asta powerproject: the power behind successful...
TRANSCRIPT
SEE WHY CONSTRUCTION PROFESSIONALS PREFER
ASTA POWERPROJECT
Asta Powerproject: The power behind successful projects
www.astapowerproject.net
See what schedulers throughout the world say about why they
prefer Asta Powerproject to other software:
Bill Jack Daniel, Saunders Construction
“We like to use Asta Powerproject because it’s
credible and looks more professional than MS
Project and less confusing than Primavera.”
Martin Long, Buro Four
“We were looking to move away from MS
Project as it was proving too expensive and
found the flexibility of Asta’s approach much
more suited to our ways of collaborative
working. The Project teams welcomed a
software change as they felt it was superior
and more user friendly than other
solutions.”
Clive Bassett, Beard
Gavin Clegg
North Midland Construction
“Asta Powerproject has a ‘drag and drop’
functionality that makes it much easier to use
than P6. It also has all the power and functionality
we need to run even our most complex projects
and is much more cost effective with its shared
licensing options.”
Using the wrong tool
for the job can be
frustrating. When it
comes to running your
projects you can rely
on Asta Powerproject, specifically developed
for construction, to
reduce the stress.
“We compared Asta Powerproject with other
programmes like Primavera, and decided
that this would better fit our needs…mostly
because it is so much more user-friendly
and cost-efficient.”
SEE WHY CONSTRUCTION PROFESSIONALS PREFER ASTA POWERPROJECT
www.astapowerproject.net
EASIER TO CREATE TASKS
“Asta Powerproject, has become the
standard because traditionally a lot of
the higher-end project management
software on the market needs a
very careful coding process and a
very long-winded period of
preparation before you can actually
start planning. With Asta
Powerproject you can start pretty
much within an hour of getting an
understanding of how the software
works because the interface is so intuitive
and crucially, it offers the same, if not more
power, than many of the competing higher-
end products.”
Phil Solomon, Mace
MULTI-USER, ENTERPRISE WIDE
ACCESS TO UP-TO-DATE
PROJECT DATA
“The multi-user application is extremely
useful as it allows different members
of the project team to access the
most up-to-date data at the
same time.”
Kevin Balaam, Atkins Highways
& Transportation
“Using Asta Powerproject meant
that our planners could work
on the project in unison,
regardless of their
location, have the same
visibility across the programme
and get an accurate view
of updates and progress to all areas.”
Mick Davis, BAM
SUPERIOR PRESENTATION
“What Asta Powerproject is particularly
good at is presentation, which is exactly
what you need for good reports. With a
very small amount of effort, the user can
easily produce a very presentable and
professional-looking report. I have
worked for other contractors and seen
other programmes, but none have been
as presentable as Powerproject.”
Ian Birch, HJ Martin
“Asta Powerproject is undoubtedly
helpful to us in winning contracts, it
means we can produce better
quality information than we could
with MS Project. We can enhance it
by using histograms to give clients the
cashflow forecasts that they want – it’s
simple to do using the software and
clients like it, it gives them more
information and more
confidence in us.”
Robin Percy, J Breheny
“I think the secret
ingredient of Asta Powerproject
is that it is produced by planners for
planners. It remains a project
management/planners tool with the
capability to produce output at whatever
level of understanding is required.
Other software available often fails
to produce output that can
easily be read and
understood.”
Andrew Pearce,
Balfour Beatty Construction
▲▲
▲
“When we were using P6 there was abig
time-lag. We never really had an up-
to-date programme because the
information was always based on
engineer updates from a week or even
up to a month before. Any issues arising
could add a few days more delay. The
information was never accurate – but
now, the master programme effectively
updates itself.”Steve Allan, Banora Point Upgrade
Alliance
SEE WHY CONSTRUCTION PROFESSIONALS PREFER ASTA POWERPROJECT
www.astapowerproject.net
EASY INTEGRATION WITH
OTHER SOFTWARE FOR
SIMPLE COMMUNICATION
With other planning tools:
“Our operational partner was using
Primavera 6, but we were able to
interface directly with them using Asta’s
built-in conversion files (XER). The
whole process underlined the real
beauty of Asta Powerproject – its ease of
use and its excellent format of
presentation.”
Mick Davis, BAM
With ERP systems:
“We have managed to integrate
hundreds of projects and align SAP data
with our programme data with a few
clicks of the mouse.”
Gavin Clegg,
North Midland Construction
With 4D modelling for BIM “Using
Asta Powerproject with our software
gives us 4D BIM scheduling
animation that makes it easy for
audiences, the owners, trades,
teams, contractors, and so on, to
see just how the building will
come together.”
