ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
AR Museum of Natural Resources Sen. 27 Union + Renovation of the Fire Sprinkler System $ 75,489
AR Museum of Natural Resources Rep. 7 Union + Waterline extension-Tie-in museum with City of Smackover water system $ 78,177
AR Museum of Natural Resources Union + Phase I: Design, fabricate & install exhibits in Galleries 4, 5, 7 & 8 $ 693,600
AR Museum of Natural Resources Union + Phase II: Design, fabricate & install exhibits in Galleries 9,10 & 12 $ 798,160
AR Museum of Natural ResourcesUnion + Phase II: Design, fabricate & install exhibits in Gallery 13-Bromine Industry (A-75 only; FY06
ANCRC 3KE $394,700) $ 105,300
AR Museum of Natural Resources Union + Installation of HVAC system in Museum Building $ 126,200
AR Museum of Natural ResourcesUnion + Construction of new landscape sprinkler system (A-75 only; $12,000 donated by Southwest Arkansas
Planning & Development District) $ 328
AR Museum of Natural Resources Union $ 1,877,254
Arkansas Post Museum Sen. 25 Arkansas + Installation of Fire & Security Alarm System $ 52,470
Rep. 12 Arkansas $ 52,470
Bull Shoals/White River Sen. 17 Baxter/Marion + Bank Stabilization/Erosion Control along White River from Big Spring to park boundary $ 358,031
Bull Shoals/White River Rep.99,100 Baxter/Marion + Construction of barrier-free fishing area on river revetment adjacent to marina, including parking and
access $ 16,830
Bull Shoals/White River Baxter/Marion + Construct playground to meet Consumer Product Safety Commission & ADA guidelines $ 31,381
Bull Shoals/White River Baxter/Marion + Construct Wildflower Interpretive Garden including ADA parking and barrier-free trail (In-house) $ 81,912
Bull Shoals/White River Baxter/Marion + Renovation/repair of Area "D" campground bathhouse, to include barrier-free modifications (In-
house) $ 41,841
Bull Shoals/White River Baxter/Marion + Wastewater Treatment Analysis/Report $ 3,650
Bull Shoals/White River Baxter/Marion + Construct employee residence (A-75 only) (ANCRC $176,825) $ 11,175
Bull Shoals/White River Baxter/Marion + Construction of sewer improvements including force main to City of Bull Shoals wastewater
treatment plant $ 290,458
Bull Shoals/White River Baxter/Marion + Construction of new barrier-free bathhouse at Area "C" campground, to include parking, access and
utilities $ 179,123
Bull Shoals/White River Baxter/Marion + Construction of Visitor Center, including barrier-free parking, access, utilities, exhibits (A-75 only)
and FFE (ANCRC FY06 - $358,133) $ 5,261,280
Bull Shoals/White River Baxter/Marion + Lakeview Day Use Area improvements, Big Spring Area Access improvements and new barrier-free
Amphitheater Improvements to include Parking $ 465,873
Bull Shoals/White River Baxter/Marion + Cultural Resource Survey for new COE lease area $ 4,500
Bull Shoals/White River Baxter/Marion + Environmental Assessment report for new COE lease area $ 19,280
Bull Shoals/White River Baxter/Marion + Signage for Oak Ridge Mountain Bike Trail $ 3,942
Bull Shoals/White River Baxter/Marion + Installation of P1 pump at Visitor Center $ 3,628
Bull Shoals/White River Baxter/Marion + Modification / reconstruction of the existing water feature to a landscape feature at the James A.
Gaston Visitor Center. $ 16,065
1 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Bull Shoals/White River Baxter/Marion + Repair / modifications of the Geothermal System and associated equipment at the James A. Gaston
Visitor Center. $ 26,253
Bull Shoals/White River Baxter/Marion + Repair Marina Store due to flood damage. $ 10,726
Bull Shoals/White River Baxter/Marion + Installation of site furnishings, trailhead signage, and wayside exhibits on a barrier-free trail.($20,000
to be reimbursed by AGFC Wildlife Observation Trail Grant) $ 24,753
Bull Shoals/White River Baxter/Marion $ 6,850,700
Cane Creek Sen. 26 Lincoln + Parking/Paving Improvements $ 87,680
Cane Creek Rep. 12 Lincoln + Construction of employee residence & multi-purpose pavilion including barrier-free access & utilities
(Including Furnishings, Fixtures and Equipment) $ 549,931
Cane Creek Lincoln + Construction of employee residence with associated access and utilities $ 175,584
Cane Creek Lincoln + Acquisition of manufactured home for employee residence $ 13,350
Cane Creek Lincoln + Conduct Cultural Resources Survey for new Cane Creek Lake Trail. $ 3,697
Cane Creek Lincoln + Construction of a new courtesy dock adjacent to campground. (Project also funded from ANCRC
FY04 - $29,152 & ANCRC FY06 - $29,477) $ 19,487
Cane Creek Lincoln + Construction of Two (2) Trail Shelters on Cane Creek Lake Trail. $ 20,797
Cane Creek Lincoln + Construction of Grill Shelters (2) adjacent to Day-Use Pavilions. $ 18,567
Cane Creek Lincoln + Continuation of construction of Timberland Cut-off Trail $ 3,119
Cane Creek Lincoln + Construction of new Wastewater Treatment Plant $ 281,143
Cane Creek Lincoln $ 1,173,355
Conway Cemetery Sen. 11 Lafayette + Construction of new entrance road and barrier-free access improvements $ 96,243
Conway Cemetery Rep. 2 Lafayette $ 96,243
Cossatot Sen. 10 Polk + Water systems improvements - tie-in to City of Wickes water system $ 271,842
Cossatot Rep. 19,20 Polk + Construction of new employee residence including access and utilities (Including FFE) $ 171,890
Cossatot Polk + Construction of new Visitor Center, including site improvements, access, utilities and exhibits
(Including FFE) $ 2,951,727
Cossatot Polk + Addition/expansion of maintenance facility, equipment shed and flammable storage building $ 189,787
Cossatot Polk + Design, fabrication and installation of exhibits at the new Visitor Center $ 684,400
Cossatot Polk + Road and parking improvements $ 15,805
Cossatot Polk + Harris Creek Trailhead improvements (A-75 only) $ 688
Cossatot Polk + Water, sewer and electrical improvements, including water line extension to maintenance building
and installation of septic tank and leach field $ 188,624
Cossatot Polk + Appraisal of five (5) tracts of land $ 2,500
Cossatot Polk + Construction of new campground and composting toilet at Sandbar Area (In-house) (A-75 only;
FY04 ANCRC 1WT $65,666.68) $ 57,212
Cossatot Polk + Acquisition one (1) tract of land approximately 40 acres (ANCRC FY-06 $139,577) $ 96,065
2 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Cossatot Polk + Purchase and installation of a manufactured home, including new drilled well, small maintenance
building and complex, access, and utilities at Hwy 246 area. (In-house) $ 119,644
Cossatot Polk + Funding for Bat study $ 5,000
Cossatot Polk + Construction of composting toilet to include site and access improvements at Brushy Creek Day-Use
Area. $ 175,995
Cossatot Polk + Construction / Installation of a new Amphitheater w/barrier free access and Playground adjacent to
Visitor Center (In-House) $ 45,817
Cossatot Polk + Repairs to Exhibits in the Visitor Center. $ 17,496
Cossatot Polk + Upgrade recycling bins in park. $ 21,017
Cossatot Polk + Continuation of repairs/renovations to the River Corridor Trail (A-75 only; $92,450.00 FY09
ANCRC) $ 909
Cossatot Polk ++ Construction of River Ridge Group Camp to include road, access, parking, utilities, campsites,
shelters, and a restroom. $ 135,000
Cossatot Polk $ 5,151,418
Crater of Diamonds Sen. 10 Pike + Renovation of campground bathhouse/public laundry, including barrier-free modifications (In-house) $ 56,709
Crater of Diamonds Rep. 19 Pike + Diamond search area clearing $ 6,000
Crater of Diamonds Pike + River trail improvements, including barrier-free accessibility and exhibits $ 181,426
Crater of Diamonds Pike + Develop Interpretive Plan for media and Programs $ 19,500
Crater of Diamonds Pike + Develop overall Concept Plan for Park development $ 17,160
Crater of Diamonds Pike + Construct Diamond Springs Water Park, including site improvements, barrier-free access and utilities
(A-75 only; LWCF $461,000; Total Cost $1,253,141) $ 792,141
Crater of Diamonds Pike + Restroom trailer rental during Construction of Diamond Springs Water Park $ 14,668
Crater of Diamonds Pike + Asbestos surveys for selected park structures to meet state and federal regulations $ 2,983
Crater of Diamonds Pike + Acquisition and appraisal of one (1) tract of land (approximately 23.41 acres) $ 106,119
Crater of Diamonds Pike + Construction of a Diamond Discovery Center, including site improvements, access, utilities and
exhibits $ 1,684,587
Crater of Diamonds Pike + Relocate existing playground to campground due to construction of DDC (FY 05) $ 42,500
Crater of Diamonds Pike + Restoration of existing guardhouse (In-house construction) $ 15,929
Crater of Diamonds Pike + Phase I Improvements - construct 2 employee residences, renovate bathhouse, day-use area, wildlife
blind and amphitheater (A-75 only; FY01 ANCRC 1DG $838,296; Including FFE) $ 385,228
Crater of Diamonds Pike + Extension of electrical lines to the Diamond Springs Water Park. $ 75,575
Crater of Diamonds Pike + Sewer Pump / Lift Station Improvements $ 78,991
Crater of Diamonds Pike + Acquisition and set up two (2) manufactured homes including access and utilities $ 200,234
Crater of Diamonds Pike + Asbestos survey on four (4) structures scheduled for demolition. $ 1,145
Crater of Diamonds Pike + Expand parking for overflow visitation. $ 11,139
3 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Crater of Diamonds Pike + Diamond Discovery Center (DDC) improvements to include an awning over the Demonstration Area,
installation of concrete block walls for additional storage, extension of a chain link fence adjacent to
the building for better security and installation of vinyl curtain enclosure on the lower level. $ 17,092
Crater of Diamonds Pike + Construct picnic area at service road/overflow parking area.(In-House) $ 4,918
Crater of Diamonds Pike + Modifications to Day-Use Pavilion for temporary re-use as a Visitor Center. $ 51,661
Crater of Diamonds Pike + Renovation / Repair / Expansion of the Visitor Center to correct structural, roof, and exterior siding
problems. (A-75 only, $532,331 - General Improvement Fund) $ 277,589
Crater of Diamonds Pike + Installation of fitness equipment cluster system ($4,395 Cash [$4,000 donation - America's State Park
Foundation + $395 Cash Funds]) $ 5,586
Crater of Diamonds Pike + Construction of ADA compliant modifications to the Mineral Washing Pavilion and the Clean-up
Station. $ 28,377
Crater of Diamonds Pike + Construction / installation of a swimming pool liner at Diamonds Springs. $ 59,688
