ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES July 8, 2010 The meeting was called to order at 9:15 am by Steve Weintraut. Those in attendance were: Anne Rearick INDOT, Structural Services Randy Strain INDOT, Structural Services Jim Reilman INDOT, Construction Management Mike McCool Beam Longest & Neff, LLC. Mike Halterman USI Consultants, Inc. Pete White R.W. Armstrong Don Bosse Prestress Services, Inc. Celeste Spaans Prestress Services, Inc. Jason Yeager Gohman Asphalt Company Steve Weintraut Butler, Fairman and Seufert, Inc. Michael Eichenauer Butler, Fairman and Seufert, Inc. In addition to the attendees, these minutes will be sent to the following: Tony Uremovich INDOT, Structural Services Ron McCaslin INDOT, Structural Services Brian Harvey INDOT, Program Development Bill Dittrich INDOT, Program Development Tony Zander INDOT, Materials and Tests Division Keith Hoernschmeyer Federal Highway Administration Mike Wenning American Structurepoint, Inc. Burleigh Law HNTB Corp. Troy Jessup R. W. Armstrong A meeting agenda had previously been distributed and the following items were discussed: 1. The April 13, 2010, meeting minutes were approved as written, and have been placed on the INDOT website. 2. Tony Zander was not present to discuss semi-light weight concrete and self consolidating concrete specifications. 3. Mike McCool and Randy Strain spoke about crack control in concrete decks. Only difference is whether the maximum reinforcement spacing should be 9” or 8”. The group concluded that the maximum spacing will be 8”. A design memo will be issued. 4. The Bridge Design Conference will be on July 27. Anne is working on getting CEUs through Purdue. 5. Mike McCool, Mike Halterman and Anne Rearick stated that the plan notes for construction loadings have been finalized. Anne stated that a design memo will be forthcoming showing what wording will need to be shown on the plans. This memo will list what loads and load combinations per AASHTO the designer will need to check.

Upload: duonghuong

Post on 12-Feb-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES

ASCE-INDOT STRUCTURAL SUBCOMMITTEE

MEETING NO. 48 MINUTES July 8, 2010

The meeting was called to order at 9:15 am by Steve Weintraut. Those in attendance were:

Anne Rearick INDOT, Structural Services Randy Strain INDOT, Structural Services Jim Reilman INDOT, Construction Management Mike McCool Beam Longest & Neff, LLC. Mike Halterman USI Consultants, Inc. Pete White R.W. Armstrong Don Bosse Prestress Services, Inc. Celeste Spaans Prestress Services, Inc. Jason Yeager Gohman Asphalt Company Steve Weintraut Butler, Fairman and Seufert, Inc. Michael Eichenauer Butler, Fairman and Seufert, Inc.

In addition to the attendees, these minutes will be sent to the following:

Tony Uremovich INDOT, Structural Services Ron McCaslin INDOT, Structural Services Brian Harvey INDOT, Program Development Bill Dittrich INDOT, Program Development Tony Zander INDOT, Materials and Tests Division Keith Hoernschmeyer Federal Highway Administration Mike Wenning American Structurepoint, Inc. Burleigh Law HNTB Corp. Troy Jessup R. W. Armstrong

A meeting agenda had previously been distributed and the following items were discussed: 1. The April 13, 2010, meeting minutes were approved as written, and have been placed

on the INDOT website. 2. Tony Zander was not present to discuss semi-light weight concrete and self

consolidating concrete specifications. 3. Mike McCool and Randy Strain spoke about crack control in concrete decks. Only

difference is whether the maximum reinforcement spacing should be 9” or 8”. The group concluded that the maximum spacing will be 8”. A design memo will be issued.

4. The Bridge Design Conference will be on July 27. Anne is working on getting CEUs

through Purdue. 5. Mike McCool, Mike Halterman and Anne Rearick stated that the plan notes for

construction loadings have been finalized. Anne stated that a design memo will be forthcoming showing what wording will need to be shown on the plans. This memo will list what loads and load combinations per AASHTO the designer will need to check.

Page 2: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES

6. The group discussed the 401 bar in prestressed beams in relation to how they are detailed and limits. Further discussion will be needed. Mike McCool will develop questions or comments for Anne to discuss with AASHTO.

7. The group discussed the use of weld wire reinforcement in approach slabs, bridge

decks and prestressed beams. Steve passed out a handout (see Attachment No. 1). Anne would like to do some additional research before fully committing to using galvanized welded wire reinforcement. Celeste will investigate using welded wire reinforcement in prestressed beams.

8. Jim discussed what he learned about cracking in prestressed beams based on the

Florida DOT memo of 2004 (see Attachment No. 2) and what has been released in Florida in 2010 (see Attachment No. 3). The group discussed Item 4 on page 4-11 and possibly incorporating it into INDOT’s Standards.

Jim mentioned a reference manual called “Manual for the Evaluation and Repair of

Precast, Prestressed Concrete Bridge Products.” He stated that it was a good book which identifies cracking causes and prevention and repairs of these cracks.

9. There was a small discussion on post tensioning. Anne stated that a small group

outside of the structural subcommittee will be developing a post tension section in the Design Manual.

The next meeting for the INDOT Structural Subcommittee is scheduled for 9:00 am on September 30, 2010, in a room to be determined. This meeting was adjourned at 12:00 p.m. Respectfully submitted, BUTLER, FAIRMAN and SEUFERT, INC. Michael Eichenauer, P.E. [email protected] ME:me Attachments

Page 3: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 4: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 5: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 6: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 7: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 8: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 9: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 10: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 11: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 12: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 13: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 14: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 15: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 16: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 17: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 18: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 19: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 20: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 21: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 22: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES
Page 23: ASCE Structural Subcommittee Mtg 48 Minutes - IN.govin.gov/dot/div/contracts/standards/bridges/ASCEminutes/ASCE-48M.pdf · ASCE-INDOT STRUCTURAL SUBCOMMITTEE MEETING NO. 48 MINUTES