Martin Long, Buro Four
MORE POWERFUL
NAVIGATION FEATURES
“I love the way you can move around
quickly. Whereas in MS Project you must
create summary bars to group activities, in
Asta Powerproject it lifts them all into a
single window so you can see exactly what
you need. It makes it really easy to break
the job into different areas, and you never
have to scroll through page after page of
activities to find something. If you have two
areas you want to compare and see how
they interface, you just click ‘Control’ at the
same time and they both appear side by
side. The visual navigation capability of Asta
Powerproject is one of its very best
features.”
Steve Allan, Project Manager for
Earthworks, Banora Point Upgrade
Alliance
TEST DIFFERENT SCENARIOS
WITH CONFIDENCE
“ Asta Powerproject has a powerful “what-if”
functionality which allows us to be
innovative and overcome technical
challenges, even when a technique has not
been used before. Everything can be risk
assessed.”
Rob Owen, Director, Mace
BETTER PROTECTION AGAINST
LITIGATION FROM DELAY
“Asta Powerproject provides us with a
documented story of how the project is
performing and acts as a delay
management tool.”
Kevin Taylor, Senior Contracts Manager,
J Breheny
“We had not come
across Asta Powerproject
before and were assessing a
couple of other tools including
Primavera and MS Project. We
chose Asta Powerproject ultimately
because it was more user-friendly
compared to the other tools we were
looking at, and because of how
we could use it as a
management tool.”
Matt O’Grady, Hansen Yuncken
▲
▲▲
▲
“We have found that Asta
Powerproject is easiest to use in
conjunction with 4D modelling
software.” Koenraad Nys, D Studio
SEE WHY CONSTRUCTION PROFESSIONALS PREFER ASTA POWERPROJECT
PLUS ASTA GIVES YOU:
software such as MS Project for which
you need to buy a full licence for every
user. We were looking to move away from
MS Project as it was proving too
expensive and found the flexibility of
Asta’s approach much more suited to our
ways of collaborative working. ”
Clive Bassett, Financial Director,
Beard
Projects Analytics Inc.
E: [email protected] T: 1-800-931-1582
Windows®, MS Project® and Microsoft Excel® are registered trademarks of Microsoft Corp.Oracle Primavera® is a registered trademark of Oracle Corporation.
©2013 Asta Development plcAsta Powerproject is a registered trademark of Asta Development plc.All trademarks recognised. E & OE.
www.astapowerproject.net
▲enough to replace Oracle Primavera. Then one of our
customers introduced me to Asta Powerproject and we were
very impressed with what it could do. Under further
examination I came to believe that its capabilities
actually exceed those of
Oracle Primavera”
▲
PROGRESS MONITORING PUTS YOU
IN CONTROL
“The software compares what was planned
with actual progress. It plots a line that shows
whether the programme is behind or ahead of
schedule, from that we can see which items
have fallen behind and take the appropriate
action, in time.”
Phil Williams, Wates
SCALABLE FOR LARGER
PROJECTS
“Asta Powerproject has proved to be an
excellent tool because of its ability to produce
fully integrated, logic linked programmes of
several thousand activities that are easily to
understand, backed up with cost and resource
data as required.”
Bob Davis, Carillion
FILTERING FOR EASIER MANAGING
OF SUB-CONTRACTORS
“Asta Powerproject is also particularly good at
modularising projects. The master programme
can be broken down into work packages, and
they can be filtered. We can filter out
whichever aspects we need to, for example,
concrete or cladding, which gives you more
manageable projects rather than one large
programme. This is obviously useful for
subcontractors who do not need to see
everyone else’s tasks, but can be provided
with a succinct programme of their own
works.”
Ray Ferguson, GRAHAM Construction
SIMPLER PRINTING
SUPPORT YOU CAN RELY ON
Russell Chappe, Focus Project Management
▲▲
▲▲
“We were looking for
something that would compete with Oracle
Primavera. We looked at other software solutions
but nothing really came across that would be powerful
FLEXIBLE LICENSING
“Asta’s shared licensing model makes it
much more economical than other
“My experience with the team at Asta,
whether help or sales is always a pleasure-
polite, considerate, knowledgeable and
efficient all of which are lacking in Oracle’s
offering of Primavera P6."Gwion Evans, Planner
“Our repeated choice of Asta as provider of
project management software is in the
knowledge that we have complete in-house
support and a continually developed
product.”Martin Buckthorpe, David Johns
Associates Consultants Ltd
“A unique thing with Asta Powerproject is
having multiple activities on the same line, so it
is easy to see what is going on and easy to
produce summary print outs. On large
complex projects like I work on to do the same
in Primavera without this would be complex
and take lots of pages to print.”Michael Powell-Brett,
Powell Brett Associates