Page 1: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)
Page 2: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 1

APPENDIX I

(See paragraph - 6)

FORM 1

I. Basic Information

S.

No. Item Details

1. Name of the project Enhancement in Production Capacity of Cement Project - Clinker

(1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) &

WHRB (15 MW) at Village: Ghorawat, Tehsil: Pipar City, District:

Jodhpur (Rajasthan) by M/s. Marwar Cement Ltd.

2. S. No. in the schedule As per EIA Notification dated 14th Sept., 2006 & as amended from

time to time; this project falls under S. No. 3 (Material Production),

Project Activity ‘3 (b)’ Cement Plants.

3. Proposed capacity/area/length/tonnage to

be handled/command area/lease

area/number of wells to be drilled

S.

No.

Particular Granted

Capacity

Additional

Capacity

Total Capacity

after

Enhancement

1. Clinker (MTPA) 1.0 2.0 3.0

2. Cement (MTPA) 1.37 0.63 2.0

3. CPP (MW) 18 7 25

4. WHRB (MW) Nil 15 15

5. DG Set (MW) 5 Nil 5

4. New/Expansion/Modernization Enhancement Project

5. Existing Capacity/Area etc. Total Project Area - 57.87 ha

6. Category of Project i.e. 'A' or 'B' Category ‘A’

7. Does it attract the general condition? If

yes, please specify.

No, it does not attract the general condition.

8. Does it attract the specific condition? If

yes, please specify.

No, it does not attract the specific condition.

9. Location

Plot/Survey/Khasra No. 343 / 34

Village Ghorawat

Tehsil Pipar City

District Jodhpur

State Rajasthan

Page 3: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 2

S.

No. Item Details

10. Nearest railway station/airport along

with distance in kms.

o Nearest Railway Station: Kharia Kangar Railway Station (~13.0

km in NW direction from project site)

o Nearest Airport: Jodhpur Airport (~73.0 km in WSW direction

from project site)

11. Nearest Town, city, District Headquarters

along with distance in kms.

o Nearest City: Merta City (~28.0 km in NE direction from project

site)

o District Headquarter: Jodhpur

12. Village Panchayats, Zilla Parishad,

Municipal Corporation, Local body

(complete postal addresses with

telephone nos. to be given)

Gram Panchayat: Sarpanch Khawaspura,

Tehsil - Pipar City,

District - Jodhpur

13. Name of the applicant M/s. Marwar Cement Limited.

14. Registered Address Office No. A - 505,5thFloor, Plot No. 14C, Sector-19, Groma House,

Vashi, Navi Mumbai (Maharashtra) - 400705

15. Address for correspondence: Project Proponent EIA Consultant

Name Mr. Motilal Chouhan Mr. B. M. Mathur

Designation (Owner/Partner/CEO) Director Associate Director

Address

Ground Floor, Jodhpur

Tower, Dharam Narain ji Ka

Hatha, Paota, Jodhpur

J. M. EnviroNet Pvt. Ltd.

202-A, ABW Tower, M.G. Road, Near

IFFCO Chock, Opp. West Inn Hotel,

Gurugram, Haryana

Pin Code 342010 122 001

E-mail [email protected] [email protected]

Telephone No. 0291-2540550 -

Fax No. - -

16. Details of Alternative Sites examined, if

any. Location of these sites should be

shown on a toposheet.

Since, the proposed enhancement will be done within the existing

project area; hence, no alternative site has been considered.

17. Interlinked Projects o Limestone Mine (ML Area - 73.33 ha) with production capacity

of 0.15 MTPA located at Village - Pundlu, Tehsil - Merta, District-

Nagaur (Rajasthan).

o Limestone Mine (ML Area: 35.98 ha) with production capacity

Page 4: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 3

S.

No. Item Details

0.75 MTPA located at Village -Ghorawat, Tehsil - Pipar City,

District - Jodhpur (Rajasthan).

o Limestone Mine (ML Area: 137.993 ha) with production capacity

3.10 MTPA ha located at Villages- Ghorawat & Pundlu, Tehsil -

Pipar City &Merta City, District- Jodhpur &Nagaur (Rajasthan).

o Limestone Mine (ML Area: 195.7064 ha) with production

capacity 1.0 MTPA ha located at Near Villages- Ghorawat,

Borunda & Pundlu, Tehsil -Pipar City (earlier Bhopalgarh) &

Merta City, District- Jodhpur &Nagaur (Rajasthan).

