ARCHITECTURE DESIGN STUDIO 3 [ARC 2116] Project 3 : GENIUS LOCI: VISITOR INTERPRETIVE CENTRE (VIC). My thinking about the site ( Pulau Jerejak ) - Pulau Jerejak had been famous for detention of leprosy patient and there is quite a few quarantine centre was built. - PowerPoint PPT PresentationTRANSCRIPT
ARCHITECTURE DESIGN STUDIO 3 [ARC 2116]Project 3 : GENIUS LOCI: VISITOR INTERPRETIVE CENTRE (VIC)
My thinking about the site (Pulau Jerejak)-Pulau Jerejak had been famous for detention of leprosy patient and there is quite a few quarantine centre was built.-People who step into this island must be fill with feeling of separation and hopeless.-People that staying in the Pulau Jerejak can always see their homeland (Pulau Penang or others) but they cannot reach there.-They are hoping someday they may walk through the darkness to the light source, guidance to the hope.-People inside the detention camp was used to the long corridor alongside with the opening of small cabin.-Inside the small spaces there is always an opening to let the only light source come into the cabin.
Ground Floor PlanScale 1:200
First Floor PlanScale 1:200
Roof Floor PlanScale 1:200
West elevationScale 1:200
East elevationScale 1:200
South elevationScale 1:200
North elevationScale 1:200
Section A-AScale 1:200
Section B-BScale 1:200
Site PlanScale 1:500
Orthographic Drawings
Location Plan (Pulau Jerejak)NTS
Khoo Chee Mei 0303125
Site Context I had chosen a flat ground between the jetty and the quarantine centre. Activities carried out previously was quarry, transport and detaining leprosy patient.
A
A
B B
Poetic SpacesInterior space:
The slits of glass panel allow the light source to go through the wall into the spaces. The shadow and light effect will play on the VIC ‘s visitors as they walk through the long ramp.
A huge light source coming from the two end of the building giving people hope and guidance to walk through the building.
Design Strategy•Ramp – Convenient for old people (disabled)
•Glass Block – Giving the full view around the site
•Linear form – Smooth flowing of the experience inside the VIC
•Glass slits – Penetration of light
Public gathering space and cafeteria, expose to the environment outside, contrast compared to other spaces.
Characteristics of My Design Model •Different feeling at different view port.
•Feeling of little hope(light) in contrast with dark spaces within the model.
•Alternate path instead of just one way trip.
•50 % exibition hall, 20 % public gathering space, 10 % cafeteria, 5% W/C,5% souvenir shop, 10% utilities.
Quarry area
Khoo Chee Mei 0303125
Views
Quarantine Centre
Penang Bridge
Jetty
Viewing Position
Photomontage of Design Model On Site
The extended open space, wall-less design at the centre of the buiding and open space view port was designed for interacting the building with the environment (surrounding).
Relationship Between Inside and Outside
Roof Plan
ARCHITECTURE DESIGN STUDIO 3 [ARC 2116]Project 3 : GENIUS LOCI: VISITOR INTERPRETIVE CENTRE (VIC)
1. View from the glass block and balcony. • Feel the bitterness of leprosy patient.
2. View from cafeteria(ground floor) / exhibition hall (1st floor)
•Relaxing view (ocean and mainland)
3. View from the glass block and balcony
•Feel how people come and leave from this deadly island
4. View from the cafeteria (ground floor)/ exhibition hall (1st floor)
• View of quarry stone (relaxing )
Space orientation:
1
236
7
8
1.Entrance2.Reception3. Exibition 4.W/C5.Office6.Souvenir shop7. Cafeteria8.Public gather9. Viewing glass block10.Store room11.Kitchen
8
Private space
Public space
Open and enclosed spaces:
Open space
Semi enclosed space space
Enclosed space
Main open spaces was centred in the middle of the building.
Circulation:To the exhibition hall, 1st floor
From the 1st floor
To the souvenir shop, WC, store room and office.
To the WC, Public gather space , cafeteria.
