ashutosh resume.doc
TRANSCRIPT
-
7/27/2019 ashutosh resume.doc
1/4
ASHUTOSH DWIVEDI
Address : 24/169,Dwarika Nagar,Rewa MP
E-mail :[email protected] : +91 9907543998
Objective :
Intend to build a career with leading corporate of hi-tech environmentwith committed & dedicated people, which will help me to exploremyself fully and realize my potential. Willing to work as a key playerin challenging & creative environment.
Skills :
Key Skill :
ComputerProficiency:
OS: DOS/Windows
Programming Languages: c/c++/java MS Office & internet
AutoCAD
Educational Qualification :
Degree College/School University/Board Marks
B.E. (Civil)Govt.Engg.College,Rewa(M.P.)
R.G.P.V, Bhopal 65.11%
H.S.S.C. Govt.Higher SecondarySchool No-2 Rewa
M.P.Board,Bhopal
52.22%
S.S.CSaraswati ShishuMandir Rewa
M.P.Board,Bhopal
67.22%
EMPLOYMENT RECORD
From April 2013 to till date.
Position : Ass Bridge Engineer
Employer : Voyants Solutions India Limited.
Client : MORTH
Concessionaire : NavYuva Dhola Infra Pvt.Ltd.
PMC : SN Bhobe Associates with Voyants Pvt.Ltd.
Contractor : NavYuva Pvt. Limited.
Cost of project : 992.00 Crores
Job Title and project:
Duties Assistant Bridge Engineerfor
Construction of 12.9m wide Bridgebetween Dhola & Sadia ghats along with 2 lane connecting roads from near about
Dhola to Islampur Tinali in Assam at our Independent Engineering Assam Project
Site under Transportation, Roads & Bridges Division, (TRB) Asia`s Second Largest
bridge by Asia at Brahmputra River 12 km approx.
Experience :
mailto:[email protected]:[email protected] -
7/27/2019 ashutosh resume.doc
2/4
From June. 2010 to March 2013.
Position : Ass Bridge Engineer
Employer : Supreme Infrastructure India Limited.
Client : National Highway Authority of India.
Concessionaire : Supreme Panvel Indapur Tollways Private Limited.
PMC : Consulting Engineering Services (I) Pvt. Ltd.
Contractor : Supreme Infrastructure India Limited.Cost of project : 670.00 Crores
Job Title and project: Rehabilitation and Upgrading of NH-17 4-Lane in the state
of Maharashtra under NHDP Phase 111 on a DBFOT basis from Km 0.00 to Km
84.000.
Duties As Bridge Engineer was responsible for studying & verifying the drawings
issued by DPR Consultants and prepare good for construction drawings and as built drawings
along with Design Engineers. Planning and programming of the project along with planning
engineers and scheduling of all the items of the works. Preparing the methodologies of all themajor activities. Preparation of traffic management plan, safety plan and environment
management plan & implement.. Liason and co-ordinate with public and Govt. bodies to procure
the material as per specifications. Setting out of all plants, monitoring day-to-day production of
concrete batching plants, aggregate crusher plant etc. Instructing all the field staff regarding
survey works, supervision, execution and organization of all site activities i.e. construction
techniques, checking and taking measurements. Preparation of bills, calculation of quantities,
quality assurance and quality control procedures and certifying sub contractor bills. Supervise
all the site activities i.e. construction supervision of structures i.e.8 nos of major bridge,both well
and pile foundation,psc girder launching with grantry girder, span length 28m,16 nos of minor
bridges all open foundation and solid slab, 3 nos of , underpasses,11 nos of slab culverts,10 nos box
culverts and2 nos of pipe culverts, service roads, median drains, kerb and longitudinal drains
related to the project. Preparation of quality assurance manual and quality control procedures,
and supervise all the activities are carrying out as per specifications stipulated in contract
documents. MORT & H, IS codes and IRC standards. Conducting internal quality audits.
Discuss with Sr. Quantity Surveyor or Contracts Manager regarding variation orders, Interim
payment statements, and contractual matters and finalise. Site visits along with Consultants and
client conducting internal meetings with staff members to discuss and sort out problems en-counted if any while execution. Fixing of targets, monthly quantity wise, prepare physical
progress and financial progress of the month. Liason and co-ordinate with client, and consultants
regarding all the issues related to the project. Prepare Hindrance list, carryout hindrance survey
Liason and Co-ordinate with public and relevant authorities to clearing all the obstructions and
encumbrances subject to the project. Participating in progress review meetings along with client
& consultants
.
-
7/27/2019 ashutosh resume.doc
3/4
Trainings :
Organization: Mahan Canal Project (Water ResourcesDeptt.,Govt.of MP)Duration: 4 weeks.Field in which took the training: study of canal project
Organization: Path Oriental Infrastructure Ltd.Duration: 4 weeks.Field in which took the training :study of road,highways andBypass Construction.
Projects Undertaken
Project Name :Soil Testing of Polytechnic Buiding Site at GECRewa
Role Description:
Team Leader
Duration : Eighth Semester
Project Name :Innovative research of RCC using Bamboo insteadof Steel.(Patent Pending.)
Role Description:
Team Leader
Duration : Sixth Semester
Co-curricularActivities:
Got first Prize in Quiz conducted by Gayatri Shakti Peeth at districtlevel.
Got first prize in quiz conducted by Int`l Youth Hostels ASS. OfIndia .
I has been active member in all kinds of construction work, soiltesting, surveying of sites in Rewa Engineering college .
PERSONAL
PersonalInformation :Name: Ashutosh DwivediFathers Name: Shri A.P. dwivediMothers Name: Smt. Usha DwivediD.O.B: 03th Dec. 1989Nationality: IndianLanguages: English, Hindi
Hobbies: Computers,Listening Music & PC gaming
Declaration :
Major Project :
Minor Project :
-
7/27/2019 ashutosh resume.doc
4/4
I hereby declare that information mentioned above is true to best of myknowledge. And the Reference could be furnished upon request.
Date: / /Place: Rewa
ASHUTOSH DWIVEDI