Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 1
APPENDIX I
(See paragraph - 6)
FORM 1
I. Basic Information
S.
No. Item Details
1. Name of the project Enhancement in Production Capacity of Cement Project - Clinker
(1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) &
WHRB (15 MW) at Village: Ghorawat, Tehsil: Pipar City, District:
Jodhpur (Rajasthan) by M/s. Marwar Cement Ltd.
2. S. No. in the schedule As per EIA Notification dated 14th Sept., 2006 & as amended from
time to time; this project falls under S. No. 3 (Material Production),
Project Activity ‘3 (b)’ Cement Plants.
3. Proposed capacity/area/length/tonnage to
be handled/command area/lease
area/number of wells to be drilled
S.
No.
Particular Granted
Capacity
Additional
Capacity
Total Capacity
after
Enhancement
1. Clinker (MTPA) 1.0 2.0 3.0
2. Cement (MTPA) 1.37 0.63 2.0
3. CPP (MW) 18 7 25
4. WHRB (MW) Nil 15 15
5. DG Set (MW) 5 Nil 5
4. New/Expansion/Modernization Enhancement Project
5. Existing Capacity/Area etc. Total Project Area - 57.87 ha
6. Category of Project i.e. 'A' or 'B' Category ‘A’
7. Does it attract the general condition? If
yes, please specify.
No, it does not attract the general condition.
8. Does it attract the specific condition? If
yes, please specify.
No, it does not attract the specific condition.
9. Location
Plot/Survey/Khasra No. 343 / 34
Village Ghorawat
Tehsil Pipar City
District Jodhpur
State Rajasthan
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 2
S.
No. Item Details
10. Nearest railway station/airport along
with distance in kms.
o Nearest Railway Station: Kharia Kangar Railway Station (~13.0
km in NW direction from project site)
o Nearest Airport: Jodhpur Airport (~73.0 km in WSW direction
from project site)
11. Nearest Town, city, District Headquarters
along with distance in kms.
o Nearest City: Merta City (~28.0 km in NE direction from project
site)
o District Headquarter: Jodhpur
12. Village Panchayats, Zilla Parishad,
Municipal Corporation, Local body
(complete postal addresses with
telephone nos. to be given)
Gram Panchayat: Sarpanch Khawaspura,
Tehsil - Pipar City,
District - Jodhpur
13. Name of the applicant M/s. Marwar Cement Limited.
14. Registered Address Office No. A - 505,5thFloor, Plot No. 14C, Sector-19, Groma House,
Vashi, Navi Mumbai (Maharashtra) - 400705
15. Address for correspondence: Project Proponent EIA Consultant
Name Mr. Motilal Chouhan Mr. B. M. Mathur
Designation (Owner/Partner/CEO) Director Associate Director
Address
Ground Floor, Jodhpur
Tower, Dharam Narain ji Ka
Hatha, Paota, Jodhpur
J. M. EnviroNet Pvt. Ltd.
202-A, ABW Tower, M.G. Road, Near
IFFCO Chock, Opp. West Inn Hotel,
Gurugram, Haryana
Pin Code 342010 122 001
E-mail [email protected] [email protected]
Telephone No. 0291-2540550 -
Fax No. - -
16. Details of Alternative Sites examined, if
any. Location of these sites should be
shown on a toposheet.
Since, the proposed enhancement will be done within the existing
project area; hence, no alternative site has been considered.
17. Interlinked Projects o Limestone Mine (ML Area - 73.33 ha) with production capacity
of 0.15 MTPA located at Village - Pundlu, Tehsil - Merta, District-
Nagaur (Rajasthan).
o Limestone Mine (ML Area: 35.98 ha) with production capacity
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 3
S.
No. Item Details
0.75 MTPA located at Village -Ghorawat, Tehsil - Pipar City,
District - Jodhpur (Rajasthan).
o Limestone Mine (ML Area: 137.993 ha) with production capacity
3.10 MTPA ha located at Villages- Ghorawat & Pundlu, Tehsil -
Pipar City &Merta City, District- Jodhpur &Nagaur (Rajasthan).
o Limestone Mine (ML Area: 195.7064 ha) with production
capacity 1.0 MTPA ha located at Near Villages- Ghorawat,
Borunda & Pundlu, Tehsil -Pipar City (earlier Bhopalgarh) &
Merta City, District- Jodhpur &Nagaur (Rajasthan).
