astrid institute for storage ring facilities, aarhus€¦ · astrid søren pape møller 22-24 nov...

32
ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus ASTRID is operating ~40 weeks/year, 24 hours/day, 7 days/week ~150 users annually, 50/25/25 % from abroad/Aarhus/DK FUNDING for ASTRID2 37 MDKK (5 M€) 08/2009-02/2013: ASTRID modifications (mainly fast extr. kicker) Transfer beamline ASTRID2 2T MPW Smaller SR beamline modifications/upgrades 10 MDKK for AMOLINE (incl. U-53) Future (X-mas): Materials/iNANO/STM beamline

Upload: others

Post on 29-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

1

Institute for Storage ring facilities, Aarhus

• ASTRID is operating ~40 weeks/year, 24 hours/day, 7

days/week

• ~150 users annually, 50/25/25 % from abroad/Aarhus/DK

FUNDING for ASTRID2 37 MDKK (5 M€) 08/2009-02/2013:

•ASTRID modifications (mainly fast extr. kicker)

•Transfer beamline

•ASTRID2

•2T MPW

•Smaller SR beamline modifications/upgrades

10 MDKK for AMOLINE (incl. U-53)

Future (X-mas): Materials/iNANO/STM beamline

Page 2: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID2 with beamline layout

2

Page 3: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Present ASTRID injections

3 19-10-2007 18-10-2007 17-10-2007

Cu

rre

nt

[mA

]

220

200

180

160

140

120

100

80

60

40

20

0

Life

time

[ho

ur]

220

200

180

160

140

120

100

80

60

40

20

0

Page 4: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

4

Beamlines at ASTRID

Page 5: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID2 schedule

37 MDKK (5M€) 08-2009/02-2013

•2010 normal ASTRID operation with SR

•2011 install ASTRID2

•2012 Commission ASTRID2 and first beamline

•2013 ASTRID2 operating in full including all beamlines

Page 6: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Page 7: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID2 with 4 ID’s

Page 8: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Parameter ASTRID2 ASTRID

Energy 580 MeV 580 MeV

Circumference 45.7 m 40.0 m

Current 200 mA 200 mA

Lifetime Top-up (~few hours) ~100 hours

Horizontal emittance ~10 nm 140 nm

H/V tunes 5.23/2.14 2.29/2.69

H/V Chromaticity -6.4/-11.2 -4.0/-7.1

Energy spread 0.24/0.45 keV 0.36 keV

Characteristic energy Dipole/MPW 0.43 ‰ 0.43 ‰

Characteristic wavelength 5.2/2.8 nm 3.5 nm

Straight sections (number and length) 4x3.0 m 12.0 m

ASTRID vs. ASTRID2

Page 9: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

• DBA

• 6-fold symmetry

• Each period:

• 2 combined function dipole

magnets

(+ pole-face strips for qpole)

• 2 quadrupole families

• 2 sextupole families

• 4 H/2 V correctors

• 4 BPM’s

ASTRID2 lattice

9

QF3 QF3 QF2 QF2

SD SF SD

Page 10: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Girder/vacuum design

Page 11: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

• Each dipole chamber has

› one 150 l/s ion pump with integrated TSP

› All interconnecting tubes (Ø38mm) are

NEG coated

• Insertion straights

› ID chambers are NEG coated

• Bake out: In-situ

› Dipole chambers: ~150°C

› Interconnecting tubes (NEG): ~200°C

› Heating: Thin (<0.5 mm) heating foil (Soleil)

› Isolation: Thin (~1 mm) ceramic “paper”

• Bake-out of first sector has ended today

ASTRID2 Vacuum

11

Page 12: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Dipole chamber with pole-face strips

12

Page 13: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID2 JAN-SEPT 2011

Page 14: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Insertion devices for ASTRID2

14

1. ASTRID U55, 0.56 T, 48 poles

2. New W116 mm period, 2 T, 14 poles

3. New U53, 1.06 T, 87 poles, ordered from

KYMA for AMO beamline

Page 15: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

• ASTRID2 will be operated in top-up mode using ASTRID as a booster

Long cycle time of ASTRID, ~10 s

• 1 ¼ turn ASTRID extraction using the existing DC septum (12mm, 9°) and new

fast kicker (150 mm long, 132 gauss, <50 ns, flat-top jitter < ±0.02)

• Transfer beamline to take the beam below ASTRID2 through the girder injecting

into ASTRID2 from the inside.

• Beam is injected into ASTRID2 with a pulsed septum (15°)and 3 bumpers

(250 Gauss)

• ASTRID2 commissioned alternating with ASTRID operation and beamline

transfer → minimize dark period

ASTRID → ASTRID2

Page 16: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID

Extr. Kicker

septum

ASTRID2

bumper

septum

ASTRID2 injection

Page 17: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID 1¼ turn extraction

17

0 5 10 15 20 25 30 35 40-30

-20

-10

0

10

20

30

40

50

Position in ring [m]

Positio

n [

mm

]

Astrid 1¼ turn extraction

Bumpers on, Kicker on, 1 kick

Bumpers on, Kicker on, 2 kicks

Bumpers on, Kicker off

CK SS C C BL CBL BL BL

Page 18: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID extraction kicker

18

-2

0

2

4

6

8

10

12

-200 -150 -100 -50 0 50 100 150 200 250 300

Cu

rre

nt [

mA

]

Time (ns)

Extraction Beamline: Fast Current Transformer SignalBackground subtracted

50ns

Page 19: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Simulated ASTRID2 injection

19

-15 -10 -5 0 5 10 15 20-4

-3

-2

-1

0

1

2

3

4Horizontal phase space, dx=0.0013 df=0.0001 dp=0.0004

Position [mm]

Angle

[m

rad]

1

2

3

4

5

6

7

8

910

11

12

13

14

15

septum

septum

Page 20: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Diagnostics instruments

20

RF Cavity w. IonpumpValve

BPMStripline

DCCTViewer

Ionpump

Valve

BPM

BPM

SR camera

Bumper

Bumper

Bumper

Dual Stroke ViewerFCT (Fast Current Transformer)

StriplineBPM

Septum

SR camera

BPM

BPM

BPMBPM

BPM

BPM

BPM

BPM

BPMBPM

3.0 m

Standard suite of beam diagnostics

Since last, we chose LIBERA Electron BPM system (24),

which has been received.

