ASM Phase II Reserve Zone Criteria. NEPOOL Markets Committee May 24, 2005 Jim Milligan ISO-NE Markets Development. Outline. Proposed Reserve Zones Use of Reserve Zones Reserve Zone Characteristics Review/Definition Periodicity Relationship with Other Zone Definitions. - PowerPoint PPT PresentationTRANSCRIPT
ASM Phase IIReserve Zone Criteria
NEPOOL Markets CommitteeMay 24, 2005
Jim Milligan
ISO-NE Markets Development
2
Outline
• Proposed Reserve Zones
• Use of Reserve Zones
• Reserve Zone Characteristics
• Review/Definition Periodicity
• Relationship with Other Zone Definitions
3
Proposed Reserve Zones
• The ISO is proposing that the following Reserve Zones be defined and used for the initial implementation of ASM Phase II:
– SouthWest Connecticut (SWCT)
– Connecticut
– NEMA/Boston
4
Use of Reserve Zones
• Reserve Zones will be modeled as part of the power system configuration used in the New England Wholesale markets
• Reserve Zones and Reserve Zone requirements will be inputs into the LFRM clearing, the real time dispatch algorithm and Settlements
5
Reserve Zone Characteristics
• Defined for areas of power system that routinely require Daily RMR Resources to cover local 2nd contingency reliability criteria.
• Zones are import constrained areas and consist of closed interfaces.
• Zones must be contained within or the same as Energy Load Zones.
6
Zone Review/Definition Periodicity• Zone definitions (and requirements) will be
reviewed and discussed as part of derivation and assumptions for each LFRM Auction.
• Zone changes will be published as part of LFRM Auction Assumptions.
• Zone changes will be coordinated with other Market timing and notifications.
7
Zone Relationships (based on ISO Proposals)
Reliability LICAP ASM Energy
Region Region Reserve Zone Load Zone
Maine Maine RoP Maine
NH RoP RoP NH
VT RoP RoP VT
WCMass RoP RoP WCMass
SEMass RoP RoP SEMass
NEMA/Bos NEMA/Bos NEMA/Bos NEMA/Bos
RI RoP RoP RI
RoCT RoCT RoCT RoCT
SWCT SWCT SWCT SWCT
8
Questions