18. Whether separate application of
interlinked project has been submitted?
No
19. If yes, date of submission -
20. If no, reason Environmental Clearance for above mentioned three limestone
mines i.e. 73.33 ha, 35.98 ha & 195.7064 ha has been obtained from
concerned authorities and 137.993 ha has been recommended for
grant of EC by 30th EAC (Non-Coal Mining).
21. Whether the proposal involves
approval/clearance under: if yes, details of
the same and their status to be given.
(a) The Forest (Conservation) Act, 1980?
(b) The Wildlife (Protection) Act, 1972?
(c) The C.R.Z Notification, 1991?
No
22. Whether there is any Government
Order/Policy relevant/relating to site
No
23. Forest land involved (hectares) No forest land is involved
24. Whether there is any litigation pending
against the project and/or land in which
the project is propose to be set up?
Name of the Court
(a) Case No.
(b) Orders/directions of the Court, if any
and its relevance with the proposed
project.
No litigation is pending against the project.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 4
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.
No. Information/Checklist confirmation Yes/No
Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
1.1 Permanent or temporary change in land
use, land cover or topography including
increase in intensity of land use (with
respect to local land use plan)
No Total project area is 57.87 ha. Land use of the existing land
is already industrial and since the proposed enhancement
will be done within the existing project site; therefore,
there will be no change in land use, only intensity will
increase due to proposed project.
Topography of the land is almost flat; there will be no
change in the topography.
1.2 Clearance of existing land, vegetation
and buildings?
Yes There will be some clearance of the land and vegetation
for the proposed activity.
1.3 Creation of new land uses? No Land use of the existing project area is industrial; since,
the proposed enhancement will be done within the
existing project site, hence, there will not be any creation
of new land uses.
1.4 Pre-construction investigations e.g. bore
houses, soil testing? (Please confirm)
No Pre-construction investigations have already been carried
out. Thus, it is not required for proposed enhancement
project.
1.5 Construction works? Yes Various structures/facilities will be constructed to start
with the cement manufacturing process.
1.6 Demolition works? No There will be no demolition work.
1.7 Temporary sites used for construction
works or housing of construction
workers?
Yes During construction phase, temporary housing facilities
will be provided to the workers as they will come from the
nearby villages.
Proper sanitary facilities will be provided in order to avoid
contamination to the soil, surface and ground water in the
nearby area.
1.8 Above ground buildings, structures or
earthworks including linear structures,
cut and fill or excavations.
Yes There will be excavation, cut and fill during the process of
construction for proposed project.
1.9 Underground works including mining or
tunneling?
No No underground works including mining or tunneling is
required.
1.10 Reclamation works? No No reclamation work will be done.
1.11 Dredging? No No dredging will be carried out.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 5
S.
No. Information/Checklist confirmation Yes/No
Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing
processes?
Yes
Cement Plant
Cement Plant is based on dry process consisting of
following unit operations:
� Transport of limestone from Limestone mine site
� Raw Mix Preparation & Homogenization
� Preheating and Calcination
� Clinker cooling
� Clinker storage and transport
� Cement Grinding, Storage, Packing & Dispatch
Captive Power Plant
� Burning of fuel in the CFBC boiler to generate
steam.
� Power generation in Turbine
� Air Cooled system
Waste Heat Recovery Power Generation
� For re-utilization of the wasted heat from the
exhaust gases of pre-heater/ cooler, the Waste Heat
Recovery System is used to generate the electrical
power. Waste Heat Recovery System (WHRS) will
be installed near Kiln Pre-heater and Cooler.
1.14 Facilities for storage of goods or
materials?
Yes Proper storage facilities for raw material and finished
product will be provided within the proposed project site.
1.15 Facilities for treatment or disposal of
solid waste or liquid effluents?
Yes � Dust collected from Air Pollution Control Equipments
like ESP, Bag house / Bag filters will be totally recycled
into the process.
� Fly ash generated from CPP will be utilized in
manufacturing of PPC grade cement.
� Sludge generated from STP will be used as manure in
greenbelt development/ plantation.
� In cement plant, RO reject water & boiler blow down
water will be used for dust suppression.