18. Whether separate application of

interlinked project has been submitted?

No

19. If yes, date of submission -

20. If no, reason Environmental Clearance for above mentioned three limestone

mines i.e. 73.33 ha, 35.98 ha & 195.7064 ha has been obtained from

concerned authorities and 137.993 ha has been recommended for

grant of EC by 30th EAC (Non-Coal Mining).

21. Whether the proposal involves

approval/clearance under: if yes, details of

the same and their status to be given.

(a) The Forest (Conservation) Act, 1980?

(b) The Wildlife (Protection) Act, 1972?

(c) The C.R.Z Notification, 1991?

No

22. Whether there is any Government

Order/Policy relevant/relating to site

No

23. Forest land involved (hectares) No forest land is involved

24. Whether there is any litigation pending

against the project and/or land in which

the project is propose to be set up?

Name of the Court

(a) Case No.

(b) Orders/directions of the Court, if any

and its relevance with the proposed

project.

No litigation is pending against the project.

Page 5: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 4

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.

No. Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities /rates,

wherever possible) with source of information data

1.1 Permanent or temporary change in land

use, land cover or topography including

increase in intensity of land use (with

respect to local land use plan)

No Total project area is 57.87 ha. Land use of the existing land

is already industrial and since the proposed enhancement

will be done within the existing project site; therefore,

there will be no change in land use, only intensity will

increase due to proposed project.

Topography of the land is almost flat; there will be no

change in the topography.

1.2 Clearance of existing land, vegetation

and buildings?

Yes There will be some clearance of the land and vegetation

for the proposed activity.

1.3 Creation of new land uses? No Land use of the existing project area is industrial; since,

the proposed enhancement will be done within the

existing project site, hence, there will not be any creation

of new land uses.

1.4 Pre-construction investigations e.g. bore

houses, soil testing? (Please confirm)

No Pre-construction investigations have already been carried

out. Thus, it is not required for proposed enhancement

project.

1.5 Construction works? Yes Various structures/facilities will be constructed to start

with the cement manufacturing process.

1.6 Demolition works? No There will be no demolition work.

1.7 Temporary sites used for construction

works or housing of construction

workers?

Yes During construction phase, temporary housing facilities

will be provided to the workers as they will come from the

nearby villages.

Proper sanitary facilities will be provided in order to avoid

contamination to the soil, surface and ground water in the

nearby area.

1.8 Above ground buildings, structures or

earthworks including linear structures,

cut and fill or excavations.

Yes There will be excavation, cut and fill during the process of

construction for proposed project.

1.9 Underground works including mining or

tunneling?

No No underground works including mining or tunneling is

required.

1.10 Reclamation works? No No reclamation work will be done.

1.11 Dredging? No No dredging will be carried out.

Page 6: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 5

S.

No. Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities /rates,

wherever possible) with source of information data

1.12 Offshore structures? No Not applicable

1.13 Production and manufacturing

processes?

Yes

Cement Plant

Cement Plant is based on dry process consisting of

following unit operations:

� Transport of limestone from Limestone mine site

� Raw Mix Preparation & Homogenization

� Preheating and Calcination

� Clinker cooling

� Clinker storage and transport

� Cement Grinding, Storage, Packing & Dispatch

Captive Power Plant

� Burning of fuel in the CFBC boiler to generate

steam.

� Power generation in Turbine

� Air Cooled system

Waste Heat Recovery Power Generation

� For re-utilization of the wasted heat from the

exhaust gases of pre-heater/ cooler, the Waste Heat

Recovery System is used to generate the electrical

power. Waste Heat Recovery System (WHRS) will

be installed near Kiln Pre-heater and Cooler.

1.14 Facilities for storage of goods or

materials?

Yes Proper storage facilities for raw material and finished

product will be provided within the proposed project site.

1.15 Facilities for treatment or disposal of

solid waste or liquid effluents?

Yes � Dust collected from Air Pollution Control Equipments

like ESP, Bag house / Bag filters will be totally recycled

into the process.

� Fly ash generated from CPP will be utilized in

manufacturing of PPC grade cement.

� Sludge generated from STP will be used as manure in

greenbelt development/ plantation.

� In cement plant, RO reject water & boiler blow down

water will be used for dust suppression.

