duca
tion
Labo
rato
ry B
uild
ing
type
or f
unct
ion
pres
ent:
A s
take
hold
er e
ngag
emen
t wor
ksho
p ha
s be
en u
nder
take
n at
RIB
A s
tage
B.
A d
esig
n te
am m
eetin
g ha
s be
en u
nder
take
n at
RIB
A s
tage
C o
r equ
ival
ent
with
a fo
cus
on a
ppro
pria
te s
izin
g, o
ptim
isat
ion
and
inte
grat
ion
of la
bora
tory
eq
uipm
ent a
nd s
yste
ms
The
resu
lts o
f the
abo
ve a
ctiv
ities
hav
e be
en s
umm
aris
ed in
a d
esig
n in
tent
do
cum
ent,
whi
ch h
as b
een
appr
oved
by
all p
artie
s in
volv
ed a
nd fo
rmed
the
basi
s of
sub
sequ
ent q
ualit
y co
ntro
l.
Two
cred
its w
here
, in
addi
tion
to th
e ab
ove,
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
cons
ulta
tion
proc
ess
is b
eing
, or h
as b
een,
und
erta
ken
usin
g an
in
depe
nden
t met
hod
such
as
DQ
I, D
QM
or S
choo
l Wor
ks, f
acili
tate
d by
a th
ird
party
.
21.
00-
--
--
Man
7S
hare
d Fa
cilit
ies
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
sha
red
faci
litie
s ha
ve
been
pro
vide
d as
a c
onse
quen
ce o
f con
sulta
tion
feed
back
.
Two
cred
its w
here
, in
addi
tion
to th
e ab
ove,
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
thes
e fa
cilit
ies
can
be a
cces
sed
with
out c
ompr
omis
ing
the
safe
ty a
nd
secu
rity
of th
e bu
ildin
g an
d its
occ
upan
ts.
22.
00-
--
--
Man
8S
ecur
ity
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
an
Arc
hite
ctur
al L
iais
on
Offi
cer (
ALO
) or C
rime
Pre
vent
ion
Des
ign
Adv
isor
(CP
DA
) fro
m th
e lo
cal p
olic
e fo
rce
has
been
con
sulte
d at
the
desi
gn s
tage
and
thei
r rec
omm
enda
tions
in
corp
orat
ed in
to th
e de
sign
of t
he b
uild
ing
and
its p
arki
ng fa
cilit
ies
(if re
leva
nt).
11.
00-
--
--
Man
9P
ublic
atio
n of
bui
ldin
g in
form
atio
nO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at th
e de
sign
team
are
co
mm
itted
to p
ublic
isin
g in
form
atio
n ab
out t
he e
nviro
nmen
tal p
erfo
rman
ce o
f th
e ne
w d
evel
opm
ent v
ia th
e in
tern
et, n
ewsl
ette
rs, s
ite v
isits
, pre
sent
atio
ns e
tc.
11.
00-
--
-1
Man
10
Dev
elop
men
t as
a le
arni
ng
reso
urce
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
prop
osed
bui
ldin
g A
ND
/OR
land
scap
e de
sign
pro
vide
s a
lear
ning
reso
urce
that
can
be
used
to
faci
litat
e de
velo
pmen
t of e
nviro
nmen
tal i
ssue
s fo
r bui
ldin
g us
ers
and
visi
tors
.1
1.00
--
--
1
Man
11
Eas
e of
Mai
nten
ance
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
spe
cific
atio
ns fo
r the
bu
ildin
g an
d th
e bu
ildin
g se
rvic
es/s
yste
ms
and
land
scap
ing
have
con
side
red
ease
and
effi
cien
cy o
f mai
nten
ance
in li
ne w
ith b
est p
ract
ice.
11
11.
00-
--
--
Man
12
Life
Cyc
le C
ostin
g
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
a L
ife C
ycle
Cos
t (LC
C)
anal
ysis
bas
ed o
n th
e fe
asib
ility
stu
dy p
ropo
sals
has
bee
n un
derta
ken
on th
e bu
ildin
g de
sign
at a
stra
tegi
c an
d sy
stem
leve
l.
Two
cred
its w
here
, in
addi
tion
to th
e ab
ove,
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
resu
lts o
f the
feas
ibili
ty s
tudy
and
con
side
ratio
n of
LC
C h
ave
been
im
plem
ente
d.
21.
00-
--
--
Indi
cativ
e M
ange
men
t (w
eigh
ted)
Sec
tion
Scor
e9.
00%
Hea
lth &
Wel
lbei
ng
OU
TSTA
ND
ING
*≥85%
Indi
cativ
e O
vera
ll B
REE
AM
Sco
re
66.5
7%VE
RY
GO
OD
≥55%
EXC
ELLE
NT
≥70%
BR
EEA
M R
atin
g B
ench
mar
ks
PASS
≥30%
GO
OD
≥45%
Min
imum
BR
EEAM
Sta
ndar
ds
--
--
-
Min
imum
requ
ired
cred
its b
y B
REE
AM is
sue
and
ratin
g
Ref
Title
Num
ber o
f B
REE
AM c
redi
ts
avai
labl
eH
ighe
r Edu
catio
n C
riter
ia
Area
(m2)
Tota
l pre
dict
ed 'a
rea
wei
ghte
d' B
REE
AM
cred
its a
chie
ved
11 11
Num
ber o
f BR
EEAM
cre
dits
Ac
hiev
ed
1 12 2 2 0 2
Up
to tw
o cr
edits
whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at a
ll oc
cupi
ed
spac
es a
re a
dequ
atel
y da
ylit.
22
Hea
1D
aylig
htin
g2.
002
Cop
yrig
ht o
f BR
E G
loba
l Ltd
25/0
1/20
11
BREEAM 1
![Page 13: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/13.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_nts
12
BREE
AM E
stim
ator
BREE
AM C
redi
ts
Hea
3G
lare
Con
trol
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
an
occu
pant
-con
trolle
d sh
adin
g sy
stem
(e.g
. int
erna
l or e
xter
nal b
linds
) is
fitte
d in
rele
vant
bui
ldin
g ar
eas.
