LEED v4 WorkshopApril 9, 2014

As presented by

Wade Bevier, FCSI, CCS, LEED-AP BD+C,SCIPa, USGBC

[email protected] (919-741-0060)

Page 2: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

MANY SHADESOF GREEN

Page 3: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Program ObjectivesIntroduction to the Fundamentals of the USGBC LEED and GBI Green Globes building certification rating systems

Understand the Certification and Administrative Delivery changes between USGBC LEED 2009 and LEED v4.

Understand the GBI -Green Globes Certification and Administrative Delivery Process.

Review a comparison of the Pricing and Project Certification Administration Delivery Flow between the two building rating systems.

Learn some Tips and Recommendations for successful project certification delivery.

Page 4: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Disclaimer

This presentation is based on USGBC LEED and GBI Green Globes

for New Construction.

Specific building type ratings and rating systems such as Schools, Hospital, Retail, Existing Building, Interiors Residential etc. are not included or referenced in this

presentation.

Page 5: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Program Objective - One

• Introduction to the Fundamentals of the USGBC LEED and GBI Green Globes Building Certification Rating Systems

Page 6: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v2009

• MAIN CREDIT CATEGORIES• Sustainable Sites

• Strategies that minimize the impact on ecosystems and water resources.

• Water Efficiency • Promote smarter use of water, inside and out, to

reduce potable water consumption.• Energy & Atmosphere

• Promote better building energy performance through innovative strategies.

Page 7: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v 2009

• MAIN CREDIT CATEGORIES• Materials & Resources

• Encourage using sustainable building materials and reducing waste.

• Indoor Environmental Quality • Promote better indoor air quality and access to

daylight and views.• Plus Innovation in Design and Regional

Priorities

Page 8: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v 2009

LEED rating system has 100 base points plus six Innovation in Design points and fourRegional Priority points, for a total of 110 points:• Certified: 40-49 pts.• Silver: 50-59 pts.• Gold: 60-79 pts.• Platinum: 80+ pts.

Page 9: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Green Globes is a web-based program for green building guidance and certification that includes an onsite assessment by a third party.

Current version launched on June 4, 2013

Page 10: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Changes to the current version:• Criteria developed by ANSI-approved consensus body• Focus on Energy with 4 paths for performance• Increased Focus on Materials & Resources

• Emphasis on LCA (life cycle assessment)• New approach assessing building assemblies, furnishings,

finishes, and fit outs utilizing multi-attribute certifications and/or third-party assessments by approves organizations.

• Coverage of federal government “Guiding Principles for New Construction”, with separate compliance detail report

Page 11: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

• The program includes: • A environmental assessment protocol • Software tools to simplify online assessment • Best practices guidance for green

construction and operations • Third-party assessors with green building

expertise • A rating/certification system

Page 12: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Environmental Assessment Areas:Project Management 50Site 115Energy 390Water 110Materials and Resources 125Emissions 50Indoor Environment 160Total Points 1000

Page 13: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Green Globes Rating Scale

35 – 54% = One Globe55 - 69% = Two Globes

70 – 84% = Three Globes85 – 100% = Four Globes

Page 14: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Green Globes Program Features:

• Weighted Criteria and Flexibility

• No Perquisites• Green Globes recognizes that each verified

achievement should count according to its assigned points.

Page 15: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

• Green Non-Applicable Criteria

• N/A option includes all technical criteria except: actual energy and water performance, and management type criteria.

• Primary reasons for the N/A designation are regional variations, building occupancy type, and conflict with state or local jurisdictions.

Page 16: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

• Green Non-Applicable Criteria

• The credits associated with third-party assessor verified N/A designations are deducted from the total applicable points to avoid penalizing the owner/user.

• Green Globes limits the award of N/A designations to a total of 100 points for each building/project.

Page 17: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

• Partial Credit• Includes several criteria with incremental credit

depending on the level of achievement. • Many criteria have built-in point award

methodologies that incorporate threshold energy and water performance.

• Third-party assessor allowed to award partial credit for any criteria where practical, based on professional judgment.

Page 18: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

After achieving a minimum threshold of 35% of the 1,000 total points in the preliminary self-evaluation, buildings are eligible to seek a Green Globes certification and rating for their environmental sustainability and achievements.

Page 19: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

The process utilizes third-party assessors (GGA) with expertise in green building design, engineering, construction, and facility operations. These professionals interface with project teams and building owners to review documentation and conduct onsite building tours.

Page 20: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Program Objective - Two

• Understand the USGBC LEED Certification and Administrative Delivery changes between LEED 2009 and LEED v4.

