atrcom - online piu information system | national highways...

3
AtrcoM l_ :\{ }{ t lt tff coiiiifia'niiY a f'r irittt L i:rritr:ii;iNz ln association with :i:' AE C OM/ITWIV2O 1 4. 1 s/GO N3O2 To, O/o Construction Supervision Consultants F i rst fl oor, Ni kh ith a Bu ild i ng B.B Road,Kundhapun - 576201 Udupi-dist,Kamataka Ph- 08254 230575 www.aecom.com and www. rodlcconsultants.com Date:04/1112014 The Chief Project Manager, IRB West Coast Tollway Pvt. Ltd., Kadikodi,Kumta. Subject : Four Laning of Goa/Karnataka border - Kundapur section of NH-17 (Now NH 66) from Km. 93.700 to Km.283.300 in the state of Karnataka under NTIDP phase IV on design build Operate Transfer (DBFOT) toll basis. Submission of drawings of Pipe Culverts from Km. 220+000 to Km.280+000- reg. Ref : IRB LetterNo.IRBWTPL/CTO/KKBOT1I46|20I4 dated 18.09.2014 for submission of drawings of Pipe Culverts (29 Locatior.rs) at Design Chainages viz. Ch. 221+589, Ch.222+455, ch.222+571, Ch.222+888, Ch.223+453, Ch"223+549, Ch.223+771, Ch"224+129, Ch.224+700, ch.228+286, Ch.228+506, Ch.233+483, Ch"234+360, Ch.234+589, Ch.234+888, Ch"236+652, ch.237+223, Ch"237+666, Ch.253+382, Ch.256+624, Ch.257+118, Ch.257+t97, Ch.25g+740, ch.2 60+5 3 8, Ch"2 6 I +5 8 2, Ch.264+949, Ch "265 +492, Ch.27 0+0 1 0 & Ch.27 0+27 3 Dear Sir, We are in receipt of drawings of Pipe Culvers (29 Loactions)as submitted by you vide reference as mentioned above" These have been reviewed and reviewed drawings are issued with some modifications/corrections as marked in red ink. Points noted on review are brought out as under. J" 1. 2" 4" 5. 6. 7" The FRL shown may be reconciled with the FRL in the approved Plan & Profile Drawings" For Hume Pipe Culvert at Design C}J.228+286 (RC), the proposed total width as per Concession Agreement is 26.00m (LHS) and 26.00m (RHS), whereas in the drawing, the width proposed is 19.375m (U/S) and 19.375m (D/S). Culvert total width needs modification as per CA provision. For Hume Pipe Culvert at Design CH. 228+506 (RC), the proposed total width as per Concession Agreement is 26.00m on LHS and 26.00m on RHS, whereas in the drawing, the width proposed is 20.425 (U/S) and 19.575m (D/S). Needs modification as per CA provision. Design Chainages for each culvert locationand as shown on the drawings shall be re-confirmed with the latest highway approved alignment. Key plan at each culvert location will be shown on the drawing. Traffic management plan during construction of each culvert location meant for widening, reconstruction will be submitted to IE for review before start of work. 300mm thick dry stone apron of width 1.5m U/S and 3m on D/S to be provided, however dry stone apron at inlet and outlet of pipe may be avoided in case of availability of rock with UCS more than 5.0 MPa (Refer Table-2 under Notification No. 68 to IRC:78-2000 for classification of rock). In case of earth cushion more than 4.0m, only concrete cradle bedding will be used under the pipes. Pipe Culvert Drawings as given in IRC:SP: l3-2004 may be referred for this requirement. Drawing of Pipe Culvert at Ch. 270+010 mentioned in the list given on reference letter is missing from the attached drawing folder submitted for review. List of Reviewed Drawings@ 9. 10. AECOM Asia Company Ltd. in association with RODIC Consultanb Pvt Ltd.

Upload: volien

Post on 21-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AtrcoM - Online PIU Information System | National Highways ...nhai.org.in/spw/CorrespondenceIssues/302-AECOMHWH2014-15GOA.pdf · AtrcoM l_:\{ }{ t lt tff ... For Hume Pipe Culvert

AtrcoM l_:\{ }{ t lt tffcoiiiifia'niiY a

f'r irittt L i:rritr:ii;iNzln association with :i:'

AE C OM/ITWIV2O 1 4. 1 s/GO N3O2

To,

O/o Construction Supervision ConsultantsF i rst fl oor, Ni kh ith a Bu ild i ng

B.B Road,Kundhapun - 576201Udupi-dist,Kamataka

Ph- 08254 230575www.aecom.com and www. rodlcconsultants.com

Date:04/1112014

The Chief Project Manager,IRB West Coast Tollway Pvt. Ltd.,Kadikodi,Kumta.