11
11.
00-
--
--
Hea
4H
igh
frequ
ency
ligh
ting
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
hig
h fre
quen
cy b
alla
sts
are
inst
alle
d on
all
fluor
esce
nt a
nd c
ompa
ct fl
uore
scen
t lam
ps.
11
11.
001
11
11
Hea
5In
tern
al a
nd e
xter
nal l
ight
ing
leve
ls O
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at a
ll in
tern
al a
nd e
xter
nal
light
ing,
whe
re re
leva
nt, i
s sp
ecifi
ed in
acc
orda
nce
with
the
appr
opria
te
mai
ntai
ned
illum
inan
ce le
vels
(in
lux)
reco
mm
ende
d by
CIB
SE
.1
11
1.00
--
--
-
Hea
6Li
ghtin
g zo
nes
& c
ontro
lsO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at, i
n al
l rel
evan
t bui
ldin
g ar
eas,
ligh
ting
is a
ppro
pria
tely
zon
ed a
nd o
ccup
ant c
ontro
llabl
e w
ith th
e op
tion
for c
omm
only
requ
ired
light
ing
setti
ngs
to b
e se
lect
ed q
uick
ly a
nd e
asily
.1
11
1.00
--
--
-
Hea
7P
oten
tial f
or n
atur
al v
entil
atio
nO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at fr
esh
air i
s ca
pabl
e of
be
ing
deliv
ered
to th
e oc
cupi
ed s
pace
s of
the
build
ing
via
a na
tura
l ven
tilat
ion
stra
tegy
, and
ther
e is
suf
ficie
nt u
ser-
cont
rol o
f the
sup
ply
of fr
esh
air.
11
11.
00-
--
--
Hea
8In
door
air
qual
ityO
ne c
redi
t whe
re a
ir in
take
s se
rvin
g oc
cupi
ed a
reas
avo
id m
ajor
sou
rces
of
exte
rnal
pol
lutio
n an
d re
circ
ulat
ion
of e
xhau
st a
ir.1
11
1.00
--
--
-
Hea
9V
olat
ile O
rgan
ic C
ompo
unds
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
emis
sion
s of
VO
Cs
and
othe
r sub
stan
ces
from
key
inte
rnal
fini
shes
and
fitti
ngs
com
ply
with
bes
t pr
actic
ele
vels
.1
11
1.00
--
--
-
Hea
10
Ther
mal
com
fort
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
ther
mal
com
fort
leve
ls
in o
ccup
ied
spac
es o
f the
bui
ldin
g ar
e as
sess
ed a
t the
des
ign
stag
e to
eva
luat
e ap
prop
riate
ser
vici
ng o
ptio
ns, e
nsur
ing
appr
opria
te th
erm
al c
omfo
rt le
vels
are
ac
hiev
ed.
11
11.
00-
--
--
Hea
11
Ther
mal
zon
ing
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
loca
l occ
upan
t con
trol i
s av
aila
ble
for t
empe
ratu
re a
djus
tmen
t in
each
occ
upie
d sp
ace
to re
flect
diff
erin
g us
er d
eman
ds.
11
11.
00-
--
--
Hea
12
Mic
robi
al c
onta
min
atio
n O
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at th
e ris
k of
wat
erbo
rne
and
airb
orne
legi
onel
la c
onta
min
atio
n ha
s be
en m
inim
ised
.1
11
1.00
11
11
1
Hea
13
Aco
ustic
Per
form
ance
Two
cred
its w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
all
spac
es in
the
build
ing
mee
t the
app
ropi
ate
stan
dard
s re
quire
d fo
r ind
oor a
mbi
ent n
oise
le
vels
and
reve
rber
atio
n tim
es.
21
11.
00-
--
--
Indi
cativ
e H
ealth
& W
ellb
eing
(wei
ghte
d) S
ectio
n Sc
ore
14.0
0%
Ener
gy
Ene
1R
educ
tion
of C
O2
Em
issi
ons
Up
to fi
fteen
cre
dits
whe
re e
vide
nce
prov
ided
dem
onst
rate
s an
impr
ovem
ent i
n th
e en
ergy
effi
cien
cy o
f the
bui
ldin
g’s
fabr
ic a
nd s
ervi
ces
and
ther
efor
e ac
hiev
es lo
wer
bui
ldin
g op
erat
iona
l rel
ated
CO
2 em
issi
ons.
157.
50-
--
610
Ene
2S
ub-m
eter
ing
of S
ubst
antia
l E
nerg
y U
ses
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
the
prov
isio
n of
dire
ct s
ub-
met
erin
g of
ene
rgy
uses
with
in th
e bu
ildin
g.1
11
1.00
--
11
1
Ene
3S
ub-m
eter
ing
of h
igh
ener
gy lo
ad
Are
as a
nd T
enan
cyO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s su
b-m
eter
ing
of e
nerg
y co
nsum
ptio
n by
tena
ncy/
build
ing
func
tion
area
is in
stal
led
with
in th
e bu
ildin
g.1
11
1.00
--
--
-
Ene
4E
xter
nal L
ight
ing
One
cre
dit w
here
ene
rgy-
effic
ient
ext
erna
l lig
htin
g is
spe
cifie
d an
d al
l lig
ht
fittin
gs a
re c
ontro
lled
for t
he p
rese
nce
of d
aylig
ht.
11
11.
00-
--
--
Ene
5Lo
w z
ero
carb
on te
chno
logi
es
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
a fe
asib
ility
stu
dy
cons
ider
ing
loca
l (on
-site
and
/or n
ear s
ite) l
ow o
r zer
o ca
rbon
(LZC
) te
chno
logi
es h
as b
een
carr
ied
out a
nd th
e re
sults
impl
emen
ted.
