UNDER PRESSURE: AGING OUTLET CONDUITS
Jeremy Young, PE
Tyson Clouser, PE
Dam Safety 2013 –
ASDSO National Conference
Providence, Rhode Island
September 9, 2013
![Page 2: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/2.jpg)
CONDUITS THROUGH EMBANKMENT DAMS
2
![Page 3: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/3.jpg)
AGING, PRESSURIZED CONDUITS
3
![Page 4: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/4.jpg)
PRESENTATION OUTLINE
4
![Page 5: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/5.jpg)
External Seepage and Earth Pressures
PRESSURIZED CONDUIT/DOWNSTREAM CONTROL
5
Ref: FEMA 484
Internal Water Pressure
![Page 6: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/6.jpg)
PFMs ASSOCIATED WITH CONDUITS
6
• PFM 1: Erosion of Soils into a Nonpressurized Conduit
• PFM 2: Erosion by Flow from a Pressurized Conduit
• PFM 3: Erosion of Soils Along the Outside of a Conduit
• PFM 4: Erosion in the Earthfill Above/Below/Adjacent to a Conduit
![Page 7: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/7.jpg)
PFM 2: EROSION BY FLOW FROM A PRESSURIZED CONDUIT
7Ref: FEMA 484
![Page 8: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/8.jpg)
CONTRIBUTING FACTORS TO FAILURE
8
![Page 9: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/9.jpg)
COMMON PFMs ASSOCIATED WITH IRON PIPES
9
Ref: NRCC
![Page 10: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/10.jpg)
COMMON PFMs ASSOCIATED WITH IRON PIPES
10
Ref: NRCC
![Page 11: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/11.jpg)
IDENTIFYING CORROSIVE POTENTIAL
11
![Page 12: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/12.jpg)
CORROSION RATES
12
![Page 13: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/13.jpg)
• As MC increases, so does corrosion rate
• Corrosion rates are slower under saturated conditions (Less Exposure to O2)
MOISTURE CONTENT
13
![Page 14: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/14.jpg)
CORROSION RATES AS A FUNCTION OF TIME?
14
• Development Has Been Elusive to Researchers
• Generally Decrease with Time
• DIPRA provides average pitting rates for various soils on the 10-pt rating scale
Ref: Bonds et al. 2005
![Page 15: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/15.jpg)
ESTIMATE LIFESPAN OF DUCTILE IRON PIPES
DIPRA Research –
Asphaltic Coated DIP
15
![Page 16: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/16.jpg)
16Ref: Spickelmire 2012
DIP vs. CIP
![Page 17: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/17.jpg)
INSPECTION OF PRESSURIZED CONDUITS
17
![Page 18: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/18.jpg)
INSPECTION
• Requirements vary widely
Visible portions of outlet system are inspected, detailed internal inspection only required if problems noted.
Require detailed inspections on regular intervals, from 2 to 10 years.
Requirements on how a detailed inspection is defined varies, from only inspecting accessible portions of the outlet conduit to inspecting each and every portion of the outlet works system.
18
![Page 19: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/19.jpg)
INSPECTION
• Inspections can be accomplished by manned entry or with push-cameras or ROVs, depending on size.
19
![Page 20: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/20.jpg)
INSPECTION
• Visual quality in the wet is typically poor to accurately assess the condition / potential defects in the pipe.
• Recommended to dewater pipe Drain Reservoir? Not typically feasible, especially with water
supply reservoirs. Install Bulkhead on upstream end of pipe Access to downstream end of pipe?
20
![Page 21: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/21.jpg)
DIFFICULT ACCESS - MANIFOLD SYSTEM
21
Flow
![Page 22: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/22.jpg)
DIFFICULT ACCESS – VERTICAL BENDS
22
Flow
![Page 23: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/23.jpg)
BULKHEAD/PLUG TYPES
• Steel Plate
23
![Page 24: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/24.jpg)
BULKHEAD/PLUG TYPES
• Inflatable Plug
24
![Page 25: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/25.jpg)
WHAT HAPPENS WHEN THE LIMITS ARE PUSHED?!
25
![Page 26: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/26.jpg)
TURBERCULATION, PIPE CLEANING AND LINING
• Tuberculation - Friend or Foe? Hydraulic Capacity Concerns
Water Supply
Remove to facilitate effective inspection of pipe interior Tuberculation acts a protective layer
Corrosion begins more quickly, then tapers as pipe is tuberculated
Sliplining or Cured In-Place Pipe
26
![Page 27: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/27.jpg)
PIPE CLEANING - JETTING
• Pre-cleaning inspection must be performed
• Based on results of this inspection, jetting pressures and angles, pace of jetting action, etc. can be established
27
![Page 28: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/28.jpg)
PIPE CLEANING – PIGGING
• Must have adequate access
• Any fixed obstructions within the pipe prevent this type of cleaning
28
![Page 29: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/29.jpg)
PIPE CLEANING - CHAINING
• Risk of damage to pipe
• Should only be used before sliplining
29
![Page 30: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/30.jpg)
INSPECTION CASE HISTORY
30
![Page 31: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/31.jpg)
NON-DESTRUCTIVE TESTING
• Varying Degrees of Accuracy and Application
• Methods available (from FEMA 484) Voids on outside of a conduit
Self-potential Resistivity Seismic tomography Ground penetrating radar
Pipe thickness Ultrasonic Magnetic Flux Broadband Electromagnetics
New Technologies Sensor passes through pipe to find potential leaks from pressurized pipes
31
![Page 32: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/32.jpg)
REDUCING RISK OF FAILURE
32
![Page 33: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/33.jpg)
REDUCING RISK OF FAILURE
33
![Page 34: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/34.jpg)
EMBANKMENT RAISE/CONDUIT EXTENSION
34
![Page 35: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/35.jpg)
RETROFIT CONDUITS WITH UPSTREAM CONTROL
35
![Page 36: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/36.jpg)
CONSTRUCTION WITH FULL POOL?
36
![Page 37: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/37.jpg)
CASE HISTORY
37
• Constructed 1879• Pressurized CIP, No Concrete Encasement, Corroded• Abandoned (Grouted) Conduit In-Place• Constructed New Siphon Intake Structure on Abutment
![Page 38: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/38.jpg)
RECOMMENDATIONS
• Evaluate Each Dam Site Independently
• Plan and Coordinate with Entire Project Team Owner Engineer Regulators Contractors
• Balance Technical, Practical, and Regulatory Constraints
• Develop an Appropriate Investigation/Repair Plan
38
![Page 39: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/39.jpg)
RISK INFORMED DECISION MAKING
• Can be Used to Prioritize Investigations and Repairs
• Refer to Procedures Developed by Various Federal Agencies
• Consider Factors that Contribute to Failure and their Consequences:
39
Conduit Type, Age, Encasement Wall Thickness and Section Loss
Defect Dimension Pipe Coating
Soil Gradation and Erodibility Soil Resistivity
Hydraulic Fracture pH of Reservoir
Seepage Gradient
![Page 40: ASDSO Dam Safety 2013 Presentation](https://reader035.vdocument.in/reader035/viewer/2022062320/55d559c9bb61eb4f3f8b4650/html5/thumbnails/40.jpg)
QUESTIONS?
40
UNDER PRESSURE: AGING OUTLET CONDUITS
Jeremy Young, PE
Tyson Clouser, PE
Dam Safety 2013 –
ASDSO National Conference
Providence, Rhode Island
September 9, 2013