Crater of Diamonds Pike + Construction / structural repair to the ramp at the northwest corner of the Diamond Discovery Center $ 22,716
Crater of Diamonds Pike $ 4,159,661
Crowley's Ridge Sen. 20 Greene + Road and parking improvements $ 170,513
Crowley's Ridge Rep. 56 Greene + Construct vending shelter by VIC, renovate campground bathhouse and make ADA modifications at
the Group Area Dining Hall $ 183,058
Crowley's Ridge Greene + Phase I dredging of Lake Ponder Swimming Lake $ 9,950
Crowley's Ridge Greene + Asbestos surveys for selected park structures to meet state and federal regulations $ 3,029
Crowley's Ridge Greene + Installation of recreational equipment at swimming lake $ 6,844
Crowley's Ridge Greene + Replace deteriorated pedal boat dock and construct new attendant shelter, including
barrier-free access (In-house) $ 30,703
Crowley's Ridge Greene + Acquisition of one (1) tract of land with four (4) structures (Approximately 2.6 acres) $ 110,369
Crowley's Ridge Greene + Archeology work at Lake Ponder for dredging project $ 9,897
Crowley's Ridge Greene + Lake research-water quality study for algae problem $ 10,000
Crowley's Ridge Greene + Construction of a new boat ramp on Walcott Lake. (In-house) $ 4,171
Crowley's Ridge Greene + Construction of Gravity Main Extenstion (A75 only; FY14 Major Maintenance $13,166) $ 63,821
Crowley's Ridge Greene ++ Construction of two (2) employee residences to include site improvements, road, access, all utilities,
and appliances. $ 760,000
Crowley's Ridge Greene $ 1,362,355
Daisy Sen. 10
Rep. 19
Pike + Construct barrier-free campground bathhouse in Area "B", pavilion with restrooms and
renovate/expand maintenance building $ 458,475
Daisy Pike + Construct employee residence including access, utilities and appliances $ 160,133
Daisy Pike + Shoreline stabilization/erosion control along lake shore $ 115,978
Daisy Pike + Replace primary sewer lift station $ 46,377
Daisy Pike + Road and parking improvements $ 209,511
4 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Daisy Pike + Asbestos surveys for selected park structures to meet state and federal regulations $ 1,324
Daisy Pike + Renovate Area "E" campground to include all utilities and access roads and construct barrier-free
bathhouse (A-75 only) $ 568,019
Daisy Pike + Acquisition of one (1) tract of land (approximately 3.78 acres) with improvements $ 127,625
Daisy Pike + Renovation/Repair of newly acquired employee residence $ 39,740
Daisy Pike $ 1,727,182
Davidsonville Historic Sen. 19 Randolph + Construct pavilion with restroom including parking improvements and barrier-free access $ 137,176
Davidsonville Historic Rep. 60 Randolph + Parking, access improvements and construction of barrier-free trail $ 83,210
Davidsonville Historic Randolph + Installation of barrier-free playground $ 38,861
Davidsonville Historic Randolph + Phase II Archeology $ 61,180
Davidsonville Historic Randolph + Asbestos surveys for selected park structures to meet state and federal regulations $ 923
Davidsonville Historic Randolph + Purchase of manufactured home to include site improvements, access and all utilities. $ 94,734
Davidsonville Historic Randolph + Construction of basic ghost structures of the first Courthouse and the original Post Office. (A-75
only; also funded by FY13 ANCRC - $106,113.68) $ 48,797
Davidsonville Historic Randolph ++ Construction of a newVisitor Center to include site improvements, all utilities, exhibits, and FF&E
(Furnishings, Fixtures and Equipment) $ 895,000
Davidsonville Historic Randolph $ 1,359,881
DeGray Sen. 10,13 Hot Springs + Lodge renovate (Phase I; A-75 only; Total Cost $3,178,525.82) $ 1,978,526
DeGray Rep. 18, 26 Hot Springs + Lodge renovation (Phase II) $ 3,804,437
DeGray Hot Springs + Complete renovation of Caddo Bend Day-Use area, parking and picnic site improvements $ 567,327
DeGray Hot Springs + Replace golf course irrigation system including pump house, pumps, and distribution lines $ 611,580
DeGray Hot Springs + Construct DeRoche Ridge campground bathhouse, pavilion and restroom at Caddo Bend Day-Use
are, including utilities and barrier-free access $ 416,949
DeGray Hot Springs + Golf course clubhouse landscaping and plaza, including expanded golf cart loading area $ 328,634
DeGray Hot Springs + Construct service and fuel dispensing dock at marina $ 461,453
DeGray Hot Springs + Installation of water lines and hydrants at De Roche Ridge campground $ 105,982
DeGray Hot Springs + Construct perimeter fencing on boundary adjacent to golf course $ 27,990
DeGray Hot Springs + Installation of a new fuel line and monitoring system at marina (A-75 only) $ 81,875
DeGray Hot Springs + Construction of three (3) employee residences, renovation/expansion of sub-standard residence,
including access and utilities (Including FFE) $ 678,485
DeGray Hot Springs + Water treatment plant renovations $ 99,639
DeGray Hot Springs + Construction of one (1) employee residence including access and utilities (A-75 only; FY99 ANCRC
$130,940) $ 39,118
DeGray Hot Springs + Construct three (3) restrooms and demolish four (4) existing restrooms at Caddo Bend Day-Use Area,
install new water distribution line, construct one (1) employee residence including access, utilities
and site improvements (Including FFE) $ 599,153
5 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
DeGray Hot Springs + Asbestos surveys for selected park structures to meet state and federal regulations $ 5,853
DeGray Hot Springs + Acquisition of two (2) manufactured homes for employee residences $ 60,503
DeGray Hot Springs + Installation of new underground electrical in DeRoche Ridge Campground $ 101,982
DeGray Hot Springs + Construction of breakwater system for the lodge courtesy dock $ 149,922
DeGray Hot Springs + Repair/Installation of new Ramp Rider Car for ABA accessibility at Lodge Courtesy Dock $ 19,142
DeGray Hot Springs + Electrical system upgrade for the Park Administration Offices $ 66,478
DeGray Hot Springs + HVAC improvements at Lodge including advertising $ 58,651
DeGray Hot Springs + Cultural Resources Survey for wastewater treatment plant and new pavilion. $ 2,506
DeGray Hot Springs + Construct new wastewater treatment plant and three (3) new sewer lift stations $ 1,333,683
DeGray Hot Springs + Renovation of Golf Course Greens (Holes 1-9 completed) (Holes 10-18 competed) (In-house) $ 85,252
DeGray Hot Springs + Installation of new Park wide Telecommunications System to include Data Cabling, trenching, and
equipment $ 514,510
DeGray Hot Springs + Continuation of Marina lift station modifications to correct piping problems. $ 19,400
DeGray Hot Springs + Relocate Marina Service Dock, Dock "A" and all associated utilities due to repetitive low water
conditions. $ 162,587
DeGray Hot Springs + Construction of new Disc Golf Course. $ 17,612
DeGray Hot Springs + Repairs to the Lodge concrete columns. $ 14,373
DeGray Hot Springs + HVAC renovations to the Hot Tub Room in the Lodge. $ 55,043
DeGray Hot Springs ++ Complete renovation of the DeRoche Ridge Campground to include access and all utilites. $ 2,000,000
DeGray Hot Springs ++ Construction for the repair of State Highway 600 Drives $ 75,699
DeGray Hot Springs ++ Renovation of the DeRoche Ridge Day Use Area (A-75 only; FY14 ANCRC - $16,913.85 and FY15
ANCRC - $221,905.67) $ 317,735
. Hot Springs $ 14,862,079
Delta Heritage Trail Sen. 25, 26 Phillips + Construct 3.64 mile hike/bike trail including bridge and trailhead improvements and signage $ 518,493
Delta Heritage Trail Rep. 11, 12 Phillips + Acquisition of four (4) tracts of land (approximately 10.197 acres) with improvements $ 218,946
Delta Heritage Trail Phillips + Acquisition of one (1) tract of land (approximately 3.150 acres) with improvements $ 345,831
Delta Heritage Trail Phillips + Construction of Lick Creek Trail Head ($21,520 reimbursed by AHTD) $ 40,018
Delta Heritage Trail Phillips + Appraisal for existing rail on trail corridor to meet AHTD bid requirements $ 24,365
Delta Heritage Trail Phillips + Construct Trail Extension (A-75 only; General Improvement 3HC $1,500,000.00) $ 17,525
Delta Heritage Trail Phillips + Lighting Improvements at the Benzal Bridge, Construct Group Camp & Day-Use Area Improvements
at Barton Trail Head. (In-house) $ 44,920
Delta Heritage Trail Phillips + Appraisal services for rail and other track material (OTM), $ 26,750
Delta Heritage Trail Phillips + Construction of approx. seven (7) miles of trail, trailhead, site furnishings, and associated
improvements from Lakeview to Elaine; parking and barrier-free access improvements at Barton
Visitor Center (A-75 only, Trail Grant - $146,075.00 and Cash - $42,416.17) $ 1,230,717
Delta Heritage Trail Phillips ++ Construction of approx. twenty nine (29) miles of trail, trailheads, and associated improvements from
Arkansas River to Arkansas City. (A-75 only; GIF - $3,250,000 and Cash - $5,773,316.74) $ 6,000,000
Delta Heritage Trail Phillips $ 8,467,565
6 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Devil's Den Sen. 5 Washington + Re-roofing seven (7) buildings $ 18,041
Devil's Den Rep. 80,81 Washington + Construct new barrier-free bathhouse at Campground "E", including parking, access and utilities $ 202,769
Devil's Den Washington + Parking, paving & utility improvements at selected locations in park; Replace Primary Sewer Lift
Station $ 582,184
Devil's Den Washington + Construct two (2) employee residences, including site improvements, access and utilities $ 474,017
Devil's Den Washington + Renovation/restoration of the interior of seven (7) CCC era cabins (Including FFE) $ 729,855
Devil's Den Washington + Asbestos surveys for selected park structures to meet state and federal regulations $ 1,218
Devil's Den Washington + Acquisition of one (1) manufactured home for an employee residence $ 16,466
Devil's Den Washington + Reconstruct two (2) CCC-era cabins, Yellow Rock overlook shelter including barrier-free access and
parking improvements; Replace one (1) bathhouse in Campground "E"; Archeology work at original
Cabin sites $ 529,925
Devil's Den Washington + Renovation/replacement of swimming pool and CCC bathhouse including barrier-free parking and
access improvements (A-75 only; total cost $624,458) $ 580,269
Devil's Den Washington + Renovation of Area "E" Campground, including access, all utilities and advertising $ 1,338,533
Devil's Den Washington + Repair/renovation of flood damage at dam. Removal of silt and repair damage to retaining wall.