Two
cred
its w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
first
cre
dit h
as
been
ach
ieve
d an
d th
ere
is a
10%
redu
ctio
n in
the
build
ing’
s C
O2
emis
sion
s as
a
resu
lt of
the
inst
alla
tion
of a
feas
ible
loca
l LZC
tech
nolo
gy.
Thre
e cr
edits
whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at th
e fir
st c
redi
t has
be
en a
chie
ved
and
ther
e is
a 1
5% re
duct
ion
in th
e bu
ildin
g’s
CO
2 em
issi
ons
as
a re
sult
of th
e in
stal
latio
n of
a fe
asib
le lo
cal L
ZC te
chno
logy
.
Or a
ltern
ativ
ely:
A m
axim
um o
f one
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
a
cont
ract
with
an
ener
gy s
uppl
ier i
s in
pla
ce to
pro
vide
suf
ficie
nt e
lect
ricity
use
d w
ithin
the
asse
ssed
bui
ldin
g/de
velo
pmen
t to
mee
t the
abo
ve c
riter
ia fr
om a
10
0% re
new
able
ene
rgy
sour
ce. (
Not
e: a
sta
ndar
d G
reen
Tar
iff w
ill n
ot c
ompl
y)
31.
00-
--
11
Ene
6B
uild
ing
fabr
ic p
erfo
rman
ce &
av
oida
nce
of a
ir in
filtra
tion
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
app
ropr
iate
des
ign
and
as b
uilt
perfo
rman
ce m
easu
res
(as
iden
tifie
d in
the
com
plia
nce
requ
irem
ents
) ar
e ta
ken
to m
inim
ise
heat
loss
and
air
infil
tratio
n th
roug
h th
e bu
ildin
g fa
bric
.1
11
1.00
--
--
-
Ene
8Li
ftsU
p to
two
cred
its a
re a
vaila
ble
whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
e in
stal
latio
n of
ene
rgy-
effic
ient
lift(
s).
22
22.
00-
--
--
Ene
10
Free
Coo
ling
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
the
build
ing
inco
rpor
ates
a
free
cool
ing
stra
tegy
that
com
plet
ely
disp
lace
s th
e ne
ed fo
r con
vent
iona
l m
echa
nica
l coo
ling
syst
ems
(exc
ludi
ng e
xcep
tiona
l loc
alis
ed c
ircum
stan
ces
with
sm
all s
cale
sys
tem
s, fo
r exa
mpl
e se
rver
room
s) a
nd th
e th
erm
al c
omfo
rt re
quire
men
ts o
f cre
dit H
ea 1
0 ar
e ac
hiev
ed.
11
11.
00-
--
--
Ene
20
Ene
rgy
Effi
cien
t IT
solu
tions
One
cre
dit w
here
evi
denc
e de
mon
stra
tes
that
dat
a ce
ntre
s an
d se
rver
-bas
ed IT
su
ites
are
desi
gned
in a
ccor
danc
e w
ith th
e E
U C
ode
for D
ata
Cen
tres
and
best
pr
actic
e en
ergy
effi
cien
cy m
easu
res.
11.
00-
--
--
Indi
cativ
e En
ergy
(wei
ghte
d) S
ectio
n Sc
ore
12.0
6%
Tran
spor
t
Tra
1P
rovi
sion
of p
ublic
tran
spor
t U
p to
five
cre
dits
are
aw
arde
d on
a s
lidin
g sc
ale
base
d on
the
asse
ssed
bu
ildin
gs’ a
cces
sibi
lity
to th
e pu
blic
tran
spor
t net
wor
k.5
5.00
--
--
-
Tra
2P
roxi
mity
to a
men
ities
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
build
ing
is lo
cate
d w
ithin
500
m o
f acc
essi
ble
loca
l am
eniti
es a
ppro
pria
te to
the
build
ing
type
and
its
use
rs.
11.
00-
--
--
5 1
1.00
--
--
-H
ea 2
Vie
w O
ut1
1
1
1O
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at a
ll re
leva
nt b
uild
ing
area
s ha
ve a
n ad
equa
te v
iew
out
.
7.5 1
Cop
yrig
ht o
f BR
E G
loba
l Ltd
25/0
1/20
11
BREEAM 2
![Page 14: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/14.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_nts
BREE
AM E
stim
ator
BREE
AM C
redi
ts
Tra
3C
yclis
t Fac
ilitie
s
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
cov
ered
, sec
ure
and
wel
l-lit
cycl
e st
orag
e fa
cilit
ies
are
prov
ided
for a
ll bu
ildin
g us
ers.
Two
cred
its w
here
, in
addi
tion
to th
e ab
ove,
ade
quat
e ch
angi
ng fa
cilit
ies
are
prov
ided
for s
taff
use.
22.
00-
--
--
Tra
4P
edes
trian
and
cyc
le s
afet
yO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at th
e si
te la
yout
has
bee
n de
sign
ed in
acc
orda
nce
with
bes
t pra
ctic
e to
ens
ure
safe
and
ade
quat
e pe
dest
rian
and
cycl
e ac
cess
.1
1.00
--
--
-
Tra
5Tr
avel
pla
nO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at a
trav
el p
lan
spec
ific
to
the
build
ing
has
been
pre
pare
d, w
hich
enc
oura
ges
the
redu
ctio
n of
use
r re
lianc
e on
form
s of
trav
el th
at h
ave
the
hige
st e
nviro
nmen
tal i
mpa
ct.
11.
00-
--
--
Tra
6M
axim
um c
ar p
arki
ng c
apac
ity
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
no m
ore
than
one
par
king
sp
ace
is p
rovi
ded
for e
very
fifte
en b
uild
ing
user
s.
Two
cred
its w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
no m
ore
than
one
par
king
sp
ace
is p
rovi
ded
for e
very
twet
ny b
uild
ing
user
s.
22.
