Page 1: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Ashland School DistrictFacility and Capacity

Assessment Report 2005

Dull Olson Weekes Architects Inc.

Page 2: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Project Goals

Comprehensive evaluations of district facilities Review capacity based on existing use Lay foundation for future planning

Page 3: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Methodology

Facility Assessment Kick-off meeting with district staff Site visits and documentation Review and input by district Prioritize recommended upgrades

Page 4: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Methodology

Capacity Assumptions Kindergarten: 25 students/classroom Grades 1 – 5: 24 students/classroom Middle School: 25 students/classroom High School: 26 students/classroom Core Facilities based on capacity:

Cafeteria Gym(s) Theater Media Center Administration Kitchen

Page 5: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Report Format

Part I: Overview / Introduction Part II: Executive Summary

Individual Facility Summary of Costs New Building Costs New Building Acreage

Part III: Detailed Summaries of Each Facility Finding and Recommendations Visual Inspection – Exterior Visual Inspection – Interior Code Analysis

Appendix Seismic Report

Page 6: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Commentary on Code & ADA

Limits of Study ADA Demographics Hazardous Materials

General Code Problems in Older Schools Life Safety

Page 7: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Executive Summary – District Wide Capacity Assessment

Sufficient classrooms for current enrollment Core facilities insufficient Site and grounds mostly sufficient

Page 8: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Executive Summary – District Wide Facility Assessment

Well cared for Wide range in facility ages Life safety, energy, code issues at all facilities Many schools in need of attention Master plan at Ashland High School Acreage at Willow Wind Lincoln’s historic character

Page 9: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

District Wide Recommendations

 High Priority Architectural

High Priority Mechanical/

ElectricalHigh Priority

Seismic

Moderate Priority

ArchitecturalLow Priority Architectural TOTAL

Bellview Elementary $1,127,640 $2,101,432 $1,026,995 $984,940 $1,057,129 $6,298,136

Helman Elementary $3,310,855 $1,721,333 $124,344 $1,476,179 $297,482 $6,930,193

Walker Elementary $1,805,045 $2,219,301 $1,586,776 $1,966,713 $555,109 $8,132,944

Ashland Middle $2,576,383 $5,374,152 $1,768,690 $968,604 $1,690,047 $12,377,876

Ashland High $6,565,454 $7,628,264 $2,851,497 $15,542,466 $2,555,310 $35,142,991

Willow Wind $266,792 $153,986 $100,739 $106,199 $81,849 $709,565

Central Office $182,270 $175,812 $53,422 $822,722 $47,013 $1,281,239

Maintenance $169,638 $436,983 $54,952 $94,827 $0 $756,400

Transportation $141,342 $115,703 $110,401 $0 $0 $367,446

Briscoe Elementary $1,198,642 $1,656,732 $1,810,029 $1,543,476 $382,870 $6,591,749

Lincoln Elementary $1,616,521 $1,551,317 $1,209,956 $1,334,395 $712,762 $6,424,951

TOTAL $18,960,582 $23,135,015 $10,697,801 $24,840,521 $7,379,571 $85,013,490

Page 10: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

New School Acreage

Recommended School Acreage

       

New Construction: Recommended Acreage

New Elementary School for 450 - 600 Students 10 acres

450 - 600 Students on new site.

New Middle School for 650 - 800 Students 20 acres

650 - 800 Students on new site.

New High School for 1200 - 1600 Students 40 acres

1200 Students on new site.

Note: These are recommended acreages. Schools can be built on less acreage, though less acreage may compromise parking, playfields, athletic fields, building footprints, and other such items.

Page 11: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

New School Costs

New ConstructionConstruction

CostsTotal Project

Costs Capacity

Cost/Student

New Elementary School for 300 Students $7,750,000 $11,074,000

300 $36,913

New Elementary School for 450 Students $9,000,000 $12,824,000

450 $28,498

New Middle School for 650 Students $18,400,000 $26,208,000

650 $40,320

New Middle School for 800 Students $19,520,000 $27,776,000

800 $34,720

New High School for 1200 Students $35,650,000 $50,190,000

1,200 $41,825

New High School for 1600 Students $42,700,000 $60,060,000

1,600 $37,538

Page 12: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

New School Costs

New Elementary School for 300

Project Costs:

