2
QUALITY
ASSURANCE
PROCESS
CONTROL
(QC)
INDEPENDENT
ASSURANCE
(IA) ACCEPTANCE
(VST)
![Page 3: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/3.jpg)
Asphalt QA Program
• Contractor – Performs QC
• VDOT – Performs IA & VST • Asphalt Certification schools for contractors,
inspectors and testing personnel. • Plant Certification
• Field Certification
![Page 4: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/4.jpg)
Quality Control (QC)
• All activities performed to control the quality of
the asphalt mixture during production and
placement to fulfill the contractor requirements.
• Section 211
• Mix Design
• Contractor provides QC testing
• Section 315
• Mix Placement
• Contractor provides Field Control - Equipment
• Density Testing
4
![Page 5: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/5.jpg)
Independent Assurance (IA)
• Activities that are an unbiased and an independent
evaluation of all Operations, sampling and testing
procedures, and equipment used in the acceptance
program.
• VDOT provides IA during production and placement
• Inspection – observations
• Split sample tests
• Evaluations of Technicians
• AASHTO Materials Reference Laboratory
5
![Page 6: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/6.jpg)
Verification Sampling and Testing (VST)
• Validate the quality of the product
• Performed by VDOT
• VST should determine if the material is acceptable
per specification.
• VDOT uses split samples plus a statistical process
of examining Contractor QC test data to verify the
accuracy of sampling and testing used in the
acceptance decision.
• Plant
• VDOT uses independent samples
• Field
![Page 7: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/7.jpg)
Mix Design Approval Process
• Contractor submits mix design laboratory data
and forms to VDOT for initial approval.
• Limited production - contractor can produce up
to 500 tons or one day’s production. Gyratory
samples taken and analyzed by both VDOT and
Contractor for compliance with Specification
requirements and conformance to submitted mix
design.
• Full production approval granted after a
successful limited production trial.
7
![Page 8: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/8.jpg)
Asphalt Plant Quality Control
![Page 9: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/9.jpg)
9
Random Truck Sampling
![Page 10: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/10.jpg)
10
Sample Splitting
![Page 11: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/11.jpg)
11
VDOT uses the Contractor’s
test data (QC) in the
acceptance of plant produced
Asphalt mixtures
Asphalt Plant QA
![Page 12: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/12.jpg)
Producer Samples and Tests (QC)
• Perform Gradation and Asphalt Content testing
randomly every 500 tons
• Temperature Measurements 1st and 5th load then
at least once an hour
• Volumetric SUPERPAVE tests every 1,000 tons
• Air Voids (VTM)
• Voids in Mineral Aggregate (VMA)
• Voids filled with Asphalt (VFA)
• Rice test – Maximum Specific Gravity (Gmm)
12
![Page 13: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/13.jpg)
VDOT Responsibilities,
Samples and Tests
• Inspect Plant equipment and lab for compliance
with specifications – IA
• Split sample tests for gradation and Asphalt
Content are used for system wide IA and VST
purposes
• Volumetrics SUPERPAVE tests used for
verification purposes.
• Air Voids (VTM)
• Voids in Mineral Aggregate (VMA)
• Voids filled with Asphalt (VFA)
• Rice test – Maximum Specific Gravity (Gmm)
13
![Page 14: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/14.jpg)
Independent Assurance
14
3 3
IA1
3 2 2 1 1 4 1 4 3 2 1 4
Lot 2 Lot 3 Lot 1 Lot 4
2
IA3 IA2 IA1 IA4
IA4 IA3 IA2
Matched Comparison
Analysis
4 3 4 2 QC
Sample
Comparison
IA
![Page 15: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/15.jpg)
15
3 3
IA1
3 2 2 1 1 4 1 4 3 2 1 4
Lot 2 Lot 3 Lot 1 Lot 4
2
IA3 IA2 IA1 IA4
IA4 IA3 IA2
2 1 2 1 3 4 1 3 2 1 3 4 QC
System
Comparison
Non Matched
Comparison VST
VST
![Page 16: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/16.jpg)
Comparison Reports
16
4.4 4.6 4.8 5.0 5.2 5.4 5.6
Asphalt Content
f(x) Lab #1 Lab #2
![Page 17: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/17.jpg)
Comparison Reports
17
4.4 4.6 4.8 5.0 5.2 5.6 5.8
Asphalt Content
f(x)
![Page 18: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/18.jpg)
Asphalt MITS - PLAID Reports
• Statistical Tests are performed on both Split Comparison and IA Samples.
• Any non comparison must be investigated, resolved and documented.
18
![Page 19: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/19.jpg)
Assessment of Random Samples
19
Is this random?
![Page 20: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/20.jpg)
Summary – Asphalt Plant QA
• Statistics is the tool that VDOT uses to verify the quality of asphalt mixtures.
20
![Page 21: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/21.jpg)
Asphalt Field
Quality
Assurance
21
![Page 22: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/22.jpg)
Contractor Field QC Testing
• Depth Checks
• Cross Slope
• Straight Edge Transverse Joints
• QC Density testing either by Thin Lift Nuclear
gauge or through cores/plugs
• Joint Density
• Test and Test frequency will be determined by
Road & Bridge Specifications, Special Provisions
or as directed by the Engineer
• Cut plugs for VST at direction of Materials QA
technician.
