Page 1: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

OCTOBER 30, 2019

PUBLIC MEETING

ASPEN HILL

NEIGHBORHOOD

GREENWAY

PILOT

PROJECT

Page 2: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

• Project Overview

• Project Update

• Proposed Improvements

• Q&A

Outline

2

Page 3: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

3

Neighborhood Traffic Circle

Chicane

Curb Extension

• Shared Road Facility

• Low Traffic Volumes and Speeds

• Prioritize Walking and Bicycling

• Signed Route

• Speed and Volume Management

• Crossing Improvements

Design Guidance:

BICYCLE FACILITY DESIGN TOOLKIT

Montgomery County Planning Department

Project Overview

Neighborhood Greenway

Page 4: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Aspen Hill Neighborhood Greenway Pilot Project

Project Overview

• Parallel to Georgia Avenue

• Uses neighborhood roads

• Connectivity between:

• Glenmont Metro

• Shopping Centers

• County-Wide Trail Network

4

Page 5: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Begin

Study

April 2019

Pilot Project: Accelerated Schedule

Project Update

Oct 2019

Public Meeting

Implementation

We Are Here

April 2019

Field Visit

Preliminary

Recommendations

May 2019

Sept 2019

Traffic Counts

June 2019

Public Workshop

Stakeholder

Coordination

July 2019

5

Page 6: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Project Update

• Neighborhood Greenway Route

• Wendy Lane

• Connection to Aspen Hill Shopping Center

• Georgia Avenue Sidewalk

• Niles Street

• Holdridge Road

• Denley Road

• Connection to Glenmont Metro

• Urbana Drive

• Connection to Glenmont

Greenway

• Future Connections

• Palmira Lane

• Harmony Hill Neighborhood Park

• Matthew Henson State Park

6

Page 7: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Route Improvements

• Wayfinding Signs / Branding

• Pavement Markings

7

Proposed Improvements

Existing Bike Route Signs - Niles Street and Holdridge Road

Sharrow – Shared Lane Pavement Marking

Page 8: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Bicycle Prioritization

• Switching Stop Signs to

Cross Streets

• Bicycle Forward Stop Bars

8

Proposed Improvements

Stop Control on Minor Road

Bicycle Forward Stop BarsImage Source: NACTO

Page 9: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Raised Pavement

• Speed Cushions

• Raised Crosswalks

• Raised Intersections

Street Narrowing

• Curb Extensions

• Concrete Medians

• Neighborhood Traffic Circles

9

Proposed Improvements

Neighborhood Traffic Circle

Image Source: NACTO

Speed CushionImage Source: NACTO

Speed Management

Page 10: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Volume Management

• Traffic Diverters in limited

locations

10

Proposed Improvements

Image Source: NACTO

Image Source: NACTO

Page 11: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Off-Road Connections

• Harmony Hill Neighborhood Park

• Matthew Henson Trail

Georgia Avenue Connection

Other Improvements

• Realign / remove bollards

• Restrict Parking in front of trail

access

• Evaluate Lighting

11

Matthew Henson State Park Access -

North End of Holdridge Road

Harmony Hill Neighborhood Park Access -

South End of Loyola Street

Future Improvements

Page 12: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

• Greenway Information

• Proposed Route Maps

• Intersection Improvements

Meeting Displays

Page 13: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

• Pilot Treatments

• Evaluation

• Before / After

13

Next Steps

Image Source: NACTO

Image Source: NACTO

Page 14: ASPEN HILL NEIGHBORHOOD GREENWAY PILOT PROJECT€¦ · Study April 2019 Pilot Project: Accelerated Schedule Project Update Oct 2019 Public Meeting Implementation We Are Here April

Contact

Kyle Lukacs, AICPProject Manager

240-777-7207

[email protected]

https://www.montgomerycountymd.gov/dot-dte/projects/aspenhill/index.html

14