assam energy development agency ... · web viewa copy of price schedule (without prices), duly...

159
ASSAM ENERGY DEVELOPMENT AGENCY BID DOCUMENT FOR SUPPLY, INSTALLATION & COMMISSIONING OF SOLAR PHOTOVOLTAIC HOME LIGHTING SYSTEMS & STREET LIGHTING SYSTEMS IN THE SELECT VILLAGES IN THE STATE OF ASSAM INCLUDING COMPREHENSIVE MAINTENANCE CONTRACT UNDER REMOTE VILLAGE ELECTRIFICATION PROGRAMME OF THE 1

Upload: haduong

Post on 31-Mar-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

ASSAM ENERGY DEVELOPMENT AGENCY

BID DOCUMENT

FOR

SUPPLY, INSTALLATION & COMMISSIONING

OF SOLAR   PHOTOVOLTAIC    HOME   LIGHTING

SYSTEMS & STREET LIGHTING SYSTEMS IN THE

SELECT VILLAGES IN THE STATE OF ASSAM

INCLUDING    COMPREHENSIVE   MAINTENANCE

CONTRACT    UNDER   REMOTE   VILLAGE

ELECTRIFICATION PROGRAMME OF THE

MINISTRY OF NEW & RENEWABLE ENERGY;

GOVT. OF INDIA ON TURNKEY BASIS1

Page 2: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

COST OF TENDER DOCUMENTS : Rs 10,000.00 (Rupees Ten Thousand only) per group

DATE OF ISSUE OF TENDER DOCUMENT : 14/02/09 to 13/03/09

CLOSING DATE FOR SUBMISSION OF THE BID : 16/03/09 at 12.00 Noon

DATE OF OPENING OF THE TECHNICAL BID : 16/03/09 at 2.00 pm.

ASSAM ENERGY DEVELOPMENT AGENCY BIGYAN BHAWAN, NEAR IDBI BUILDING

G.S ROAD, GUWAHATI -5;ASSAM

LIST OF CONTENTS

SL. No

Section Particulars Page

1 1 Notice Inviting Tender(NIT) 3 - 7

2 2 Tender Inviting Proposal for Remote Village Electrification 8 -14

2

Page 3: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

work under MNRE,,Govt.of India,on Turnkey basis.

3 3 Instruction to Bidder (INB) 15 - 25

4 4 General Terms and Conditions of Contract(GT&CC)

26-40

5 5 Technical Specifications(TS) 41-49

6 6 Bid Proforma 50-66

7 7 Work Packages(Groups) and List of Villages.

67-91

3

Page 4: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

SECTION -1

NOTICE INVITING TENDER

4

Page 5: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

NOTICE INVITING TENDER

No: AEDA/ 244/2008/22 Date 14.02.2009

Sealed tender accompanied by non refundable crossed Indian Postal Order of Rs 20.00

(Rupees Twenty) only payable at Guwahati, favouring the Director, AEDA are invited from

reputed manufacturer cum supplier, installer for the work of supply ,installation and

commissioning of Solar Photo Voltaic Home Lighting Systems and Solar Photo Voltaic

Street Lighting systems including comprehensive maintenance for 5 years in selected

villages in Assam as under.

5

ASSAM ENERGY DEVELOPMENT AGENCY(Under Science & Technology Department, Govt. Of Assam)

Bigyan Bhaban, Near IDBI BuildingG.S. Road, Guwahati-781005

0361-2464619.2464621, Fax: 0361-2464617 e-mail: [email protected]

Page 6: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Description Of The Work:

Supply, Installation & commissioning of Solar Photo Voltaic Home Lighting systems

(SHLS) and Solar Photo Voltaic Street Lighting Systems (SSLS) including 5 years

Comprehensive Maintenance Contract in selected villages in Assam under the Remote

Village Electrification Programme of the Ministry of New & Renewable Energy , Govt. of

India implemented by AEDA.

Minimum Eligibility Criteria:

(i) The Bidder must be a reputed manufacturer cum supplier and installer of SHLS

and SSLS or manufacturer of at least one major component of SHLS & SSLS cum

supplier and installer of the system.

(ii) The Bidder must have past proven record of successful execution of similar

contract work of supply, installation and commissioning of minimum 1000 Nos. of

SHLS and 100 Nos. of SSLS for minimum 20 villages for the purpose of RVE

programme with work value of at least Rs 3.00 Crores (Rs.1.50 Crores in case of

registered SSI unit of Assam) during any of the last three financial years.

(iii) The Net worth of the Bidder during the last three financial years must be positive.

(iv) The Bidder must have valid Sales Tax/ VAT registration No., PAN No., EPF No

and valid 15 digits Service Tax Registration number .

Bid Documents : Bid documents, containing details of the scope of the work, eligibility and qualifying

criteria of the Bidder, specification of the systems/ component, Tender Proforma for

Techno-Commercial and Price Bid ,List of villages, general and special terms and

conditions of the Bid etc. may be obtained from the office of the undersigned during

working hours from 14/02/09 to 13/03/09

Time of completion : 120 (One hundred and twenty) days from date of signing of the contract agreement.

Cost of Bid documents (Non refundable) :

Rs 10,000.00 (Rupees ten thousand) only payable in favour of the Director, AEDA in the

form of “A/C Payee” Demand Draft of scheduled commercial banks payable at Guwahati,

6

Page 7: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Assam. In case of registered SSI unit of Assam, the cost of Bid document will be Rs

5000.00 (Rupees five thousands)only. Separate bid document must be purchased by the

bidder for each group/ package of work.

Earnest Money :

Amount shown below in the earnest money column (approximately 2% on estimated

value) against each Group of Work is to be deposited along with the bid in form of DD

in favour of Director AEDA and payable at Guwahati. In case of registered SSI unit of

Assam. 50% of the amount is to be deposited along with the Techno-Commercial Bid.

Proposed Work Packages

Sl.

No

Group No of

villages

No. of Systems Estimated Cost Earnest money

1 I 59 SHLS : 5555

SSLS : 317

Rs. 7,66,85,705.00 Rs 15,35,000.00

2 II 128 SHLS : 6019

SSLS : 138

Rs. 7,83,92,870.00 Rs 15,70,000.00

3 III 129 SHLS : 5833

SSLS : 297

Rs. 7,97,03,405.00 Rs 16,00,000.00

4 IV 160 SHLS : 6036

SSLS : 456

Rs. 8,58,76,440.00 Rs 17,20,000.00

5 V 97 SHLS : 5597

SSLS : 242

Rs. 7,54,95,830.00 Rs 15,10,000.00

TOTAL SHLS : 29040

SSLS : 1450

Rs. 39,61,54,250.00

:

Date of issue of Tender Document : 14/02/09 to 13/03/09

Closing Date for Submission of the Bid : At 12.00 Noon on 16/03/09

Date of opening of the Bid :

i) Techno- Commercial Bid : At 2.00.pm on 16/03/09

7

Page 8: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

ii) Price Bid : As incorporated in clause 27.1 of INB.

8

Page 9: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Notes. 1. The work should be carried out strictly as per guidelines of the MNRE for

Remote Village Electrification programme.

2. The system components must be as per required technical specification of IS

or BIS supported by test report issued by SEC/OATCs for SHLS and SSLS

conforming to MNES 2005-2006 or 2006-2007 and years thereafter.

3. The Bid should be submitted against a particular group in three parts (i)

Earnest Money (ii) Techno-Commercial Bid (iii) Price Bid –in three separate

sealed envelopes superscribing (a) Tender No. (b) Group No (c) Techno-

Commercial Bid /Price Bid. A single Bidder can bid for any number of work

packages/groups. However, for such Bidding the Bidder must obtain separate

Bid Documents.

4. Earnest Money as shown should be deposited along with the Techno-

Commercial Bid payable in favour of the Director; AEDA, in the form of “A/C

Payee” demand draft on any nationalized bank payable at Guwahati.

5. Bidding Documents are non–transferable and can be obtained by the

interested firms/Bidder or their authorized representatives on submission of a

written application and on payment of non refundable specified amount.

Issuance of the Bidding Documents, however, shall not automatically mean

that such Bidder fulfills/meets the Qualifying Requirements. The Bid

documents   may    also be downloaded from the website

http://www.assamrenewable.org . However, such downloaded documents will

be treated valid only on receipt of the cost of the Bid Documents of

Rs.10,000.00 (Ten thousand) only for each group by AEDA.

6. AEDA reserves the right to break the packages and distribute to more than

one Bidder, in any way as may deem fit.

7. AEDA reserves the right to cancel/withdraw the Bid without assigning any

reason for such decision. Such decision will not incur any liability whatsoever

on the part of AEDA consequently.

8. Rate shall be quoted inclusive of all applicable taxes and duties . All

applicable taxes will be deducted at source against which necessary tax

deduction certificates will be issued as and when required.

9

Page 10: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

9. Tax related evidences like PAN No., VAT Registration No. are to be

mentioned clearly (evidences are to be duly attached) otherwise the tender

will be rejected. Moreover 15 digit Service Tax Registration Number is also to

be furnished.

(Niraj Verma IAS)

DIRECTOR

AEDA.

10

Page 11: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Copy to

1. The Director, RVE

Ministry of New and Renewable Energy B-14, CGO Complex. Lodi Road, New Delhi -110003

2. The Commissioner and Secretary,Power

Govt. of Assam, Dispur.Guwahati-6

3. The Dy. Finance & Accounts Officer

AEDA, G.S Road ; Guwahati.

4. AEDA notice board.

(Niraj Verma IAS)

DIRECTOR

AEDA.

SECTION -2

TENDER INVITING PROPOSAL FOR

SUPPLY,INSTALLATION& COMMISSIONING

OF SOLAR PHOTO VOLTAIC HOME

11

Page 12: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

LIGHTING SYSTEMS (MODEL–II)AND

STREET LIGHTING SYSTEMS AT SITE AND

COMPREHENSIVE MAINTENANCE

CONTRACT (FOR 5 YEARS) UNDER RVE OF

MNRE, GOVT. OF INDIA ON TURNKEY

BASIS

ASSAM ENERGY DEVELOPMENT AGENCY

BIGYAN BHAWAN, NEAR IDBI BUILDINGG.S ROAD, GUWAHATI -5;

ASSAM

TENDER INVITING PROPOSALS FOR REMOTE VILLAGE ELECTRIFICATION WORK

UNDER MNRE ,GOVT. OF INDIA. ON TURNKEY BASIS.

1  Assam Energy Development Agency has been selected as implementing agency for implementation of Remote Village Electrification Programme of the Ministry of New

and Renewable Energy, Government of India. The objective of the RVE programme

is to provide rural electrification in the remote villages in Assam by way of

12

Page 13: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

installation of Solar Photo Voltaic Home Lighting Systems and Solar Photo Voltaic

Street Lighting Systems where it is not feasible to provide grid power.

2. Scope of work:

2.1. Manufacturing, shop testing, packing , forwarding, Supplying, of Solar Photo

Voltaic Home Lighting Systems (SHLS) and Solar Photo Voltaic Street

Lighting Systems (SSLS) as per specification including Comprehensive

Maintenance Contract (CMC) for 5 years on turnkey basis complete in all

respect along with one set of tools and tackle kit for each village.

2.2. Submission of implementation schedule from date of award of the contract.

2.3. Safe storage and handling of all materials supplied including transit insurance.

2.4. Installation, site fabrication, commissioning and testing of the systems.

2.5. Project management and site organization.

2.6. Supply of one set of tools and tackle kit in each village and one set of user’s

manual and instruction manual in English and Assamese for each beneficiary.

2.7. Organizing and arranging for training and demonstration for beneficiary as per

direction of AEDA.

2.8. Comprehensive Maintenance Contract (CMC) including repairing/ replacement

of system components/ parts etc for 5 years, including insurance coverage of

the systems covering necessary risk with burglary clause.

2.9 All above scope of work of the contractor will include all items and facilities as

may be necessary to complete the work on turnkey basis and as a binding

requirement.

3. Basic Specification of the equipments/systems to be supplied:

The general technical specification requirement and requirement for

CMC for the Remote Village Electrification are enclosed in the Section- 5 of the Bid

Document. The technical specification offered by the Bidder must conform to

13

Page 14: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

specifications fixed by the Ministry of New and Renewable Energy for Remote Village

Electrification (RVE) for the year 2006-07 and years afterwards or as notified by the

Ministry for the current year. The components/ systems of SHLS and SSLS must be

tested and certified by the SEC/OATCs for the year 2005-06, 2006-07 or years after

2006-07 or for RVE corresponding to Specification of MNRE for RVE programme for

2006-07

The Bidder shall submit a “Compliance Certificate for meeting Technical Specification”

along with the Techno -Commercial part-II of Proforma –III. For qualification condition.

The Bidder may submit their technical Specifications for Remote Village Electrification

offered to be supplied.

4. Submission of Bid. The Bid should be submitted in three separate sealed envelopes as following

4.1 Earnest Money (Part-I)

Earnest Money amount as stipulated in the Tender Notice shall be paid in the form

of A/C Payee Bank Demand Draft with a forwarding letter on letter head clearly

mentioning the D.D No, date of the D.D, Name of the Bank and Branch , and

amount. The envelope should be superscribed as “Earnest Money” & “Group -…….”

4.2 Techno- Commercial Bid (Part-II)

Techno- Commercial Bid (Part-II) will include vendor’s scope of work, responsibilities,

guarantees, specification of the equipments, commercial terms and conditions,

Bidders credentials, past experience of similar assignments, registration details, and

earnest money particulars. Tender proforma for Techno- Commercial Bid (Part-II) is

enclosed as Proforma V. The envelope should be super scribed as “TECHNO-

COMMERCIAL BID” followed by title of the work and enquiry reference. All particulars

as per check list of INB be submitted with this part.

4.3 Price Bid (Part-III)

Under this (Part-III) will include rate of supply, installation, commissioning, of various

items as per requirement and rate for Comprehensive Maintenance Contract for five

years for the proposed villages as per list in the group. Tender Proforma for Price

14

Page 15: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Bid (part-III) is enclosed as Proforma –VII. The envelope should be super scribed as

“PRICE BID”

All three envelopes containing Part-I, Part-II and Part-III should be submitted in

Duplicate (One original and one photo copy) in a single sealed envelope Super

scribing “ BID FOR RVEP UNDER MNRE” and “GROUP NO……” addressed to The

Director, Assam Energy Development Agency, Bigyan Bhawan, Near IDBI,

Guwahati-5

The AEDA will not be responsible for misplacement/delay in receipt of either

request for issuance of Bidding Documents or Bidding Documents or Bids sent by

post.

15

Page 16: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

5. Volume of the work. Tentative total volume of the work in each group are as below.

Sl. No Group No. of

villages

No. of Systems Estimated Cost

1 I 59 SHLS : 5555

SSLS : 317

Rs. 7,66,85,705.00

2 II 128 SHLS : 6019

SSLS : 138

Rs. 7,83,92,870.00

3 III 129 SHLS : 5833

SSLS : 297

Rs. 7,97,03,405.00

4 IV 160 SHLS : 6036

SSLS : 456

Rs. 8,58,76,440.00

5 V 97 SHLS : 5597

SSLS : 242

Rs. 7,54,95,830.00

TOTAL SHLS : 29040

SSLS : 1450

Rs. 39,61,54,250.00

6. Opening of Bid document:

Bids must be delivered to the AEDA at the address mentioned at Para 4.3. Bids will be received and opened in the presence of Bidders’ representatives who choose to be present, as per following schedule:

Date of opening of the Bid

i) Techno Commercial Bid : At 2.00 p.m. on 16/03/09

ii) Price Bid : As incorporated in INB clause 27.1

Award of the work

For evaluation of the Bid, Techno- Commercial Bid will be first opened. The Price Bid of

those Bidders only who qualify in the Techno-Commercial Bid and meet the technical

requirement will be opened.

16

Page 17: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

The work will be awarded to the Bidders qualifying in the Techno- Commercial Bid and

offering lowest work value for the package.

The work should be started within 30 days from the date of signing of the work contract

agreement.

6.4 AEDA reserves the right to cancel/withdraw the Bid without assigning any reason for such decision. Such decision will not incur any liability whatsoever on the part of the AEDA consequently.

6.5 The work group may be broken down to smaller ones and allotted to more than

one Bidder at the discretion of AEDA.

7. Period of Completion.

The entire work of supply , installation, commissioning work complete in all respect as

per tender requirement shall have to be completed in 120 days from date of issue of

letter offering the work order.

8 Termination of the Work Order;

AEDA reserves the right to terminate the work order at any stage in accordance with

the Terms & Conditions of Contract of AEDA.

9. Commercial Terms and Conditions:

9.1 Payment Terms:

Subject to deduction clause and other clause incorporated in General Terms and

Condition, 70% of the contract price (excluding CMC part) for each village shall be

paid after satisfactory supply, installation and commissioning of the systems

against submission of bills/ invoices, lorry receipt, challans etc in triplicate,

certificate of installation, testing, commissioning, utilization report as per proforma of

AEDA and installation completion certificate from concerned circle officer/ BDO or

higher officer within 30 days.

20% of the contract price out of balance 30% of the contract value(excluding CMC

part) for each village will be released (subject to release of fund from MNRE,GOI)

after satisfactory submission of all the documents as per clause 24.1 of GT&CC

and on receipt of satisfactory 3rd party verification report and training & awareness

programme completion report .

17

Page 18: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Remaining 10% of the contract price (excluding CMC part) will be released after 5

years from date of commencement of CMC subject to satisfactory performance of

CMC as well as subject to release of fund from MNRE ,Govt. of India.

The payment against CMC part will be released in 5 annual installment as per

clause in General Terms and Conditions of Contract.

9.2 Earnest Money Deposit:

Earnest Money as detailed earlier for each Group of Work is to be deposited along

with the Techno- Commercial Bid payable in favour of the Director; AEDA, in the

form of “A/C Payee” demand draft on any nationalized bank payable at Guwahati In

case of registered SSI unit of Assam the EMD would be relieved upto 50%.

9.3 Security Deposit: The successful Bidder shall have to furnish security deposit of 10% of the

contract value after adjusting the earnest money amount within 15 days from

date of letter of awarding work in the form of Demand Draft or Banker’s Cheque

or pay order on any Nationalized/ Scheduled Commercial bank in India in favour

of the Director, AEDA, payable at Guwahati.

The work order will be liable for cancellation if the bidder fails to furnish the

required Security Deposit within 15 days from the date of allotment of work.

The security deposit is liable for forfeiture by AEDA in case of termination,

cancellation of the contract pursuant to Clause : “Termination of Contract" No 43

of GT&CC or failure of the systems to deliver satisfactory and acceptable

performance.

The security deposit shall be released after satisfactory completion of the

supply, installation & commissioning work and completion of training program

subject to satisfactory third party monitoring report.

18

Page 19: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

9.4 Taxes and Duties:

The rate should be quoted as per price proforma inclusive of all applicable taxes

and duties like. CST, VAT, Income Tax, Entry Tax, Octroi etc in respect of supply

only and applicable service taxes. VAT and income tax for installation and

commissioning part only and Service Tax & Income Tax will be applicable in case of

only CMC part. All Taxes and Duties as may be applicable (CST, VAT, Income Tax,

Octroi, Service Tax, Entry Tax etc) shall be borne by the Bidder and applicable

taxes shall be deducted at source by AEDA at the time of payment.

Director, AEDA shall not be responsible for issuing of Road Permit. However this

office will co-operate with the selected bidders in this regard if felt necessary.

9.5 Income Tax. Income Tax applicable will be deducted at source as per rule.

10. Basic Qualifying Requirement:

10.1 The Bidder should be a reputed manufacturer cum supplier and installer of SHLS

and SSLS or manufacturer of at least one major component of the system and

supplier cum installer of SHLS and SSLS.

10.2 The Bidder must have past proven record of successful execution of similar work of

supply, commissioning of minimum 1000 Nos of SHLS and 100 Nos of SSLS of

both systems for minimum 20 villages for the purpose of RVE programme with work

value of at least Rs 3.00 Crores ( Rs 1.50 Crores in case of registered SSI unit of

Assam under DI&CC or NSIC) during any of the last three financial years.

10.3 The Net worth of the Bidder during the last three financial years must be positive.

10.4 The Bidder must have valid Sales Tax/ VAT registration No., PAN No., EPF No and

up- to-date Sales Tax/ VAT clearance certificate, and 15 digit service tax registration

No.

11. Other Requirement :

The Bidder

19

Page 20: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

11.1 Should be acquainted with the local conditions of geography, socio- economic

setup of the remote villages of the State and be capable to mobilize , organize and

expedite the activities.

11.2 Should have adequate working personnel comprising of technical, skilled and

unskilled workers to execute the work.

11.3 Should be conversant with the code and standards, specifications etc for the

proposed type of work under MNRE.

12. Project Management & Site organization:

12.1 Site Office/Project Office to be set up by the Bidder within the project area/

jurisdiction

12.2 Monthly progress report highlighting works completed, plan for next working period,

any delay vis-à-vis committed schedule be submitted by the Bidder within 7 th of

each month.

12.3 Store house for materials, Site fabrication facilities etc. be arranged by the Bidder of

their own for proper implementation of the project.

13. Approval, Clearance, Certifications etc .

Necessary test certificate issued by the Solar Energy Centre (SEC),Gurgaon,

Haryana or Electronics Regional Test Laboratory (ERTL) Kolkota or Central Power

Research Institute (CPRI) Tiruvananthapuram or Electronics Test and Development

Centre , Bangalore conforming to required specification of the Solar System for

MNRE, Govt. of India to be furnished with Bid documents without which the Bid will

be outrightly rejected. Other statutory approval, clearance as may be required shall

be obtained by the Bidder.

14. Guarantees and Penalties:

20

Page 21: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

14.1 Liquidated Damage

The proposed work is on top priority of Govt. of India and therefore has to be

completed within the stipulated / agreed scheduled. Any delay beyond that will

attract penalty as per General Terms and Condition of Supply and Contract.

15. Bid Forms and Bid Proforma:

15.1 Section - 6 of the tender documents be referred to.

21

Page 22: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

SECTION -3

INSTRUCTION TO BIDDER (INB)

22

Page 23: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

INSTRUCTION TO BIDDERS (INB)

1.0 GENERAL INSTRUCTIONS

1.1 Assam Energy Developoment Agency (implementer of the project) hereinafter called

“AEDA” will receive Bids in respect of equipments/system to be supplied and

installed as set forth in the accompanying Specifications. All Bids shall be prepared

and submitted in accordance with these instructions.

2.0 QUALIFYING REQUIREMENTS OF BIDDERS:2.1 This Bidding is open to any manufacturer who provides satisfactory evidence

concerning the following that

a. The Bidder is a qualified manufacturer who regularly manufactures ,supplies and

installs the equipment/systems of the type specified and has adequate technical

knowledge and practical experience:

b The Bidder should be a reputed manufacturer cum supplier of SHLS and SSLS or

manufacturer of at least one major component of the system and supplier ,installer

of SHLS and SSLS

c The Bidder must have past proven record of successful execution of similar contract

work of supply, commissioning of minimum 1000 Nos of SHLS and 100 Nos of

SSLS of both systems for minimum 20 villages for the purpose of RVE programme

with work value of at least Rs 3.00 Crores ( Rs 1.50 Crores in case of registered

SSI unit of Assam) during any of the last three financial years.

d. The Net worth of the Bidder during the last three financial years must be positive.

e. The Bidder must have valid Sales Tax/ VAT Registration No., PAN No., EPF No and

up- to-date Sales Tax/ VAT clearance certificate and 15 digit Service Tax

Registration number.