(Reimbursed by FEMA) $ 817,050
Devil's Den Washington + Renovate 8 CCC Cabins (A-75 only; 948-Federal Funds $253,522.59) $ 724,937
Devil's Den Washington + Campground "A" Improvements due to Flood Damage; Riprap Replacement; Day-Use area
improvements (Reimbursement received from FEMA) $ 226,780
Devil's Den Washington + Reconstruct Pedestrian Suspension Bridge that was destroyed by flood (to be reimbursed by FEMA)
$ 309,972
Devil's Den Washington + Construction of a new employee residence (A-75 only, FY14 ANCRC $284,867)
$ 16,036
Devil's Den Washington + Construction / relocation of Hwy 220 waterline.
$ 12,050
Devil's Den Washington ++ Construction/Renovation of Campground B to include a new Bathhouse, six (6) Camper Cabins,
access, road, parking, and all utlilites. $ 996,000
Devil's Den Washington $ 7,576,102
Hampson Archeological Museum Sen. 22 Mississippi + Construction of playground to meet consumer Product Safety Commission & ADA guidelines $ 31,381
Hampson Archeological Museum Rep. 55 Mississippi + Asbestos surveys for selected park structures to meet state and federal regulations $ 1,093
Hampson Archeological Museum Mississippi + Acquisition of Employee Residence $ 65,000
Hampson Archeological Museum Mississippi $ 97,474
Herman Davis Sen. 22 Mississippi + Access, parking and landscaping improvements $ 46,362
Herman Davis Rep. 54 Mississippi + Installation of irrigation system $ 13,944
Herman Davis Mississippi $ 60,306
7 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Historic Washington Sen. 10
Rep. 3
Hempstead + Renovation of the 1940 WPA Gym including equipment, barrier-free access and parking
improvements (Including FFE) $ 624,199
Historic Washington Hempstead + Renovation of the 1874 Courthouse and reconstruction of the 1839 Clerk's Office, including barrier-
free access (A-75 only) $ 1,181,149
Historic Washington Hempstead + Renovation of the 1914 schoolhouse, including construction of adjacent bathhouse (A-75 only) $ 330,560
Historic Washington Hempstead + Asbestos surveys for selected park structures to meet state and federal regulations $ 6,656
Historic Washington Hempstead + Appraisal of one (1) track of land (Old Jail) $ 3,200
Historic Washington Hempstead + Acquisition of one (1) tract of land (approximately .5 acres) and one (1) structure (A-75 only;
FY98ANCRC) $ 800
Historic Washington Hempstead + Acquisition of one (1) tract of land (approximately .94 acres) $ 7,347
Historic Washington Hempstead + Acquisition of one (1) tract of land (approximately 1.118 acres) with improvements $ 154,234
Historic Washington Hempstead + Crouch House Museum exhibits (In-house) $ 14,423
Historic Washington Hempstead + Repair/reconstruction of the Sanders Barn and exhibits due to fire damage $ 37,295
Historic Washington Hempstead + Upgrade 1874 Courthouse Exhibits (In-house) $ 46,500
Historic Washington Hempstead ++ Renovation / rehabilitation of the Brunson House to include site improvements, access, all utilities,
and Furniture, Fixtures, and Equipment (FF&E) $ 1,550,000
Historic Washington Hempstead ++ Construction of a new Equipment Shed (A-75 only; FY15 ANCRC - $49,967.43) $ 88,199
Historic Washington Hempstead $ 4,044,562
Hobbs Sens. 3,5 Benton + Water main extension-tie-in park to Madison County Rural Water Association $ 168,830
Hobbs Rep. 96,97 Benton + Conduct archeological investigations at Van Hollow (Van Winkle site; Phase I) $ 10,000
Hobbs Benton + Continuations of archeological investigations at Van Hollow (Van Winkle site; Phase II) $ 10,000
Hobbs Benton + Continuations of archeological investigations at Van Hollow (Van Winkle site; Phase III) $ 11,000
Hobbs Benton + Analysis of artifacts and data from Van Winkle Site (A-75 only) $ 6,364
Hobbs Benton + Acquisition of one (1) tract of land (approximately 5.10 acres) with one (1) structure $ 139,951
Hobbs Benton + Acquisition of one (1) tract of land (approximately 10.40 acres) $ 42,480
Hobbs Benton + Acquisition of one (1) tract of land (approximately 41.76 acres) $ 185,918
Hobbs Benton + Acquisition of one (1) tract of land (approximately 37.55 acres) with five (5) structures $ 218,013
Hobbs Benton + Acquisition of one (1) tract of land (approximately 17.40 acres) with one (1) structure $ 202,011
Hobbs Benton + Acquisition of one (1) tract of land (approximately 201.41 acres) (ANCRC FY03 $552,586) $ 228,590
Hobbs Benton + Acquisition of four (4) tracts of land (approximately 94.807 acres) $ 586,362
Hobbs Benton + Acquisition of one (1) tract of land (approximately 3.04 acres) $ 27,272
Hobbs Benton + Acquisition of one (1) tract of land (approximately .78 acres) with improvements $ 65,789
Hobbs Benton + Acquisition of one (1) tract of land (approximately 2.00 acres) with improvements $ 86,555
Hobbs Benton + Construct Multi-Use Trail (approximately sixteen (16) miles and two (2) trailheads $ 52,565
Hobbs Benton + Complete renovation of Shooting Range (A-75 only) $ 31,566
Hobbs Benton + Construct Van Hollow Trail including barrier-free access, parking improvements and restroom $ 612,813
8 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Hobbs Benton + Construction of Maintenance Facility including maintenance building, equipment shed, flammable
storage building, access and utilities $ 367,365
Hobbs Benton + Installation/Construction of underground electrical distribution lines to tie-in new park development $ 345,773
Hobbs Benton + Construction of multi-use trail including trailhead parking, signage, and toilet at Townsend Ridge (In-
house) $ 110,026
Hobbs Benton + Construction of new Visitor Center including site improvements, access and utilities $ 4,551,080
Hobbs Benton + Purchase of Furniture, Fixtures and Equipment (FFE) for new Visitor Center. $ 93,947
Hobbs Benton + Design, fabrication and installation of exhibits in the new Visitor Center. $ 858,904
Hobbs Benton + Construction of hitching rails and fence for the horse corral adjacent to the Visitor Center. $ 4,702
Hobbs Benton + Purchase of materials for in-house construction of picnic site on grounds of the new Visitor Center
and Van Winkle trailhead. $ 11,100
Hobbs Benton + Installation of site furnishings, trailhead signage, and wayside exhibits on a barrier-free trail. (To be
reimbursed by AGFC Wildlife Observation Trail Grant) $ 17,356
Hobbs Benton + Construction of a storm water collection facility and rain garden to drain into the existing wildlife
pond. ($2,800 donation from Beaver Water District) $ 9,378
Hobbs Benton $ 9,055,709
Jacksonport Sen. 23 Jackson + Renovation of both interior & exterior of the Jacksonport Courthouse (A-75 only; total cost
$1,818,683) $ 41,185
Jacksonport Rep. 47 Jackson + Shoreline stabilization/erosion control along White River adjacent to campground $ 249,950
Jacksonport Jackson + Construct equipment shed and employee residence including access and utilities $ 211,918
Jacksonport Jackson + Restoration of Mary Woods No. 2 Riverboat following 1997 tornado (A-75 only; total cost $896,303)
$ 34,302
Jacksonport Jackson + Road and parking improvements $ 113,223
Jacksonport Jackson + Construct new residence including site improvements, access and utilities (Including FFE) $ 198,762
Jacksonport Jackson + Replace deteriorated underground electrical and pedestals in campground (A-75; In-house) $ 31,611
Jacksonport Jackson + Acquisition of one (1) tract of land (approximately 0.992 acres) with improvements $ 25,017
Jacksonport Jackson + Water system improvements $ 187,202
Jacksonport Jackson + Acquisition of one (1) tract of land (approximately .3331 acres) ` $ 5,068
Jacksonport Jackson + Phase I Cultural Resource Surveys for the proposed Visitor Center area of disturbance. $ 5,976
Jacksonport Jackson + Acquisition of one (1) track of land totaling .50 acres (Wilmans) $ 3,119
Jacksonport Jackson + Continuation of acquisition of shelving for the new Collections Management Facility $ 68,809
Jacksonport Jackson + Repainting the roof of the Courthouse $ 52,532
Jacksonport Jackson $ 1,228,674
Jenkins Ferry Sen. 13,12 Grant + Road, parking and boat ramp improvements $ 85,724
Jenkins Ferry Rep. 15 Grant + Asbestos survey of restroom to meet state and federal regulations $ 324
Jenkins Ferry Grant $ 86,048
9 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Lake Catherine Sen.13 Garland + Renovation of day-use area. $ 22,881
Lake Catherine Rep. 26 Garland + Construct swim beach bathhouse, construct bathhouse in Area "B", construct two (2) residences and
renovate exterior of three (3) rental cabins $ 950,206
Lake Catherine Garland + Construct new five slip boat dock including access and utilities $ 102,732
