Author: Brenton Watts AIS/BIS/DOC/IOCL/0314/04 REV00 Reviewer: John Fuad Edwards Page 8 of 8 12 March 2014
Units (Table 2)
This page may be copied and used as a form to record qualitative risk assessment for individual units.
Unit ID Date of Assessment
Unit Description No. of pressure assets
Most Hazardous Process or Service (excluding utilities eg. fuel gas)
Consequence Determination per Table 2 (circle) A B C
Last Unit M&I Shutdown Date
Time Since Last Unit M&I Shutdown (years)
Next Planned Unit M&I Shutdown Date
Time to Next Planned Unit M&I Shutdown (years)
Recorded integrity related production loss incidents during last run (summary):
1.
2.
3.
4.
5.
Recorded integrity related production loss incidents since last shutdown (summary):
1.
2.
3.
POF Determination (Probability Score) per Table 2 (circle) 0 1 2
Overall Risk Assessment (circle)
LOW MEDIUM MEDIUM-HIGH HIGH
Distance to nearest population or water source (km) - optional
Plant Size: equipment count (no.) or throughput (units)- optional
Priority adjustment made for: Distance to nearest population or water source Plant size
Notes and assumptions:
AdminTypewriter25.03.14
AdminTypewriterAmine Regeneration unit (ARU)
AdminTypewriterH2S(Rich Amine)
AdminTypewriter20
AdminOval
AdminOval
00053778Typewriter9050-04
00053778TypewriterOctober 2017
00053778Typewriter3
00053778TypewriterNil
00053778TypewriterNil
00053778Rectangle
00053778Typewriter August 2011
00053778Typewriter3
00053778TypewriterCriticality of Unit for sustainable operation of MR has beenconsidered.