23

Page 24: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

f. The Bidder has adequate financial stability and status to meet the financial obligation

pursuant to the scope of the works (the Bidders should submit at least 3 copies of

the Profit and Loss Account and Balance Sheet for the last 3 years)

g. Manufacturers should have adequate Plant and Manufacturing capacity available to

perform the works properly and expeditiously within the time period specified. The

evidence shall consists of written details of the installed manufacturing capacities

and present commitments (excluding the work under this specification) of the

Bidder. If the present commitments are such that the installed capacity results

inadequacy of the manufacturing capacities to meet the requirement of equipment

corresponding to this Bid, then the details of alternative arrangements to be

organized by the Bidder for this purpose and which shall meet the AEDA’s approval,

shall also be furnished.

.

2.2  In addition, the qualifying requirement as stated in the accompanying General

Terms & Conditions of Contract (GT&CC) shall also apply.

2.3 The above stated requirements are a minimum and the AEDA reserves the right to

request for any additional information and also reserves the right to reject the

proposal of any Bidder,if in the opinion of the AEDA, the qualification data is

incomplete or the Bidder is found not qualified to satisfactorily perform the Contract.

24

Page 25: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

3.0 COST OF BIDDING

3.1 The Bidder shall bear all costs and expenses associated with preparation and

submission of its Bid including post-Bid discussions, technical and other presentation

etc. and the AEDA will in no case be responsible or liable for those costs, regardless

of the conduct or outcome of the Bidding process.

4.0 CONTENTS OF BIDDING DOCUMENTS

4.1 The goods and services required, Bidding procedures and contract terms are

prescribed in the Bidding Documents.

In addition to the Invitation for Bids, the Bidding Documents is a compilation of the

following sections:

a. Instructions to Bidders Section - 3 ( INB )b. General Terms & Conditions of Contract Section - 4 (GT&CC )c. Technical Specification (Volume II). Section - 5 ( T.S )d. Bid Forms, Price Bid Forms Section - 6 ( Proforma)e. List of villages Section - 7 (Annexure)

5.0 UNDERSTANDING OF BIDDING DOCUMENTS

5.1 A prospective Bidder is expected to examine all instructions, forms, terms and

specifications in the Bidding Documents and fully inform himself as to all the

conditions and matters which may in any way affect the scope of work or the cost

thereof. Failure to furnish all information required by the Bidding Documents or

submission of a Bid not substantially responsive to the Bidding Documents in every

respect will be at the Bidder’s risk and may result in the rejection of its Bid.

6.0 CLARIFICATIONS ON BIDDING DOCUMENTS

6.1 If the prospective Bidder finds discrepancies or omissions in the specifications and

documents or is in doubt as to the true meaning of any part, he shall at once make a

request, in writing, for an interpretation/clarification, to the AEDA in duplicate. AEDA

then will issue interpretation/clarification as he may think fit in writing. After receipt of

such interpretation and clarification, the Bidder may submit his Bid but within the

time and date as specified in the Invitation for Bids. All such interpretations and

clarifications shall form a part of the Bidding Documents and shall accompany the

Bidder’s proposal. A prospective Bidder requiring any clarification on Bidding

Documents may notify the AEDA in writing. The AEDA will respond in writing to any

request for such clarification of the Bidding Documents which it receives not later

25

Page 26: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

than fifteen (15) days prior to the deadline for submission of Bids prescribed by the

AEDA. Written copies of the AEDA’s response (including an explanation of the

query but without identifying its source) will be sent to all prospective Bidders which

have procured the Bidding Documents.

6.2 Verbal clarification and information given by the AEDA or its employee(s) or its

representative (s) shall not in any way be binding on the AEDA.

7.0 AMENDMENT TO BIDDING DOCUMENTS

7.1 At any time prior to the deadline for submission of Bids, the AEDA may, for any

reason, whether at its own initiative or in response to a clarification requested by a

prospective Bidder, modify the Bidding Documents by amendment (s).

7.2 The amendment will be notified in writing or by fax/ e mail to all prospective Bidders,

which have received the Bidding Documents at the address contained in the letter of

request for issue of Bidding Documents from the Bidders. AEDA will bear no

responsibility or liability arising out of non-receipt of the same in time or otherwise.

The same will also be uploaded in the website of AEDA.

7.3 In order to afford prospective Bidders reasonable time in which to take the

amendment into account in preparing their Bids, the AEDA may, at its discretion,

extend the deadline for submission of Bids.

7.4 Such amendments, clarifications, etc, shall be binding on the Bidders and will be

given due consideration by the Bidders while they submit their Bids and invariably

enclose such documents as a part of the Bid.

8.0 LANGUAGE OF BID

8.1 The Bid prepared by the Bidders and all correspondence and documents relating to

the Bid, exchanged by the Bidder and the AEDA, shall be written in the English

language, provided that any printed literature furnished by the Bidder may be written

in another language so long as accompanied by an English translation of its pertinent

passages. Failure to comply with this may disqualify a Bid. For purposes of

interpretation of the Bid, the English translation shall govern.

9.0 LOCAL CONDITIONS

9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and

factors which may have any effects on the execution of the contract covered under

these documents and specifications. The AEDA shall not entertain any request for

clarification from Bidders, regarding such local conditions.

9.2 It must be understood and agreed that such factors have properly been investigated

and considered while submitting the proposals. No claim for financial adjustment to

26

Page 27: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

the Contract awarded under these specifications and documents will be entertained

by the AEDA. Neither any change in the time schedule of the Contract nor any

financial adjustments arising thereof shall be permitted by the AEDA, which are based

on the lack of such clear information or its effect on the cost of the works to the

Bidder.

10.0 DOCUMENTS COMPRISING THE BID

10.1 The Bidder shall complete the Bid Form inclusive of Price Schedules,Technical Data

Sheets etc. furnished in the Bidding Documents, indicating; for the goods to be

supplied and services to be rendered, a brief description of goods and services;

quantity and prices.

10.2 The Bidder shall also submit documentary evidence to establish that the,Bidder

meets the qualification requirements as detailed in clause 2.0 above and

accompanying the list of documents as under.

a. Forwarding Letter. Proforma – I

b. Minimum Eligibility Qualification Condition Proforma - II

c. Compliance certificate for meeting Technical Specification Proforma – III

d. Attested photocopy of Registration Certificate of Firm/SSI/ NSIC

as the case may be

e. Documentary evidence in support of execution of similar works Proforma - VI

f. Copy of all valid Registration Certificate

g. Certified copies of latest Sales Tax Clearance Certificate and Sales Tax

Registration Certificate and PAN No./Tan No. and 15 digit service tax registration No.

h. Attested Photo-copy of Partnership Deed in case of partnership firm with

the photograph & details of each partner

i. Power of Attorney for authorised signatory in case of companies.

j. Financial capability certificate from Bank/Financial Institution indicating that the

manufacturer has the necessary resources for execution of the order.

k. Proof of annual turnover for past 3 years for SPV systems including details of

manufacturing capacity / facility along with testing facilities and list of items /

products manufactured in house and bought-out items.

l. Photocopies of certificate of satisfactory performance of systems supplied to state

Nodal agencies along with copies of purchase orders / contracts.

m. Test Certificate of Solar Home Lighting System issued by Solar Energy Centre/MNES

approved testing centres (OATCs) for the test performed during 2006-2007 or 2007-

2008 as per MNES, Govt. of India specifications.

n. Technical Specifications of all quipments/components of the systems

o. Photocopy of bank draft submitted as cost of bid document.

p. PF Registration Certificate & PF Registration No.

27

Page 28: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

q. A tentative overall schedule in the form of Bar Chart and PERT

r. A copy of Price Schedule (without prices), duly signed & stamped, as per Proforma-

VII mentioning “ Quoted “ word in the column of UNIT rate and Total rate for which

price is quoted and mentioning “not quoted” for which price is not quoted.

s. Declaration that they have never been de-listed or banned at any time in the

 past by any Govt. or Public Sector undertaking.

t. GPS Co-ordinate & address of the registered office and factory of the bidder.

u. No Deviation Confirmation as per Proforma IX

v. Bidder shall submit complete bidding document including subsequent amendment,

modification and revision, duly signed and stamped as a token

w Copy of audited Balance Sheet and Profit & Loss Account for last three (3) years or

certificate from a reputed Bank regarding financial soundness of the party.

x. Net Worth of last three (3) years

y. Proof in support of all Tax & Duties clearance

Please note that this is a zero deviation tender. Bidders are advised to strictly confirm

compliance to bid conditions and not to stipulate any deviation / conditions in their offer.

Subsequent to bid submission, AEDA may not seek confirmations / clarifications and

any offer(s) not in line with BID conditions shall be liable for rejection. Bidders are also

requested to submit the documents / confirmations strictly as per requirement.

11.0 SCOPE OF THE PROPOSAL

11.1 The scope of the proposal shall be on the basis of a single Bidder’s responsibility,

completely covering all the equipment specified under the accompanying Technical

Specification. It will include the following:

a. Detailed design of the equipment/systems as applicable.

b. Complete manufacture including complete test report from competent authority.

c. Providing engineering drawing, data, operation, manual, etc. for AEDA’s approval.

d. Packing and transportation from the manufacturer’s works to the Site.

e. Receipt, storage, preservation and conservation of equipment at the Site.

f. Pre-assembly, if any, erection, testing and commissioning of all the equipment.

g. Reliability tests and performance and guarantee tests on completion of

commissioning;

h. Organizing and arranging for training and demonstration for beneficiary as per

direction of AEDA.

i Comprehensive Maintenance Contract (CMC) including repairing/ replacement of

system components/ parts etc for 5 years, for PV modules 10 years and insurance

of the systems covering necessary risk including burglary clause.

28

Page 29: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

11.  Bids containing deviations from provisions relating to Bid clauses will be considered

as non-responsive :

11.3 The AEDA’s determination of a Bid’s responsiveness is to be based on the contents

of the Bid itself without recourse to extrinsic evidence.

11.4 Bids not covering the above entire Scope of Work may be treated as incomplete

and hence rejected.

12.0 BID PRICE

12.1 The Bidder shall quote in the appropriate schedule of the Bid Form, the unit price

and total price for the entire Scope of Work (covered under the Bidding Documents)

with unit rates of the goods it proposes to supply unless otherwise specified in the

Terms & Conditions of Contract.

13.0 PRICE BASIS AND PAYMENTS

13.1 The Bidders shall quote in their proposals the total price for the entire Scope of

Works covered under the Technical Specifications as required in the Bid Proposal

sheets on a base price plus taxation basis unless otherwise specified in the

Conditions of Contract. Bidders quoting a system of pricing other than that specified

shall be rejected.

13.2 Bidder shall indicate Bid prices in Indian Rupees only.

14.0 TAXES AND DUTIES

14.1 All applicable taxes and duties like Excise, CST,VAT, Octroi, Entry Tax, Service

Tax, Income Tax etc payable by the Bidders in respect of supply of the systems

shall be the obligation to the bidder and included in the Bid price . No claim on this

behalf will be entertained by the AEDA.

14.2 Applicable VAT , local taxes and other levies in respect of the transactions between

the AEDA and the Contractor under the Contract, if any, shall be included in the Bid

price and applicable taxes will be deducted at sources against which necessary tax

deduction certificate shall be issued as and when required.

14.3 Necessary Service tax, VAT & Income Tax in respect of commissioning and

installation part be included in the price bid. Service Tax and Income Tax are to be

included in CMC part of the Price Bid at the applicable rate.

29

Page 30: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

14.4 Applicable income tax as per rule shall be incorporated in the price bid which shall

be deducted at source by AEDA at the time of payment to the bidder and issue TDS

Certificate to the Contractor.

15.0 TIME SCHEDULE

15.1 The basic consideration and the essence of the Contract shall be strict adherence to

the time schedule for performing the specified works.

15.2 The AEDA’s requirement of completion schedule for the works are mentioned in the

accompanying General Terms & Conditions of Contract.

15.3 The completion schedule as stated in the Conditions of Contract shall be one of the

major factors in consideration of the Bids.

15.4 The AEDA reserves the right to request for a change in the work schedule during

post-Bid discussion with successful Bidder.

15.5 The successful Bidder will be required to prepare detailed PERT-Network and

submit the same to AEDA, as per the requirement of clause

16.0 CONTRACT QUALITY ASSURANCE

16.1 The Bidder shall include in his proposal, the quality assurance programme

containing the overall quality management and procedures which he proposed to

follow in the performance of the works during various phases, as detailed in relevant

clause of the General Technical Conditions.

16.2 At the time of award of Contract, the detailed quality assurance programme to be

followed for the execution of the contract will be mutually discussed and agreed to

and such agreed programme shall form a part of the contract.

17.0 INSURANCE

The Bidder’s insurance liabilities pertaining to the Scope of Work are detailed out in

clauses titled insurance in Terms & Conditions of Contract and Bidder’s attention is

specifically invited to these clauses. The Bid price shall include all the cost in

pursuance of fulfilling all the insurance liabilities under the Contract.

18.0 BID SECURITY

18.1 The Bidder shall furnish, as part of its Bid, a Bid SECURITY for an amount as

specified in the accompanying General Terms & Conditions of Contract. The Bid

guarantee/Security shall be valid for the contract period.

18.2  The Bid security is required to protect the AEDA against the risk of Bidder’s

conduct, which would warrant the guarantee forfeiture pursuant to Para 18.4. The

Bid guarantee shall be made payable to the AEDA without any conditions,

whatsoever.

30

Page 31: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

18.3 The Bid security shall be denominated in Indian Rupees only and shall be in one of

the following forms

(a) Crossed bank draft in favour of “The Director, AEDA”payable at Guwahati from a Reputed commercial Bank

(b) A cheque certified by the Banker as good for payment drawn in favour of “The Director, AEDA” payable at Guwahati on a Reputed commercial Bank/

Financial institution.

18.4 The Bid Security may be forfeited:

a. If a Bidder withdraws/ modifies its Bid during the period of Bid validity specified

by the Bidder on the Bid form; or

b. In case the Bidder does not withdraw the deviations proposed by him, if any, at

the cost of withdrawal stated by him in the Bid; or

c. If a Bidder does not accept the corrections to arithmetical errors identified during

preliminary evaluation of this Bid .

e. In case of a successful Bidder, if the Bidder fails to sign the contract within

stipulated time.

f. In case of a successful Bidder, if the Bidder fails to furnish the Performance

Guarantee.

18.5 The Bid security shall be submitted within 15 days from the date of award of the

contract work. . Contract Order will be liable for rejection if Bid security in

accordance with provision of this clause is not furnished.

18.6 The Bid Security will be released after successful completion of installation work

and on satisfactory third party monitoring report. No interest shall be payable by the

AEDA on the above Bid security

18.7 If the Bidder fails to execute the order within the stipulated time or Supplies

substandard material the security deposit will be forfeited.

19. PERIOD OF VALIDITY OF BIDS

19.1 Bids shall remain valid for 6 (six) calendar months after the date of Bid opening

prescribed by the AEDA, unless otherwise specified in the accompanying Terms &

Conditions of Contract. A Bid valid for a shorter period will be rejected as non-

responsive.

19.2 In exceptional circumstances, the AEDA may solicit the Bidder’s consent to an

extension of the period of Bid validity. The request and the response thereto shall

be made in writing (including cable or fax). The Bid guarantee provided under

clause 22.0 shall also be extended by the same period as the extension in the

validity of the Bid. A Bidder may refuse the request without forfeiting his Bid

security. A Bidder granting the request will not be required or permitted to modify his

Bid.

31

Page 32: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

20. SUBMISSION OF BIDS20.1 The Bidder shall prepare two copies of the Bid, clearly marking each “Original Bid”

and “Copy of Bid”, as appropriate. In the event of any discrepancy between them,

the original shall govern.

20.2 The original and the copy of the Bid shall be typed or written in indelible ink and shall

be signed by the Bidder or a person or persons duly authorized by the Bidder. The

letter of authorization shall be indicated by written power-of-attorney accompanying

the Bid. All pages of the Bid, except for unamended printed literature, shall be

initialed by the person or persons signing the Bid.

20.3 The Bidders must submit the qualifying data in two copies, as required in these

Instructions to Bidder along with the Techno- Commercial Bid

20.4 The Bid shall contain no interlineations, erasures or overwriting except as necessary

to correct errors made by the Bidder, in which case such corrections shall be

initialed by the person or persons signing the Bid.

21.0 SIGNATURE OF BIDS

21.1 The Bid must contain the name, residence and place of business of the person or

persons making the Bid and must be signed and sealed by the Bidder with his usual

signature. The names of all persons signing should also be typed or printed below

the signature.

21.2 Bid by a partnership must be furnished with full names of all partners and be signed

with the partnership name, followed by the signature(s) and designation(s) of the

authorized partner(s) or other authorized representative(s).

21.3 Bids by Corporation/Company must be signed with the legal name of the

Corporation/Company by the President, Managing Director or by the Secretary or

other person or persons authorized to bid on behalf of such Corporation/Company

in the matter.

21.4 Satisfactory evidence of authority of the person signing on behalf of the Bidder shall

be furnished with the Bid.

21.5 The Bidder’s name stated on the proposal shall be exact legal name of the firm

21.6 Bids not conforming to the above requirements of signing may be disqualified

22.0 SEALING AND MARKING OF BIDS

22.1 The Bidders shall seal the original and each copy of the Bid in an inner and an outer

envelope, duly marking the envelopes as “Original” and “Copy”.

22.2 The inner and outer envelopes shall be:

a) Addressed to the AEDA at the following address:

To

The Director

32

Page 33: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Assam Energy Development Agency;

Bigyan Bhawan, Near IDBI building,

G.S Road; Guwahati-781005.

b) Bear (the name of package, the specification number, and the words “DO NOT OPEN BEFORE………………”

22.3 The inner envelope shall indicate the name and address of the Bidder to enable the

Bid to be returned unopened in case it is declared “late” or “rejected”.

22.4 If the outer envelope is not sealed and marked as required by para 22.2, AEDA will

assume no responsibility for the Bid’s misplacement or premature opening.

22.5 The Earnest Money must be submitted in a separate sealed envelope.

23.0 DEADLINE FOR SUBMISSION OF BIDS23.1 The Bidders have the option of sending the Bid by registered post or submitting the

Bid in person. Bids submitted by telex/telegram/fax will not be accepted. No request

from any Bidder to the AEDA to collect the Bid from airlines, cargo agents etc. shall

be entertained by the AEDA.

23.2 Bids must be received by the AEDA at the address specified under para 22.2 (a) not

later than the time & date mentioned in the Invitation to Bid.

23.3 The AEDA may, at its discretion, extend this deadline for the submission of Bids by

amending the Bidding Documents, in which case all rights and obligations of the

AEDA and Bidders previously subject to the deadline will thereafter be subject to the

deadline as extended.

24.0 LATE BIDS24.1 Any Bid received by the AEDA after the time & date fixed or extended for

submission of Bids prescribed by the AEDA, will be rejected and/or returned

unopened to the Bidder.

25.0 MODIFICATION AND WITHDRAWAL OF BIDS25.1 The Bidder may modify or withdraw its Bid after the Bid’s submission provided that

written notice of the modification or withdrawal is received by the AEDA prior to the

deadline prescribed for submission of Bids.

25.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked

and dispatched in accordance with the provisions of clause 22.0.

25.3 No Bid may be modified subsequent to the deadline for submission of Bids.

26.0 INFORMATION REQUIRED WITH THE PROPOSAL

33

Page 34: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

26.1 The Bids must clearly indicate the name of the manufacturer, the type of model of

each principal item of equipment proposed to be furnished and erected with proper

specification.

26.2 The above information shall be provided by the Bidder in the form of separate

sheets, drawings, catalogues, etc. in all copies.

26.3 Any Bid not containing sufficient descriptive material to describe accurately the

equipment proposed, may be treated as incomplete and hence rejected. Such

descriptive materials and drawings submitted by the Bidder will be retained. Any

major departure from these drawings and descriptive material submitted will not be

permitted during the execution of the Contract.

26.4 Necessary test certificate issued by the Solar Energy Centre (SEC) Gurgaon,

Haryana or Electronics Regional Test Laboratory (ERTL) Kolkota or Central Power

Research Institute (CPRI) Tiruvananthpuram or Electronics Test and Development

Centre , Bangalore conforming to required specification of the Solar System for

MNRE, Govt. of India to be furnished with Bid documents without which the Bid will

be out rightly rejected. Other statutory approval, clearance as may required shall be

obtained by the Bidder.

27.0 OPENING OF BIDS.27.1 The AEDA will open Bids in the presence of Bidders’ representatives (up to 2

persons) who choose to attend at the date and time for opening of Bids indicated in

the Invitation to Bid, or in case any extension has been given thereto, on the

extended Bid opening date and time notified to all the Bidders, who have purchased

the Bidding Documents. The Bidders’ representatives who are present shall sign a

register evidencing their attendance. Price Part of each lot of only those bidders,

whose offers are technically and commercially acceptable after evaluation of the

Technical and Commercial Part, will be opened and evaluated. The date & time for

opening of Part-III: Price Part will be uploaded in AEDA web-site. Bidders are requested to visit the web-site (www.assamrenewable.org) regularly and keep themselves informed. The Price Part will be opened at the office of Director, AEDA

as intimated, in the presence of eligible bidders or their authorized representative.

The authorized representative will be allowed to attend the opening on production of

authorization letter.

.

27.2 No electronic recording devices will be permitted during Bid opening.

28.0 CLARIFICATION OF BIDS

34

Page 35: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

28.1 To assist in the examination, evaluation and comparison of Bids, the AEDA may, at

its discretion, ask the Bidder for a clarification of its Bid. The request for clarification

and the response shall be in writing and no change in the price or substance of the

Bid shall be sought, offered or permitted.

29.0 EVALUATION OF BID AND AWARDING OF THE WORK:29.1 For evaluation of the Bid, Techno- Commercial Bid will be first opened. The Price

Bid of those Bidders only who qualify in the Techno-Commercial Bid and meet the

technical requirement will be opened.

29.2 Prior to the detailed evaluation, the AEDA will determine the substantial

responsiveness of each Bid to the Bidding Documents. For purpose of these

Clauses, a substantially responsive Bid is one which conforms to all the terms and

conditions of the Bidding Documents without material deviations. A material

deviation is one which limits in any substantial way the prices, quality, quantity or

delivery period of the equipment or which limits in any way the responsibilities or

liabilities of the Bidder of any right of the AEDA as required in these specifications

and documents. The AEDA’s determination of a Bid’s responsiveness shall be

based on the contents of the Bid itself without recourse to extrinsic evidence.

29.3 A Bid determined as not substantially responsive will be rejected and may not

subsequently be made responsive by the Bidder by correction of the non-

conformity.

.

30.0 COMPARISION OF BIDS30.1 The Bids shall be evaluated on the basis of total value of the package for he entire

scope of work as defined in the Bidding Documents.

.30.1 Evaluated Bid prices of all the Bidders shall be compared among themselves to

determine the lowest evaluated Bid and, as a result of this comparison, the lowest

Bid will be selected for award of the Contract.

31. AWARD OF CONTRACT31.1 The AEDA will award the Contract to the successful Bidder whose Bid has been

determined to be technically qualified and has been determined as the lowest

evaluated Bid, provided further that the Bidder is determined to be qualified to

perform the Contract satisfactorily. The AEDA shall be the sole judge in this regard.

31.2 Further,the AEDA reserves the right to award separate Contracts to two or more

parties in line with the terms and conditions specified in the accompanying

Technical Specifications

.