Lake Catherine Garland + Various parking and road improvements in cabin area and construction of new boat launch ramp $ 233,164
Lake Catherine Garland + Renovation and expansion of sub-standard employee residence $ 106,425
Lake Catherine Garland + Swim beach improvements $ 74,262
Lake Catherine Garland + Construction of new maintenance facility including maintenance building, equipment shed,
flammable storage building and fenced compound (Including FFE) $ 299,268
Lake Catherine Garland + Asbestos surveys for selected park structures to meet state and federal regulations $ 4,329
Lake Catherine Garland + Renovation/repair of Area "A" campground bathhouse, including barrier-free modifications
(In-house) $ 31,451
Lake Catherine Garland + Renovation of Wastewater Treatment Plant $ 166,760
Lake Catherine Garland + Renovation of Area "C" Campground bathhouse including ADA modifications (In-house) $ 39,666
Lake Catherine Garland + Renovation of Campgrounds "A" & "C" including access road, new campsites with amenities and all
utilities (water, sewer, and electric) $ 1,825,775
Lake Catherine Garland + Construct new employee residence including access, utilities, FFE and advertising $ 170,039
Lake Catherine Garland + Conduct Phase I Cultural Resources Survey of Campgrounds "A" and "C" $ 5,500
Lake Catherine Garland + Replace Entergy's primary underground electrical conductors in campground to include digging
trench, installing conduit and backfill. $ 27,890
Lake Catherine Garland ++ Construction of parking and installation of site furnishings, traihead signage, and wayside exhibits on
a barrier-free trail ($100,000 to be reimbursed by AGFC Wildlife Observation Trail Grant) $ 146,000
Lake Catherine Garland ++ Construction / installation of a larger fuel tank at the Marina. $ 210,000
Lake Catherine Garland ++ Renovation of the CCC Nature Cabin (A-75 only; FY14 ANCRC - $8,510 and FY15 ANCRC -
$170,583.56) $ 22,672
Lake Catherine Garland $ 4,439,020
Lake Charles Sen.20 Lawrence + Construct maintenance complex, including maintenance building, equipment shed, flammable storage
building and fenced compound, employee residence and day-use restroom $ 540,122
Lake Charles Rep. 60 Lawrence + Road and parking improvements $ 146,305
Lake Charles Lawrence + Renovation of two (2) day-use area restrooms to include ADA modifications (In-house) $ 47,471
Lake Charles Lawrence + Water lines and hydrant installation in Area "C" campground $ 28,723
Lake Charles Lawrence + Asbestos surveys for selected park structures to meet state and federal regulations $ 2,733
Lake Charles Lawrence + Acquisition and appraisal of one (1) tract of land (approximately 23.98 acres) $ 243,328
Lake Charles Lawrence + Improvements to Cedar Trail (Phase I) $ 187,524
Lake Charles Lawrence ++ Replacement of the Bathhouse in Area C Campground (A-75 only; FY15 ANCRC - $222,152.53) $ 25,726
Lake Charles Lawrence $ 1,221,932
10 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Lake Chicot Sen. 26 Chicot + Day use improvements and bank stabilization, erosion control adjacent to campground and cabins $ 628,524
Lake Chicot Rep. 11 Chicot + Water, sewer and drainage improvements park wide $ 534,056
Lake Chicot Chicot + Construct equipment shed, restroom, enclose pavilion, and ADA parking $ 215,964
Lake Chicot Chicot + Construct gasoline dock with dispensing system, courtesy docks for Area "F" campground $ 235,964
Lake Chicot Chicot + Renovation/Expansion of Visitor Information Center, including parking and barrier-free access
(Including FFE) $ 459,406
Lake Chicot Chicot + Fabrication/installation of exhibits at VIC. (In-house Exhibit Shop) $ 22,246
Lake Chicot Chicot + Installation of new underground electrical in Areas "B" and "D" campgrounds $ 179,809
Lake Chicot Chicot + Installation of recreational equipment at swimming pool $ 6,844
Lake Chicot Chicot + Renovation of temporary Visitor Information Center $ 24,832
Lake Chicot Chicot + Renovation/Expansion of existing sub-standard residence, including ADA modifications (In-house) $ 11,808
Lake Chicot Chicot + Relocation of park residence $ 13,856
Lake Chicot Chicot + Tie-in park sewer system to the City of Lake Village Sewer System (A-75 only) $ 44,237
Lake Chicot Chicot + Acquisition of four (4) tracts of land (approximately 78.789 acres) $ 54,062
Lake Chicot Chicot + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 11,166
Lake Chicot Chicot + Renovation/Expansion of three (3) duplex cabins, including ADA parking, access and utilities $ 712,867
Lake Chicot Chicot + Construction of new Park Store (to replace structure destroyed by fire), including parking, barrier-free
access, Furniture, Fixtures, & Equipment (FFE) and advertising $ 343,746
Lake Chicot Chicot + Repair of Fire Damage at Cabin 11 $ 90,611
Lake Chicot Chicot + Construct new Swimming Pool, Bathhouse, access parking and all utilities including FFE (A-75 only;
FY05 ANCRC 2KU $1,316,603.57) $ 910,996
Lake Chicot Chicot $ 4,500,994
Lake Dardanelle Sens. 6,16
Reps.71,73
Pope + Construct fishing pavilion tournament weigh-in, including barrier-free parking , access and utilities
with purchase of benches and trash receptacles $ 176,138
Lake Dardanelle Pope + Construction of Visitor Information/Education Center, including barrier-free parking, access and
utilities (Including FFE) $ 2,413,531
Lake Dardanelle Pope + Design, fabricate/install Visitor Information Center exhibits (A-75 only) $ 469,850
Lake Dardanelle Pope + Repair/renovation of breakwater system $ 198,544
Lake Dardanelle Pope + Construct boat dock/fishing pier with barrier-free parking and access in Dardanelle area (In-house) $ 13,745
Lake Dardanelle Pope + Asbestos surveys for selected park structures to meet state and federal regulations $ 470
Lake Dardanelle Pope + Construction of new park entrance road and sewer lift station $ 137,322
Lake Dardanelle Pope + Construction of employee residence, including new access & utilities (Russellville unit; Including
FFE) $ 199,571
Lake Dardanelle Pope + Acquisition of one (1) manufactured home for employee residence $ 27,519
Lake Dardanelle Pope + Construction of employee residence and small maintenance area, including access and utilities and
other site improvements (Dardanelle unit) $ 314,567
11 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Lake Dardanelle Pope + Fishing Tournament Weigh-In Pavilion expansion to include barrier-free public restrooms, additional
storage vending area and all ancillary utilities $ 190,198
Lake Dardanelle Pope + Adaptive re-use of old Visitor Center for new Region I office (In-house) $ 44,628
Lake Dardanelle Pope + Construction of new sewer dump station at the Dardanelle unit $ 5,273
Lake Dardanelle Pope + Construction of a new employee residence to include access, and all utilities. $ 297,044
Lake Dardanelle Pope ++ Construction of the replacement of the campground Bathhouse and resurfacing campground road and
spurs. (A-75 only; FY15 ANCRC - $1,512.57) $ 297,682
Lake Dardanelle Pope $ 4,786,082
Lake Fort Smith Sen. 5 Crawford + Installation of recreational equipment at swimming pool $ 6,849
Lake Fort Smith Rep. 81 Crawford + Asbestos surveys for selected park structures to meet state and federal regulations $ 318
Lake Fort Smith Crawford + Remodel 3 WPA cabins (ANCRC $100,895) $ 16,106
Lake Fort Smith Crawford + Installation of Telecommunications and Data for new Park development. $ 334,625
Lake Fort Smith Crawford + Design, fabrication and installation of exhibits at Visitor Center. $ 617,654
Lake Fort Smith Crawford + Construction of new park development to replace relocated Park. $ 9,776,381
Lake Fort Smith Crawford + Purchase of Furniture, Fixtures, & Equipment (FFE) for new park. $ 291,765
Lake Fort Smith Crawford + Construct Trails within new Park development. $ 9,277
Lake Fort Smith Crawford + Installation of septic system and purchase of appliances for Residence 3 $ 4,956
Lake Fort Smith Crawford + Construction of Dining Hall and Group Lodge "B" $ 2,319,900
Lake Fort Smith Crawford + Purchase of Furniture, Fixtures, & Equipment (FFE) for Dining Hall and Group Lodge "B" $ 91,184
Lake Fort Smith Crawford + Completion of Design and construction of new employee residence to include site improvements,
access, utilities and furniture, fixtures and equipment (FF&E) $ 249,739
Lake Fort Smith Crawford + Construction of ten (10) Housekeeping Cabins to include access, all utilities, and FF&E (Furinshings,
Fixtures and Equipment) $ 2,165,007
Lake Fort Smith Crawford $ 15,883,761
Lake Frierson Sen. 20 Craighead + Road and parking improvements $ 70,357