� The domestic wastewater generated from plant &

colony will be treated in STP and the treated water

will be utilized for greenbelt development/ plantation.

Page 7: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 6

S.

No. Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities /rates,

wherever possible) with source of information data

1.16 Facilities for long term housing of

operational workers?

Yes A residential colony will be constructed for plant within

the proposed site.

1.17 New road, rail or sea traffic during

construction or operation?

Yes Approach road will be constructed to connect the project

site to nearest highway.

1.18 New road, rail, air waterborne or other

transport infrastructure including new or

altered routes and stations, ports,

airports etc?

Yes Approach road will be constructed to connect the

proposed project site to nearest highway for the

transportation of the machinery and construction

materials. Later the same road will be used for the inward

and outward traffic movement.

1.19 Closure or diversion of existing transport

routes or infrastructure leading to

changes in traffic movements?

No No closure or diversion of existing transport routes or

infrastructure leading to changes in traffic movements

will be required.

1.20 New or diverted transmission lines or

pipelines?

No No new or diverted transmission lines or pipelines will be

there.

1.21 Impoundment, damming, culverting,

realignment or other changes to the

hydrology of watercourses or aquifers?

No There will be no impoundment, damming, culverting,

realignment or other changes to the hydrology of

watercourses or aquifers.

1.22 Stream crossings? No No stream crossing is there.

1.23 Abstraction or transfers of water from

ground or surface waters?

Yes The total water requirement for the proposed

enhancement project will be 1160 KLD which will be

sourced from the Ground Water & Mine Sump / Water

reservoir developed in plant area.

1.24 Changes in water bodies or the land

surface affecting drainage or run-off?

No There will be no change in the water bodies due to the

proposed project and the same is not likely to have any

adverse effect on the land surface affecting drainage or

run-off.

1.25 Transport of personnel or materials for

construction, operation or

decommissioning?

Yes During construction, transport arrangements will be made

for the personnel coming from distant villages / towns

from where they commute to and from for work.

During operation phase, long term housing facility will be

provided for both skilled &unskilled workers.

Transportation of raw materials other than limestone and

finished products will be done by Road/ Rail.

Limestone from the captive limestone mine will be

transported to the cement plant through covered

Page 8: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 7

S.

No. Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities /rates,

wherever possible) with source of information data

conveyor belt.

1.26 Long-term dismantling or

decommissioning or restoration works?

No No long-term dismantling or decommissioning or

restoration works is required.

1.27 Ongoing activity during decommissioning

which could have an impact on the

environment?

No Not Applicable

1.28 Influx of people to an area in either

temporarily or permanently?

Yes Total man power required is 600 persons.

1.29 Introduction of alien species? No Introduction of alien species is not envisaged.

1.30 Loss of native species or genetic

diversity?

No No such case is reported from the area so far.

1.31 Any other actions? No Not applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water,

materials or energy, especially any resources which are non-renewable or in short supply):

S.

No. Information/checklist confirmation

Yes /

No

Details thereof (with approximate quantities /rates,

wherever possible) with source of information data

2.1 Land especially undeveloped or

agricultural land (ha)

Yes Total project area is 57.87 ha. Land use of the existing land

is already industrial and since the proposed enhancement

will be done within the existing project site; therefore,

there will be no change in land use, only intensity will

increase due to proposed project.

2.2 Water (expected source & competing

users) unit KLD

Yes The total water requirement for the proposed

enhancement project will be 1160 KLD which will be

sourced from the Ground Water & Mine Sump / Water

reservoir developed in plant area.

2.3 Minerals (MT) Yes Limestone, Silica, Red Ochre will be required for the

enhancement project during operation phase.

2.4 Construction material – stone,

aggregates, and/ soil (expected source-

MT)

Yes The construction material required for the proposed

project will be purchased from nearby local market.

2.5 Forests and timber (source-MT) No No Forests and timber will be used during

construction/operation of the project activity.

Page 9: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 8

S.

No. Information/checklist confirmation

Yes /

No

Details thereof (with approximate quantities /rates,

wherever possible) with source of information data

2.6 Energy including electricity and fuels

(source, competing users) Unit: fuel

(MT), energy (MW)

Yes The power requirement for the enhancement project will

be 42 MW.

Source: CPP, WHRB & State Grid

2.7 Any other natural resources (use

appropriate standard units)

No Not Applicable

3. Use, storage, transport, handling or production of substances or materials, which could be

harmful to human health or the environment or raise concerns about actual or perceived risks to

human health.

