    Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    S E A T T L E A R E N A

  • 8/18/2019 Arena Presentation (41916)

    2/25

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    PUBLIC BENEFITS OVERV

    5

    4

    51

    7 7

    6

    33 5

    5

    4

    5

    4

    66

    3

    2

    2

    7

    Ped/Bike Bridge Amtrak Office

    Parking Garage

    1st Ave S

    Utah Ave S

    Occidental Ave SOccidental Ave S

       S

       H  o   l  g  a   t  e   S   t

       S

       W  a   l   k  e  r   S   t

    3rd Ave S

    Safeco Garage

    Publicly Accessible Open Space & Living M

    S Mass. St ROW Improvements & Curbless S

    1st Ave S Enhanced ROW Improvements

    S Holgate St Enhanced ROW Improvements

    Public Art Program

    Bike Facilities

    Off-Site Wayfinding

    ARENA

    1

       S

       M  a  s  s .

       S   t

    L E G E N D

    Surface Par

  • 8/18/2019 Arena Presentation (41916)

    3/25

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    Project P

    0N

       S

       M  a  s  s  a  c   h  u  s  e   t   t  s

       S   t

       S  a   f  e  c  o

       A  c  c  e  s  s   D

      r   i  v  e

       S

       H  o   l  g  a   t  e

       S   t

    1st Ave S

    Occidental Ave S Oc

    Access Road

    Player/StaffParking

    ServiceEntrance

    TeamStoreStairs Stairs

    Lobby

    LobbyYear RoundRestaurant

    PedestrianBridge

    SafecoGarage

    Bike Shop/Valet

    TicketOffice Reception

    Public Open Space& Living Machine

    ARENA

    Public Restrooms

    Plaza Storage

    SITE PLAN - ENLARGEM

  • 8/18/2019 Arena Presentation (41916)

    4/25

    Living Machine Gardens

    Living Machine Markers & AccessHatches

    Interactive Display Panel

    Water Feature

    Programmable Community Area

    Daytime Loading ZoneS. Mass. Curbless Street

    Significant Artwork

       S

       M

      a  s  s  a  c   h  u  s  e   t   t  s

       S   t

    1st Ave S

    Lobby

    Ticket Office Reception

    4

    6

    5

    3

    2

    1

    7 6

    5

    Bike Shop / Va le t

    2

    4

    4

    1

    1

    3

    7

    8

    8

    Sit

    Storage

    PublicRestroom

    2

    2

       N

    L E G E N D

    1- PUBLIC OPEN SPACE & LIVING MAC

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

  • 8/18/2019 Arena Presentation (41916)

    5/25

    Westlake Park Occidental Park

    Hing Hay Park

    18,000SF

    35,000SF

    35,000SF

    24,500SF

    31,800SF

    Arena Public Open Space

    Pioneer Square

    Comparable Public Open 1- PUBLIC OPEN SPACE & LIVING MAC

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

  • 8/18/2019 Arena Presentation (41916)

    6/25

  • 8/18/2019 Arena Presentation (41916)

    7/25

    LIVING MACHINE

    • A Living Machine is an ecological sewage

    treatment facility that will enable a 99%reduction in wastewater

    • It will remove 4 million gallons of wastewatereach year from the overflowing combined sewer

    system (not required by code)• Treated water will be re-used in the building for

    toilet flushing, landscape irrigation and other

    potentail re-use.

    • The system is scalable and allows for a districtopportunities

    • The system is educational opportunities andcan be incorporated into the public open spaceprogram

    • The sytems is the first of its kind among North

    American sports facilities

    4

    6

    5

    3

    2

    Settling Tank

    Equalization &Recirculation Tank

    Stage 1 Treatment Cells

    Stage 2 Treatment Cell

    Reuse Tank

    Potential Reuse: toilets, irrigation hockey rink iceInteractive Display Panel

    Garden Beds at Public Open Space

    1

    Arena bui lding

    8

    7

    8

    4

    5

    3

    2

    1

    7

    2

    2

    LEGEND

    1- PUBLIC OPEN SPACE & LIVING MACLiving M

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

  • 8/18/2019 Arena Presentation (41916)

    8/25

    1- PUBLIC OPEN SPACE & LIVING MACView of Living Machine G

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

  • 8/18/2019 Arena Presentation (41916)

    9/25

    Public

    OpenSpace

       U   t  a   h

       A  v  e

       O  c  c   i   d  e  n   t  a   l

       A  v

      e   S

    Future Development

    A

    Loading

    Curbless Street

        1   s   t

        A   v   e     S

    Exist ing Condit ion

    Proposed Street Alignment and ImprovementsN

    2 - S MASSACHUSSETTS ST ROW IMPROVEM

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

  • 8/18/2019 Arena Presentation (41916)

    10/25

    PublicOpen Space

    34’Drive Lanes

    80’ ROW

    12’Sidewalk

    24’Planting / Furn. Zone

    10’Loading

    S Massachussets St east of 1st Ave S.

