asme certified yankee dryer king hardware may 3rd, 2010

29
ASME Certified Yankee Dryer King Hardware May 3rd, 2010

Upload: ronald-crowden

Post on 31-Mar-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

ASME Certified Yankee DryerKing Hardware

May 3rd, 2010

Page 2: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

King Hardware

King Hardware is a dedicated ASME & PED certified Dryer Cylinder manufacturer for more than 20 years.

With 300 plus employees and 10,000 tons of annual production capabilities

Well known in Europe, Asia & Africa for delivering products with good quality, competitive prices and short delivery time.

Other product lines include Former Cylinders, Calendar Rolls, Press Rolls, Mill Rolls, Felt Rolls and Suction Couch Rolls

Page 3: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

Why ASME ?

The American Society of Mechanical Engineers Boilers and Pressure Vessels Codes except for Transportation Tanks (hereafter as ‘ASME Codes’) have been adopted as boilers and pressure vessels safety rules by almost all states of US and provinces of Canada.

It is mandatory that all boilers and pressure vessels, which are used in North America and in the scope of ASME Codes, shall be designed, fabricated and inspected in accordance with ASME Codes and stamped ASME Code Symbol stamps.

Page 4: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

Why ASME?

It is not a mandatory requirement for the boilers and pressure vessels, which are neither used in North America nor in the scope of ASME Code, to bear ASME Code symbols.

However, above mentioned boilers and pressure vessels may be stamped ASME Code Symbols in the following cases providing that they are designed, fabricated and inspected in conformity with ASME Codes:

that required by the end user; or that required by the local Jurisdiction in the locations where the boilers or pressure vessels are used (e. g. Australia, South America).

Page 5: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

ASME Certified Process

1. Design

2. Fabrication

3. Examination

4. Inspection

5. Testing

6. Stamping

King Hardware

Page 6: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

1. Design

Assure the drawing, design calculation and material selected meet the requirement of ASME VIII-1

Check the service restriction and pressure-temperature limitations according to the ASME VIII-1

ASME Certified Process

Page 7: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

1. Design

Key Specifications:

• Diameter: up to 3,660 mm• Face Length: up to 8,000 mm• Operation Speed: up to 1200 MPM• Operation Pressure: up to 10 BAR

ASME Requirements:• Break Test: 6 x Operation Pressure e.g.. 6x 150 psi= 900 psi (60 BAR)• Hydrostatic Test: e.g.. 25 bar x 2 Hours, w/o Leakage

ASME Certified Process

Page 8: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

1. Design – Key Components Selection

Bolts: • Material: Cr/Mo Alloy• Strength: 10.8 class• Suppliers: Taiwan

Gasket Seals: • Material: Patented• Strength: 28 BAR • Suppliers: Europe

ASME Certified Process

Page 9: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

2. Fabrication- Side Cover

Self-hardening mold: Smooth Surface Accurate Dimensions Easy to Clean

ASME Certified Process

Page 10: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

2. Fabrication- Side Cover

Casting Machinery

Gasket sealing

Drilling

ASME Certified Process

Page 11: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

2. Fabrication- Side Cover

Hand Hole Finishing Journal Grinding

ASME Certified Process

Page 12: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

2. Fabrication – Body

Inner Finishing

CastingDrilling ( Casting Material:

Comply with the ASME VIII-1 UG-7 ).

ASME Certified Process

Page 13: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

2. Fabrication – Body

Inner Machinery Outer Machinery

ASME Certified Process

Page 14: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

2. Fabrication – Body

Surface Grinding Balance Machinery

ASME Certified Process

Page 15: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

2. Fabrication – Body

Balancing

ASME Certified Process

Page 16: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

3. Examination

Examine all materials before fabrication 1. Assure the required thickness 2. Maintain traceability to the material identification

Examine cylinder and cover sections1. Assure properly formed to the specified shapes 2. Within the permissible tolerances

ASME Certified Process

Page 17: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

3. Examination

Examine parts as fabrication progresses, 1. Material marking, 2. Dimensional geometries are maintained

No welding repair were permitted

ASME Certified Process

Page 18: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

4. Inspection

Check Dimensions

ASME Certified Process

Page 19: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

4. Inspection

Surface Inspection

Roughness ﹤ 0.4 Ra

ASME Certified Process

Metallographic

Inspection

Page 20: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

4. Inspection

Dynamic Balancing

ASME Certified Process

Page 21: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

5. Test Some parts of dryer cylinder is difficult to

determine the maximum allowable working pressure or thickness

When a proof test is considered necessary, the Manufacturer has the responsibility of performing the test in the presence of the AI.

The test shall be acceptable to the AI and a test report shall be made available to the AI.

ASME Certified Process

Page 22: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

5. Test – Break Test

ASME Certified Process

Comply with ASME VIII-1

Spec: 6 x Operation Pressure

Example: 6 x 150 psi= 900 psi (60 BAR)

Page 23: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

5. Test – Hydrostatic Test

Comply with ASME VIII-1

← 28 bar x 2 Hours, w/o Leakage

ASME Certified Process

Page 24: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

6. ASME Certificate

ASME Certified Process

Preparing required Data Report and having it certified by the Inspector

Issued by ASME authorized agency

Page 25: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

6. Stamping the Code Symbol

Applying the required U symbol stamping and nameplate to the cylinder

Assure it is applied to proper vessel

ASME Certified Process

Page 26: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

Final Assembly (w/ Bearings)

King Hardware

Page 27: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

Pack and Delivery on Time ( 90 days)﹤

King Hardware

Page 28: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

Happy + Satisfying Customers

King Hardware

Page 29: ASME Certified Yankee Dryer King Hardware May 3rd, 2010

King Hardware is your Best Partner. Thank You !