S. No. Information/Checklist confirmation Yes/

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

3.1

Use of substances or materials, which

are hazardous (as per MSIHC rules) to

human health or the environment (flora,

fauna, and water supplies)

No No such substances or materials will be used, which are

hazardous to human health or the environment.

3.2

Changes in occurrence of disease or

affect disease vectors (e.g. insect or

water borne diseases)

No Not Applicable

3.3

Affect the welfare of people e.g. by

changing living conditions?

Yes There will be positive impact of the enhancement project in

the area which are as follows:

� Provide employment opportunities, both direct and

indirect, thus improving the economic status of the

villagers.

� Communication and transport facilities will be

improved.

� Education facilities will be improved.

� Community Health Care programmes will provide

better health and medical facilities not only to the

employees but also to the nearby villagers.

3.4

Vulnerable groups of people who could

be affected by the project e.g. hospital

patients, children, the elderly etc.,

No No effect envisaged.

3.5 Any other causes No Not Applicable

Page 10: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 9

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes No No major spoil production is envisaged from cement plant

as there will be no demolition work. However, the spoil

generated during construction will be reused for filling.

4.2 Municipal waste (domestic and or

commercial wastes)

Yes Municipal solid waste generated from plant will be

collected, segregated and disposed off scientifically.

4.3 Hazardous wastes (as per Hazardous

Waste Management Rules)

Yes Small quantity of used oil and grease will be generated,

which will be sold to the CPCB authorized recycler.

4.4 Other industrial process wastes No � Dust collected from Air Pollution Control Equipments

like ESP, Bag house / Bag filters will be totally recycled

into the process.

� Fly ash generated from CPP will be utilized in

manufacturing of PPC grade cement.

� Sludge generated from STP will be used as manure in

greenbelt development/ plantation.

� In cement plant, RO reject water & boiler blow down

water will be used for dust suppression.

� The domestic wastewater generated from plant&

colony will be treated in STP and the treated water will

be utilized for greenbelt development/ plantation.

4.5 Surplus product No There will be no surplus product.

4.6 Sewage sludge or other sludge from

effluent treatment Yes

Sludge generated from the STP will be used as manure for

plantation or greenbelt development.

4.7 Construction or demolition wastes

Yes

Construction waste like soil, brick bits, etc. will be used for

filling up of low lying areas. No demolition waste is

envisaged.

4.8 Redundant machinery or equipment No No redundant machinery or equipment will be involved.

4.9 Contaminated soils or other materials No There will be no contamination of soil or any other

material.

4.10 Agricultural wastes No There will not be any agricultural waste.

4.11 Other solid wastes No There will not be any other solid waste.

Page 11: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 10

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. No. Information/Checklist confirmation Yes/

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

5.1 Emissions from combustion of fossil

fuels from stationary or mobile sources

Yes Emission from combustion of fossil fuels from stationary or

mobile sources will be maintained within the prescribed

environmental regulatory standards.

5.2 Emissions from production processes

Yes

The emission of PM, NO2 and SO2 will be accounted due the

operational activities which will be reduced by adopting the

following appropriate measures:

� Installation of Pollution Control Equipments (PCEs).

� Providing proper stack height as per CPCB guidelines.

� Adequate greenbelt will be development.

Proper storage facilities will be provided such as closed

silos and covered sheds.

5.3 Emissions from materials handling

including storage or transport

Yes

The transportation and material handling activities will lead

to increase in dust concentration which will be maintained

by adopting proper mitigating measures such as:

• Covered conveyor belts will be used for raw material

and finished product transportation within the plant.

• Water sprinkling will be done for dust suppression.

• Bag Filters shall be provided at the transfer points

• Concrete Road inside the Plant premises.

5.4 Emissions from construction activities

including plant and equipment

Yes

Fugitive dust emissions are envisaged from the

constructional activities apart from gaseous emissions from

the vehicles and construction machineries. However, this

will be temporary and proper mitigation measures will be

taken to reduce the level of emission.

5.5 Dust or odour from handling of

materials including construction

materials, sewage and waste Yes

The construction activities may lead to increase in the dust

levels locally. The impact will be marginal and temporary in

nature. However, there will be no odour generating

substances.

