athens olympic games projects presentation.pdf · athena s.a. participated and completed major...

26
On the occasion of the Athens 2004 Olympic Games event presented herebelow are certain structures for which ATHENA S A is very proud for herebelow are certain structures for which ATHENA S.A. is very proud for the timely completion and quality achieved. ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olympic Stadium, the Palais de Sports, the roof cover of Olympic Velodrome and Agora, the International Broadcasting Complex (IBC), the Olympic Main Press Centre (MPC), the Olympic Sailing Centre of Ag. Kosmas, the Journalist Accommodation Village – Maroussi 2004, the Zea Marina, the Rion – Antirion bridge, as well as the world renowned Olympic Stadium Roof Cover designed by the well as the world renowned Olympic Stadium Roof Cover designed by the famous Spanish Architect Calatrava. 1

Upload: others

Post on 25-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

On the occasion of the Athens 2004 Olympic Games event presentedherebelow are certain structures for which ATHENA S A is very proud forherebelow are certain structures for which ATHENA S.A. is very proud forthe timely completion and quality achieved.

ATHENA S.A. participated and completed major Works for the OlympicGames. These Projects include the Olympic Stadium, the Palais de Sports,j y p pthe roof cover of Olympic Velodrome and Agora, the InternationalBroadcasting Complex (IBC), the Olympic Main Press Centre (MPC), theOlympic Sailing Centre of Ag. Kosmas, the Journalist AccommodationVillage – Maroussi 2004, the Zea Marina, the Rion – Antirion bridge, aswell as the world renowned Olympic Stadium Roof Cover designed by thewell as the world renowned Olympic Stadium Roof Cover designed by thefamous Spanish Architect Calatrava.

1

Page 2: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

2

Page 3: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

3

Page 4: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Palais de Sports Athens Sports Center

Athens 2004 Olympic Games Projects

Palais de Sports, Athens Sports Center

Client: General Secretariat of Sports

15,000 seat Stadium, complete with, , pinstallations & facilities for large domesticand international athletic & social events, 120m roof span, 32 pylons, 17m to 32m high,600 ton/each on a 42.000 m2 area.

4

Page 5: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Palais de Sports Athens Sports CenterPalais de Sports, Athens Sports Center

5

Page 6: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Aesthetic Unification of the Olympic Athletic Centre of Athens : Special Constructions

6

Page 7: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Aesthetic Unification of the Olympic Athletic Centre of Athens : 

Client: General Secretariat ofSports Consists of the specialconstructions of Olympic Stadium

d

Special Constructions

(2nd Construction Period), OlympicVelodrome and the Agora.

7

Page 8: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Olympic Stadium (1st Construction Period 1980 1982)

Athens 2004 Olympic Games Projects

Olympic Stadium (1st Construction Period 1980‐1982)

Client: General Secretariat of Sports

75,000 seat Olympic Stadium, with in situfabrication, casting and installation of 2,4m high, 600 ton twin pylons, speciallydesigned by Athena S.A. to reduceconstruction time. Twin level stands, 34twin pylons, 45,000 m3 concrete, 52,000m3 prefabricated concrete elements.Complete services and utilities of all theathletic & supporting facilities &installations, including landscaping., g p g

8

Page 9: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Olympic Stadium (2nd C t ti P i d 2002 2004)

Athens 2004 Olympic Games Projects

Olympic Stadium (2nd Construction Period 2002‐2004)

Client: General Secretariat of Sports

Upgrade of Stadium using innovative and creativeways including the new roof structure designedways, including the new roof structure designedby the Spanish Architect Santiago Calatrava.

9

Page 10: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Olympic Stadium (2nd C t ti P i d 2002 2004)Olympic Stadium (2nd Construction Period 2002‐2004)

10

Page 11: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Olympic Stadium (2nd C t ti P i d 2002 2004)Olympic Stadium (2nd Construction Period 2002‐2004)

11

Page 12: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Olympic Stadium (2nd C t ti P i d 2002 2004)Olympic Stadium (2nd Construction Period 2002‐2004)

12

Page 13: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Olympic Velodrome

Athens 2004 Olympic Games Projects

y p

Client: General Secretariat of Sports

The Olympic Velodrome, at the AthensOlympic Sports Complex (OAKA), is thevenue where the Track Cycling discipliney g ptook place. It hosted 5,250 spectators, whohad the opportunity to view the fast‐pacedsport in the modern Velodrome venue.

The field of play is a wooden track made byafzelia hard wood of 250 m. length and 720m. width. The banking at the two bends is42° and at the two straights is 12°.

Part of it included its roof, designed by thefamous Spanish architect SantiagoCalatrava.

13

Page 14: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Olympic Velodromey p

14

Page 15: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Agora

Athens 2004 Olympic Games Projects

Agora

15

Page 16: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

AgoraAgora

16

Page 17: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

International Broadcasting Center

Athens 2004 Olympic Games Projects

g

Client: General Secretariat of Sports

C t ti f th 115 000 2Construction of the 115,000 m2broadcasting facilities, two undergroundgarages of 38,500 m2 each, adjoining 38,500m2 of broadcasting studios, all requiredfacilities dedicated to the radio andtelevision coverage of the Athens 2004Olympic Games.

17

Page 18: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

International Broadcasting Centerg

18

Page 19: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Olympic Main Press Center

Athens 2004 Olympic Games Projects

y p

Client: General Secretariat of Sports

The firm implemented the design andconstruction of the Olympic Main PressCenter. Works include the construction oftwo steel buildings, of seven and eightstories respectively, along with all theelectromechanical installations, to servethe press media during the Athens 2004Olympic Games.

19

Page 20: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Olympic Main Press Centery p

20

Page 21: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Olympic Sailing Centre Ag. Kosmas

21

Page 22: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Client: Hellenic Ministry of Public

Olympic Sailing Centre Ag. Kosmas

Works

Construction of an outer 1 km breakwater,protected with rock armor and acropods. Theinner harbor includes basin dredging,construction of quay wall of 1.13 km at ‐4mdepth, buildings of 25,000 m2, andl d i d di klandscaping and surrounding works.

22

Page 23: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Journalist Accommodation Village – Maroussi 2004

Athens 2004 Olympic Games Projects

g

Client: Lamda Olympia Village S.A.

Construction of nine 4‐storey residentialbuildings in 108 apartments with basementstotaling 27,800 m2 to accommodate thevisiting journalists attending the Athens 2004Olympic Games, building maintenance andphase adaptation required for final after‐Olympic residential use.

23

Page 24: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Zea Marina

Athens 2004 Olympic Games Projects

Client:Marina Zeas S.A.

Reconstruction and repairs to existing piersand quays, sea bottom dredging, repairs onbreakwater buildings for new installationsbreakwater, buildings for new installationsand landscaping works.

24

Page 25: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Rio – Antirio Bridge Construction

Athens 2004 Olympic Games Projects

g

Client: Hellenic Ministry of Public Works

A BOT project, 7‐year design / construction contract, 35‐year concession for the construction of 2.29 km bridgewhich forms an integral part of the Trans EuropeanNetwork. The works comprise two access bridges of 378m & 252 m respectively, and 5 cable stayed bridge spansof 2.24 km of total length. In addition, four concretepylons are placed at ‐45 m & ‐62 m sea depth to supportthe main bridge.

25

Page 26: Athens Olympic Games Projects PRESENTATION.pdf · ATHENA S.A. participated and completed major Works for the Olympic Games. These Projects include the Olyypmpic Stadium, the Palais

Athens 2004 Olympic Games Projects

Rio – Antirio Bridge Constructiong

26