Subject : Four Laning of Goa/Karnataka border - Kundapur section of NH-17 (Now NH 66) from Km.93.700 to Km.283.300 in the state of Karnataka under NTIDP phase IV on design build OperateTransfer (DBFOT) toll basis. Submission of drawings of Pipe Culverts from Km. 220+000 toKm.280+000- reg.

Ref : IRB LetterNo.IRBWTPL/CTO/KKBOT1I46|20I4 dated 18.09.2014 for submission of drawingsof Pipe Culverts (29 Locatior.rs) at Design Chainages viz. Ch. 221+589, Ch.222+455,ch.222+571, Ch.222+888, Ch.223+453, Ch"223+549, Ch.223+771, Ch"224+129, Ch.224+700,ch.228+286, Ch.228+506, Ch.233+483, Ch"234+360, Ch.234+589, Ch.234+888, Ch"236+652,ch.237+223, Ch"237+666, Ch.253+382, Ch.256+624, Ch.257+118, Ch.257+t97, Ch.25g+740,ch.2 60+5 3 8, Ch"2 6 I +5 8 2, Ch.264+949, Ch "265 +492, Ch.27 0+0 1 0 & Ch.27 0+27 3

Dear Sir,

We are in receipt of drawings of Pipe Culvers (29 Loactions)as submitted by you vide reference asmentioned above" These have been reviewed and reviewed drawings are issued with somemodifications/corrections as marked in red ink. Points noted on review are brought out as under.

J"

1.

2"

4"

5.

6.

7"

The FRL shown may be reconciled with the FRL in the approved Plan & Profile Drawings"For Hume Pipe Culvert at Design C}J.228+286 (RC), the proposed total width as per ConcessionAgreement is 26.00m (LHS) and 26.00m (RHS), whereas in the drawing, the width proposed is19.375m (U/S) and 19.375m (D/S). Culvert total width needs modification as per CA provision.For Hume Pipe Culvert at Design CH. 228+506 (RC), the proposed total width as per ConcessionAgreement is 26.00m on LHS and 26.00m on RHS, whereas in the drawing, the width proposed is20.425 (U/S) and 19.575m (D/S). Needs modification as per CA provision.Design Chainages for each culvert locationand as shown on the drawings shall be re-confirmedwith the latest highway approved alignment.Key plan at each culvert location will be shown on the drawing.Traffic management plan during construction of each culvert location meant for widening,reconstruction will be submitted to IE for review before start of work.300mm thick dry stone apron of width 1.5m U/S and 3m on D/S to be provided, however dry stone

apron at inlet and outlet of pipe may be avoided in case of availability of rock with UCS more than5.0 MPa (Refer Table-2 under Notification No. 68 to IRC:78-2000 for classification of rock).In case of earth cushion more than 4.0m, only concrete cradle bedding will be used under thepipes. Pipe Culvert Drawings as given in IRC:SP: l3-2004 may be referred for this requirement.Drawing of Pipe Culvert at Ch. 270+010 mentioned in the list given on reference letter is missingfrom the attached drawing folder submitted for review.List of Reviewed Drawings@

9.

10.

AECOM Asia Company Ltd. in association with RODIC Consultanb Pvt Ltd.

Page 2: AtrcoM - Online PIU Information System | National Highways ...nhai.org.in/spw/CorrespondenceIssues/302-AECOMHWH2014-15GOA.pdf · AtrcoM l_:\{ }{ t lt tff ... For Hume Pipe Culvert

I@COM ,I*K${ite Yffi

Consultants?.j. , li:r,i;(,.. :1

ln association with "ds+t

O/o Construction Supervision ConsultantsFirst floor, Nikhitha Buitding

B.B Road,Kundhapura - 576201Udupi-dist,Kamataka

Ph- 08254 230575www.aecom.com and u l rv. rodicconsultants.com

l0.l Drawing No. ANL544/STNIIPC122L589/001(Rev.M) GAD for Hume pipe Culvert(Reconstruction) at Design Ch. 2Zl+589

10.2 Drawing No. AA/1544/STR/HPC/222455/001(Rev.R3) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 222+45 5

10.3 Drawing No. AN|544/STNHPC1222571/001(Rev.M) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 222+57 |

10.4 Drawing No. AN|544/STNHPC/222888/001(Rev.R3) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 222+BgB

10.5 Drawing No. AA/1544/STR/I{PC/2234531001(Rev.R1) GAD for Hume Pipe Culvert (Widening)at Design Ch.223+453

10.6 Drawing No. AA/1544/STR4{PC12235491001(Rev.Rl) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 223+549

10"7 Drawing No. AA/1544ISTR/I{PC1223771/001(Rev.Rl) cAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 223+77 1

