assignment 1 smsn

1
ASSIGNMENT -1 1. With the help of neat sketch explain the hydrologic cycle. 2. Differentiate between surface hydrology and ground water hydrology 3. Differentiate between rainfall and runoff 4. Discuss the various sources of water available in Chennai city for design of new waster supply system. Guidelines for Assignment Submission: 1. Individual, neatly hand written report, 2. Copying and late submission of assignment attracts penalties. 3. Last date for assignment submission : Thursday, 7 th February 2013 (Before 5 PM)

Upload: rudrathecivil

Post on 16-Feb-2016

215 views

Category:

Documents


0 download

DESCRIPTION

df

TRANSCRIPT

Page 1: Assignment 1 Smsn

ASSIGNMENT -11. With the help of neat sketch explain the hydrologic cycle.2. Differentiate between surface hydrology and ground

water hydrology 3. Differentiate between rainfall and runoff 4. Discuss the various sources of water available in Chennai

city for design of new waster supply system.

Guidelines for Assignment Submission:

1. Individual, neatly hand written report,

2. Copying and late submission of assignment attracts penalties.

3. Last date for assignment submission : Thursday, 7th February 2013 (Before 5 PM)