5.6 Emissions from incineration of waste No No incineration of waste is involved

5.7 Emissions from burning of waste in

open air (e.g. slash materials,

construction debris)

No No waste will be burnt in open air.

5.8 Emissions from any other sources No There is no other source of emission.

Page 12: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 11

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No. Information/Checklist confirmation Yes /

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data.

6.1 From operation of equipment e.g.

engines, ventilation plant, crushers

Yes

Following precautionary measures will be adopted to

reduce high noise levels:

• Regular Maintenance of machineries will be done.

• To minimize the noise level proper acoustic

enclosures, flexible padding etc. will be provided to

the machineries.

• Green belt will be developed all around the periphery

of project boundary to restrict noise.

• All workers will be provided with the PPEs

6.2 From industrial or similar processes

Yes

Noise will be generated due to the running of machinery.

Proper mitigation measures will be taken for the

reduction of noise levels, like acoustic enclosures will be

provided to the plant machineries.

6.3 From construction or demolition

Yes

During construction phase the noise level will be

increased which will be temporary & there will be no

significant impact on environment.

No demolition work is involved in the proposed activity

6.4 From blasting or piling No

There will be no requirement of blasting or piling for the

proposed enhancement.

6.5 From construction or operational traffic

Yes

There will be some noise due to movement of vehicles but

that will be kept within the prescribed limit, for which

proper maintenance of the vehicles will be done. Regular

noise monitoring will be done.

6.6 From lighting or cooling systems No Not envisaged

6.7 From any other sources No Nil

7. Risks of contamination of land or water from releases of pollutants into the ground or into

sewers, surface waters, groundwater, coastal waters or the sea:

S. No. Information/Checklist confirmation Yes /

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

7.1 From handling, storage, use or spillage

of hazardous materials

No There will be no use / handling of hazardous material

except during periodic oil change period, which will be

handled in closed containers and will be sold to CPCB

authorized recycler.

Page 13: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 12

S. No. Information/Checklist confirmation Yes /

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

Also, care will be taken during its use for lubrication of

external part of equipment, so that nothing falls on

ground, which may contaminate the soil.

Equipments will be kept well maintained, so that they

may remain leakage free.

7.2 From discharge of sewage or other

effluents to water or the land (expected

mode and place of discharge)

No In the cement plant, no effluent will be generated during

the process. Only domestic waste water will be

generated which will be treated in STP.

Treated water from STP will be used for greenbelt

development / plantation.

7.3 By deposition of pollutants emitted to

air into the land or into water

Yes There is likely hood of increase of air emissions. But

proper mitigating measures will be adopted to reduce the

effect. However, periodical monitoring will be done and

results will be analyzed. In case, any change shows

adverse effects, it will be attended for improvements.

7.4 From any other sources No Not applicable

7.5 Is there a risk of long term build up of

pollutants in the environment from

these sources?

No There will be no long term build up of pollutants in the

environment, however periodic monitoring will be done

for the air, water, noise and soil, so that timely mitigation

measures can be undertaken.

8. Risk of accidents during construction or operation of the Project, which could affect human health

or the environment

S. No. Information/Checklist confirmation Yes/

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

8.1 From explosions, spillages, fires etc

from storage, handling, use or

production of hazardous substances

Yes Possibility of accidents on account of explosions,

spillages, fires etc. and from storage, handling, use or

production of hazardous substances etc. is very less.

Proper maintenance, operation and leakage proof

condition of machineries will eliminate the possibilities of

fire.

Fire extinguishers will be installed near all machineries &

all persons will be properly trained to quench the fire at

source itself. No other major risk will be involved.

8.2 From any other causes No Not applicable

Page 14: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 13

S. No. Information/Checklist confirmation Yes/

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

8.3 Could the project be affected by natural

disasters causing environmental damage

(e.g. Floods, earthquakes, landslides,

cloudburst etc.)?

No No such case has been reported in the area and chances

are minimal. However, we are having Emergency and

Contingency plans in place.

9. Factors which should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned

activities in the locality

S. No. Information/Checklist confirmation Yes /

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

9.1 Lead to development of supporting

utilities, ancillary development or

development stimulated by the project

which could have impact on the

environment e.g.:

• Supporting infrastructure (roads,

power supply, waste or waste water

treatment, etc.)

• housing development

• extractive industries

• supply industries

• other

Yes Proposed enhancement project will result in considerable

growth of the surrounding areas by generating direct and

indirect employment opportunities in the region including

ancillary development.