To the exhibition hall, viewing port
To the exhibition hall, viewing port
To the exhibition hall, cafeteria
Path from entrance to exitAlternative path
Other opening
Opening for rubbish disposal
Opening for staff only
To the exhibition hall, ground floor
10 511
44
93 3 3
9
ARCHITECTURE DESIGN STUDIO 3 [ARC 2116]Project 3 : GENIUS LOCI: VISITOR INTERPRETIVE CENTRE (VIC)
Orientation Components Surface Area (m2)
Exposed/ Sheltered Month
Exposed Time Design Strategy Refers
North Concrete 80 Remaining months(Shaded)May,June, July , August (Exposed)
9 am to 6pm light coloured wall
East Concrete and Glass
320 Throughout the year(Exposed)
9am to 1pm Install tinted Glass panel, horizontal shading, light coloured wall, venting machine
South Concrete 80 January, Febuary,November,December(Exposed)Remaining months ( Shaded)
9am to 6pm light coloured wall
West Concrete 320 Throughout the year 1pm to 6pm Horizontal shading and vegetation shading, light coloured wall
Horitontal Surface (Roof)
Concrete and glass
500 Throughout the year 9am to 6pm Green Roof and roof insulationZONING
Location : Pulau Jerejak, Pulau PinangLatitude : 5.331580 Longitude : 100.317793 Altitude : 4metresBuilding Operation hours : 8am – 6pm
Mechanical Ventilation
Natural Ventilated
Ground Floor Plan
First Floor
PASSIVE COOLING DESIGN Green Roof
SITE ANALYSIS
First Floor Plan
Spaces organisation :1.Entrance2.Reception3. Exibition 4.W/C5.Office6.Souvenir shop7. Cafeteria8.Public gather9. Viewing glass block
1 23
3
3
3
6
4
4
5
7
8
9
9Wind come from North-East (wing walls)
BASIC BUILDING DESIGN
Ventilation Opening facing North-West and South-West is designed for catching the wind
Building Material Roof and wall insulation is added to minimise heat gain
Fenestration Constrainted openings of extreme north and south
Sun control There is no heat reflected around the site.
Landscape Vegetation shading to restrict direct sunlight.
Section A-A
Green roof, or rooftop garden, is a vegetative layer grown on a rooftop. Green roofs provide shade and remove heat from the air through evapotranspiration, reducing temperatures of the roof surface and the surrounding air.It maximise radiant cooling.
Critical date and time:
Sun path –Critical side (East)21st June 9amNorthern sun path
Sun path –Critical side (west)22nd December 9amSorthern sun path
Prevailing wind ( South-West)
Roof Plan
Section B-B
AA
B
B
MECHANICAL COOLING
Interior ventilation interior spaces .An ideal mechanical cooling is the circulation of air within the would provide air to occupants at a comfortable temperature and humidity.
Interior ventilation through openings (entrance and exit) to the 1st floor ( open space).
Climatic conditions Value
Average outdoor temperature 29.3 °C
Average wind frequency 9.26 km/h
Average wind temperature 29°C
Wind direction South-West and North-East
Average Max. Temp: 32°C
Average Min. Temp: 23°C
Average Precipitation: 228mm
Average Relative Humidity AM: 77.42%
Average Relative Humidity PM: 67.25%
Average Sunlight Hours: 6.85 hours
VENTILATION
SUN PATH
Critical date and time:The heat gain calculation is based on this critical time shown below.
Sun path –Critical side (East)21st June 9amNorthern sun path
21st March 9am 12pm 5pm
212t June 9am 12pm 5pm
22 December 9am 12pm 5pm
Note : vegetation at the west façade is represented by a wall.
OOTV = 36253.4 / 800=45.31675 W/m2
Khoo Chee Mei 0303125
Precedent Study
Strasbourg Cathedral by Jacques-Francois BlondelThe light that comes in from the clerestory window and rose window create shadow on the path.
Glass House by Ludwig Mies van der Rohe
Fully glass furnished buiding provide better view.
Slits house by Eastern Design OfficeThe light came in from the thin slits between walls.
Integration of Design : ( BSC Project)
Ground Floor Plan