22
![Page 23: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/23.jpg)
VDOT Project Staff Responsibilities IA
• Verifies Paving equipment meets specifications
• Verifies materials being used are from approved
sources
• Take Temperature measurements of AC at least
every hour
• Verifies that contractor personnel are performing
QC operations correctly
• Verifies Density testing being performed
• Joint Density
23
![Page 24: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/24.jpg)
![Page 25: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/25.jpg)
VDOT/Materials VST and IA
• Perform VST testing on plugs
• IA testing
• Verify method of random selection
• Marking of test locations
• Observe QC testing at control strip
• Observe test sections.
• Obtain samples of cores from control strip to
reweigh in laboratory.
• Depth Control tests
25
![Page 26: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/26.jpg)
Asphalt Density Virginia Test Method
VTM-76
• Stratified Random Locations - QC
–Control Strip
–Test Sections
• Cores for Control Strips - IA
–6 cores for new mixes
• 2 cores per site
–2 cores
![Page 27: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/27.jpg)
STRATIFIED RANDOM LOCATIONS
5000 FEET
1000 ft.
1000 FOOT SECTIONS
TEST SECTION
![Page 28: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/28.jpg)
![Page 29: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/29.jpg)
75
ft.
300 ft.
NUMBER OF
PASSES TARGET DENSITY
ROLLER
PATTERN CONTROL STRIP
![Page 30: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/30.jpg)
![Page 31: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/31.jpg)
TEST THREE LOCATIONS
1
2
3
50 FEET
75 FEET
MARK TEST LOCATIONS
ORIENT GAUGE IN SAME DIRECTION
![Page 32: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/32.jpg)
DENSITY vs NUMBER OF PASSES
NUMBER OF PASSES
1 2 3 4 5 6 7 8
144.0
143.0
142.0
141.1
140.0
138.0
137.0
139.0
136.0
135.0
D
E
N
S
I
T
Y
(lb/ft3)
![Page 33: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/33.jpg)
Locations of nuclear readings are marked by
contractor.
VTM-76
![Page 34: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/34.jpg)
CONTROL STRIP
300 FEET
TAKE READINGS AT LEAST 1 FOOT FROM EDGE OF PAVEMENT
Using 5 roller passes
2
1
3
4
5
6
7
8
9
10
![Page 35: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/35.jpg)
Core locations are marked for cutting.
VTM-76
![Page 36: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/36.jpg)
![Page 37: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/37.jpg)
Cores are cut …
VTM-76
![Page 38: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/38.jpg)
…and carefully
removed.
VTM-76
![Page 39: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/39.jpg)
![Page 40: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/40.jpg)
MINIMUM DENSITY
REQUIREMENT
(Bulk Specific Gravity / Max Specific Gravity) * 100
(Table III-3)
![Page 41: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/41.jpg)
TABLE III-3 Density Requirements
Mixture Type
Min. Control
Strip Density (%)
SM-9.5A, 12.5A
92.5
SM-9.5D, 12.5D
92.2
SM-9.5E, 12.5E
92.2
IM-19.0A
92.2
IM-19.0D
92.0
BM-25.0 92.2
Note: The control strip density requirement is the percentage of
theoretical maximum density at the job-mix formula as
determined by Superpave Mix Design.
![Page 42: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/42.jpg)
Calibrated
Same gauge used at Control Strip
Nuclear Gauge
![Page 43: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/43.jpg)
QC Density Test Section
5000 FEET
TAKE READINGS AT LEAST 1 FOOT FROM EDGE OF PAVEMENT
Average of 10 readings (98 – 102% of control strip)
Density Readings 4 or 6 inches from the Joint
2
1 3
4
5
6
7
8
9
10
3 J
3 J
2 J
1 J
1 J
2 J
9 J 10 J
10 J 9 J
8 J 7 J 6 J 5 J
5 J 4 J 7 J 8 J 6 J
4 J
![Page 44: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/44.jpg)
QC Density Test Section
5000 FEET
TAKE READINGS AT LEAST 1 FOOT FROM EDGE OF PAVEMENT
Average of 10 readings (98 – 102% of control strip)
Density Readings 4 or 6 inches from the Joint
2
1 3
4
5
6
7
8
9
10
3 J 1 J 2 J 10 J 9 J 5 J 4 J 7 J 8 J 6 J
![Page 45: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/45.jpg)
Lot 2
Contractor must cut 2 cores for VST at the
direction of VDOT
Lot 5 Lot 1 Lot 3 Lot 4
Select one Test Section for VST
![Page 46: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/46.jpg)
VST Density Test Section
5000 FEET
CUT 2 CORES
Referee Procedure - Cut 3 more Cores
use average of all 5 for final decision
2
1
3
4
5
6
7
8
9
10 VST
VST
R-VST
R-VST
R-VST
![Page 47: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/47.jpg)
Lot 16 Lot 15
Failing
After Preceding
Lot 14 Lot 17 Lot 13
Determine Limits
![Page 48: Asphalt Quality Assurance Program · 2020-03-19 · • QC Density testing either by Thin Lift Nuclear gauge or through cores/plugs •Joint Density • Test and Test frequency will](https://reader036.vdocument.in/reader036/viewer/2022070804/5f0370e47e708231d409362f/html5/thumbnails/48.jpg)
W.R. Bailey, P.E.
Asphalt Regional Meetings
Asphalt
Quality Assurance
Program