32.0 RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS

35

Page 36: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

32.1 The AEDA reserves the right to accept or reject any Bid, and to annul the Bidding

process and reject all Bids at any time prior to award of contract, without thereby

incurring any liability to the affected Bidder or Bidders or any obligation to inform the

affected Bidder or Bidders of the grounds for the AEDA’s action.

33.0 NOTIFICATION OF AWARD33.1 Prior to the expiration of the period of Bid validity and extended validity period, if any,

the AEDA will notify the successful Bidder in writing by registered letter or FAX or e-

mail to be confirmed in writing by registered letter/Speed Post, that his Bid has been

accepted.

33.2 The Notification of Award/Letter of Award will constitute the formation of the

Contract.

33.3 Upon the successful Bidder’s furnishing of Contract Performance Guarantee

pursuant to Clause 35.0, the AEDA will promptly notify each unsuccessful Bidder

and will release its Bid Documents, pursuant to Clause 18.0

34.0 SIGNING OF CONTRACT34.1 At the same time as the AEDA notifies the successful Bidder that its Bid has been

accepted, the AEDA will send the Bidder the detailed Letter of Award, incorporating

all agreements between the parties.

34.2 Within 15 days of receipt of the detailed Letter of Award, the successful Bidder shall

sign and date the same and return it to the AEDA.

34.3 The Bidder will prepare the Contract Agreement as per the proforma enclosed in

Annexure –IX to this Volume I and the same will be signed within 30 (thirty) days of

notification of Award.

35.0 CONTRACT PERFORMANCE GUARANTEE35.1 As a Contract Performance Security, the successful Bidder, to whom the work is

awarded, shall be required to furnish a Performance Guarantee ie Bid Security in

favour of the the AEDA as per clause 18. The guarantee amount shall be equal to

ten percent (10%) of the Contract Price and it shall guarantee the faithful

performance of the Contract in accordance with the terms and conditions specified

in these documents and specifications. The guarantee shall be valid upto 90 days

after the end of Warranty Period.

35.2 The Performance Guarantee shall cover additionally the following guarantees:

a. The successful Bidder guarantees the successful and satisfactory operation of the

equipment furnished and erected under the Contract, as per the specifications and

documents.

36

Page 37: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

b. The successful Bidder further guarantees that the equipment provided and installed

by him shall be free from all defects in design, material and workmanship and shall

upon written notice from the AEDA fully remedy free of expenses such defects as

developed under the normal use of the said equipment within the period of

guarantee specified in the relevant clause of the General Terms and conditions of

Contract.

35.3 The Contract Performance Guarantee is intended to secure the performance of the

entire contract. However, it is not to be construed as limiting the damages under

clause entitled “Equipment Performance Guarantee” in Technical Specifications

Volume II and damages stipulated in other clauses in the Bidding Documents.

37

Page 38: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

SECTION-4

GENERAL TERMS AND CONDITION OF

CONTRACT (GT&CC).

38

Page 39: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

GENERAL TERMS & CONDITIONS OF CONTRACT (GT&CC)

1.0 DEFINATION OF TERMS1.1 ‘The Contract’ means the agreement entered into between the AEDA and

Contractor as per the Contract Agreement signed by the parties, including all attachments and appendices thereto and all documents incorporated by reference therein.

1.2 ‘AEDA’ shall mean Assam Energy Development Agency and shall include their legal representatives, successors and assigns.

1.3 ‘Contractor’ or ‘Supplier’ shall mean the Bidder whose bid will be accepted by the AEDA for award of the Works and shall include such successful Bidder’s legal representatives, successors and permitted assigns.

1.4 The terms ‘Equipment’ ‘Systems’ , ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and materials to be provided by the Contractor under the Contract.

1.5 ‘Works’ shall mean and include the supply of equipment, systems, labour and services, as per the Specifications and complete erection, testing and putting into satisfactory operation including all transportation, handling, unloading and storage at the Site as defined in the Contract and Comprehensive maintenance of the systems.

1.6 ‘Specifications’ shall mean the Specifications and Bidding Documents forming a part of the Contract and such other schedules and drawings as may be mutually agreed upon.

1.7 ‘Site’ shall mean and include the land and other places on, into or through which the works and the related facilities are to be erected or installed and commissioned.

1.8 The term ‘Contract Price’ shall mean total price quoted by the Contractor in his bid with additions and/or deletions as may be agreed and incorporated in the Letter of Award, for the entire scope of the works.

1.9 ‘Inspector’ shall mean the AEDA or any person nominated by the AEDA from time to time, to inspect the equipment; stores or Works under the Contract and/or the duly authorized representative of the AEDA.

1.10 ‘Notice of Award of Contract’/Letter of Award’/Telex of Award’ shall mean the official notice issued by the AEDA notifying the Contractor that his bid has been accepted.

39

Page 40: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

1.11 ‘Date of Contract’ shall mean the date on which Notification of Award of Contract/Letter of Award/Telex of Award has been issued.‘Month’ shall mean the calendar month. ‘Day or ‘Days’, unless herein otherwise expressly defined, shall mean calendar day or days of 24 hours each. A ‘Week’ shall mean continuous period of seven (7) days.

1.12 ‘Writing’ shall include any manuscript, type written or printed statement, under or over signature and/or seal as the case may be..

1.13  ‘Test on Commissioning’ shall mean such tests as prescribed in the Contract to be performed by the Contractor before submission of Installation and Commissioning report to AEDA.

1.14 ‘Guarantee period’/’Maintenance Period’ shall mean the period during which the Contractor shall remain liable for repair or replacement of any defective part of the works performed under the contract.

1.15 Words imparting ‘Person’ shall include firms, companies, corporation and association or bodies of individuals, whether incorporated or not.

1.16 Terms and expressions not herein defined shall have the same meaning as are assigned to them in the Indian Sale of Goods Act (1930), failing that in the Indian Contract Act (1872) and failing that in the General Clauses Act (1897) including amendments thereof if any.

2.0 APPLICATIONThese Conditions shall apply to the extent that they are not superseded by provisions in other parts of the Contract.

3.0 STANDARDSThe Goods supplied under this Contract shall conform to the standards mentioned in the Technical Specifications and when no applicable standard is mentioned, to the authoritative standard appropriate to the Goods and such standards shall be the latest issued by the concerned institution.

4.0 LANGUAGE AND MEASURESAll documents pertaining to the Contract including specification, Schedules, notices, correspondence, operating and maintenance instructions, drawings or any other writing shall be written in English language. The Metric System of measurement shall be used exclusively in the Contract.

5.0 JURISDICTION OF CONTRACT5.1 The laws applicable to the Contract shall be the laws in force in India. The Courts

of Guwahati shall have exclusive jurisdiction in all matters arising under this Contract.

6.0 MANNER OF EXECUTION OF CONTRACT

40

Page 41: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

6.1 The AEDA, after the issue of the Letter of Award to the Contractor, will send one copy of the final agreement to the Contractor for his scrutiny and approval.

6.2 The Agreement, unless otherwise agreed to, shall be signed within 15 days of the acceptance of the Letter of Award, at the office of the AEDA on a date and time to be mutually agreed. The Contractor shall provide for signing of the Contract, Performance Guarantee in three copies, appropriate power of attorney and other requisite materials. In case the Contract is to be signed beyond the stipulate time, the Bid Guarantee submitted with the proposal will have to be extended accordingly.

6.3 The Agreement will be signed in six originals and the Contractor shall be provided with one signed original and the rest will be retained by the AEDA.

.7.0 ENFORCEMENT OF TERMS7.1The failure of either party to enforce at any time any of the provisions of this

Contract or any rights in respect thereto or to exercise any option therein provided, shall in no way be construed to be a waiver of such provisions, rights or options or in anyway to affect the validity of the Contract. The exercise by either party of any of its rights herein shall not preclude or prejudice either party from exercising the same or any other right it may have under the Contract.

8.0 BID DOCUMENTS8.1 Bid documents shall comprise of all documents as per clause 4 of INB.

9.0 COST OF BID DOCUMENT (Non Refundable) The cost of the bid document is Rs 10,000.00 (Rupees Ten Thousand) only for each

group payable in favour of the Director, AEDA in the form of “A/C Payee” Demand

Draft on scheduled commercial banks payable at Guwahati, Assam. However, the

cost of Bid Document will be Rs 5,000.00 (Rupees five thousands) only for each

group in case of registered SSI units of Assam. Bidder downloading the tender copy

should furnish the DD in a separate envelope affixed on top of the tender document

superscribing “Tender Cost of Rs.10,000.00 vide DD No………… dtd………… of

………... Bank …. Branch. And Group ……”

10.0 SCOPE OF WORK10.1.Manufacturing, shop testing, packing , forwarding, Supplying, of Solar Photo Voltaic

Home Lighting Systems(SHLS) and Solar Photo Voltaic Street Lighting Systems

(SSLS) as per specification. including Comprehensive Maintenance Contract (CMC)

for 5 years on turnkey basis complete in all respect along with one set of tools and

tackle kits for each villages. The scope of work includes following works also.

41

Page 42: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

10.2 Submission of implementation schedule from date of award of the contract.

10.3 Safe storage and handling of all materials supplied including transit insurance.

10.4 Installation, site fabrication, commissioning and testing of the systems .

10.5 Project management and site organization.

10.6 Supply of one set of tools and tackles kit in each village and one set of user’s

manual and instruction manual in English and Assamese for each beneficiary.

10.7 Organizing and arranging for training and demonstration for beneficiary as per

direction of AEDA.

10.8 Comprehensive Maintenance Contract (CMC) including repairing/ replacement of

system components/ parts etc for 5 years, including insurance of the systems

covering necessary risk with burglary clause.

10.9 All above scope of work of the contractor will include all items and facilities as may

be necessary to complete the work on turnkey basis and as a binding requirement.

11.0 SCOPE OF FIVE YEAR COMPREHENSIVE CONTRACT (CMC)11.1 The Comprehensive Maintenance Contract shall be comprehensive which shall

include servicing & replacement guarantee for parts and components (such as

battery, electronics, lamps etc) of solar home lighting system and Solar Street

Lighting System for five years. For PV models, the replacement guarantee is for ten

years. The maintenance service provided shall ensure proper functioning of the

SPV system as a whole. All preventive / routine maintenance and breakdown /

corrective maintenance required for ensuring maximum uptime shall have to be

provided. Accordingly, the Comprehensive Maintenance Contract (CMC) shall have

two distinct components as described below:

11.2 PREVENTIVE / ROUTINE MAINTENANCE: This shall be done by the company at least once in a every four/ six months and

shall Include activities such as cleaning and checking the health of the SPV system,

cleaning of module surface, topping up of batteries, tightening of all electrical

connections, changing of tilt angle of module mounting structure, cleaning &

greasing of battery terminals and any other activity that may be required for proper

functioning of the SPV system as a whole.

11.3 BREAKDOWN / CORRECTIVE MAINTENANCE: Whenever a complaint is lodged by the user, the bidder shall attend to the same

within a reasonable period of time and in any case the breakdown shall be corrected

within a period not exceeding ten days from the date of complaint. If more than 10 days are taken after registering of complaint, then supplier has to pay Rs. 20/-

42

Page 43: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

for each system for each month till the problem is rectified. This money shall

be deposited to the account of Village Energy Committee.

11.4 For carrying out the CMC effectively, the Bidder supplier shall establish at least one

service center for every 500 Solar PV Systems, deployed within a specified

geographical area.

11.5 The bidder shall maintain following facilities at the local Service Centre for ensuring

highest level of services to the end user:

i) Adequate trained manpower specifically trained by the bidder for carrying out the

service activities.

ii) Adequate provisions for record keeping, which shall inter-alia, include the

following.

Details of system supplied within the command area of the service station

including full name and address of end user, system and sub-system serial

numbers and records of routine maintenance carried out (duly signed by the end

user). These records shall include voltage, current, specific gravity, indicator

charge, CFL full glow; charge controller operation, electronics etc.

History record sheets of maintenance done.

iii) Adequate spares for ensuring least down time of an individual system.

iv) The service center shall send summary service reports to State Nodal Agency on

half yearly basis. These reports shall include the following information.

Number of systems covered by the service station

Number of systems working satisfactorily on the reporting date

Number of complaint received during the period of reporting

Number of complaint attend during period of reporting

Major cause of failure, as observed.

Major replacement made during the reporting period. Separate report shall be

submitted for each type of systems manufacture wise in case the service center

caters to the requirement of more than one manufacture.

v) The bidder shall ensure adequate insurance of SPV systems against robbery,

theft, burglary and acts of God such as natural calamities, flood etc. for the

entire 5 year period

vi) The records maintained at the service center shall be available for scrutiny of

authorized representatives of the concerned State Nodal Agency or MNRE.

vii) The date of CMC maintenance period shall begin on the date of actual

commissioning of the SPV systems.

43

Page 44: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

viii) Bidder shall furnished details of infrastructure that they have presently available

for establishing of repair shop.

ix) The supplier should pay Re.1(One) to the agent (appointed by Village Energy

Committee) per light/month for the services of topping up and general

maintenance during CMC. The agent will also carry out the laisoning activity

amongst supplier, VEC and beneficiary. The quality / level of service provided by

the bidder would form the basis for determining eligibility of the bidder to

participate in the subsequent programmes of AEDA. Service of the agent should

be specifically mentioned by the bidder. However, the Bidder will stand

responsible for overall upkeep of the system.

12.0 TECHNICAL SPECIFICATION The general technical specifications of the Remote Village Electrification are

enclosed at Section-5. The technical specifications of the Remote Village

Electrification offered by the bidder should conform to the specifications fixed by the

Ministry of New and Renewable Energy (MNRE) for the year 2006-07, 2007-08 or

as notified by the ministry acceptable for the current year. The Test Reports issued

by the SEC/ OATCs for the year 2005-06 or 2006-2007 and years onward for the

SHLS & SSLS (for RVE) of the bidder should correspond to the specifications for

2006-07 or 2007-2008 of MNRE. The bidder shall submit a “Compliance Certificate

for meeting Technical Specifications” along with the Technical & Commercial Part:

Part-II as per Proforma – III for qualification conditions. The bidder may submit the

technical specifications of their Remote village Electrification offered to be supplied.

12.1 TEST CERTIFICATEIt is mandatory for the bidders to have test certificate issued by the Solar Energy

Centre (SEC), Gwalpahari – Gurgaon, Haryana; or Electronics Regional Test

Laboratory (East) (ERTL) Bidhan Nagar, Kolkata; or Central Power Research

Institute (CPRI), Thiruvananthpuram; or Electronics Test & Development Centre,

Bangalore that SSHLS & SSLS conform to specification of MNRE, Govt of India for

the year 2006-07 or 2007-2008. Test Certificates issued for 2005-06, 2006-07 and

years onwards would be considered valid for placement of orders . The test reports

issued prior to 2005-2006 are not valid. Bid received without test certificate with

Technical & Commercial Part: Part –II will be rejected outright and no

correspondence will be entertained in this regard.

13.0 QUANTITY OF SUPPLY

44

Page 45: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Bidder shall submit their offer for groups as per Annexure I to IV for SHLS &SSLS

respectively.. In case any bidder offers for part of the group, his offer shall be liable

for rejection.

14.0 MINIMUM ELIGIBILITY AND QUALIFICATIONS CRITERIA As per clause 2 of INB

15.0 SUBMISSION OF BID The Bid should be submitted in three separate sealed envelopes as following

15.1 EARNEST MONEY (Part-I)

Earnest Money amount as stipulated in the Tender Notice shall be paid in the

form of A/C Payee Bank Demand Draft with a forwarding letter on letterhead

clearly mentioning the D.D No, date of the D.D, Name of the bank, and amount.

The envelope should be super scribed as “Earnest Money”

15.2 TECHNO- COMMERCIAL BID (Part-II)

Techno- Commercial Bid (Part-II) will include vendor’s scope of work,

responsibilities, guarantees, specification of the equipments, commercial terms and

conditions, Bidders credentials, past experience of similar assignments, registration

details, and earnest money particulars. Tender proforma for Techno- Commercial

Bid (Part-II) is enclosed as Proforma V. The envelope should be super scribed as

“TECHNO- COMMERCIAL BID” followed by title of the work and enquiry reference.

All particulars as per check list of INB be submitted with this part.

15.3 PRICE BID (Part-III)

Under this (Part-III) will include rate of supply, installation, commissioning, of

various items as per requirement and rate for Comprehensive Maintenance

Contract for five years for the proposed villages for as per list in the group. Tender

Proforma for Price Bid (Part-III) is enclosed as Proforma –VII. The envelope should

be super scribed as “PRICE BID”

All three envelopes containing Part-I, Part-II and Part-III should be submitted in

Duplicate (One original and one photo copy)in a single sealed envelope Super

scribing “ BID FOR RVEP UNDER MNRE” addressed to The Director, Assam

Energy Development Agency .

45

Page 46: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

15.4 The AEDA will not be responsible for misplacement/delay in receipt of either request for issuance of Bidding Documents or Bidding Documents or Bids sent by post.

15.5 Also clauses 10, 22 &23 of INB will be applicable.

16.0 EARNEST MONEY DEPOSIT16.1 Bidder shall submit non-interest bearing Earnest Money Deposit (EMD) as

mentioned earlier under “Proposed Work Package” - for each group comprising

respective SHLS & SSLS in the form of Demand Draft from any Indian Nationalised

Bank, drawn in favour of “Director, AEDA” payable at Guwahati .In case of SSI

registered in Assam the earnest money amount will relieved upto 50% per group of

work.

16.2 Bidder shall submit additional EMD of appropriate amount for each group.

16.3 Earnest Money is to be submitted in a separate sealed envelope (PART-I) duly

superscripted with the Bid Enquiry reference, Bidder’s own names full address and

titled “Earnest Money”.

16.4. Bidders seeking concession from submission of Earnest Money, shall submit own

valid Registration Certificate in the envelope titled “Earnest Money” failing which the

Bid will be treated as if “submitted without exact amount Earnest Money”, and will

be rejected. Request for adjustment of earlier dues in place of Earnest Money

Deposit shall not be entertained. The SSI units registered in State of ASSAM must

furnish an attested photocopy of valid SSI unit certificate issued by Govt. of ASSAM

in this respect.

16.5 The Earnest Money shall be returned to all the unsuccessful Bidders, within sixty

days from the date of placement of LOI/Order on successful bidder.

16.6 In the event the Bid of any party is rejected during the course of Techno-

Commercial Scrutiny and Evaluation, the Earnest Money will be returned to such

Bidder.

16.7 Earnest Money shall be forfeited if –

a) Any Bidder withdraws his Bid or resigns from his offer during the validity period or

unable to complete the work/part work within the stipulated period.

b) The successful Bidder fails to furnish his Acceptance of the Order or fails to submit

the Security Deposit within specified time as per terms of the LOI/Order.

17.0 OPENING OF BIDS.17.1 The AEDA will open Bids in the presence of Bidders’ representatives (up to 2

persons) who choose to attend at the date and time for opening of Bids indicated in

the Invitation to Bid, or in case any extension has been given thereto, on the

extended Bid opening date and time notified to all the Bidders, who have purchased

46

Page 47: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

the Bidding Documents. The Bidders’ representatives who are present shall sign a

register evidencing their attendance. Price Part of each lot of only those bidders,

whose offers are technically and commercially acceptable after evaluation of the

Technical and Commercial Part, will be opened and evaluated. The date & time for

opening of Part-III: Price Part will be uploaded in AEDA web-site. Bidders are requested to visit the web-site (www.assamrenewable.org) regularly and keep themselves informed. The Price Part will be opened at the office of Director, AEDA

as intimated, in the presence of eligible bidders or their authorized representative.

The authorised representative will be allowed to attend the opening on production of

authorization letter.

.

17.2 No electronic recording devices will be permitted during Bid opening.

18. PERIOD OF VALIDITY OF BID. As per clause 19 of INC.

19.0 CLARIFICATION OF BIDS19.1 To assist in the examination, evaluation and comparison of Bids, the AEDA may, at

its discretion, ask the Bidder for a clarification of its Bid. The request for clarification

and the response shall be in writing and no change in the price or substance of the

Bid shall be sought, offered or permitted.

20.0 EVALUATION OF BID AND AWARDING OF THE WORK:20.1 For evaluation of the Bid, Techno- Commercial Bid will be first opened. The Price

Bid of those Bidders only who qualify in the Techno-Commercial Bid and meet the

technical requirement will be opened.

20.2 Prior to the detailed evaluation, the AEDA will determine the substantial

responsiveness of each Bid to the Bidding Documents. For purpose of these

Clauses, a substantially responsive Bid is one which conforms to all the terms and

conditions of the Bidding Documents without material deviations. A material

deviation is one which limits in any substantial way the prices, quality, quantity or

delivery period of the equipment or which limits in any way the responsibilities or

liabilities of the Bidder of any right of the AEDA as required in these specifications

and documents. The AEDA’s determination of a Bid’s responsiveness shall be

based on the contents of the Bid itself without recourse to extrinsic evidence.

20.3 A Bid determined as not substantially responsive will be rejected and may not

subsequently be made responsive by the Bidder by correction of the non-

conformity.

.

21.0 COMPARISION OF BIDS

47

Page 48: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

21.1 The Bids shall be evaluated on the basis of total value of the package for he entire

scope of work as defined in the Bidding Documents.

.21.2 Evaluated Bid prices of all the Bidders shall be compared among themselves to

determine the lowest evaluated Bid and, as a result of this comparison, the lowest

Bid will be selected for award of the Contract.

22. AWARD OF CONTRACT22.1 The AEDA will award the Contract to the successful Bidder whose Bid has been

determined to be technically qualified and has been determined as the lowest

evaluated Bid, provided further that the Bidder is determined to be qualified to

perform the Contract satisfactorily. The AEDA shall be the sole judge in this regard.

22.2 Further, the AEDA reserves the right to award separate Contracts to two or more

parties in line with the terms and conditions specified in the accompanying

Technical Specifications. Further, the Groups may be broken and awarded to

Successful Bidders area wise for convenience of smooth implementation of the

project.

22.3 Prior to the expiration of the period of Bid validity and extended validity period, if

any, the AEDA will notify the successful Bidder in writing by registered letter or by

cable or telex or FAX, to be confirmed in writing by registered letter, that his Bid has

been accepted.

22.4 The Notification of Award/Letter of Award will constitute the formation of the

Contract.

22.5 Upon the successful Bidder’s furnishing of Contract Performance Guarantee

pursuant to Clause 35.0,of INB the AEDA will promptly notify each unsuccessful

Bidder and will release its Bid Documents, pursuant to Clause 18.0

23.0 CONTRACT PRICE23.1 The total contract price for a quoted quantity (SHLS & SSLS) including SPV module,

lamp & luminaries, charge controller, control electronics, battery, mechanical

components, Comprehensive Maintenance contract charges etc. should be quoted

in Proforma -VII (Price Part).

23.2 For Supply of items in full & good condition at FOR Site / Stores site (door delivery

basis) to various consignees across State of ASSAM, including transportation cost

and transit insurance. Contract Price also includes all charges towards packing &

forwarding, inspection Insurance and freight including door delivery charges.

Contract Price is also inclusive of Excise Duty, Custom duty. Income Tax,

CST,Sales Tax / ASSAM VAT and Service Tax (wherever applicable) on the

finished items, Turn Over Tax (TOT) / Octroi, entry tax etc. as applicable for the

supplies.

