Author: Brenton Watts AIS/BIS/DOC/IOCL/0314/04 REV00 Reviewer: John Fuad Edwards Page 8 of 8 12 March 2014 Units (Table 2) This page may be copied and used as a form to record qualitative risk assessment for individual units. Unit ID Date of Assessment Unit Description No. of pressure assets Most Hazardous Process or Service (excluding utilities eg. fuel gas) Consequence Determination per Table 2 (circle) A B C Last Unit M&I Shutdown Date Time Since Last Unit M&I Shutdown (years) Next Planned Unit M&I Shutdown Date Time to Next Planned Unit M&I Shutdown (years) Recorded integrity related production loss incidents during last run (summary): 1. 2. 3. 4. 5. Recorded integrity related production loss incidents since last shutdown (summary): 1. 2. 3. POF Determination (Probability Score) per Table 2 (circle) 0 1 2 Overall Risk Assessment (circle) LOW MEDIUM MEDIUM-HIGH HIGH Distance to nearest population or water source (km) - optional Plant Size: equipment count (no.) or throughput (units)- optional Priority adjustment made for: Distance to nearest population or water source Plant size Notes and assumptions:

Upload: jay-lawson

Post on 08-Nov-2015

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Author: Brenton Watts AIS/BIS/DOC/IOCL/0314/04 REV00 Reviewer: John Fuad Edwards Page 8 of 8 12 March 2014

    Units (Table 2)

    This page may be copied and used as a form to record qualitative risk assessment for individual units.

    Unit ID Date of Assessment

    Unit Description No. of pressure assets

    Most Hazardous Process or Service (excluding utilities eg. fuel gas)

    Consequence Determination per Table 2 (circle) A B C

    Last Unit M&I Shutdown Date

    Time Since Last Unit M&I Shutdown (years)

    Next Planned Unit M&I Shutdown Date

    Time to Next Planned Unit M&I Shutdown (years)

    Recorded integrity related production loss incidents during last run (summary):

    1.

    2.

    3.

    4.

    5.

    Recorded integrity related production loss incidents since last shutdown (summary):

    1.

    2.

    3.

    POF Determination (Probability Score) per Table 2 (circle) 0 1 2

    Overall Risk Assessment (circle)

    LOW MEDIUM MEDIUM-HIGH HIGH

    Distance to nearest population or water source (km) - optional

    Plant Size: equipment count (no.) or throughput (units)- optional

    Priority adjustment made for: Distance to nearest population or water source Plant size

    Notes and assumptions:

    AdminTypewriter25.03.14

    AdminTypewriterAmine Regeneration unit (ARU)

    AdminTypewriterH2S(Rich Amine)

    AdminTypewriter20

    AdminOval

    AdminOval

    00053778Typewriter9050-04

    00053778TypewriterOctober 2017

    00053778Typewriter3

    00053778TypewriterNil

    00053778TypewriterNil

    00053778Rectangle

    00053778Typewriter August 2011

    00053778Typewriter3

    00053778TypewriterCriticality of Unit for sustainable operation of MR has beenconsidered.