Site Development $1,500,000

New Construction @ $ 125.00 5,750,000

Off-Site Improvements - Budget 500,000

Construction Subtotal $7,750,000

Fees, Permits, Equipment, Furnishings @ 25% 1,937,500

Development Fee Estimate 200,000

Total Project Cost $9,887,500

Add for Inflation to Construction Start @ 6% / yr. 12% 1,186,500

Total Project Cost $11,074,000

Page 13: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

District Wide Commentaries

Toilet Facilities Most facilities do not meet code for fixture count Lack of ADA facilities

Parking Parking is limited at most sites Many facilities do not have paved parking Many facilities are in need of ADA parking and

paths

Page 14: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

District Wide Commentaries

ADA Majority of facilities do not have ADA access to the

buildings Majority of facilities do not have ADA access of

specific areas (such as stages, upper floors, basements)

Parking, access and toilets are also a concern Door hardware is not accessible

Windows Mostly Single pane and not energy efficient

Page 15: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

District Wide Commentaries

Electrical Lighting Upgrades Panelboard Replacements Technology Upgrades

Mechanical/Plumbing Pipes need replacement Lack of Energy Efficient Boilers and/or systems Ventilation is poor

Seismic Report Reports: 1995, 2005 Some work completed at most facilities in 1997 Detailed notes in appendix

Page 16: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Bellview Elementary School

Capacity Summary Date of Original Construction: 1910 Enrollment (2004-2005): 250 Capacity: 275 Items for Consideration

Improve Entry and Administration Enlarge Library Improve Site Traffic and Circulation Enlarge Kitchen Consider Total Replacement

Page 17: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Bellview Elementary School

RECOMMENDATIONS High Priority Architectural and Code-Related Recommendations

Replace Windows $506,749 ADA Upgrades $131,694 Add Site Lighting $28,168 Improve Site Drainage $160,964 Replace Carpet $216,291 Replace VCT $41,924 Add Signage $32,193 Add Emergency Egress Door Hardware $9,657 Total Cost $1,127,640

Moderate Priority Architectural and Code-Related Recommendations Resurface Parking $106,236 Add Separate Bus Loop $80,482 Expand Kitchen and Replace Equipment $544,059 Expand Administration $237,423 Replace Marker boards $16,740 Total Cost $984,940

Page 18: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Bellview Elementary School

Lower Priority Architectural and Code-Related Recommendations Improve Acoustics $60,755 Repair Low Slope Roofs $328,075 Replace Ceiling Panels $243,018 Replace Cabinets $425,281 Total Cost $1,057,129

Mechanical, Plumbing, and Electrical Recommendations Install fire sprinkler system $179,226 Replace Boilers $169,012 Replace domestic cold and hot water piping with copper $288,583 Replace auto flush with infra red sensors $30,905 Provide ventilation for cafeteria, restrooms and basement $19,316 Upgrade controls for energy conservation $182,264 Replace plumbing fixtures $108,168 Upgrade receptacles and add as needed for technology $121,509 Replace Intercom system $121,509 Upgrade lighting throughout $243,018 Add emergency lighting $121,509 Upgrade fire alarm system $121,509 Upgrade electrical service $273,395 Replace panelboards $121,509 Total Cost $2,101,432

Page 19: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Bellview Elementary School

Higher Priority Seismic Recommendations Brace chimney $241,446 Tie walls to roof, ceiling and floors $161,000 Tie bowstring truss to walls $32,193 Reinforce/Install shear walls $243,018 Reinforce roof diaphragm $227,830 Install slip/expansion joints $121,508 Total Cost $1,026,995

Page 20: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Helman Elementary School

Capacity Summary Date of Original Construction: 1966 Enrollment (2004-2005): 320 Capacity: 350 Items for Consideration

Enlarge & Improve Administration Enlarge Kitchen Add Toilet Facilities Enlarge Library Improve Site Security Add New Gym

Page 21: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Helman Elementary School

RECOMMENDATIONS High Priority Architectural and Code-Related Recommendations

Replace glazing w/ insulated glass $495,557 ADA upgrades $131,135 Add site lighting $56,338 Improve site drainage $120,724 Replace breezeways $470,096 Add new gym $1,448,680 Expand kitchen/replace equipment $544,060 Add signage $44,265 Total Cost $3,310,855

