athenry case study - case study - 2pp pta
TRANSCRIPT
LOCATIONAthenry Motorway Services Area, Junction 4 M6, Athenry, Co Galway
CUSTOMERFVG Construction
Below Ground Storage Tank
Case Study
Requirements: A series of fi re hydrants on site were unable to function properly due to insuffi cient water pressure and volume from the local supply.
JANUARY 2017
Design target
To install a cost effective, environmentally friendly, and discrete water storage solution that could cater to the volume of water required for the hydrants.
Solution
1 x 45,000L, 9.6m + 2.5m diameter, underground water storage tank
Any Other Information
The installation took place on a site that was both very active and quite con� ned, therefore required an excavation that could be performed quickly and ef� ciently to reduce the risk to personnel. With that in mind, PTA ensured that the installation was an ef� cient and streamlined process with minimal disruption. This was completed in only a matter of one working day.