� The domestic wastewater generated from plant &
colony will be treated in STP and the treated water
will be utilized for greenbelt development/ plantation.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 6
S.
No. Information/Checklist confirmation Yes/No
Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
1.16 Facilities for long term housing of
operational workers?
Yes A residential colony will be constructed for plant within
the proposed site.
1.17 New road, rail or sea traffic during
construction or operation?
Yes Approach road will be constructed to connect the project
site to nearest highway.
1.18 New road, rail, air waterborne or other
transport infrastructure including new or
altered routes and stations, ports,
airports etc?
Yes Approach road will be constructed to connect the
proposed project site to nearest highway for the
transportation of the machinery and construction
materials. Later the same road will be used for the inward
and outward traffic movement.
1.19 Closure or diversion of existing transport
routes or infrastructure leading to
changes in traffic movements?
No No closure or diversion of existing transport routes or
infrastructure leading to changes in traffic movements
will be required.
1.20 New or diverted transmission lines or
pipelines?
No No new or diverted transmission lines or pipelines will be
there.
1.21 Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses or aquifers?
No There will be no impoundment, damming, culverting,
realignment or other changes to the hydrology of
watercourses or aquifers.
1.22 Stream crossings? No No stream crossing is there.
1.23 Abstraction or transfers of water from
ground or surface waters?
Yes The total water requirement for the proposed
enhancement project will be 1160 KLD which will be
sourced from the Ground Water & Mine Sump / Water
reservoir developed in plant area.
1.24 Changes in water bodies or the land
surface affecting drainage or run-off?
No There will be no change in the water bodies due to the
proposed project and the same is not likely to have any
adverse effect on the land surface affecting drainage or
run-off.
1.25 Transport of personnel or materials for
construction, operation or
decommissioning?
Yes During construction, transport arrangements will be made
for the personnel coming from distant villages / towns
from where they commute to and from for work.
During operation phase, long term housing facility will be
provided for both skilled &unskilled workers.
Transportation of raw materials other than limestone and
finished products will be done by Road/ Rail.
Limestone from the captive limestone mine will be
transported to the cement plant through covered
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 7
S.
No. Information/Checklist confirmation Yes/No
Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
conveyor belt.
1.26 Long-term dismantling or
decommissioning or restoration works?
No No long-term dismantling or decommissioning or
restoration works is required.
1.27 Ongoing activity during decommissioning
which could have an impact on the
environment?
No Not Applicable
1.28 Influx of people to an area in either
temporarily or permanently?
Yes Total man power required is 600 persons.
1.29 Introduction of alien species? No Introduction of alien species is not envisaged.
1.30 Loss of native species or genetic
diversity?
No No such case is reported from the area so far.
1.31 Any other actions? No Not applicable
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short supply):
S.
No. Information/checklist confirmation
Yes /
No
Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
2.1 Land especially undeveloped or
agricultural land (ha)
Yes Total project area is 57.87 ha. Land use of the existing land
is already industrial and since the proposed enhancement
will be done within the existing project site; therefore,
there will be no change in land use, only intensity will
increase due to proposed project.
2.2 Water (expected source & competing
users) unit KLD
Yes The total water requirement for the proposed
enhancement project will be 1160 KLD which will be
sourced from the Ground Water & Mine Sump / Water
reservoir developed in plant area.
2.3 Minerals (MT) Yes Limestone, Silica, Red Ochre will be required for the
enhancement project during operation phase.
2.4 Construction material – stone,
aggregates, and/ soil (expected source-
MT)
Yes The construction material required for the proposed
project will be purchased from nearby local market.
2.5 Forests and timber (source-MT) No No Forests and timber will be used during
construction/operation of the project activity.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 8
S.
No. Information/checklist confirmation
Yes /
No
Details thereof (with approximate quantities /rates,
wherever possible) with source of information data
2.6 Energy including electricity and fuels
(source, competing users) Unit: fuel
(MT), energy (MW)
Yes The power requirement for the enhancement project will
be 42 MW.
Source: CPP, WHRB & State Grid
2.7 Any other natural resources (use
appropriate standard units)
No Not Applicable
3. Use, storage, transport, handling or production of substances or materials, which could be
harmful to human health or the environment or raise concerns about actual or perceived risks to
human health.