Greenery of the surrounding area will be developed which

will further add on to the area aesthetically.

Due to upcoming of project, several local house

construction and commercial construction may get

accelerated, which will contribute towards raising socio-

economic status and standard of living of the nearby

population.

9.2 Lead to after-use of the site, which

could have an impact on the

environment

No Not applicable

9.3 Set a precedent for later developments Yes A better after use scenario which is likely to increase

aesthetic beauty of area & greenery should set

precedence for subsequent entrepreneurs who venture

such projects.

9.4 Have cumulative effects due to

proximity to other existing or planned

projects with similar effects

No

No environmental effects or the potential for cumulative

impacts with other existing or planned activities in the

locality.

Page 15: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 14

(III) Environmental Sensitivity

S. No. Areas Name/Identity Aerial distance (within 15 km.) Proposed

project location boundary

1 Areas protected under international

conventions, national or local legislation for

their ecological, landscape, cultural or other

related value

None Not applicable

2 Areas which are important or sensitive for

ecological reasons - Wetlands, watercourses

or other water bodies, coastal zone,

biospheres, mountains, forests

Ghorawat Dam 2.0 km in SSW direction

Jojri Nadi 1.8 km in NW direction

Gaya Bhala Nadi 3.0 km in NNE direction

Badal Pond 5.5 km in ESE direction

Rediya Nada 1.8 km in SSW direction

3 Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting, over

wintering, migration

None -

4 Inland, coastal, marine or underground

waters

None

Not applicable

5 State, National boundaries None Not applicable

6 Routes or facilities used by the public for

access to recreation or other tourist, pilgrim

areas

SH- 21 5.0 Km in SE direction

Kharia Kangar

Railway Station 13.0 Km in NW direction

7 Defense installations None Not applicable

8 Densely populated or built-up area

9 Areas occupied by sensitive man-made land

uses (hospitals, schools, places of worship,

community facilities)

Yes There are primary schools, dispensaries,

small hospitals, places of worship within

15 km radius of the plant site.

10 Areas containing important, high quality or

scarce resources

(ground water resources, surface resources,

forestry, agriculture, fisheries, tourism,

minerals)

Limestone Limestone is present in the captive mine

area.

11 Areas already subjected to pollution or

environmental damage. (those where

existing legal environmental standards are

exceeded)

None There is no area already subjected to

pollution or environmental damage

within 15 km radius of the plant site.

Page 16: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 15

S. No. Areas Name/Identity Aerial distance (within 15 km.) Proposed

project location boundary

12 Areas susceptible to natural hazard which

could cause the project to present

environmental problems (earthquakes,

subsidence, landslides, erosion, flooding or

extreme or adverse climatic conditions)

None The project site falls in Seismic Zone - II

as per IS: 1893 (Part-I): 2002.

(IV) Proposed Terms of Reference

M/s. Marwar Cement Limited is proposing an Enhancement in Production Capacity of Cement

Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15

MW) at Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

The proposal of the project is as given below-

Unit Granted Capacity Enhanced Capacity Total capacity after Enhancement

Clinker (MTPA) 1.0 2.0 3.0

Cement (MTPA) 1.37 0.63 2.0

CPP (MW) 18 7 25

WHRB (MW) Nil 15 15

Application for obtaining Environmental Clearance for the above mentioned project was

submitted to MoEFCC, New Delhi on 16th April, 2015.

The First Technical Presentation (for ToR approval) for the project was held before EAC (I) on 3rd

July, 2015 and subsequently, ToR letter was issued on 22nd July, 2015.

Baseline study for the project has already been carried out during Summer Season (March to

May, 2016). Documents for conduction of Public Hearing for the said project was submitted on

06th June, 2018 to Regional Office, Rajasthan State Pollution Control Board (RSPCB), Jodhpur.

Date and time for the conduction of Public Hearing is awaited.

Since, the ToR issued for the project is valid upto 21st July, 2018, it is requested to kindly extend

the validity of the same for next one year.

Page 17: At Village: Ghorawat, Tehsil: Pipar City, District: …environmentclearance.nic.in/writereaddata/modification/...Name Mr. Motilal Chouhan Mr. B. M. Mathur Designation (Owner/Partner/CEO)

Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)

Form – I / Appendix I

M/s. Marwar Cement Ltd. 16

(V) Undertaking