Lake Frierson Rep. 60 Craighead + Construct new composting toilet at boat launch ramp and construction of pavilion/restroom including
utilities and barrier-free access $ 263,773
Lake Frierson Craighead + Renovation of day-use are restroom including ADA modifications (In-house construction) $ 16,388
Lake Frierson Craighead + Asbestos survey of restroom to meet state and federal regulations $ 318
Lake Frierson Craighead + Fabrication of exhibits at VIC (In-house Exhibit Shop) $ 13,386
Lake Frierson Craighead + Construction of a new equipment shed to include site improvements, access, and all utilities. $ 86,084
Lake Frierson Craighead $ 450,306
Lake Ouachita Sen. 14 Garland + Dock improvements (i.e. new floatation, tread material, etc) $ 82,020
Lake Ouachita Rep. 18 Garland + Completion of interpretive exhibits for VIC (In-house Exhibit Shop) $ 24,502
Lake Ouachita Garland + Renovation of Area "A" (west) & Area "B" campground bathhouse (In-house) $ 31,951
12 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Lake Ouachita Garland + Construct new bathhouses in campground Areas "A" between "C" & "D", new day-use area restroom
including parking, utilities and barrier-free access $ 481,171
Lake Ouachita Garland + Construction of tertiary unit at the wastewater treatment plant $ 103,423
Lake Ouachita Garland + Renovation of Three Sisters Spring including rockwork & signage $ 34,962
Lake Ouachita Garland + Installation of new fuel lines and monitoring wells at marina $ 81,875
Lake Ouachita Garland + Acquisition of manufactured home for employees residence $ 55,300
Lake Ouachita Garland + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 8,254
Lake Ouachita Garland + Renovate Day-use area & Construct new barrier-free access to the Amphitheater $ 344,096
Lake Ouachita Garland + Construct two (2) replacement cabins and demolish one (1) to include road, parking improvements,
utilities and advertising $ 393,275
Lake Ouachita Garland + Purchase of a manufactured home for employee residence to include site improvements and all
utilities $ 106,271
Lake Ouachita Garland + Complete renovation of Campground A including access and utilities (A-75 only; FY05 ANCRC
2KU $1,166,335.88) $ 33,166
Lake Ouachita Garland + Relocation of two (2) A-Frame Rental Cabins for Seasonal Staff housing. $ 32,968
Lake Ouachita Garland + Construction of Four (4) Housekeeping Cabins. $ 1,097,143
Lake Ouachita Garland + Purchase of Furniture, Fixtures, & Equipment (FFE) for Four (4) Housekeeping Cabins. $ 133,119
Lake Ouachita Garland + Construction of a new equipment shed to include site improvements, access, and all utilities. $ 131,379
Lake Ouachita Garland + Construction/Renovation of Area C Campground to include site improvements, all utilities, road,
parking, campsite amenities. $ 476,157
Lake Ouachita Garland ++ Construction/Renovation of Area D Campground to include site improvements, all utilities, road,
parking, campsite amenities and four (4) camper cabins. $ 772,805
Lake Ouachita Garland + Construction of a new Breakwater Structure to protect the Marina. $ 452,014
Lake Ouachita Garland + Pump Station Renovation (A-75 only, FY14 ANCRC $87,556) $ 8,170
Lake Ouachita Garland + Renovation of the lower Bathhouse in Area A Campround (In-House)(A-75 only; FY15 ANCRC -
$134,399.57) $ 3,262
Lake Ouachita Garland $ 4,887,283
Lake Poinsett Sen. 22 Poinsett + Road, parking and campsite improvements $ 232,842
Lake Poinsett Rep. 52 Poinsett + Appraisal of thirteen (13) tracts of land (approximately 18.25 acres) $ 1,000
Lake Poinsett Poinsett + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 7,428
Lake Poinsett Poinsett ++ Construction of new equipment shed to include utilities, gravel parking, and fence. $ 160,000
Lake Poinsett Poinsett $ 401,270
Logoly Sen. 12 Columbia + Renovation/Expansion of sub-standard residence $ 81,024
Logoly Rep. 5 Columbia + Construction of playground to meet consumer Product Safety Commission and ADA guidelines $ 28,052
Logoly Columbia + Replace sewer lift station $ 26,397
Logoly Columbia + Asbestos survey of Visitor Information Center to meet state and federal regulations $ 730
13 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Logoly Columbia ++ Construction of a new Visitor Center to include access, parking, all utilities, exhibits, and FF&E
(furnishings, fixtures, and equipment) (A-75 only, also funded from FY14 ANCRC $616,283 and
FY15 ANCRC $1,660,031.26) $ 2,600,000
Logoly Columbia $ 2,736,203
Louisiana Purchase Sens. 23,25 Monroe/Lee/Phillips + Repair/Renovate interpretive boardwalk (960 ft.) to include wayside exhibits (FA) (AR Recreational
Trails Grant $35,520) $ 8,880
Louisiana Purchase Rep. 12,48 Monroe/Lee/Phillips $ 8,880
Lower White River Museum Sen. 28 Prairie + Renovation/Expansion of museum and fabrication, installation of exhibits $ 259,592
Lower White River Museum Rep. 13 Prairie + Asbestos surveys of museum building to meet state and federal regulations $ 550
Lower White River Museum Prairie $ 260,142
Mammoth Spring Sen. 19 Fulton + Construct water supply intake and distribution line from spring to fish hatchery (A-75 only) $ 354,511
Mammoth Spring Rep. 61 Fulton + Parking and access improvements $ 124,541
Mammoth Spring Fulton + Improvements to trail and day-use area including barrier-free access $ 517,163
Mammoth Spring Fulton + Construction of playground to meet Consumer Product Safety Commission and ADA guidelines $ 35,721
Mammoth Spring Fulton + Construction of boat dock for rental equipment $ 4,270
Mammoth Spring Fulton + Water line replacement park wide $ 39,950
Mammoth Spring Fulton + Construct new pavilion and associated access, parking, utilities, FFE and advertising $ 181,542
Mammoth Spring Fulton $ 1,257,698
Mark's Mill Sen. 27 Cleveland + Renovation of day-use area including barrier free access $ 2,713
Mark's Mill Rep. 8 Cleveland $ 2,713
Millwood Sen. 11 Little River + Construction of campground Area "D" bathhouse including access and utilities $ 165,873
Millwood Rep. 4 Little River + Construction of playground to meet Consumer Product Safety Commission and ADA guidelines $ 31,680
Millwood Little River + Renovation of Area "C" campground bathhouse (In-house) $ 25,214
Millwood Little River + Construction of new campground bathhouse between Areas "A" & "B" $ 222,566
Millwood Little River + Renovation of sub-standard employee residence $ 25,551
Millwood Little River + Asbestos surveys & abatement for selected park structures to meet state and federal regulations $ 3,398
Millwood Little River + Construction of day-use area restroom, including parking and access improvements (A-75) $ 26,362
Millwood Little River + Renovation of wastewater treatment plant $ 149,898
Millwood Little River + Shoreline erosion control and replace deteriorated sub-standard boat ramp (In house) (Game & Fish
to fund boat ramp $36,000.00 budget, est.) $ 3,068
Millwood Little River + Purchase of water meter for the tie-in of the park water system to the Little River County Rural Water
System. $ 2,146
Millwood Little River + Renovation of Campgrounds A & B to include access, all utillities, and campsite amenities. $ 1,009,787
14 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Millwood Little River ++ Replacement / repair of Park Facilities to include bathhouses, restrooms, pavilions, campgrounds,
access, and utilities due to flood damage. $ 500,000
Millwood Little River $ 2,165,543
Mississippi River Sen. 24 Lee + Appraisals of surplus properties to be sold $ 2,500
Mississippi River Rep. 12,48 Lee + Re-acquisition of Mississippi River land (Spears) $ 13,921
Mississippi River Lee + Construction of Phase I Park Development to include new Park Residence to include access, parking
and utilities. $ 263,423
Mississippi River Lee + Relocation & Installation of 2 Gunnison precast concrete vault toilet buildings within Bear Creek
Recreation Area. $ 16,900
Mississippi River Lee + Clearing and grubbing of 15 ft. wide 1,430 ft. long wooded area for electrical right-of-way. $ 4,620
Mississippi River Lee + Construction of Phase I Park Development to include new Beech Point Campground to include
access, parking and utilities. $ 1,935,180
Mississippi River Lee + Engineering analysis on Lee County Water Association water distribution lines serving the proposed
Visitor Center $ 2,032
Mississippi River Lee + Construction of new Visitor Center to include site improvements, parking, access, utilities, barrier-
free trial & Furniture, Fixtures, and Equipment (FF&E) and installation of new Exhibits. ($245,972
FHWA Byways Grant) $ 5,213,793
Mississippi River Lee + Fabrication of new Exhibits for the new Visitor Center (A-75 only) (also FY13 ANCRC -