S. No. Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
3.1
Use of substances or materials, which
are hazardous (as per MSIHC rules) to
human health or the environment (flora,
fauna, and water supplies)
No No such substances or materials will be used, which are
hazardous to human health or the environment.
3.2
Changes in occurrence of disease or
affect disease vectors (e.g. insect or
water borne diseases)
No Not Applicable
3.3
Affect the welfare of people e.g. by
changing living conditions?
Yes There will be positive impact of the enhancement project in
the area which are as follows:
� Provide employment opportunities, both direct and
indirect, thus improving the economic status of the
villagers.
� Communication and transport facilities will be
improved.
� Education facilities will be improved.
� Community Health Care programmes will provide
better health and medical facilities not only to the
employees but also to the nearby villagers.
3.4
Vulnerable groups of people who could
be affected by the project e.g. hospital
patients, children, the elderly etc.,
No No effect envisaged.
3.5 Any other causes No Not Applicable
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 9
4. Production of solid wastes during construction or operation or decommissioning (MT/month)
S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No major spoil production is envisaged from cement plant
as there will be no demolition work. However, the spoil
generated during construction will be reused for filling.
4.2 Municipal waste (domestic and or
commercial wastes)
Yes Municipal solid waste generated from plant will be
collected, segregated and disposed off scientifically.
4.3 Hazardous wastes (as per Hazardous
Waste Management Rules)
Yes Small quantity of used oil and grease will be generated,
which will be sold to the CPCB authorized recycler.
4.4 Other industrial process wastes No � Dust collected from Air Pollution Control Equipments
like ESP, Bag house / Bag filters will be totally recycled
into the process.
� Fly ash generated from CPP will be utilized in
manufacturing of PPC grade cement.
� Sludge generated from STP will be used as manure in
greenbelt development/ plantation.
� In cement plant, RO reject water & boiler blow down
water will be used for dust suppression.
� The domestic wastewater generated from plant&
colony will be treated in STP and the treated water will
be utilized for greenbelt development/ plantation.
4.5 Surplus product No There will be no surplus product.
4.6 Sewage sludge or other sludge from
effluent treatment Yes
Sludge generated from the STP will be used as manure for
plantation or greenbelt development.
4.7 Construction or demolition wastes
Yes
Construction waste like soil, brick bits, etc. will be used for
filling up of low lying areas. No demolition waste is
envisaged.
4.8 Redundant machinery or equipment No No redundant machinery or equipment will be involved.
4.9 Contaminated soils or other materials No There will be no contamination of soil or any other
material.
4.10 Agricultural wastes No There will not be any agricultural waste.
4.11 Other solid wastes No There will not be any other solid waste.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 10
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S. No. Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
5.1 Emissions from combustion of fossil
fuels from stationary or mobile sources
Yes Emission from combustion of fossil fuels from stationary or
mobile sources will be maintained within the prescribed
environmental regulatory standards.
5.2 Emissions from production processes
Yes
The emission of PM, NO2 and SO2 will be accounted due the
operational activities which will be reduced by adopting the
following appropriate measures:
� Installation of Pollution Control Equipments (PCEs).
� Providing proper stack height as per CPCB guidelines.
� Adequate greenbelt will be development.
Proper storage facilities will be provided such as closed
silos and covered sheds.
5.3 Emissions from materials handling
including storage or transport
Yes
The transportation and material handling activities will lead
to increase in dust concentration which will be maintained
by adopting proper mitigating measures such as:
• Covered conveyor belts will be used for raw material
and finished product transportation within the plant.
• Water sprinkling will be done for dust suppression.
• Bag Filters shall be provided at the transfer points
• Concrete Road inside the Plant premises.
5.4 Emissions from construction activities
including plant and equipment
Yes
Fugitive dust emissions are envisaged from the
constructional activities apart from gaseous emissions from
the vehicles and construction machineries. However, this
will be temporary and proper mitigation measures will be
taken to reduce the level of emission.
5.5 Dust or odour from handling of
materials including construction
materials, sewage and waste Yes
The construction activities may lead to increase in the dust
levels locally. The impact will be marginal and temporary in
nature. However, there will be no odour generating
substances.