Page 21: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 Key Changes

Page 22: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 Key Changes

• New Integrative Process Category

• New Location and Transportation Category

• Increased Requirements for High Performance

Site

• Water Efficiency for Whole Project

• Energy and Water Performance Measurements

• Increased Emphasis on Energy – 20%

Page 23: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 Key Changes

• More Rigorous Commissioning Requirements

• Energy Demand Response

• Life Cycle Approach to Materials

• Environmental Stewardship in Manufacturing

• Performance Based IEQ Measures

• Daylighting Autonomy

Page 24: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 Key Changes

Development of the new version LEED On-Line 4

for submittal of certification credit documentation

simplifying the usability of the process.

Credentials and Exams to support LEED v4 in

spring 2014

New LEED v4 Reference Guides both hardcopy

and PDF or interactive web based versions

Page 25: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 Key Changes

New forms and calculators embedded in the

web based LEED On-Line tool.

Dynamic Plaque to graphically track LEED

progress and performance in real time during

the certification period.

Ongoing LEED v4 education online webinar

education courses

Page 26: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Program Objective - Three

• Understand the Green Globes Certification and Administrative Delivery Process.

Page 27: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Green Globes for New Construction (NC)

Page 28: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date
Page 29: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date
Page 30: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Stage 1 Report Sample

Page 31: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Stage 2 - Report

• When construction and commissioning (if applicable) are essentially complete, GBI will schedule a third-party assessor to perform the Stage II Site Assessment for your project.

• Whenever possible, GBI will assign the same assessor for both your Stage I and Stage II assessments.

• Note that the site visit typically must be scheduled at least 30 days in advance. In the weeks leading up to the site visit, your assessor will contact you to discuss the itinerary and specific details of the assessment.

Page 32: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Stage 2 - Report

• After the visit, the assigned assessor will create a report of his/her findings that contains the recommended Green Globes score and rating.

• GBI will review the report and issue the appropriate Green Globes certification.

Page 33: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Program Objective - Four

Review a comparison of the Pricing and Project Certification Administration Delivery flowbetween the two building rating systems.

Page 34: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 BD+C

• Registration is a flat fee paid up front at the time of

registration; rates are based on the date of registration.

• The certification fee is based the project's rating system

and size; it is calculated and paid when the project team

submits documentation for review in LEED Online.

• The fees for either the standard and split review cover

both the preliminary and final reviews.

Page 35: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 BD+C

Building Designand ConstructionFees

ORGANIZATIONALLEVEL OR

NON-MEMBERS

SILVER, GOLDAND PLATINUM

LEVELMEMBERS

MEMBERSAVINGS

Registration $1200 $900 $300

COMBINED REVIEW: DESIGN & CONSTRUCTION

Gross Floor Area: <50K S/F $2750 $2250 $500

Gross Floor Area: 50-500 K S/F $0.055/SF $0.045/SF $0.01/SF

Gross Floor Area: >500K S/F $27500 $22500 $5000

Expedited Review + $10000

Page 36: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 BD+CBuilding Designand ConstructionFees

ORGANIZATIONALLEVEL OR

NON-MEMBERS

SILVER, GOLD,AND PLATINUM

LEVELMEMBERS

MEMBERSAVINGS

Registration $1200 $900 $300

SPLIT REVIEW: DESIGN

Gross Floor Area: <50K S/F $2750 $3250 $500

Gross Floor Area: 50-500 K S/F $0.055/SF $0.045/SF $0.01/SF

Gross Floor Area: >500K S/F $27500 $22500 $5000

SPLIT REVIEW: CONSTRUCTION

Gross Floor Area: <50K S/F $750 $500 $250

Gross Floor Area: 50-500 K S/F $0.015/SF $0.01/SF $0.005/SF

Gross Floor Area: >500K S/F $7500 $5000 $2500

Page 37: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 BD+C

Building Designand ConstructionFees

ORGANIZATIONALLEVEL OR

NON-MEMBERS

SILVER, GOLDAND PLATINUM

LEVELMEMBERS

MEMBERSAVINGS

APPEALSCOMPLEX CREDITS $800/CREDITALL OTHER CREDITS $500/CREDITEXPEDITED REVIEW +$500/CREDIT

Page 38: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Green Globes NC Subscription & Third Party

Assessment/Certification Pricing

SOFTWARE SUBSCRIPTION Price Each

Green Globes for New Construction (GG NC)Project Registration and Online Self-Evaluation(Valid for use with one building assessment/certification)

$1,000 per building

Page 39: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Green Globes NC Subscription & Third Party