Moderate Priority Architectural and Code-Related Recommendations Resurface parking and bus loop $154,525 Add security fencing $228,570 Replace cabinets $392,244 Expand & remodel administration $237,423 Replace marker boards $16,470 Expand & remodel library $446,677 Total Cost $1,476,179

Page 22: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Helman Elementary School

Lower Priority Architectural and Code-Related Recommendations Improve acoustics $56,035 Improve natural light to classrooms $241,447 Total Cost $297,482

Mechanical, Plumbing, and Electrical Recommendations Replace the domestic hot and cold water piping $266,167 Install Fire sprinkler system $165,302 Replace boiler system including providing code required

backflow devise for makeup water $124,748 Replace cooling tower $72,434 Upgrade controls for energy conservation $168,104 Upgrade receptacles and add as needed for technology $112,070 Upgrade lighting throughout $224,140 Add emergency lighting $112,070 Upgrade fire alarm system $112,070 Upgrade electrical service $252,158 Replace panelboards $112,070 Total Cost $1,721,333

Page 23: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Helman Elementary School

Higher Priority Seismic Recommendations Brace top of CMU wall $68,007 Separate walkway canopies from building $56,337 Total Cost $124,344

Page 24: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Walker Elementary School

Capacity Summary Date of Original Construction: 1948 Enrollment (2004-2005): 375 Capacity: 400 Items for Consideration

Enlarge and Improve Administration Enlarge Kitchen Add Toilet Facilities Enlarge Library Add Staff Room

Page 25: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Walker Elementary School RECOMMENDATIONS

High Priority Architectural and Code-Related Recommendations Replace windows $669,291 ADA upgrades $298,850 Add site lighting $28,168 Replace breezeways $205,069 Improve courtyard drainage $120,723 Replace VCT $47,885 Add signage $32,193 Replace roof $402,866 Total Cost $1,805,045

Moderate Priority Architectural and Code-Related Recommendations Replace ceiling tile $277,554 Resurface parking $106,236 Replace marker boards $16,740 Expand and remodel administration $301,808 Expand and remodel library $454,725 Expand kitchen/replace equipment $544,059 Add staff room $265,591 Total Cost $1,966,713

Page 26: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Walker Elementary School

Lower Priority Architectural and Code-Related Recommendations Improve acoustics $69,389 Replace cabinets $485,720 Total Cost $555,109

Mechanical, Plumbing, and Electrical Recommendations Replace the domestic hot and cold water piping $329,596 Replace boiler system $169,012 Install full fire protection system $204,696 Provide ventilation in basement area $24,145 Upgrade controls for energy conservation $208,165 Upgrade receptacles and add as needed for technology $138,777 Replace intercom system $138,777 Upgrade lighting throughout $277,554 Add Emergency lighting $138,777 Upgrade fire alarm system $138,777 Upgrade electrical service $312,248 Replace panelboards $138,777 Total Cost $2,219,301

Page 27: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Walker Elementary School

Higher Priority Seismic Recommendations Reinforce parapets $74,527 Epoxy inject cracks in chimney $40,240 Install/reinforce shearwall $693,885 Tie walls to roof, ceiling and floors $346,943 Reinforce roof diaphragm $260,208 Tie chords and plates together $32,193 Add slip/expansion joints $138,780 Total Cost $1,586,776

Page 28: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Ashland Middle School

Capacity Summary Date of Original Construction: 1959 Enrollment (2004-2005): 680 Capacity: 1200+ Items for Consideration

Enlarge Kitchen Provide New entry Enlarge Library Add Toilet Facilities Possible to demolish part of the

existing school

Page 29: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Ashland Middle School

RECOMMENDATIONS High Priority Architectural and Code-Related Recommendations

Replace windows $1,171,293 ADA upgrades $465,630 Add site lighting $28,168 Replace vertical siding $77,263 Replace 80% of roof $695,367 Add emergency egress door hardware $16,097 Replace VCT $122,565 Total Cost $2,576,383

Moderate Priority Architectural and Code-Related Recommendations Add a new entry $424,544 Expand kitchen/replace equipment $544,060 Total Cost $968,604