00-
--
--
Tra
7Tr
avel
info
rmat
ion
poin
tO
ne c
redi
t is
avai
labl
e w
here
evi
denc
e pr
ovid
ed u
p-to
-dat
e in
form
atio
n on
tra
nspo
rt ro
utes
and
tim
etab
les.
11.
00-
--
--
Tra
8D
eliv
erie
s &
man
oeuv
ring
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
veh
icle
acc
ess
area
s ha
ve b
een
desi
gned
to e
nsur
e ad
equa
te s
pace
for m
anoe
uvrin
g de
liver
y ve
hicl
es a
nd p
rovi
de s
pace
aw
ay fr
om m
anoe
uvrin
g ar
ea fo
r sto
rage
of r
efus
e sk
ips
and
palle
ts.
11.
00-
--
--
Indi
cativ
e Tr
ansp
ort (
wei
ghte
d) S
ectio
n Sc
ore
8.00
%
Wat
er
Wat
1W
ater
Con
sum
ptio
nU
p to
thre
e cr
edits
whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at th
e sp
ecifi
catio
n in
clud
es ta
ps, u
rinal
s, W
Cs
and
show
ers
that
con
sum
e le
ss p
otab
le w
ater
in
use
than
sta
ndar
d sp
ecifi
catio
ns fo
r the
sam
e ty
pe o
f fitt
ings
.3
33
3.00
-1
11
2
Wat
2W
ater
met
erO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at a
wat
er m
eter
with
a
puls
ed o
utpu
t will
be
inst
alle
d on
the
mai
ns s
uppl
y to
eac
h bu
ildin
g/un
it.1
11
1.00
-1
11
1
Wat
3M
ajor
leak
det
ectio
nO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at a
leak
det
ectio
n sy
stem
is
spe
cifie
d or
inst
alle
d on
the
build
ing'
s w
ater
sup
ply.
11
11.
00-
--
--
Wat
4S
anita
ry s
uppl
y sh
ut o
ffO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at p
roxi
mity
det
ectio
n sh
ut-
off i
spr
ovid
ed to
the
wat
er s
uppl
y to
all
toile
t are
as.
11
11.
00-
--
--
Wat
5W
ater
recy
clin
g O
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
e sp
ecifi
catio
n of
sys
tem
s th
at c
olle
ct, s
tore
and
, whe
re n
eces
sary
trea
t, ra
inw
ater
or g
reyw
ater
for W
C
and
urin
al fl
ushi
ng p
urpo
ses.
11
11.
00-
--
--
Wat
6Irr
igat
ion
syst
ems
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
a lo
w-w
ater
irrig
atio
n st
rate
gy/s
yste
m h
as b
een
inst
alle
d, o
r whe
re p
lant
ing
and
land
scap
ing
is
irrig
ated
via
rain
wat
er o
r rec
laim
ed w
ater
.1
0.00
--
--
-
Indi
cativ
e W
ater
(wei
ghte
d) S
ectio
n Sc
ore
5.25
%
Mat
eria
ls
Mat
1M
ater
ials
Spe
cific
atio
n (m
ajor
bu
ildin
g el
emen
ts)
Up
to s
ix c
redi
ts a
re a
vaila
ble,
det
erm
ined
by
the
Gre
en G
uide
to S
peci
ficat
ion
ratin
gs fo
r the
maj
or b
uild
ing/
finis
hing
ele
men
ts.
62.
00-
--
--
Mat
2H
ard
land
scap
ing
and
boun
dary
pr
otec
tion
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
at l
east
80%
of t
he
com
bine
d ar
ea o
f ext
erna
l har
d la
ndsc
apin
g an
d bo
unda
ry p
rote
ctio
n sp
ecifi
catio
ns a
chie
ve a
n A
or A
+ ra
ting,
as
defin
ed b
y th
e G
reen
Gui
de to
S
peci
ficat
ion.
11.
00-
--
--
Mat
3R
e-us
e of
bui
ldin
g fa
çade
One
cre
dit i
s aw
arde
d w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
at l
east
50%
of
the
tota
l faç
ade
(by
area
) is
reus
ed a
nd a
t lea
st 8
0% o
f the
reus
ed fa
çade
(b
y m
ass)
com
pris
es in
-situ
reus
ed m
ater
ial.
10.
00-
--
--
Mat
4R
e-us
e of
bui
ldin
g st
ruct
ure
One
cre
dit i
s aw
arde
d w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
a d
esig
n re
uses
at l
east
80%
of a
n ex
istin
g pr
imar
y st
ruct
ure
and
for p
art r
efur
bish
men
t an
d pa
rt ne
w b
uild
, the
vol
ume
of th
e re
used
stru
ctur
e co
mpr
ises
at l
east
50%
of
the
final
stru
ctur
e’s
volu
me.
11.
00-
--
--
Mat
5R
espo
nsib
le s
ourc
ing
of m
ater
ials
Up
to 3
cre
dits
are
ava
ilabl
e w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
80%
of th
e as
sess
ed m
ater
ials
in th
e fo
llow
ing
build
ing
elem
ents
are
resp
onsi
bly
sour
ced:
a. S
truct
ural
Fra
me
b. G
roun
d flo
orc.
Upp
er fl
oors
(inc
ludi
ng s
epar
atin
g flo
ors)
d. R
oof
e. E
xter
nal w
alls
f. In
tern
al w
alls
g. F
ound
atio
n/su
bstru
ctur
eh.
Sta
ircas
e
Add
ition
ally
100
% o
f any
tim
ber m
ust b
e le
gally
sou
rced
.
31.
00-
--
--
Mat
6In
sula
tion
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
ther
mal
insu
latio
n pr
oduc
ts u
sed
in th
e bu
ildin
g ha
ve a
low
em
bodi
ed im
pact
rela
tive
to th
eir
ther
mal
pro
perti
es, d
eter
min
ed b
y th
e G
reen
Gui
de to
Spe
cific
atio
n ra
tings
.
