Page 1: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Assessing the Assessments: Transboundary Impact Assessment

in the Mekong River and Other International Watercourses

Carl Bruch

China Environment Forum

26 February 2007

Page 2: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Overview

• Background

• Case studies– Review (selected)

• Lessons learned

• Next steps

Page 3: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Background• Transboundary impact assessment (TIA) an important planning tool•Problem: Typically only consider TIAs at the planning stage

– Do not know how accurate TIAs predict actual impacts or factors contributing to (in)accurate TIAs.

• Joint research project: Environmental Law Institute (ELI), University of Tokyo, United Nations Environment Programme (UNEP)• Methodology of the study

– Develop a common template for comparing the impacts predicted in a TIA with the actual impacts– Proof of concept: five initial case studies

Page 4: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

The Case Studies

• Navigation Channel Improvement Project of the Lancang-Mekong River from China-Myanmar Boundary Marker 243 to Ban Houei Sai of Laos (China, Laos, Myanmar, and Thailand//Cambodia and Vietnam)• Hydropower Development in the Se San River Basin, including Yali Falls Dam (Vietnam//Cambodia)• Emergency Action Plan for the Control of Water Hyacinth in Lake Victoria (Uganda//Kenya, Tanzania, Rwanda)•Lesotho Water Highlands Project, Phase 1B: Mohale Dam, Matsoku Weir, Delivery tunnels to the Katse River, and Access Roads and other Infrastructure (Lesotho//South Africa)• Epupa Dam (Angola and Namibia)

Considerations: regional diversity, diversity of projects, different governing legal regimes, projects in different stages, range of results

Page 5: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Navigation Channel Improvement Project

of the Lancang-Mekong River

Based on report by:

Naho Mirumachi et. al.

Department of International Studies

Graduate School of Frontier SciencesUniversity of Tokyo

Page 6: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Navigation Channel Improvement Project

• The Navigation Channel Improvement Project of the Lancang-Mekong River is designed to upgrade large vessel navigation on the Mekong River. – Additional benefits: improved navigation will also benefit trade an

d tourism; reduce accidents and consequently the losses of properties and lives; prevent environmental damage caused by oil pollution from such accidents.

• The Agreement among China, Laos, Myanmar, and Thailand was signed in 2000 for project implementation.

• The first phase was executed from March 2002 to 2004, with the core construction completed in April 2003.

• The project is to be conducted in three phases. The first phase will remove ten major rapids, one shoal, and ten scattered reefs. The second phase will remove 51 rapids and shoals. The last phase includes canalization.

Page 7: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Watershed area concerned with the Navigation Channel Improvement Project.

Page 8: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Transboundary environmental impact assessment report on the first phase

• Report of Environmental Impact Assessment was prepared by the Joint Experts Group on EIA of China, Laos, Myanmar and Thailand in September 2001.

• The team was comprised of six representatives from China, three from Laos, one from Myanmar and four from Thailand.

• It was predicted in the Report that Laos, Myanmar, and Thailand would be affected by the project.

Page 9: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Water Quantity• Predicted

– The Report concludes that water level fluctuation from navigation improvement works will be small and limited.

– Water levels will not vary more than 0.3m except for one rapid. Most of the rapids have less than 2.3km reach under fluctuation influence.

– Asserted that individual rapids/shoals do not interact with each other and water level changes in the backwater upstream are minimal.

• Observed– Water fluctuation was observed for the whole of the boundary rive

r area from the northern-most blasting.– Tributaries of the river such as the Songkram River and wetland ar

eas in northeast Thailand are reported to have experienced fluctuation.

– While there had only been seasonal fluctuation in the past, river levels changed almost daily without any advance signs.

– Some villagers in Thailand observed water rising 12 inches, much higher than predicted.

Page 10: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Water Velocity• Predicted

– Only three rapids are examined for maximum surface velocities for three levels of flow.

– From the three test cases, the report determines that "it is very clear that waterway improvement produces very small impact".

– The Report also concluded the same for the rest of the rapids/shoals without further investigation.

• Observed – A story is reported where the current of the river has become

faster after the blasting of reefs at Ta Salung, Myanmar in April 2003.

– It is said that Chinese engineers did not clear the entire reef due to fear of increased velocity.

Page 11: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Soil Loss and Erosion• Predicted

– The Report clearly stated "no soil erosion will happen at the reef blasting places".

– Asserted that the improvement of the channel will reduce riverbed erosion (on the basis that bedrock channels do not erode).

– Dumping excavated material was contended to mitigate collapsed riverbanks from erosion.