Lower Priority Architectural and Code-Related Recommendations Replace cabinets $1,243,370 Expand and remodel library $446,667 Total Cost $1,690,047

Page 30: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Ashland Middle School Mechanical, Plumbing, and Electrical Recommendations

Replace the domestic hot and cold water piping $843,717 Replace existing aging boilers including providing code

required backflow devise for makeup water $169,102 Provide fire sprinklers for original buildings $523,993 Replace dust collection system $18,510 Upgrade controls for energy conservation $532,873 Upgrade receptacles and add as needed for technology $355,248 Replace intercom system $355,248 Upgrade lighting throughout $710,497 Add emergency lighting $355,248 Upgrade fire alarm system $355,248 Upgrade electrical service $799,310 Replace panelboards $355,248 Total Cost $5,374,152

Higher Priority Seismic Recommendations Install/Reinforce shearwall $88,813 Reinforce soft story in gym $57,948 Tie walls to roof, ceiling and floors $390,773 Reinforce roof diaphragm $1,065,744 Tie chords and plates together $32,193 Add slip/expansion joints $133,219 Total Cost $1,768,690

Page 31: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Ashland High School

Capacity Summary Date of Original Construction: 1948 Enrollment (2004-2005): 1180 Capacity: 1300 Items for Consideration

Partial Replacement of Facility (Use Master Plan Approach)

Add Parking Improve Bus Circulation

Page 32: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Ashland High School

RECOMMENDATIONS High Priority Architectural and Code-Related Recommendations

Replace grandstands $2,156,924 Replace windows $414,322 Replace old roofs $834,440 Replace all breezeways $858,583 ADA upgrades (including elevators) $1,293,434 Add site lighting $56,338 Add emergency egress hardware $48,290 Replace carpet in science/math $355,281 Replace VCT in gym building $108,408 Add parking $318,710 Move and enlarge bus area $120,724 Total Cost $6,565,454

Moderate Priority Architectural and Code-Related Recommendations Replace ceiling tile $1,190,287 Enlarge administration $1,253,696 Replace gym building $7,726,294 Replace Industrial arts buildings $3,380,253 Replace library and move to a central location $1,991,936 Total Cost $15,542,466

Page 33: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Ashland High School Lower Priority Architectural and Code-Related Recommendations

Replace english building $2,253,502 Replace and add lockers $301,808 Total Cost $2,555,310

Mechanical, Plumbing, and Electrical Recommendations Replace the domestic hot and cold water piping $1,413,466 Install fire sprinkler system $877,836 Upgrade controls for energy conservation $892,715 Upgrade Receptacles and add as needed for technology $595,143 Upgrade lighting throughout.

Lamps and Ballast replacement $1,190,287 Add Emergency lighting $595,143 Upgrade fire alarm system $595,143 Upgrade electrical service. (english building, industrial &

wood shops, grandstands, science building, gymnasiums)$873,388 Replace panelboards $595,143 Total Cost $7,628,264

Page 34: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Ashland High School Higher Priority Seismic Recommendations

Epoxy inject cracks at walkways and rails (Humanities) $64,789 Add lateral bracing to lights and drop ceiling (Humanities) $24,410 Reinforce roof diaphragm (English Building) $48,290 Install/Reinforce shear walls (English Building) $128,772 Tie walls to roof, ceilings and floors (English Building) $64,386 Brace top of brick walls on 1st floor (Science/Math Building) $37,665 Install/Reinforce shear walls (Science/Math Building) $1,009,874 Install braces in floor diaphragms (Science/Math Building) $378,703 Reinforce around diaphragm openings (Science/Math Building) $100,988 Repair steel and concrete at stairs (Science/Math Building) $16,097 Tie roof and walls (Industrial Arts Building) $56,338 Tie walls to beams (Industrial Arts Building) $56,338 Add chord tie on north side (Industrial Arts Building) $16,097 Install/Reinforce shear walls (Industrial Arts Building) $241,447 Repair water decay to structure (Industrial Arts Building) $20,120 Add steel wall cross bracing (Small Gym) $16,097 Add roof cross bracing (Small Gym) $17,803 Tie walls to roof and floors (Gym) $201,205 Reinforce parapets (Gym) $23,823 Tie trusses to wall (Gym) $26,366 Tie music and boiler to gym (Gym) $39,549 Reinforce gym wall to music room (Gym) $87,886 Reinforce roof diaphragm (Gym) $65,916 Brace walls for forces (Administration) $72,255 Brace wall around opening (Administration) $36,553 Total Cost $2,851,497