48

Page 49: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

23.3 Contract Price shall remain firm and binding and shall not be subject to any

variation, whatsoever, on any account except for statutory variation on taxes &

duties during contractual completion period as stipulated in Clause no 26 below and

/ or addition or modification of scope of work.

23.4 Various taxes, levies and duties will be included in the contract price

23.5 The Contract price includes and covers the cost of all royalty and fees for all articles

and processes, protected by letters, patent or otherwise incorporated in or used in

connection with the work, also all royalties, rents and other payments in connection

with obtaining all the materials for the work and the supplier shall indemnify and

keep indemnified the AEDA, which indemnity, the supplier hereby gives against all

actions, proceedings, claims, damages, costs and expenses arising from the

incorporation in or use of work of any such articles, processes or supplies.

23.6 During the period of the contract, AEDA may order addition/ deletion in quantities/

which supplier shall comply. The adjustment in Contract Price shall be made at the

same rate as per Price Schedule.

23.7 All applicable charges for taking statutory clearances, wherever necessary, is

included in the contract price. The price shall also be inclusive of necessary charges

towards supervision as applicable.

24.0 TERMS OF PAYMENT24.1 Subject to deduction clause and other clause incorporated in General Terms and

Condition of Contract, 70% of the contract price(Excluding CMC Part) shall be paid

on submission of request for payment after satisfactory supply, installation and

commissioning of the systems against progressive bill within 30 days on receipt of

Installation Completion Certificate from the Concerned Circle Officer/BDO or SDO

(C) or concerned D.C. and Utilization Report as per Proforma of AEDA with

following documents.

Commercial Invoice in triplicate

Copy of Receipt/ Delivery Challan/ Transportation Challan/ Lorry receipt.

Certificate of delivery of the system and delivery of user’s tools and tackles &

Operation & Maintenance Manual in terms of the Order, issued to village energy

committee / AEDA representative.

Certificate of installation testing and commissioning of the SDSL & SSLS in terms

of the Order, issued by village energy committee / Consignee’s and AEDA

representative

Proof of compliance Certificate from each beneficiaries of the village as per

Performa (to be provided at the time of placing order).

Declaration certificate from each beneficiary of the village as per Performa (to be

provided at the time of placing order).

49

Page 50: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Utilization report received from each beneficiary and village energy committee as

per Performa (to be provided at the time of placing order).

Utilization report from each beneficiary for SHLS and SSLS as per Performa (to

be provided at the time of placing order).

List of serial no. of solar module, its test parameters & other material supplied.

GPS co-ordinate (Longitude, Latitude & Altitude) and digital photograph of each

installation along with photograph of beneficiary indicating system Sl. No. clearly.

Total No of progressive bill will be limited to four with minimum 500 Nos of

installations for each bill.

Installation and Commissioning certificate with a photograph of the beneficiary

showing the system with a plate showing the Group No., Name of Village, and

System Identification No. signed by beneficiary and countersigned by Secretary,

Village Energy Committee and representative of the Company with seal as per

format to be provided by AEDA.

Digital photographs should be submitted in village wise folders after installation

and commissioning as desired by AEDA.

24.2 20% of the contract price(Excluding CMC part) out of balance 30% of the contract

value(Excluding CMC) for each village will be released(subject to release of fund

from MNRE , GOI) after satisfactory submission of request for payment and all the

documents as per clause 24.1 and on receipts of satisfactory 3 rd party verification

report and training & awareness programme completion report as per Proforma

XIV.

24.3 Remaining 10% of the contract price(Excluding CMC) will be released after 5 years

from date of commencement of CMC subject to fund received from MNRE, GOI and

satisfactory performance of CMC. against bill, challan etc.as per clause 24.1

24.4 The payment for 5 years CMC part will be paid in 5 annual installments as below

against receipt of satisfactory performance report of the system from the VEC duly

certified/ countersigned by the concerned circle officer/BDO. (Civil) of the respective

District/ Subdivision. Subject to submission of bill, System maintenance Log Book

but subject to receipt of fund from MNRE, GOI.

1st Year : 10 % of Total Amount of C.M.C

2nd Year : !5 % of Total Amount of C.M.C

3rd Year : 20 % of Total Amount of C.M.C

4th Year : 25 % of Total Amount of C.M.C

5th Year : 30 % of Total Amount of C.M.C

50

Page 51: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

24.5 All payments shall be released by AEDA through account payee cheque issued in

favour of the Bidder/contractor and payable in Indian Rupee at any Indian

Nationalised/Scheduled Bank,

25.0 TAXES,DUTIES, PERMITS & LICENCES25.1 The Bidder/ contractor shall be liable and pay all non-Indian taxes, duties, levies

lawfully assessed against the AEDA or the Contractor in pursuance of the Contract. In addition, the Contractor shall be responsible for payment of all Indian duties, levies and taxes lawfully assessed against the Contractor for his personal income & property only. This clause shall be read in conjunction with clause 14.0 of Section INB.

25.2 Income Tax.

Income Tax which AEDA may be required to deduct by law/statute, shall be

deducted at source and shall be paid to the Income Tax authorities on account of

the Supplier. AEDA shall provide the Supplier a certificate for such deduction of tax.

26.0 VARIATION IN TAXES AND DUTIES26.1 The adjustment in the Contract Price towards imposition of new taxes or abrogation

of existing taxes during the contract period shall not be applicable and AEDA will not

be responsible for any or be in any obligation for payment against such variation of

taxes.

26.2 The Supplier shall bear and pay all liabilities in respect of statutory variations in

taxes and duties and imposition of new taxes and duties in respect of supply and

installation and execution of the contract work.

27.0 TRANSIT INSURANCE Transit Insurance shall be arranged by the supplier for his total supplies. In case of

any damage / loss / pilferage / non-delivery during transit, the supplier shall lodge

the claim and settle the claim with the insurance agency. The supplier shall also

arrange replacement of the damaged, lost/pilfered items expeditiously pending

settlement of commercial implications with insurance agency, if any, so as not to

hamper the erection and commissioning work of the entire plant. The resultant loss

if any due to failure of supplier / sub- supplier to comply with the above shall be to

the account of supplier.

51

Page 52: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

28.0 DESPATCH INSTRUCTIONS

28.1 All the items /Equipments shall be subjected to inspection by AEDA or Authorised

representative as per relative Standards/ provision approved by AEDA before

dispatch of items.

28.2 The equipment shall be dispatched as per the detailed “Dispatch Instructions” which

will be required to be followed strictly at the time of dispatch. However, equipment

shall be dispatched only after receipt of “Dispatch Clearance” from AEDA after

inspection and acceptance of the equipment by AEDA. No consignment shall be

dispatched without receipt of dispatch clearance from AEDA.

28.3 The Contractor, wherever applicable, shall after proper painting, pack and crate all equipment in such a manner as to protect them from deterioration and damage during rail and road transportation to the site and storage at the site till the time of erection. The Contractor shall be responsible for all damages due to improper package.

28.4 The Contractor shall notify the AEDA of the date of each shipment from his works, and the expected date of arrival at the site for the information of the AEDA.

28.5 The Contractor shall also give all shipping information concerning the weight, size and content of each packing including any other information the AEDA may require.

28.6 The following documents shall be sent by registered post to the AEDA within three days from the date of shipment, to the AEDA

Invoice (6 copies) Packing list (6 copies) Pre-despatch clearance certificate, (3 copies) Test Certificate, wherever applicable (3 copies) Insurance Certificate (3 copies)

29.0 COMPLETION OF CONTRACT29.1 Unless otherwise terminated under the provisions of any other relevant clause,

this Contract shall be deemed to have been completed on the expiry of the stipulated period of 120 days from date of awarding of the work. as provided for under the clause entitled in 22,23,24

30.0 GUARANTEE & LIABILITIES

52

Page 53: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

30.1 The time and the date of completion of the Contract as stipulated in the Contract by the AEDA without or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to be the essence of the Contract. The Contractor shall so organize his resources and perform his Work as to complete it not later than the date agreed to.

30.2 The Contractor shall submit a detailed PERT Network/Bar Chart within the time frame agreed consisting of adequate number of activities covering various key phases of the Work such as design, procurement, manufacturing, shipment and field erection activities within fifteen (15) days of the date of Notice of Award of Contract. This Network shall also indicate the interface facilities to be provided by the AEDA and the dates by which such facilities are needed. The Contractor shall discuss the Network so submitted with the AEDA and the agreed Network shall form part of the contract documents. As provided in the clause of terms of payment in this section, finalization of the Network/Bar Charts will be pre conditions to release of any payment to the Contractor. During the performance of the Contract, if in the opinion of the AEDA proper progress is not maintained, suitable changes shall be made in the Contractor’s operations to ensure proper progress without any cost implication to the AEDA. The interface facilities to be provided by the AEDA in accordance with the agreed Network shall also be reviewed while reviewing the progress of the Contractor.

.

31.0 EFFECTIVENESS OF CONTRACTThe Contract shall be considered as having come into force from the date of the Notification of Award, unless otherwise provided in the Notification of Award.

32.0 LIQUIDATED DAMAGES32.1 If the contractor fails to perform the work within the specified period given in the

letter of award or any extension granted thereof, with respect to successful completion of supply, installation , commissioning of systems, the contractor shall pay to AEDA as Liquidated Damages and not as penalty, a sum of half % (0.5%) of the contract price for each calendar week of delay or part. However the amount of Liquidated Damages for the contract shall be limited to a maximum of 5% of the total contract Price.

32.2. Liquidated damages for not meeting performance guarantee during the performance and guarantee test shall be access and recovered from the Contractor as detailed in technical specifications/ Special Conditions of Contract. Such liquidated damages shall be without any limitation whatsoever and shall be

53

Page 54: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

in addition to damages, if any, payable under any other clause in Conditions of Contract.

33.0 GUARANTEE33.1 The Contractor shall warrant that the equipment will be new, unused and in

accordance with the contract documents and free from defects in material and workmanship for a period of five (5) calendar years (ten years for PV modules) commencing immediately upon the satisfactory commissioning. The Contractor’s liability shall be to replace any defective parts in the systems under normal use and arising solely from faulty design, materials and/or workmanship provided always that such defective parts are repairable at the site.

.34.0 LIMITATION OF LIABILITIES34.1 The final payment by the AEDA in pursuance of the Contract shall mean the

release of the Contractor from all his liabilities under the Contract. Such final payment shall be made only at the end of the Guarantee/Warranty Period, and till such time as the contractual liabilities and responsibilities of the Contractor, shall prevail. All other payments made under the Contract shall be treated as on-account payments.

.35.0 CHANGE OF QUANTITY35.1 During the execution of the Contract, the AEDA reserves the right to increase or

decrease the quantities of items under the Contract but without any change in unit price or other terms & conditions. Such variations unless otherwise specified in the accompanying Conditions ofContract and/or Technical Specification, shall not be subjected to any limitation for the individual items but the total variations in all such items under the Contract shall be limited to a percentage of the Contract price as specified in the Conditions of Contract.

36.0 PROGRESS REPORTS AND PHOTOGRAPHS36.1 During the various stages of the Work in the pursuance of the Contract, the

Contractor shall at his own cost submit periodic progress reports as may be reasonably required by AEDA with such materials as, charts, networks, photographs, installation & commissioning certificates, etc. Such progress reports shall be in the form and size as may be required by the AEDA and shall be submitted in at least three (3) copies.

54

Page 55: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

37.0 CONTRACT PERFORMANCE GUARANTEE/SECURITY37.1 The Contractor shall furnish contract performance guarantee (s) for the proper

fulfillment of the Contract in the prescribed form within fifteen (15) days of “Notice of Award of Contract.” The performance guarantee (s) shall be as per “clause 35” prescribed in section INB,

38.0 INSURANCE38.1 The Contractor at his cost shall arrange, secure and maintain all insurance as

may be pertinent to the Works and obligatory in terms of law to protect his interest and interests of the AEDA against all perils for the period covering CMC. The form and the limit of such insurance as defined herein together with the under-writer in each case shall be acceptable to the AEDA. However, irrespective of such acceptance, the responsibility to maintain adequate insurance coverage at all times during the period of Contract shall be of the Contractor alone. The Contractor’s failure in this regard shall not relieve him of any of his contractual responsibilities and obligations. The insurance covers to be taken by the Contractor shall be in a joint name of the AEDA and the Contractor. The Contractor shall, however, be authorized to deal directly with Insurance Company or Companies and shall be responsible in regard to maintenance of all insurance covers. Further the insurance should be in freely convertible currency.

38.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting into satisfactory operation and all activities to be performed till the successful completion of commissioning of the equipment shall be to the account of the Contractor. The Contractor shall be responsible for preference of all claims and make good the damages or loss by way of repairs and/or replacement of the equipment, damaged or lost. The transfer of title shall not in any way relieve the Contractor of the above responsibilities during the period of Contract. The Contractor shall provide the AEDA with copy of all insurance policies and documents taken out by him in pursuance of the Contract. Such copies of documents shall be submitted to the AEDA immediately after such insurance coverage. The Contractor shall also inform the AEDA in writing at least sixty (60) Days in advance regarding the expiry/cancellation and/or change in any of such documents and ensure revalidation, renewal etc., as may be necessary well in time.

38.3 The perils required to be covered under the insurance shall include, but not be limited to fire and allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit, theft, pilferage riot and strikes and malicious damages, civil commotion, weather conditions, accidents of all kinds,

55

Page 56: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

etc. The scope of such insurance shall be adequate to cover the replacement/reinstatement cost of the equipment for all risks upto and including delivery of goods and other costs till the equipment is delivered at Site. The insurance policies to be taken should be on replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of insurance cover and the amount of claim, available from the underwriters, the Contractor shall be liable to make good the full replacement/rectification value of all equipment/materials and to ensure their availability as per project requirements.

38.4 All costs on account of insurance liabilities covered under the Contract will be to Contractor’s account and will be included in Contract Price,

39.0 INSPECTION OF THE FACTORY AND TESTS39.1 AEDA reserves the right to inspect the manufacturer’s works/factory to ascertain the

capability/availability of necessary equipment & infrastructure required for

manufacture of the item offered before opening of the price offers of the bidders.

39.2 AEDA shall have the right to inspect and test the goods to confirm their conformity

to the technical specifications after delivery of goods to consignee. In case of

nonconformity as per T.S or failure in performance, AEDA may ask for

replacements of such supplies or deduct the payment for such supplies.

39.3 Manufactures shall inform AEDA at least 10 days in advance of schedule dispatch.

40.0 DEMURRAGE, WHARFAGE, ETC.40.1 All demurrage, wharfage and other expenses incurred due to delayed clearance

of the material or any other reason shall be to the account of the Contractor.

41.0 FORCE MAJEURE41.1 Force majeure is herein defined as any cause which is beyond the control of the

Contractor or the AEDA as the case may be, which they could not foresee or with a reasonable amount of diligence could not have foreseen and which substantially affects the performance of the Contract, such as:

a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics;

b. Acts of any Government, homeor foreign, including but no limited to war, declared or undeclared, priorities, quarantines,embargoes. Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other in writing of such causes.

41.2 The Contractor or the AEDA shall not be liable for delays in performing his obligations resulting from any force-majeure cause as referred to and/or defined above. The date of completion will, subject to hereinafter provided, be extended

56

Page 57: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

by a reasonable time even though such cause may occur after Contractor’s performance of obligation has been delayed due to other causes.

42.0 SUSPENSION OF WORK42.1 The AEDA reserves the right to suspend and reinstate execution of the whole or

any part of the Works without invalidating the provisions of the Contract. Orders for Suspension or reinstatement of the Works will be issued by AEDA to the Contractor in writing. The time for completion of the works will be extended for a period equal duration of the suspension.

42.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the Works will be paid by the AEDA, provided such costs are substantiated to the satisfaction of the AEDA. The AEDA shall not be responsible for any liabilities, if suspension or delay is due to some default on the part of the Contractor or his Sub-Contractor.

43.0 TERMINATION OF CONTRACT 43.1 The AEDA reserves the right to terminate the Contract either in part or in full due

to the following reasons .The AEDA shall in such an event give fifteen (15) days notice in writing to the Contractor of his decision to do so.

43.2 If the Contractor shall neglect to execute the Works with due diligence and expertise or shall refuse or neglect to comply with any reasonable order given to him, in the Contract by AEDA in connection with the works or shall contravene the provisions of the Contract, the AEDA may give notice in writing to the Contractor to make good the failure, neglect or contravention complained of. Should the Contractor fail to comply with the notice within thirty (30) days from the date of serving the notice, then and in such case the AEDA shall be at liberty to terminate the Contract.

43.3 If the goods supplied does not conform to the required Specification as per clause 11

43.4 If Test Certificate as per clause 12 is not furnished.43.5 If the inspection report as per clause 31 is not satisfactory.

44.0 ARBITRATIONAll disputes would be settled within Guwahati Jurisdiction of Court of Law only. All

arbitration cases would only be settled under Arbitration and Conciliation Act 1996

but at Guwahati only.

45.0 ASSIGNMENT The supplier shall not assign, in whole or part, its obligations to perform under the

order/contract, without written permission of the AEDA.

57

Page 58: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

SECTION-5

TECHNICAL SPECIFICATION (T.S.)

58

Page 59: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

TECHNICAL SPECIFICATION

1.0 DEFINITION1.1 SOLAR HOMELIGHTING SYSTEM:

A Solar HomeLighting System aims at providing solar electricity for operating lights

and/or fan or energizing a DC operated portable TV sets for specified hours of

operation per day.

1.2 SOLAR STREET LIGHTING SYSTEM: A stand alone solar photovoltaic street lighting system comprises a compact

fluorescent lamp, lead acid battery, and PV module control electronics,

interconnecting wires/cables, modules mounting hardware, battery box, instruction

and maintenance manual

2.0 GENERAL SPECIFICATION The Solar Photovoltaic Homelighting system and Solar Photovoltaic Street Lighting

system shall have vented battery box, operated within a temperature range 0°C to

50°C, built in surge and lightning protection, environment friendly, adjustable array

mount, designed for high wind load. The following physical characteristics shall be

considered for designing the system:

Function at temperature ranging from 0 to 50°C

Unaffected by humidity <= 90%

Resist wind gusts up to 150 km/h

Component realized to resist against the worst climatic condition.

3.0 PART A: SOLAR HOMELIGHTING SYSTEM

3.1 MODEL AND COMPONENTS (As per MNRE guidelines)

MODEL: Model – 2 (Two light systems)

COMPONENTS:

59

Page 60: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

S.L No Components Specification

1 PV Module 1x37 Wp under STC, crystalline silicon solar cell

operating above 16.4 V, with open circuit voltage of

21.0V.

2 Lamps 2x CFLs of 9 W each.

3 Battery 1x12 V, 40 Ah tubular plate, low maintenance type

lead acid battery.

4 Other

components

Control Electronics, Inverter, module mounting

hardware, battery box, inner connecting wire,

conductor, cable, switches, instruction & maintenance

manual.

3.3 DUTY CYCLE:

MODEL AVERAGE HOURS OF OPERATION PER DAY

Model-2 2 light , 3-4 hours.

3.4 LAMPS The lamps shall be compact fluorescent (CFL) type, 4 – Pin, 9 Watt rating with a

suitable pre- heating circuit .

The light output from the lamps should be around 600 (+/- 5%) lumens (for 9W

CFL). No blackening should be observed after 1000 ON / OFF cycles.

The lamps should be housed in an assembly suitable for indoor use, with a

reflector on its back. While fixing the assembly, the lamp should be held in a base

up configuration.

Maximum DC current consumption for a 9W CFL at 12V should not exceed 0.8

Amp.

The lamps should conform to relevant BIS standards.

3.5 BATTERY: The battery will be of flooded electrolyte type, positive tubular plate, low

maintenance lead acid rechargeable battery, conforming to relevant BIS

standards. The energy generated is stored in the battery and is available to power

the solar home lighting system for a duty cycle.

The battery will have a minimum rating of 12V, 40Ah (at C/10) discharge rate at

20°C. 75% of the rated capacity of the battery should be between fully charged

and load cut off conditions.

60

Page 61: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

The battery shall have following features

Wide operating temperature range ( 0 deg.C to 50 deg C)

Protection against reverse connection of battery/panel, overcharge &

deep discharge

Safety vent to prevent gas build up

Life up to minimum 300 full cycles at 100% discharge capacity

Very low self discharge rates

Operate at any orientation

The Battery should have approval of ETDC/ERTL/ Railway/Telecom/DRDO/

CECRI.

The battery should be housed in a weather proof, acid proof, well ventilated

casing preferably of PVC or similar material.

3.6 ELECTRONICS: The inverter should be of quasi sine wave/sine wave type with frequency in the

rage of 20- 35 KHz to drive 4-pin 9W CFL with preheat technique to avoid the

blackening of ends. Half – wave operation is not acceptable.

The total electronics efficiency should be at least 80%.

No blackening or reduction in the lumen output by more than 10% should be

observed after 1000 ON/OFF cycles (two minutes ON followed by four minutes

OFF is one cycle).

The idle current consumption should not be more than 10mA.

Electronics should operate at 12 V and should have temperature compensation

for proper charging of the battery throughout the year.

Necessary lengths of wires/cables, switches suitable for DC use and fuses should

be provided.

Entire Electronics shall be housed on a single PCB with connectors for easy

replacement without any need of desoldering.

Only copper wires of appropriate gauge & dimensions as per BIS standards

should be used.

3.7 PV MODULE(S) The PV module (s) shall contain crystalline silicon solar cells and shall be

protected from hail storm, worst climatic condition.

The power output of the module(s) under STC should be a minimum of 37W.

The operating voltage corresponding to the power output mentioned above should

be 16.4 V.

The open circuit voltage of the PV modules under STC should be at least 21.0

volts.

61

Page 62: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

The terminal box on the module should have a provision for opening for replacing

the cables, if required. Plug in type connection shall be provided in the PV

terminal box as well as in the charge controller.

Weatherproof enclosure shall be provided.

A strip containing the following details should be laminated inside the module (on

the right hand top corner) so as to be clearly visible from the front side.

Name of the Manufacturer or distinctive logo.

Model or Type No.

Serial No.

Year of make

A strip containing Monogram of AEDA along with the following details translated

into Assamese language should be laminated on the left hand top corner of each

PV module.

Remote Village Electrification Programme Phase II

Not for sale or transfer

Statutory action would be taken by AEDA, if it is found sold or transferred.

Back of the module should clearly be marked with AEDA Logo printing RVEP-Phase II under MNRE, GOI with undeletable ink.

3.8 ELECTRONIC PROTECTION Adequate protection is to be incorporated under no load conditions, e.g., when the

lamp is removed and the system is switched ON.

The system should have protection against battery overcharge and deep

discharge conditions.

Fuses should be provided to protect against short circuit conditions.

A blocking diode preferably a Schottky type, should be provided as part of the

electronics to prevent reverse flow of current through the PV module(s). In case

such diode is not provided with the PV module (s), full protection against open

circuit, accidental short circuit, reverse polarity and lightning should be provided.

3.9 MECHANICAL COMPONENTS Metallic frame structure (with corrosion resistance paint) to be fixed on the roof of

the house to hold the SPV module(s). The frame structure should have provision

to adjust its angle of inclination to the Horizontal between 0o and 55o, so that it can

be installed at the specified tilt angle. However, in case of thatched roof, the

module should be pole mounted. The length of the pole should be minimum 3 m

above the ground level after grouting & final installation and the diameter of the

pole should be 5 cm. The pole should be medium duty GI pipe directly fixed into

the ground.

62

Page 63: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

A vented acid proof and corrosion resistance (Galvanised) metallic box for

housing the storage battery indoors should be provided.

3.10 OTHER FEATURES The system should be provided with 2 LED indicators: a green light to indicate

charging in progress and a red LED to indicate deep discharge condition of the

battery. The green LED should glow only when the battery is actually being

charged.

There will be a Name Plate on the system which will give:

Name of the Manufacturer or distinctive logo.

Model or Type No.

AEDA Logo and “RVEP-Phase II under MNRE, GOI” should be printed on each component like control unit, battery and each luminare

Components and parts used in solar home system should confirm to the latest BIS

specifications, wherever such specifications are available and applicable.

The PV module or system will be warranted as per the clause given in Volume-I of

the NIT documents. The manufacturer can also provide additional information

about the system and condition of warranty as necessary. The warranty card shall

be supplied as per Proforma -VIII.

3.11 An operation, Instruction Maintenance Manual in English and the local language

should be provided with the solar home lighting system. The following minimum

details must be provided in the manual:

(a) About Photovoltaic

(b) About solar home system – its components and expected performance.

(c) About PV Module.

(d) About CFL

(e) Clear instructions about mounting of PV module(s)

(f) About electronics

(g) About electronics

(h) About charging and significance of indicators.

(i) Dos and Don’ts

(j) Clear instructions on regular maintenance and trouble shooting of solar home

system

(k) Name and address of the person or service center to be contacted in case of

failure or complaint.

3.12 INSTALLATION INSTRUCTIONS

63

Page 64: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

The SPV module should be fixed on a rigid pole in case it is not possible for fixing

on to the roof of the house. The pole should be of minimum 5 cm dia. GI pipe of

medium gauge and 3 m above the ground level.

Adequate space should be provided behind the PV module / array for allowing

unobstructed air flow for passive cooling.

Cables of appropriate size should be utilized to keep electrical losses to a bare

minimum (e.g. Length of the wire from module to charge controller and charge

controller to load should be as minimum as possible)

The battery should be located in a dry area with proper ventilation. Care should be

taken to ensure that the battery is placed with appropriate leveling on a

structurally sound surface.

The control electronics should not be installed directly above the battery. All wiring

should be in proper conduit or capping casing. Wire should not be hanging loose.

4.0 PART B: SOLAR STREET LIGHTING SYSTEM:

4.1 TECHNICAL SPECIFICATION4.2 DUTY CYCLE

The system shall be designed to automatically switch ON at dusk, operate throughout

the night and automatically switch OFF at the dawn, under average daily insolation of

5kWh/sq.mt. on a horizontal surface.

4.3 LAMPS The lamps shall be compact fluorescent (CFL) type, 4 – Pin 11 W with a suitable

pre-heating circuit to avoid the blackening of ends.

The light output from the lamp should be around 900+5% lumens. No blackening

or reduction in the lumen output by more than 10% after 1000 ON/OFF cycles.

The lamps should be housed in a weather proof assembly suitable for outdoor

use, with a reflector on its back. While fixing the assembly, the lamp should be

held in a base up configuration.

Maximum DC current consumption for a 11W CFL at 12 V, should not exceed 1

Amp.

The lamp shall have following features.

High efficiency and long operating life (Minimum 8000hrs)

Reverse polarity protection

Resistance to flickering effect and radio/TV interference

Automatic frequency control

The lamps should conform to relevant BIS standards.

4.4 BATTERY

64

Page 65: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Flooded electrolyte type, positive tubular plate, low maintenance lead acid

rechargeable battery, conforming to relevant BIS standards. The energy

generated is stored in the battery and is available to power the solar street lighting

system for a predetermined duty cycle. The battery shall have weather proof,acid

proof well ventilated enclosure.

The battery shall have a minimum rating of 12V, 75 Ah (at C/10) discharge rate at

20 deg. C.

75% of the rated capacity of the battery should be between fully charged and load

cut off conditions.

The battery shall have following features

Wide operating temperature range ( 0 deg.C to 50 deg C)

Protection against reverse connection of battery/panel, overcharge & deep

discharge

Safety vent to prevent gas build up

Life up to minimum 300 full cycles at 100% discharge capacity

Very low self discharge rates

Operate at any orientation

The Battery should have approval of ETDC/ERTL/ Railway/Telecom/DRDO/

CECRI.

The battery should be housed in a weather proof, acid proof, well ventilated

casing    with locking arrangement

4.5 ELECTRONICS The inverter should be of quasi-sine wave/sine wave type with frequency in the

range of 20-35 KHz to drive 4-pin 11 W CFL with preheat technique to avoid the

blackening of ends. Half-wave operation is not acceptable.

The total electronics efficiency should be at least 80%.

No blackening or reduction in the lumen output by more than 10% should be

observed after 1000 ON/OFF cycles (two minutes ON followed by four minutes

OFF is one cycle).

The idle current consumption should not be more than 10mA.

Electronics should operate at 12 V and should have temperature compensation

for proper charging of the battery throughout the year.

Necessary lengths of wires/cables, switches suitable for DC use and fuses should

be provided.

Entire Electronics shall be housed on a single PCB with connectors for easy

replacement without any need of desoldering.

The PV module shall be used as an auto switcher to sense the ambient light level

for switching ON and OFF the lamp.

65

Page 66: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Twilight set control: Adjustable with screw to precisely set the twilight level at

which to switch ON and OFF the load.

4.6 PV MODULE(S) (i) The PV module(s) shall contain crystalline silicon solar cells and shall be

protected from hail storm, worst climatic condition.

(ii) Power output of the module(s) under STC should be a minimum of 74W. Either

two modules of minimum 37W output each or one module of 74W output should

be used.

(iii) The operating voltage corresponding to the power output mentioned above

should be 16.4 V.

(iv) The open circuit voltage of the PV modules under STC should be at least 21.0

volts.

(v) The terminal box on the module should have a provision for opening for

replacing the cables, if required.

(vi) Weatherproof enclosure shall be provided.

(vii) A strip containing the following details should be laminated inside the module

(on the right hand top corner) so as to be clearly visible from the front side.

(I) Name of the Manufacturer or distinctive logo.

(II) Model or Type No.

(III) Serial No.

(IV) Year of make

(viii) Models of reputed make shall be offered.

(ix) A strip containing Monogram of AEDA along with the following details translated

into Assamese language should be laminated on the left hand top corner

of each PV module.

Remote Village Electrification Programme Phase II of MNRE, GOI

Not for sale or transfer

Statutory action would be taken by AEDA, if it is found sold or transferred.

(x) Back of the module should clearly be marked with AEDA Logo printing RVEP- Phase II under MNRE, GOI with undeletable ink.

4.7 ELECTRONIC PROTECTION Adequate protection is to be incorporated under no load conditions, e.g., when the

lamp is removed and the system is switched ON.

The system should have protection against battery overcharge and deep

discharge conditions.

Fuses should be provided to protect against short circuit conditions.

A blocking diode preferably a Schottky type, should be provided as part of the

electronics to prevent reverse flow of current through the PV module(s). In case

66

Page 67: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

such diode is not provided with the PV module (s), full protection against open

circuit, accidental short circuit, reverse polarity and lightning should be provided.

4.8 MECHANICAL COMPONENTS Metallic frame structure (with corrosion resistance paint) to be fixed on Standard

poles for Soalr Street Lights. The frame structure should have provision to adjust

its angle of inclination to the Horizontal between 0o and 55o, so that it can be

installed at the specified tilt angle. Adequate grouting with footing for the pole is to

be provided. Drawing of the structure complete to be provided

A vented acid proof and corrosion resistant battery box for housing the storage

battery indoors should be provided having theft proof arrangement.

4.9 OTHER FEATURES The system should be provided with 2 LED indicators: a green light to indicate

charging in progress and a red LED to indicate deep discharge condition of the

battery. The green LED should glow only when the battery is actually being

charged.

There will be a Name Plate on the system which will give:

Name of the Manufacturer or distinctive logo.

Model or Type No.

AEDA Logo and “RVEP-Phase II under MNRE, GOI” should be printed on the Battery Box

Components and parts used in solar home system should confirm to the latest BIS

specifications, wherever such specifications are available and applicable.

The PV module or system will be warranted as per the clause given in Volume-I of

the NIT documents. The manufacturer can also provide additional information

about the system and condition of warranty as necessary. The warranty card shall

be supplied as per Proforma -VIII.

4.10 An operation, Instruction Maintenance Manual in English and the local language

should be provided with the solar home lighting system. The following minimum

details must be provided in the manual:

(a) About Photovoltaic

(b) About Street Light – its components and expected performance.

(c) About PV Module.

(d) About CFL

(e) Clear instructions about mounting of PV module(s)

(f) About electronics

(g) About electronics

(h) About charging and significance of indicators.

(i) Dos and Don’ts

67

Page 68: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

(j) Clear instructions on regular maintenance and trouble shooting of solar home

system

(k) Name and address of the person or service center to be contacted in case of

failure or complaint.

4.11 INSTALLATION INSTRUCTIONS The SPV module should be fixed on standard pole for solar street lights

Adequate space should be provided behind the PV module / array for allowing

unobstructed air flow for passive cooling.

Cables of appropriate size should be utilized to keep electrical losses to a bare

minimum (e.g. Length of the wire from module to charge controller and charge

controller to load should be as minimum as possible)

The battery should be located in a dry area with proper ventilation. Care should be

taken to ensure that the battery is placed with appropriate leveling on a

structurally sound surface.

The control electronics should not be installed directly above the battery. All wiring

should be in proper conduit or capping casing. Wire should not be hanging loose.

5.0 OTHER GENERAL POINTS5.1 Any minor equipment and material which may not be specifically mentioned in this

specification but are required to make the system complete in every respect in

accordance with technical specification and guaranteed performance of the

equipment shall be deemed to have been covered under the scope of this

specification and shall be provided by the Bidder/supplier within the quoted price.

5.2 The Bidder shall satisfy the purchaser that he possesses the necessary technical

experience and has at his disposal suitable facilities and staff to ensure that the

contract shall be executed with the best quality material and workmanship within the

stipulated time. Necessary particulars in this regard shall be furnished with the

Tender.

5.3 The equipment supplied shall be new and best of their kind and of latest technology

on the date. All materials and equipment shall comply with the latest MNRE

Standard.

5.4 The equipment shall be designed to have maximum reliability and ease of operation

and maintenance as primary consideration. The equipment offered shall be of a

family having basic design as per which other equipment have already been

supplied and which have operated efficiently and reliably elsewhere at least three

years under similar climatic and operating condition. Operation feed back for such

plants already supplied shall be attached with the offer.

68

Page 69: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

5.5 All the equipment supplied shall be guaranteed for quality workmanship and

compliance with the specified requirements for integrated performance to deliver

rated output.

69

Page 70: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

SECTION-6PROFORMA

70

Page 71: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

ASSAM ENERGY DEVELOPMENT AGENCY Bigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone: 0361-2464619, 2464621, Fax: 0361-2464617

e-mail: [email protected] No. AEDA/244/2008/22

Techno- Commercial Part : Part – II / Price Part : Part – III(In Sealed Cover part –II & Part –III )

Proforma I

Format for Forwarding Letter

(To be submitted by bidders on official letter-head of the company)

No…………………..

To,

The Director

Assam, Energy Development Agency

Bigyan Bhawan, Near IDBI Bank

ABC, G.S. Road,

Guwahati -781005

Sub.: Offer in response to Notice Inviting Tender No…………………… for manufacture,

supply, Installation, commissioning and Comprehensive maintenance of SHLS and

SSLS.

Sir,

We are hereby submitting our offer in compliance with the terms and conditions

of the Notice Inviting Bid No. ……………………... As specified, the offer has been

submitted in two different envelops duly marked and sealed. The offer is submitted in

triplicate. We also further declare:

That we are submitting this offer under the above mentioned notice after having

fully read and understood the nature of the work and having carefully noted all the

specifications, terms & conditions laid down in the bid documents.

That we have never been debarred from executing similar type of work by any

Central / State / Public Sector Undertakings / Departments.

That we shall execute the offer/work as per specifications, terms & conditions of

the Bid Documents and in exact configuration of the sample submitted on award

of work.

That our offer shall remain valid for placement of purchase orders up to

71

Page 72: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Yours faithfully,

Dated ……………………..

(Authorized Signatory)

Name

Designation

Company Seal

ASSAM ENERGY DEVELOPMENT AGENCY Bigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone; 0361-2464619, 2464621, Fax: 0361-2464617

e-mail: [email protected] NIT No.AEDA/244/2008/22

Techno- Commercial Part – II(In sealed cover Part – II)

Proforma IIFormat for confirmation of Minimum Eligibility Condition

(To be submitted by bidders on official letter-head of the company)

No…………………..

To,

The Director

Assam Energy Development Agency

Bigyan Bhawan, Near IDBI Bank

ABC, G.S. Road,

72

Page 73: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Guwahati -781005

Subject: Confirmation of meeting the Minimum Eligibility Condition for NIT

No.………………………………. for Remote Village Electrification Programme .

Sir,

Having examined the Bid documents of NIT No. …………………, we hereby

confirm the following towards the minimum eligibility conditions to participate in the bid for

Manufacture, Supply and Maintenance of Solar Photovoltaic Systems –SHLS & SSLS

1) We are indigenous manufacturers of sub-systems of SPV Systems (Module or battery

or both).

2) We have valid test certificates from ___________________________________

(Solar Energy Centre (SEC) Gurgaon or Electronics Regional Test Laboratory (East)

(ERTL), Kolkata or Central Power Research Institute (CPRI), Thiruvananthapuram or

Electronics Test and Development Centre (ETDC), Bangalore) tested during the year

2004-05/2005-06 for the specific model of SHLS & SSLS to be supplied.

3) We confirm that these systems have been working satisfactorily since supply.

Certificate to this effect from the concerned State Nodal Agency and other

organisations is enclosed.

4) If any time, any of declaration is found to be false, our offer or order is liable to

rejection.

Yours faithfully,

Encl. attached.

(Authorized Signatory)

Dated Name

Designation

Company Seal …………

ASSAM ENERGY DEVELOPMENT AGENCY Bigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone: 0361-2464619, 2464621, Fax: 0361-2464617

73

Page 74: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

e-mail: [email protected]

NIT No. AEDA/244/2008/22Techno- Commercial Part : Part - II

Format for Compliance Certificate for meeting Technical Specifications -In sealed cover Part - II

Proforma III

(To be submitted by bidders on official letter-head of the company)

No…………………..

To,

The Director

Assam Energy Development Agency

Bigyan Bhawan, Near IDBI Bank

ABC, G.S. Road,

Guwahati -781005

Subject: Compliance Certificate for meeting Technical Specifications – Remote village

Electrification Programme

Sir,

Having examined and understood fully the contents of the Bid document of NIT

No.………………,…… we hereby confirm that the SHLS & SSLS/ products offered by us

herein meet the technical specifications and scope of work in to without any

deviation whatsoever from those specified in the bid documents towards fulfilling the

eligibility criteria & qualifications.

Yours faithfully,

Dated ……………………..

(Authorized

Signatory)

Name

Designation

Company Seal

74

Page 75: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

ASSAM ENERGY DEVELOPMENT AGENCY Bigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone: 0361-2464619, 2464621, Fax: 0361-2464617

e-mail: [email protected]

NIT No. AEDA/244/2008/22Techno-Commercial Part : Part – II / Price Part : Part - III

(In seal cover Part – II & Part – III) Pro

forma IV Format for authorizing for attending Bid Opening Meeting

(To be submitted by bidders on official letter-head of the company)

No…………………..

To,

The Director

Assam Energy Development Agency

Bigyan Bhawan, Near IDBI Bank

ABC, G.S. Road,

Guwahati -781005

Subject: Authorization letter for attending Bid Opening Meeting of NIT

No………………………… on Remote village Electrification

Sir,

We hereby authorize ……………………………………… (Name & Designation) to attend

the Bid Opening Meeting to be held on ………… at AEDA on behalf of our company. He

is also authorized to provide any clarification, if any, and signing of documents, etc. at the

time of opening.

The specimen signature of authorized person is as follows:

Dated ……………………..

(Specimen Signature)

Name & Designation

Yours faithfully,

75

Page 76: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

(Authorized Signatory)

Name

Designation

Company Seal

76

Page 77: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

ASSAM ENERGY DEVELOPMENT AGENCY Bigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone: 0361-2464619, 2464621, Fax: 0361-2464617

e-mail: [email protected]

NIT No. AEDA/244/2008/22 Tender Proforma for Techno- Commercial Part.

(In sealed cover Part – II)Proforma-V

(Techno- & Commercial Part II)

1 (a) Name of the manufacturer ; (b) Postal Address (c) Telephone No., Fax No., E-mail : d) GPS Co-ordinate of registered office and Factory campus :2. Name and designation of the authorized signatory to whom reference shall be made3. Nature of firm (individual/Partnership/ : Pvt. Ltd./Public Ltd. Co./ Public Sector) [Attach attested copy] and photographs of MD or two directors of the company.4. Registration No. :

5. Financial capability : (Attach certificate of financial capability from Bank/Financial Institution)6. Specify the item originally manufactured :7. % Growth in Net Worth in last three years :8. Name of govt. agencies to whom the manufacturer supplied during last 3 years (with supporting document) :9. Performance Certificate from Govt. Agency :

10. Year of staring of manufacturing of PV : Component. :11. International standard awarded : (Attach :photocopy of certificate)12. Installed capacity for solar product / Component :13. Production and sales of solar component : in last three years

Cont.

77

Page 78: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

14. Total sales of PV product during the last four years :15. Name of material and model type offered :16. Name of the work :17.Name of manufacturer of SHLS & SSLS with full address :

(i) SPV SHLS & SSLS(ii) PV Module :(iii) Control Electronics / Charge Controller :(iv) Battery :

18. Quantity offered SHLS SSLS :19. Indicate if the price has been quoted net &: firm FOR destination : (Prices shall be quoted as per format.)20. Acceptance of terms of payment :21. Acceptance of penalty clause :22. Validity of the offer up to :23. Particulars of Earnest Money Deposit Amount Bank Draft No. (Attach evidence)

24. Particulars of payment for purchase of Bid Documents : of quantity & specification (Attach evidence)25. Indicate delivery period :

26. Acceptance of the technical specifications. :(If not accepted, attach relevant technicalspecification duly approved and certifiedby designated competent authority)

27. (i) Whether attested photocopy of BISCertificate and/ or Test Certificate issued by MNES Approved Institution/ Centres attached. (Certificate shall be as required by MNES ) :

(ii) Whether proof of enlistment with MNES attached :

(iii) Give Registration No & other details on above, if any :

28. Performance Guarantee : (Give details and period of guarantee)

29. Warranty Details for each type of Material and sub- system. SHLS, SSLS,Control Electronics PV Module Battery

Cont.

30. Registration No if registered as SSI unit in Assam, or registered under NSIC for SPV System.

78

Page 79: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

(An attested copy of the registration No. to be attached.) :

31. Place of manufacturing of materials and place where the materials will be available for inspection. :

32. Whether the Bidder has submitted details regarding the supplies made to other organization. :

33. Any deviation made from the technical Specification and general terms and Conditions of Bid (Give details if any) :

34. Whether up-to-date Income tax, Sales tax Clearance certificate submitted or not : (Give details)

35. Details of any existing service network in Assam (Name & Address of service centre) :

36. Other details and remarks is any

37. All evidences of Tax Registration Numbers :(PAN No., VAT Registration, Service Tax Registration etc)

Signature of Authorized Signatory

Name . Designation . Company Seal .

(Separate sheet may be used for furnishing detailed information duly signed . This Bid Proforma must be submitted duly signed in case separate sheet is submitted)

ASSAM ENERGY DEVELOPMENT AGENCY Bigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone; 0361-2464619, 2464621, Fax: 0361-2464617

79

Page 80: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

e-mail: [email protected]

NIT No. AEDA/244/2008/22 (In sealed cover Part – II)

Proforma-VI (Techno- Commercial Part II)

(Information in Support of Meeting Eligibility Criteria)

Details of order received and executed by the manufacturer for supply of SHLS & SSLS to different Govt. Organization /AEDA/Other Nodal Agency/Other Organization during last three years.

S.L No

Name of Agency/Organization

P.O No/Date/Ordered Qty

Name of Model

Delivery Schedule

Qty supplied within schedule

Qty supplied after schedule

Date of full supply

1 2 3 4 5 6 7 8

Note: Attach Photo copies of purchase order Photo copies of certificate of satisfactory performance issued by concerned

Agencies/Organizations

Signature of Authorized Signatory

Name . Designation . Company Seal

ASSAM ENERGY DEVELOPMENT AGENCY Bigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone; 0361-2464619, 2464621, Fax: 0361-2464617

e-mail: [email protected]

80

Page 81: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

NIT No.AEDA/244/2008/22Price Part – III

(In sealed cover Part – III) Proforma VII Bid proforma for price bid for RVEP

Pleases refer to Annexures Group:

Sl. No.(1)

Item No.(2)

Description of Items

(3)

Rate per unit

Total Amount

Quantity Unit rate Including

all applicable taxes and

duties. *

Installation, Commissioning

**

C.M.C #

TOTAL

(4) (5) (6) (7)

1 A

Solar Photo Voltaic Domestic Lighting System (SDLS) conforming to Technical Specification

2 B

Solar Photo Voltaic Street Lighting System (SDLS) conforming to Technical Specification

Total Amount both in figures and words to be written for above.* Rates should be quoted inclusive of transportation, insurance cost, VAT. Income Tax etc, wherever necessary.** Rates should be quoted inclusive of all applicable Service Tax, Income tax, VAT and any other applicable taxes.# Rate should be quoted including insurance for 5 years plus Service Tax, income Tax and any

other applicable Taxes. Proforma VIIUse separate sheet and rows if necessary..Total Bid Value in figure = in words (Rupees ) only

Note: In case of discrepancy between unit price and total price , the unit price shall prevail

We agree to supply, install and demonstrate the performance of the above items of equipment/works and systems in accordance with the technical specifications for a contract price quoted against each item within the period specified in the Invitation for Bid

81

Page 82: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

We also confirm that applicable periods of on-site all comprehensive warranty/ guarantee for all items of equipment, goods and components shall be as per requirement of AEDA detailed in the List of Equipment along with specifications.

Signature of the authorized signatory ……….………………………………………………………………..

Place:……………………………………………………….Name

Date: ……………………………………………………….. Address

Office Seal

ASSAM ENERGY DEVELOPMENT AGENCYBigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone 0361-2464619, 2464621, Fax: 0361-2464617

e-mail: [email protected]

82

Page 83: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

NIT No. AEDA/244/2008/22Techno- Commercial Part II

Proforma-VIII

(To be supplied by bidders on official letter-head of the company)WARRANTY CARD

SSDL & SSLS1. Name & Address of the Manufacturer cum Supplier: of the System

2 Name & Address of the Purchasing Agency : 3 Date of supply of the system :

4. Details of PV module(s) supplied in the system a) Name of the Manufacturer : b) Make : c) Model : d) Serial No. : e) Wattage of the PV Module(s) under STC : f) Warranty valid up to :5. Details of Battery :

a) Name of the Manufacturer :b) Make :c) Model :d) Batch/Serial No(s) :e) Month & year of Manufacture :f) Rated V & AH capacity at C/20 or C/10 rated

at 270C : g) Warranty valid upto :6. Details of Electronics & other BOS item :

a) Name of the Manufacturer :b) Make :c) Model :

d) Serial No(s) :e) Month & year of Manufacture :f) Warranty valid upto :

7. Designation & Address of the person to be : contacted for claiming Warranty obligations

Place & Date: (Signature)Name & Designation of the authorized signatory

Name & Address of the Manufacturer / Supplier

(SEAL)

Filling Instructions:(1) The SHLS & SSLS components will be generally warranted as per clause 18 of General

Terms & Conditions & covering the MNRE specified warranty. The manufacturer can also provide additional information about the system and conditions of warranty as

83

Page 84: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

necessary. The warranty card to be supplied with the system must contain the details of the system supplied as per format given above.

(2) During the warranty period AEDA/ users reserve the right to cross check the performance of the systems for their minimum performance levels specified in the MNRE specifications.

ASSAM ENERGY DEVELOPMENT AGENCYBigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone 0361-2464619, 2464621, Fax: 0361-2464617

e-mail: [email protected]

84

Page 85: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

NIT No. AEDA/244/2008/22Techno- Commercial Part II

Proforma IX

FORMAT FOR NO DEVIATION CONFIRMATION Techno- Commercial Part II

ToThe DirectorAssam Energy Development AgencyBigyan Bhawan, Near IDBI BankABC, G.S. Road,Guwahati -781005

Dear Sir,We understand that any deviation/ exception in any form may result in rejection of bid. We therefore, certify that we have not taken any exceptions/ deviations anywhere in the bid and we agree that if any deviation is mentioned or noticed, our bid may be rejected.

Note: This NO DEVIATION CONFIRMATION should be written on the letterhead of the bidder indicating tender ref. no. duly signed and stamped with date by a person competent and having the power of attorney to bind the bidder.

Signature of Authorized Signatory

Name . Designation . Company Seal

85

Page 86: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

ASSAM ENERGY DEVELOPMENT AGENCYBigyan Bhawan, Near IDBI Building, G.S. Raod,

GUWAHATI-781005 Phone 0361-2464619, 2464621, Fax: 0361-2464617

e-mail: [email protected]

NIT No. AEDA/244/2008/22

Proforma -X

CONTRACT AGREEMENT FORMAT

This contract ( hereinafter, together with all attachment annexed hereto and

forming its integral part thereof, call the Contract on the …………………….day of the

month of

2009, between, Assam Energy Development Agency ,

authorized by the Govt. of Assam to undertake schemes for implementation of Remote

Village Electrification programme under MNRE , Govt of India. and having its Head Office

at Bigyan Bhawan, G.S Road, Guwahati – 781 005 and represented by The Director,

( hereinafter referred to as AEDA which expression shall unless repugnant to the context

of meaning thereof includes its successors and assigns ) of the one part and

………………...

………………………………………………………………………………………………

…………………………………………………………………………………………

a Company registered under the Laws of ………………………………………………….

and having its registered office at ………………………………………………………….

………………………………………………………………………………………………

86

Page 87: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

( hereinafter called the contractor which expressed shall repugnant to the context of

meaning thereof includes its successors and assigns ) of the other part.

WHEREAS

(A) AEDA has placed work order for supply, installation, commissioning and

comprehensive maintenance contract for 5 years of the Solar Photo Voltaic Home

Lighting Systems and Solar Photo Voltaic Street Lighting Systems and provide

other services as covered in this contract vide work order

………………………………………

……………………………. Dtd. …………………………………………………………..

(B) The contractor has accepted the work order as set forth above vide reference

No...

…………………………………………………………….. dtd. …………………………

(C) The AEDA and the contractor shall jointly be termed as “ Parties “.

(D) The contractor, having represented to AEDA that they have the required

professional skill, personnel and technical resource have agreed to provide the

services on the terms and conditions set forth in this contract.

NOW THEREFORE THE PARTIES HERETO HEREBY AGREE AND COVENANT AS

FOLLOWS :

1. The parties hereto hereby covenant, bind and undertake to observe and

perform this contract faithfully for the work of “ Supply” , Installation,

Commissioning at site and Comprehensive Maintenance Contract (CMC) for

5(five) years of complete Solar Photo Voltaic Home Lighting Systems

( Nos.) and Solar Photo Voltaic Street Lighting Systems ( Nos.) in the

individual House holds of Nos. of un-electrified remote census villages in

the State of Assam” and execute, perform and do all works and things

87

Page 88: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

mentioned and described in the contract and in all other documents annexed

hereto and in accordance with such conditions, specifications and terms and

conditions forming part of this contract to the entire satisfaction of ASEB and

shall respect, perform, observe and fulfill all such terms, conditions and

specifications which are expressed or intended to be performed, observed or

fulfilled by the contractor.

2. The following documents, which are deemed to be integral part of this

contract as in herein, set out verbatim and / or is hereto annexed shall be

binding on the parties.

(i) : INB, GT& CC , Proforma, & Annexure of Bidding Documents

(ii) : Contractor’s Compliance Certificate to the various sections of the NIT .

(iii): Offered Prices.

(iv): Negotiation record, if any.

(v) : Copy of Letter of Intent No……………… and acceptance.

(vi): Copy of Work Order No………………….and acceptance.

Security Deposit : The contractor has deposited a security amount to the

tune of ………………………………….by………………………………………..

The security deposit shall be released after successful completion of isupply,

installation, commissioning of the work on satisfactory third party monitoring

report.

3. The parties hereto hereby agree and declare that the contractor shall

execute the work as defined in the contract in the manner and as prescribed in

this contract or which are implied or may be necessary for the completion of

the said work or incidental thereto on the terms and conditions mentioned in

the contract and AEDA will make payment to the contractor as per payment

Clause In General Terms & condition of Contract.

In witness whereof the parties hereto have signed this agreement hereunder

on the date respectively mentioned against signature of each.

88

Page 89: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

FOR AND ON BEHALF OF FOR AND ON BEHALF OF

SUPPLIER/MANUFACTURER/ ASSAM ENERGY DEVELOPMENT AGENCY

CONTRACTOR

PLACE :

DATE :

WITNESS :

1.

2.

89

Page 90: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

90

Page 91: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

SECTION-7ANNEXURES

91

Page 92: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

GROUP-I

Sl

No

Name of

District

No of

Villages

No of

HLS

(HH)

No of

HLS

(Comm)

Total

HLS

No of

SLS

1 Dhubri 21 1247 66 1313 43

2 Kokrajhar 10 464 26 490 23

3 Bongaigaon 19 2339 59 2398 148

4 Barpeta 9 1337 17 1354 103

Total 59 5387 168 5555 317

SL

No

No

of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

Total

SLS

Dhubri

1 1 34/101

Raur Par

(Rowarpara) Salmara (S) Dhubri 207800

25 1

26 1

2 2 35/101 Dighirpar Salmara (S) Dhubri 209000 14 1 15 1

3 3 39/101Choto Kulia Pt-II

Salmara (S) Dhubri 213500213 35

248 8

4 4 55/101

Choto Kulia Pt-

III Salmara (S) Dhubri 213600

2 0

2 0

5 5 85/101 Tharigrambita Gauripur Dhubri 141100 42 2 44 2

6 6 86/101 Mantirchar Gauripur Dhubri 141200 60 4 64 2

7 7 87/101 Fulkakata I Gauripur Dhubri 141300 75 4 79 3

8 8 88/101 Fulkakata II Gauripur Dhubri 141400 66 1 67 2

9 9 89/101 Fulkakata III Gauripur Dhubri 141500 66 4 70 3

10 10 90/101

Shialmari/

Saulmari Bilasipara Dhubri 171500

105 2

107 3

11 11 91/101 Khurkhuri Bilasipara Dhubri 171900 60 1 61 2

12 12 92/101

Tindubi

Phuhirtari (Char) Salmara (S) Dhubri 199500

71 2

73 2

13 13 93/101 Tulsi Para Salmara (S) Dhubri 199800 9 1 10 0

14 14 94/101 Pahirtari Salmara (S) Dhubri 199900 71 0 71 2

15 15 95/101

Berarjhar/

Berurghar Salmara (S) Dhubri 206900

56 1

57 2

92

Page 93: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

16 16 96/101 Mahajan Para Salmara (S) Dhubri 207200 82 1 83 2

17 17 97/101 Routhmari Salmara (S) Dhubri 207200 29 2 31 1

18 18 98/101 Mandia Salmara (S) Dhubri 207400 105 1 106 3

19 19 99/101 Sundar Para Pt-I Salmara (S) Dhubri 207500 60 1 61 2

20 20

100/10

1

River Block -7

Salmara (S) Dhubri 207600

20 1

21 1

21 21

101/10

1

Pagla Para

Salmara (S) Dhubri 207700

16 1

17 1

Total No of Sysyem of Dhubri 1247 66 1313 43

Kokrajhar

SL

No

No

of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB)

Total

SLS

22 1 1/65 Kathal Mari Sidli Chirang Kokrajhar. 93900 162 2 164 16

23 2 89/206 Sukunjhar Saijhar Bhowguri Kokrajhar 41500 25 3 28 1

24 3 90/206 Chandra Pur Gosai Gaon Kokrajhar 23700 51 4 55 1

25 4 91/206 Pub Pata Bari Sidi Chirang

Chirang

(Kokrajhar) 88700 37 5 42 1

26 5 92/206

Aienadi

Dhubri NO. - 2 Sidi Chirang

Chirang

(Kokrajhar) 88400 16 2 18 0

27 6 93/206 Aiepowali NO. – 1 Sidi Chirang

Chirang

(Kokrajhar) 88000 14 2 16 0

28 7 94/206

Aienadi Dhubri

NO. – III Sidi Chirang

Chirang

(Kokrajhar) 89200 14 0 14 0

29 8 95/206

Aienadi Dhubri

NO. - IV Sidi Chirang

Chirang

(Kokrajhar) 89300 27 1 28 1

30 9 96/206 Aiechara Sidi Chirang

Chirang

(Kokrajhar) 90000 35 3 38 1

31 10 97/206 Bhurapara Dotma Kokrajhar 93800 83 4 87 2

Total No of Systems of Kokrajhar 464 26 490 23Bongaigaon

93

Page 94: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

SL

No

No

of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB)

Total

SLS

32

1 2/65 Kawadi (Sonalika

No 2)

Manikpur Bongaigaon 384800 271 2 273 27

33

2 3/65 Kawadi (Sonalika

No 1)

Manikpur Bongaigaon 384700 187 1 188 19

34

3 4/65 Kheluapara Part I

OLD

Boitamari Bongaigaon 330800 166 5 171 17

35 4 7/65 Sisubari Boro bazar Bongaigaon 359700 57 2 59 6

36 5 8/65 Bashbari No. 1 Manikpur Bongaigaon 392000 237 4 241 24

37 6 10/65 Jhankura Pt II Boitamari Bongaigaon 326900 179 5 184 18

38 7 70/101 Bhandara No.6 Manikpur Bongaigaon 391900 78 12 90 4

39 8 71/101 Palasguri No.2 Manikpur Bongaigaon 364000 79 3 82 3

40

9 72/101 Odalguri No.1,

Adalguri No.2

Manikpur Bongaigaon 363600 56 2 58 2

41 10 73/101 Choraikhosra Manikpur Bongaigaon 367500 12 1 13 1

42 11 74/101 Majhrabari Manikpur Bongaigaon 368400 37 3 40 2

43 12 75/101 Chikajhora No.3 Manikpur Bongaigaon 370900 114 1 115 4

44 13 76/101 Abdaguri Manikpur Bongaigaon 377100 50 5 55 3

45 14 77/101Gourabdora No.2

Manikpur Bongaigaon 37730011 1

12 1

46 15 78/101 Alengmari Manikpur Bongaigaon 379400 161 2 163 5

47 16 79/101 Debechuri Pt-I Srijangram Bongaigaon 356100 298 6 304 5

48 17 80/101 No.6 Char Srijangram Bongaigaon 359300 267 1 268 5

49

18 81/101 Khorchimari

NC-II

Srijangram Bongaigaon 327600 7 1 8 0

50

19 82/101 Uchungarchar

Pt-III

Srijangram Bongaigaon 327900 72 2 74 2

Total no of Systems of Bongaigaon 2339 59 2398 148Barpeta

SL

No

No

of

Villages San.

Sl No

Name of the

Villages Bolck District

Census

Code HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB)

Total

SLS

51 1 5/65 Phulora NC Mondia Barpeta 435200 128 4 132 13

52 2 6/65 Sikatary Mondia Barpeta 433400 245 4 249 25

94

Page 95: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

53 3 9/65 Dhakaliapara Mondia Barpeta 432900 223 0 223 22

54 4 11/65 Katbal Pather Bhawanipur Barpeta 498100 350 2 352 35

55 5 84/206 Gola Gaon NC Jalah Barpeta 512400 29 2 31 1

56 6 85/206 Bhutia Para NC Jalah Barpeta 512700 56 2 58 1

57 7 86/206 Chapna NC Jalah Barpeta 512600 10 0 10 0

58 8 87/206 Belortari Gamaful Bari Barpeta 470500 150 1 151 3

59 9 88/206 Mainamath Pothar Gobur Dhan Barpeta 408000 146 2 148 3

Total no of Systems of Barpeta 1337 17 1354 103

Grand Total of Gr I 5387 168555

5317

95

Page 96: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

GROUP-II

Sl

No

Name

of

District No of Villages

No of

HLS

(HH)

No of

HLS

(Comm)

Total

HLS

No of

SLS

1 Dhemaji128 5832 187 6019

138

SL

No

No of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code HLS (HH)

HLS

for

CB

Total

HLS

Total

SLS

Dhemaji

1 1 3/127 Cilli Bij Bari Dhemaji Dhemaji 1439300 36 4 40 1

2 2 4/127 Alu para Dhemaji Dhemaji 1440000 21 0 21 0

3 3 5/127 No. 2 Cilli Nepali Dhemaji Dhemaji 1440100 39 3 42 1

4 4 6/127 No. 1 Arne Chpori Dhemaji Dhemaji 1440200 20 1 21 0

5 5 7/127 Pan Bari Siva Nagar Dhemaji Dhemaji 1440300 5 1 6 0

6 6 8/127 Muktiar Ajarbari Hajong Dhemaji Dhemaji 1440400 13 1 14 0

7 7 9/127 No. 2 Nalbari Dhemaji Dhemaji 1441000 38 2 40 1

8 8 10/127 Gowranga Pur Dhemaji Dhemaji 1441700 20 2 22 0

9 9 11/127

No. 2 Manikpur

Balichar Dhemaji Dhemaji 1442000 41 2 43 1

10 10 12/127 No.1 Manikpur Balichar Dhemaji Dhemaji 1442100 14 0 14 0

11 11 13/127 Arne pan Bari Hajong Dhemaji Dhemaji 1442700 7 0 7 0

12 12 14/127 No. 1 Moha Ranipur Dhemaji Dhemaji 1443800 41 2 43 1

13 13 15/127 No. 2 Moha Ranipur Dhemaji Dhemaji 1443900 20 1 21 0

14 14 51/127 Tulakshi pur Simen Dhemaji Dhemaji 1437900 20 1 21 0

15 15 52/127

Majar Bari Krishna

Nagar Dhemaji Dhemaji 1438200 39 2 41 1

16 16 53/127 Lamajan Asomiya Dhemaji Dhemaji 1438400 45 3 48 1

17 17 54/127

Sengajan Krishna

Nagar Dhemaji Dhemaji 1438700 12 2 14 0

18 18 55/127 Sengajan Major Bari Dhemaji Dhemaji 1438800 39 2 41 1

96

Page 97: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Asomiya

19 19 56/127 Muktiar Lakshimi Dhemaji Dhemaji 1440500 64 2 66 1

20 20 57/127 Kashinath Hazong Dhemaji Dhemaji 1440600 48 1 49 1

21 21 58/127 Hari Nath Pur Dhemaji Dhemaji 1440700 48 2 50 1

22 22 59/127 Napam Kuli Dhemaji Dhemaji 1440800 27 2 29 1

23 23 60/127 Kawa Guri Dhemaji Dhemaji 1440900 21 1 22 0

24 24 61/127

Kassi Nath Chapori

Missing Dhemaji Dhemaji 1441100 56 1 57 1

25 25 62/127 Kherbari Bongali Dhemaji Dhemaji 1441500 46 3 49 1

26 26 63/127 Sriram Pur Dhemaji Dhemaji 1441900 54 3 57 1

27 27 64/127 No.2 Kareng Balipur Dhemaji Dhemaji 1442300 19 1 20 0

28 28 65/127 Sibanagar Balipur Dhemaji Dhemaji 1442400 57 2 59 1

29 29 66/127 Kakabari Kamalapur Dhemaji Dhemaji 1442500 66 1 67 1

30 30 67/127 Kadamtala 1 & 2 Dhemaji Dhemaji 1443000 9 1 10 0

31 31 68/127 Bukabeel Dhemaji Dhemaji 1443100 30 3 33 1

32 32 69/127

No. 2 Muktiyar

Bukabeel Dhemaji Dhemaji 1443500 16 1 17 0

33 33 70/127 Bishnu Nagar Dhemaji Dhemaji 1443600 20 4 24 0

34 34 71/127

Bolikota Missing

(Sagalikota) Dhemaji Dhemaji 1444000 20 2 22 0

35 35 72/127 Ramaya Pur Dhemaji Dhemaji 1444100 16 2 18 0

36 36 73/127 No. 2 Kakabari

Mur Kong

Seleck Dhemaji 1444200 23 1 24 0

37 37 74/127 Mouza Chapori

Mur Kong

Seleck Dhemaji 1444900 15 1 16 0

38 38 75/127 Manik Pur

Mur Kong

Seleck Dhemaji 1446800 11 2 13 0

39 39 76/127 Simen Koiborta

Mur Kong

Seleck Dhemaji 1446700 9 1 10 0

40 40 77/127 Sensowa

Mur Kong

Seleck Dhemaji 1447100 13 2 15 0

41 41 78/127 Hosong

Mur Kong

Seleck Dhemaji 1448000 57 1 58 1

42 42 79/127 Mach Khowa

Mur Kong

Seleck Dhemaji 1448200 24 3 27 0

97

Page 98: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

43 43 80/127 Bokajan

Mur Kong

Seleck Dhemaji 1448400 24 1 25 0

44 44 81/127 Bara Bhakat

Murkong

seleck Dhemaji 1448500 66 4 70 1

45 45 82/127 Kakabari Dharmapur Dhemaji Dhemaji 1442600 10 1 11 0

46 46 11/206 Kecha Kathoni Dhemaji Dhemaji 1379400 21 1 22 0

47 47 12/206 Adikalia Majgaon Dhemaji Dhemaji 1380700 50 2 52 1

48 48 13/206

Ronganadi

Chapori Dhemaji Dhemaji 1380800 44 2 46 1

49 49 14/206 Chechela Dhemaji Dhemaji 1386600 19 1 20 0

50 50 15/206 Jungle Block Dhemaji Dhemaji 1386700 16 1 17 0

51 51 16/206 No. 3 Ramyapur Dhemaji Dhemaji 1407500 42 1 43 1

52 52 17/206 No. 2 Ramyapur Dhemaji Dhemaji 1407700 63 2 65 1

53 53 18/206 Gamri Gaon Dhemaji Dhemaji 1409400 29 2 31 1

54 54 19/206

No. 1

Ramayapur Dhemaji Dhemaji 1409600 17 1 18 0

55 55 20/206 No. 3 Lakhipur Gohain Dhemaji Dhemaji 1409700 68 2 70 1

56 56 21/206

No. 1 Uday

pur Gaon Dhemaji Dhemaji 1409800 44 2 46 1

57 57 22/206

No. 1 Lepe

Barhoiting Dhemaji Dhemaji 1410200 29 2 31 1

58 58 23/206

No. 2 Lepe

Barhoiting Dhemaji Dhemaji 1410300 49 1 50 1

59 59 24/206 Dighali Chapori Dhemaji Dhemaji 1418500 24 1 25 0

60 60 25/206 Dighali Gaon Dhemaji Dhemaji 1418600 60 2 62 1

61 61 26/206 Pamua Gaon Dhemaji Dhemaji 1419200 37 2 39 1

62 62 27/206 Chabori Gaon Dhemaji Dhemaji 1422400 38 1 39 1

63 63 28/206 Pumi Gaon Dhemaji Dhemaji 1423300 117 2 119 1

64 64 29/206 Kareng Gaon Dhemaji Dhemaji 1423400 69 2 71 2

65 65 30/206 Mer chapori Dhemaji Dhemaji 1423500 64 2 66 1

66 66 51/206 Sesu Dighali Gaon Dhemaji Dhemaji 1423700 84 1 85 2

67 67 52/206 Naharani Kuli Dhemaji Dhemaji 1424200 50 2 52 1

68 68 53/206 Bauli Miri Dhemaji Dhemaji 1424300 56 2 58 1

69 69 54/206 No.- 1 Amlakhi Dhemaji Dhemaji 1424400 39 0 39 1

70 70 55/206 No.- 2 Amlakhi Dhemaji Dhemaji 1424500 72 2 74 2

71 71 56/206 Bhekeli Tangani Dhemaji Dhemaji 1424600 82 2 84 2

72 72 113/206 Mer Debera Dhemaji` Dhemaji 1424700 21 1 22 1

98

Page 99: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

73 73 114/206 Pipal Guri Dhemaji Dhemaji 1424800 56 1 57 2

74 74 115/206 Kalyani Gaon Dhemaji Dhemaji 1424900 59 1 60 2

75 75 116/206 Namki Gaon Dhemaji Dhemaji 1425100 57 1 58 2

76 76 117/206 Debera Gaon Dhemaji Dhemaji 1425200 24 1 25 1

77 77 118/206 Singi Beel Dhemaji Dhemaji 1426600 38 1 39 1

78 78 119/206 RangaKap Bill Dhemaji Dhemaji 1425900 20 1 21 1

79 79 120/206 No2 Saru Bauli Dhemaji Dhemaji 1425400 2 0 2 0

80 80 121/206 Dalpung Gaon Dhemaji Dhemaji 1426000 34 1 35 1

81 81 122/206 No1 Bulakata Dhemaji` Dhemaji 1426200 45 1 46 1

82 82 123/206 No1 Luvia Chuk Dhemaji Dhemaji 1426300 49 1 50 1

83 83 124/206 Siri Kali Gaon Dhemaji Dhemaji 1427900 12 1 13 1

84 84 125/206 No2 Manuha Beel Dhemaji Dhemaji 1427400 32 1 33 1

85 85 126/206 No1 SaruBauli Dhemaji Dhemaji 1425600 44 1 45 1

86 86 127/206 Batua Nepali Dhemaji Dhemaji 1425500 67 1 68 2

87 87 128/206 Nepali Bari Dhemaji Dhemaji 1427700 26 1 27 1

88 88 129/206 Khojua Gaon Dhemaji Dhemaji 1425700 77 1 78 2

89 89 130/206 Bulakata Gohain Dhemaji Dhemaji 1425800 72 1 73 2

90 90 131/206 No. 2 Bulakata Dhemaji Dhemaji 1426100 65 1 66 2

91 91 132/206 Batua Miri Dhemaji Dhemaji 1426500 84 1 85 2

92 92 133/206 Bhangidia Pathar Dhemaji Dhemaji 1426900 63 1 64 2

93 93 134/206 Bhangidia Gaon Dhemaji Dhemaji 1427100 86 1 87 2

94 94 135/206 Upar Bhangidia Gaon Dhemaji Dhemaji 1427200 41 1 42 1

95 95 136/206 Balijan Dhemaji Dhemaji 1427300 49 1 50 1

96 96 137/206 Punai Gaon Dhemaji Dhemaji 1425000 99 1 100 2

97 97 138/206 Bhadia Chuk Dhemaji Dhemaji 1426700 55 1 56 2

98 98 139/206 No.1 Dumkata Dhemaji Dhemaji 1427500 101 1 102 3

99 99 140/206 Dijmur Miri Dhemaji Dhemaji 1430200 40 1 41 1

100 100 141/206 Tangani Nalbari Dhemaji Dhemaji 1432200 60 1 61 2

101 101 142/206 Kerakani Maj Gaon Dhemaji Dhemaji 1432600 102 1 103 3

102 102 143/206

Nilakh Salakhani

Borbam Dhemaji Dhemaji 1433600 60 1 61 2

103 103 144/206 No.2 Majar Bari Dhemaji Dhemaji 1437600 35 1 36 1

104 104 145/206 No.3 Majar Bari Dhemaji Dhemaji 1437700 81 1 82 2

105 105 146/206 Bor Bauli Dhemaji Dhemaji 1426400 74 1 75 2

106 106 147/206

No. 2 Bhangidiya

Pathar Dhemaji Dhemaji 1427000 61 1 62 2

107 107 148/206 Vereki Kachamari Dhemaji Dhemaji 1427600 75 1 76 2

99

Page 100: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

108 108 149/206 Bor Chapori Dhemaji Dhemaji 1427800 108 2 110 3

109 109 150/206 Sengajan Kachari Dhemaji Dhemaji 1437800 101 1 102 3

110 110 179/206 Gali Pathar Singapur

Murkong

selleck Dhemaji 1471800 68 2 70 2

111 111 180/206

Jone Kareng

Lolitimorang

Murkong

selleck Dhemaji 1471900 66 2 68 2

112 112 181/206

Jone Kareng Rest

Camp

Murkong

selleck Dhemaji 1472000 75 2 77 2

113 113 182/206 Debing Mishing Gaon

Murkong

selleck Dhemaji 147220 35 1 36 1

114 114 183/206

Jone Kareng

Chamaibari

Murkong

selleck Dhemaji 1472300 9 1 10 1

115 115 184/206 Jone Kareng

Murkong

selleck Dhemaji 1472400 44 2 46 1

116 116 185/206

No. 3, Rayeng

Sukannalla

Murkong

selleck Dhemaji 1472500 30 1 31 1

117 117 186/206 No.3, Rajakhana

Murkong

selleck Dhemaji 2472600 41 1 42 1

118 118 187/206 No.3, Rayeng Nepali

Murkong

selleck Dhemaji 1472700 226 3 229 5

119 119 188/206 No.1, Kaitong Maskhowa Dhemaji 1485300 79 2 81 2

120 120 189/206 No. 2, Kaitong Maskhowa Dhemaji 1485400 30 1 31 1

121 121 190/206 Solmara Gaon Maskhowa Dhemaji 1487400 60 2 62 2

122 122 191/206 Durpadi Pathar Maskhowa Dhemaji 1487500 18 1 19 1

123 123 192/206 Mangaldai Para Bordoloni Dhemaji 1493000 15 1 16 1

124 124 193/206 No.1, Salmari N.C Bordoloni Dhemaji 1496200 17 1 18 1

125 125 194/206 Chawtal Pur Bordoloni Dhemaji 1497600 28 1 29 1

126 126 195/206 Madan Pur Bordoloni Dhemaji 1507500 51 2 53 2

127 127 196/206 Bengali Jan Bordoloni Dhemaji 150790 46 2 48 1

128 128 197/206 Chengeli Suit, No.2 Bordoloni Dhemaji 1508000 97 2 99 2

Grand Total of Gr II 5832 187 6019 138

100

Page 101: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

GROUP-III

Sl

No

Name

of District

No of

Villages

No of

HLS (HH)

No of

HLS

(Comm)

Total

HLS

No of

SLS

1 Sonitpur 31 1872 34 1906 55

2 Lakhimpur 32 1710 58 1768 111

3 Tinsukia 31 431 26 457 8

4 Dibrugrah 6 204 3 207 16

5 Sivsagar 1 45 2 47 1

6 Jorhat 12 663 23 686 33

7 NC Hills 16 711 51 762 73

Total 129 5636 197 5833 297

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB) Total SLS

Sonitpur

1 1 30/101 No.1 Siruani Tezpur Sonitpur 1159800 12 1 13 1

2 2 31/101 Majuli Sar Dhekiajuli Sonitpur 1114500 13 1 14 1

3 3 32/101

Chilabanda

Sonari Tezpur Sonitpur 1167100 3 0 3 0

4 4 33/101 Ramdas Tapu Dhekiajuli Sonitpur 1113800 15 1 16 1

5 5 36/101

Mahari Chapori

(Meghai) Tezpur Sonitpur 1169500 21 1 22 1

6 6 37/101 Arimara Pan Tezpur Sonitpur 1151000 16 1 17 1

7 7 38/101 Tarajuli Chaiduar Sonitpur 1223600 5 1 6 0

8 8 40/101 Thote Chapori Chaiduar Sonitpur 1230300 2 1 3 0

9 9 41/101 No.2 Hatijan Chaiduar Sonitpur 1230400 3 1 4 0

10 10 42/101 Mohloti Chaiduar Sonitpur 1232300 3 0 3 0

11 11 43/101

Uma Tormani

(Umatomani) Biswanath Sonitpur 1194900 3 0 3 0

12 12 44/101 kehuwa Chaiduar Sonitpur 1232200 2 0 2 0

13 13 45/101 Gonai Tapu Chaiduar Sonitpur 1219900 10 1 11 1

14 14 46/101 Bahumari Chaiduar Sonitpur 1251500 10 1 11 1

15 15 47/101

No.1 Makua

Chapori Tezpur Sonitpur 1158500 2 0 2 0

16 16 48/101 Morisall Tapu Dhekiajuli Sonitpur 1114000 31 2 33 1

101

Page 102: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

17 17 49/101

No. 3 Makua

Chapori Tezpur Sonitpur 1158300 22 2 24 1

18 18 50/101 Marisuti Gaon Tezpur Sonitpur 1160200 28 1 29 1

19 19 51/101

No.2 Makua

Chapori Tezpur Sonitpur 1158400 25 1 26 1

20 20 52/101 Bherveri Pathar Gohpur Sonitpur 1241800 31 1 32 1

21 21 53/101 Borphalong Gohpur Sonitpur 1241600 47 1 48 2

22 22 54/101 Dak Chapori Gohpur Sonitpur 1251300 54 1 55 2

23 23 56/101 No.1 Tangia Tezpur Sonitpur 1180700 59 1 60 2

24 24 57/101

No.2 Nabil

Kachari Gaon Dhekiajuli Sonitpur 1101300 67 3 70 3

25 25 58/101 Siparia Chapori Dhekiajuli Sonitpur 1100400 64 1 65 3

26 26 59/101

Singari

Protected

Forest area Dhekiajuli Sonitpur 1111100 79 1 80 2

27 27 60/101 No.2 Siruani Tezpur Sonitpur 1159900 125 1 126 4

28 28 61/101 Singitali Gaon Chaiduar Sonitpur 1129600 414 3 417 8

29 29 84/101 Kutum Gaon Chaiduar Sonitpur 1251400 121 1 122 4

30 30 110/206 Jahajduba Gaon Tezpur Sonitpur 1155500 168 1 169 5

31 31 111/206 N0 - 3 Siruani Tezpur Sonitpur 1159700 417 3 420 8

Total no of systems of Sonitpur 1872 34 1906 55Lakhimpur

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB) Total SLS

32 1 16/74 Bahbari Narayanpur Lakhimpur 1284400 102 4 106 11

33 2 17/74 Bhalukaguri Karunabari Lakhimpur 1295600 126 2 128 13

34 3 18/74 Chalichuk N.C. Boginadi Lakhimpur 1340900 150 1 151 15

35 4 19/74 Borhamukh N.C. Telahi Lakhimpur 1341500 206 4 210 21

36 5 20/74

Mahara

Barchapari Telahi Lakhimpur 1341900 56 2 58 6

37 6 21/74 Dhala Miri N.C. Telahi Lakhimpur 1344100 50 2 52 5

38 7 22/74 Ligiramukh Telahi Lakhimpur 1344200 159 3 162 16

39 8 23/74 Bangkeleng Ghilamora Lakhimpur 1371700 48 1 49 5

40 9 57/206

Borokhi Mukh

NC Telahi Lakhimpur 1343200 60 3 63 2

41 10 58/206 Balijan NC Telahi Lakhimpur 1343100 32 2 34 1

102

Page 103: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

42 11 59/206

Assera

Katamiri NC Telahi Lakhimpur 1342900 55 3 58 2

43 12 60/206 Karah Chapori Telahi Lakhimpur 1342600 33 2 35 1

44 13 61/206 Gamchuk Telahi Lakhimpur 1342700 45 2 47 1

45 14 62/206 Gulabori NC Telahi Lakhimpur 1342000 42 3 45 1

46 15 63/206 Jengrai Nc Telahi Lakhimpur 1343000 22 2 24 0

47 16 64/206

Mahara

Barchapori Telahi Lakhimpur 1341600 20 0 20 0

48 17 65/206 Bandar Kata NC Telahi Lakhimpur 1341700 21 1 22 0

49 18 66/206 Uhani NC Telahi Lakhimpur 1341200 5 0 5 0

50 19 67/206 Uriumtol NC Telahi Lakhimpur 1341300 24 1 25 1

51 20 68/206 Roumari NC Telahi Lakhimpur 1341400 5 0 5 0

52 21 69/206 Malaha Khati Boginadi Lakhimpur 1358300 5 0 5 0

53 22 70/206 Purana Parghat Boginodi Lakhimpur 1321400 38 2 40 1

54 23 71/206 Bhori Dhowa Boginodi Lakhimpur 1325400 26 1 27 1

55 24 72/206 Tinsukia Boginodi Lakhimpur 1325500 31 1 32 1

56 25 73/206 Ghauli Chuk Boginodi Lakhimpur 1325700 43 2 45 1

57 26 74/206 Mer Gaon Boginodi Lakhimpur 1325800 74 3 77 2

58 27 75/206 Polash Para NC Boginodi Lakhimpur 1340500 13 2 15 0

59 28 76/206

Ghunsuti

Bebejia Boginodi Lakhimpur 1340700 22 0 22 0

60 29 77/206

Rajbhera

Santipur Telahi Lakhimpur 1343400 20 1 21 0

61 30 78/206 Morton Chapori Telahi Lakhimpur 1343500 32 2 34 1

62 31 79/206 Adisuti NC Telahi Lakhimpur 1342100 61 3 64 1

63 32 98/206 Singimari Telahi Lakhimpur 1342800 84 3 87 2

Total no of systems of Lakhimpur 1710 58 1768 111Tinsukia

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB) Total SLS

64 1 14/74

Sapmari

Gaon No.2 N.C. Kakopathar Tinsukia 1532800 1 0 1 0

65 2 15/74 Borkacholi N.C. Kakopathar Tinsukia 1535800 3 0 3 0

66 3 16/127 Purana Report Sodiya Tinsukia 1511000 33 2 35 1

67 4 17/127 Chilling Lachan Sodiya Tinsukia 1511100 29 0 29 0

68 5 18/127 Cilling Sodiya Tinsukia 1511300 43 2 45 1

103

Page 104: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Modhupur

69 6 19/127 Tellabari Sodiya Tinsukia 1511800 62 3 65 1

70 7 20/127 Laimakuri Sodiya Tinsukia 1511400 27 1 28 1

71 8 21/127 Champet Bodo Sodiya Tinsukia 1512000 6 0 6 0

72 9 22/127 Arapatang Sodiya Tinsukia 1512300 2 0 2 0

73 10 23/127

Kukurmora

Banchal Sodiya Tinsukia 1524100 6 0 6 0

74 11 43/127

Chilling Ming

Mang Sodiya Tinsukia 1511500 24 2 26 0

75 12 44/127 Napun Sodiya Tinsukia 1511600 25 3 28 1

76 13 45/127 No. 3 Karami Sodiya Tinsukia 1512400 15 0 15 0

77 14 46/127 No. 2 Gohpur Sodiya Tinsukia 1511900 20 1 21 0

78 15 47/127 No. 2 Karami Sodiya Tinsukia 1512600 9 0 9 0

79 16 48/127 Etsum Sodiya Tinsukia 1512100 11 0 11 0

80 17 49/127 Amarpur Sodiya Tinsukia 1512200 15 1 16 0

81 18 99/127 Erasuti N.C. Tinsukia Tinsukia 1569500 6 1 7 0

82 19 100/127

Hugrijan 116

I.S. Tinsukia Tinsukia 1584600 12 1 13 1

83 20 101/127 Balijan Gaon Tinsukia Tinsukia 1569700 3 1 4 0

84 21 102/127 Erasuti Gaon Tinsukia Tinsukia 1569600 6 1 7 0

85 22 103/127 Chuta Tingrai Tinsukia Tinsukia 1583800 5 1 6 0

86 23 104/127 No. 1 Gorajan Tinsukia Tinsukia 1569400 7 1 8 0

87 24 105/127 No. 2 Gorajan Tinsukia Tinsukia 1569300 14 1 15 1

88 25 106/127 Lukhrang N.C. Karo Pothar Tinsukia 1537900 9 1 10 0

89 26 107/127 Rupai T.E. Karo Pothar Tinsukia 1543400 3 0 3 0

90 27 108/127

Fulbari Habi

N.C. Karo Pothar Tinsukia 1533000 8 0 8 0

91 28 109/127 Tarate Karo Pothar Tinsukia 1567000 12 2 14 1

92 29 110/127 Ningda Gaon Margerita Tinsukia 1624500 6 1 7 0

93 30 111/127 Ubon Pothar -1 Margerita Tinsukia 1607500 3 0 3 0

94 31 112/127

Hahchora

Pothar Margerita Tinsukia 1605900 6 0 6 0

Total no of Systems of Tinsukia 431 26 457 8Dibrugrah

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB) Total SLS

104

Page 105: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

95 1 24/74 Gereki Gaon Chabua Dibrugarh 1658100 69 1 70 7

96 2 25/74 Gereki Nepali Chabua Dibrugarh 1658000 90 2 92 9

97 3 80/206 Larua Jan Chabua Dibrugarh 1625600 9 0 9 0

98 4 81/206 Chukan Chapori Chabua Dibrugarh 1654500 1 0 1 0

99 5 82/206 Nepali Chapori Chabua Dibrugarh 1654600 14 0 14 0

100 6 83/206 Simal Chapori Chabua Dibrugarh 1654700 21 0 21 0

Total no of systems of Dibrugrah 204 3 207 16Sivsagar

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB) Total SLS

101 1 50/206 Na Bhangia Amguri Sibsagar 1780400 45 2 47 1

Jorhat

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB) Total SLS

102 1 12/65 Bejorchiga Koliapani Jorhat 1886300 245 10 255 26

103 2 1/206 Phalengi

Majuli

(Komalabari) Jorhat 1849800 24 1 25 0

104 3 2/206 Chayani

Majuli

(Komalabari) Jorhat 1850000 18 2 20 0

105 4 3/206 Tenga Chapori

Majuli

(Komalabari) Jorhat 1850400 5 0 5 0

106 5 4/206 Garu Chapori

Majuli

(Komalabari) Jorhat 1850700 26 1 27 1

107 6 5/206 Aakum Village Jorhat Jorhat 1931600 23 1 24 0

108 7 6/206 Chungtia Village Jorhat Jorhat 1931700 77 1 78 1

109 8 7/206

New Longha

Village Jorhat Jorhat 1931800 32 1 33 1

110 9 8/206 Akahika Village Jorhat Jorhat 1932300 27 1 28 0

111 10 9/206

Satal Bagh

Chapori Jorhat Jorhat 1886100 32 0 32 0

112 11 10/206 Major chapori Jorhat Jorhat 1886400 53 2 55 1

113 12 112/206 Hutter Kamalabari Jorhat 1849700 101 3 104 3

105

Page 106: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Total no of systems of Jorhat 663 23 686 33NC Hills

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

(HH +

CB) Total SLS

114 1 62/74 Longlut (H) Diyungbra N.C. Hills 2352900 16 2 18 2

115 2 63/74 Longlut (CH) Diyungbra N.C. Hills 2353000 43 3 46 5

116 3 64/74 Panimur Diyungbra N.C. Hills 2345200 80 5 85 9

117 4 65/74 Gopikot Diyungbra N.C. Hills 2374900 18 2 20 2

118 5 66/74 Daoban Diyungbra N.C. Hills 2376000 33 2 35 4

119 6 67/74

Khangram

(Khangnan) Diyungbra N.C. Hills 2376100 66 6 72 7

120 7 68/74 Purana Paisa Diyungbra N.C. Hills 2376300 35 4 39 4

121 8 69/74 Natun Paisa Diyungbra N.C. Hills 2376400 15 2 17 2

122 9 70/74 Baladhan Diyungbra N.C. Hills 2376500 77 6 83 8

123 10 71/74 Boro Ningle Diyungbra N.C. Hills 2376900 78 4 82 8

124 11 72/74 N.Ninglo Diyungbra N.C. Hills 2377100 68 4 72 7

125 12 73/74 Hejaichak Diyungbra N.C. Hills 2377200 48 6 54 5

126 13 74/74 Sampari disa Harangajaw N.C. Hills 2356000 59 1 60 6

127 14 3/101

Bonjare

(Bonglangbra) Diyungbra NC Hills 2338600 12 1 13 1

128 15 24/101

Longula

(Longkupur) Diyungbra NC Hills 2338900 22 2 24 1

129 16 83/101

Khuonglong

(khumlung) Diyungbra NC Hills 2374100 41 1 42 2

Total no of systems of NC Hills 711 51 762 73

Grand Total Gr III 5636 197 5833 297

106

Page 107: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

GROUP-IV

Sl

No

Name

of

District

No of

Villages

No of

HLS (HH)

No of

HLS

(Comm)

Total

HLS

No of

SLS

1 Golaghat 33 1955 26 1981 130

2

Karbi

Anglong127 3989 66 4055 326

Total 160 5944 92 6036 456

SL

No

No of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS

Total

SLS

Golaghat

1 1 26/74

Borichowa

Pothar Gomariguri Golaghat 1988300 105 1 106 11

2 2 27/74 Narayonpur Gomariguri Golaghat 1988500 207 1 208 21

3 3 28/74

Udoipur

Merapani Gomariguri Golaghat 1988700 255 1 256 26

107

Page 108: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

4 4 29/74

Kulajan

No.2 Gomariguri Golaghat 1989100 216 1 217 22

5 5 30/74

Lakhi

Pathar Sarupathar Golaghat 2010700 189 0 189 19

6 6 31/74

West

Dhontola Sarupathar Golaghat 2010800 75 1 76 8

7 7 32/74

Ming Mang

No.2 Sarupathar Golaghat 2024800 57 0 57 6

8 8 24/127

Puheka

(Pihekhu) Sarupothar Golaghat 2036600 29 0 29 1

9 9 25/127 Hoito Sarupothar Golaghat 2037000 23 1 24 0

10 10 26/127

Uhozhe

(Ghakipo) Sarupothar Golaghat 2037100 26 0 26 1

11 11 27/127

Hatovi

( S. Hatovi ) Sarupothar Golaghat 2037300 35 2 37 1

12 12 28/127

Uhazhe

(Ghazhi) Sarupothar Golaghat 2037400 19 0 19 0

13 13 29/127 Tokughe Sarupothar Golaghat 2037500 32 1 33 1

14 14 30/127 Lozhoto Sarupothar Golaghat 2037600 27 1 28 1

15 15 31/127 Khugovi Sarupothar Golaghat 2037700 30 1 31 1

16 16 32/127 Henevi Sarupothar Golaghat 2037800 23 0 23 0

17 17 50/127 Suhovi Saru Pothar Golaghat 2036800 49 1 50 1

18 18 83/127

Mazdala Para

(Phohato) Bokakhat Golaghat 9142000 72 2 74 1

19 19 84/127 Ghonivi Saru Pothar Golaghat 2035200 31 1 32 1

20 20 85/127

Pishikhu

(Rishkhu) Saru Pothar Golaghat 2035300 63 1 64 1

21 21 86/127 Keyezu Saru Pothar Golaghat 2035400 15 1 16 0

22 22 87/127 Heneto Saru Pothar Golaghat 2035500 44 2 46 1

23 23 88/127

Vikhekha

(Yeveto) Saru Pothar Golaghat 2035600 24 1 25

24 24 89/127

Hevishe

(Hevighe) Saru Pothar Golaghat 2035700 45 1 46 1

25 25 90/127

Photo

(Phohato) Saru Pothar Golaghat 2035000 21 0 21 0

26 26 91/127

Hetio

(hetoi) Saru Pothar Golaghat 2035800 50 1 51 1

27 27 92/127 Sonito Saru Pothar Golaghat 2035900 23 0 23 1

108

Page 109: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

28 28 93/127 Ahovi (Itovi) Saru Pothar Golaghat 2036000 21 1 22 0

29 29 94/127

Khudi

(khutovi) Saru Pothar Golaghat 2036100 25 0 25 1

30 30 95/127 L. Vihoto Saru Pothar Golaghat 2036200 51 1 52 1

31 31 96/127

Rengma

Naga Saru Pothar Golaghat 2036300 39 1 40 1

32 32 97/127

Sokhoyi

(Shihoto) Saru Pothar Golaghat 203640 22 1 23 0

33 33 98/127

Nacheri

(kuhoboto) Saru Pothar Golaghat 2036500 12 0 12 0

Total no of Systems of Golaghat 1955 26 1981 130

Karbi - Anglong

SL

No

No of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code

HLS

(HH)

HLS

for

CB

Total

HLS (HH

+ CB)

Total

SLS

34 1 33/74 Newvomli Bokajan

Karbi

Anglong 2151900 9 1 10 1

35 2 34/74

Phaimai

(Phaimai) Bokajan

Karbi

Anglong 2152400 21 1 22 2

36 3 35/74 Khoken Bokajan

Karbi

Anglong 2152500 31 2 33 3

37 4 36/74

Piwomal

(P.Vomli) Bokajan

Karbi

Anglong 2154600 12 2 14 1

38 5 37/74 Mulram Bokajan

Karbi

Anglong 2152800 54 1 55 6

39 6 38/74 Seijang Bokajan

Karbi

Anglong 2152900 42 2 44 4

40 7 39/74

Kania

Tarang Bokajan

Karbi

Anglong 2154400 15 0 15 2

41 8 40/74 Mijikro Bokajan

Karbi

Anglong 2160500 69 1 70 7

42 9 41/74 Bura Taro Bokajan

Karbi

Anglong 2160300 27 0 27 3

43 10 42/74 Sum Teron Bokajan

Karbi

Anglong 2160400 15 1 16 2

44 11 43/74

Hemari

Bey Bokajan

Karbi

Anglong 2160500 6 0 6 1

109

Page 110: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

45 12 44/74

Sing

Hanse Bokajan

Karbi

Anglong 2160600 33 0 33 3

46 13 45/74

Hatuka

Gaon Bokajan

Karbi

Anglong 2161400 28 0 28 3

47 14 46/74 Hatuka Bokajan

Karbi

Anglong 2161700 24 0 24 2

48 15 47/74 Pheranke Bokajan

Karbi

Anglong 2162200 72 0 72 7

49 16 48/74 Nihang Bokajan

Karbi

Anglong 2164400 63 1 64 6

50 17 49/74

Nong

Krong Rongkhong

Karbi

Anglong 2058900 1 0 1 0

51 18 50/74 Ronghidi Rongkhong

Karbi

Anglong 2059400 80 5 85 9

52 19 51/74

Woham

Langso Rongkhong

Karbi

Anglong 2061400 17 2 19 2

53 20 52/74 Amlet Rongkhong

Karbi

Anglong 2060800 42 1 43 4

54 21 53/74

Harsing

Teron Rongkhong

Karbi

Anglong 2076900 7 0 7 1

55 22 54/74

Kathar

Gaon Rongkhong

Karbi

Anglong 2069400 24 1 25 3

56 23 55/74

Kabung

Ronghang

Gaon Rongkhong

Karbi

Anglong 2061900 73 1 74 7

57 24 56/74

Basa

Rongpher Rongkhong

Karbi

Anglong 2071300 45 0 45 5

58 25 57/74

Kamar

Hanse Rongkhong

Karbi

Anglong 2071200 39 1 40 4

59 26 58/74

Rongpher

Seuot Rongkhong

Karbi

Anglong 2072100 24 1 25 3

60 27 59/74

Arting

Sanfau Socheng

Karbi

Anglong 2080800 208 1 209 21

61 28 60/74 Tasheng Socheng

Karbi

Anglong 2085400 123 0 123 12

62 29 61/74 Amser Chinthong

Karbi

Anglong 2091000 31 0 31 3

63 30 13/65 Ratial Chinthong Karbi 2092200 19 0 19 2

110

Page 111: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Anglong

64 31 14/65

Sar Rongpi

Gaon Howraghat

Karbi

Anglong 2215100 4 0 4 0

65 32 15/65

Mai

Kramsa Howraghat

Karbi

Anglong 2216300 9 0 9 1

66 33 16/65 Das Bari Howraghat

Karbi

Anglong 2209900 11 0 11 1

67 34 17/65

Maine Hanse

Gaon Chinthong

Karbi

Anglong 2096800 13 0 13 1

68 35 18/65

Kongching Tokbi

Gaon Chinthong

Karbi

Anglong 2097200 14 0 14 1

69 36 19/65 Rongchirim Chinthong

Karbi

Anglong 2047800 14 0 14 1

70 37 20/65

Langang

Engti Gaon Chinthong.

Karbi

Anglong 2096900 15 0 15 2

71 38 21/65

Khoya

Hanse Amri

Karbi

Anglong 2055000 17 0 17 2

72 39 22/65

Bura Rongpi

Gaon Howraghat

Karbi

Anglong 2260900 19 0 19 2

73 40 23/65

Monda Bey

Gaon Howraghat

Karbi

Anglong 2257400 28 1 29 3

74 41 24/65 Umpaklong Chinthong

Karbi

Anglong 2096500 29 0 29 3

75 42 25/65

Norten

Engti Howraghat

Karbi

Anglong 2260700 34 0 34 3

76 43 26/65

Tikok

Langso Howraghat

Karbi

Anglong 2256300 20 0 20 2

77 44 27/65

Bagaram

Ronghana Howraghat

Karbi

Anglong 2206600 14 0 14 1

78 45 28/65

Kania Hanse

Gaon Howraghat

Karbi

Anglong 2211900 28 2 30 3

79 46 29/65

Sarthe Engti

Gaon Howraghat

Karbi

Anglong 2212100 25 0 25 3

80 47 30/65

Bura

Rongphar Howraghat

Karbi

Anglong 2256200 34 0 34 3

81 48 31/65 Bor-Amli Amri

Karbi

Anglong 2051100 54 0 54 5

82 49 32/65 Teron Gaon Howraghat Karbi 2215900 49 0 49 5

111

Page 112: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

No-2 Anglong

83 50 33/65 Soru-Amli Amri

Karbi

Anglong 2051000 45 0 45 5

84 51 34/65 Umru Laru Chinthong

Karbi

Anglong 2091900 120 1 121 12

85 52 35/65 Umat Chinthong

Karbi

Anglong 2091700 122 1 123 12

86 53 36/65 Umwang Chinthong

Karbi

Anglong 2093000 136 2 138 14

87 54 37/65 Amri Khat Amri

Karbi

Anglong 2057800 18 0 18 2

88 55 38/65

Barim

Gaon Amri

Karbi

Anglong 2056900 17 0 17 2

89 56 39/65 Chamr Amri

Karbi

Anglong 2078800 2 0 2 0

90 57 40/65 Khay Bey Amri

Karbi

Anglong 2042900 30 0 30 3

91 58 41/65

Langang Senar

Gaon Amri

Karbi

Anglong 2079000 1 0 1 0

92 59 42/65

Sing

Rongphar Amri

Karbi

Anglong 2077000 6 0 6 1

93 60 43/65

Klengdun Hanse

Gaon Amri

Karbi

Anglong 2069500 21 0 21 2

94 61 44/65

Borsing

Engleng Amri

Karbi

Anglong 2071800 64 1 65 7

95 62 45/65

Larsing

Engti Amri

Karbi

Anglong 2076200 35 0 35 4

96 63 46/65 Mithi Gaon Amri

Karbi

Anglong 2057300 13 0 13 1

97 64 47/65

Morten-2

(Nongtham) Amri

Karbi

Anglong 2048200 21 1 22 2

98 65 48/65

Rong

Phom Amri

Karbi

Anglong 2057900 2 2 4 0

99 66 49/65

Uttar Bali

Gaon Amri

Karbi

Anglong 2070900 19 0 19 2

100 67 50/65

Kumrai

khura Amri

Karbi

Anglong 2043200 33 1 34 3

101 68 51/65 Amduba Amri Karbi 2043100 31 0 31 3

112

Page 113: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Anglong

102 69 52/65 Bogajamin Amri

Karbi

Anglong 2043400 29 0 29 3

103 70 53/65 Mubai Amri

Karbi

Anglong 2047100 29 1 30 3

104 71 54/65 Singkung Amri

Karbi

Anglong 2047200 18 1 19 2

105 72 55/65

Karbi

Archon Amri

Karbi

Anglong 2052700 25 1 26 3

106 73 56/65 Lalmati Amri

Karbi

Anglong 2068700 32 0 32 3

107 74 57/65 Dengthit Chinthong

Karbi

Anglong 2092500 5 0 5 1

108 75 58/65 Kamaidap Chinthong

Karbi

Anglong 2090900 2 0 2 0

109 76 59/65 Latmarleng Chinthong

Karbi

Anglong 2091500 11 1 12 1

110 77 60/65 Patikyndok Chinthong

Karbi

Anglong 2095200 26 1 27 3

111 78 61/65

Rongmandu

(Engti Gaon) Chinthong

Karbi

Anglong 2094700 2 0 2 0

112 79 62/65

Solu

Rongphar Chinthong

Karbi

Anglong 2097000 26 1 27 3

113 80 63/65 Umlado Chinthong

Karbi

Anglong 2094800 18 1 19 2

114 81 64/65 Umsekan Chinthong

Karbi

Anglong 2094400 48 1 49 5

115 82 65/65 Langap Socheng

Karbi

Anglong 2088500 1 0 1 0

116 83 1/101

Kunja

Engti Howraghat

Karbi

Anglong 2254200 10 1 11 1

117 84 2/101

Monsing

Tokbi Howraghat

Karbi

Anglong 2254100 5 0 5 0

118 85 4/101 Langkeroi Socheng

Karbi

Anglong 2081200 21 0 21 1

119 86 5/101 Umjulahar Socheng

Karbi

Anglong 2087500 30 0 30 1

120 87 6/101 Laram Chinthong Karbi 2089100 15 0 15 1

113

Page 114: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Anglong

121 88 7/101 Phetkuso Amri

Karbi

Anglong 2078900 25 1 26 1

122 89 8/101 Langsangpi Chinthong

Karbi

Anglong 2063300 14 0 14 1

123 90 9/101 Jor Teron Howraghat

Karbi

Anglong 2190300 26 0 26 1

124 91 10/101

Langtuk Teron

Gaon Howraghat

Karbi

Anglong 2193000 29 0 29 1

125 92 11/101

Bhugot

Tokbi Howraghat

Karbi

Anglong 2235400 35 0 35 1

126 93 12/101

Arson

Singner Howraghat

Karbi

Anglong 2256900 7 0 7 0

127 94 13/101

Katon

Teron Howraghat

Karbi

Anglong 2208100 8 0 8 0

128 95 14/101 Langhonjar Chinthong

Karbi

Anglong 2091600 60 1 61 3

129 96 15/101 Sabuda Chinthong

Karbi

Anglong 2092600 42 0 42 2

130 97 16/101

Karbi

Lalung Amri

Karbi

Anglong 2050600 64 1 65 3

131 98 17/101 Bepari Gaon Howraghat

Karbi

Anglong 2212400 42 0 42 2

132 99 18/101 Moput Chinthong

Karbi

Anglong 2092900 38 0 38 1

133 100 19/101 Mulajan Howraghat

Karbi

Anglong 2182600 19 1 20 1

134 101 20/101

Langchi Tung

Gaon Lumbajong

Karbi

Anglong 2259700 12 0 12 1

135 102 21/101

Phongioket Doli

Gaon Howraghat

Karbi

Anglong 2216400 28 0 28 1

136 103 22/101

Englang

Hanso Lumbajong

Karbi

Anglong 2259400 15 0 15 1

137 104 23/101

Lungtuk

Engti Lumbajong

Karbi

Anglong 2260100 14 0 14 1

138 105 25/101 Kania Bey Rongmongwa

Karbi

Anglong 2158700 10 0 10 1

139 106 26/101 Sarthe Rongmongwa Karbi 2122500 9 0 9 0

114

Page 115: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Kramsa Anglong

140 107 27/101

Sarthe

Terong Rongmongwa

Karbi

Anglong 2154800 20 0 20 1

141 108 28/101 Thanghoi Rongmongwa

Karbi

Anglong 2154700 6 0 6 0

142 109 29/101 Khanuomphai Rongmongwa

Karbi

Anglong 2154900 14 0 14 1

143 110 62/101

Birching Teron

Gaon Lumbajong

Karbi

Anglong 2259800 12 0 12 1

144 111 63/101

Kiring

Engti Rongmongwa

Karbi

Anglong 2286800 85 0 85 4

145 112 64/101

Kohora

Gaon Rongmongwa

Karbi

Anglong 2324900 29 0 29 1

146 113 65/101

Madan

Mini Socheng

Karbi

Anglong 2081700 42 1 43 2

147 114 66/101 Nongrirong Socheng

Karbi

Anglong 2081900 90 3 93 4

148 115 67/101 Deuglier Socheng

Karbi

Anglong 2087900 50 4 54 2

149 116 68/101 Muriap Socheng

Karbi

Anglong 2087700 30 1 31 1

150 117 69/101 Baida Socheng

Karbi

Anglong 2079700 62 1 63 2

151 118 33/127 Japisoja Howra Ghat

Karbi

Anglong 2184000 37 0 37 1

152 119 34/127 Dimbeswar Goan Howra Ghat

Karbi

Anglong 2235500 33 1 34 1

153 120 35/127

Bikhoy

Bey Howra Ghat

Karbi

Anglong 2259000 35 1 36 1

154 121 36/127

Sikari

Pahar Howra Ghat

Karbi

Anglong 2214000 39 1 40 1

155 122 37/127 Engti gaon Bokajan

Karbi

Anglong 2296300 33 1 34 1

156 123 38/127 Ronghong Bokajan

Karbi

Anglong 2296600 21 1 22 0

157 124 39/127

Deohari

Rongpi Bokajan

Karbi

Anglong 2296700 30 1 31 1

158 125 40/127 Jongung Bokajan Karbi 2296900 15 0 15 0

115

Page 116: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Gaon Anglong

159 126 41/127

Wapung

Hanse Bokajan

Karbi

Anglong 2298500 20 0 20 0

160 127 42/127

Kongot

Gaon Bokajan

Karbi

Anglong 229700 15 0 15 0

Total no of Systems of Karbi Anglong 3989 66 4055 326

Grand Total of Gr IV 5944 92 6036 456

116

Page 117: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

GROUP-V

Sl

No

Name

of District

No of

Villages

No of

HLS

(HH)

No of

HLS

(Comm)

Total

HLS

No of

SLS

1 Cachar 18 380 16 396 18

2 Hailakandi 12 670 9 679 32

3 Karimganj 35 2777 68 2845 152

4 Kamrup 13 482 32 514 19

5 Goalpara 19 1115 48 1163 21

Total 97 5424 173 5597 242

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code HLS (HH)

HLS

for

CB

Total

HLS

Total

SLS

Cachar 1 1 165/206 Chanslu Punji Udarband Cachar 2456800 22 1 23 1

2 2 166/206 Eu Buck Punji Udarband Cachar 2456500 1 0 1 0

3 3 167/206

Unsurveyed

Khuli Cherra Udarbond Cachar 2455000 33 1 34 1

4 4 168/206 Haibong Punji Udarbond Cachar 2456100 25 1 26 1

5 5 169/206

Elyas Khasia

Punji Borkhala Cachar 2422500 52 1 53 2

6 6 170/206 Akai Punji Udarbond Cachar 2456600 17 1 18 1

7 7 171/206

New

Machangjai Borkhola Cachar 2421000 18 1 19 1

8 8 172/206 Kayang Pai Borkhola Cachar 2421500 18 1 19 1

9 9 173/206

Bandar khal

Punji Borkhola Cachar 2422900 24 1 25 1

10 10 174/206 Old Juhar Basti Borkhola Cachar 2421100 42 1 43 1

11 11 175/206 Laljuar Borkhola Cachar 2421300 16 1 17 1

12 12 176/206 Bejung Punjee Raja Bazar Cachar 2491400 11 1 12 1

13 13 177/206 Suiga Punjee Raja Bazar Cachar 2486600 23 1 24 1

14 14 178/206

Choto Tulpi

Punjee Raja Bazar Cachar 2491600 16 1 17 1

15 15 198/206 Kayang Pur Borkhola Cachar 2421200 16 1 17 1

16 16 199/206 Darga Chara Borkhola Cachar 2422700 19 1 20 1

117

Page 118: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

Punji

17 17 200/206 Sunjan Punji Uda Bond Cachar 2456300 7 0 7 1

18 18 201/206

Simla Dikcha

Mukh Raja Bazar Cachar 2485700 20 1 21 1

Total no of systems of Cachar 380 16 396 18

Hailakandi

SL

No

no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code HLS (HH)

HLS

for

CB

Total

HLS

(HH +

CB)

Total

SLS

19 1 12/74

Dam Cherra

N.C. Katlichera Hailakandi 2620800 90 2 92 9

20 2 13/74 Ahalyapur N.C. Katlichera Hailakandi 2621000 65 2 67 7

21 3 160/206

Bakri Howar

PT XI Algapur Hailakandi 2601600 55 1 56 2

22 4 161/206 Kalyan Pur Katlichera Hailakandi 2628600 40 0 40 1

23 5 162/206 Krishnapur NC Katlichera Hailakandi 2628500 14 0 14 1

24 6 163/206

Aloicherra

Pt VI Hailakandi Hailakandi 2625700 9 0 9 1

25 7 164/206 Ram Santipur Katlichera Hailakandi 2620900 61 0 61 2

26 8 202/206 Kulichsa Lala Haliakandi 2616900 25 1 26 1

27 9 203/206 Santipur N.C. Katli Chera Haliakandi 2628300 14 0 14 1

28 10 204/206

Pagla Cherra

N.C. Katli Chera Haliakandi 2620600 96 1 97 2

29 11 205/206 Mullapur N.C. Katli Chera Haliakandi 2620200 128 1 129 3

30 12 206/206 Makenjipur Katli Chera Haliakandi 2623500 73 1 74 2

Total no of Systems of Hailakandi 670 9 679 32

Karimganj

SL

Sl no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code HLS (HH)

HLS

for

Total

HLS

Total

SLS

118

Page 119: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

No CB

(HH +

CB)

31 1 1/74 Hummak

Karimganj

(S) Karimganj 2518000 120 3 123 12

32 2 2/74 Bamon

Karimganj

(S) Karimganj 2518100 261 16 277 28

33 3 3/74 Gharuya

Karimganj

(S) Karimganj 2520300 93 4 97 10

34 4 4/74 Jabda Chauk

Karimganj

(N) Karimganj 2506900 21 2 23 2

35 5 5/74 Lakarkhai

Karimganj

(N) Karimganj 2508100 51 3 54 5

36 6 6/74

Dhitchak-8-

Nayabaridhit

Karimganj

(N) Karimganj 2511200 57 3 60 6

37 7 7/74 Jaruya

Karimganj

(N) Karimganj 2506000 80 5 85 9

38 8 8/74

Moujkhri

Chack

Karimganj

(S) Karimganj 2537500 69 4 73 7

39 9 9/74

Sarpurkita

Chutabil

Karimganj

(S) Karimganj 2547200 57 3 60 6

40 10 10/74

Hizim Angura

Pt.I

Karimganj

(N) Karimganj 2531700 85 4 89 9

41 11 11/74 Dandibhri

Karimganj

(N) Karimganj 2532500 105 0 105 11

42 12 113/127

Dhalchara

Kittikeuti Patharkandi Karimganj 2548600 43 1 44 1

43 13 114/127

Purbo Tutir

Bond Patharkandi Karimganj 2550600 138 1 139 3

44 14 115/127

Purbo

Purbogool Patharkandi Karimganj 2550700 11 1 12 1

45 15 116/127

Purbo

narainpur Patharkandi Karimganj 2553500 97 1 98 2

46 16 117/127

Jamirdalua

Punjee Patharkandi Karimganj 2553600 118 0 118 3

47 17 118/127 Dakhin Patharkandi Karimganj 2553700 107 0 107 3

119

Page 120: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

narainpur

48 18 119/127 Ghilaitikar I Patharkandi Karimganj 2556100 29 0 29 1

49 19 120/127

Badshahi

Forest Lowairpoa Karimganj 2557800 83 2 85 2

50 20 121/127

Pachim

Hafanigool Lowairpoa Karimganj 2559500 73 0 73 2

51 21 122/127 Uttar Gopalpur Lowairpoa Karimganj 252000 223 1 224 5

52 22 123/127

Purbo Haitam

Charra Lowairpoa Karimganj 2563200 38 1 39 1

53 23 124/127

Purbo

Pecherghat Lowairpoa Karimganj 2563300 118 1 119 3

54 24 125/127

Purbo Pecherghat

kitte Char TI Lowairpoa Karimganj 2563400 30 0 30 1

55 25 126/127 Dengura Charra Lowairpoa Karimganj 2563600 78 1 79 2

56 26 127/127

Uttar Chagolmar

Bond Lowairpoa Karimganj 2565000 132 2 134 3

57 27 151/206

Jummahal

Pt -I R.K Nagar Karimganj 2573100 46 1 47 1

58 28 152/206

Jummahal

Pt -II R.K. Nagar Karimganj 2573300 40 1 41 1

59 29 153/206

Dhura Gamarim

Kitte Miskincha R.K. Nagar Karimganj 2573800 8 1 9 1

60 30 154/206

Dam Cherra

T.E. Pt. VI

Durlabh

Cherra Karimganj 2588300 67 1 68 2

61 31 155/206

Dam Cherra

T.E. Pt. V

Durlabh

Cherra Karimganj 2588500 56 1 57 2

62 32 156/206

Munashya Pur

Kitte Purba Pungl

Durlabh

Cherra Karimganj 2589900 65 1 66 2

63 33 157/206

Pani Cherra

Punjee

Durlabh

Cherra Karimganj 2590300 81 1 82 2

64 34 158/206

Dakhim Ahmedpur

Kitte Dhalipan

Durlabh

Cherra Karimganj 2590500 41 1 42 1

120

Page 121: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

65 35 159/206 Dakhin Rampur

Durlabh

Cherra Karimganj 2593300 56 1 57 2

Total no of systems of Karimganj 2777 68 2845 152

Kamrup

SL

No

Sl no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code HLS (HH)

HLS

for

CB

Total

HLS

(HH +

CB)

Total

SLS

66 1 1/127 Nowapara Choy Gaon Kamrup 564400 26 2 28 1

67 2 2/127

Baghbor Gohain

Para Choy Gaon Kamrup 565200 1 0 1 0

68 3 99/206 Deuri Doba Garoi-mari Kamrup 563800 42 2 44 2

69 4 100/206 Dighal Duba Garoi-mari Kamrup 562800 21 3 24 1

70 5 101/206

Maghuabilar

Pathar Garoi-mari Kamrup 563700 30 5 35 1

71 6 102/206 Bhugedia No.1 Garoi-mari Kamrup 564200 37 2 39 1

72 7 103/206 Ujan Duramari Garoi-mari Kamrup 563300 26 4 30 2

73 8 104/206 Dekradiatup Garoi-mari Kamrup 565000 35 2 37 1

74 9 105/206 Kalar Dia Tup Garoi-mari Kamrup 564800 30 3 33 1

75 10 106/206 Choudhuripara Garoi-mari Kamrup 563600 11 2 13 1

76 11 107/206 Sitalmari Garoi-mari Kamrup 563400 11 2 13 1

77 12 108/206 Khatra Para Garoi-mari Kamrup 564700 87 3 90 3

78 13 109/206 Kalar Dia Garoi-mari Kamrup 563900 125 2 127 4

Total no of systems of Kamrup 482 32 514 19

Goalpara

SL

No

Sl no of

Villages

San.

Sl No

Name of the

Villages Bolck District

Census

Code HLS (HH)

HLS

for

CB

Total

HLS

(HH +

CB)

Total

SLS

79 1 31/206 Batabari Joleswar Goalpara 234400 8 1 9 0

80 2 32/206 Gerapuri Joleswar Goalpara 236300 80 4 84 2

81 3 33/206

Killa Hara

PT-II Lakhipur Goalpara 243800 46 2 48 1

82 4 34/206

Killa Hara

PT-II Lakhipur Goalpara 244400 14 3 17 0

83 5 35/206 Chular Char Lakhipur Goalpara 244800 17 1 18 0

121

Page 122: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

84 6 36/206

Kristomoni

Para PT-I Kharmuja Goalpara 258100 15 2 17 0

85 7 37/206

Nunkhowa

PT-I Kharmuja Goalpara 258000 87 5 92 2

86 8 38/206

Kristomoni

PT-II Lakhipur Goalpara 248100 12 0 12 0

87 9 39/206

Nunkhowa

PT-I Kharmuja Goalpara 258300 168 5 173 3

88 10 40/206

Uttar

Katlamari Kharmuja Goalpara 258600 9 0 9 0

89 11 41/206 Holanga Char Kharmuja Goalpara 259300 23 0 23 0

90 12 42/206

Birsing

Halang-II Kharmuja Goalpara 259400 99 3 102 2

91 13 43/206

Birsing

Halang–I Kharmuja Goalpara 259500 204 4 208 4

92 14 44/206

Dakhin

Katlamari Kharmuja Goalpara 259600 32 2 34 1

93 15 45/206

Singimari

River Motia Goalpara 285800 50 3 53 1

94 16 46/206 Ujerer Char Motia Goalpara 280900 61 2 63 1

95 17 47/206 Basanta Pur Motia Goalpara 284000 91 1 92 2

96 18 48/206

Sutar Para

Char Motia Goalpara 286400 60 5 65 1

97 19 49/206

Hajua Char

No-I Kharmuja Goalpara 260600 39 5 44 1

Total no of systems of Goalpara 1115 48 1163 21

Grand Total of Gr IV 5424 173 5597 242

122

Page 123: ASSAM ENERGY DEVELOPMENT AGENCY ... · Web viewA copy of Price Schedule (without prices), duly signed & stamped, as per Proforma- VII mentioning “ Quoted “ word in the column

123