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
ther
mal
insu
latio
n pr
oduc
ts u
sed
in th
e bu
ildin
g ha
ve b
een
resp
onsi
bly
sour
ced.
22
22.
00-
--
--
Mat
7D
esig
ning
For
Rob
ustn
ess
One
cre
dit w
here
pro
tect
ion
is g
iven
to v
ulne
rabl
e pa
rts o
f the
bui
ldin
g su
ch a
s ar
eas
expo
sed
to h
igh
pede
stria
n tra
ffic,
veh
icul
ar a
nd tr
olle
y m
ovem
ents
.1
11
1.00
--
--
-
Indi
cativ
e M
ater
ials
(wei
ghte
d) S
ectio
n Sc
ore
6.67
%
Was
te
2 1 01 2 1 1 0 12 1 1
Cop
yrig
ht o
f BR
E G
loba
l Ltd
25/0
1/20
11
13
BREEAM 3
![Page 15: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/15.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_nts
BREE
AM E
stim
ator
BREE
AM C
redi
ts
Wst
1C
onst
ruct
ion
Site
Was
te
Man
agem
ent
Up
to th
ree
cred
its a
re a
vaila
ble
whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at
the
amou
nt o
f non
-haz
ardo
us c
onst
ruct
ion
was
te (m
3/10
0m2
or to
nnes
100m
2)
gene
rate
d on
site
by
the
deve
lopm
ent i
s th
e sa
me
as o
r bet
ter t
han
good
or
best
pra
ctic
e le
vels
.
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
a s
igni
fican
t maj
ority
of
non-
haza
rdou
s co
nstru
ctio
n w
aste
gen
erat
ed b
y th
e de
velo
pmen
t will
be
dive
rted
from
land
fill a
nd re
used
or r
ecyc
led.
41.
00-
--
--
Wst
2R
ecyc
led
aggr
egat
esO
ne c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
e si
gnifi
cant
use
of
recy
cled
or
seco
ndar
y ag
greg
ates
in ‘h
igh-
grad
e’ b
uild
ing
aggr
egat
e us
es.
11
11.
00-
--
--
Wst
3R
ecyc
labl
e w
aste
sto
rage
One
cre
dit w
here
a c
entra
l, de
dica
ted
spac
e is
pro
vide
d fo
r the
sto
rage
of t
he
build
ing’
s re
cycl
able
was
te s
tream
s.1
0.00
--
-1
1
Wst
5C
ompo
stin
g
One
cre
dit w
her
e ev
iden
ce p
rovi
ded
dem
onst
rate
s th
ere
is a
ves
sel o
n si
te fo
r co
mpo
stin
g fo
od w
aste
, and
ade
quat
e st
orag
e fo
r suc
h w
aste
gen
erat
ed b
y th
e bu
ildin
g’s
user
s an
d op
erat
ion.
OR
Whe
re s
pace
or a
cces
s is
lim
ited,
ther
e is
a d
edic
ated
spa
ce fo
r com
post
able
food
was
te to
be
stor
ed p
rior t
o re
mov
al a
nd c
ompo
stin
g at
an
alte
rnat
ive
site
.
10.
00-
--
--
Indi
cativ
e W
aste
(wei
ghte
d) S
ectio
n Sc
ore
2.14
%
Land
Use
& E
colo
gy
LE1
Re-
use
of la
nd
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
maj
ority
of t
he
foot
prin
t of
the
prop
osed
dev
elop
men
t fal
ls w
ithin
the
boun
dary
of p
revi
ousl
y de
velo
ped
land
.1
1.00
--
--
-
LE2
Con
tam
inat
ed la
nd
One
cre
dit i
s aw
arde
d w
here
evi
denc
e p
rovi
ded
dem
onst
rate
s th
at th
e la
nd
used
for t
he n
ew d
evel
opm
ent h
as, p
rior t
o de
velo
pmen
t, be
en d
efin
ed a
s co
ntam
inat
ed a
nd w
here
ade
quat
e re
med
ial s
teps
hav
e be
en ta
ken
to
deco
ntam
inat
e th
e si
te p
rior t
o co
nstru
ctio
n.1
0.00
--
--
-
LE3
Eco
logi
cal v
alue
of s
ite A
ND
P
rote
ctio
n of
eco
logi
cal f
eatu
res
One
cre
dit i
s aw
arde
d w
here
evi
denc
e p
rovi
ded
dem
onst
rate
s th
at th
e co
nstru
ctio
n zo
ne is
def
ined
as
land
of l
ow e
colo
gica
l val
ue a
nd a
ll ex
istin
g fe
atur
es o
f eco
logi
cal v
alue
will
be
fully
pro
tect
ed fr
om d
amag
e du
ring
site
pr
epar
atio
n an
d co
nstru
ctio
n w
orks
.1
0.00
--
--
-
LE4
Miti
gatin
g E
colo
gica
l im
pact
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
chan
ge in
the
site
’s
exis
ting
ecol
ogic
al v
alue
, as
a re
sult
of d
evel
opm
ent,
is m
inim
al.
Two
cred
its w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
ther
e is
no
nega
tive
chan
ge in
the
site
’s e
xist
ing
ecol
ogic
al v
alue
as
a re
sult
of d
evel
opm
ent.
20.
00-
-1
11
LE5
Enh
anci
ng S
ite E
colo
gy
One
cre
dit w
here
the
desi
gn te
am (o
r clie
nt) h
as a
ppoi
nted
a s
uita
bly
qual
ified
eco
logi
st to
ad
vise
and
repo
rt on
enh
anci
ng a
nd p
rote
ctin
g th
e ec
olog
ical
val
ue o
f the
site
;an
d im
plem
ente
d th
e pr
ofes
sion
al’s
reco
mm
enda
tions
for g
ener
al e
nhan
cem
ent
and
prot
ectio
n of
site
eco
logy
.
