Corrosion Protection and Inhibition Solutions
Predict and Prevent Corrosion Before It’s a Problem
ASSURE® HI-43DW LDHI CAPABILITIES
The Problem: Deepwater operators use large volumes of methanol and
mono-ethylene glycol (MEG) to protect from hydrate blockages during
operations and shut-in/re-start operations. Traditional anti-agglomerate-
low dose hydrate inhibitors (AA-LDHIs) cause water quality issues, and
do not function at high water cuts and gas to oil ratios (GOR’s). The Solution: Assure HI-43DW low dose hydrate inhibitor (LDHI)
Features: Most used LDHI in Gulf of Mexico (GOM) Deepwater; Won
every major competitor evaluation in the last three years; Proven for
water cuts up to 90%; High GOR applications (up to 100,000); High
sub cooling (up to 38°F); Effective in low salinity (0.05 g/L) systems.
Benefits: Proven track record of 18 applications in the GOM;
Eliminates/reduces MeOH and MEG usage; No water quality issues;
Eliminates hydrate blockage risk; Manufactured in-house; Champion
Technologies patented chemistry.
Learn more at champ-tech.com
Vellum sheetdivider goes here
Regional Headquarters: Aberdeen, Scotland, UK+44 (0) 1224-879022North Africa, Europe, Middle East Operations Technology Center, Manufacturing
Buenos Aires, Argentina+54 11-4343-1100South America Operations
Calgary, Alberta, Canada+1 403-234-7881Canada Operations Technology Center, Manufacturing
Corsicana, Texas, USA+1 800-477-5353 Manufacturing
Delden, The Netherlands+31 743-775-281 Technology Center, Manufacturing
Dubai, UAE+971-4-2146121
Fresno (Houston), Texas, USA+1 281-431-2561Technology Center, Manufacturing
Geismar, Louisiana, USA+1 225-673-2436Water Solutions Moscow, Russia+7 (495) 981-2558Russia, Caspian, Sakhalin Operations
Odessa, Texas, USA+1 432-363-9105Manufacturing Perth, Australia+61 (8) 9472-9400
Port Harcourt, Nigeria+1 713-627-3303West Africa Operations
Rio de Janiero, Brazil+55 22-2106-6666
Sherwood Park, Alberta Canada+1 780-417-2720 Technology Center
Singapore+65 6733-9482Asia-Pacific Operations
Corporate Headquarters:3200 Southwest FreewaySuite 2700Houston, Texas, USA 77027+1 713-627-3303
champ-tech.com © 2013 Champion Technologies, Inc.
Assure HI-43DW: Gas Condensate System Problem: High hydrate risk required large amounts of methanol to control. Pump restrictions and supply chain issues prevented the operator from being able to apply enough methanol. Challenge: High water cut gas condensate system and un-insulated 7.5 mile flowlines. Competitor LDHI was not successful. Solution: Apply Assure HI-43DW continuously using existing pumping equipment. Results: Product has been continuously injected since 2010 with no hydrate blockage and reduced/eliminated methanol handling costs. Value: Total savings to customer > $10,000,000, no lost production, deferral of additional equipment cost, and reduced corrosivity of the system.
Assure HI-43DW: MEG system
Problem: Reduced production due to MEG system limitations.
Challenge: Product must allow for increased production, cause no water quality issues, and must not require MEG or methanol. Solution: Inject Assure HI-43DW continuously using existing equipment.
Results: Able to bypass the MEG Regen unit; No water quality issues; No increase in pressure drop; Allowed for increased production; No methanol slugging was required.
Value: > $70,000,000 annually, increased oil production by 2,000 bbls/d, and gas by 20 mmscf/d.
Assure HI-43DW: Black Oil System Problem: Hydrate blockage during shut-in/re-start operations. 50% water cut, three 4.5 mile flowlines. Challenge: Planned to use methanol; Large volumes of methanol required; Penalties for methanol in crude; Concerned about over water quality issues. Solution: Inject Assure HI-43DW during shut-in/re-start operations. Results: Multiple successful shut-in/re-start operations, including a seven-day shut-in/re-start for tropical storm Lee; No lost production and no water quality issues; No crude penalties for methanol content.
Value: $600,000 annual methanol savings and no lost production.
Assure HI-43DW: High Water Cut, Long Un-Insulated Flowlines
Problem: 70% water cut, 26-mile flowline required large volumes of methanol to control hydrates.
Challenge: High water cut and long un-insulated oil and gas flowline, high hydrate potential.
Solution: Apply Assure HI-43DW continuously
Results: No lost production due to hydrate blockage for more than 2 years; No use of methanol; No water quality issues; Lowered flowline corrosivity; No crude penalties for methanol content; Lowered the HSE risks.
Value: $700,000 annual methanol savings. No lost production.
Case histories