asipp
DESCRIPTION
HT-7. ASIPP. Daily Operation Report Operation Team I. X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang. 31 May ~ 01 June 2004. ICRF Cleaning + Boronization (08:30-11:00) OH Discharges after Boronization (12:30 –22:30) Long Pulse Discharges(22:30-07:30) Shot No. #71161~#71341. - PowerPoint PPT PresentationTRANSCRIPT
ASIPPASIPP
HT-7HT-7
Daily Operation ReportDaily Operation Report
Operation Team IOperation Team I
X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.ZhangX.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang
31 May ~ 01 June 200431 May ~ 01 June 2004
• It: 2800A-4000AIt: 2800A-4000A
• Pout:2.5E-4Pa Pin:1.0E-3Pa~8.0E-6PaPout:2.5E-4Pa Pin:1.0E-3Pa~8.0E-6Pa
• PPLHWLHW:100KW~200KW :100KW~200KW
• ICRF Cleaning + Boronization (08:30-11:00)
• OH Discharges after Boronization (12:30 –22:30)OH Discharges after Boronization (12:30 –22:30)
• Long Pulse Discharges(22:30-07:30)Long Pulse Discharges(22:30-07:30)
• Shot No. #71161~#71341Shot No. #71161~#71341
OH Discharges (I)after BoronizationOH Discharges (I)after Boronization
OH Discharges (II) After BoronizationOH Discharges (II) After Boronization
Long Pulse Discharges Testing with LHWLong Pulse Discharges Testing with LHW
Long Pulse Discharge(I) impuritiesLong Pulse Discharge(I) impurities
Long Pulse Discharge(II)OH Free Long Pulse Discharge(II)OH Free
Long Pulse Discharge(Long Pulse Discharge(IIIIII))
The Longest Pulse Discharge(106.99s)The Longest Pulse Discharge(106.99s)