Page 21: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID2 RF system

21

• 105 MHz (like ASTRID)

• Main ASTRID2 RF parameters

Synchrotron radiation power: ~1.4 kW (incl. IDs)

Harmonic: 16

RF voltage: 50-150 kV

Synchrotron frequency: 10-20 kHz

Cavity power: 0.8-7 kW

8 kW solid state amplifier has been ordered from TOMCO

Page 22: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID/ASTRID2 RF

• Old 105 MHz Cu-plated capacity-loaded

cavity with stubs operating since 20 years

• Several (outside) water leaks has been fixed!!

• 20 kW tetrode transm. (tube changed once)

• For ASTRID2 and ASTRID, 2 ebeam welded

cavities are procured together with MAXLAB

from RI.

• Delivery of first cavity February 2012.

• Intend to procure Landau cavity together with

MAXLAB

(Thank you Åke and others)

22

Page 23: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

ASTRID/2 105 MHz Cu cavity

23

Page 24: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

MAXLAB Landau cavity

24

Page 25: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

LLRF

25

PreAmp

+40 dB, 10 W

FM transmitter

+36 dB, 10 kW

Splitter

Master oscillator 104.95 MHz

Rohde&Schwartz SMY01 or DDS

CombinerPhase

shifter

Atten-

nuator

-5 –

-55 dB

-180 –

+180

optional

Fast feedback loop

Diag

RF

sp

litt

er

DM

Diag

Realtime computer (running LabVIEW RealTime) with

FPGA controlled IO (NI PCIe-7852) for fast regulation and a Multifunction card for slower IO

adcM

Ole

vel

dacφ

dac

A

MOMO

adcC

avQ

adcC

avI

adcF

PW

Q

adcF

PW

I

dac

Plu

nger

adcR

PW

(fa

st)

Attenuator/

gain

-35 –

+20 dBm

Phase

shifter

-180 –

+180

adcD

riveP

wr

adcP

reA

mp

Inp

ut

adcB

eam

Curr

ent

Diag

adcS

par

e(f

ast)

Mic

Tri

gger

Ram

pT

rigger

Diag

Home-built digitally controlled analogue system. PC running

LabVIEW Real-Time with a commercial FPGA.

Operated at ASTRID since one year.

Page 26: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Missing/late items/nearest future

26

Installation, cabling and mechanical mounting ongoing.

RF solid state amplifier (TOMCO) (late Jan. 12)

RF cavity (February)

BPM blocks Coorstek Advanced Materials (Saint-Gobain)

ordered Dec. 2010. 11 out of 26 received (1 leaks)!

First commissioning in February 2012 (?)

Page 27: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

TATION pRÆSEN

20 DECEMBER, 2008

AARHUS

UNIVERSITET

THANK YOU FOR YOUR ATTENTION

SØREN PAPE MØLLER

Page 28: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

1E+11

1E+12

1E+13

1E+14

1E+15

1E+16

1E+17

0.001 0.01 0.1 1 10

Ph

/s*m

m^

2*m

rad

^2

*0.1

BW

Photon Energy (keV)

Brilliance

Undulator, ASTRID2

Undulator

2T 12 pol wiggler, ASTRID2

Bend, ASTRID1

Bend ASTRID2

ASTRID-ASTRID2 comparison

Page 29: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

TATION pRÆSEN

20 DECEMBER, 2008

AARHUS

UNIVERSITET

ESLS XIX

23rd & 24th november

Søren Pape Møller

Welcome & ASTRID2

Page 30: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Aarhus University, Denmark

• ~40.000 students

• ~11.000 staff (~6.500 academic,

~4.500 tech/adm.)

• Budget 800 M€

• Established in 1928

• 2nd largest university in Denmark

• Has all the standard academic areas

• Merging with

Aarhus School of Business and

Engineering College of Aarhus

Page 31: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Department of Physics and Astronomy

31

• ~100 students/year

• ~100 staff (~50 academic, ~50 tech/adm.)

• Established in 1933 (for teaching medical students)

• Part of Faculty of Science and Technology (from 1954)

• Main research areas

› Atomic, molecular and optical (AMO) physics

› Condensed matter physics and nanophysics, surface

physics, statistical physics and biophysics

› Subatomic physics

› Astrophysics and cosmology

Page 32: ASTRID Institute for Storage ring facilities, Aarhus€¦ · ASTRID Søren Pape Møller 22-24 Nov 2011 AARHUS UNIVERSITET 1 Institute for Storage ring facilities, Aarhus •ASTRID

ASTRID

Søren Pape Møller

22-24 Nov 2011

AARHUS

UNIVERSITET

Institute for Storage Ring Facilities (ISA)

32

• ~10 staff +

• Operate and develop the

synchrotron ASTRID and

ASTRID2

• Other accelerator projects:

ELISA (electrostatic storage

ring for ions)

several other small

electrostatic accelerators and

storage rings

• Involvement in:

DANFYSIK projects

PT

ESS