    Arena

    2 - S. MASSACHUSSETTS ST ROW IMPROVEMStreet S

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

  • 8/18/2019 Arena Presentation (41916)

    11/25

       S

       M  a  s   S

       S   t

    1st Ave S

    Drive LanesDrive Lanes23’ min

    Clear ZoneRain Garden

    23’ minClear Zone

    Clear ZoneRain Garden

    ARENA

    3 - 1ST AVE S. ROW IMPROVEMS Massachussets St to S Holgate S (Arena Fro

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    A B

    A B

  • 8/18/2019 Arena Presentation (41916)

    12/25

       S

       M  a  s   S

       S   t

    1st Ave S

       E   d  g  a  r   M  a  r   t   i  n  e  z   D  r   S

    Drive LanesDrive Lanes

    16’-0”Ped. Zone

    16’-0”Ped. Zone

    ExistingParking Lot

    ExiBuiRain Garden

    Ped Zone

    Rain Garden

    Private Property

    3 - 1ST AVE S. ROW IMPROVEMEdgar Martinez Dr S to S Massachussets St (block north of Aren

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    A B

    A B

    3 1ST AVE S ROW IMPROVEM

  • 8/18/2019 Arena Presentation (41916)

    13/25

    3 - 1ST AVE S. ROW IMPROVEM1 Ave S. lookin

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    4 S HOLGATE ST ROW IMPROVEM

  • 8/18/2019 Arena Presentation (41916)

    14/25

     Exist ing Condit ion

    Proposed Street Alignment and Improvements

    Amtrak

    Pedestr ianBridge

    WF

     JTh

    Krispy

    Kreme

    Proposed Arena

    Parking Garage

    Rai l Corr idor

       1  s   t   A  v

      e   S

       3  r   d

       A  v

      e   S

       O  c  c .

       A  v  e   S

    S Holgate St

    Proposed

    Arena

    4 - S. HOLGATE ST ROW IMPROVEM

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    4 S HOLGATE ST ROW IMPROVEM

  • 8/18/2019 Arena Presentation (41916)

    15/25

    Drive Lanes

    11’Sidewalk

    3’Setback

    30’Rain garden / Vertical circulation

     Planting

    4 - S. HOLGATE ST ROW IMPROVEMSection at Pedestrian

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    4 S HOLGATE ST ROW IMPROVEM

  • 8/18/2019 Arena Presentation (41916)

    16/25

    Direct Connectionto Arena

    West Landing& Ramp

    East Landing& Ramp

     S.  H o l g  a

     t e  S t.

    O   c  c  .  A   

    v   e   S   . 

    3 r d  A v e  S .

    4 t h  A v e  

    Rail Corr id or

    1        s      t         

    A        v      e       S        

    4 - S. HOLGATE ST ROW IMPROVEMPedestrian

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    4 S HOLGATE ST ROW IMPROVEM

  • 8/18/2019 Arena Presentation (41916)

    17/25

    East Landing& Ramp

    West Landing& Ramp1s t A ve S

     3 r d  A v

     e  S.

    S  .  H  o l   g  a t  e  S  t  . 

    Wells Fargo BaDrive Thru

    Ra il Co rr idor

    4 - S. HOLGATE ST ROW IMPROVEMPedestrian

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    5 PUBLIC

  • 8/18/2019 Arena Presentation (41916)

    18/25

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    5 - PUBLIC

    0N

       S

       M  a  s  s  a  c   h  u  s  e   t   t  s   S   t

       S

       H  o   l  g  a   t  e   S   t

    1st Ave S

    Occidental Ave S Oc

    Access Road

    Significant Artwork for Public Open Space

    Temporary Artworks

    Integrated Artworks in ROW

    Pedestrian Bridge

    P U B L I C A R T L O C A T I O N S

    A B

    C

    D

    C

    A

    D

    C

    B

    6 BICYCLE FACIL

  • 8/18/2019 Arena Presentation (41916)