• Observed– Contrary to the Report, erosion has occurred. – Riverbanks, sandbars, and islets that appeared during

the dry season are currently nonexistent. – Local people have reported losing their “riverbank

gardens” where they would cultivate vegetables. – Several villages in Laos and Thailand have experienced

loss of housing from erosion during the flood season.

Page 12: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Socio-Economic Impacts• Predicted

– No mention is made about specific social impacts on the communities.

– Broad predictions regarding impacts on the quality of life are made with advantages being increased opportunities to improve living conditions

– The only adverse effect is “some local epidemic diseases may be distributed to other area through the transportation”

• Actual– Large vessels in the Chiang Saen port, Thailand, have swamp

ed anglers, hindering their fishing activities.– Illegal trade of wildlife, timber, and drugs has been taking pla

ce on the Lancang-Mekong across boundaries.– Loss of arable riverbed– The number of fishermen has decreased in Thailand.

Page 13: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Hydropower Developmentin

Se San River Basin, including Yali Falls Dam

Based on report by:

Andrew B. WyattAustralian Mekong Resource Centre

School of GeosciencesUniversity of Sydney

Page 14: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Se San River Basin• The Se San River is among the

largest tributaries of the Mekong River.

• It has been recognized as "one of the top 3 rivers in Vietnam in terms of hydropower potential."

• It forms one of two remote international sub-catchments of the Mekong River Basin.

• About 90,000 people live in the Se San River Basin. They rely on a diverse range of activities for their livelihoods, from small-scale subsistence farming to plantation and cash cropping.

Page 15: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Impacts on Ratanakiri Province (Cambodia)• Downstream villages along the Se San River in Vietnam

were adversely affected. • The greatest impacts have been experienced in the two do

wnstream Cambodian provinces of Ratanakiri Province (approximately 70 km downstream), and Stung Treng Province (250-300 km downstream).

• The river banks and edges of forest flood and recede unnaturally on a daily basis as a result of daily fluctuations in river level due to the operation of the Yali Falls Dam.

• Viet Nam has not provided detailed historical information to Cambodia regarding water releases.

• Rainy season flooding has intensified. Some villages reported being flooded up to three times a year.

Page 16: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Hourly water levels for at Andong Meas(110 kms downstream of the Yali Falls Dam)

Page 17: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Impacts (Not Predicted)• Two assessments of impacts: covered an area 8 km long and 1 km wide downs

tream of the dam (failed to address the impacts in Cambodia) • 8 km below dam only• Material Losses

– From 1996 to 1999, sudden floods from Yali Falls Dam's water releases resulted in tangible losses, such as lost livestock and fishing gears, approximating US$800,000, or about US$237 for each household.

– More than 40,000 chickens, thousands of pigs and ducks, and hundreds of buffaloes and cows since 1996.

• Damage to aquatic ecology– At least 14 varieties of riverine plants have diminished in numbers due to the unnatu

ral flooding. – Nests of turtles and birds such as the endangered Black-bellied Tern have been floo

ded or swept away.• Water quality

– Ratanakiri Fisheries Office cited the Yali reservoir as a likely source of contamination “with toxic blue green algae, or possibly other toxic elements.”

– An unusual frothy foam often appears on the surface of the Se San River since the construction of the Yali Falls Dam.

Page 18: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Increasing incidences of ailments• Local people reported that

serious human health problems have resulted from changes in water quality.

• River-associated ailments have also been reported.

• Stomach and respiratory problems, throat and nasal irritation, dizziness, and vomiting were among ailments experienced after ingesting the water.

Page 19: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned

Page 20: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Assessing TIAs

• Lack of data is a significant challenge– Lack of baseline data (also a problem for the TIA)

– Lack of data on the current status

– End up relying on anecdotal evidence, site visits, interviews, and professional opinions (i.e., educated guesses)

• Yali Falls: dismissing concerns based on “anecdotal evidence”, although this evidence is at least as rigorous as that in the initial impact assessment

• Issue: limited evidence v. no evidence

– Need for long-term monitoring (provide baseline data for next project)

Page 21: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs

• Need to have a clear set of legal, procedural, and institutional requirements and standards regarding how TIAs are conducted, reviewed, and finalized– Agree prior to conducting TIA– Lack of standard requirements, let alone methodology

for conducting TIA– In some cases, no requirement to consider transbound

ary impacts • E.g., Lake Victoria/Water Hyacinth: Uganda’s national legisl

ation; but public insisted on consultation with other countries, and NEMA agreed; spurred the development of regional TIA guidelines and influenced development of national EIA regulations

Page 22: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• Composition of the TIA team can affect objectivity (real and perceived)– E.g., Navigation Channel Improvement (team dominated and led

by Chinese)