Page 35: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Willow Wind

Capacity Summary Date of Original Construction: Unknown Enrollment (2004-2005): Unknown Capacity: Unknown Items for Consideration

Future School Site? Inadequate information

Page 36: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Willow Wind

RECOMMENDATIONS High Priority Architectural and Code-Related Recommendations

Replace single pane windows $80,123 ADA upgrades $18,317 Pave and paint parking $100,742 Replace wood shingle roof $36,266 Add site lighting $26,711 Replace vinyl floor $4,633 Total Cost $266,792

Moderate Priority Architectural and Code-Related Recommendations Repaint exterior of facility $106,199 Total Cost $106,199

Lower Priority Architectural and Code-Related Recommendations Replace cabinets $47,013 Replace carpet $23,910 Add window coverings $10,926 Total Cost $53,622

Page 37: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Willow Wind

Mechanical, Plumbing, and Electrical Recommendations Replace the domestic hot and cold water piping $31,902 Provide new AHU’s to provide ventilation $18,317 Provide fire sprinkler system $19,812 Upgrade lighting throughout $26,865 Upgrade fire alarm system $13,433 Upgrade electrical service $30,244 Replace panelboards $13,433 Total Cost $153,986

Higher Priority Seismic Recommendations Add foundation and attach to (e) structure $22,896 Add shear walls to (e) structure $67,162 Shore supports at walkways $1,526 Repair and replace deteriorating deck $9,155 Total Cost $100,739

Page 38: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Central Office

RECOMMENDATIONS High Priority Architectural and Code-Related Recommendations

Replace windows $90,667 ADA upgrades $27,245 Add site lighting $16,026 Replace carpet $23,910 Add signage $15,264 Add egress exit hardware $9,158 Total Cost $182,270

Moderate Priority Architectural and Code-Related Recommendations Enlarge and remodel building $822,722 Total Cost $822,722

Lower Priority Architectural and Code-Related Recommendations Replace cabinets $47,013 Total Cost $47,013

Page 39: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Central Office

Mechanical, Plumbing, and Electrical Recommendations Replace the domestic hot and cold water piping $31,902 Provide complete fire sprinkler system $19,812 Replace domestic hot water heater $26,711 Upgrade receptacles and add as needed for technology $13,433 Upgrade lighting throughout $26,865 Add emergency lighting $13,433 Upgrade fire alarm system $13,433 Upgrade electrical service $30,223 Total Cost $175,812

Higher Priority Seismic Recommendations Repair deteriorating beams $53,422 Total Cost $53,422

Page 40: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Maintenance

RECOMMENDATIONS High Priority Architectural and Code-Related Recommendations

ADA upgrades $42,185 Pave and stripe parking $100,742 Add site lighting $26,711 Total Cost $169,638

Moderate Priority Architectural and Code-Related Recommendations Replace cabinets $94,827 Total Cost $94,827

Page 41: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Maintenance

Mechanical, Plumbing, and Electrical Recommendations Replace the domestic hot and cold water piping $90,086 Provide full fire sprinkler system $55,948 Provide code approved paint booth $76,320 Provide new heating/cooling and vent unit for office area $22,896 Provide heating and ventilating unit for the metal shop

and wood shop $30,528 Emergency lighting $37,930 Upgrade fire alarm system $37,930 Upgrade electrical service $85,345 Total Cost $436,983

Higher Priority Seismic Recommendations Tie lean-to to (e) structure $15,265 Add sheathing to roof (Tin Shed) $9,159 Add sheathing to walls (Tin Shed) $15,265 Strap roof to walls (Tin Shed) $15,263 Total Cost $54,952

Page 42: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Transportation

High Priority Architectural and Code-Related Recommendations ADA upgrades. $13,889 Pave and stripe parking $100,742 Add site lighting $26,711 Total Cost $141,342

