assuring compliance with waste acceptance requirements
DESCRIPTION
Assuring Compliance with Waste Acceptance Requirements. Federal Office for Radiation Protection Department SE Safety of Nuclear Waste Management Section SE 3.1 Waste Package Quality Control Stefan Steyer Waste Acceptance Criteria for Disposal of Very Low, Low and Intermediate Level Waste - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/1.jpg)
1
Federal Office for Radiation Protection
Department SE
Safety of Nuclear Waste Management
Section SE 3.1
Waste Package Quality Control
Stefan Steyer
Waste Acceptance Criteria for Disposal of
Very Low, Low and Intermediate Level Waste
30 September 2010, Peine, Germany
Assuring Compliance with Waste Acceptance Requirements
![Page 2: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/2.jpg)
2
Waste Acceptance Requirements and Quality Control
Quality Control
SafetyAnalyses
Model Data
Waste Acceptance Requirements
![Page 3: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/3.jpg)
3
– Process Qualification with Accompanying Inspections
– Spot Checking of Legacy Waste
– Type Checking of Containers
Quality Control Measures for Radioactive Waste Packages
![Page 4: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/4.jpg)
4
Process QualificationM
anua
l
![Page 5: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/5.jpg)
5
Spot Checking of Legacy Waste
0.5 to 12 %
![Page 6: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/6.jpg)
7
Process Qualification versus Spot Checking
Process Qualification:
– Handbook or
Process Control Quality Plan– Statement on the Suitability of
the Process – Accompanying Inspections
Mandatory according to §74
Radiation Protection Ordinance
Spot Checking:
– Applicable to Legacy Waste
– Checking of 0.5 to 12 % of the
Waste Products
![Page 7: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/7.jpg)
8
Type Testing of Containers
– Production of Containers including QA Measures
– Prototype Test
– Assessment of the Application Documents (Construction Drawings,
Parts Lists), Results of the Prototype Test and the QA Measures
– Supervision of the Container Production
![Page 8: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/8.jpg)
9
Prototype Test
• Stacking Test (6 m) -> Stackability• Lifting Test -> Handling• Drop Test 0.8 m (4 m/s)• Drop Test 5 m• Thermal Test (1 h at 800 °C)
![Page 9: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/9.jpg)
10
Drop Test 5 m
![Page 10: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/10.jpg)
11
Thermal Test (1 h at 800 °C)
![Page 11: Assuring Compliance with Waste Acceptance Requirements](https://reader036.vdocument.in/reader036/viewer/2022081513/56815dc7550346895dcbf4a5/html5/thumbnails/11.jpg)
12
Thank You for Your Attention