atlas-fiori guidelines for - siemens energy ag

68
Atlas-Fiori guidelines for suppliers January 2021 Unrestricted © Siemens AG 2018 Unrestricted Unrestricted

Upload: others

Post on 16-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Atlas-Fiori guidelines for suppliers

January 2021

• Unrestricted © Siemens AG 2018

UnrestrictedUnrestricted

Index

Intro Page First login StepsLanguage Setting

Main menu Overview

ECC agreement FIORI SettingClarification of ECC instruction

Notification Overview

Notification Creation

Adding files CompletedMandatory documents

Task Overview Task Creation

Task Reply Step Email overview Annexes

This is Siemens Business

Portal.

Connect to Siemens Portal

using this link:

https://cportal.siemens.com

Use this Link to

access the FIORI

Portal

Connect to Siemens Portal using this link:

https://cportal.siemens.com

IMPORTANT to Remember

when using Fiori always use

Google Chrome

or Mozilla Firefox

Do not use internet explorer or Microsoft edge

Click to sign up

This is Login Window.

For first login, the external

user must use Other Login

Services

To Reset your Password.

It you need to Reset you

password,

Click on the link

Don't remember the password ?

And

This is the Login Window.

Click here

Click here to change

language

If desired, User must

change language on this

page for the complete

session.

Only English, French

and Deutsch are available.

Languages

available to

choose from

Adjust User

settings

To Sign out

QM Notification

tabQM Task tab

This is Home Page of

FIORI Platform.

Clicking on User

Profile Icon or the tabs

will take you to

respective slides.

1 2

IMPORTANT

when using Fiori always use

Google Chrome

or

Mozilla Firefox

Do not use internet explorer or

Microsoft edge

Please Note

This Message will appear only once

After every first session login

Some Example of ECC Classification

Legacy information

Legacy Drawing or Specification

Please contact your SQA or use eMail address below

[email protected]

What should you do if you are unsure ?

This is QM

Notification window. It

shows all currently open

Notifications.

Clicking on a

Notification Number will

show it’s details.

An exclamation mark

“!” against a Notification

number shows pending

action against that

particular Notification.

For more details on the

QM notification Window.

Refer to Slide 33

Left Pane lists all

currently open

Notifications

This symbol

shows Open

Action against

this Notification

Click here to

create a new

Notification

QM Notif. Detail

window tabs

Notification an be printed from here

QM

Notification Detail

window tabs

QM Notification

Detail window tabs

You Can Upload ECC compliant

Document from here also

You Can Upload

ECC compliant

Document from

here also

Click here to

create a new

Notification

This is Create

Notification popup window.

Use this window to

provide details on new

Notification.

It is recommended to

complete fields in

sequential manner.

All fields with Asterisk

(*) are mandatory.

For greyed out fields,

data shall be

automatically

extracted from SAP

Example:

Concession – TRN101737 – RRSCAMGB70008 or

MBO Concession – TRN101737 - RRSCAMGB70008

Space

limitation

Title field follows a defined

convention. It has 3 parts. All three

are separated by dash (-).

1st part: Write Concession, Prod.

Permit, MBO Concession, Delta

Concession, TAD or MDA

depending upon the nature of

request.

2nd part: Write Part Number of the

affected part.

3rd part (if applicable): Write serial

number of the affected part.

Space

limitation

Supplier to enter their internal NCR

number against this non-conformance

report (if applicable)

Supplier to enter a Problem Code for this

non-conformance report

Annex 1This is Problem

Code Selection popup

window.

Choose one from

the list. A problem code

can directly be entered

into search box.

Click here for

complete list.

This is Create

Notification popup

window.

Ensure that correct

PO number is entered.

For Schedule

Agreement if the number

does not appear in the list,

please continue to enter

you full SA number and

then press enter if the

number is accepted, just

continue to the next field

Click here to show all PO or SA currently open.

If the P.O or SA is not in the list just type the complete number

This is Create

Notification popup

window.

Once correct PO

number is entered, it

automatically extracts

information from SAP

for following 4 fields.

Exact number of

affected parts must be

put in Quantity field.

Change Item# as

required.

Change quantity

as required.

This is Cause

Selection popup

window.

Choose one from

the list. A problem code

can directly be entered

into search box.

Refer to Annex 2 for

complete list.

Insert a code

directly if known

Annex 2

Click here for

complete list.

For MBO concessions

please add

a line on top

“PPQ Lead name:”

This is Create

Notification popup window.

Provide clear & precise

information for each element.

