GAS group weekly meeting 08/07/2019 Kacper Kapusniak EP/DT/FS ATLAS RPC distribution racks Channel mapping after LS2 upgrade

Upload: others

Post on 26-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATLAS RPC distribution racks Channel mapping after LS2 upgrade€¦ · EP/DT/FS GAS group weekly meeting 08/07/2019 Kacper Kapusniak ATLAS RPC distribution racks Channel mapping after

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

ATLAS RPC distribution racksChannel mapping after LS2 upgrade

Page 2: ATLAS RPC distribution racks Channel mapping after LS2 upgrade€¦ · EP/DT/FS GAS group weekly meeting 08/07/2019 Kacper Kapusniak ATLAS RPC distribution racks Channel mapping after

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

New P&ID for future racks:

-Instead of High and Low flow line => One line with regulation valve. Goal: Smooth regulation

Page 3: ATLAS RPC distribution racks Channel mapping after LS2 upgrade€¦ · EP/DT/FS GAS group weekly meeting 08/07/2019 Kacper Kapusniak ATLAS RPC distribution racks Channel mapping after

GAS group weekly meeting 04/03/2019 Kacper KapusniakEP/DT/FS

Page 4: ATLAS RPC distribution racks Channel mapping after LS2 upgrade€¦ · EP/DT/FS GAS group weekly meeting 08/07/2019 Kacper Kapusniak ATLAS RPC distribution racks Channel mapping after

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

Rack 63:

-New manifold to be added

Page 5: ATLAS RPC distribution racks Channel mapping after LS2 upgrade€¦ · EP/DT/FS GAS group weekly meeting 08/07/2019 Kacper Kapusniak ATLAS RPC distribution racks Channel mapping after

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

Page 6: ATLAS RPC distribution racks Channel mapping after LS2 upgrade€¦ · EP/DT/FS GAS group weekly meeting 08/07/2019 Kacper Kapusniak ATLAS RPC distribution racks Channel mapping after

GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS

Summary:

-All channels will be displayed in SCADA. Unused/not connected will have indication.-2 channels will be moved inside the rack to empty space for dummy chambers.

-Dummy chambers – installed in last available place in manifold and in SCADA.