Director of Asphalt Technology
George Reed Inc.
CalAPA Fall ConferenceOctober 28 - 29, 20015Sacramento, CA
![Page 2: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/2.jpg)
Asphalt Rubber Binder• How do you produce it?• Quality control?• Binder components?• How do you design it? • How do you test it?• Critical factors?
![Page 3: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/3.jpg)
Asphalt Rubber Binder• Uses a minimum of 20 +/- 2 % crumb
rubber• Uses 10 mesh (2mm) crumb rubber• Reacts/interacts crumb rubber for a
minimum of 45 min. at elevated temperatures
• Modifies original properties of asphalt cement
![Page 4: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/4.jpg)
Asphalt Rubber
Conventional or Modified Asphalt
![Page 5: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/5.jpg)
How is Asphalt Rubber Produced?
• Specialized equipment and binder blended on-site
• High shear blender for mixing crumb rubber with asphalt
• Reaction tank with adequate agitation to assure proper reaction
• All materials are metered-in
![Page 6: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/6.jpg)
Asphalt Rubber Blending Schematic
Crumb Rubber
Asphalt Storage Tank
Heat TankHigh Speed
Blender
Reaction Vessel
Binder Pumped to Plant
![Page 7: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/7.jpg)
![Page 8: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/8.jpg)
Rubber Weigh Hopper
![Page 9: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/9.jpg)
Heater-Blender
![Page 10: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/10.jpg)
Reaction Vessel
Reaction VesselAugers and
Direct Fire Heating
![Page 11: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/11.jpg)
Binder Storage Vessel
![Page 12: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/12.jpg)
Computer Controlled Metering
MPQP Requirements
![Page 13: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/13.jpg)
High Shear Blender
Computer Controlled
Key is to have proper blending of components
![Page 14: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/14.jpg)
Chip Seal
Plant Site Set-up
![Page 15: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/15.jpg)
Quality Control
• Materials sampling and testing
• Field binder testing - hand held viscometer
![Page 16: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/16.jpg)
Materials Sampling
• Components of the binder must be sampled and tested
• Asphalt rubber binder must be sampled from a point that will provide a representative sample
![Page 17: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/17.jpg)
![Page 18: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/18.jpg)
Quality Control/Quality Assurance
• QC- testing performed by contractor to ensure production is in control
• QA- testing performed to accept/reject the product
![Page 19: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/19.jpg)
On-Site Qc for Asphalt Rubber Binder
![Page 20: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/20.jpg)
Components of the Asphalt Rubber Binder• Crumb rubber modifier (CRM)• Asphalt cement• Asphalt modifier
![Page 21: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/21.jpg)
Paving Asphalt
• PG 64-16 and PG 58-22 asphalt (80 +/- 2 %) (hot environments PG 70-10)
• Conform to Section 92 “Asphalts” of the Standard Specifications
![Page 22: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/22.jpg)
Crumb Rubber Modifier (CRM)
• Scrap tire CRM (18 – 22 %)• Max. 0.01 % wire (by wt. Of
CRM)• Max. 0.05 % fabric (by wt. Of
CRM)• It must be a very clean rubber
![Page 23: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/23.jpg)
Crumb Rubber
![Page 24: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/24.jpg)
![Page 25: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/25.jpg)
Laboratory Binder Design• Asphalt heated to 400 to 425°F• Asphalt modifier added to asphalt • Crumb rubber blended into asphalt/asphalt
modifier blend• Reacted for a minimum of 45 minutes• Agitated (stirred) frequently during reaction
period• Properties tested over 24 hour period
Compatibility of components
![Page 26: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/26.jpg)
Binder ProfileTest 45
Minutes
60 Minutes
90 Minutes
120 Minutes
240 Minutes
360 Minutes
1440 Minutes
Viscosity @ 375°F
3600 3450 3100 2800 2200 2000 1800
Cone Penetration @ 77°F
30 34 32
Resilience, % Rebound @ 77°F
51 56 51
Softening Point, °F
166 165 163.5
![Page 27: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/27.jpg)
Minimum reaction point
Typical Reaction Curve
![Page 28: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/28.jpg)
Asphalt Rubber Binder Properties
• Cone penetration• Resilience• Field softening point• Viscosity
![Page 29: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/29.jpg)
Cone Penetration
![Page 30: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/30.jpg)
Resilience
![Page 31: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/31.jpg)
Softening Point• Disc of asphalt material is
prepared• Ball bearing placed on top• Placed in water or glycol• Water heated up at a slow
constant rate• Softening point is temperature
at which ball falls through
![Page 32: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/32.jpg)
Hand Held Viscometer• Haake/Rion viscometer or equivalent• Viscometer must be calibrated• Viscosity range 1500 - 4000 cp @ 375°F• Target viscosity: hot mix binder is about 2500 -
3500 cp, chip seal binder 1800 – 2200cp• Viscosity is a very good indicator of other
binder properties
![Page 33: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/33.jpg)
![Page 34: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/34.jpg)
Critical Factors Affecting Asphalt Rubber Binder
• Grade and source of base asphalt
• Amount of crumb rubber• Gradation of crumb rubber• Reaction time and temperature
![Page 35: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/35.jpg)
![Page 36: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/36.jpg)
Rubber particles in the binder help fight cracking
![Page 37: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/37.jpg)
20 % CRM
HighViscosity
![Page 38: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/38.jpg)
Current Use Asphalt Rubber Strategies
• Asphalt Rubber Hot Mix (Gap graded and open graded)
• Asphalt Rubber Chip Seal• Asphalt Rubber Cape Seal• Multi-Layer Systems
![Page 39: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/39.jpg)
Properly blended binder
Good performing pavement strategy
Results in
![Page 40: Asphalt Rubber Blending](https://reader036.vdocument.in/reader036/viewer/2022081604/5885b0ff1a28abd2348b67a9/html5/thumbnails/40.jpg)