5.6 Emissions from incineration of waste No No incineration of waste is involved
5.7 Emissions from burning of waste in
open air (e.g. slash materials,
construction debris)
No No waste will be burnt in open air.
5.8 Emissions from any other sources No There is no other source of emission.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 11
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S. No. Information/Checklist confirmation Yes /
No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data.
6.1 From operation of equipment e.g.
engines, ventilation plant, crushers
Yes
Following precautionary measures will be adopted to
reduce high noise levels:
• Regular Maintenance of machineries will be done.
• To minimize the noise level proper acoustic
enclosures, flexible padding etc. will be provided to
the machineries.
• Green belt will be developed all around the periphery
of project boundary to restrict noise.
• All workers will be provided with the PPEs
6.2 From industrial or similar processes
Yes
Noise will be generated due to the running of machinery.
Proper mitigation measures will be taken for the
reduction of noise levels, like acoustic enclosures will be
provided to the plant machineries.
6.3 From construction or demolition
Yes
During construction phase the noise level will be
increased which will be temporary & there will be no
significant impact on environment.
No demolition work is involved in the proposed activity
6.4 From blasting or piling No
There will be no requirement of blasting or piling for the
proposed enhancement.
6.5 From construction or operational traffic
Yes
There will be some noise due to movement of vehicles but
that will be kept within the prescribed limit, for which
proper maintenance of the vehicles will be done. Regular
noise monitoring will be done.
6.6 From lighting or cooling systems No Not envisaged
6.7 From any other sources No Nil
7. Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea:
S. No. Information/Checklist confirmation Yes /
No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
7.1 From handling, storage, use or spillage
of hazardous materials
No There will be no use / handling of hazardous material
except during periodic oil change period, which will be
handled in closed containers and will be sold to CPCB
authorized recycler.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 12
S. No. Information/Checklist confirmation Yes /
No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
Also, care will be taken during its use for lubrication of
external part of equipment, so that nothing falls on
ground, which may contaminate the soil.
Equipments will be kept well maintained, so that they
may remain leakage free.
7.2 From discharge of sewage or other
effluents to water or the land (expected
mode and place of discharge)
No In the cement plant, no effluent will be generated during
the process. Only domestic waste water will be
generated which will be treated in STP.
Treated water from STP will be used for greenbelt
development / plantation.
7.3 By deposition of pollutants emitted to
air into the land or into water
Yes There is likely hood of increase of air emissions. But
proper mitigating measures will be adopted to reduce the
effect. However, periodical monitoring will be done and
results will be analyzed. In case, any change shows
adverse effects, it will be attended for improvements.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of
pollutants in the environment from
these sources?
No There will be no long term build up of pollutants in the
environment, however periodic monitoring will be done
for the air, water, noise and soil, so that timely mitigation
measures can be undertaken.
8. Risk of accidents during construction or operation of the Project, which could affect human health
or the environment
S. No. Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
8.1 From explosions, spillages, fires etc
from storage, handling, use or
production of hazardous substances
Yes Possibility of accidents on account of explosions,
spillages, fires etc. and from storage, handling, use or
production of hazardous substances etc. is very less.
Proper maintenance, operation and leakage proof
condition of machineries will eliminate the possibilities of
fire.
Fire extinguishers will be installed near all machineries &
all persons will be properly trained to quench the fire at
source itself. No other major risk will be involved.
8.2 From any other causes No Not applicable
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 13
S. No. Information/Checklist confirmation Yes/
No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
8.3 Could the project be affected by natural
disasters causing environmental damage
(e.g. Floods, earthquakes, landslides,
cloudburst etc.)?
No No such case has been reported in the area and chances
are minimal. However, we are having Emergency and
Contingency plans in place.
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned
activities in the locality
S. No. Information/Checklist confirmation Yes /
No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
9.1 Lead to development of supporting
utilities, ancillary development or
development stimulated by the project
which could have impact on the
environment e.g.:
• Supporting infrastructure (roads,
power supply, waste or waste water
treatment, etc.)
• housing development
• extractive industries
• supply industries
• other
Yes Proposed enhancement project will result in considerable
growth of the surrounding areas by generating direct and
indirect employment opportunities in the region including
ancillary development.
Greenery of the surrounding area will be developed which
will further add on to the area aesthetically.