    19/25

    Existing and P

    Utah GreenwayExistingWaterfront Trail

    Alaskan WayCycle Track

    Airport WayCycle Track

    Atlantic Multi-UseTrail Connection

    Holgate Multi-Use Trail

    Connection to Holgate Ramp (S

    Mountain to Sound Greenway

    Pedestrian / Bike Bridge

    Holgate Multi-Use Trail (SDOT)

    L E G E N D

    B I K E F A C I L I T I E SP R O P O S E D B Y A R E N A

    Off StreetCycle Track

    In StreetGreenway

    Shared-Use Street

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    SafecoField

    Century

    Link Field

       S .

       H  o   l  g  a   t  e   S   t

     .

       S .

       A   t   l  a  n   t   i  c   S   t .

    1st Ave S.

    Occidental A

    6th Ave S.

       S .

       J  a  c   k  s  o  n

       S   t .

     

     

     

      

       E .

       M  a  r   t   i  n  e  z   D  r .   S .

    6 - BICYCLE FACIL

    N

    0

  • 8/18/2019 Arena Presentation (41916)

    20/25

  • 8/18/2019 Arena Presentation (41916)

    21/25

    PUBLIC BENEFITS MATRIX & C

  • 8/18/2019 Arena Presentation (41916)

    22/25

    3

    2

    1

    PUBLIC BENEFITS MATRIX & C

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    PUBLIC BENEFIT DESCRIPTION PROPOSED CODE EIS COST

    Publicly Accessible Open Space &

    Living Machine Gardens

    Flexible accessible plaza open space 31,800 sf

    None

    Ped safety &

    crowd control

    (Queuing at

    Ticketing and

    Ingress/Egress atLobby)

    $9m -

    Living Machine: on-site waste water treatment and reuse 4m gal capacity

    Seasonal programming (food trucks, movable seating, etc.) Programming Doc

    Utility connections for public event use 3 event connections

    Public restroom access 2 restrooms

    Plaza storage room 500 SFPublic seating (permanent) 300+ LF seating

    Water features 2 water features

    Drinking fountains 2 drinking fountains

    Pedestrian lighting (poles, bollards and surface lighting) 1/2 FC average

    S Massachusetts St ROWImprovements & Curbless Street

    Dedication of private property to public ROW 2,400 SF

    New curbs,

    sidewalk (min. 6’

    width) and street

    trees

    None $800k

    Realignment / improvement of curbless street between 1st & Occidental (east)

      Concrete and granite resurfacing, drainage, channelization and signage 16,000 SF

      Street Trees 15 trees

      Seating 20 LF seating

      Pedestrian lighting (poles and bollards) 1/2 FC average

    Realignment / improvement of standard curb / gutter street between 1st & Utah(west)

      Asphalt resurfacing, curb & gutter, drainage, channelization and signage 12,500 SF

      Street Trees 4 trees

      Rain Garden 2,600 SF

    1st Ave S Enhanced ROWImprovements

    Improvements between Massachusetts and Holgate

    New curb,

    sidewalk (16’

    width per Street

    Concept Plan),

    and street trees

    Ped safety &

    crowd control

    (Ingress/Egress at

    Team Store and

    Year-Round Club/ 

    Stairs)

    23’ Min ClearZone

    $900k

      Rain garden 5,800 SF

      Pedestrian lighting (poles) 17 light poles

      Seating 460 LF seating

    Improvements between Mass. and E. Martinez (sidewalk, street trees, rain garden)

      Sidewalk 9,300 SF

      Rain garden 4,700 SF

      Pedestrian lighting (poles) 16 light poles

  • 8/18/2019 Arena Presentation (41916)

    23/25

    CAPITAL IMPROVEMENT C

  • 8/18/2019 Arena Presentation (41916)

    24/25

    CAPITAL IMPROVEMENT C

    Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016

    CAPITAL IMPROVEMENTS (partial) COST RANGE 

    Construct new south parking garage and incorporate modal options $45.0m - $65.0m

      Install new traffic signal at South Walker Street and 1st Avenue South $250 - $450k

      Pro rata contribution to Lander Street grade separation project  Unknown

      Construct new Holgate pedestrian bridge for pedestrians and bicyclists $15m - $18m