$177,171.00) $ 871,057
Mississippi River Lee + Installation of site furnishings, trailhead signage, and wayside exhibits on a barrier-free trail. (To be
reimibursed by AGFC Wildlife Observation Trail Grant) $ 60,000
Mississippi River Lee $ 8,383,426
Moro Bay Sen. 26 Bradley + Parking/paving improvements $ 51,244
Rep. 8 + Shoreline Erosion Control $ 18,535
Moro Bay Bradley + Construction of new campground bathhouse, including construction/expansion of septic/leach field $ 279,993
Moro Bay Bradley + Enclose day-use pavilion including ADA modifications (In-house) $ 12,652
Moro Bay Bradley + Renovation of two (2) day-use area restrooms including ADA modifications (In-house) $ 28,215
Moro Bay Bradley + Construction of playground to meet Consumer Product Safety Commission and ADA guidelines $ 41,539
Moro Bay Bradley + Asbestos surveys for selected park structures to meet state and federal regulations $ 2,694
Moro Bay Bradley + Expand residence including barrier-free modifications (In-house) $ 13,416
Moro Bay Bradley + Marina repairs to include painting of telescoping anchors $ 5,880
Moro Bay Bradley + Construction of (5) five housekeeping cabins and laundry building including parking, access, and
utilities. $ 1,594,534
Moro Bay Bradley + Purchase / Acquisition of Furniture, Fixtures and Equipment for (5) five housekeeping cabins and
laundry building. $ 108,855
Moro Bay Bradley + Construction of Phase I Shoreline Erosion Control (FY02-03) $ 609,397
15 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Moro Bay Bradley $ 2,766,954
Mt. Magazine Sen. 6 Logan + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 7,029
Mt. Magazine Rep. 74 Logan + Roadway improvements (A75 Only; Total Cost $1,061,623) $ 150,471
Mt. Magazine Logan + Renovation/repair of Cameron Bluff overlook $ 50,823
Mt. Magazine Logan + Construct Visitor Information Center, employee residence, maintenance building, upgrade eighteen
(18) campsites to Class A and construct bathhouse at Cameron Bluff campground, develop associated
roads, parking & utilities. (General Improvement Funds; ANCRC-FY 98; A-75) (A-75 Only)
$ 5,469
Mt. Magazine Logan + Renovate Historic Fire Tower Cabin to serve as seasonal employee residence. (ANCRC-FY 00;
General Improvement Funds; A-75)(A-75 Only) $ 5,814
Mt. Magazine Logan + Archeological documentation of development areas (USFS) $ 50,000
Mt. Magazine Logan + Construct two (2) Standard Residences including site improvements, new access, all utilities, FFE
and advertising $ 541,380
Mt. Magazine Logan + Furnishings, Fixtures and Equipment (FFE) for Lodge, dormitory in lodge basement, entrance sign,
exhibits, cabin patio at ADA cabin, and other miscellaneous close-out items $ 1,372,421
Mt. Magazine Logan + Repairs to the passenger elevator located in the Lodge. $ 173,329
Mt. Magazine Logan + Improvements to the water distribution system. $ 66,158
Mt. Magazine Logan + Replacement of Lodge kitchen flooring $ 96,515
Mt. Magazine Logan + Benefield Restroom Replacement (A-75 only, FY14 ANCRC $3,896) $ 67,244
Mt. Magazine Logan ++ Roofing Imrpovements and Lightening Protection $ 519,751
Mt. Magazine Logan ++ Phase I Exterior Improvements $ 542,124
Mt. Magazine Logan $ 3,648,528
Mt. Nebo Sen. 6 Yell + Parking lot improvements at VIC, CCC pavilion and swimming pool/bathhouse, including barrier-
free access $ 273,201
Mt. Nebo Rep. 73 Yell + Complete construction of approximately 1,800 feet of sewer line (A-75 only) $ 6,887
Mt. Nebo Yell + Wastewater improvements, including the addition of selected facilities to the wastewater plant that
was previously in septic tanks $ 241,919
Mt. Nebo Yell + Renovate and expand two (2) "A" frame cabins and materials for two (2) additional cabins $ 500,879
Mt. Nebo Yell + Repair/renovation of two (2) CCC era cabins (In-house) $ 63,596
Mt. Nebo Yell + Construct new "A" frame cabin, including parking and barrier-free access (In-house) $ 66,735
Mt. Nebo Yell + Construct employee residence, including access and utilities $ 200,462
Mt. Nebo Yell + Construct new swimming pool and renovate bathhouse $ 514,422
Mt. Nebo Yell + Acquisition of two (2) tracts of land (approximately .860 acres) $ 39,259
Mt. Nebo Yell + Acquisition of one (1) tract of land (approximately 40 acres) $ 67,052
Mt. Nebo Yell + Asbestos surveys and abatement for selected park structures to meet state and fed, regulations $ 6,126
Mt. Nebo Yell + Repair/renovation work on CCC Pavilion, residence and VIC $ 18,573
16 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Mt. Nebo Yell + Repair/renovation and expansion of employee residence including FFE and advertising $ 139,443
Mt. Nebo Yell + Appraisal Reports on two (2) tracts of land (PR) $ 3,000
Mt. Nebo Yell + Acquisition of 80 acres of land (Cowger) (PR) $ 153,214
Mt. Nebo Yell + Continuation of rehabilitation of Cornwell House Exhibit. (A-75 only, FY08 ANCRC - $194,185) $ 6,989
Mt. Nebo Yell + Installation of new roof, ceiling, and interior walls to the Fire Station. $ 15,688
Mt. Nebo Yell $ 2,317,445
Ozark Folk Center Sen. 18 Stone + HVAC renovations at selected building $ 142,250
Ozark Folk Center Reps. 62,64 Stone + Re-roof Administration Building, sales shop and two (2) southern sections flat roofs of large
auditorium (MM) (A-75 only) $ 14,800
Ozark Folk Center Stone + Installation of new seating in large auditorium $ 103,242
Ozark Folk Center Stone + ADA improvements/modifications in restrooms at craft sales shop, large auditorium and smokehouse;
rehabilitation of a barrier-free pavilion, lodge door & lock replacement, restaurant roof replacement,
and construction of roof over restroom access at craft sales shop $ 284,053
Ozark Folk Center Stone + Appraisal of one (1) tract of land (Approximately 3.46 Acres) w/ 2 structures $ 450
Ozark Folk Center Stone + Asbestos surveys for selected park structures to meet state and federal regulations $ 4,791
Ozark Folk Center Stone + Renovation/expansion of Skillet Restaurant including replacement/updating of all kitchen equipment $ 882,951
Ozark Folk Center Stone + Re-roof Administration Building $ 249,824
Ozark Folk Center Stone + HVAC replacement at Administration Building and Skillet Restaurant. $ 435,764
Ozark Folk Center Stone + Re-roof Cabin Check-In and Conference Buildings. (A75 only -General Improvement Fund -
$50,000) $ 206,656
Ozark Folk Center Stone + Construction to modify access to the General Store to allow after hours access to the restrooms. $ 3,912
Ozark Folk Center Stone + Installation of new gas lines within park. $ 25,315
Ozark Folk Center Stone + HVAC replacement at the Music Auditorium. (A75 only; $3890.00-39X, $5182.47 - 39Y) $ 665,054
Ozark Folk Center Stone + Connect and convert the Smokehouse and the Skillet Restaurant from propane gas to natural gas. $ 22,004
Ozark Folk Center Stone + Expand the parking area in the cul-de-sac between the Skillet Restaurant and the Administration
Building and the lower west parking lot of the Skillet Restaurant. $ 38,043
Ozark Folk Center Stone $ 3,079,109
Parkin Sen. 24 Cross + Road and parking improvements $ 144,627
Parkin Rep. 50 Cross + Construct new pavilion and restroom in Day Use Area including barrier-free access and utilities $ 204,060
Parkin Cross + Asbestos surveys for selected park structures to meet state and federal regulations $ 5,621
Parkin Cross + Construction of playground to meet consumer Product Safety Commission and ADA guidelines $ 31,382
Parkin Cross + Acquisition of four (4) tracts of land (approximately 41.71 acres) $ 176,667
Parkin Cross + Construct maintenance building, equipment shed & flammable storage building, including site
improvements, access and utilities (Including FFE) $ 492,668
Parkin Cross + Native American paintings for Visitor Center $ 15,000
Parkin Cross + Archeology work on historic cemetery within Park $ 70,000
17 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Parkin Cross $ 1,140,025
Petit Jean Sens. 15
Rep. 65
Conway + Construct new barrier-free boardwalk to Cedar Falls and Petit Jean Grave Overlook, ADA parking,
access improvements at Visitors Information Center and Mather Lodge $ 1,188,021
Petit Jean Conway + Interior renovations for five (5) duplex cabins (Including FFE) $ 271,007
Petit Jean Conway + Construct two (2) employee residences including access and utilities, exterior renovation on
five (5) duplex cabins $ 603,605
Petit Jean Conway + Re-roof six (6) buildings $ 182,500
Petit Jean Conway + Completion of renovation work on swimming pool bathhouse (A-75 only) $ 10,468
Petit Jean Conway + Interior renovation/stabilization and re-roofing VIC and adjacent public restrooms; repair/renovate