Write N/A if not applicable.

Don’t forget to provide

Cause and Corrective action.

Provision of Corrective Action

Report is mandatory with

every request.

Annex 3

Mandatory documents to be attached

1. Spread Sheet

a. Supplier_Template_Concessions.xlsx

2. For all other report use Word or PDF file, to consolidate all information in 1 single file:

a. PIR.b. Pictures, sketches, Figures, Spline/Gear Graphs, … (If needed) c. Repair Scheme/Plan. (If needed)d. Other document that might clarify any deviations ambiguity

3. CMM Data. (when needed only provide report in Excel format)

Click

here to

openMandatory: For all deviations (dimensional and others) the attach excel

template needs to be completed

Don’t attach drawings or Data cards, if unsure please contact your SQA or

use [email protected] to ask your question

Click here to open the PIR

document

Please do not upload

any documents for Controlled

Technology through this

portal. If you are not sure

about the documents that you

are uploading please contact

your Siemens procurement /

Quality contact to get

instructions.

Click here to

attache files

Drop filrs here to

attach to

Notification

OR

Please do not upload

any documents for Controlled

Technology through this

portal.

Please select all the

mandatory files to complete

the notification

Click here to

submit.

This is QM

Notification window. It

shows all currently open

Notifications.

Clicking on a

Notification Number

will show it’s details.

Click here to go

to Home Page.

Notification number

will appear once a

submission is made.

Files can be attached

here also

Click on Icon to

Filter Left Pane

Concession list

Use this field

to Filter Notification list by

CoordinatorUse this field

to Filter Notification list by

Material

Use this field

to Filter Notification list by

Purchase Order Modify date Reported on and To in

order to Filter further the Notification

list

IMPORTANT

keep this field checked to

see Closed Notifications

This is QM

Notification window. It

shows all currently open

Notifications.

Clicking on a

Notification Number will

show it’s details.

This is QM TASK

window. It shows all

currently open tasks.

Clicking on a task will

show it’s details.

Duration (in days) if in

red means that a task is

pending to be processed.

Left Pane lists all

tasks currently in

WIP.

QM Task Detail

Window

Click here to

create a new

task.

Click here to add text

/ response to

Description Window.

Please do not click

here even if the task is

completedSupplier to re-assign a

task back to Siemens.

Click here if Supplier

wants to re-assign a task

internally.

Task Description

Window

This is QM

Notification window. It

shows all currently open

Notifications.

Clicking on a

Notification Number

will show it’s details.

Click here to see

the details of this

task.

With in QM notification

window, a new task can

also be created by clicking

here.

Click here to go

to Home Page.

Click here to see the tasks

against this Notification.

A small number with circle

shows total number of tasks.

This is QM Create

New Task popup

window.

Use this window to

provide details about

new task.

It is recommended to

complete fields in

sequential manner.

All fields with

Asterisk (*) are

mandatory.

Choose the correct

Notification number from

the list against which this

task is being raised.

Click here to

add Task Title.

Click here to open

Task Type Selection

popup window.

This is QN Number

Selection popup

window.

Choose the right

reference number from

the list.

Click here to save

and submit.

Provide a Task

Title

Provide details

in Description

Window.

New task with ID

0003 is created.

This is QM TASK

window. It shows all

currently open tasks.

Clicking on the

recently created task

(left pane) will show it’s

details in main window.

Click here to see

the details of the

Notification

Click here to go

to Home Page.

Siemens

user ID.

If this window

appears, when you click

on save, it means that

there is another user

currently working on

this task.

Please try again later.

Concession and PP disposition• The disposition will be send by a task to the supplier.

• Supplier must reassign to Siemens as a confirmation response.

• Add long text to acknowledge

• For more information about Concession, CAT disposition and requirement

Please consult the file below:

Definitions,

requirements

Click here to

open

Click here to add text

/ response to

Description Window.

Add any relevant

comment relating the

question, comment or

request in the task

Supplier to re-assign a

task back to Siemens.

This is an example of E-

mail that you will receive

from Coordinators, if there is a

task assigned to you

Task title could be :

Disposition use as is,

Disposition rework

Disposition Reject

ANNEX 1 : Problem Selection Code

Back

Click here to go

back

Click here to

open

Problem Selection

Code

ANNEX 2 : Cause Code Selection

Back

Click here to go

back

Click here to

open

Cause Code

Selection

ANNEX 3 : Mandatory Excel format for deviations

Back

Click here to go

back

Click here to

open

Concession

details