ACE Los Angeles / Orange County Design Project 2018-2019 School Year Arts District Neighborhood Revitalization Project Project Premise: The Arts District near downtown Los Angeles is experiencing a large- scale revitalization—new housing projects are being constructed, old buildings are being renovated, pocket parks are popping up, and new businesses are moving in. Nearby, the Sixth Street Bridge project is bringing in over $480 million in construction work, including the new bridge, street improvements, and a large public park. Even with all these improvements, there are still many areas within the Arts District in states of disrepair. The Arts District Revitalization Project has identified several of these blocks for redevelopment, Project Goals: Redevelop a mixed-use area, incorporating the character and spirit of the Arts District, while providing for the needs of both the local residents and broader regional community. Development should focus on the urban environment and the building of community. Overall, the ACE Arts District Neighborhood should be inviting, pedestrian friendly, safe, and sustainable. Individually, each building should be functional, constructable, idea-driven, and aesthetically interesting. The buildings and site should work together to create a cohesive urban environment.

Upload: others

Post on 24-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Arts District Neighborhood Revitalization Project€¦ · Revitalization Project . Project Premise: The Arts District near downtown Los Angeles is experiencing a large-scale revitalization—new

ACE Los Angeles / Orange County Design Project 2018-2019 School Year

Arts District Neighborhood Revitalization Project

Project Premise: The Arts District near downtown Los Angeles is experiencing a large-scale revitalization—new housing projects are being constructed, old buildings are being renovated, pocket parks are popping up, and new businesses are moving in. Nearby, the Sixth Street Bridge project is bringing in over $480 million in construction work, including the new bridge, street improvements, and a large public park. Even with all

these improvements, there are still many areas within the Arts District in states of disrepair. The Arts District Revitalization Project has identified several of these blocks for redevelopment,

Project Goals: Redevelop a mixed-use area, incorporating the character and spirit of the Arts District, while providing for the needs of both the local residents and broader regional community. Development should focus on the urban environment and the building of community. Overall, the ACE Arts District Neighborhood should be inviting, pedestrian friendly, safe, and sustainable. Individually, each building should be functional, constructable, idea-driven, and aesthetically interesting. The buildings and site should work together to create a cohesive urban environment.

Page 2: Arts District Neighborhood Revitalization Project€¦ · Revitalization Project . Project Premise: The Arts District near downtown Los Angeles is experiencing a large-scale revitalization—new

Project Site:

Each team has been randomly assigned a land parcel within the development area. The land parcels are all adjacent and, together, will form the ACE Arts District Neighborhood. Teams are encouraged to communicate with neighboring land parcels to coordinate site and building designs. Current assignments are as follows:

Team Name Lot # Team Name Lot # Applied Technology Center HS 25 Jefferson HS 2 Bell High School 26 John Marshall HS 10 Bishop Montgomery HS 23 La Habra HS Team 1 Centennial HS 22 Lennox Academy 5 Costa Mesa HS 6 Morningside HS Team 8 Dorsey HS 12 North Torrance HS 19 Downtown LA Team 18 Pasadena Team 16 El Rancho HS 20 Rancho Dominguez HS 11 Fairfax HS 3 Santa Monica / West LA 14 Franklin HS 21 St. Mary’s Academy 13 Gabrielino HS 9 STEM Academy of Boyle Heights 15 Glendale HS 17 Valley HS 24 Hamilton HS 7 Venice HS Team 4

Many of the land parcels have existing buildings and/or structures located on them. Each ACE Team is responsible for evaluating existing buildings and determining whether or not to renovate or demolish and build new.

Page 3: Arts District Neighborhood Revitalization Project€¦ · Revitalization Project . Project Premise: The Arts District near downtown Los Angeles is experiencing a large-scale revitalization—new

Land Parcel / Lot # Map

Page 4: Arts District Neighborhood Revitalization Project€¦ · Revitalization Project . Project Premise: The Arts District near downtown Los Angeles is experiencing a large-scale revitalization—new

Building Program: Each team determines what building program they want to use for their design. If desired, the team may select a building program type from the following list. For each building program type listed, a sample space program has been provided in a separate Excel file for reference and/or use.

Potential Building Programs • Community Center• Event Hall• Elementary School• Food Court• Learning Resource Center or Library• Movie Theater

• Office Building• Recreation Center• Residential & Retail Shops• Student Housing• Transportation Hub• University Buildings

Project Tasks / Steps:

1. Assessment of Existing Buildings (as applicable)• What condition are the buildings in?• What is the character of the buildings?• Could the buildings support a different use?

From your assessment, determine if the existing buildings should be renovated or demolished and replaced with new construction.

2. Identify and Develop a Building Program• Identify the type of project.• Develop project goals and vision.• Develop a list of spaces to be included in the project.

3. Project Design• Create a design addressing the ACE Arts Neighborhood needs, project goals, and space list.• Understand and show the engineering systems included in the project (structural,

mechanical, electrical, etc.)• Understand and show how the project would be built.

Page 5: Arts District Neighborhood Revitalization Project€¦ · Revitalization Project . Project Premise: The Arts District near downtown Los Angeles is experiencing a large-scale revitalization—new

Deliverables: To explain your design provide, the following are suggested presentation materials:

• Presentation Board(s) (maximum of three boards). May include:o Space Programo Design Idea Diagramo Site Plano Floor Plan(s)o Elevation(s)o Section(s)o Perspective View(s)o Framing Plan(s)o Logistics Plano Cost Estimateo Construction Schedule

• A Sketchup Model that can be inserted into a master Sketchup file.• A self-standing physical model that can be inserted onto the master aerial photograph to show

the entire neighborhood. Ensure that your model exactly ends at the boundaries of your parcel.Scale of the physical model is to be determined and will be issued in future addendum.

• A 5–minute presentation of your work, including a PowerPoint presentation.

Supplemental Materials & Information:

You will be provided with the following information:

1. Assigned land parcel2. Reference Building Programs3. Cost Estimate Template4. AutoCAD file of the site (to be issued in future addendum)5. Base site Sketch-Up model (to be issued in future addendum)

Please note, this is not a competition, but rather, a collaborative effort to design a larger entity. Therefore, there are no “winners” for this event. However, there will be professionals available to comment on the designs and your presentation materials as feedback for learning.

All questions about the brief should be directed to Andrea Stalker at [email protected] and answers will be provided to all teams simultaneously.

Page 6: Arts District Neighborhood Revitalization Project€¦ · Revitalization Project . Project Premise: The Arts District near downtown Los Angeles is experiencing a large-scale revitalization—new

ACE Los Angeles / Orange CountyConstruction Cost Estimate 2018-2019 School Year You will be asked to provide a construction cost estimate, which is an approximation of the total cost to build your project.

The table below is a template to help you identify construction activities, material costs, and installation costs. You may modify this template to suit your project needs.

A B C D E F

Construction Activity Material

Units Material

Unit Rate Manhours Manhour

Rate Estimated Value (B x C) + (D x E)

Site Mobilization $65 Demolition $65 Abatement $65 Excavation $65 Structural $65 Mechanical $65 Electrical $65 Plumbing $65 Fire Sprinkler $65 Framing & Drywall $65 Exterior Enclosure $65 Roofing $65 Interior Finishes $65 Site Work $65 Commissioning $65

Grand Total:

All questions about the construction cost estimate should be directed to Andrea Stalker at [email protected] and answers will be provided to all teams simultaneously.