and ADA modifications to Area "D" campground bathhouse $ 256,156
Petit Jean Conway + Replace two (2) sewer lift stations $ 59,010
Petit Jean Conway + Renovation of boat house (In-house) $ 40,634
Petit Jean Conway + Renovation of Cedar Creek Cabin (In-house) $ 21,054
Petit Jean Conway + Installation of recreational equipment at swimming pool $ 7,040
Petit Jean Conway + Runway Reconstruction and New Taxiway, Apron, and Fly-in Campground (A-75 only; total cost
$1,385,755) $ 308,488
Petit Jean Conway + Acquisition of one (1) tract of land (approximately 5.030 acres) $ 189,458
Petit Jean Conway + Asbestos surveys for selected park structures to meet state and federal regulations $ 5,995
Petit Jean Conway + Renovation of the Group Campground, including new campsites, barrier-free bathhouse, parking and
utilities $ 316,886
Petit Jean Conway + Repaint/re-roofing of two (2) hangars at airport $ 102,927
Petit Jean Conway + Construction of new wastewater treatment plants to replace two (2) old wastewater treatment plants
including new distribution lines and lift stations for tie-in $ 828,113
Petit Jean Conway + Acquisition of land (approximately 0.65 acres) $ 32,517
Petit Jean Conway + Acquisition and appraisal of land (approximately 55.53 acres) $ 449,114
Petit Jean Conway + Construction of Restroom in Museum of Automobiles (In-house) $ 2,897
Petit Jean Conway + Construction of Employee Residence including site improvements, access, and utilities (In-house) $ 129,544
Petit Jean Conway + Renovation of Campground "A" including access road, new campsites, and all utilities (including
sewer) $ 1,532,088
Petit Jean Conway + Improvements to Petit Jean Airport to include lighting and other navigational aids. (To be reimbursed
by The Federal Aviation Administration (FFA) and State Aeronautics Commission.) $ 457,178
Petit Jean Conway + Fabrication and installation of a CCC Commemorative Statue $ 26,365
Petit Jean Conway + Repair roof due to wind damage (2/11/2009) at the Museum of Automobiles. (To be reimbursed by
insurance proceeds.$67,985.92) $ 100,372
Petit Jean Conway + Installation / Construction of road bore across HWY 154 for fire hydrant and access for a dry hydrant
at Lake Bailey. $ 10,736
Petit Jean Conway + Construction of Airport Fuel System (A-75 only, ANCRC FY08 - $315,573). $ 8,305
18 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Petit Jean Conway + Construction / Renovation of the kitchen, dining area, registration area and swimming pool at Mather
Lodge to include site improvements, barrier-free access, parking and all utilities.(A-75 only)
(ANCRC FY10 & FY11 $3,925,401) $ 568,780
Petit Jean Conway + Feasibility Study for Hardison Hall. $ 14,900
Petit Jean Conway ++ Resurfacing of Airport Runway $ 325,000
Petit Jean Conway $ 8,049,158
Pinnacle Mountain Sens.15,32 Pulaski + Road, parking, trail improvements throughout the park $ 340,772
Pinnacle Mountain Reps. 31,35 Pulaski + Day-use area and trail improvements; erosion control measures along Kingfisher Trial, new barrier-
free fishing pier at Big Maumelle River $ 394,865
Pinnacle Mountain Pulaski + Interior renovations at Visitor Information Center $ 130,169
Pinnacle Mountain Pulaski + Develop arboretum watering system $ 6,000
Pinnacle Mountain Pulaski + Water line tie-in with City of Little Rock water system $ 117,296
Pinnacle Mountain Pulaski + Acquisition of one (1) tract of land (approximately 137.470 acres) (A-75 only) $ 298,625
Pinnacle Mountain Pulaski + Acquisition of approximately 89.38 acres (one (1) tract) of land (FY 03 $583,404) $ 2,900
Pinnacle Mountain Pulaski + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 3,108
Pinnacle Mountain Pulaski + Acquisition of two (2) tracts of land (appraisal only) $ 2,900
Pinnacle Mountain Pulaski + Construct new pavilion and restroom with associated access, utilities, and furnishings. $ 508,262
Pinnacle Mountain Pulaski + Phase I Cultural Resources Survey - Stuckey Property $ 9,210
Pinnacle Mountain Pulaski + Phase I Cultural Resources Survey - Base Trail Corridor $ 4,621
Pinnacle Mountain Pulaski + Construct Pedestrian bridge on new trail connecting Day-Use Area to overflow Parking Area. (A-75
only)(Partners for Pinnacle $16,100) $ 8,154
Pinnacle Mountain Pulaski + Phase I Cultural Resources Survey for proposed mountain bike trail corridor. $ 5,516
Pinnacle Mountain Pulaski + Acquisition and installation of new playground (A-75 only; reimbursed by private donation
$200,000) $ 4,697
Pinnacle Mountain Pulaski + Site improvements for Horse Concession including archeology for the proposed horse corridor trail. $ 5,690
Pinnacle Mountain Pulaski + Construction of bridge located near Red Bluff along the Ouachita Trail. $ 7,641
Pinnacle Mountain Pulaski + Construction of new Day Use Area Restroom (A-75 only, FY13 ANCRC $305,924 and FY14
ANCRC $122,653) $ 111,865
Pinnacle Mountain Pulaski ++ Construction of a new playground at the Big Maumelle Pavilion area (A-75 only; FY15 ANCRC -
$15,200) $ 97,693
Pinnacle Mountain Pulaski $ 2,059,984
Plantation Agriculture Museum Sen. 30 Lonoke + Stabilization Plan and Historic Structures Report for Seed Warehouse $ 28,877
Plantation Agriculture Museum Rep. 14 Lonoke + Access and drainage improvements $ 47,954
Plantation Agriculture Museum Lonoke + Acquisition of one (1) tract of land (approximately 3.09 acres) $ 59,790
Plantation Agriculture Museum Lonoke + Asbestos surveys for selected park structures to meet state and federal regulations $ 593
Plantation Agriculture Museum Lonoke + Conservation of gin equipment and exhibits for the reconstructed Dortch Cotton Gin (A-75 only) $ 542,078
19 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Plantation Agriculture Museum Lonoke + Renovation / repair of museum building porch and roof components $ 117,525
Plantation Agriculture Museum Lonoke $ 796,817
Poison Spring Sen. 12 Ouachita + Day use area and parking lot improvements, including barrier-free access and perimeter fence $ 107,146
Poison Spring Rep. 5 Ouachita $ 107,146
Powhatan Historic Sen. 20 Lawrence + Parking area and barrier-free access improvements at Courthouse $ 9,069
Powhatan Historic Rep. 60 Lawrence + Re-roof 1888 courthouse $ 307,471
Powhatan Historic Lawrence + Acquisition of four (4) tracts of land (approximately 3.304 acres) with improvements $ 96,509
Powhatan Historic Lawrence + Acquisition of one (1) tract of land (approximately 14.70 acres) with two (2) structures (Clark) $ 55,850
Powhatan Historic Lawrence + Acquisition of one (1) tract of land .517 acres (BLEVINS) $ 45,770
Powhatan Historic Lawrence + Restoration of Male & Female Academy, including barrier-free access & parking improvements (A-
75 only; FY00 ANCRC $419,112) $ 127,949
Powhatan Historic Lawrence + Renovate and restore interior of the historic 1888 Courthouse including Asbestos Survey and
advertising $ 808,804
Powhatan Historic Lawrence + Renovate Telephone Exchange Building and furnish $ 17,015
Powhatan Historic Lawrence + Appraisal of one tract of land $ 1,500
Powhatan Historic Lawrence + Acquisition of one (1) tract of land totaling .08 acres $ 3,690
Powhatan Historic Lawrence $ 1,473,627
Prairie Grove Sen. 2 Washington + Road, parking lot, trail and utility improvements $ 621,988
Prairie Grove Rep. 80 Washington + Construct battlefield overlook with exhibits, utilities and landscaping (A-75 only) $ 59,852
Prairie Grove Washington + Acquisition of land (approximately 70.0 acres) (Black) $ 878,115
Prairie Grove Washington + Day-use area improvements including barrier-free access $ 117,005
Prairie Grove Washington + Renovation of day-use area restroom and amphitheater restroom $ 47,582
Prairie Grove Washington + Acquisition of four (4) tracts of land (approximately 254.39 acres) with improvements and appraisal
of (8) tracts of land $ 2,320,952
Prairie Grove Washington + Construction of Maintenance building, equipment shed, flammable storage building, access &
utilities $ 358,777
Prairie Grove Washington + Appraisals on 8 tracts of land $ 8,490
Prairie Grove Washington + State match (81,000 - Federal) for Cultural Resource Studies, Historical Research and Archeological
Studies to delineate battlefield features. $ 20,000
Prairie Grove Washington $ 4,432,761
Queen Wilhelmina Sen. 10 Polk + Installation of new HVAC and fire alarm system at lodge (A-75 only; FY98 ANCRC $487,205) $ 12,492
Queen Wilhelmina Rep. 20,21 Polk + Purchase of Flow Meter for the new Wastewater Treatment Plant $ 2,003
Queen Wilhelmina Polk + Construct new sewer treatment plant and lift station (A75 Only; FY98 ANCRC 1CE $92,549) $ 390,719
Queen Wilhelmina Polk + Drill new water well and construct pump house $ 70,218
20 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Queen Wilhelmina Polk + Day-use area improvements, including barrier-free access $ 256,649
Queen Wilhelmina Polk + Construct campground bathhouse with parking, access and utilities $ 226,432
Queen Wilhelmina Polk + Lodge renovations including upgrade of two (2) standard rooms to "premium" rental units and
replacement of registration desk $ 122,016
Queen Wilhelmina Polk + Infrastructure improvements to include water line and hydrant installation in campground and
installation of new water line from water well to lodge $ 340,136
Queen Wilhelmina Polk + Remove/replace sidewalk, patio and resurfaced loading dock access $ 7,716
Queen Wilhelmina Polk + Construct new employee residence including access and utilities $ 187,487
Queen Wilhelmina Polk + Asbestos surveys for selected park structures to meet state and federal regulations $ 4,298
Queen Wilhelmina Polk + Construction/Installation of new water line to Depot Concession (In-house) $ 1,552
Queen Wilhelmina Polk + Re-Roof Lodge, Phase II (A-75 only; FY06 ANCRC $65,000) $ 2,858
Queen Wilhelmina Polk + Acquisition of manufactured home to include site improvements, access, and all utilities. $ 92,882
Queen Wilhelmina Polk ++ Exterior / interior renovation, repair, and expansion of the Lodge to include site improvements,
landscaping, parking and access improvements, and all utilities. A-75 only (FY12 ANCRC -
$2,081,155, FY13 ANCRC - $86,211, FY14 ANCRC - $1,536,920 & Cash - $200,000) $ 6,075,000
Queen Wilhelmina Polk ++ Construction of clearing a right of way for water line repairs to include repair / renovation of the
water system. $ 300,000
Queen Wilhelmina Polk + Renovation of Lodge Overlook. $ 73,022
Queen Wilhelmina Polk ++ Construction for the repair of State Highway 600 Drives. $ 31,139
Queen Wilhelmina Polk $ 8,196,619
Toltec Mounds Sen. 28 Lonoke + Acquisition of manufactured home for employee residence $ 17,800
Toltec Mounds Rep. 14 Lonoke + Construction of Education Pavilion including barrier-free access, parking and utilities. $ 351,353
Toltec Mounds Lonoke + Improvements to picnic sites with shelters. Replace wastewater treatment plant (FY03 ANCRC
$139,689) $ 2,495
Toltec Mounds Lonoke + Renovation of VIC public restroom including barrier-free modifications (In-house) $ 4,793
Toltec Mounds Lonoke + Acquisition of manufactured home for employee residence $ 16,869
Toltec Mounds Lonoke + Construction of a new Storage Building (In House Construction) $ 12,706
Toltec Mounds Lonoke ++ Construction of new/replacement Wastewater Treatment System to include demolition of the existing
Waste Water Treatment Plant. $ 149,000
Toltec Mounds Lonoke $ 555,016
Village Creek Senn.23 Cross + Swim beach renovation at Lake Austell for improved safety $ 114,545
Village Creek Rep.49 Cross + Renovation of four (4) campground bathhouses, Visitor Information Center restrooms to include
ADA modifications; construct new equipment shed and underpin ten cabins $ 436,711
Village Creek Cross + Renovation of employee residences $ 12,709
Village Creek Cross + Replace sewer lift station $ 39,450
Village Creek Cross + Golf course feasibility study, update, and preparation of RFP, RFQ and evaluation information $ 29,760
21 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Village Creek Cross + Market Feasibility Analysis for the proposed Lodge, golf course development from Wellington
International, LLC (ASP only) $ 17,403
Village Creek Cross + Asbestos surveys for selected park structures to meet state and federal regulation $ 4,964
Village Creek Cross + Renovation of West Campground including site renovations, site amenities, access and utilities
(Water, sewer, electric) $ 826,501
Village Creek Cross + Design for the construction of a 27-hole signature golf course $ 205,050
Village Creek Cross + Construction of rental equestrian stables including utilities (In-house) $ 61,707
Village Creek Cross + Construct new Wastewater Treatment Plant $ 664,312
Village Creek Cross + Golf Course Construction - Phase II contract increased and Change Orders to contract. (ASP only) $ 883,664
Village Creek Cross + Cultural Resources Survey on Approx.22 miles of Multi-Use Trail. $ 15,733
Village Creek Cross + Repair of landscaping disturbances along roads and side slopes located at Village Creek Golf Course. $ 33,261
Village Creek Cross + Construction of The Ridges at Village Creek, Phase I & Phase II. Improvements to include
infrastructure, new Club House, Cart Barn, and two (2) restrooms(A-75 only)(Cash - $2,285,217) $ 3,055,180
Village Creek Cross $ 6,400,950
White Oak Lake Sen. 12 Nevada + Construct new campground and access road, including barrier-free parking and utilities $ 801,684
White Oak Lake Rep. 5 Nevada + Day-use area improvements, including barrier-free access and parking $ 55,535
White Oak Lake Nevada + Construct sediment basin to prevent silt build-up at launch ramp $ 303,096
White Oak Lake Nevada + Asbestos surveys for day-use area restroom to meet state and federal regulations $ 224
White Oak Lake Nevada + Construct new employee residence, including access and utilities $ 204,448
White Oak Lake Nevada + Construct Boat Launch Ramp, Parking Improvements, access, utilities, and associated walkways for
relocated Marina (In-house) (A-75 only; AG&F $65,000) $ 94,177
White Oak Lake Nevada + Repair Sediment Basin due to flood damage. $ 19,555
White Oak Lake Nevada + Continuation of construction of a new Wastewater Collection/ Distribution and Treatment Plant (A-
75 only) (FY10 ANCRC - $547,380) $ 31,677
White Oak Lake Nevada ++ Renovation of existing Wastewater Treatment Plant. $ 177,500
White Oak Lake Nevada $ 1,687,896
Withrow Springs Sen. 5 Madison + VIC expansion and pavilion enclosure including barrier-free access to pavilion restroom $ 181,445
Withrow Springs Rep. 97 Madison + Installation of recreational equipment at swimming pool $ 6,844
Withrow Springs Madison + Renovation of swimming pool bathhouse (In-house) $ 18,607
Withrow Springs Madison + Asbestos surveys for selected park structures to meet state and federal regulations $ 708
Withrow Springs Madison + Acquisition of one (1) track of land (approximately 3.45 acres) with improvements $ 45,019
Withrow Springs Madison + Parking and access improvements at Swimming Pool and Day-use Pavilion $ 318,869
Withrow Springs Madison + Construct new campground facilities, including access, utility improvements and advertising $ 1,475,569
Withrow Springs Madison + Installation of Concrete Wheel Stops at the Ball field Parking Area. $ 3,750
Withrow Springs Madison ++ Construction of a new Campground (Walk-in tent camp area) $ 350,000
Withrow Springs Madison ++ Construction of an Equipment Storage Shed. (A-75 only; FY15 ANCRC - $165,834.02) $ 8,286
22 6-30-2016
ARKANSAS STATE PARKS
CAPITAL IMPROVEMENT PROJECTS
AMENDMENT 75
Park / Museum District # County Accomplishments as of June 30, 2016 Costs
Withrow Springs Madison $ 2,409,097
Woolly Hollow Sen. 18 Faulkner + Construction of playground to meet Consumer Product Safety Commission and ADA guidelines $ 33,572
Woolly Hollow Rep. 66 Faulkner + Construct ADA fishing pier in funding partnership with AR Game & Fish Commission $ 15,341
Woolly Hollow Faulkner + Construct one (1) and renovate one (1) employee residence to include access, site improvements and
utilities (Including FFE) $ 293,141
Woolly Hollow Faulkner + Road, parking and trail improvements including barrier-free access $ 348,935
Woolly Hollow Faulkner + Replace two (2) sewer lift stations $ 87,395
Woolly Hollow Faulkner + Acquisition of one (1) tract of land (approximately 39.93 acres) $ 71,115
Woolly Hollow Faulkner + Asbestos surveys for selected park structures to meet state and federal regulations $ 1,916
Woolly Hollow Faulkner + Tie-in park water supply system to Community Water System, Inc. $ 73,808
Woolly Hollow Faulkner + Construction for the renovation of fifteen (15) & addition of new campsites (Class A) with
bathhouse, utilities & road (A-75 only )(Design FY 08 ANCRC - $67,500) (Construction FY09
ANCRC -$851,031)
$ 73,671
Woolly Hollow Faulkner + Construction of a new Bathhouse to include site improvements, to replace the Bathhouse destroyed
by fire.
$ 74,994
Woolly Hollow Faulkner ++ Construction of a new mountain bike trail to include parking, trailhead, and trailhead signage. $ 110,527
Woolly Hollow Faulkner $ 1,184,415
+ PROJECTS - Completed $ 144,741,300
++ PROJECTS - Underway $ 26,238,538
GRAND TOTAL $ 170,979,838