Two
cred
its w
here
, in
addi
tion
to th
e ab
ove,
ther
e is
a p
ositi
ve in
crea
se in
the
ecol
ogic
al
valu
e of
the
site
of u
p to
(but
not
incl
udin
g) 6
spe
cies
.
Thre
e cr
edits
whe
re, i
n ad
ditio
n to
the
abov
e, e
vide
nce
is p
rovi
ded
to d
emon
stra
te a
pos
itive
in
crea
se in
the
ecol
ogic
al v
alue
of t
he s
ite o
f 6 s
peci
es o
r gre
ater
.
30.
00-
--
--
LE6
Long
term
impa
ct o
n bi
odiv
ersi
ty
One
cre
dit w
here
the
clie
nt h
as c
omm
itted
to a
chie
ving
the
man
dato
ry
requ
irem
ents
list
ed b
elow
and
at l
east
two
of th
e ad
ditio
nal r
equi
rem
ents
.
Two
cred
its w
here
the
clie
nt h
as c
omm
itted
to a
chie
ving
the
man
dato
ry
requ
irem
ents
list
ed b
elow
and
at l
east
four
of t
he a
dditi
onal
requ
irem
ents
.
20.
00-
--
--
Indi
cativ
e La
nd U
se &
Eco
logy
(wei
ghte
d) S
ectio
n Sc
ore
1.00
%
Pollu
tion
Pol
1R
efrig
eran
t GW
P -
Bui
ldin
g se
rvic
es
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
the
use
of re
frige
rant
s w
ith a
gl
obal
war
min
g po
tent
ial (
GW
P) o
f les
s th
an 5
or w
here
ther
e ar
e no
re
frige
rant
s sp
ecifi
ed fo
r use
in b
uild
ing
serv
ices
.1
00
0.00
--
--
-
Pol
2P
reve
ntin
g re
frige
rant
leak
s
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
refri
gera
nt le
aks
can
be
dete
cted
AN
D th
at th
e pr
ovis
ion
of a
utom
atic
refri
gera
nt p
ump
dow
n is
mad
e to
a
heat
exc
hang
er (o
r ded
icat
ed s
tora
ge ta
nks)
with
isol
atio
n va
lves
. Or w
here
th
ere
are
no re
frige
rant
s sp
ecifi
ed fo
r the
dev
elop
men
t.1
11
1.00
--
--
-
Pol
4N
Ox
emis
sion
s fro
m h
eatin
g so
urce
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
max
imum
dry
NO
x em
issi
ons
from
del
iver
ed s
pace
hea
ting
ener
gy a
re ≤
100
mg/
kWh
(at 0
%
exce
ss O
2).
Two
cred
its w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
max
imum
dry
NO
x em
issi
ons
from
del
iver
ed s
pace
hea
ting
ener
gy a
re ≤
70 m
g/kW
h (a
t 0%
exc
ess
O2)
.
Thre
e cr
edits
whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at th
e m
axim
um d
ry
NO
x em
issi
ons
from
del
iver
ed s
pace
hea
ting
ener
gy a
re ≤
40 m
g/kW
h (a
t 0%
ex
cess
O2)
and
emis
sion
s fro
m d
eliv
ered
wat
er h
eatin
g en
ergy
are
100
mg/
kWh
or le
ss (a
t 0%
ex
cess
O2)
.
30
00.
00-
--
--
Pol
5Fl
ood
risk
Two
cred
its w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
asse
ssed
de
velo
pmen
t is
loca
ted
in a
zon
e de
fined
as
havi
ng a
low
ann
ual p
roba
bilit
y of
flo
odin
g.
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
asse
ssed
de
velo
pmen
t is
loca
ted
in a
zon
e de
fined
as
havi
ng a
med
ium
or h
igh
annu
al
prob
abili
ty o
f flo
odin
g A
ND
the
grou
nd le
vel o
f the
bui
ldin
g, c
ar p
arki
ng a
nd
acce
ss is
abo
ve th
e de
sign
floo
d le
vel f
or th
e si
te’s
loca
tion.
One
furth
er c
redi
t whe
re e
vide
nce
prov
ided
dem
onst
rate
s th
at s
urfa
ce w
ater
ru
n-of
f atte
nuat
ion
mea
sure
s ar
e sp
ecifi
ed to
min
imis
e th
e ris
k of
loca
lised
flo
odin
g, re
sulti
ng fr
om a
loss
of f
lood
sto
rage
on
site
due
to d
evel
opm
ent.
32.
00-
--
--
Pol
6M
inim
isin
g w
ater
cour
se p
ollu
tion
One
cre
dit h
ere
evid
ence
pro
vide
d de
mon
stra
tes
that
effe
ctiv
e on
site
trea
tmen
t su
ch a
s S
usta
inab
le D
rain
age
Sys
tem
s (S
UD
s) o
r oil
sepa
rato
rs h
ave
been
sp
ecifi
ed in
are
as th
at a
re o
r cou
ld b
e a
sour
ce o
f wat
erco
urse
pol
lutio
n.1
1.00
--
--
-
0 0 0 0 20 01 0 1 1
Cop
yrig
ht o
f BR
E G
loba
l Ltd
25/0
1/20
1114
BREEAM 4
![Page 16: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/16.jpg)
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_nts
BREE
AM E
stim
ator
BREE
AM C
redi
ts
Pol
7R
educ
tion
of N
ight
Tim
e Li
ght
Pol
lutio
n
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
the
exte
rnal
ligh
ting
desi
gn is
in c
ompl
ianc
e w
ith th
e gu
idan
ce in
the
Inst
itutio
n of
Lig
htin
g E
ngin
eers
(ILE
) Gui
danc
e no
tes
for t
he re
duct
ion
of o
btru
sive
ligh
t, 20
05.
11
11.