Assessment/Certification Pricing

THIRD-PARTY ASSESSMENT/CERTIFICATION Price Per Building Based on Enclosed/Occupied Square Footage

Service Type < 50,000 SF 50,000 to < 100,000 SF

100,000 to< 150,000 SF 150,000 to

< 500,000 SF500,000+

SF

Stage 0 (Optional)

$2500 $3500 $4000 $0.22/SF(up to $9K)

$9000

Stage 1 $4500 $5000 $5500 $0.035/SF(up to $16K)

$16000

Stage 2 $3500 $4000 $4500 $0.030/SF(up to $12.5K)

$12500

Stage 1 & 2 Combo

$7500 $8500 $9500 $0.006/SF(up to $27K)

$27000

Page 40: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Green Globes NC Subscription & Third Party

Assessment/Certification Pricing

THIRD-PARTY ASSESSMENT/CERTIFICATION Price Per Building Based on Enclosed/Occupied Square Footage

Service Type

Assessor Travel Expenses $1500 upfront flat fee

Final Score/Rating Appeal Fee $1500

12 x 12 burnished Aluminum Plaque $495 (Includes Shipping)

16 x 16 burnished Aluminum Plaque$945 (Includes Shipping)

Page 41: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Compare the basic cost for<50s/f building

USGBC GGI

Registration $1200 $1000

<50K SF $2750 $7500

Assessor expenses (GBI only)

N/A $1500

TOTAL $3950 $10000

These are the hard costs of building registration certification and do not take into account the time required by the professionals involved to evaluate the design or gather the supporting documentation, nor does it include the cost of any elements included in the project specifically to achieve a certain level of certification or anticipated performance goals.

Page 42: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Program Objective - Five

• Learn some Tips and Recommendations for successful project certification delivery.

Page 43: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Common Green Building Tips

• IDP/Early Project Charrette• Include Owner, A/E Design Team, Constructor and any project

specific consultants for specialized project elements• Include Commissioning Agent (CxA) and Building Element

Commissioning Agent (BECx). Their review and input on the design details will go a long way towards the construction of a successful building that performs as anticipated.

• Assign “champion” for each credit or specialty element that will be included in the building certification.

• The more complex the project the more this group need to be aware and able to understand the goals of the project and the expectations of the Owner.

Page 44: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Common Green Building Tips

• Utilize add-on modeling tools for developing Energy Performance strategies, Daylighting configurations, Site selections and building alignment, Water Use measurement and effective utilization.

• These can include Sketch-Up and REVIT Add ons, Sefaira, Energy Star Target Finder, WaterScore, etc.

• Gather and Evaluate Life Cycle Assessments, use Energy Star rated appliances, convert to LED lighting and design exterior lighting to be sky and adjacent property friendly, Plant local trees and vegetation that uses little or no irrigation.

Page 45: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Common Green Building Tips

• Design and Build with the whole building performance and end user requirements as a constant realignment of the design element strategies and selection.

• Owner/End User Training and System Demonstration of the working elements is critical to achieving the intended performance and durability of the building.

Page 46: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Green Globes NC Tips

• Include Green Globe Professional (GGP) on Project team and encourage other project team members to get certified as a GGP; i.e., Engineers, Owners Representatives, Construction Professionals, and other key Building Element professionals.

• Utilize the Green Building Initiative online and call in interpretive resources.

• The assigned GGA can also be a resource and assist with decision making during the review process.

Page 47: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 BD+CTips

• Determine the expertise of the individuals on the project team including the Designer, Owner, & Constructor; including LEED GA/AP/AP with Specialty

• LEED User: Subscription site includes overview of each credit with supporting forms and tools for compiling documentation require for LEED On-Line submittal for each credit.

Page 48: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

USGBC LEED v4 BD+CTips

• GreenWizard: Online site developed to compile and document materials as they are selected for a project and then be directly submitted to the project LEED On-Line credits as completed.

Page 49: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Program ObjectivesIntroduction to the Fundamentals of the USGBC LEED and GBI Green Globes building certification rating systems

Understand the Certification and Administrative Delivery changes between USGBC LEED 2009 and LEED v4.

Understand the GBI-Green Globes Certification and Administrative Delivery Process.

Review a comparison of the Pricing and Project Certification Administration Delivery Flow between the two building rating systems.

Learn some Tips and Recommendations for successful project certification delivery.

Page 50: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

Questions ???

Page 51: As presented by Wade Bevier, FCSI, CCS, LEED-AP BD+C ... · USGBC LEED v4 BD+C • Registration is a flat fee paid up front at the time of registration; rates are based on the date

THE ENDCopyright: