assembly instructions...-2-1 m29 p1 p2 p4 p5 p6 m8 a15 a16 23.6”x23.6” 27 2 059” 10 2 2 550mm...
TRANSCRIPT
Overall Dimensionsincluding base (Approx.)247.4 L • 193 W • 210 H cms97.5" L • 76" W • 82.6" H
(a)
(a)
ASSEMBLY INSTRUCTIONS
Overall dimensions including base:247.4 L x 193 W x 210 H cms97.5" L x 76" W x 82.7" H
ASSEMBLY INSTRUCTIONS
(Internal Dimensions)
Please read these instructions carefully before you start to assemble this greenhouse.To save time and will ensure proper assembly, follow the step-by-step instructions carefully in order.
New or revised instructions may be available for download at hobbygrower.com, or if you would like to view a breif general assembly video to gain a basic understanding of how the structure is constructed,
visit http://www.hobbygrower.com, then click on the Assembly tab.
IMPORTANT!!!
22
4M56
8
M602
M53
M604
M605
M607
A12
A13
M19
M69
C23
ITEM MM QTY.
CONTENTS
ITEM MM QTY. ITEM MM QTY.
1190mm 46.8” 10
575mm 22.6” 81290mm 50.7” 4
062” 616mm
M216
1
-2-
1
M29
P1
P2
P4
P5
P6
M8
A15
A16
23.6”x23.6” 27
2
059” 10
22
550mm 21.6” 21290mm 50.7” 2
Doorhandle hole
See fig. 49
A11 1100mm 43.3” 2 590mm 23.2” 181290mm 50.7” 8 920mm 36.2” 4
P3
600x600mm
23.6”x27.5” 1
23.6”x27.5” 13
3
M9 2
M10
M10A
5
9
600x700mm
600x700mm
A14N 530mm 20.8” 1L 530mm 20.8” 1R 590mm 23.2” 11330mm 52.3” 2
550mm 21.6” 11290mm 50.7” 1
1010
062” 4816mm
12
47.2” 21200mm
0.31” 1 8mm
M70
M33
M32
M31
1
1
M603
23.6” 2600mm
15mm
TOOLS & EQUIPMENT REQUIRED
SAFETY ADVICE
GENERAL ADVICE
CARE & MAINTENANCE
1 See next page for complete list of parts
• Do not attempt to assemble the greenhouse in windy or wet conditions.
• Take special care not to touch overhead power cables with aluminum profiles.
• Ensure that there are no buried pipes or cable in the ground before inserting the ground stakes.
• Always wear shoes and saftey goggles during assembly.
• We strongly recommend the use of work glove during assembly as aluminum profiles and steel bases components may have sharp edges.
• Dispose of plastic bags and protective poly film covers safely - keep them out of reach of small children.
• The greenhouse must be positioned and anchored on a flat, level surface.
• Do not lean on or push against the greenhouse during construction.
• Keep children away from assembly area - the aluminum profiles may have sharp edges.
• Do not position your greenhouse in an area exposed to heavy wind.
• Do not attempt to assemble the greenhouse if your are tired, have taken drugs or alcohol or if you are prone to dizzy spells.
• If you use a step ladder, carefully follow the manufacturer's instructions.
• Hot items such as recently used grills, blowtorches, etc. must not be stored in the greenhouse.
• Before beginning the assembly process, confirm that all necessary parts have been included in the package. It is advisable to lay the parts out in an orderly fashion according to the part numbers so that parts can be easily identified during the assembly process. If parts are missing, contact Palram Americas Hort Division at (800) 994-5626.
• This is a multi-part assembly. Average assembly time is between 4 to 6 hours from start to finish, however, it may take longer. Do not begin assembly if heavy winds or rain are expected within 12 hours.
• Choose a sunny level location for your greenhouse, away from overhanging trees.
• You can opt to use the base brackets supplied to anchor your greenhouse to a concrete floor, or you can use the base supplied base kit . If you intend to anchor your greenhouse directly to concrete, you must
purchase separately concrete anchor screws. The area required for the greenhouse is 104.5" (266cm) length x 83" (212cm) width.
• It is advisable to use lubricant to ease the connection between aluminum profiles and panel (a mild soap and water solution in a pump-spary bottle is useful for this).
• Note that the door is permanently hinged on the right hand side and therefore opens out and to the right.
• We strongly advise that you keep the special poly-film protective covers on the side panels and the first row of roof panels until that greenhouse is fully assembled. You should however remove the poly-film prior to installing the very top roof panels. You should also remove the rest of the protective poly film immediatly after assembly.
• Keep roof clear of snow and leaves.
• Use mild soap and water and a soft cloth to wash greenhouse glazing panels. Rinse with cold water.
• Do not use acetone, abrassive cleaners or sponges, or other amonia-based cleaners to clean the clear panels.
• Some chemicals and cleaners can be agressive to the
clear panels, which are made of polycarbonate. For a complete list of chemical compatibility, visit:
http://www.spscorp.com/compatibility
• To purchase replacement parts, contact customer service at Palram Americas at (800) 994-5626.
• 100% "Silicone" Sealant (compatible w/polycarbonate)
• Tape measure• Work gloves• Plastic or rubber mallet
• Crosshead Screwdriver (a.ka. "Philips screwdriver")
* Screw-gun is suggested• Scissors• 10mm Wrench
• Lubricant (mild soap & water)• Step ladder• Level• Large Hammer (for anchor stakes)• 5/64" Drill bit (or similar diameter nail)
SYMBOLS USED IN THIS GUIDE
(a)M6051 Indicates new
installation step.
Indicates item or part
number to be used;
references list on pg. 2.
Lower case letters within
parenthesis indicate a sub-
installation step. Complete
a, b, c, etc. in order.
!Important safety
warning, caution,
or time-saving tip.
click
1
M607
M607
M605
M605
(b)
M603
M604
(c)
(c)
M604
(d)
M29
M603
2
(a) M605
!!!!
3
M605M29
-3-
A
B
C
DAC = BD
M603
M606
(e)
M601
M601
M603
M603
M602
M602
M606
7
8 (a)
(a)
(a)
A1136.2”
A1136.2”
FrontSide
A1136.2”
M10A
A1136.2”
A1136.2”
(a)
(c)
(b)
(a)
BackSide
(d)
A1150.7”
A1143.3”
(a)
M10A
(a)
A1143.3”
A1143.3”
A1150.7”
A1150.7”
M10A
(a)
(c)
(c)
-5-
BackSide
FrontSide
(d)0.07”
(b)
(b)
0.07”
0.07”
14
(b)
(a)
P1
P1
P1
P3
P3
P1
P3
-8-
13
P1
P1
P1
P3
A1150.7”
A1150.7”
A1150.7”
A1150.7”
(b)(a)
Slide profile A11/50.7” to connect the panels.
Slide one more rectangular panel P3 onto the profile ensuring it has the interlocking slot at its bottom(a), (b).
16
(a)
P1
P1
P1
P3
P3
(b)(b)
P1
P3
P3P1
15
-9-
P3
P3
P1
P1P1
P1
A1150.7” A11
50.7”
Slide another profile A11/50.7” to connect the panels, and anotherpanel P1.
Slide one more rectangular panel P3 onto the profile ensuring it has the interlocking slot at its bottom(a), (b).
P1
(a)
(b)
A1150.7”
P1
18
17
-10-
P1P1
P3
P3
(b)
P3
P1
P1
A1150.7”
P1
P1P1
P3
P3
P3
P1
P3
Slide another profile A11/50.7” to connect the panels, and anotherpanel P1.
Slide one more rectangular panel P3 onto the profile ensuring it has the interlocking slot at its bottom(a), (b).
(a)
(b)
21
20
-12-
(a)
P3
P1
P1
P1P1
P3
P3
P3
P1
P3
P3
P1
P1P1
P3
P3
P3
P1
P3A1350.7”
A1350.7”
P1P1
0.39”
(b)
P6
P6
0.39”
Slide panel P1from left to right and the vent panel P6 from right to left.
Slide another corner profile A13-50.7” but leaving approximately 0.39”protruding at the top.21
P6
P6
22
P3
P1
P1P1
P3
P3
P3
P1 (b)
BACK
A1452.3”
A1452.3”
A1452.3”
-13-
23 A14
Slide one more rectangular panel P3 onto the profile A13/50.7”
Slide a vertical profile A14/52.3” to connect the panels on the back wall.
P6
P6
P3
P3
P1
(a)
(b) A1423.2”A14
23.2”
24
P1
P1
P1
P3P3
P3
BACK
P3
25
-14-
P3
P1
P3
P6
Slide one more rectangular panel P3 onto the profile A14/52.3”.
25Fit horizontal profile A14/23.2” asshown.
26
-15-
P6
P3
P3
P1
P1P1
P1
P4
27
P1
P6
A1452.3”
P3
P3
P4
Slide on a top panel P4.
Slide another vertical profile A14/52.3” to connect the panels.
28
-16-
P3
P6
(a)
P3
P3
P1
P1
P4
(b)
(c) P1
P1
29
P6
A1350.7”
P3
P3
P1
P4
P1
P1
A1350.7”
P1P1
0.39”
Slide another two panel P1.
Slide another corner profile A13-50.7” leaving approximately 0.39” protruding at the top.
P6
(b)
P3
P3
P1
P1P1
P4
P1
P1(a)
A1150.7”
30
31
-17-
P1
P3
P6
P3
P3
P4
P1
P1
P3
Slide one more rectangular panel P3 onto the profile A13/50.7”
Slide another profile A11/50.7” to connect the panels.
P1
P3
P6
P1
P3
P6
32
(b) P3
P3
P1
P1P1
P3
P3
P3
P1
P4
P1
P1
(a)
(d)
(c)
(b)P1
P1
P3
P3
A1150.7”
-18-
P3
P3
P1
P1P1
P3
P3
P3
P1
P4
P1
(c)
(d)
A1150.7”
P1
P1
P3
P3
(a)
(b)
P1
33
Slide one more rectangular panel P3 onto the profile A11/50.7”and another profile A11/50.7” to connect the panels.
Slide one more profile A11/50.7” and one panel P1.
35
P1
(a)
(b)
-19-
P1P1
0.39”
P6
P3
P3
P1
P1
P1P1
P3
P3
P3
P1
P4
P1
(c)
P3
P1
P1
P3
P3
(a)
(b)
P3
P3
M31
M31
P1
(c)
34
A1350.7”
Slide part number M31 onto the profileA11/36.2” from left to right (see thediagram).
Slide one more panel P1 (a) and another corner profile A13/50.7” (b).
36
37
P3
P3
(a)
(b)
(b)
1
View from underside.
(b)
M31
A1550.7”
(b) M31
A1550.7”
A1550.7”
A1550.7”
M31
-20-
Slide two panels P3.
Slide the vertical profile A15/50.7” and insert the part M31 (see the diagram b ).
-21-
39
P1 P1
A1350.7”
A1350.7”
P1P1
(a)
(b)
38
(a)
(b)
(b)
M32
M32
(a)
A1650.7”
M70
Slide the vertical profile A16/50.7” (door frame) leaving approximately 0.39”.Tighten the part M32 with the part M31 using screw M70 as shown in the diagram.
Tap down all the vertical corners profiles using a rubber malletif necessary.
-22-
41
M9
M9
M9
A1621.6”
M10A
A1650.7”
M10A
40
A1650.7”
A1650.7”
View from underside.
Insert onto the bottom of the door profile, A16/50.7” the bracket M9.and part M32(see diagram).
I nsert three metal connector bars M10A into the top of the door profiles as
Slide another profile A15/21.6” onto the top of A15/50.7” ensuring it locates
shown. Slide the two part profile A16/21.6” onto the hinged side ensuring it locates onto the metal bars.
with the inner metal connector.
A15
A15
21.6”
50.7”
0.39”
M32
42
43
(a)
(b)A14R20.8”
A14L20.8”
(a)
M10A
M10A
(b)
(a)
(b)
(b)
A1123.2”
A1123.2”
A1123.2”
(b)
-23-
(a)
Slide on the two front angled panels P5 (a). Insert two profiles A 11/23.2” horizontallyto join panels P3 and P5 together (b).
At the back wall of the greenhouse insert two metal connecting
Slide down profiles A14L/20.8” andA14R/20.8” either side of panel P4ensuring the angled end of the profilesare at the top and follow the same angleas the panel.
M10A
M10A
bars M10A into the top section of profiles A14 as shown.
A14R20.8”
(b)
(a)
P5
A1123.2”
(b)A1123.2”
P544
45
-24-
(a)
M9
(b)
(c)
M9
(b)
(c)A1123.2”
A1123.2”
A1123.2”
A1123.2”
M9
(b)
P1
(a)
Slide on the two front angled panels P5 (a). Insert two profiles A11/23.2” horizontally to join panels P3 and P5together (b).
Slide one panel P1 (a) and then slide a A11/23.2” profile onto the bottom of the panel ensuring the angled brackets M9slots into the bottom profile (see close up diagram b, c ).
-25-
47
46
(a)
P1
(a)
P2
(b)
(c)
(b)
P1
(a)
P2(b)
A1123.2”
(a)
P4
INSIDE
Slide the rectangular panel P2 (must be thepanel with the door handle hole) onto thedoor profile ensuring it has the interlocking slot at its bottom .
HANDLEDOOR
HOLE
Slide a A11/23.2” profile onto the top of the door panel
Slide top panel P4 on to the top of the door assembly (a). 15
P2 (b).
INSIDE
(b)
(a)
(c)
A1550.7”
(b)
(c) (c)
(a)
M10A
A1550.7”
M10A
48
49
(b)
(a)
(b)
A1521.6”
A1550.7”
M10A
(a)
A1550.7”
-26-
Slide the A16/50.7” profile on to the long side of the door (a)ensuring the angled bracket M9 slots into the end of it (b).I nsert a metal connector bar M10A into the top of the door profile as hown (c).
Slide the A15/21.6” onto the door side ensuring it locates onto the metal bars.
50
51
M33
-27-
(a)
A1246.8”
A1246.8”
A1246.8”
A1246.8”
A1246.8”
A1246.8”
A1246.8”
A1246.8”
M10
(b)
(b)
(a)
(a)
(a)
(b)
Insert part number M33 into the 2 frame door from above.
Slide two profiles A12/46.8” along the top long sides of the greenhouse. Insert a joining bar M10 between
Panels may need aligning as you go.each pair to strengthen the join.
(a)
A1322.6”
A1322.6”
P1
(b)(c)
(d)52
53 A1123.2”
A1123.2”
(b)
(a)
(d)
(c)P1
P1
-28-
A1123.2”
Slide two panels P1 on to profiles A12 as shown.From inside the greenhouse insert a profile A13/22.6” to lockpanels P5 and P1 together.
Insert two A11/23.2” profilesbetween the roof panels P1 to lockthem together.53
54 A1123.2”
(b)
(a)
(d)
(c)
P1
P1
P1
A1123.2”
55 A1123.2”
(b)
(a)
(d)
(c)P1
P1
A1123.2”
P1
P1
-29-
A1123.2”
A1123.2”
Same as step 53.
Same as step 53.
56
(a)
(b) P1
P1
P1
P1
A1322.6”
57
(b)A1246.8”
(a)
M10
A1246.8
-30-
A1246.8”
A1246.8”
A1246.8”
A1246.8”
Same as step 52.
Slide on two roof profiles A12/46.8” on eitherside. You may need a stable step ladder atthis stage. Insert a joining bar M10between each pair to strengthenthe join.
M10
(a)P1
(b)
A1322.6”
A1322.6”
(b)
58
59A1322.6”
(b)
(a)
A1322.6”
(b)
-31-
Same as step 52.Remove the protective poly film from these panels beforeinstalling. Dispose of poly filmcarefully to keep out ofchildren.
Same as step 58.
(a)
A1123.2”
(b)
P6
(b)
(a)
(b)P1
60
61
-32-
A1123.2”
(b)
Place the roof vent panel P6 and continue same as step 53.
Same as step 53.
64
(a) (b)P1
(a)
P6
A1121.6”
(b)
P6
P1
P1
P1
P1
65
(a)
(a)
P1
A1123.2”
(b)
-34-
A1123.2”
Same as step 61.
Same as step 61.
A1246.8”
(a)A1246.8”
67(c)
A1322.6”
M33
DOOR
A1322.6”
A1322.6”
(a)
!66
-35-
M10
(a)
(b)
A1246.8”
(b)
(b)A1246.8”
M10
IMPORTANT! you must slide the profile to the roof panel on one side and topart M33 on the other side.
Slide two profiles A12/46.8”to the centre of the roof.Insert a joining bar M10between each pair tostrengthen the join. M10
A1246.8”
(a)
68
69
-36-
(b)(a)
M21
M21
M69
From inside the greenhouse apply silicone sealant to all the roof joint holes as shown.Inject the silicone generously until it oozes from the other holes.
Use pairs of roof brackets M21 to clamp each roof section where shown (a). Fix brackets in place usingnutsand bolts M69 (b). Tighten with 10mm wrench.
70
-37-
A1246.8”
OUTSIDE
INSIDE
M19
DOOR
INSIDE
M8
C23
A1246.8”
71
Attach corner caps C23 in all ten positions (frontand back) using screws M8.You will need someone to help youwith this step (one person inside,another outside). Do not over tighten.
Install door handle M19 in the hole bored the in right hand sidedoor.See inside / outside proper mounting position.