00-
--
--
Pol
8N
oise
Atte
nuat
ion
One
cre
dit w
here
evi
denc
e pr
ovid
ed d
emon
stra
tes
that
new
sou
rces
of n
oise
fro
m th
e de
velo
pmen
t do
not g
ive
rise
to th
e lik
elih
ood
of c
ompl
aint
s fro
m
exis
ting
nois
e-se
nsiti
ve p
rem
ises
and
am
enity
or w
ildlif
e ar
eas
that
are
with
in
the
loca
lity
of th
e si
te.
11.
00-
--
--
Indi
cativ
e Po
llutio
n (w
eigh
ted)
Sec
tion
Scor
e5.
45%
Inno
vatio
n - E
xem
plar
y Le
vel C
riter
ia
Inno
vatio
nM
an 2
: Con
side
rate
Con
stru
ctor
s
Whe
re p
ost c
onst
ruct
ion,
a C
onsi
dera
te C
onst
ruct
ors
Sch
eme
certi
ficat
e ca
n be
pr
ovid
ed d
emon
stra
ting
that
the
site
ach
ieve
d C
CS
Cod
e of
Con
side
rate
P
ract
ice
with
a s
core
of a
t lea
st 3
6.
OR
Whe
re p
ost c
onst
ruct
ion,
the
site
has
com
plie
d in
full
with
the
alte
rnat
ive,
in
depe
nden
tly a
sses
sed
sche
me,
and
the
alte
rnat
ive
sche
me
addr
esse
s al
l the
m
anda
tory
and
opt
iona
l ite
ms
in C
heck
list A
2.
10.
00
Inno
vatio
nH
ea 1
: Day
light
ing
At l
east
80%
of t
he fl
oor a
rea
(for t
he b
uild
ing
spac
es/ro
om id
entif
ied
abov
e in
th
e st
anda
rd re
quire
men
ts) h
as a
n av
erag
e da
ylig
ht fa
ctor
of 3
% in
mul
ti-st
orey
bu
ildin
gs a
nd 4
% in
sin
gle-
stor
ey b
uild
ings
.1
11
1.00
Inno
vatio
n E
ne 1
: Red
uctio
n of
CO
2 em
issi
ons
One
add
ition
al in
nova
tion
cred
it ca
n be
aw
arde
d w
here
evi
denc
e pr
ovid
ed
dem
onst
rate
s th
e bu
ildin
g is
des
igne
d to
be
a ca
rbon
neu
tral b
uild
ing
as
defin
ed b
y th
e N
CM
(i.e
. in
term
s of
bui
ldin
g se
rvic
es e
nerg
y de
man
d), a
s fo
llow
s:a.
A n
ew b
uild
ing
achi
eves
a C
O2
inde
x le
ss th
an 0
on
the
benc
hmar
k sc
ale.
b. A
refu
rbis
hed
build
ing
achi
eves
a C
O2
inde
x eq
ual t
o or
less
than
0 o
n th
ebe
nchm
ark
scal
e.
Two
addi
tiona
l inn
ovat
ion
cred
its c
an b
e aw
arde
d w
here
evi
denc
e pr
ovid
ed
dem
onst
rate
s th
e bu
ildin
g is
des
igne
d to
be
a Tr
ue z
ero
carb
on b
uild
ing
(in
term
s of
bui
ldin
g se
rvic
es a
nd o
pera
tiona
l ene
rgy
dem
and)
.
20.
00
Inno
vatio
nE
ne 5
: Low
or Z
ero
Car
bon
Tech
nolo
gies
A lo
cal L
ZC e
nerg
y te
chno
logy
has
bee
n in
stal
led
in li
ne w
ith th
e re
com
men
datio
ns o
f a c
ompl
iant
feas
ibili
ty s
tudy
and
this
met
hod
of s
uppl
y re
sults
in a
20%
redu
ctio
n in
the
build
ing’
s C
O2
emis
sion
s.1
0.00
Inno
vatio
nW
at 2
: Wat
er M
eter
Whe
re s
ub m
eter
s ar
e fit
ted
to a
llow
indi
vidu
al w
ater
-con
sum
ing
plan
t or
build
ing
area
s to
be
mon
itore
d su
ch a
s co
olin
g to
wer
s, c
ar w
ashe
s, c
ater
ing
area
s, e
tc. I
f the
bui
ldin
g do
es n
ot h
ave
any
maj
or w
ater
con
sum
ing
plan
t thi
s ex
empl
ar c
redi
t is
not a
vaila
ble.
Eac
h su
b m
eter
has
a p
ulse
d ou
tput
to e
nabl
e co
nnec
tion
to a
Bui
ldin
g M
anag
emen
t Sys
tem
(BM
S) f
or th
e m
onito
ring
of w
ater
con
sum
ptio
n.
In a
dditi
on to
the
abov
e, fo
r site
s w
ith m
ultip
le d
epar
tmen
ts e
.g. l
arge
hea
lth
cent
res
or a
cute
hos
pita
ls, s
epar
ate
puls
ed s
ub m
eter
s ar
e fit
ted
on th
e su
pply
to
the
follo
win
g ar
eas
whe
re p
rese
nt:
a. S
taff
and
publ
ic a
reas
b. C
linic
al a
reas
and
war
dsc.
Let
ting
area
s: O
n th
e w
ater
sup
ply
to e
ach
tena
nt u
nit
d. L
aund
ries
e. M
ain
prod
uctio
n ki
tche
nf.
Hyd
roth
erap
y po
ols
g. L
abor
ator
ies
h. C
SS
D/H
SD
U, p
atho
logy
, pha
rmac
y, m
ortu
ary
and
any
othe
r maj
or p
roce
ss
wat
er u
ser.
11.
