asset lifecycle information management...
TRANSCRIPT
![Page 1: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/1.jpg)
Andy Chew – Industry Solutions Manager
Asset Lifecycle Information Management (ALIM)
![Page 2: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/2.jpg)
2 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Time in Market …
Asset Lifecycle Information Management
![Page 3: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/3.jpg)
3 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Poor Asset Information can be Disastrous
“… BP told us the modifications on the BOP were extensive. After the accident, they asked
Transocean for drawings of the blowout preventer. Because of the modifications, the
drawings they received didn't match the structure on the ocean floor.. …”
Source: House Committee on Energy and Commerce hearings on the Deepwater Horizon disaster
“… we learned that the blowout preventer had been modified in unexpected
ways…”
![Page 4: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/4.jpg)
4 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
CAD models
Documents
Requirements
Schedules
Budgets
Contracts
Status
Permits
Etc.
Procedures
Materials
Maintenance
Work Management
Configuration Management
Equipment Reliability
Operations
etc.
Forecasts, Projections, Status Reports, Histories, Configurations, Permits, Regulations, etc.
Permits
Conceptual Designs
Demand/Cost Forecasts,
Asset Status/History
Asset Lifecycle Information Management (ALIM)
Asset Information
Management
Project Information
Management
Asset & Project
Portfolio
Information
Management
Asset Lifecycle
Information
Management
(ALIM)
PIM AIM
![Page 5: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/5.jpg)
5 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Ideal Asset Information Management
Source: ARC Advisory Group
![Page 6: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/6.jpg)
6 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
In reality....Some common causes... • Project Delivery
– Difficulty locating data
– Incomplete information
– Incorrect version of data
– Design changes / re-work
– Late detection of clashes / anomalies
– Difficult team co-ordination
•Operation & Maintenance – Ownership of asset data
– Incomplete / inaccessible data
•Physical
•Contextual
![Page 7: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/7.jpg)
7 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Poor communications between
people and systems wastes 30%
of project costs
The delivery of reliable data
defining the asset upon
completion can deliver a saving
in O&M cost of 14% per annum.
40% of engineering time is spent
locating & validating information
![Page 8: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/8.jpg)
8 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Integration and Interoperability
Integration Interoperability
Applications Applications
ISO
159
26
Applications Applications
Key it once and connect or merge my information with your information
![Page 9: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/9.jpg)
9 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Project System • Multiple
Systems - ERP, EMMS, WBS, CAD, etc
• Operating in Silos
• Minimal Integration - No communication of change between apps
Silo Operation
![Page 10: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/10.jpg)
10 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Tying into the OpenPlant Design Environment
OpenPlant Services
OpenPlant ModelServer
OpenPlant
Functional
Applications
WIP
ISO 15926
Reference
Data
ProjectWise Integration Server Enterprise Bridge [eB]
OpenPlant Schema
(ISO15926)
OpenPlant
Physical
Applications
Other
Bentley
Applications
3rd Party
Applications
Enterprise
Applications
i-model i-model i-model Bentley Platform Technology
![Page 11: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/11.jpg)
11 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Portable Self-Describing Provenance
i-model Container Open Information Exchange
Precise
Clash
Resolution
Material
Estimating
Schedule
Simulation
Dynamic
Review
Structural
Analysis
![Page 12: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/12.jpg)
12 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
ERP Human Resources Finance Incident
Management
Requirements
Management
Engineering
Maintenance
Asset Operations
• Maintain
• Repair
• Compliance
• Safety
• Inspect
• Replace
•
ProjectWise Integration Server AssetWise
Data Quality
Services
Asset Lifecycle Information Management Platform
(Single Source of Truth)
Design
Optimization Document
Approvals
Data
Analysis &
Loading
ProjectWise Integration Server
• Engineering Document Management
• Engineering Collaboration
• Design Application Configuration
AssetWise Data Quality Services • Data Quality Analysis
• Milestone Data Loads from Design
Infrastructure for Asset Engineering and Operations
![Page 13: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/13.jpg)
13 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Infrastructure for Asset Engineering and Operations
i-Model • 2D/3D + data from multiple sources
• Contains full knowledge of origin + evolution
• Requires no application logic to display
OpenPlant AutoPLANT PDS SmartPlant PDMS
Design Tools of Choice • Legacy data not lost
• Re-Tool when the time is right
• Reduce time to innovation …
Design
Optimization Document
Approvals
ProjectWise Integration Server
• Engineering Document Management
• Engineering Collaboration
• Design Application Configuration
AssetWise Data Quality Services • Data Quality Analysis
• Milestone Data Loads from Design
•
ProjectWise Integration Server
Asset Lifecycle Information Management Platform
(enterprise Bridge (eB))
AssetWise
Data Quality
Services
Data
Analysis &
Loading
![Page 14: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/14.jpg)
14 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Interoperable Information Management Platforms
Project System
• Inter-document
relationships
• Meta-document
relationships
• External Repositories • Granular, role based
permission model
• Audit trail
• Centralized store
• Transmittal / Distribution
• Assets
• Requirements
• Regulations
• MicroStation
• AutoCAD
• AutoPlant
• Revit
• InRoads
• GEOPAK
• AutoCAD MEP
• Etc…
• Delta File Transfer
• Caching Servers
• Data Compression
• CAD standards management
• Reference file management
• Dependency Management
• Dynamic Review
![Page 15: Asset Lifecycle Information Management (ALIM)cf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.… · Andy Chew – Industry Solutions Manager Asset Lifecycle Information](https://reader034.vdocument.in/reader034/viewer/2022051010/5abbbe957f8b9a297f8d3b6b/html5/thumbnails/15.jpg)
15 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Thank You