• The process of conducting a TIA can improve institutional coordination and collaboration– among government institutions, and – between governmental and non-governmental actors

• Political support for the TIA process is important (e.g., Lake Victoria) …

• but political pronouncements about the outcome of the process (i.e., that pre-judge the outcome) can be polarizing and counter-productive (e.g., Epupa Dam)

Page 23: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• Range of public involvement– Where public actively involved and government(s) wil

ling to listen, TIA more accurate• Lake Victoria

– Where public not involved, TIA problematic• Navigation Channel: very little time for public participation;

a small portion of the public actually involved environmental impacts under-predicted; social impacts not considered seriously

– Where public involved, but outcome appears to be pre-judged, TIA process can be stalled by controversy

• Epupa Dam

Page 24: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• An external, independent reviewer can be important, especially in controversial projects– Add objectivity and rigor– Comforted most of the stakeholders (including

the governments), who realized that the reviewer could help to reduce the chances that the project would be derailed or high-jacked by special interests

– E.g., Epupa Dam

Page 25: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• The accuracy of the TIA depends in part on how the project is designed and undertaken– E.g., Lake Victoria:

• Water hyacinth was a priority affecting many people, so broad (and immediate) interest in removing it

• Public and commercial enterprises actively involved in the TIA process

– Generally fine with the mechanical and biological approaches, but objected to chemical/herbicide approach

– NEMA approved mechanical and biological approaches– Enhanced buy-in

• Commercial enterprises donated equipment and funds• Public actively involved in control measures on a voluntary

basis– Awareness raising; provided with equipment – Their contributions were essential to the project and TIA

proceeding as expected.

Page 26: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• Methodologies generally under-predict severity and extent of impacts– Rarely (if ever) over-predict– The only case where the impacts were as

predicted was for Lake Victoria Water Hyacinth

• Public and private sector broadly involved• Chemical/herbicide approaches rejected by public

and government (although EIA indicated no significant impacts)

• Exception: Resurgence of hyacinth happened more quickly than expected (due to actions in other countries)

Page 27: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• A single mistake in the TIA analysis can lead to many mistakes in the predicted impacts– E.g., Navigation Channel Improvement:

• Predicted no change to water velocity, but channelization actually caused the water velocity to speed up, so …

• Significant fluctuations in water levels (unpredicted)

• Erosion, leading to loss of habitat for birds and fish and livelihoods (riverside gardens and fisheries) (unpredicted)

Page 28: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• TIA problems are often associated with insufficient time to collect the data, do the analysis, or consult the public

• Timing often an issue: TIA is often rushed; even if they knew the procedural requirements, they did not do it that well, because they were pushing it through (and public participation was limited)

• E.g., Navigation Channel Improvement; Yali Falls Dam

Page 29: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• Silver Linings– Even problematic TIAs can yield significant benefits– Lake Victoria:

• Initially, Uganda did not consult Kenya or Tanzania or consider effects in those countries

• But the process ultimately did consult them• At the request of Kenya and Tanzania, Uganda tested the biological

methods for specificity before applying to Lake Victoria• Exchange of experiences facilitated rapid action in Kenya and Tanz

ania• Process also spurred the development of regional (T)EIA guidelines

governing shared ecosystems• Also a factor in the elaboration of an MOU and Protocol on Environ

ment Management• Informed the development of national EIA procedures in Kenya and

Tanzania– Epupa Dam: new approach to providing information to the publi

c (meetings, access to full feasibility report, filming); improved governance

Page 30: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Lessons Learned about Conducting Effective TIAs (cont.)

• Need for more consideration of effectiveness, cost, and actual implementation of mitigation measures

• Not all mitigation measures are equal– Environmental (scientific) mitigation measures are often given

more thought, are better modeled, and are more effective than social mitigation measures (e.g., resettlement as the “solution”)

– Discrepancies between predicted cost of mitigation measures and actual costs (much higher than predicted, therefore the cost-benefit analysis was skewed)

– There is a need to ensure that mitigation measures are actually done

– Over-reliance on mitigation measures rather than on presenting and analyzing alternatives: assumption was the project was going to go through, and it was only a matter of mitigation

Page 31: Assessing the Assessments: Transboundary Impact Assessment in the Mekong River and Other International Watercourses Carl Bruch China Environment Forum

Next Steps

• Technical assistance– Developing and/or improving the regulatory framewor

k governing TIA– Assistance in elaborating or improving technical guide

lines on TIA

• Capacity building– On how to conduct effective TIAs

• Focused research on additional case studies– On management of other international watercourses– In other sectors (e.g., transportation, energy grid, other

infrastructure)– Potential links to context of adaptation to climate chan

ge