documentas

1
And insure that at the end of the day it can be signed on paper you need to mark AP, Routes, Switch locations, connectivity plan & take signature from each stake owner on as built in field only. Joint Implementation Start for Vivekanand Institute Hi Rakesh, It should be taken by you before going at site. Kindly note down at the end of the day we are expecting following outcome, Kindly ensure from your end. Need to mark AP, Routes, Switch locations, connectivity plan & take signature from each stake owner on as built in field only. [email protected] [email protected] [email protected] [email protected]

Upload: niraj-kumar-maurya

Post on 01-Oct-2015

212 views

Category:

Documents


0 download

DESCRIPTION

N.a

TRANSCRIPT

And insure that at the end of the day it can be signed on paperyou need to mark AP, Routes, Switch locations, connectivity plan & take signature from each stake owner on as built in field only. Joint Implementation Start for Vivekanand InstituteHi Rakesh,

It should be taken by you before going at site.

Kindly note down at the end of the day we are expecting following outcome, Kindly ensure from your end.

Need to mark AP, Routes, Switch locations, connectivity plan & takesignature from each stake owner on as built in field only.

[email protected]@[email protected]@shivaminfo.in