arra project summary information division of construction management
TRANSCRIPT
ARRA Program Update
(As of February 23, 2010)ODOT Let
• 129 Projects let in 2009• 14 Projects let in 2010• 143 Total ARRA Projects let to date• 59 projects remain to be let in 2010
2010 Conaway Conference 2
ARRA Program Update
Local Let Projects (LPA)
• 66 Projects Let to date• 90 Remain to be let in 2010
2010 Conaway Conference 4
ARRA Program Update
(As of February 23, 2010)ODOT Let
• 50 projects completed in 2009• 78 projects will continue into 2010
season
2010 Conaway Conference 5
ARRA Program Update
Local Let Projects (LPA)
• 34 have construction start dates• 18 are completed
2010 Conaway Conference 7
ARRA Program Update(As of February 23, 2010)
ODOT Let
$436,591,978.56 Total Original Contract Amt.
$352,647,970.02 ARRA Funding
2010 Conaway Conference 8
ARRA Program Update
Local Let (LPA)• $333.33 M local program• $93.8 M has been awarded to date• $18 M has been paid to date
2010 Conaway Conference 10
ARRA Program Update(As of February 23, 2010)
ODOT Let
$436,591,978.56 Total Original Contract Amt.
$119,329,262.55Total Paid to Date
2010 Conaway Conference 11
ARRA Program Update(As of February 23, 2010)
ODOT Let
Change Orders Processed$165,460.41
Or0.14% of Paid to Date
2010 Conaway Conference 13
ARRA Program Update
Of the 143 Contracts (ODOT) Let to date:
57 Different Contractors37 Contractors have a single contract9 Contractors have 2 contracts3 Contractors have 3 contracts2 Contractors have 4 contracts
2010 Conaway Conference 15
ARRA Program Update
1 Contractor has 5 contracts1 Contractor has 8 contracts1 Contractor has 9 contracts1 Contractor has 12 contracts1 Contractor has 14 contracts1 Contractor has 23 contracts
2010 Conaway Conference 16
ARRA Projects (ODOT) - Types
Bridge Deck Replacement 4 projectsBridge Maintenance 2 projectsBridge Painting 3 projectsBridge Repair 7 projectsBridge Replacement 17 projectsCulvert Constr./Reconstr./ 5 projects
RepairBRIDGE RELATED 38 projects
2010 Conaway Conference 18
ARRA Projects (ODOT) - Types
Mill & Fill 11 projectsPave Gnrl System 23 projectsPave Prmy System 9 projectsResurfacing Undivided 29 projectsResurfacing Divided 3 projectsResurfacing Safety 1 projectPAVING RELATED 76 projects
2010 Conaway Conference 19
ARRA Projects (ODOT) - TypesInterchange Reconstruction2 projectsIntersection Improvement 1 projectMajor Rehab 1 projectMajor Widening 3 projectsMinor Widening 1 projectsWidening 1 projectNew Construction 2 projectsRelocation 2 projects
2010 Conaway Conference 20
ARRA Projects (ODOT) - Types
Add Sidewalks 1 projectDrainage Improvement 1 projectEarthwork/Slide Repair 2 projectGR Maintenance (NEW) 2
projectsParks 1 projectPreventive Maintenance 5
projects
2010 Conaway Conference 21
ARRA Projects (ODOT) - Types
Section Improvement 1 projectSignals 1 projectSpot Safety 1 projectTraffic Management System 1
project
2010 Conaway Conference 22