Due to upcoming of project, several local house
construction and commercial construction may get
accelerated, which will contribute towards raising socio-
economic status and standard of living of the nearby
population.
9.2 Lead to after-use of the site, which
could have an impact on the
environment
No Not applicable
9.3 Set a precedent for later developments Yes A better after use scenario which is likely to increase
aesthetic beauty of area & greenery should set
precedence for subsequent entrepreneurs who venture
such projects.
9.4 Have cumulative effects due to
proximity to other existing or planned
projects with similar effects
No
No environmental effects or the potential for cumulative
impacts with other existing or planned activities in the
locality.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 14
(III) Environmental Sensitivity
S. No. Areas Name/Identity Aerial distance (within 15 km.) Proposed
project location boundary
1 Areas protected under international
conventions, national or local legislation for
their ecological, landscape, cultural or other
related value
None Not applicable
2 Areas which are important or sensitive for
ecological reasons - Wetlands, watercourses
or other water bodies, coastal zone,
biospheres, mountains, forests
Ghorawat Dam 2.0 km in SSW direction
Jojri Nadi 1.8 km in NW direction
Gaya Bhala Nadi 3.0 km in NNE direction
Badal Pond 5.5 km in ESE direction
Rediya Nada 1.8 km in SSW direction
3 Areas used by protected, important or
sensitive species of flora or fauna for
breeding, nesting, foraging, resting, over
wintering, migration
None -
4 Inland, coastal, marine or underground
waters
None
Not applicable
5 State, National boundaries None Not applicable
6 Routes or facilities used by the public for
access to recreation or other tourist, pilgrim
areas
SH- 21 5.0 Km in SE direction
Kharia Kangar
Railway Station 13.0 Km in NW direction
7 Defense installations None Not applicable
8 Densely populated or built-up area
9 Areas occupied by sensitive man-made land
uses (hospitals, schools, places of worship,
community facilities)
Yes There are primary schools, dispensaries,
small hospitals, places of worship within
15 km radius of the plant site.
10 Areas containing important, high quality or
scarce resources
(ground water resources, surface resources,
forestry, agriculture, fisheries, tourism,
minerals)
Limestone Limestone is present in the captive mine
area.
11 Areas already subjected to pollution or
environmental damage. (those where
existing legal environmental standards are
exceeded)
None There is no area already subjected to
pollution or environmental damage
within 15 km radius of the plant site.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 15
S. No. Areas Name/Identity Aerial distance (within 15 km.) Proposed
project location boundary
12 Areas susceptible to natural hazard which
could cause the project to present
environmental problems (earthquakes,
subsidence, landslides, erosion, flooding or
extreme or adverse climatic conditions)
None The project site falls in Seismic Zone - II
as per IS: 1893 (Part-I): 2002.
(IV) Proposed Terms of Reference
M/s. Marwar Cement Limited is proposing an Enhancement in Production Capacity of Cement
Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15
MW) at Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
The proposal of the project is as given below-
Unit Granted Capacity Enhanced Capacity Total capacity after Enhancement
Clinker (MTPA) 1.0 2.0 3.0
Cement (MTPA) 1.37 0.63 2.0
CPP (MW) 18 7 25
WHRB (MW) Nil 15 15
Application for obtaining Environmental Clearance for the above mentioned project was
submitted to MoEFCC, New Delhi on 16th April, 2015.
The First Technical Presentation (for ToR approval) for the project was held before EAC (I) on 3rd
July, 2015 and subsequently, ToR letter was issued on 22nd July, 2015.
Baseline study for the project has already been carried out during Summer Season (March to
May, 2016). Documents for conduction of Public Hearing for the said project was submitted on
06th June, 2018 to Regional Office, Rajasthan State Pollution Control Board (RSPCB), Jodhpur.
Date and time for the conduction of Public Hearing is awaited.
Since, the ToR issued for the project is valid upto 21st July, 2018, it is requested to kindly extend
the validity of the same for next one year.
Enhancement in Production Capacity of Cement Project - Clinker (1.0 to 3.0 MTPA), Cement (1.37 to 2.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) At Village: Ghorawat, Tehsil: Pipar City, District: Jodhpur (Rajasthan)
Form – I / Appendix I
M/s. Marwar Cement Ltd. 16
(V) Undertaking