Mechanical, Plumbing, and Electrical Recommendations Replace the domestic hot and cold water piping $22,231 Provide ventilation for the office and shop areas $30,528 Provide fire sprinkler system $13,805 Emergency lighting $9,360 Upgrade fire alarm system $9,360 Upgrade electrical service $21,059 Total Cost $106,343

Page 43: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Transportation

Higher Priority Seismic Recommendations Add ties from walls to roof $23,400 Strap roof, increase roof diaphragm $17,550 Brace walls $53,424 Strap from top plate to top plate $763 Tie wood structure to CMU $15,264 Total Cost $110,401

Page 44: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Briscoe Elementary School

Capacity Summary Date of Original Construction: 1948 Enrollment (2004-2005): 0 Capacity: 275 Items for Consideration

Improve Entry and Administration Enlarge Library Add Parking? Enlarge Kitchen Enlarge Media Center

Page 45: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Briscoe Elementary School RECOMMENDATIONS

High Priority Architectural and Code-Related Recommendations Replace windows $489,042 ADA upgrades $324,981 Add site lighting $28,168 Add parking $318,709 Replace VCT $37,742 Total Cost $1,198,642

Moderate Priority Architectural and Code-Related Recommendations Expand kitchen/replace equipment $544,059 Expand and remodel administration $237,423 Replace marker board $16,740 Replace ceiling tile at stage $3,220 Repair roof $295,357 Expand and remodel library $446,677 Total Cost $1,543,476

Lower Priority Architectural and Code-Related Recommendations Replace cabinets $382,870 Total Cost $382,870

Page 46: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Briscoe Elementary School Mechanical, Plumbing, and Electrical Recommendations

Replace the domestic hot and cold water piping $259,803 Replace boilers including backflow devise for

make-up water $169,012 Install Fire Sprinkler System $161,354 Upgrade controls to DDC for energy conservation $164,088 Upgrade receptacles and add as needed for technology $109,390 Upgrade lighting throughout $218,784 Add emergency lighting $109,390 Upgrade fire alarm system $109,390 Upgrade electrical service $246,131 Replace panelboards $109,390 Total Cost $1,656,732

Higher Priority Seismic Recommendations Reinforce parapets $80,096 Reinforce CMU walls $563,375 Tie walls to roof, ceilings and floors $529,453 Reinforce roof diaphragm $321,610 Tie chords and plates together $160,964 Attach Brick Veneer $154,531 Total Cost $1,810,029

Page 47: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Lincoln Elementary School

Capacity Summary Date of Original Construction: 1926 Enrollment (2004-2005): 0 Capacity: 350 Items for Consideration

Enlarge & Improve Administration Enlarge Kitchen Enlarge Library Add Toilet Facilities

Page 48: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Lincoln Elementary School

RECOMMENDATIONS High Priority Architectural and Code-Related Recommendations

Add toilet facilities $241,446 Replace windows $619,571 ADA upgrades $362,979 Add site lighting $28,168 Add emergency egress door hardware $16,096 Replace sunscreens $14,486 Improve site drainage $40,240 Add signage $32,193 Replace Carpet $218,907 Replace VCT $42,435 Total Cost $1,616,521

Moderate Priority Architectural and Code-Related Recommendations Expand and remodel library $446,677 Expand kitchen/replace equipment $544,059 Expand and remodel administration $237,423 Resurface parking $106,236 Total Cost $1,334,395

Page 49: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Lincoln Elementary School

Lower Priority Architectural and Code-Related Recommendations Replace cabinets $430,431 Add meeting spaces $265,591 Replace marker boards $16,470 Total Cost $712,762

Mechanical, Plumbing, and Electrical Recommendations Replace the domestic hot and cold water piping $292,078 Provide fire sprinkler system $181,395 Replace boiler system $124,748 Provide Ventilating units for interior areas $184,470 Upgrade lighting throughout $245,961 Add Emergency lighting $122,980 Upgrade fire alarm system $276,705 Replace panelboards $122,980 Total Cost $1,551,317

Page 50: Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc

Lincoln Elementary School Higher Priority Seismic Recommendations

Reinforce parapets $316,899 Install/reinforce shear walls $322,822 Tie walls to roof, ceilings and floors $307,450 Reinforce roof diaphragm $230,588 Tie chords and plates together $32,197 Total Cost $1,209,956