10"8 Drawing No. AA/1544lSTR/HPCl224l29l00l(Rev.R3)- (Sheet I & 2) GAD for Hume pipeCulvert (Reconstruction) at Design Ch. 224+129

10.9 Drawing No. ANL5441STNEIPC/224700/001(Rev.Rl) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 224+7 00

10.10 Drawing No. AN15441STRMPC1228286/001(Rev.R0) GAD for Hume Pipe Culvert(Reconstruction) with service road at Design Ch.228+286

10.11 Drawing No. AA/1544/STRIIDC/228506/001(Rev.R0) GAD for Hume Pipe Culvert(Reconstruction) with service road at Design Ch.228+506

10.12 Drawing No. AN15441STR/I{PC1233483/001(Rev.RI) GAD for Hume Pipe Culvert (Widening)atDesign Ch.233+483

10.13 Drawing No. AA/1544/STR/HPC/234360/001(Rev.R3) GAD for Hume Pipe Culvert (Widening)at Design Ch.234+360

10.14 Drawing No. AA/1544iSTR/I{PC/234589/001(Rev.R2) GAD for Hume Pipe Culvert (Widening)at Design Ch"234+589

10.15 Drawing No. AA/1544ISTNI{PC1234888/001(Rev.R2) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 234+888

10.16 Drawing No. ANI544|STNI*C1236652/001(Rev.M) cAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 236+652

10.17 Drawing No. ANL5441STRIHPC1237223/001(Rev"R3) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 237 +223

10.18 Drawing No. ANl544lSTRlIIPCl237666/001(Rev.R4) cAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 237 +666

10"19 Drawing No. ANLS441STR/HPC/253382/001(Rev.R4) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 253+3Bz

10.20 Drawing No. ANIS44ISTR/HPC/256624I001(Rev"R4) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 256+624

10.21 Drawing No. AN1544/STNE{PC|25:71l8l001(Rev"R4) GAD for Hume Pipe Culvert (Widening)at Design Ch.257+118

10"22 Drawing No. AA/1544/STR/HPC|257l87/001(Rev.R4) GAD for Hume Pipe Culvert (Widening)at Design Ch.257+187

AECOM Asia Company Ltd. in association with RODTC Consultanb pvt Ltd.

Page 3: AtrcoM - Online PIU Information System | National Highways ...nhai.org.in/spw/CorrespondenceIssues/302-AECOMHWH2014-15GOA.pdf · AtrcoM l_:\{ }{ t lt tff ... For Hume Pipe Culvert

// ,trjCOM."[Y,f,'nk

tn associationwith'!;t'":ttt:')::':t#@ffi

O/o Construction Supervision ConsultantsFi rst floor, Nikhitha Buitding

B.B Road,Kundhapura - 576201Udupi-dist,Kamataka

Ph- 08254 230575www.aecom.com and www.rodicconsultants.com

10.23 Drawing No. AA/1544ISTR/I{PC/259740/001(Rev.R4) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 259+7 40

10.24 Drawing No. AN|544/STR/HPC/260538/001(Rev.R3) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 260+538

10.25 Drawing No. AA/1544/STR/I{PC/2615821001(Rev.R4) GAD for Hume Pipe Culvert (Widening)at Design Ch.26l+582

10.26 Drawing No. ANl544lSTNHPCl264848/001(Rev.R4) GAD for Hume Pipe Culvert(Reconstruction) at Design Ch. 264+848

10"27 Drawing No. AA/1544ISTR/HPC/2654921001(Rev.R4) GAD for Hume Pipe Culverr (Widening)at Design Ch.265+492

10"28 Drawing No. AA/1544/STR/HPC/2702731001(Rev.R5) GAD for Hume Pipe Culvert (Widening)at Design Ch.270+273

I l. For Hume Pipe Culvert at Design CH. 253+382 (at Sl. No. 10.19), CH.259+740 (at Sl. No. 10.23)and CH' 270+273 (at Sl. No. 10.28), RE wall is proposed to retained earth cushion. For proposedRE wall and head wall over pipe stability calculations to be submitted. Details of inlet and outletchannels on upstream and downstream to be shown and details of protection on U/S and D/S to beprovided. Details to be submitted along with modified drawings.

Drawings need modifications in the light of the above observations. One set of reviewed drawings aslisted in point no.-10 incorporating modifications/ corrections in red is enclosed for further action at yourend.

Thanking you and assuring you ofour highest considerations.

With regards,AECOM Asia Company Ltd. in Association withRodic Consultants hrt" Ltd

(Anil Kumar Singh)Acting Team Leader

CC: l. The Project Director, (NHAI) PIU- Mangalore2" AECOM Asia Company Ltd, Gurgaon3" Rodic Consultants Pvt" Ltd. Gurgaon

For kind information please

AECOM Asia Oompany Ltd" in association with RODIC Consultanb Pvt. Ltd.