00
Inno
vatio
nM
ater
ials
Spe
cific
atio
n
One
exe
mpl
ary
BR
EE
AM
cre
dit c
an b
e aw
arde
d as
follo
ws:
a. W
here
ass
essi
ng fo
ur o
r mor
e ap
plic
able
bui
ldin
g el
emen
ts, t
he b
uild
ing
achi
eves
at l
east
two
poin
ts a
dditi
onal
to th
e to
tal p
oint
s re
quire
d to
ach
ieve
m
axim
um c
redi
ts u
nder
the
stan
dard
BR
EE
AM
requ
irem
ents
.
b. W
here
ass
essi
ng fe
wer
than
four
app
licab
le b
uild
ing
elem
ents
, the
bui
ldin
gac
hiev
es a
t lea
st o
ne p
oint
add
ition
al to
the
tota
l poi
nts
requ
ired
to a
chie
vem
axim
um c
redi
ts u
nder
the
stan
dard
BR
EE
AM
requ
irem
ents
.
10.
00
Inno
vatio
nR
espo
nsib
le S
ourc
ing
of M
ater
ials
Whe
re, i
n ad
ditio
n to
the
stan
dard
BR
EE
AM
requ
irem
ents
, 95%
of t
he
appl
icab
le m
ater
ials
, com
pris
ed w
ithin
the
appl
icab
le b
uild
ing
elem
ents
, hav
e be
en re
spon
sibl
y so
urce
d.1
0.00
Inno
vatio
nW
st 1
Con
stru
ctio
n S
ite W
aste
M
anag
emen
t
Whe
re n
on-h
azar
dous
con
stru
ctio
n w
aste
gen
erat
ed b
y th
e bu
ildin
g’s
deve
lopm
ent m
eets
or e
xcee
ds th
e re
sour
ce e
ffici
ency
ben
chm
ark
requ
ired
to
achi
eve
thre
e cr
edits
(as
outli
ned
in th
e gu
idan
ce).
Whe
re a
t lea
st 9
0% b
y w
eigh
t (80
% b
y vo
lum
e) o
f non
-haz
ardo
us c
onst
ruct
ion
was
te a
nd 9
5% o
f dem
oliti
on w
aste
by
wei
ght (
85%
by
volu
me)
(if a
pplic
able
) ge
nera
ted
by th
e bu
ildha
s be
en d
iver
ted
from
land
fill a
nd e
ither
:a.
Reu
sed
on s
ite (i
n-si
tu o
r for
new
app
licat
ions
)b.
Reu
sed
on o
ther
site
sc.
Sal
vage
d/re
clai
med
for r
euse
d. R
etur
ned
to th
e su
pplie
r via
a ‘t
ake-
back
’ sch
eme
e. R
ecov
ered
from
site
by
an a
ppro
ved
was
te m
anag
emen
t con
tract
or a
nd
recy
cled
.
Whe
re a
ll ke
y w
aste
gro
ups
are
iden
tifie
d fo
r div
ersi
on fr
om la
ndfil
l at p
re-
cons
truct
ion
stag
e S
WM
P.
11.
00
Inno
vatio
n - B
REE
AM
Acc
redi
ted
Prof
essi
onal
Inno
vatio
nB
RE
EA
M A
ccre
dite
d P
rofe
ssio
nal
Up
to tw
o cr
edits
are
ava
ilabl
e fo
r the
com
preh
ensi
ve u
se o
f a B
RE
EA
M
Acc
redi
ted
Pro
fess
iona
l (A
P) t
hrou
ghou
t pro
ject
wor
k st
ages
.2
0.00
Indi
cativ
e In
nova
tion
(wei
ghte
d) S
ectio
n Sc
ore
3.00
%
100 0101 0 0
Cop
yrig
ht o
f BR
E G
loba
l Ltd
25/0
1/20
1115
BREEAM 5
![Page 17: ARCHITECTURAL_technology](https://reader033.vdocument.in/reader033/viewer/2022051519/568c4ab11a28ab4916993b15/html5/thumbnails/17.jpg)
For the BREEAM estimator the score achieved was 66.57 % which is a grade of good, out of a possible outstanding, according to the minimum BREEAM standards. It is assumed that at the initial planning stage of the building, a thorough investigation of the site would be carried out, thus making it easier to foresee the limitations and the opportunities that that site has to offer in terms of en-vironmental strategies. Due to the infill nature of the site, provisions were taken in order to make the parking area a shared space with the occupants of the existing neighbouring buildings. This is crucial in order to maximise the use of the car park, because the parking area is dedicated to only three uses, cycle parking, disabled parking and delivery unloading. As the location of the build-ing is in an urban area, that is easily accessible by several public transportations systems, trains, buses, the need for car parking provisions was limited in order to encourage the use of public transport. The use of cycles is suggested by offering dedicated bicy-cle racks, and showers within the building. Additionally a cycle route from Middlehaven to exchange square was opened up.In terms of water conservation and reuse, water collection and storage on the roof of the building provides rain water that is used in the flushing of toilets and urinals. A water meter, major leak detection system is all available in the plant room of the building that is located on the third floor and is easily accessible. While the existing structure on the site was demolished, reclaimed bricks were used as aggregate in the new build construction, mainly in the hardcore compact binding of the foundations. Additionally, the materiality of the building was limited to the use of only slate and glazing. Also, while not all materials are reclaimed, provision has been taken into consideration in order to source the materials responsibly, from local sites, approved manufacturers.For the Land use and Ecology, only one point was obtained, because the building sits on a previously occupied site, and no soft landscaping was introduced to the site. Due to the nature of the building being a film archive and cinema, the use of mechanical ventilation was used in order to regu-late the temperature in these key areas. On the other hand for most of the building, the use of stack ventilation is utilised due to its open plan nature.While the building both passed and received a grade of good, complacency should not be an option due to the vast possibility of improvement. One of the key issues that may be improved is a more thorough investigation of the site that would lead to a more comprehensive understanding. Additionally the implementation of more zero carbon technologies would prove to be beneficial in the life cycle of the building.ww
name_ALAA TARABZOUNI module_ARC3013: ARCHITECTURAL TECHNOLOGYproject_MIDDLESBROUGH FILM ARCHIVEsite_Ascale_nts
16
BREEAM COMMENT